HomeMy WebLinkAboutCAG2022-162 - Change Order - #1 - Westmark Construction, Inc. - Police Firing Range Ventilation Upgrade - 04/21/2022ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: Director or Designee Date of Council Approval: Grant? Yes No Type:Review/Signatures/RoutingComments: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? Yes No* Business License Verification: Yes In-Process Exempt (KCC 5.01.045) If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? Yes No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 Budget Account Number: Budget? Yes No rev. 20210513 FOR CITY OF KENT OFFICIAL USE ONLY * Memo to Mayor must be attached Jan RachApple Sup/Mgr: 4 Leah Bryant Parks, Recreation & Community Services 09/26/2022 ASAP 4/5/2022 N20094.64110.9421 4 4 N/A Contract 2480406 Change Order ASAP Bid 12/31/2023 4 4 4 $1,172.39 ECH ECH Sep 26, 2022 CHANGE ORDER - 1 OF 3 CHANGE ORDER NO. #1 NAME OF CONTRACTOR: Westmark Construction, Inc (“Contractor”) CONTRACT NAME & PROJECT NUMBER:Police Firing Range Ventilation Upgrade Project, CAG2022-162 ORIGINAL CONTRACT DATE: 4/21/2022 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled “Description of Work,” is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: As described in attached Exhibit A, incorporated herein, contractor shall provide additional labor and materials for removing existing outdated lighting and installing new LED lighting in the firing range. Also, we are extending the completion date 365 calendar days due to lead time on parts. 2. The contract amount and time for performance provisions of Section II “Time of Completion,” and Section III, “Compensation,” are hereby modified as follows: Original Contract Sum, (including applicable alternates and WSST) $448,968.19 Net Change by Previous Change Orders (incl. applicable WSST) $0 Current Contract Amount (incl. Previous Change Orders) $448,968.19 Current Change Order $1,060.99 Applicable WSST Tax on this Change Order $111.40 Revised Contract Sum $450,140.58 CHANGE ORDER - 2 OF 3 Original Time for Completion (insert date) 12/31/2022 Revised Time for Completion under prior Change Orders (insert date) NA Days Required (±) for this Change Order +365 calendar days Revised Time for Completion (insert date) 12/31/2023 In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: By: (signature) Print Name: Its (title) DATE: CITY OF KENT: By: (signature) Print Name: Its (title) DATE: charles weeks (Sep 26, 2022 11:01 PDT) charles weeks charles weeks Project Manager Sep 26, 2022 Eric Hemmen (Sep 26, 2022 11:52 PDT) Eric Hemmen Eric Hemmen Assistant Chief Sep 26, 2022 CHANGE ORDER - 3 OF 3 ATTEST: ___________________________ Kent City Clerk APPROVED AS TO FORM: (applicable if Mayor’s signature required) Kent Law Department [In this field, you may enter the electronic filepath where the contract has been saved] 6102 N 9th St, Suite 400 Tacoma, WA 98406 H:\Forms\Contract Forms Page 1 of 1 9/22/2022 COP Contractor Breakdown Summary Project Name: Project No.22-C032 9/22/2022 COR 001 Direct Labor Costs:Cost Code a.Admin/Project Accounting 01-0010 120.50$ b.Project Engineer 01-0015 -$ c.Project Manager/Acct Exec 01-0020 -$ d.General Superintendent 01-3050 -$ e.Site Superintendent w/ Tools 01-3105 -$ f.Site Superintendent NO Tools 01-3107 -$ g.Service Technician 01-3115 -$ h.General Labor/Truck Driver 06-0590 -$ i.Carpenter 06-1000 -$ j.Premium Time 01-3150 -$ k.Overtime Allowance 01-3160 -$ DIRECT LABOR SUBTOTAL 120.50$ e.direct supervision (% of 1a)15.0%18.08$ f.safety (% of 1a, b,& c)2.0%2.41$ 140.99$ 2. MATERIAL COSTS Cost Code a.material total from cost breakdown form 06-0500 -$ -$ 3. EQUIPMENT COSTS Cost Code a.equipment total from cost breakdown form 01-6450 -$ -$ 4. SMALL TOOLS Cost Code a.small tools (% of 1a & b)3.0%01-6490 3.62$ 3.62$ 144.60$ a.Portion of 1, 2, 3, & 4 up to $50,000 10.0%14.46$ b.Portion of 1, 2, 3, & 4 in excess of $50,000 8.0%-$ 14.46$ 6. SUBCONTRACTORS Cost Code a.26-0500 795.00$ b. c. d.-$ e.-$ f.-$ 795.00$ a.Portion of Line 6 up to $50,000 10.0%79.50$ b.Portion of Line 6 in excess of $50,000 8.0%-$ 79.50$ a.1.0%% of 1 1.41$ b.1.0%% of 1-7 10.34$ 11.75$ a.1.5%% of 1-8 15.68$ 15.68$ 0 1,060.99$ Tax 10.50%SALES TAX 111.40$ TOTAL WITH TAX 1,172.39$ Owner:Architect:Westmark Construction: Signature Signature Signature Print Name & Date Print Name & Date Print Name & Date SUBTOTAL 1 thru 4 5. OVERHEAD & PROFIT 5. OVERHEAD & PROFIT bond 9. BOND 8. INSURANCE payroll driven liability insurance volume driven liability insurance 9. BOND 8. INSURANCE North Shore Lighting Charles Weeks 9-22-22 Number of days schedule change:TOTAL COST Charles Weeks 9-22-22 Labor Markups: Itemize all costs on attached COP Cost Breakdown form. Supervision markup should be zero if Superintendent time is included in direct labor costs. 3. EQUIPMENT COSTS 4. SMALL TOOLS 2. MATERIAL COSTS Kent Police Firing Range Upgrade RFI 1. CRAFT LABOR COSTS Source Documents: New light as the existing are not compatable with a drop down T bar ceiling 1. CRAFT LABOR COSTS Description: Date: Contractor:Westmark Construction Inc Contractor Ref. No. 7. OVERHEAD & PROFIT OF SUBCONTRACTORS 6. SUBCONTRACTORS 7. OVERHEAD & PROFIT OF SUBCONTRACTORS Nathen C. Harper 9/26/22 N/A N/A Exhibit A Due to the changes of constant improvement in LED technology, all details are subject to change without notice. Consult factory for up to date information. www.iuseelite.com By Elite Lighting EMERGENCY LUMENS DIMMING & CONTROL COLOR QUALITY SIZE MOUNTING CRI LIFETIME PHOTOMETRIC TESTS CCT 3000/ 4000/ 5000 10W - Up to 1000L output (Bodine BSL310) 20W - Up to 2000L output (Bodine BSL20) 0-10V Flicker Free 10% Dimming Standard (DIM10) 35K/ 40K/ 50K 3 Step MacAdam Ellipse 2’x4’, 2’x2’, 1’x4’ Recessed, Suspended, Surface Mount 85+ L70 at 60,000 Hours In Accordance with IES LM79-08, LM80 and TM-30, TM-21 FEATURES The clean design of the FLP1-BL provides a modern alternative to traditional fluorescent troffers. Available in 1x4, 2x2, and 2x4. Backlit design delivers unmatchable uniform light distribution. Easily adjust brightness level (multi-lumen) and color options (multi-CCT) in the field with multi-lumen and multi-CCT selectors. Perfect for offices, schools, healthcare, hospital, retail, among other applications. 2’ x 4’ Architectural LED Flat Panel Backlit with Multiple Lumens and CCT 24-FPL-BL-LED 2’x4’ NOMINAL LUMENS DELIVERED LUMENS WATTAGE 5000 5250 50 W 4000 4200 40 W 3000 3150 30 W Based on 4000K, 85+ CRI. Actual wattage may vary +/- 5% CRI90 VOLT DIMMING120VTRIACWATT5LUMENS300CCT40Kup to 3500K •4000K • 5000K EASY 3 COLORS 23-7/8” 47-7/8”1-3/4” By Elite Lighting Due to the changes of constant improvement in LED technology, all details are subject to change without notice. Consult factory for up to date information. www.iuseelite.com MAINTENANCE LED engines and driver are removable and upgradable even after installation. Luminaire can be regularly and safely wiped down for peak performance. OPTICAL SYSTEM Backlit design provides exceptional light distribution. Illumination is spread across the entire surface of the panel, emitting soft, even light. A 110-degree beam angle ensures clear, shadow-free light. CONSTRUCTION 20-gauge cold rolled steel body, post-painted for durability. White finish standard. All corners are rounded for safe handling. Multiple wiring entrances allow for easy access. MOUNTING Easy to install. Mounting hardware included. Accommodates lay-in ceilings, Slot T, and T-bar suspension systems for 5/8” and 3/8” ceiling widths. Four corner tie points and built-in earthquake clips come standard. Options for flange kits, surface mounted kits, and more. OPTIONS Luminaires can be shipped pre-installed with whips, modular wiring systems, daylight harvesting controls, occupancy sensors, and power packs for individual or room control applications. DRIVER ELECTRICAL INFORMATION Powered by high-quality constant-current power LED drivers which are rated for 50 to 60Hz at 120/277V input. Available in 347V., produce less than 20% THD, and have a power factor of .90 to 1.00. DIMMING & DRIVER INFORMATION DIM10 - Flicker Free 10% Dimming Standard (DIM10) 0-10V dimming on either MVOLT 120, 277 or 347V. WARRANTY Five-year warranty for parts and components. (Labor not included) LISTINGS c-UL-us - Listed for Feed Through Wiring. Listed for DLC, California Title 24 compliant. 2’ x 4’ Architectural LED Flat Panel Backlit with Multiple Lumens and CCT 24-FPL-BL-LED 2’x4’ Example: 24-FPL-BL-LED-3000/4000/5000L-DIM10-MVOLT-35K/40K/50K-85 FIXTURE SIZE 24 - 2’ X 4’ SERIES FPL-BL - LED Flat Panel Backlit VOLTAGE MVOLT EMERGENCY O-EMG-LED-10W O-EMG-LED-20W CCT 35K/40K50K CRI 85 TYPE LED LEDFPL-BL24 LUMENS 3000/4000/5000L DIMMING DIM10 - 0-10V Dimming OTHER OPTIONS 24FK 24-FPL1-LED-SMK FBF SBF RIS USA - 2’x4’ Flange Kit - 2’x4’ Surface Mount Kit - Internal Fast Blow Fuse - Internal Slow Blow Fuse - Radio Interference Suppressor - Made in America Compliance By Elite Lighting Due to the changes of constant improvement in LED technology, all details are subject to change without notice. Consult factory for up to date information. www.iuseelite.com 1’ x 4’ Architectural LED Flat Panel Backlit with Multiple Lumens and CCT 14-FPL-BL-LED 1’x4’ 1- Luminaire will be shipped with Powerpacks pre-installed, ready to be integrated to designated contol systems 2- Luminaire will be shipped with Sensors installed on the luminaire, allowing for individual luminaire control. Luminaires will be ready to be integrated with designated control systems 3- Luminaire will be shipped with Sensors to be remotely installed on the ceiling. Luminaires will be ready to be integrated with designated control systems BRAND CONTROL UNIT o LEDRU LED Relay Zone Controller 0-10V 1 o FCJS-010 Lutron Vive 0-10V Individual Pow Pak (Luminare is shipped Vive Enabled) 1 4 o CU-4E-FMH Fixture Mount Control Unit 1 5 o ZL027 –N0W Intellect Power Control Module 1 6 o EN-WCM2-ZB-DR Wireless Control Module 1 7 o SBR -BS Xitanium SR Bridge 1 8 o LMFC-011 ON/OFF/0-10V dimming fixture controller 1 9 o EN- ALC-ZB-BK-DR Wireless Area Lighting Control Module 1 7 o LEDDU LED Zone Controller 0-10V 1 o FCJS-ECO Lutron Vive Eco-system Pow Pak (Luminare is shipped Vive Enabled) 1 4 o ZL027 –N0W Intellect Power Control Module 1 6 o ZBHA-CLM-DIM-ENC Connected Lighting Module DIM 1 7 INTEGRAT SENSOR N/A N/A N/A N/A N/A N/A N/A *WIRELESS OCCUPANCY SENSOR o EOSCU-W-EO Occupancy Sensor - Ceiling Mounted (Must be specified with LEDRU or LEDDU control unit) 3 N/A N/A N/A N/A N/A o LMDC-100 Dual technology PIR Ceiling Mount Occupancy Sensor 3 *WIRELESS DAYLIGHT SENSOR o ELLSU-W-EO Light Level Sensor - Ceiling Mounted (Must be specified with LEDRU or LEDDU control unit) 3 N/A N/A N/A N/A N/A o LMLS-400 Single zone switching and dimming digital photosensor 3 *WIRELESS OCCUPANCY & DAYLIGHT SENSOR N/A N/A o SU-5E-IoT IoT Node Micro Sensor 3 o SU-5E-CL Connected Lighting Micro Sensor 3 o SU-5E-IL Independent Lighting / Enlighted One Micro Sensor 3 o SU-5S-H-(IoT/CL/IL) Surface Mount Sensor 3 (Must be specified with CU- 4E-FMH Control Unit) o ZL00J -T0W Intellect Intelligent Fixture Control System 3 (Must be specified with ZL027 –N0W Control Unit) o EN-CLM-PIR-DD-ZB SensiLUM™ Wireless Integrated Sensor o EN-SCPPH-1500-ZB Wireless Passive Infrared Occupancy and Photo Sensors 3 (Must be specified with EN-WCM2-ZB-DR or EN- ALC-ZB-BK-DR Control Unit) o SNS200- CMP SNS200 for grouping 3 N/A ACCESORIES N/A N/A o TMC-SU-5E Tile Mount Carrier o CBL-5E-CU4-30N 30 inch Sensor Cable for CU-4 and IoT ReadyTM drivers o CBL-5E-CU4-7F 7 foot Sensor Cable for CU-4 and IoT ReadyTM drivers N/A N/A N/A N/A NOTES N/A 4- Luminaire will be compatible with Lutron LRF2-OCR2B-P-WH Ceiling mount360° occupancy/va- cancy sensor & LRF2-DCRB- WH Ceiling-mount daylight sensor. Sensors must be ordered through Lutron. 5- Luminaire will be compatible with ENLIGHTED SU-5E-IoT, SU-5E-CL, SU-5E-IL, SU- 5S-H, Sensors. 6-Luminaire will be compatible with Leviton Intellect App & Keypad Room Controller 7-Luminaire will be compatible with EN-SCPPH-1500-ZB Wireless Passive Infrared Occupancy and Photo Sensors 8-Luminaire will be compatible with Philips field and wireless switch. 9-Luminaire will be compatiable with DLM Room control system LMPB-100. DLM control system must be orderd through Legrand. WATTSTOPPER® EasySense Signature: Email: Melissa McCormick (Sep 26, 2022 12:05 PDT) Melissa McCormick cityclerk@kentwa.gov CAG2022-162 - Change Order 1- Westmark Construction, Inc. - Police Firing Range Final Audit Report 2022-09-26 Created:2022-09-26 By:Leah Bryant (lbryant@kentwa.gov) Status:Signed Transaction ID:CBJCHBCAABAAg3WlUX76ygJ-6dJNanxm2GsZAuglh5i8 "CAG2022-162 - Change Order 1- Westmark Construction, Inc. - Police Firing Range" History Document created by Leah Bryant (lbryant@kentwa.gov) 2022-09-26 - 5:53:24 PM GMT Document emailed to cweeks@westmarkconst.com for signature 2022-09-26 - 5:56:40 PM GMT Email viewed by cweeks@westmarkconst.com 2022-09-26 - 5:59:49 PM GMT Signer cweeks@westmarkconst.com entered name at signing as charles weeks 2022-09-26 - 6:01:29 PM GMT Document e-signed by charles weeks (cweeks@westmarkconst.com) Signature Date: 2022-09-26 - 6:01:31 PM GMT - Time Source: server Document emailed to ehemmen@kentwa.gov for signature 2022-09-26 - 6:01:33 PM GMT Email viewed by ehemmen@kentwa.gov 2022-09-26 - 6:50:22 PM GMT Signer ehemmen@kentwa.gov entered name at signing as Eric Hemmen 2022-09-26 - 6:52:29 PM GMT Document e-signed by Eric Hemmen (ehemmen@kentwa.gov) Signature Date: 2022-09-26 - 6:52:31 PM GMT - Time Source: server Document emailed to Kim Komoto (kkomoto@kentwa.gov) for signature 2022-09-26 - 6:52:33 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2022-09-26 - 7:02:36 PM GMT Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date: 2022-09-26 - 7:02:49 PM GMT - Time Source: server Document emailed to cityclerk@kentwa.gov for signature 2022-09-26 - 7:02:51 PM GMT Email viewed by cityclerk@kentwa.gov 2022-09-26 - 7:03:18 PM GMT Signer cityclerk@kentwa.gov entered name at signing as Melissa McCormick 2022-09-26 - 7:05:29 PM GMT Document e-signed by Melissa McCormick (cityclerk@kentwa.gov) Signature Date: 2022-09-26 - 7:05:30 PM GMT - Time Source: server Agreement completed. 2022-09-26 - 7:05:30 PM GMT