Agreement Routing Form
• For Approvals, Signatures and Records Management
T This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
KEN
W A S H I N O T O N (Print on pink or cherry colored paper)
Originator: Department:
C. Frame PW Engineering
Date Sent: Date Required:
11 /8/2022 10/27/2022
Authorized to Sign: Date of Council Approval:
❑ Director or Designee El Mayor 5/17/2022
Budget Account Number: Grant? ❑ Yes 0 No
R20119.64110.120
Budget? 0 Yes ❑ No Type: N/A
Vendor Name: Category:
Lakeside Industries, Inc. Contract
Vendor Number: Sub -Category:
34030 Change Order #3
Project Name: 2022 Asphalt Overlays
In accordance with revision 2, add eight(8) speed bumps with associated signage and pavement markings in the South Park neighborhood. Add three(3) ADA ramps,
Project Deta i I s: associated sidewalk curb & gutter, rolled curb, residential driveway approach, storm extension and sign relocation at W Sipe St and 2rd Ave N. Add re-channelization on
132nd Ave SE that will add a two way left turn lane North of the SE 240th St intersection. Add channervadon and painting of extruded curb to a lane North or the SE 240th
St intersection. Add channelization and painting of extruded curb to a City of Kent constructed crossing on Reith Rd. East of 38th Ave S.
Agreement Amount: $103,269.50 Basis for Selection of Contractor: Bid
Start Date: N/A Termination Date: 150 Working Days
Local Business? ❑ Yes ❑ No*
*If meets requirements per KCC 3.70.100, please complete "Vendor Purchase -Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
❑ Yes 0 No
Date Received by City Attorney:
KENT LAW DEPT.
Date Routed to the Mayor's Office:
Contract Number:
CAG2022-216
Comments:�
Date Routed to the City Clerk's Office: ii� `1 , A w'
1 i
Visit Documents.KentWA.gov to obtain copies of all agreements
KENT
WASHINGTON
CHANGE ORDER NO. #3
NAME OF CONTRACTOR:
CONTRACT NAME & PROJECT NUMBER:
ORIGINAL CONTRACT DATE:
Lakeside lndu5tries, Inc. ("Contractor")
2022 Asphalt Overlays
May 17. 2022
This Change Order amends the above -referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
In accordance with Revision 2, add eight (8) speed bumps with associated signage and pavement
markings in the South Park neightborhood; add three (3) ADA ramps, associated sidewalk, curb
& gutter, rolled curb, residential driveway approach, storm extension, and sign relocation at W
Sipe St and 2nd Ave N; add rechannelization on 132nd Ave SE that will
add a two way
left turn
lane North of the SE 240th St intersection; add channelization
and painting of extruded curb to a
City of Kent constructed crossing on Reith
Rd, east
of
38th
Ave S.
Description
I Unk Price
ny
Unka
Amount
Mobiiization-Revision 2 Sch II)
IQua
11,300.00
L
00.00
11,3112"
Ductile Iron Pipe20 (Sch II)
I Speed Bumps (Sch II)
1 4,400.00 1
1.00
LS
$ 4,400.00
1Reoocate Existing Barricade (Sch 11)
i 5,000.00 I
i 1,200.00 1
8.00
1.001
EA
LS
I $ 40,000.00
$ 1.200.00
Iclearing and Grubbing (SchR
1 5,500.00 I
1.00
LS
$ 5,500.00
1 Remove Cement Concrete Sidewalk (Sch 11)
I 44.00 I
11.501
SY
$ 506.00
Remove cement Concrete Curb and Gutter (Sch 4)
i 11.00 I
40.001
LF
1 $ 440.00
JCement Concrete Driveway 6 inch Deep (Sch II)
1 85.00
10.00
SY
850.00
(Cement Concrete Sidewalk (Sch II
Jrype
55.00
6.001
SY
330.00
ICement Concrete Sidewalk Ramp Parallel A (Sch II
(Cement
I 2,300.00
2.001
EA
I $ 4,600.00
Concrete Sidewalk Ramp Type Combination (Sch II)
1 2,800.00 I
1.001
EA
1 $ 2.800.00
Cement Concrete Rolled Curb and Gutter (Sch II)
1 32.00 I
17.001
LF
1 $ 544.00
Cement Concrete Curb and Gutter (Sch II)
i 32.00 I
65.001
LF
1 $ 2,080.00
Pedestrian Curb (Sch II)
36.00 I
41.001
LF
1,476.00
Per7panent Signing Incl. Post and Foundation (Sch II)
I 850.00 1
4.001
EA
3,400.00
(Traffic Pylon (Sch II)
I 105.00 1
1.001
EA
1 $ 105.00
Plastic Crosswalk Line (Sch 10
i 8.00 I
100.001
SF
1 $ 800.00
Plastic Stop Line 24 inch Wide (Sch 11)
i 14.00 i
26.00
LF
1 $ 364.00
ISawcut Existing Asphalt Concrete Pavement
i 6.00 I
90.001
LF
1 $ 540.00
1 Painting Traffic Curb (Sch U)
I 1.50 1
110.001
LF
1 $ 165.00
ISeeding and Fertilizing by Hand (Sch A)
i 10.00 1
25.001
SY
j $ 250.00
(Increase Old Item 2010 Remove Existing Asphalt Concrete Pavement (Sch II
1 28.00
37.00
SY
I $ 11036.00
Increase Bid Item 2050 Saw Cut Existing Asphalt Concrete Pavement (Sch II�
1 6.00 I
38.001
LF
I $ 228.00 1
Increase Bid Item 2075 Gravel Borrow, Including Haul and Compaction (Sch II)
1 35.00
25.001
TON l
$ 875.00 1
!Increase Bid Item 2080 Crushed Surfacing Top Course, 5/8 Inch Minus (Sch II)
1 40.00
10.001
TON I
$ 400.00 i
IIncrease Bid Item 2095 HMA Class 1/2", PG SSV-22 (Sch II)
1 175.00
20.001
TON 1
3,500.00
1 increase Bid Item 2505 Traffic Control Labor (Sch �)
1 75.00
80.001
HR
6,000.00 1
(Increase Bid Item 2510 Traffic Control Supervisor (Sch III)
1 100.00
70.001
HR
$ 7,000.00 I
Increase Bid Item 2600 Double Yellow Centerline Paint Stripe (Sch II)
1 0.55 11650.001
LF
$ 907.50 I
11ncrease Bic! Item 2630 Plastic Traffic Arrow (Sch n)
I 212.00 1
4.00
EA
$ 848.00 I
1Increase Bid Item 2800 Inlet Protection (Sch II)
I 75.00 1
11.00
EA 1
$ 825.00 I
CHANGE ORDER - 1 OF 3
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $3,851,364.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $420,564.00
(incl. applicable WSST)
Current Contract Amount $4,271,928.00
(incl. Previous Change Orders)
J Current Change Order 1 $103,269.50
Applicable WSST Tax on this Change I $0.00
Order j
Revised Contract Sum
Original Time for Completion
(insert date)
Revised Time for Completion under
prior Change Orders
(insert date)
1 $4,375,197.50
130 working days
140 working days
Days Required (f) for this Change Order 110 calendar days
Revised Time for Completion 150 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
CHANGE ORDER - 2 OF 3
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR:
By:
(signature)
Print Name: 5Aw,- PWA--
Its Prn , t tt /41wa4v—
(Ntle)
DATE: /0-7-4
CHANGE ORDER - 3 OF 3
CITY OF KENT:
By:J
(sign re
Print Name: Dana lk n
Its Mavor
�\ ( tli/e)
DATE: �� I f - __
ATTEST:
Kent City Clerk
c[In this flefd, you may enter the electronic flWath where the contract has been saved]
CHANGE ORDER - 4 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
File No. 200.2
KENT
Wg5H1YGJ� CHANGE ORDER WORKSHEET NO. 3
Construction Engineering Division - Public Works
Project: 2022 Overlay Project No: 22-3001.1
Project Engineer: Drew Holcomb Fed -Aid No:
Capital Projects Brian Shields Contractor: Lakeside Industries, Inc
Matn,aaer:
Date: 10/17/2022
I. Proposed Change
This change makes the following revisions to the Contract Documents and provides compensation for
added work:
In accordance with Revision 2, add eight (8) speed bumps with associated signage and pavement
markings in the South Park neightborhood; add three (3) ADA ramps, associated sidewalk, curb &
gutter, rolled curb, residential driveway approach, storm extension, and sign relaction at W Sipe St and
2nd Ave N; add rechannelization on 132nd Ave SE that will add a two way left turn lane North of the SE
240th St intersection; add channelization and painting of extruded curb to a City of Kent constructed
crossing on Reith Rd, east of 38th Ave S.
II. Reason and Background for Change
During the construction phase of the City of Kent 2022 Overlay project, Transportation Engineering
determined the necessity of speed bumps in the South Park neighborhood, ADA accomodations in the
North Park neighborhood, and channelization additions to both SE 240th St & 132nd Ave SE and at Reith
Rd (east of 38th Ave S). These were reflected in Revision 2, signed July 21, 2022.
III. Method of Payment
NEW PAY ITEMS ❑Not applicable
Sch.
Item Description
No
II
Mobilization - 235th pipe repair
II
12" Ductile Iron Pipe 20' length
II
Speed Bumps
II
Relocate Existing Barricade
II
Clearing and grubbing
II
Remove cement concrete sidewalk
II Remove cement concrete curb and gutter
II Cement concrete driveway 6 inch depth
II Cement concrete sidewalk
0
Total Est.
Total Estimated Cost of
Oty
Unit
Unit Price
Item
1
LS
$11,300.00
$
11,300.00
1
LS
$4,400.00
$
4,400.00
8
EA
$5,000.00
$
1
40,000.001
1
LS
$1,200.00
$
1,200.00
1
LS
$5,500.00
$
5,500.00
11.5
SY
$44.00
$
506.00
40
LF
$11.00
$
440.00
10
SY
$85.00
$
850.00
6
SY
$55.00
$
330.00
Page 1
II
Cement concrete sidewalk ramp type
I
I parallel A I
2
EA
I $2,300.00
I $
II
I Cement concrete sidewalk ramp type
combination I
1
EA
I $2,800.00
I $
II
I Cement concrete rolled curb and gutter
17
I LF
I $32.00
I $
II
I Cement concrete curb and gutter I
65
I LF
I $32.00
I $
II
I Pedestrian curb I
41
I LF
I $36.00
I $
II
I Permanent signing incl post and
foundation I
4
I EA
I $850.00
I$
II
I Traffic Pylon I
1
I EA
I $105.00
I$
II
I Plastic crosswalk line I
100
I SF
I $8.00
I $
II
I Plastic stop line 24 inch wide I
26
I LF
I $14.00
I $
II
I Sawcut existing asphalt concrete
pavement I
90
I LF
$6.00
$
II
I Painting traffic curb I
110
I LF
I $1.50
I $
III
I Seeding and fertilizing by hand I
25
I SY
I $10.00
I $
New Pay Items Total:
$
DELETE EXISTING PAY ITEM(S) per 1-09.5 El Not applicable
Sch
No.
Bid Item No.
Item Descri tion
P
Qty
Unit
Unit Price
Delete Existing
Pay Items Total:
$
INCREASE/DECREASE TO EXISTING PAY
ITEM(S)
❑ Not applicable
Sch
Bid Item No. Item Description
P tion
Qty I
Unit
Unit Price
II
2010 Remove existing asphalt
37
SY
$28.00
$
concrete pavement
II
2050
Sawcut existing concrete
38
LF
$6.00
$
pavement
II
2075 Gravel Borrow incl. haul
25
TON
$35.00
$
and compaction
II
2080
CSTC
10
TON
$40.00
$
II
2095
HMA Class 1/2" PG 58V-
20
TON
$175.00
$
22
II
2505
Traffic control labor
80
HR
$75.00
$
II
2510 Traffic control supervisor
70
HR
$100.00
$
Page 2
4,600.00
2,800.00
544.00
2,080.00
1,476.00
3,400.00
105.00
800.00
364.00
540.00
165.00
250.00
81,650.00
Cost of Item
Cost of Item
1,036.00
228.00
875.00
400.00
3,500.00
6,000.00
7,000.00
II 2600 Double yellow centerline 1,650 LF $0.55 $ 907.50
paint stripe
11 2630 Plastic traffic arrow 4 EA $212.00 $ 848.00
if 2800 I Inlet protection 11 EA $75.00 $ 825.00
II I I $
Increase / Decrease to Existing Pay Items Total: $ 21,619.50
*TOTAL ESTIMATED COST OF CHANGE ORDER: $103,269.50
* Total of the Cost of Item Columns
IV. WORKING DAYS
I
Original Contract: 130 � Due This Change Order:1 10
Explanation/3ustification for Additional Working Days:
Previous Total: 140
*TOTAL WORKING DAYS: 150
* This Change Order + Previous Total
Capital Projects Manager: (Xtan
B Shields
Construction Engineering
Supervisor: 1-10�1rt
,,�,-�e,`,7ason Barry
Construction Manager:
€ric Connor
Page 3
Date: /U 7 ~ 1 7,2,
Date:
Date: /0/1�/� �
LAKESIDE
INDUSTRIES
Lakeside industries, Inc.
lakesideindustries.com
P.U. Box 7016 /Issaquah, WA 95027
ph: 425.313.2600 / fax: 425.313.2622
Washington Contractor License No. LAKESI.274JD
Oregon Contractor License No. CC8 108542
Equal Opportunity Employer
PROPOSAL CONTRACT AGREEMENT
To:
City of Kent
Address:
220 - 4th Ave S
Kent, WA 98032
Project Name: 2022 Kent Overlay Revision #2
Project Location: Kent, WA
Item #
Item Description
001
Speed Bumps
002
12" Ductile To Extend Storm
003
Relocate Existing Barricade To Proposed East End Of
Sidewalk
004
Clearing And Grubbing
1000
Mobilization
1010
Remove Existing Asphalt Concrete Pavement
1020
Remove Cement Concrete Sidewalk
1025
Remove Cement Concrete Curb And Gutter
1050
Sawcut Existing Concrete Pavment
1055
Saw Cut Existing Asphalt Concrete Pavement
1075
Gravel Borrow Including Haul And Compaction
1080
CSTC
1095
HMA Class 1/2" PH 58V-22
1140
Cement Concrete Driveway 6 Inch Depth
1145
Cement Concrete Sidewalk
1170
Cement Concrete Sidewalk Ramp Type Parallel A
1180
Cement Concrete Sidewalk Ramp Type Combination
1200
Cement Concrete Rolled Curb And Gutter
1205
Cement Concrete Curb And Gutter
1211
Pedestrian Curb
1295
Permanent Sign Including Post And Foundation
1505
Traffic Control Labor
1510
Traffic Control Supervisor
1560
Traffic Pylon
1595
Double Yellow Centerline Paint Stripe
1615
Plastic Crosswalk Line
1625
Plastic Stop Line (24) Inch Wide
1630
Plastic Traffic Arrow
1660
Painting Traffic Curb
1800
Inlet Protection
1830
Seeding And Fertilizing By Hand
Contact: Brian Sheilds
Phone: (253) 856-5654
Fax:
Bid Number:
Bid Date: 9/20/2022
Estimated Quantity Unit Unit Price
8.00 EACH
1.00 LS
1.00 LS
1.00 LS
1,00 LS
37.00 SY
11.50 SY
40.00 LF
38.00 LF
90.00 LF
25.00 TON
10.00 TON
20.00 TON
10.00 SY
6.00 SY
2.00 EACH
1.00 EACH
17.00 LF
65.00 LF
41.00 LF
4 irs 0 EACH
80.00 HR
70.00 HR
1.00 EACH
1,650.00 LF
100.00 SF
26.00 LF
4.00 EACH
110.00 LF
11.00 EACH
25.00 SY
Total Bid Price:
$5,000.00
$4,400.00
$1,200.00
$5,500.00
$11,300.00
$28.00
$44.00
$11.00
$6.00
$6.00
$35.00
$40.00
$175.00
$85.00
$55.00
$2,300.00
$2,800.00
$32.00
$32.00
$36.00
$850.00
$75,00
$100.00
$105.00
$0.55
$8.00
$14.00
$212.00
$1.50
$75.00
$10.00
Notes:
• Price Based on 1 Mobilizations.
• Performance Bond not included in bid price. If required please add 1% to total cost of bid.
• Bid based on approved contract, This proposal & Lakeside Provisions to be a part of all contract documents.
• Lakeside Industries is not responsible for designed cross slopes of less than 1% that hold water after paving is complete.
• Price based on current petroleum cost. Price escalation to be linked to the WSDOT/ODOT asphalt binder index.
Total Price
$40,000.00
$4,400.00
$1,200.00
$5,500.00
$11,300.00
$1,036.00
$506.00
$440.00
$228.00
$540.00
$875.00
$400.00
$3,500.00
$850.00
$330.00
$4,600.00
$2,800.00
$544.00
$2,080.00
$3,400 '47
6.00
$6,000.00
$7,000.00
$105.00
$907.50
$800.00
$364.00
$848.00
$165.00
$825.00
$250.00
$103, 269.50
9/23/2022 12:08:27 PM Page i of 2
Connor, Eric
From:
Sent:
To:
Cc:
Subject:
Attachments:
Good Afternoon Brian,
Connor, Eric
Friday, October 14, 2022 3:01 PM
Shields, Brian
Barry, Jason
FW: 2022 Asphalt Overlay - Revision 2 Pricing
Revision 2 Updated pricing (ec).pdf
We have approval to proceed with the change order based on the attached.
Thank you for your work negotiating the proposal for this revision with the contractor.
Eric
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT, WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Bieren, Chad <CBieren@kentwa.gov>
Sent: Friday, October 14, 2022 2:49 PM
To: Connor, Eric <EConnor@kentwa.gov>
Cc: Peterson, Kelly <KPeterson@kentwa.gov>; Barry, Jason <JBarry@kentwa.gov>
Subject: RE: 2022 Asphalt Overlay - Revision 2 Pricing
Hi Eric,
I've reviewed the attachments, please proceed with a change order for the revised work.
Thank you,
Chad
Chad Bieren, P.E. Public Works Director
Engineering Administration I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5534 1 Cell 253-740-9139
cbieren(@KentWA.aov
CITY OF KENT, WASHINGTON
KentWA.ciov Facebook YouTube Instagram
From: Connor, Eric <EConnor@kentwa.gov>
Sent: Friday, October 14, 2022 1:55 PM
To: Bieren, Chad <CBieren@kentwa.QOV>
Cc: Peterson, Kelly <KPeterson@kentwa.F!ov>; Barry, Jason <JBarrv@kentwa.gov>
Subject: 2022 Asphalt Overlay - Revision 2 Pricing
1
Good Afternoon Chad,
Construction received Revision 2 for our 2022 Asphalt Overlay project on 7/21/22. This revision
is adding 8 speed bumps in the South Park neighborhood, 2 curb ramps at the intersection of 2nd
Ave N and W Sipe St, rechannelization on 132" d Ave SE, and a new crosswalk on S Reith Rd,
East of 38t" Ave S.
Pricing has been proposed, negotiated, and reproposed. New pay items are being proposed for
the speed bumps, 12" DI storm pipe, barricade relocation, clearing & grubbing, and
mobilization. With quantities agreed to by staff in Construction, the contractor is proposing to
complete all other work associated with this revision at the contract's existing bid item unit
prices. The final proposed price for this revision is $103,269.50. This is 2.6% of the base
contract amount.
Are you okay with proceeding with a change order to add this revision to our contract with
Lakeside Industries on this project?
Please let me know if you need any additional information or would like to discuss.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT, WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Shields, Brian <BShields@kentwa.gov>
Sent: Friday, October 14, 2022 11:51 AM
To: Connor, Eric <EConnor@kentwa.Rov>
Cc: Barry, Jason <JBarrv@kentwa.gov>
Subject: FW: Revision 2 updated quantities and pricing
Thank you for the reminder!!
Brian Shields, Capita/ Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 1 Desk 253-856-6510
bshields(abKentWA.gov
CITY OF KENT, WASHINGTON
KentWA.gov Facebook YouTube
From: Shaun White <Shaun.White@lakesideindustries.com,>
Sent: Friday, September 23, 2022 12:21 PM
To: Shields, Brian <BShields@kentwa.gov>; Barry, Jason <JBarrv@kentwa.gov>
Cc: Andrew Chu <Andrew.Chu@ lakesideindustries.com.>; Pat Tavenner <Pat.Tavenner@lakesideindustries.com,>
Subject: Revision 2 updated quantifies and pricing
EXTERNAL EMAIL
Brian,
Please see updated pricing and quantities. We have added seeding and lowered the quantities on some items to get
closer. Also good catch on the clearing and grubbing as I fat fingered it and had 2 days for the team and truck. This has
also been adjusted and back up provided.
Shaun White, Project Manager I Lakeside Industries, Inc. I t 253.631.3611 1 c 206.396.5371
shaun.white@lakesideindustries.com
Kent Division 1 18808 SE 256t" Street I Covington, WA 98042 1 www.lakesideindustries.com
ffLAKESIDE
INDUSTRIES
Shields, Brian
From: Brown, Rob
Sent: Tuesday, October 4, 2022 2:24 PM
To: Connor, Eric; Shields, Brian
Cc: Holcomb, Drew; Hawkes, Derek; Preston, Erik; Peterson, Kelly
Subject: FW: 2022 Overlay - Ramps change order
Attachments: SHEETS 74-77 -rb.pdf
Eric and Brian,
Chad asked if it would be possible to change the signing for the change order (I do not seem to have the
final) for speed humps in the neighborhood south of Willis. The design has two signs per location. We can
change the signing to "Area Speed Bumps" at the four entrances to the neighborhood and reduce the
signs form 16 to 4. The discussion was around the signing and the number of signs, not a cost reduction.
-..
From: Brown, Rob
Sent: Thursday, July 14, 2022 12:06
To: Holcomb, Drew <DHolcomb@kentwa.gov>; Hawkes, Derek <DHawkes@kentwa.gov>; Preston, Erik
<EPreston@kentwa.gov>; Connor, Eric <EConnor@kentwa.gov>; Shields, Brian <BShields@kentwa.gov>
Cc: Maloney, Carla <CMaloney@kentwa.gov>; Fealy, Angella <AFealy@kentwa.gov>; Peterson, Kelly
<KPeterson@kentwa.gov>
Subject: RE: 2022 Overlay - Ramps change order
Hi Drew. Looks good. A few comments from us.
. $7
From: Holcomb, Drew <DHolcomb@kentwa.gov>
Sent: Wednesday, July 13, 2022 17:59
To: Brown, Rob <RBrown@kentwa.gov>; Hawkes, Derek <DHawkesC@kentwa.gov>; Preston, Erik
<EPreston@kentwa.gov>; Connor, Eric <EConnor@kentwa.gov>; Shields, Brian <BShields@kentwa.goy>
Cc: Maloney, Carla <CMalonev@kentwa.gov>; Fealy, Angella <AFealy@kentwa.gov>; Peterson, Kelly
< K Peterson @ ke ntwa . g ov>
Subject: RE: 2022 Overlay - Ramps change order
Hello all,
Please review the attached plans for the requested change order on the 2022 Overlay. I believe
these meet the sketch Erik provided but would like to have another set of eyes before we issue
these as a revision. I will update my cost estimate now that we have closer to finalized plans and
respond to this email.
Please complete your review by 7/20/22.
Thank you,
Drew Holcomb, P.E. Design Engineer III
Design Engineering I Public Works Department
PUBLIC WORKS DESIGN ENGINEERING
Carla Maloney
Design Engineering Manager
T� 400 West Gowe
KENT
Kent, WA 98032
W R " ^ � r Fax: 253-856-6500
PHONE: 253-856-5500
Date: July 21, 2022
To: Eric Connor, Construction Engineering Manager
Cc: Jason Barry, Construction Supervisor
Brian Shields, Capital Project Manager
Carla Maloney, Design Engineering Manager
From: Derek Hawkes, Engineering Supervisor
Drew Holcomb, Project Engineer
Regarding: 2022 Asphalt Overlay Project
Project No. 22-3001.1
Revision No. 2
ADD Sheet 74
Additional speed bumps (not speed cushions, these will NOT have the emergency
vehicle cutout) and associated bump signage and channelization added to the South
Park neighborhood.
ADD Sheet 75
Additional ADA ramps and associated sidewalk, curb gutter, rolled curb, residential
driveway approach, storm extension, and sign relocations need to construct these
ramps at 2nd Ave and Sipe St. in the North Park neighborhood.
ADD Sheet 76
Rechannelization on 132nd Ave SE that will add a two way left turn lane north of the SE
240th St intersection.
ADD Sheet 77
On Reith Rd. the City will construct a crossing including extruded curb. This sheet will
add channelization and painting of this extruded curb to the contract.
Attachments: Sheet 74-77
Z�� 440dil-
Drew Holcomb
Project Engineer
City of Kent Public Works Department
Chad Bieren, Public Works Director
! ! 1
I Ie t
is smim 3
I
10_ ZA
�oz
Zx�
po
J OLLtld ONLLSIX3 Ol ,S'Z
9
S
W
09 Z Y6w
cWi#�N
z
Qix�
�
M
r3w
® AOZ
Slb
U
W
�
I
I
1
w
V)
I -
- -� -- �*
Z I
I
Q 1
1
z
2 1
i
N
1
i
z
Fo I
I
UUF
rom
tt N011tl N19WOO V o a o--
:3dU dP,tlN SWO 0,9
0'S NIV
/211SIX3
o
dl1'fL '�NgNtl'1 dIY��
F-�
I —_
1S UIS M m�
awe
'
------------•
aka
i oo 4.6'
I ! -
I who xo��w
ttN I 6
i �mW zza��M
� I UJ64�Z
.�
LL 3
3NI MOIL
01 01 .0'L
m�a
U64
_INE SEE BELOW
U )
Q
i �
I
I
I
o
N++
I
3
L1SH10bZ3S
�
�Q<�
I
I ZgYza'i�a��
_
a
C1 <
a
¢
O
-
3AOBV 33S 3NIIHOlVW
L
-01
J
Q
3
in
W
0
0
a
U
Y
a
a
Y
V
W
Z
w
w
F-
V)
3
L®
R
E
s
g
J
2
3
a
a
N
N
='
A
a
SE 1 /4, SEC. 13, T 22 N, R 4 E, W.M.
�1
-�-
I
�Z 2ND AVE N I
CURB TRANSITION 1 0o
o I PARCEL NO. 132204-9019
0 o PER COK STD 18 I I LARC ® KENT STATION LLC
PLAN 6-33 FULLCU
HEIGHT
------ - - - -
----------- BEVEL D END 'Q./\ I I 1001 1ST AVE N
------
180
ADJUST C
BASIN TO MATCH �� DEPRESSED CEMENT � ' I 10
2.0' FROM j CURB TRANSITION 6.0' I,1' 3j ® �� CONCRETE SIDEWALK/RAMP I a
DRIVEWAY TO CBI I 2 0 \ WITH CURB REVEAL PER I o
�ry o DETAIL 1, THIS SHEET z
ILI
CURB TRANSITION — — - �` I w
PER COK STD \ .0 RAMP 4_< oo °° �\ I o
MAX 0X ° °° �\� � FULL HEIGHT PROTECT �
PLAN 6-33 45 17,p RAMP 1 5% oQ /\ CURB WITH EXISTING
1140 6,0, - MAX h�,e \ \ BEVELED END TREE i ri
__..
�t V—o is 1�P+� \ 7025 ``I n
SIDEWALK REMOVAL ` 0•
\ 1050 L� �,. ^ i b m I
LIMITS 10201055 055 \-- MAX I 'n
®� - \ \ - - - - - - - - - - ------ - ---I
Z
.5%EXIST R/W Xi M,
MATCH EXISTING CEMENT z MIx. M
�� OD/vCONCRETE DRIVEWAY RELOCATE EXISTING FQ
17ao BARRICADE TO PROPOSED I s� � °°° 1 :n 1-
1.5%
EAST END OF SIDEWALK - I 11 W a MAX I
1 a x I 6
TO NECT EXISTING PIPE 15% 121
USING FERNCO OR AS MAX (n ^ s
APPROVED BY ENGINEER D_ 5.0,
PARCEL NO. 614760-0149 CURB RAMP TYPE: s v 121 I
KUMAR PRADEEP+NANDA FILL WITH GRAVEL PARALLEL A 117 x 1 I
944 2ND AVE N BORROW AND SEED PER I
NOTE 3 i 5.0.
I
I
12" DUCTILE i tta I
IRON PIPE
o I 20.0' I
NOTES: I
1. SEE CURB RAMP GENERAL NOTES ON SHEET 2. I iT i 1
2. SEE DETAIL B, SHEET 5 FOR TYPICAL EXTEND DUCTILE IRON PIPE OUTSIDE
SIDEWALK/RAMP CONSTRUCTION. OF FILL FOR RAMP AND SIDEWALK 1; �� RELOCATE EXISTING BARRICADE I ~
3. GRADE BEHIND CURB RAMP AND LANDING AT
3:1 MAX TO EXISTING CONDITIONS, SEEDING 183 CONSTRUCTION. INVERT TO MATCH I I X
EXISTING BOTTOM OF DITCH ELEVATION I I AND MOUNT FIXED
BARRICADE PER
6-71B I
1 I
W SIPE ST & 2ND AVE INTERSECTION (E) A
SCALE: 1 "=5' —
11830118351
1205 CEMENT CONCRETE SIDEWALK TO MATCH FLOWLINE —LANDSCAPE RESTORATION
PAVEMENT
CURB AND GU3TER,ELEVATION AT BACK OF CURB MATCH EXISTING GRADE
SECTION 4" CEMENT CONCRETE
PER DETAIL SIDEWALK / RAMP
B, SHEET 5
7145 1.5%
�3 1 SLOPE- \
���� 2" CRUSHED SURFACING -max
v TOP COURSE (CSTC)
CURB REVEAL
DETAIL
1
N TS
-
DESIGNED:
BRAA
CHECKED: KENT PROJECT NO SCALE:
DNH 1"=5,
22-3001.1
BAR I$ ONE INCH ON Cityof Kent
DRAWN:
HORIZ:
PROJECT ENGR. CONST. MGMT. REVEW —
I I
ORIGINAL DRAWING
ADJUST SCALES Public Works Department
REVISED PER REVISION 2
JBRAA 7.18.22 BRAA
APPROVED:
ASH VERT:
DATE
ACCORDINGLY
KENT Engineering Division
N0. REVISION
BY DATE
-CITY ENGINEER
w� y
ca (m
0� .y,. IJ83J
�SSJOHAt 8�a\
SHEET
W SIPE ST AND 2ND AVE 2022 ASPHALT OVERLAY 75 of 77
CURB RAMPS FILE NO. z2-SiP, St
a I1 Curb Rampa
0eC.,
G: \Design\22-3001 2022 Asphalt Overlay\Sheet Files\22-3001.1 Sipe St and 2nd Ave Curb Ramp Detalls.dwg 7/20/2022 5:34 PM
PARCEL NO. 162205.9103
WANDERING CREEK
APARTMENTS
12910 SE 240TH ST
PARCEL NO. 162205-9116
76 MY GOODS MARKET
13122 SE 240TH ST
SE, SW 1 /4, SEC. 15 & 16, T 22 N, R 5 E, W.M.
I
PARCEL NO. 162205-9103
PARCEL NO. 162205-9132 WANDERING CREEK
CAR WASH APARTMENTS
23907 132ND AVE 12910 SE 240TH ST
--------------------7�----- -----
__LT_Uuj - p
1595 � 1800
--- - — — 2MK 1595 -
100.00'
1101+00— y 1102+00
f t
STING DYCLf -- —
MATCH EXI
1800
----------------------------------------------�
PARCEL NO. 152205-9140 PARCEL NO. 152205-9149
MERIDIAN VALLEY PROFESSIONAL CTR MERIDIAN VALLEY PROFESSIONAL CTR
13200 SE 240TH ST 13210 SE 240TH ST
PARCEL NO. 873173-0730
CITY OF KENT
VACANT
-------------------------------- ----------------------
4 �
0
----------- — d3
o
d3 d3
a,8.70'--------�---
C7 I
m
Q +00 n 1107+00-1108+00
W 1595 Io 1595 BEGIN TAPER
g --- —
LLJ
Z — — ❑
J 1800
1105+00
d3
------------- d3 ----- d3 ------
PARCEL NO. 152205-9181
CITY OF KENT
VACANT
s
D
--f
n
rrt
1800
0
n
132ND AVE SE 110C rri
r'1
r
— --- - -- pC
d3 d3 <
-----------------
PARCEL NO. 873173-0710 I
SANTPS OLIVA DAMARYS & FERR /
13119 SE 236TH PL
J
CL
------------ _ -
c~D
4 MAR TAPER
d3 CH SHOULDER
- - d3 13 - -EP � - EP EF
- - -- - d3 - -- d3 d3
1109+00 1110+00 1111 +00
END TAPER
MATCH EXISTING DYCL
U
Q PARCEL NO. ,
152205-9181 =— — -- —------------=�-----------^-----
CITY OF KENT
VACANT ��\ PARCEL NO. 152205TR-C
PARCEL NO. 152205-9188
— VACANT
NOTES:
1. CONTRACTOR SHALL REFERENCE EXISTING PAVEMENT MARKINGS PRIOR TO
PLAREPLACED CED IN KINOUSIND AT THEAVEMENT EXISTIINGERLOCAATONALL N NELIZATION SHALL BE
UNLESSOTHERWISE DIRECTED.
CONTRACTOR SHALL REFER TO KENT STANDARD PLANS 6-74, 6-75 AND
6-79. SEE SPECIAL PROVISIONS 1-05.5 "REFERENCING EXISTING PAVEMENT
MARKINGS" (INCIDENTAL).
DESIGNED: CHECKED: KENT PROJECT NO SCALE: - BAR IS ONE INCH ON I City of Kent
BRAA DNH ( 22-3DD1.1 HDRIz. 1•-ZQ ORIGINAL DRAWING TT
PR03ECT ENGR.A$I'I ICONS,
. MGMT. REVIEWi ADJUST SCALES Public Works Department
BRAA VERT ACCORDINGLY REVISED PER REVISION 2 BRAA7.18.22JDRAWN;
APPROVED DATE o.. I RCTEngineering Division
BY DATE _ CITY ENGINEER .. r,ixo•ox
N0. REVISION -
Cl)
W
_ N
EP
— 1111+89
a3 d3
--------PARCEL NO. �
/ I
RAFTS AVI RAWF
SE 236TH PLC\\�\
yPTHAAi
�. of Asej 11y
z �7
ca �
A 9s E�
ASS/ONAL Eta
SHEET
76 OF 77
TWO WAY LEFT —TURN LANE 2022 ASPHALT OVERLAY
132ND AVE SE AND SE 240TH ST F,LE NO. zz-'°°" 132
G:\Design\22-3001 2022 Asphalt Overlay\Sheet Files\22-3001.1 132nd Chonnelizattoa.dwg 7/18/2022 9:50 AM
1
/
/
/
/
/
/
/
J /
J
EP
S� R
NW 1 /4, SEC. 27, T 22 N, R 4 E, W.M.
PARCEL NO. 272204-9005
CITY OF KENT
WEST FENEWICK PARK
3808 REITH RD
E-P
\\ _ TRAFFIC CURB CONSTRUCTION NIC,
\` TO BE CONSTRUCTED BY OTHERS.
0 �-�� PAINT NG TRAFFIC CURB
\\\\ WHITE 1660
- Ep � \
\\ TYP 1515 27.0p.\�
% / / EP
/ PARCEL NO. 272204-9032
TRINITY REFORMED CHURCH
/ 3807 REITH RD
WEST FENEWICK PARK CROSSWALK
eP `�
\
00�►,w 1625
2.00. TO ENp OF\ - 1560\`\\`\\\
CURE \\ -
\
TRAFFIC CURB CONSTRUCTION NIC, \\\`
TO BE CONSTRUCTED BY OTHERS. \�
PAINT EXISTING TRAFFIC CURB
WHITE 1660
PARCEL NO. 272204-9005
CITY OF KENT
WEST FENEWICK PARK
3808 REITH RD
A7bq \ \\
Ep —
wAN
NOTES: 2t7l
Q
1. ENGINEER TO FIELD VERIFY ALL CHANNELIZATION. 57937
e'rSIONAL F'�G
(T� ` SHEET
BAR 15 ONE INCH ON City of Kent I 77 OF 77
' DESIGNED: (CHECKED DNH IKINT2
PROJECT N0. (SCALE: 1—ZOWEST FENEWICK PARKBRAA 2-3001.1 HORVZ: ORIGINAL DRAWING L7 f- Department 2022 ASPHALT OVERLAY
PROJECT ENGR:ASH CONST. MGMT. REVIEW ADJUST SCALES PUi)iIC Works Department CROSSWALK (FILE NO. 22-30011 West Fene�'ick
jORAWN: BRAA VERT' ACCORDINGLY \ 0 Pew
REVISED PER REVISION 2 BRAA 7.18.22 PPRoveD: DATE D, r I s �GNT Lngineering Division
BY DATE I - clTv ENGmEER w..n�..*o. G:\Design\22-3001 2022 Asphalt Overlay\Sheet Files\22-3001.1 West fenewick Park.dwg 7/18/2022 3: 29 PM
NO. REVISION - _ _
-- SE 1 /4, SEC. 24, T 22 SW, R 4 E, W.M.
--------------- P--------'.-----^s---+�------__----- 7 ` 2I3'-----aj---��--�� --_ --- —� Ewsr nM' -----
---------- EAsr P/W _ �------33---
d3 f EP FMILROAD AVE E� EP Ep M EP a 1
E _ _ _ _
EASTR/w , r—139TRiw T SPEED BUMP PER —II
SPEED BUMP PER DETAIL 1 THIS SHEET
DETAIL 1 THIS SHEET I PARCEL NO. PARCEL
I I I
PARCEL PARCEL PARCEL NO.
NO. NO. 3828000105 I 382800-0025 NO.
II 1 382800-0125 1 382800-0120 OLSEN I LEE DANIEL 1 382800.0020
I 1 MACHUCA 1 OLSEN DANIEL 1 I 1 1 W+STANLEY 1 MENGISTEAB 1 1
NAZARIO DANIEL 616 I J+BREN SAMUEL
' I I 628 622 RAILROAD 528 RAILROAD 524
RAILROAD RAILROAD AVE S I AVE S RAILROAD
AVE S AVE S r}SPEED BUMP PER AVE S EP —
INSTALL BUMP PER
STD PLAN 6-29 TYP I
- m d3
d3
d3 d3
-------------------------
I
I
PARCEL NO. 382800.0160
PARCEL NO.
FIELDS JACK MD
PARCEL NO.
3828000115
I
3828000130
PERVIER
A-1 CORP
INGFRID J
627 BRIDGES
, 619 BRIDGES
1
I
AVE S
AVE S
I
SPEED BUMP PER
DETAIL I THIS SHEET
i
I
I�
PARCEL NO.
382800.0090
—
HUEFFED KATHY
I+JOSEPH DOMI
I
603 BRIDGES
w
AVE S
------------J L--- �__--- - - -
d3 ° r BRIDGES AVE S
EP
SPEED BUMP PER DETAIL 1 THIS SHEET
------------
-----'
----------T—R/W —------------
FXIS
Z PARCEL NO. 3828000300
SWIFT S & L LLC
0
T 610 BRIDGES AVE S
PARCEL NO. 382800-0355
w I 1
FAGG JOSEPH S
0 I 1
208 E MORTON ST
2 w
W
-------- - ------
______ �a
FASTTT.
PARCEL NO. 382800-0395 r�
TINY TOTS DEVELOPMENT
CENTER
707 CENTRAL AVE S
PARCEL NO. 382800-0325
SWIFT S & L LLC
633 E MORTON ST
SPEED BUMP PER
DETAIL I THIS SHEET
d3
PROPERTY NO. 382800-0285
S & L SWIFT LLC
601 CENTRAL AVE S
°' CEN
DETAIL 1 THIS SHEET
L---a3—I -- d} id
eMsR�wEP EP EP EP EP
------------------------
PARCEL NO.
382800.0040
DACANAY PARCEL NO.
I 5 9EBRIDGES PARCEL NO. NEUB- 060 UM
AVE S 1 382800.0055 1 i
I KRUMINS ATIS 1 1 1 TIMOTHYMOTHY A
523 BRIDGES
525 BRIDGES .I
AVE S AVE S
— d3
d3 d-1 i
EP _ EP Ep EP --
SPEED BUMP PER
DETAIL 1 THIS SHEET \'
PARCEL NO. 382800-0260 I a
JOHNSON DONALD R I I"
1 520 BRIDGES AVE S
I
I
I
la
-----I
PROPERTY NO. 382800-0275
ANIS SHAHID
217 RUSSELL ST
NOTES: SIGN SCHEDULE
1. SPEED BUMP SHALL CONFORM TO COK STD PLAN 6-29A AND 6-29B EXCEPT I LOCATION DESCRIPTION SIGN CODE SIZE
1 1. UMP SHALL 4" CONTINUOUS HEIGHT BUMP WITHOUT THE EMERGENCY I TYP I "85 MPP.H" W13-11 18x18
VEHICLE CUTOUT SHOWN IN SECTION A —A.
1.2. BUMP MARKINGS SHALL MATCH DETAIL 1 AS SHOWN ON THIS PLAN SHEET.
2. SPEED BUMPS WILL NEED TO BE FIELD LOCATED. THE INTENT IS TO GET THEM
AS CLOSE TO ALLEYS AS PRACTICAL SO THEY ARE NEAR MID —BLOCK.
DESIGNED: BRAA CHECKED: DNH KENT PROJECT NO. SCALE: BAR 15 ONE INCH ON Cityof Kent
22-3001.1 HORIZ: 1"-40r OR
DRAVfiNG T ,l
DRAWN: PROJECT ENGR CONST. MGM T. REVIEW _ ADJUST SCALES Public Works Department
8 REVISED PER REVISION 2 BRAA 7.18.22 BRAA I ASH VERT. ACCORDINGLY
APPROVED. DATE Engineering Division
NO. REVISION BY DATE CITY ENGINEER
—SPEED BUMP PER
DETAIL 1 THIS SHEET
a. OF ROADWAY
6.0' I LANE WIDTH
I
I
o W I 70I —
tO I I \ E OF LANE
o------I------I
clic OF 3" f
SPEED BUMP— j 0
1 EIOST R/N'
w
f— EAST R/w
co
I
i I
J
w w
1 0
c OF LAN 1 I �'0 1 O doe W ty
a w
LANE WIDTH I 6.0
c� cn
SPEED BUMP DETAIL 1 %ST�fi�`�
es`rfONAL Eta, i
SHEET
RAILROAD, BRIDGES,
RUSSELL, AND MORTON 2022 ASPHALT OVERLAY 7a 2-300 77