Loading...
HomeMy WebLinkAboutCity Council Meeting - Council Workshop - Regular Minutes - 05/03/2022 Approved City Council Workshop • Workshop Regular Meeting KENT Minutes WAS M IN G 7 0 N May 3, 2022 Date: May 3, 2022 Time: 5:02 p.m. Place: Chambers I. CALL TO ORDER Attendee Name itle Status _Arrived Bill Boyce Council President Present Brenda Fincher Councilmember Present Satwinder Kaur Councilmember Excused Marli Larimer Councilmember Present Zandria Michaud Councilmember Present Toni Troutner Councilmember Present Les Thomas Councilmember Present Dana Ralph I Mayor Present II. PRESENTATIONS 1 Transportation Sustainability Update Rob Brown 90 MIN. Bill Thomas Street and Vegetation Manager, Bill Thomas reviewed Public Works Transportation 2021 completed projects, including: Meet Me on Meeker - Russell Rd - GRE Lake Fenwick Road - Chip Seal 212th and 208th Street projects Thomas reviewed residential area completed projects, 2021 paving by City staff and pavement resurfacing/repaving. 2022 projects include: South 212st Street - Green River Bridge to Orillia, the pavement preservation work plan and 2022 paving by City staff. Future projects include: South 196th UPRR Spur track to East Valley Hwy 116th and South 277th chip seal 84th Ave S Central Ave to James S. 84th Ave S and 212th Street - overlay Principal Arterial Streets have a life cycle is approx. 12-15 years Minor arterial streets life cycle is approx. 15 years Residential Collector Streets - life cycle approx. 15-20 years life span Residential streets life cycle is approx. 25 years City Council Workshop Workshop Regular May 3, 2022 Meeting Kent, Washington Minutes ......................................................................................................................................................................................................................................................................................................._............................................................................................................................................................................................................... Pavement Condition index is how City grades the roads. Thomas reviewed the project pavement condition indexing map. Thomas provided specific information on potholes, concrete roads, sidewalk inspections and monitoring, crack sealing, line striping and raised pavement markings. Thomas went into the guardrail annual maintenance needs in addition to signs and markings - lifespan, maintenance and cleaning and provided an overview of the workplan to replace signs. Thomas talked about annual maintenance to the City's 21 bridges and discussed the City's street tree program. Transportation Engineering Manager, Rob Brown covered: Traffic Safety - reviewed average crashes each year on City streets Reviewed 2020 crash statistics Reviewed grants applied for in 2020 - 4 pedestrian bicycle safety grants and 2 safe routes to schools grants The Local Road Safety Plan is a data-based crash analysis and focuses on analysis of serious and fatal injury crash data over the previous 5 years - used for specific spot locations and city-wide systemic identifications. The City is required to have a Plan in order to qualify for safety grants from PCRC and WSDOT safety grants. Brown reviewed the Residential Traffic Calming Program that focuses on neighborhood livability and provided examples of traffic calming projects throughout the City. Brown reviewed the City's work on the Americans with Disabilities Act Transition Plan for the Public Right-of-Way and also discussed related improvements. Details were provided regarding the City's traffic signal system that includes: traffic signals, flashing beacons, school zone flashers and radar speed signs. The traffic signal system inventory map was reviewed. Brown reviewed traffic signal maintenance and repair that included: Annual parts Auto collisions Storm damages Overall aging system. ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Page 2 of 3 City Council Workshop Workshop Regular May 3, 2022 Meeting Kent, Washington Minutes ......................................................................................................................................................................................................................................................................................................._............................................................................................................................................................................................................... Information was provided regarding Traffic signal pole maintenance, repair and replacement, span wire traffic signals, traffic signal controllers, uninterruptable Power Supply Cabinet Installation, traffic signal timing, traffic signal communication, traffic cameras and traffic loops. Brown touched on street light maintenance and replacement, graffiti removal, tree trimming and brush cutting around traffic system, copper wire theft and decorative right-of-way lighting. Brown talked about the City's Transportation Master Plan that was adopted last year. The Transportation Master Plan feeds into the Transportation Improvement Program. Brown closed his presentation with providing statistics on the volumes of traffic on the freeways around the area from 2019 - 2022. Meeting ended at 6:28 p.m. KLwa�ley A. K&m oto- City Clerk ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Page 3 of 3 MEN % 2022 Transportation Sustainability May 3, 2022 KENT WASHINGTON - sl Traffic Safety OUR Average . 11 crashes each year on streets. SPEED LIMIT 1 a • 1,789 reported crashes (down 26 /o) 25, • 1,207 non-injury crashes (down 24%) 2020 • 582 injury crashes (down 30%) Jam: Statistics : • 49 serious injury and fatal crashes (up 2%) •56 pedestrian involved crashes (down 12%) 917 bicycle involved crashes (down 26%) — .1 Ica Grants i applied • 4 Pedestrian and Bicycle Safety Grants • •1 1 2 Safe Routes to Schools grants City of Kent Local Road SafetyPlan Systemic Lccal Road Safety Plan Prepared by Erik M. Preston, P.E. City Traffic Engineer March 2022 L-W 23M5.C.&5401 dM1d 23..S.Cade 5 +`-q!4 dsu,�d0��1u�Yd�{.uhduJrs,I..i—.kd a.—I..d rtr�t Nrpau ar WCH'RILq. [ I MM.ft p WMM[rm WY , rll .a,{It *G dll116L LabJIQ m dlOCv—V.MIYmld—d J—:d Fd—I 5[M1{pyL p xaedtrpd i8f61dt�{a1 ra d[htr WiGyrLLL IM1 Lr\!bL[Y1M1 rw dY1L8(Itl—g A—" bfdlrifK`kY i IG[IOGM1 M1itrY Yartd dd6 tl6Ld u�L�r�ii,LuiY!}1,..__,Jyi,IlLli,8�d511. 1 J r /IAY - .- Residential Traffic Calarnin 9Pro ram New program adopted in 2020 and updated in 2022 Focused on neighborhood livability � s _ 33 requests in 2021 Budget of $150,000 per year includes traffic studies, public outreach, and construction 100t" Ave and SE 244t" Ct City of Kent a • ' ° ..R Residential Traffic fNs at }, s:, Calming Program (RTCP) �,; 'r :• ' �,, (2018 to Present) Sea Ta - .., R@f7 a N5 , wnw N unn CM �� aayy�p� k� a � Rd�+dC:eniPi Lene Revised April S, 2022 L rA J. r � J 4 + A i •.tion _ 269 Sr ��1 - r,'.I � r .r LAKE Y -- � l�y i xrERrOInN T- i .T.wr Auburn I � map"of 1 � . • r � _ � _ 1 s_ Wit{ Ave S, 240th St to 248th St 3rd Ave -S z sror a, Val— SE 223rd Dr & 118th Ave SE Russell Rd at Green Riven R 132nd Ave SE at Wilson field - r Improve crosswalks for non motorized users West Valley Hwy and Kent °, Mid-block and unsignalized locations Meeker St Regional Trail F Including: V57u- Rectangular Rapid Flashing Beacons RRFB s ' Pedestrian Hybrid Beacons (HAWK signals) '� r -:��=��_� 1 W U - Upgraded Pedestrian Pushbuttons New Marked Crosswalks a 116th and 256tn __ _ �, 4.- 4th and Willis Befo re Required by the Inventory of curb r ' p� GA 1990 ADA ramps has been b �" completed Need to inventory - - - - sidewalks Public input driveways, traffic required for signals and bus prioritization stops In. Construction L j+iAU.L jate,�rm r \ �� �� • - ' . • . o a C - • ' . • . • • � ADA Crosswalk and Sidewalk Improvements va 1st Ave N between , o Meeker and GoweAw 1 a Smith St �r, •� , — 'I - w. '�' ` betweenAT State Ave and Central Ave 4 Willis between 2nd Ave and 3rd Ave 4 _ ADA and Driveways Smith St between Kennebeck Ave and 10 n . State Ave ADA and 27800 block of 9 . Sidewalks SE-2771h PI and 121s' PI SE Rj 124th Ave SE Ne", 1 � 5¢'. •„ ems_- � .� �'`u�, "r r a*. 2a .�• t >'� , 3 ti _ t ,^dA e 11 J� z.. V. - -- Traffic ADA Signal { Im provernents 104th Ave S SE 264th St ILI Before Approximately $6,500 rArproximately $2,500 Required by the 1990 per intersection for Pedestrian Countdownerntersection butADA ped push buttons Timers equires curb ramps to be compliant ® START CROSSING Watch For Vehicles , �" � DON'T START ;■ Finish Crossing 62%completed to date F aS�N�. If S ® TIME REMAINING „,DER To Finish Crossing intersetion 51EAD� f DON'T CROSS w_ I PUSH BUTTON z $35,000 to complete 14remainin TAg 9 E x• o _ PUSH 1' BUTTON TO LIE. TURN ON AMI WARNING °. to eeker St 4t and Willis 64t" Ave S Tonal Trail Accessible Pedestrian e • e and Leading Y _ E -- �.e orttr FOp at o_ — >r1-- le 000 Y � %IIUINIU111 � In - House Pre Fi7brication yT, 14 � ,�q To finish Crossinc �:EROY . D ONTCS Qeell 0 \3\ �`' PUSH BUTT'ROON w. - 253.6c�6.110 SS v r • - :�1 ` 1 START CROSSING _ +� �;• r, ;■, Finish Crossing - / r �� `�� �`4 _ 'ti-aa y�s -TIME REMAINING / ��• ' �\To Fmish Crossing :;J '' ' ■ DON'T CROSS �c � . ' �� _ - . J ;7� ■ 99 and S 272nd i � . . ■ � � � � II '� ���►\"�- � .t 'per w �. tp•_ c„ 105t" Ave SE & SE 208t" St 152"d Way SE and Lake Meridian Ped Signal IN Y f Traffican Street Lights Meeker St U... R�msa M" f �'J_;..�_- —ti}C...• .- - '� ;{. • - - ' - •a jJ .Yy.nY'Fei�iy`.C"ai. n!Wl. .. ■ .� _ .:.� cis...• — ' ' A�i4- ■ :_ - � + ..ram � ,•- - _ JF roll ¢ — I � � 117 - Traffic 12 - Flashing 44 - School 25 - Radar 17 - Enhanced Total Value Signals Beacons Zone Flashers Speed Signs Pedestrian $60 - $70 Crossing Million BqienTM.-: Renton City of Kent lei 14.3 6f Traffic Signal System SeaTac ivav Inventory P 1.46? Y/ 0 A Enhanced Crosswalk Flashef "CP-1000 '(D SE?I;js r Cob F M Radar Speed Sign V AL A 0 4 School Zone Flasher 0 0 Ods Moine5 .91 . . .. 0 Traffic$19nal C) -0 *Do 0 1 0 0 va AP A ro 01 io kwYkGd Juno 2W70 -s j 5.? SIII 0 G�-- nr - 4 OF 4'y 111-k ! ! 0 . i.t Covington 7 ct 01 0 21M r_r S,761I—I; Federal Way Auburn tran20-9xnxif �KU; Traffic Signal - IJ Maintenance : And Repair � ' Annual parts costs $240,000 Auto collisions - ' *Does not include Avg. $60'000 poles, signal cabinets or UPS .p ........... E Smith St a � Storm e dams g Overall Aging Avg. $40,000 system Fes.. n L� 1 ve"a n 4w ' {�`' ;j► = About 450 traffic signal poles K i -�-- 50-year life cycle low 64th Ave S and S 212th St 108th Ave SE and SE Kent Kangley Rd Average per pole $80K - $90K each eea o bUUK per year For signal pole replacement se zoe tr ; �y z Costs include design and contract administration i 1 64t.h Ave S and yS 228th St t ve SE and SE 208th St R C { x L r - AV�.. t 3\ 4th Ave & Meeker St 104th & 240th 68t" & 228th Central Ave & 259th We Have Six Damaged Poles That Will Need To Be Replaced Rr j ; � •{}.. 132nd Ave SE & S Ot Span Wire Signals are Temporary r _ 14 Span Wire Signals , a Umber Poles Need Replacement s �: s � In R ; lM NNW 100th Ave SE & SE 240th St �'�i6etrrrr � �il ae si r Traffic Signal �,i� _ n r r C t e s .39 by Signal team - e c '� -;� *Last legacy controller was removed on 11- f � 16-2021 at 105t" pl SE & S 208t" St. Completing City wide conversion Cc �Qom WIP "I ' �� �,,.�,Comm Manager e.0 •2 controller cabinets replaced by Signal team q •4 controller cabinets upgraded by Signal team •Involving issues with the legacy controller units 1} y�c� _ tt •Ec oLl r�y {c a PN1 E�w I u o o s�wuw:e� li4 .o .000Is U 000 _ i p1 � • � ® M.M.U. • n �v; Lsa 1401" & 2561" 140t" & 256tn Antique Electro-Mechanical Controller New TS2 Fire Signal Cabinet Antique Smignal Controller w 108th Ave Sl an8 SE 222nd St J _- Traffic Controller ne C b t a � Replacement West Valley Hwy &-199thr �r IW_ u 1 - , • Vag y A d 104th Ave SE and 260th.St 25-year life-cycle is City crews have currently at 46% replaced 54 x [ completion. controller cabinets. 5 more are scheduled to be replaced in 2022. f r West Valley Hwy and To' }vd - 68-th Ave S�, c ( t y r —a b T � ,snll Ih• i•�Y G p - f• ��. i 1 %� � 1! � U / Raw lid RME 116t" Ave SE a E Kent Kangley Rd Will need to Installed at 89 24 more are 25-year life replace on Currently have intersections needed cycle average 4 or 5 306 batteries per year $15,000 per Batteries last year for for 5 years battery replacements 6u ien 9s S` Tukwila �r Re an E ,• p� St City of Kent ° 5 ass ram- Traffic Signals with SeaTa s � ` SE192S1 Uninterruptable 167 Power Supply O O 1 7865 + t St 1 f ^ t 2 i -' O 4`-. ; Traffic Signal with UPS (78) O - O Traffic Signal without UPS (35) 5 5t lliOO CDCD No UPS Planned (4) s � i ❑ s Moines99 1"1 576 16 T' �� a i t ti� 1 -{y •�,*, w Revised July 2020 - ' s o O O O18 . q O O !, 516 r'-- Y SEf S - -� � •"i � — yes i 1=_ • 1" r CoV gton CYC 167 1 1 O it ! 18 ] 1 L + , 1 ! 1 1 11$1 - �F41•[ + Federal ay 167 Auburn � ,s - 1 a `�� S tran2D-6.mxd KEHT v fl Kent,WATSMS System V ❑0D9-Washington&Meeker[Cobalt] ®�❑ 0! Group 1 Group 1 ► 001 40t Av&Gowe St Q ► O02 41h Av&Meeker St Q - Group 3 Group 3 ► ® O03 40t Av&Smith St Q 1 Oft ► ® 004 4th Av&James St Q ® 073 interurban Trait&Smith St Q 079 Interurban Trait&James St Q ► 099 4th Av&Ramsay Wy Q ► 10D 2nd Av&Smith St Q _ ► 109 ShoWarelRJC&James St Q ► ® 110 4th Av&Cloudy St Q Group 5 Group 5 IL ► 005 40t&Wigs Ps ► O06 SR167 NB&W11is0 4 ► D07 SR167 SIB&Willis Q MGde Panerni i i r - ► OOS Washington Ave&Willis Q Desired ► 009 Washington&Meeker Q OfEEt . ► 01 D Washington&James Q 045 64iti Ave S&Meeker St p - 046 641h Ave S&James St Q 10. Ped 059 Russell Rd&W Meeker St Q Group 12 Group 12 ► 011 681tr Ave S&S 22M St Q _ _ ► 012 6801 Ave S&S 21201 StOn Q ► 013 6601 Ave S&S 21211h St QPed ► 014 59M Ave S&S 21291 St Q o. MCINA�ro Alert list LJ© Bevice Status l�J Name Description Type General Status Communications Alerts Alarms Primary Street Secondary Street Su"pe Q 909 ShoWare1RJG&James St T01315 =000=00 0 ShowarelRJC James Cobalt corridors'I Last retiming of 20 signals need to Need $200,,000 to Traffic Signal r--- Maximize major be connected to retime existing corridorsefficiency of was 2010 the central traffic traffic signal existing system *Some transit Timing signal . completed Traffic Signal . n .o� Communication - Fiber optic communications to connect traffic signals to central computer and send cameras images Y Existing network about 132,000 linear feet •.raA1S,lr`11f A` Network build out requires another 81,500 linear - feet - Remaining network costs : $675,000 to $975,000 4t" Ave and James St r Traffic Cameras WO t A. LAIL. A� it We currently have 27 traffic monitoring Hawley Rdl-� Veteran's Dr A Potential locations 1t Canyon Dr. - James St. - 3 208th/212th Reith Road - Kent Kangley f 4 new new - 3 new 4 new at 116th Ave is HwyS St: cameras: cameras: cameras: cameras: SE: at Pacific Purchased $30,000 $40,000 $50,000 $10,000 $10,000 i •� � 05 a w•-. >., _: s r'.s �. :y> taw ti r r 51, MEL r Titus & Reiten Rd 68th Ave S & S 199th St W Valley Hwy & 196th St Loops are critical for signal operations Over 4,000 loops in Kent Traffic Loops $50,000 annual budget for replacement $2,500 per loop v SE 208th St west of 116th •r! �R j va orl Ile .40 F e'er �1 Air Titus Parking Lot S 19 th St Bridge \ t � . WE - f • - 111 1 111 64th Ave S and S 212th St R t 1081" and 235th - y� r Y� Service Cabinet behind Lowe's' _ - 4t" Ave and W Harrison St - .''}, ti r y�'i •F Ins �� •� _ v--.C,+ AM Meeker St `. .i.r. d-. Of dip 277t" under 108t" AVE SE k` Graffiti Removal .I Amr" 1VI I fil 1 II , r s r I ry e f fII I . I �t I � i 5 �I w \�. I: ,��r .- ,ram', • �y�,, W Meeker St and Ethos 100th Ave S and S 208th St 64th Ave S and James St e�- r SCHOOL SPEED LIMIT 20 1 i ,, 7=♦ Avean(� 22 " e , n 76t" S 8t St 1_)VT x i 7s` a _ n � s a '� Y "' r�• ,a�4.+� _9e.�• � �� �s>.s�r�' f�•; wry 1,^, -a .. �� `t"+ .'w� �.Y� 3 •_ II - � "., iw�l��t�„✓.� i��l�i i;i N Il�i.��1���� a ea ..F��i�� e r �`t� .,� � ' v? k .- rY' l Vex �� i - e')h dQ�'.. F{� � Y;.��YJ yt�'1�Y�.. ��y1)��,1� �li� fi ,�....- ,�-,�`v ��4��s»4 '".m.� ._� '\•+• a , � W Meeker St near 64t" Ave S Military Rd S and yS Reith Rd 108t" Ave SE and SE 217t" St LL— �fee Tree Trimmingand .,� 9p �, � '. �g��i� spy ,j �. ] A �- � r f \ r n,. i auisoN Brush Cutting hllll>`;_' ��5�, ° I o N. �l,�°'�`�i Seas s.3sr S�cg�gd sepe o4;, � City of Kent m ffi ➢ E�asF Arterial Roads Additional Street s'san a s ; A Renton without Streetlights SeaTac 5 55 St g Lights �. Q � Gap in arterial streetlight ■ - a {qs� spacing of at least 200' N ' �i� svz■se s xs sr SE 224 St / miles of arterial sz2a e ] r¢ran56\ � � \■ �'ti streets in Kent I a. ' Ira LN3t�ffh 5t�E 5mlth St � � 2¢1g 515 SF ase St ;� ■+ �` have streetligh MAs • $15-20 million to complete sT 7� Y]St r5E Z74'M' � arterial street lighting s` aS2n5r E s • Additional $ 130,000 per szsesr 4 4 Mlle year for power fart1b1mid Au rn a KEHr Revised Apri12019 s wryro Jim 0>01 INK 71 \ `I 5¢: ` F :_ S = �r pp wy r v WtAM , O O - w 9400 v s. AM KMMEIDE Copper Wire Theft _ l m - •' _ ifs $ 1 111 in 2021 to deal Welding lids and replacing wire with aluminum has reduced but • • theft , 581h PI S and S 200th St l w 4 a- r. r F, •; r. r µ - Decorative Right of Way Lighting 46 T. ''� 38 1 r EN T TRANSPORTATION NCO MASTER PLAN .� CITY OF KENT f TATION k 1RANSP ERpJa MpsT Percentage Change in Vehicle Volumes Compared to Baseline I-5 at 2020 2021 2022 1 11 1 1 30% 1 11 1 1 I I 1 11 1 1 Enchanted ° 1 11 1 1 1 Parkway �° 1 11 1 1 1 I I 1 11 1 1 1 I n 10% 1 11 1 1 1 1 11 1 1 1 1 11 1 1 1 I 1 11 1 1 1 l 1 11 1 1 1 1 11 1 1 1 Federal Way - - 1111 - - - - - - - - - - ___ ' - - - - - - - - - - - - - - - - -_ - 1 11 1 1 1 I 1 °% 1 1 11 1 1 1 I 1 11 1 1 1 , 11 1 1 1 11 1 1 1 I -J1 0% 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -2 7 1 1 1 0% 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -30% 1 1 1 1 1 1 1 1 1 1 1 11 1 1 11 1 1 11 1 1 11 1 -40% 1 11 1 1 11 1 1 11 1 1 11 1 -50% ' 1 11 1 1 I 1 11 1 1 1 I I 1 11 1 1 1 -60% 1 11 1 1 1 1 11 1 1 1 I I 1 11 1 1 1 -70% I 1 11 1 1 1 1 1 11 1 1 1 I 1 1 11 1 1 1 I -80% ' Fn, CtFj 01120 Sae, CLOX F1 e Sun, 11-hniv2d fta nn.02101221 Hai, -OSjW r-21 -,'-aln,OWJO1221 Morn. 11-1M 1221 Tu a, 02r01 22 Sale,CGJ012-�-02 Percentage Change in Vehicle Volumes Compared to Baseline 40% I-405 at 2020 2021 2022 1 11 1 1 1 30% 3 7t" Ave S 20% In Renton 10% 1 11 1 1 1 1 11 1 1 1 1 11 1 1 1 � , 11 1 1 1 - 1 -10% 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -20% 1 1 1 1 1 1 -30% 1 1 1 1 1 1 1 1 1 11 1 1 11 1 -40% 1 11 1 1 11 1 1 11 1 1 1 11 1 1 1 11 1 1 1 11 1 1 -50% 1 1 11 1 1 -60/0 1 11 1 1 0 1 11 1 1 1 1 11 1 1 1 -70% 1 11 1 1 1 I 1 11 1 1 1 -80% ; Fro. 00J01.";n6 !Ra1,ceeW r2b nun, 112hbiJ2O hholn.02�01I21 nam, 4�SJOi e21 Sarn,C�01�i h cwb. 111110112i Tua, 02201u22 Sarn. 03,r011� Percentage Change in Vehicle Volumes Compared to Baseline 40% ;; ; 2020 2021 2022 , SR 167 at S 196t" St 30% In 20% ' Kent 10% 00/0 -10% ' -20% -30% -40% -50% -60% -70% -80% ' Fn,C.NJO1226 Sal,ceeal e20 Sun, 11-hOu20 hAe n, Sat, .0SfaI e21 Sun.CQ&PO1 e2i ft snn, 11M1221 Tua, 02 OV22 Sun, Cej01,?-22 2022-2027 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2022-2027 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM Table 1 CITY OF KENT Projects Added PROJECT NAME WASHINGTON 46-Four Rectangular Rapid Flash Beacons(RRFBs)at 10411 Avenue SE south of SE 2022 - 2027 SIX-YEAR 25611 Street,SE 24011 Street east of 10411 Avenue SE,Central Avenue N between TRANSPORTATION IMPROVEMENT PROGRAM Avenue Lane and Woodford Avenue N,and Central Avenue N between Woodford Avenue N and E George St s1� 47- 1081 Avenue SE(SR 515EBenson Highway)at Panther Lake Library- • ;-� Pedestrian Hybrid Beacon PHBpedestrian crossing . ` 416-New and Enhanced Pedestrian Crossings in the Downtown Regional Growth Center,in the Kent Manufacturing/Industrial Center(MIC),and along the Interurban Trail r.f*ff;.- � � *17-New Traffic Signal on Washington Avenue S(SR 181)between W Meeker Street and Kent-Des Moines Road SR 516 r. *18-W Meeker Street Frontage from N Lincoln Avenue to the Interurban Trail 419-Meeker Frontage Improvement from Kent Elementary School to Washington - .. Avenue N and New Traffic Signal - #23-5 21211 Street and E Valley Highway Concrete Intersection *31 -Local Road Safety Plan-2023 Highway Safety Improvement Program L 432-W Meeker Street at Lincoln Avenue Compact Roundabout and Two-Way Bike la�� FacilitV on Meeker Street from Washington Avenue N to N Lincoln Avenue Transportation 434-Milita Road at Reith Road S 2fi0"'Street Intersection Im rovements y *35-Reith Road -Compact Roundabouts and Road Diet #36-831 Avenue S Sidewalks from S 22811 Street to 5 224'h Street Improvement #37-SE 272^'Street at 14$'"AvenueSE[Lake Meridian}-PHB pedestrian i - crossin 442-Local Road Safety Plan-2025 Highway Safety Improvement Program #43-W Meeker Street Road Diet from the Interurban Trail to 5 611 Avenue and Program JI P) ■ ,. Intersection Improvements at S 61h Avenue 4 *46-Russell Road Pedestrian Improvements Phase 2-700 feet north Meeker Street to existing sidewalk 500 feet south of 24011 Stree James Street Table 2 Projects Removed PROJECT NAME COMMENTS S 2281h Street/Union Pacific Railroad Grade Separation Completed Willis Street at 4t'Avenue S Roundabout Completed Meeker Frontage Improvements and Midblock Crossing at the Mayor Dana Ralph Riverbend Driving Range-Colony Park Apartments driveway to Completed Russell Road 761h Avenue S(Middle Phase)-2201h Street S to 21611 Street S Completed Chad Bieren, PE, Meeker Frontage Improvement at the Riverwood Apartments-Russell Completed Director of Public Works Road to 700 Feet east of Russell Road 43 Mai r-: / i s LILL- �� • _ v I _ _.� c., N ,ram � i '� � iyfi* �� �hJry f i11. �.� �d �m,f •� 1 f /-- b'SixC ►D�� 4' ��" Y • 51up `yT `—T— :x � r \ f 1� e _