HomeMy WebLinkAboutCAG2022-145 - Change Order - #1 - Active Construction, Inc. - 84th Avenue South (East Valley Highway) Slump Repair - 10/28/2022Agreement Routing Form
IsIiIiiiiiiiI • For Approvals, Signatures and Records Management
T This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
KEN
WASHINGTON (Print on pink or cherry colored paper)
Originator: Department:
Stephanie Anderson PW Engineering
M
0
L
a
a
all
C
0
a
E
L
0
4-
C
C
E
N
a
L
a
M
C
:F+
3 cc
•� i
GJ
f0
C
C1.
Ti
adccW27373_1_20
Date Sent: Date Required:
11 /1 /2022 N/A
Authorized to Sign: Date of Council Approval:
0 Director or Designee ❑ Mayor 4/5/2022
Budget Account Number: Grant? ❑ Yes 0 No
R20069.64110.120 Type: N/A
Vendor Name: Category:
Active Construction Contract
Vendor Number: Sub -Category:
Change Order 1
Project Name: 84th Avenue South (East Valley Highway) Slump Repair
Force Account 2. The additional repair of settled and damaged roadway adjacent to project limits. Work included removal and disposal of
Project Detal IS: existing asphalt. Placement of +/- 9 inches of HMA. The work was performed by Active Construction Inc's sub Lakeridge Paving.
Agreement Amount: $14,376.76 Basis for Selection of Contractor: Bid
Start Date: 4/15/2022 Termination Date: 40 working days
Local Business? []Yes ❑ No*
*Ifineets requirements per KCC3.70. 700, pleasecomplete "Vendor Purchase -Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
[]Yes ❑ No
Date Received by City Attorney:
Date Routed to the Mayor's Office:
Contract Number:
CAG2022-145
Comments:
Date Routed to the City Clerk's Office:
Visit Documents.KentWA.gov to obtain copies of all agreements
KENT
WAS.INGTON
NAME OF CONTRACTOR:
CONTRACT NAME & PROJECT NUMBER:
ORIGINAL CONTRACT DATE:
Active Construction ("Contractor")
41h Avenue South (East Valley Higbwav) SlumqRepair
Adril. 15. 2022
This Change Order amends the above -referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Force Account 2. The additional repair of settled and damaged roadway
adjacent to project limits. Work included removal and disposal of
existing asphalt. Placement of +J- 9 inches of HMA. The work was
performed by Active Construction Inc's sub Lakeridge Paving.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $466,466
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0
(incl. applicable WSST)
Current Contract Amount $466,466
(incl. Previous Change Orders)
Current Change Order l $18,925.03
Applicable WSST Tax on this Change $0
Order
Revised Contract Sum $485,391.03
CHANGE ORDER - 1 OF 3
Original Time for Completion
(insert date)
Revised Time for Completion under
prior Change Orders
(insert date)
40 working days
40 working days
Days Required (±) for this Change Order 10 calendar days
Revised Time for Completion 50 working days
(insert date)
........ ... _.....
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR:
By:- . (signature)
ature)
Print Name:Ar'ri 13p4s
its PV'V?
,i (title)
DATE: 1 d,/� %�.
CITY OF KENT:
D10 Fatly s goed by Chad Ili —
ON: Chad B i e re n KeC=US ublic Works,
CNt C gov, O=City of
Kent.OU Public Works, CN Chad eieren
g y : Datw,2022 10.28 10:21 26 07'00'
(signature)
Print Name: Chad Bieren, P.E.
Its Public Works Director
(title)
DATE:
EC
CHANGE ORDER - 2 OF 3
ATTEST:
r
Kent City Clerk
Me this field, you may enter the electronic fllepath where the cantract has been saved;
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
CHANGE ORDER - 3 OF 3
File No. 200.2
'Z�KENT
W... I --
CHANGE ORDER WORKSHEET NO. 1
Construction Engineering Division - Public Works
84th Av S (East Valley Highway) Slump Project No: 15-3009
Project: Repair
Project Engineer: Drew Holcomb Fed -Aid No: N/A
Capital Projects Phil McConnnell Contractor: Active Construction Inc
Manaaer:
Date: 9/19/2022
I. Proposed Change
Force Account 2. The additional repair of settled and damaged roadway adjacent to project limits. Work
included removal and disposal of existing asphalt. Placement of +/- 9 inches of HMA. The work was
performed by Active Construction Inc.'s sub Lakeridge Paving.
II. Reason and Background for Change
There was settled and damaged roadway adjacent to the project and directly over the sewer main. The
condition of this area of roadway required repairs to eleviate further damage of the roadway and
possible vehicle damage. Work consisted of grinding and removal of existing asphalt and placment of +/
9 inches of HMA. The work was directed after the original scoe of work was completed. It was mutually
agreed that the work would be performed as a force account.
III. Method of Payment
NEW PAY ITEMS ❑ Not applicable
Sch
No . Item Description
1 Extended roadway repairs adjacent to the
project, directly over the sewer main.
Total Est. Total Estimated Cost of
Qty Unit Unit Price Item
1 LS $18,925.03 $ 18,925.03
New Pay Items Total: $ 18,925.03
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑✓ Not applicable
Sch No. Bid Item No. Item Description Qty Unit Unit Price
Cost of Item
I
Page 1
-!
Delete Existing Pay Items Total: $ -
INCREASE/DECREASE TO EXISTING PAY ITEM(S) E]Notapplicable
. NoBid Item No. Item Description Qty Unit Unit Price Cost of Item
No.
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $18,925.03
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 40 Due This Change Order: 10 Previous Total: 40
Explanation/Justification for Additional Working Days:
*TOTAL WORKING DAYS: 50
* This Change Order + Previous Total
Capital Projects Manager:
Phil McConnell
Construction Engineeri7ason
Supervisor: Barry
Construction Manager:
Eric Connor
Date: 4ko-2
Z
Date: /o/v/9-1-,
Date:
Page 2
El
A.C.I.
PROJECT
CERQUI, CHRISTOPHER
CURTIS, RUSSELL
ADAMS, MICHAEL
REIS, JOSHUA
GIBBONS, SPENCER
JACOBSON, TYLER
KREGNESS, BRIAN
NEWELL. TONY
O'FARRELL, BRIAN
PEDERSON, CHRISTOPHER
MUNOZ, DANIEL
ORTEGA,CALEB
OWENS, TREVOR
CARLSON, W ILLIAM
SHARP,KEN
WALDRON, BRETT
JACKSON, JEFFREY
SHARP,KEN
EQUIP. NO.
PAV409
ROL245
ROL255
ROL266
GRA178
TKC086
TKC083
TKC104
TKC093
TKD055
TKDO52
TKDO33
TKDO53
TKC135
TKC132
GRA146
Complete Site Development
Contracts - Commercial - Residential
84th Ave S Slump Repair
DATE WORK PERFORMED: 9.19.2022
DESCRIPTION OF WORK
MANPOWER
10 GENERAL LABORER
1D GENERALLABORER
2A BACKHOE 75 & UNDER
2R ROTOMILL
'2U SCREEDMAN
'2U SCREEDMAN
'2Q ROLLER PLANT MIX
'2Q ROLLER PLANT MIX
'2Q ROLLER PLANT MIX
'2V SPREADER TOPSIDE
"1A RAKER
"1A RAKER
"1A RAKER
3A DUMPSTER 0-16 YOS
3A DUMPSTER 0-16 YDS
3A DUMPSTER 0-16 YDS
3B LWBD-HVY TRAILER
38 LWBD-HVY TRAILER
'Operators Union Compensation
"Laborers Union Compensation
LABOR CLASS RATES
HOURS
@
RATE
TOTAL
4.00
@
$54.62
$218.48
4.00
@
$54.62
$218.48
4.00
@
$77.53
$310.12
2.00
@
$76.09
$152.18
3.00
@
$76.77
$230.31
3.00
@
$76.77
$230.31
3.00
@
$75.50
$226.50
3.00
@
$75.50
$226.50
3.00
@
$75.50
$226.50
3.00
@
$76.77
$230.31
3.00
@
$57.31
$171.93
3.00
@
$57.31
$171.93
3.00
@
$57.31
$171.93
1.25
@
$69.11
$86.39
4.00
@
$69.11
$276.44
2.50
@
$69.11
$172.78
2.75
@
$69.95
$192.36
1.75
@
$69.95
$122.41
18.00
@
$27.87
$501.66
9.00
@
$11.81
$106.29
SUBTOTAL LABOR
$4,243.81
EQUIPMENT DESCRIPTION / RATES
EQUIPMENT DESCRIPTION
HOURS
@
RATE
2006 BLAWKNOX PF 4410
3.00
@
$150.00
2002 INGERSOLL RAND TANDEM VIBE DD90HF
3.00
@
$60.00
2019 HAMM ROLLER HD 12VV
3.00
@
$40.00
2020 BOMAG ROLLER TANDEM VIBE BW900-50
3.00
@
$40.00
2017 WIRTGEN GRINDER W120CFI
2.00
@
$600.00
2001 INTERNATIONAL OIL DISTRIBUTOR
3.00
@
$75.00
1995 INTERNATIONAL FLATBED
3.00
@
$25.00
2015 GMC SIERRA 3500
3.00
@
$20.00
2007 INTERNATIONAL 4300
3.00
@
$25.00
2022 PETERBILT 5675UPERDUMP
5.75
@
$105.00
2020 PETERBILT567 SUPERDUMP
1.25
@
$105.00
2007 KENWORTH 5 AXLE DUMP
2.75
@
$95.00
2020 PETERBILT 567 SUPERDUMP
2.50
@
$105.00
2019 CHEVY MEDIUM DUTY 550OHD
4.00
@
$25.00
2021 CHEVY SILVERADO 350OHD
4.00
@
$20.00
2004 4X4 CASE 580M SERIES II BACKHOE
4.00
@
$45.00
SUBTOTAL EQUIPMENT
MATERIAL COSTS
DESCRIPTION
UNIT
@
RATE
1/2" HMA PG58V-22 - ICON AUBURN
45.83
TN @
$79.10
DUMP FEE - GRINDINGS
35.36
TN @
$13.00
SUBTOTAL
MATERIALS
SUB CONTRACTOR
DESCRIPTION
UNIT
@
RATE
MSI SWEEPER
6.50
HR @
$152.77
SUB CONTRACTOR SUBTOTAL
MARK-UP ON LABOR
31%
SUBTOTALLABOR
MARK-UP ON EQUIPMENT
21%
SUBTOTAL EQUIPMENT
TAX ON MATERIALS
(N/A ON WATER &
SEWER)
10.10%
MARK-UP ON MATERIALS
21%
SUBTOTAL MATERIALS
SUBTOTAL
SUB -CONTRACTOR
COST
MARK-UP ON SUB -CONTRACTOR
COST a$25,000
(Varies)
12%
GRAND TOTAL
TOTAL
$450.00
$180.00
$120.00
$120.00
$1,200.00
$225.00
$75.00
$60.00
$75.00
$603.75
$131.25
$261.25
$262.50
$100.00
$80.00
$180.00
$4,123.75
TOTAL
$3,625.15
$459.68
$4,084.83
TOTAL
$993.01
$993.01
$1,315 58
$5,559.39
$865.99
$4,989.74
$412.57
$857.81
$5,355.22
$16,897.35
$2,027.68
$18,925.03
Customer No:
60304
Invoice No:
3485736
Inv Date:
09l19/22
Page:
Page 1 of 1
Customer PO:
#22133M
1508 Valentine Ave SE
Pacific, WA 98047
Customer Job:
Active 84th Slump
Lakeridge Paving Co. ICON Materials
PO Box 8500 1508 Valentine Ave SE
Covington WA 98042 Pacific, WA 98047
206-575-3200
ap@lakepay.com
Date CEode - Material Descrif CITY UM Unit Price Matl Total Tax Total
Plant:04500 Auburn Asphalt09119122
12164230 -1/2" PG 58V-22 (70-22) 45.83 TON 78.75 3,609.11 0.00 3,609.11
09/19/22 467750 - Fuel Surcharge - Ton 45.83 TON 0.35 16.04 0.00 16.04
Total Invoice: 91.66 3,625.15 0.00 3,625.15
Ticket number(s) shipped from plant 04500 - Auburn Asphalt
*45081120 `45081134
We Appreciate You and Your Business!
New Portal Website as of Sept. 2021 - https://mycentratpremix.myamatportaLcom/ Questions? Accounts Receivable Department
Contact 509-536-3042.
Finance Charges will be applied to any late invoices at a rate of 1.5% per month per credit agreement or the State's Lawful Amount
Invoice Amount: 3,625.15
Amount Paid:
Customer Name:
Lakeridge Paving Co.
Customer No:
60304
If you have any questions about your invoice please call 206-575-3200
Invoice #:
3485736
Date:
09/19/22
Remit Payment To: ICON Materials
Customer Job:
Active 84th Slump
PO Box 742421
Customer PO:
#22133M
Los Angeles, CA 90074
Due Date:
10/19/22
Please provide your email address below it you would like to start receiving your invoices via email
1508 Valentine Ave SE
Pacific, WA 98047
Lakeridge Paving Co.
PO Box 8500
Covington WA 98042
ap@lakepay.com
Date CEode - Material Descrip
Plant: 01500 Auburn S&G
09119122 565640 -BROKEN ASPHALT
Customer No:
60304
Invoice No:
3485702
Inv Date:
09/19/22
Page:
Page 1 of 1
Customer Job: 22133M
ICON Materials
1508 Valentine Ave SE
Pacific, WA 98047
206-575-3200
QTY UM Unit Price Mail Total Tax Total
35.36 TON 13.00 35.36
Total Invoice: 35.36 35.36
Ticket number(s) shipped from plant 01500 - Auburn S&G
*406057 *406108
We Appreciate You and Your Business!
New Portal Website as of Sept. 2021 - https:/imycentralpremix.myamatportaLcom/ Questions? Accounts Receivable Department
Contact 509-536-3042,
Finance Charges will be applied to any late invoices at a rate of 1.5% per month per credit agreement or the State's Lawful Amount
Invoice Amount: 459.68
Amount Paid:
Customer Name:
Lakeridge Paving Co.
Customer No:
60304
If you have any questions about your invoice please call 206-575-3200
Invoice #:
3485702
Date;
09/19/22
Remit Payment To: ICON Materials
Customer Job:
22133M
PO Box 742421
Los Angeles, CA 90074
Due Date:
10/19/22
Please provide your email address below if you would like to start receiving your invoices via email
0.00 459.68
0,00 459.68
MCDONOUGH AND SONS, INC.
27218 SE Kent Kangley RD
' PO Box 461
www.MS,tsweep.com Ravensdale, WA 98051-9581
(415) 4.31--1054
BILL TO SHIP TO
Lakeridge Paving Co., LLC 22101 84th Ave S
Attn: Brandie Kent, WA
P.O. Box 8500 Josh 206-396-0800
Covington, WA 98042
Invoice
DATE INVOICE #
9/19/2022 258904
P.O. NO. TERMS
22133M Net 10 Days
QUANTITY DESCRIPTION RATE AMOUNT
6.5 Prevailing Wage sweeping service with air truck on 152.00 988.00
September 19 - #13814
1 Fuel Surcharge - 6.00 per service 5.00 5.00
Subtotal
$993 00
Sales Tax (9.4%)
$O.ti
Total
$90.00