Loading...
HomeMy WebLinkAboutCAG2022-216 - Change Order - #2 - Lakeside Industries, Inc. - 2022 Asphalt Overlays -11/08/2022-~ ~KENT Agreement Routing Form For Approvals, Signatures and Records Management -ftl > 0 .. A. A. C C 0 ·-.., ftl E .. ~ C -.., C cu E cu cu .. °' C °' C .:; ::, ..___ 0 ~ er: .! "vi > cu cu .. a::.e ca C °' iii ad<cW lli73_1_20 WASHINGTON This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: 10/20/2022 10/27/2022 Authorized to Sign: Date of Council Approval: D Director or Designee 121 Mayor 5/17/2022 Budget Account Number: Grant? □ Yes 121 No R20119.64110.120 Budget? @ Yes □ No Type: N/A Vendor Name: Category: Lakeside Industries, Inc. Contract Vendor Number: Sub-Category: 34030 Change Order #2 Project Name: 2022 Asphalt Overlays Project Details·Remove and replace damaged and failing 58"x36" detention storm pipe. Work includes 115 LF repl. with · 36" diameter triple wall ADS pipe, addition of one 60" and one 84" diameter type 2 MH's, 40 LF of 12" storm pipe and all appurtanences and surface restoration necessary to restore the system complete . Agreement Amount: $324,714.00 Basis for Selection of Contractor: Bid Start Date: N/A Termination Date: 140 Working Days Local Business? D Yes □ No* *If meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? Contract Number: □Yes 121 No CAG2022-216 Date Received by City Attorney: Comments : Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: Visit Documents.KentWA.gov to obtain copies of all agreements 11/1/22 KENTwasHrxoToN CHANGE ORDER NO. #2 NAME OF CONTRACTOR: CONTRACT NAME & PROJECT NUMBER: ORIGINAL CONTRACT DATE : Lakeside Industries. Inc. ("Contractor") 2022 Asohalt Overlavs MaV t7-.2O22 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Remove and replace damaged and failing 58" x 36" detention storm pipe beginning at the intersection of 112th Ave SE and SE 235th St extending east 115 feet. Work includes replacement of 115 LF of failing pipe with 36" diameter triple wall ADS pipe; the addition of one 60" and one 84" diameter type 2 MH's; replacement of 40 LF of L2" storm pipe and all appuftanences and sudace restoration necessa to restore the s m com ete Pdce QuantiW Unit AmountDescdption 30,000,00 1,00 LS $ 30,000.00Mobilization-235th Pipe Repar (Sch D 17,250,00 1,00 EA $ 17,250.0084" Type 2 Manhole (Sch I 13,250,00 1.00 EA $ 13,250,0060" Typ 2 Manhole (Sch D 1,225,0036' ADS Triph Wall Pipe, Incl, Removal& Dbposalof 0H Pipe (Sch I)115,00 LF $ 140,875.00 3s0.00 40,00 LF $ 14,000,0012' Ductile Iron Pipe, Incl. Removal & Dbposal of Old Pipe (Sch I) 5s0,00 EAPothole Utiliths (Sch 0 12,00 $ 6,600,00 28.00 128,00 SY $ 3,584.00Incrcase Bid ltem 1010 Remove Exbting Asphaft Concrete Pavement (Sch I) Increase Birl Item 1060 Roadway Excavation, Incl, Haul(Sch 11 s0.00 300.00 CY $ 15,000,00 35.00 600.00 TON $ 21,000,00Increase BirJ Item 1075 Gravel Bomow, Including Hauland Compaction (Sch I) Increase BitJ Item 1080 Crushed Surfacing Top Cource, 5/8 Inch Minus (Sch I)40,00 3ss.00 TON $ 14,200.00 1i5,00 20.00 TON $ 3,500.00Increase Bii Item 1095 Ht.4A Class 1/2", PG 58V-22 (Sch I) 120.00 s0.00 TON $ 6,000,00Increase Bid ftem 1100 Hl'lA for FullWitlth 0verlay Class 1/2", PG 58V-22 (Sch I) s.00 435.00 SY $ 2,175,00Increase Bid Item 1110 Planing Bituminous Pavement (Sch D 1,000.00 2.00 EA $ 2,000.00Increase Bkl Item 1420 Manhole Circular Frame and Cover (Sch I) 75.00 300,00 HRIncrease BU ltem 1505 Tmffc ContrclLabor (Sch I)$ 22,500.00 100,00 110.00 HR $ 11,000,00Increase BirJ Item 1510 Traft ContrulSuperubor (Sch t) 95.00 14,00 DAYIncrease BkJ Item 1530 Poftabh Changeable Message Sign (PCMS) (Sch D $ 1,330.00 75.00 5,00 EA $ 4s0,00Increase BirJ Item 1800 Inbt Proteciton {Sch I) CHANGE ORDER - 1 OF 3 2, The contract amount and time for peformance provisions of Section II "Time of Completionr" and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and wssT) $3,851,364.00 Net Change by Previous Change Orders (incl. applicable WSST) $9s,850.00 Current Contract Amount (incl. Previous Change Orders) $3,947,214.00 Current Change Order $324,714.00 Applicable WSST Tax on this Change Order $o.oo Revised Contract Sum $4,271,928.00 Original Time for Completion (insert date) 130 working days Revised Time for Completion under prior Change Orders (insert date) 00 working days Days Required (*) for this Change Order 10 calendar days Revised Time for Completion (insert date) 140 working days In accordance with Sections L-A4.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. CHANGE ORDER - 2 OF 3 IN WITNESS, the pafties below have executed this Agreement, which will become effective on the last date written below. (9- CITY OF KENT: DATE: By (tttlel Print Name : Dana Raloh (slgnature) ftc Mawnr DATE: CONTRACTORl (signature) a u Print Na By: CHANGE ORDER - 3 OF 3 11/08/2022 ATTEST: Kent City Clerk APPROVED AS TO FORM: (applicable lf Mayor's signature required) Kent Law Depaftment c[tn thls icld, you mdy €nter the eledonlc ffhpsth there the ontract htr been Savrd] CHANGE ORDER. 4 OF 3 File No. 2OO.2 KENT WagxlNorox CHANGE ORDER WORKSHEET NO.2 Construction Engineering Division - Public Works Project: 2022 Overlay project No: 22-3OOL.I Project Engineer: Drew Holcomb Fed-Aid No: Capital Projects Jvlanaoer, ' Brian Shields Contractor: Lakeside Industries, Inc Dater LO/L7/2O 22 I, Pro Chan e Remove and replace damaged and failing 58" x 36" detention storm pipe b 112th Ave Se and SE 235th St extending east 115 feet. Work includes replacement of 115 LF of iling pipe with 36" diameter, triple wall ADS pipe; the addition of one 60" and one 84" diameter Type MH's; replacement of 40 LF of 12" storm pipe; and all appurtanences and surface restoration added work: provides compensation foris change makes the followi ng revisions to the Contract Documents and eginning at the intersection 2 necessary to restore the system complete, II. Reason and Ba round for Chan e IrI. Method of Payment NEW PAY ITEMS I Notapplicabte ay of 112th Ave SE and SE 235th St, a sink hole was iscovered in the roadway on SE 23sth St, east of it's intersection with 112th Ave SE. The sinkhole ppeared to be directly over an existing storm pipe. City of Kent TV inspection of the storm run revealed that the existing 58"x36" CMP arch pipe had significant failures starting at the manhole located on SE 235th St heading easterly approximately 115 LF. Design and Operations determined it was necessary to repair this section by replacing the failed arch pipe with 36" diameter ADS triple walled pipe, and install two new manhole structures; one intersecting two existing lateral storm runs and one to connect the new ADS pipe to the old arch pipe. Due to the nature of this work, siginificant impacts to the existing roadway surfacing on SE 23sth St are necessary; a grind and overlay of the area is being performed to resurface the road, following the completion of the pipe replacement and structure installation. During the originally contracted grind/overl Sch. No Item Description Total Est. Qtv Unit Unit Price Total Estimated Cost of Item I Mobilization - 235th pipe repair 1 LS $30,000.00 $30,000.00 Page 1 I 84" Type 2 Manhole 1 EA $17,250.00 $t7,250.OO I 60" Type 2 Manhole 1 EA $13,250.00 $13,250.00 I 36" ADS Triple Wall Pipe (incl. removal and disposal of old 58"x36" pipe)115 LF $1,225.00 $140,875,00 I 12" Ductile Iron Pipe (incl. removal and disposal of old pipe)40 LF $350.00 $14,000,00 I Pothole Utilities t2 EA $ss0.00 $6,600.00 New Pay Items Total: $22Lt975.OO DELETE EXISTING PAY ITEM(S) per 1-09.5 EI Notappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item Delete Existing Pay ltems Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) I Notappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of ltem I 1010 Removing Asphalt Concrete Pavement r28 SY $28.00 $3,584.00 I 1060 Roadway Excavation, Including Haul 300 CY $s0.00 $15,000.00 I 1075 Gravel Borrow, Includin Haul and Compaction 600 Ton $3s.oo $21,000.00 I 1080 Crushed Surfacing Top Course 355 Ton $40,00 $14,200.00 I 1095 HMA Class 1/2' PG 5BV- 22 20 TON $17s.00 $3.500.00 I 1 100 HMA Class 1/2" PG 58V- 22 50 TON $120.00 $6,000.00 Page 2 1110 Planing Bituminous Pavement I L420 Manhole Circular Frame and Grate 2 EA $1,000.00 $2,000.00 I 1505 Traffic Control Labor 300 HR $7s.00 $22,500.00 I 1510 l#Traffic Control Supervisor 110 HR $100.00 $11,000.00 I 1530 Portable Changeable Message Signs (PCMS)I4 DY $9s.00 $1,330.00 I 1800 Inlet Protection 5 EA $75.00 $450.00 I 435 SY $s.00 $ Increase / Decrease to Existing Pay ltems Total: XTOTAL ESTIMATED COST OF CHANGE ORDER: 2,t75.OO $LO2t739.OO x Total of the Cost of Item Columns IV. WORKING DAYS $324,7L4.OO Original Contract:130 Due This Change Order:10 Previous Total:r30 Explanation/Justification for Additional Working Days: XTOTAL WORKING DAYS:140 * This Change Order + Previous Total Date:- l1r^Capital Projects Manager: Construction Engineering Supervisor: Brian Shields Barry Date:rtslr Construction Manager: c Connor Page 3 Date:r"//ek Shields, Brian From: Sent: To: Cc: Peterson, Kelly Monday, September 26,2022 4:09 PM Shields, Brian Connor, Eric; Barry, Jason; Bieren, Chad RE:2O22 Overlay - Remaining work prioritizationSubject: Brian- Thank you for the list of the projects. Please complete the projects with the following priority: 1) 132nd Ave ADA accommodation 2) 235tn x 112th Storm Repair 3) t+4tn Ave Road Raising 4) L44th Ave. Traffic Calming 5) 248th Grind/Overlay We are hopeful these jobs will be completed during this construction season. Please let us know if there is something we can do to help get these completed. Thank you, Kelly Kelly Peter5on, AICP, Deputy Director-Engineering Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5547 - Cell 253-740-8066 KpetersonOKentWA.oov crTY oF KENT, WASHINGTON KentWA.gov Facebook l r,'ijit:,rr YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTTNG THIS E.MATL From: Shields, Brian <BShields@ kentwa.gov> Sent: Monday, September 26,2022 3:44 PM To: Peterson, Kelly <KPeterson@kentwa.gov> Cc: Co n no r, Eric <EConnor@ kentwa.gov>; Barry, Jason <J Ba rry@ ke ntwa.gov> Subject: 2022 Overlay - Remaining work prioritization Kelly, Per our Teams conversation, here is a list of items Lakeside would like to know the City's preference on prioritization for: 1) 235th x 112th Storm Repair (added work to contract) 1 2) I44Eh Traffic Calming (added work to contract) 3) t44rh Road Raising (orig. contract; sh 57 etc) 4) 248th Grind/Overlay (orig. contract; sh 11 etc) Our contractor is happy to try accommodating our request for priority, but did mention that we will be running out of paving weather shortly; based on recent years'weather, I agree with this assertion. This week and early next week, Lakeside will be completing the ADA ramp on 132nd to stay ahead of WSDOT's paving window (to avoid needing a paving variance d/t the HMA patching in front of the new curb and gutter). In what order would you prefer they attack the abovementioned areas, after they complete the ADA ramp on 132nd x Kent-Kangley? Happy to guide them in whatever direction you choose. Let me know if you have any questions. Thanks! Brian ShieldS, Capitat projects Manager Construction Management I public Works Department 22O 4th Avenue South, Kent, WA 98032 MEln/C€ll 253-293-4973 | Desk 253-8s6-6s10 bshields@KentWA.oov crTY OF KENT, WASHTNGTON KentWA.oov Facebook j ',,/j:.i.::r YouTube 2 "fg IAKESIDE INDUSTRIES Lakeside lndustries, lnc. laltesideindustries. com P.O. Box 701O I lssaquah, WA 98027 ph: 425.31 3 .2600 I fa*: 425.313.2622 Waehingrlon Contractor Llcenss No. t AKESI'27ilD Orcgon Conlraclor License No, CCB 10&542 Equal Opportunily Ernpfi't Er PROPOSAL CONTRACT AGREEMENT To: Addrese: _Estimating Contact: Phone: Fax: Brian Sheilds Project Name: Project Locationl 235th Pipe Repair Kent, WA Bid Number: Bid Date: Budget Numbers 811212022 #Item Total Price L 2 3 4 84" Manhole Structure (3-4 Weeks Oug 60" Manhole Structure (3-4 Weeks Out) 36 Inch ADS Triple Wall Pipe (2 Week Out) Including Haul, Backfill Placement And Compaction 12 Inch Ductile Pipe, Remove Old And Replace With New And Tie In, Including Haul Off Pothole Mobilization Removing Asphalt Concrete Pavement Roadway Excavation, Including Haul Gravel Borrow, Including Haul And Compaction Crushed Surfacing Top Course HMA Class Ll2'PG 58V-22 HMA For Full Width Overlay Class 1/2" PG 58V-22 Planing Bituminous Pavement Manhole Circular Frame And Cover Traffic Control Labor Traffic Control Supervisor Portable Changeable Message Signs (PCMS) Inlet Protection 1,OO EACH 1.00 EACH 115.00 LF 40.00 LF $17,250.00 $13,250.00 $1,225.00 $350.00 $17,250.00 $13,250.00 $140,875.00 $14,000.00 5 1000 1010 1060 1075 1080 1095 1100 11 10 L420 1505 1510 1530 1800 12.00 1.00 128.00 300.00 600.00 355.00 20,00 50.00 435.00 2.00 300.00 110.00 14.00 6.00 EACH LS SY CY TON TON TON TON SY EACH HR UNIT DY EACH $ss0.0o $30,000.00 $28,00 $s0.00 $3s.00 $40,00 $17s.00 $120,00 $s.00 $1,000.00 $7s.00 $r00,00 $9s.00 $7s,00 $6,600.00 $30,ooo.oo $3,584.00 $15,000.00 $21,000.00 $14,200.00 $3,500.00 $6,000.00 $2,175.00 $2,000.00 $22,500.00 $11,000.00 $1,330,00 $4s0.00 Total Bid Price:i324,7L4.OO Notes: ' Budget number based on Yerbal information provided. Actual pricing could be affected by changes in information on eventual construction plans. Based on 115 ft stretch of road pipe and pave. ' Locates are not finished, we need locates finished to determine the amout of potholes needed. Price inclsdes Shoring, remoyal , Hauling and disposal of existing pipe ' Lakeside Industries is not responsible for designed cross slopes of less than 1olo that hold water after paving is complete.. Price based on current petroleum cost. Price escalation to be linked to the WSDOT/ODOT asphalt binder index, ' Lakeside Industries Inc. proposed prices herein assume that Lakeside Industries fnc.'s work hereunder will be substantially complete on or beforer October 14th 2O22.. CONTMCTING PARTY'S SIGNATURE ON ONE COPY RETURNED TO TAKESIDE II{DUSTRIES INC. WILL RENDER THIS A LEGAL CONTRACT FOR THE PERFORMANCE OF THE ABOVE WORK. CONTRACTING PARTY'S STGNATURE ALSO ACKNOWLEDGES RECEIPT OF LAKESIDE IITIDUSTRIES INC. NOTICE TO CU TOMER'STATEMENT ATTACHED HERETO, ' Approximate Total (Plus sales tax where applicable) Total price to be based on actual quantity or measured unless otherwise specified. ' Working Hours to be Monday through Friday 7:00am - 6;00pm, 8/fi12022 8:37:s9 AM Page I of 2 Shields, Brian From: Sent: To: Cc: Subject: Attachments: Shaun White <Shaun.White@lakesideindustries.com> Monday, August 15,2022 8:43 AM Shields, Brian Barry, Jason; Connor, Eric; Holcomb, Drew RE: 235th Pipe Repair 235th pipe repair with added 10 inch ductile.pdf Brian, Please see updated pricing for the 235th Pipe repair. We have deleted the pea gravel and reducer nipple then added 40 LF of 12 inch Ductile for the side hook ups. lf we are going to go forward with this we would like to pot hole right away to make sure we order the correct structures. Let me know if you have any questions or concerns. Shaun White, Project Manager I Lakeside lndustries, lnc. I t 253.631.3611 | c 206.396.53711 shaun.white@ lakesideindustries.com Kent Division | 1s808 SE 256th Street I Covington, WA 98042 | www.lakesidglndustries.com{g TAKESIDE lNDI,SIRIES From: Shields, Brian <BShields@kentwa.gov> Sent: Friday, August L2, 20224:11 PM To: Shaun White <Shaun.White@lakesideindustries.com> Cc: Barry, Jason <JBarry@kentwa.gov>; Connor, Eric <EConnor@kentwa.gov>; Holcomb, Drew < DHolcom b@ kentwa.gov> Subject: RE:235th Pipe Repair Caution! EXTERNAL SENDER Do not click links or open attachments unless you KNOW that the sender and content are safe. Shaun, In my initial email asking for proposal, I failed to include that the City would like 40' of L2" Ductile Iron Pipe installed, as well. This will be for the lateral runs into the 60" structure. Please provide pricing for this. Omit the pipe nipple from the proposal; the current repair plan does not include this item. The City requires CSTC (5/8 minus) for pipe bedding; no pea gravel. Does this proposal include shoring, all removal, hauling, and disposal of waste material (such as the existing pipe)? Let me know if you have any questions. Have a good weekend, Thanks! 1 EXTERNAL EMAIL Brian Shields, Capitat projects Manager Construction Management I Public Works Department 22O 4th Avenue South, Kent, WA 98032 Maln/Gell 253-2e!-4973 | Desk 2s3-8s6-6sto bshields@KentWA.gov clw oF KENT, WASHTNGTON KentWA.ooV Facebook !',\it:..:.; j: YouTube From: Shaun White <Shagn.White@lqkgsideinduglfies.com.> Sent: Friday, August 72,2A22 2:04 PM To: Shields, Brian <FShiglds@keJrtwa.eov>; Barry, Jason <JBarrv@kenlwa.gov> Subject: 235th Pipe Repair B ria n, Please see attached Budget numbers for the 235th St. Pipe repair. Let me know if you have any questions or comments. Shaun White, Project Manager I Lakeside lndustries,lnc. I t 253.531,3611 | c 205.396,53711 shaun.white@ lakesideindustries.com Kent Division | 18808 sE 256th Street I Covington, wA 98042 | www.lakesidelndustries.com{u IAKESlDE INDT'S|RIES EXTERNAL EMAIL 2 Shields, Brian From: Sent: To: Cc: Subject: Shields, Brian Wednesday, August 10,2022 9:28 AM Shaun White; Pat Tavenner Barry, Jason; Connor, Eric RE:2022 Overlay - 235th Pipe/Road repair Shaun, Time is of the essence, Please provide pricing without the reducing nipple. Thank you Brian Shields, Capitat projects Manager Construction Management I Public Works Department 22O 4th Avenue South, Kent, WA 98032 trlaln/cell 25iil-293-4973 1 Desk 2s3-8s6-6s10 bshields@KentWA.ooV clw oF KENT, WASHTNGTON KentwA.oov Facebook r,!,ii:.), YouTube From: Shields, Brian Sent: Tuesday, August 9,2022 4:22 pM To: 'Shaun White' <Shaun.White@lakesideindustries.com>; 'Pat Tavenner' <Pat.Tavenner@lakesideindustries.com> Cc: Barry, Jason <JBarry@kentwa.gov> Subject: RE:2022 Overlay - 235th pipe/Road repair Shaun, Please provide a change order price proposal for the below described work. Ed with Accurate was concerned about the structure size, but both the City of Kent detail (5-2) fortype 2, and the WSDOT (b-10-20.02), shows a table that allows the below mentioned structure sizes to work. Also, we shouldn't need a reducing nipple for the 36"x58'CMp arch pipe, as the 84" structure can take up to a 60" metal walled pipe, with no reducing nipple. Please inform the City if there is a variable that is not being accounted for that is preventing the use of these structures, per the detail. Let me know if you have any questions. Thanks! Brian Shields, Capitat projects Manager Construction Management I Public Works Department 22A 4th Avenue South, Kent, WA 98032 Mrln/Cell 253-293-4973 | Desk 2s3-gs6-6s10 bshlelds@KentWA.gov crTY OF KENT, WASHINGTON KentWA.oov Facebook i,,..,ri.r,rri YouTube 1 From: Shields, Brian Sent: Friday, August 5,2022 7:00 PM To: shaun white <Shaun.!-V.hite@lakesideindustries.com>; Pat Tavenner <Pat.Tavenner@lakesideindustries.com> Cc: Barry, Jason <JBarru@kentwa.qov> Subject: 2022 averlay - 235th Pipe/Road repair Shaun, Please provide pricing for the below listed items in relation to the 235th Pipe replacement. For the pipe material, we are interested in pursuing this work in a timely fashion, so pipe type can be discussed as far as availability, cost, etc. 1) Pothole to verify depth of existing pipe and the watermain to the north of the run; 2) Remove 115'of the damaged 58"x36" arch pipe from the MH at the intersection of 112th & 235th, going East; 3) Replace that pipe with 36" diameter pipe (we are hoping for PPE but are open based on price and availability of other pipe types, as well); 4) Set a 60" type 2 structure at the nodes of the two 12" diameter runs tying in from structures Y236 & Y235, and connect these runs to the new structure; 5) Setan84" type2structureattheterminationofthell5'run(endof removal limits)and connect the existing 58"x36" pipe (from the East) to the new 36" run via this structure.; 6) Overlay full width of 235th to the easternmost extent of this pipe replacement work. Pipe types we are hoping for pricing and availability on are: - Corrugated polypropylene (triple walled) - Ductile iron - PVC (various SDR, if applicable) - Concrete 2 {I H fvm VEDI} Let me know if you have any questions. Thanksl Brian Shields, Capitat projects Manager Construction Management I Public Works Department 22O 4tn Avenue South, Kent, WA 98032 Fdnlcglf 263-2Cl-4973 | Desk 253-8s6-6s1o bshiql{e@KentW,Aboov CITY OF KENT, WASHINGTON KentWA.qov Facebook _tyg1ttff YouTube 3 Shields, Brian From: Sent: To: Cc: Holcomb, Drew Friday, August 5,2022 7:49 AM Shields, Brian Couvillion, Chris; Barry, Jason; Connor, Eric; Hawkes, Derek;Vincent, Jens; Maloney, Carla RE: 235th Pipe/Road failureSubject: Brian, I have discussed this with Operations staff including Jens and Dave and my recommendation is below, Please review and let me know if you have any questions. r Pothole to determine depth to storm pipe. Call for locates, might be worth potholing to find the watermain to the nofth as that will likely be encountered during construction,. Remove 115'of the damaged 58"x36" detention pipe from the MH at the intersection of 112th and SE 235th St going east.. Replace 115'with 36" diameter pipe. Pipe type to be determined based on availability and cost. o Note; 36" will decrease the capacity of the pipe but 48" will not provide sufficient cover. Set a 60" Type 2 structure at the node of the two L2" diameter CBs (Y236 and Y235) and connect these runs. Set an 84"Type 2 structure at the termination of the 115'of pipe to connectto the existing 58"x36" CMP pipe. overlay all of the roadway on sE 23sth St that is impacted by this work, Please request a price/availability of the following 36" diameter pipe types (if any of these are not feasible, just indicate that): o Corrugated polyethylene storm pipe (triple walled)o Ductile Ironr PVC. Concrete a a a O 1 {I I U vs{ Drew Holcomb, P.E. Design Engineer III Design Englneering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 | Cell 253-561-1587 dholcomb@kentwa.gov crw oF KENT, WASHINGTON KentWA.oov Facebook Twitter YouTubq Inrircrsn From: Holcomb, Drew Sent: Tuesday, August 2, 2022 4:23 PM To: Shields, Brian <BShields@kentwa.gov>; Vincent, Jens <JVincent@kentwa.gov> Cc: Couvillion, Chris <CCouvillion@kentwa.gov>; Barry, Jason <JBarry@kentwa.goo; Connor, Eric < EConnor@kentwa.gov>; Hawkes, Derek <DHawkes@ kentwa.gov> Subjecil RE: 235th Pipe/Road failure 2 Hey guys, The pipe looks like it was crushed and there is roadway damage on the google earth screenshot (attached) as well as a utility marking in the vicinity of where the pipe collapse. We should pothole to determine actual coverage of the pipe. The as-built shows 5.65'to IE of current 38" pipe. Putting a 48" pipe would be 1,65'of coverage, What is the manufacture coverage rating on CPP? Drew HolCOmb, P.E. Design Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 | Cell 2s3-561-1582 dhgleomb@kentwa.gov clw oF KENT, WASHINGTON KentWA.oov Facebook ir'',,i '' YouTube Instaqram From: Shields, Brian <BShields@kentwa.qov> Sent: Tuesday, August 2,2022 2:31 PM To: vincent, Jens <JVincent@kentwa.eov>; Holcomb, Drew <DHolcomb@kentwa.gov> Cc: Couvillion, Chris <CCouvillion@kentwa.gov>; Barry, Jason <JBarrv@kentwa.gov>; Connor, Eric <EConnor@kentwa,sov>; Hawkes, Derek <DHawkes@kentwa.gov> Subject: RE: 235th Pipe/Road failure Jens, Atthis point, we have only asked Lakeside to start preparing a price proposal. No work has been directed beyond placing steel sheets over the known roadway failure area to attempt minimizing a safety hazard. Let me know if there is anything Construction Engineering can do to help out. I've attached photo/video from the site as a reference. Keep us posted, Thanks! Brian Shields, Capitat pqecrc Manager Construction Management I Public Works Department 22O 4th Avenue South, Kent, WA 98032 trlaln/cell 253-293-4971 | Desk 2s3-8s6-6510 bshl€tds@KentWA.oov crw oF KENT, WASHINGTON KentwA.qov Facebook i 1,iii:.:,ri' YouTube From: Vincent, Jens <JVincent@kentwa.eov> Sent: Tuesday, August 2,2022 2:11 PM To: Holcomb, Drew <DHolcomb@kentwa.sov>; shields, Brian <gshields@kentwa,sov> Cc: Couvillion, Chris <CCouvillion@hentwa.gov>; Barry, Jason <JBarrv@keqtwa.nov>; Connor, Eric <EConnor@kentwa.sop; Hawkes, Derek <DHawkes@kentwa.qry Subject: RE: 235th Pipe/Road failure 3 Hey all, Let's pump the brakes for a few. Dave wants to make sure that the whole run needs to be replaced before pulling the trigger on this one. James Naki will be getting Dave all the pictures and TV reports he can find in a few minutes. We may have to change our course of action, Thanks again, JV From: Holcomb, Drew <DHolcomb@kentwa.rov> Sent: Tuesday, August 2,2022I:47 PM To: Vincent, Jens <JVincent@kentwa.gov>; shields, Brian <Bshields@kentwa.eov> Cc: Couvillion, Chris <CGouvillion@kentwa.eov:; Barry, Jason < lBerfv@kentwa.sov>; Connor, Eric <EConnor:@kentwa.sov>; Hawkes, Derek <DHawkes@kentwa,qov> Subject: RE: 235th Pipe/Road failure Brian, I am good with the plan but we need to make sure we have cover for the taller diameter pipe. I checked with Ozzie and he said often times they only used the arched pipe because of issues with cover, On the bright side, as you said Brian, we will be covering it with crushed rock instead of the native that was likely used before. Drew Holcomb, P,E. Design Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 | Cell 253-561-1587 dholcomb@kentwa.oov CITY OF KENT, WASHINGTON KentWA.qov Facebook ii,;ii,l 1;; YouTube Instaqram From: Vincent, Jens <JVineent@kentwa.sov> Sent: Tuesday, August 2,2022 1:10 PM To: Shields, Brian <BShields@kentwa.eov> Cc: Couvillion, Chris <CCouvillion@kentwa.gov>; Barry, iason <JBarrv@kentwa.sov>; Connor, Eric <EConnor@kentwa.eov>; Holcomb, Drew <DHolcomb@kentwa.gov> Subject: RE: 235th Pipe/Road failure Brian, Yes, I think the best course of action at this point is to replace the line in its entirety. As far as the pipe material is concerned, I think that CPP is perfect for this. The 48" pipe is triple walled and again, I think it's perfect for this run. Thanks for getting a hold of us so quickly. Have a great day 4 Jens Vincent Sewerlstorm Drainage Manager Utilities Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 2s3-8s6-s63r I Cell 2s3-74o-zags lvincent@KentWa.qoy CITY OF KENT, WASHINGTON KentWA.oov Facebook :'.. :ri..,: YouTube Instaoram From: Shields, Brian <BShields@kentwa,eov> Sent: Tuesday, August 2,2022 12:49 PM To: Vincent, Jens <JVlncent@kentwa.qov> Cc: Couvillion, Chris <CCouvillion@kentwa.eov>; Barry, Jason <JBarrv@kentwa.gov>; Connor, Eric < Econnor@kentwa.sov>; H o l co m b, Drew < DHolcomb@kentwa. Subject: 235th Pipe/Road failure Jens, Thanks for getting your crew to help out so quickly today. As Lakeside/their subs will likely be performing this work under a change order to the existing overlay project, Eric has asked me to work with them on getting a price estimate. A couple of questions I'd like to have your input on: 1) Will we be replacing the approximate 250'run between structures (112th to SE 23sth Pl, traveling longitudinally with 23sth St), in its entirety? 2) What material will be replacing the existing 58" x 36" CMP with? Chris and Drew were informally discussing 48" poly-pro pipe as an option. I will go ahead and have Lakeside start working on getting information ready for an estimate, but these details will help us dial in a more accurate number. Let me know if you have any questions. Thanks! Brian Shields, Capital projects Manager Construction Management I Public Works Department 22O 4th Avenue South, Kent, WA 98032 llaln/Cell 253-293-4971 I Desk 2s3-Bs6-6s10 bshlelds@KentWA,ggy CITY OF KENT, WASHINGTON KentWA.oov Facebook j,,'.,j,i.;rr YouTube 5