HomeMy WebLinkAboutCity Council Meeting - Council Workshop - Regular Minutes - 01/04/2022 Approved
City Council Workshop
• Workshop Regular Meeting
KENT Minutes
WAS M IN G 7 0 N
January 4, 2022
Date: January 4, 2022
Time: 5:01 p.m.
Place: Chambers
I. CALL TO ORDER
Attendee Name Title Status Arrived
Bill Boyce Council President Present
Brenda Fincher Councilmember Remote
Satwinder Kaur Councilmember Present
Marli Larimer Councilmember Present
Zandria Michaud Councilmember Present
Toni Troutner Councilmember Present
Les Thomas Councilmember Present
Dana Ralph Mayor Present
II. PRESENTATIONS
1 2021 Grant Summaries and 2022 Grant Rob Brown 45 MIN.
Opportunities
Transportation Engineering Manager, Rob Brown and Public Works Director,
Chad Bieren provided the Council with an update on public works grants.
Previous years' grants were details:
2018 PSRC Preservation set-aside
South 212th Street Pavement Rehabilitation 72nd Avenue South to 84th Ave
South
2020 PSRC Regional Competition - 76th Avenue South Road Raising, North
Segment
2020 PSRC King County Larger Jurisdiction Competition:
South 228th Street Corridor: 218th Street/98th Avenue South from 94th
Place South to South 216th Street
This project was ranked 91h on the contingency list.
The City was awarded $4.9M and the City match is higher than the grant
award because we took the amount available and made up the difference in
the estimated project cost.
Funding will be used for the construction phase
This project is currently in the design phase. Construction is expected to
begin in late 2024 or early 2025.
2020 PSRC Non-motorized set-aside
City Council Workshop Workshop Regular January 4, 2022
Meeting Kent, Washington
Minutes
......................................................................................................................................................................................................................................................................................................._...............................................................................................................................................................................................................
Transit and non-motorized intersection improvements at Meeker Street and
64th Avenue South.
This project was ranked 5th on the contingency list.
Grant request was for $2.13 million with a $334k local match for design and
construction.
PSRC awarded us $236,667 for project design because we had a project that
could immediately accept the funds and expend them before they expired.
Design is scheduled to be completed this summer. We looking for
construction funding.
Summary of 2021 Grant Requests:
4 Projects awarded funds
Kent was awarded $9,332,347
The City match funds of $7,282,653
2021 Transportation Improvement Board (TIB) Urban Arterial Program -
Reith Road, South 253rd Street to Lake Fenwick Road
Grant request $1.59m with a $897,795 local match
2021 TIB Urban Sidewalk Program
Russell Road Pedestrian improvements Phase 2 Hogan Park frontage
sidewalk.
Design is underway and construction is scheduled to begin in the summer of
2023.
South 240th Street Russell Road to Lakeside Blvd East.
Design is underway and construction is scheduled to begin in the summer of
2023.
2021 WSDOT Local Bridge Program
Meeker Street Bridge Deck Rehabilitation - received more than what was
requested
This project will repair the bridge driving surface (or the bridge deck),
replace the expansion joints, and rehabilitate the bridge bearing pads.
Grant request was for $1,218,000
WSDOT awarded us more than the requested amount.
2021 WSDOT Local Bridge Program
Meeker Street Bridge Painting
Our grant request was for $3M and the total project cost is $3,238,320.
The City's match is the difference between the cost and the award.
2021 WSDOT Local Bridge Program
South 2121h Street Green River Bridge Expansion Joints - Not selected for
funding
...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Page 2 of 5
City Council Workshop Workshop Regular January 4, 2022
Meeting Kent, Washington
Minutes
......................................................................................................................................................................................................................................................................................................._...............................................................................................................................................................................................................
2021 WSDOT Safe Routes to School Programs
Reviewed 14 locations for installation of flashing beacons. - Not selected for
grant funding.
James Street and 94th Avenue South intersection East Hill Elementary and
Mill Creek Middle School - not selected for funding.
Brown and Erik Preston looking where the City can install improvements.
2021 WSDOT Pedestrian and Bicycle Program
Locations to install enhanced pedestrian crossings.
Meeker Street, 64th Avenue South to Washington Avenue, bicycle,
pedestrian, and transit - not selected for funding
2021 WSDOT Pedestrian and Bicycle Program - Enhanced pedestrian
crossings
Crossings will include rapid rectangular flashing beacons, median islands, and
curb ramps.
Our grant request was for $1,163,588 with a local match of $20,000.
Total project cost is $1,183,588.
Project design will start soon with construction scheduled to start in late
2022 or early 2023
2021 WSDOT Pedestrian and Bicycle Program - Meeker Street, 64t" Avenue
South to Washington Avenue, Bicycle, Pedestrian and Transit Improvements
- Design Only, 108t" Avenue SE at Panther Lake Library Pedestrian Hybrid
Beacon and Russell Road Pedestrian Improvements Phase 1 Meeker Street to
Hogan Park Sidewalk - Not selected for funding
2021 WSDOT Railway-highway crossing program
BNSF Smith Street pedestrian gates.
BNSF gave us a cost estimate of $350k
Our grant request was for $315k with a $35k local match
Our application scored well and WSDOT told us our project was above the
funding line.
Staff talked to BNSF about the project again and they determined they
needed to make additional upgrades to the crossing and revised the estimate
to $650,000
Additional funding was not available and we did not continue with the
project.
Summary of 2021 Grant Requests:
Grant funds were requested for 13 projects
Total requested funds $12,152,256 with a City match of $1,613,435
6 projects awarded funds
...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Page 3 of 5
City Council Workshop Workshop Regular January 4, 2022
Meeting Kent, Washington
Minutes
......................................................................................................................................................................................................................................................................................................._...............................................................................................................................................................................................................
• Kent was awarded $8,019,908 with a City match of $1,448,435
• Total grand funding for 2021 with prior years' grants
$17,352,255 awarded with a City match of $8,734,088
Brown detailed the Grant opportunities for 2022:
2022 PSRC Transportation Alternatives program
Meeker Street, 64th intersection and Kent Elementary frontage
2022 TIB Complete Streets
Grants available to cities that have adopted Complete Streets Ordinance
2022 PSRC Regional Competition and Larger Jurisdiction Competition
Four of the potential projects are:
1. Meeker St, 64t" Intersection and Kent Elementary Frontage Construction
2. Meeker St, Kent Elementary to Washington Avenue
3. South 216t" Street, 98t" Avenue South to 108t" Avenue South - the last
section of the 228t" Corridor
4. Meeker Street and Lincoln Avenue Compact Roundabout and Meeker Street
Improvements, Interurban Trail to Union Pacific Crossing
The City Council acknowledged they approved of Public Works applying for
grants for these projects.
2022 PSRC Preservation Set-Aside - 5 potential projects were reviewed
2022 PSRC Non-motorized set-aside - 3 potential projects were reviewed
2022 TIB Urban Arterial Program - 2 potential projects were reviewed
2022 TIB Sidewalk Program - 2 potential projects were reviewed
2022 WSDOT Highway Safety Improvement Program was reviewed
2022 WSDOT Safe Routes to Schools Program - Potential projects will be
reevaluated.
2022 WSDOT pedestrian and bicycle program - reviewed potential projects
The City Council acknowledged they approved of Public Works applying for
grants for these proposed projects.
2022 WSDOT Pedestrian and Bicycle Program - reviewed potential planning
projects
2022 WSDOT Railway-Highway Crossing Program - UPRR Willis Street
Crossing Gates relocation - reviewed as potential project
2022 UTC Railway-Highway Crossing Program - BNSF, Smith to Meeker West
Side Fence - reviewed as potential project
Brown discussed the USDOT Rebuilding American Infrastructure with
Sustainability and Equity program, the USDOT Infrastructure for Rebuilding
America program, and the Infrastructure Investment and Jobs Act.
Brown closed the presentation by providing information on the City's 2022
...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Page 4 of 5
City Council Workshop Workshop Regular January 4, 2022
Meeting Kent, Washington
Minutes
......................................................................................................................................................................................................................................................................................................._...............................................................................................................................................................................................................
legislature requests for the 228t" corridor and for the Quite Zones project.
Meeting ended at 6:06 p.m.
Ki4�te,y A. Kot to-
City Clerk
...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Page 5 of 5
2021 GRANTS SUMMARY
AND
2022 GRANT OPPORTUNITIES
City Council Workshop
January 4, 2022
PREVIOUS YEARS ' GRANTS
SUMMARY OF 2021 GRANT REQUESTS
2022 GRANT OPPORTUNITIES
PREVIOUS YEARS ' GRANTS
SUMMARY OF 2021 GRANT REQUESTS
2022 GRANT OPPORTUNITIES
idei
N s learn
2018 PSR ''` PRES 'AVATION SET-ASIDE
� _
17,1
cn
Angle Labe
L f t 1 L SE 1961h St
S 212th St Pavement Rehabilitation
De S 200111 st
Moines ,,a f The Boeing 72nd Ave S to 84th Ave S
Creek ^ �.---1 Company -
Pa rtt
--- —
Floor 5 2C•8t St SE 208th St
' y, 'Jolley 11 L
n: Community
- - J Park 5 212th
� � I
5216th51 - - w, + y� ° fork LLU
Gl = ,f �� Green River rJ. ,aa`� '" 1 i
' Natural w a
r� Reawuroes !
i�
St 1 Area �e SE 224th 5
w North `}
n o
trleridtan
1 i < Pa rk 7
v z o
U u,
Highli w / 1 } 4 tow y
C.C. 1
40thSt i !—��J 66 Russell ','JJanlesst t 4-1
SE240thSt 4w ,% U-
w Kent
i Rive the nd Road [107 Station Ciark
o�
Goff Park uJ Lake I
nju 5 _ Complex V4 h7L:eker St Kent Ur Park Meridian ra
r w � SE 248tn St Valleyrk ( f'
aL� try~'t 616 S CountryCluh I r
! 1ni St ❑ heed I -- 1
Hilk eat SE 256th S1 t
`y ! ••+a d Burial w
Fenw ick. ..
are ¢
L ti ! f v &J-. La ke y
L P, Meridian
—govi
--�$-jajF&st +.a��— r-1 1 rer i LU 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
1 N
hia cn
� OI g < 8
L
S 288th Si
2018 PSRC PRESERVATION SET=ASIDE
S212THST PAVEMENT REHABILITATION
72NDAVE S 84THAVE S
Project awarded $ 1 .4 million in 2018 f ..
. i
,
Additional $700,000 allocated in 2021
Local match reduced from $ 1 . 16 million to _--:_-- x _ _. _
n Lei
N
2020 PSRG"REGIQNAL COMPETITION
S 188th SI a
:'i, t .-- -- J
cn
Angle Labe 1 1 Y
L
AT f S 196th 81 1111 1 SE 1v6th St
~ n cn 1 -------Y
Des S 200[h St r�.�.� I � } —
Moines G y;
,4`D ----1f The Boeing _ , Llk
Creek Company '
Park ~" fJ CO
--- Valley Floor - 76th Ave S Road Raising, North Segment
n> Community
- - J Park 5 212th St
1 L !
y T
5216th51 y� ° fork Y �
ul = ,f Green River rJ. aa`� Y i
' Natural w a
rJ Reaoumee 1
m
St 1 Area �e SE 224th 5
w North `}
n o
Meridian
1 i < Pa rk 7
v z o
U u,
Highli w / 1 4 } w y
C.C. 1}
40thSt i !-0 5o Russell JJanlesSt t L SE240thSt 4w ,% U-
w Kant
i Rive the nd Road [107 Station Ciark Y
o�
Goff Park uJ Lake F
nju f'� 5 _ Complex wh'It:B ker St Kent Ur Park Meridian ra
rk r w � SE 248tn St Valley ( f'
aS� try~ik51& S CountryCluh I r--
! 1ni St ❑ heed I -- 1
Hilk eat SE 256th S1 1
`y ! ••+a d Burial w
La keY 1 4 F 1��, F A4 1
Fenwick ..
are ¢
v ��'R n La ke y
Ly� � �' Meridian —
ti .L 1 —govi
--—4.jwj6F& }—+�+.a-�— r—i 1 rer,1, i 5, 16 SE-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
1 N
hia cn
OI g
L
S 288th Si
2020 PSRC REGIONAL COMPETITION
76 TH AVE S ROAD RAISING, NORTH SEGMENT
_
• Project ranked 6th on the contingency listpop
• Grant request: $3.48 million• Kent was awarded: $3.48 million - -
• City match: $ 1 .57 million -
:.V4 i
n Le
N � ZQ2 0 PSR C KING COUNT:
Y LARGER
aTa.: % k-- _— 1
N An Iril. JUR19DICTIO T CQlqITION
L f 19u'ti;ti t
h 7a
i
wDes S200thS[Moines �� f The Boeing y ,irk S 228th St Corridor: 218th St/98th AS from 94th Pl S to S 216th St SE 208th StPark 5 212tn St5 216 th St ¢a[k 1
Gl •r Green River r am, i u
1 Natural fl i a
r Reaourcee 1
i�
St 1 Area N SE 224th 5
J w
n � North `}
t —'• v f0eridtan
1 i < Pa rk 7
v z o
r Lu i
Highli w Q to �
1 If L wC. 4
40th St i— !—1.0 t5 o Russell „Jallle6`ut Kent 4 4 SE 24G th St 1.+ �
a
4-1
ti
i ! Rive the nd Road 11G? Station Ciark
o�
— Goff Park uLJ Lake I
nju 5 • _ Complex wh7L:e ker St Kent U) Park Meridian J ra
r r r w SE 248tn St Valley ( f'
aS� try~'t .516 S CountryCluh I r--
! 1ni St ❑ heed I -- 1
4r j 1 1 w u7 !
x Hilk eat SE 256th S t
`y ! ••+a d Burial w
Fenw ick ..
are ¢
°
w sr t
i ti ! f v n La ke y
Meridian
ti .L 1 —govi
-- $-jajF&y}�+�+.a� — r—1 1 rer i co 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 N
hia
� OI g < 8
L
S 288th Si
2020 PSRC KING COUNTY LARGER
JURISDICTION COMPETITION
S228THST CORRIDOR: 218THST/ 98THAVE S
FROM 94THPL S TO S 216THST
• Project ranked 9th on the contingency list
• Grant request: $4,915,680 _
• Kent was awarded: $4,915,680
• City match funds: $5,678,320
r
r
de i
T.#39th���.— — �.. — i •n
N s last
020,,PSRC NON-KOTORIZED SET-ASIDE
.. a
v$ r , --- - -- - --�
cn
0 . ,— - t 5++I
Angle Lake If 1 f 1
_ / S 196th 81 1111 1 SE 1v6[h St
Des S 200111 St
Moines
r�D ----1 The Boeing
Creek Company
Pa rk m -.
--- — 5 2C•8t St SE 208th St
Floor
y, 'Jallsy oor 11 r
n: Community
- - 1 Park 5 212th St �^
y T
5216th51 - - w, + y� a' m fork L LU
ul = ,f �� Green River
' Natural m a
< r� Resources 1
i�
St 1 Area �e SE 224th 5
w North `}
r n
trleridtan
1 i t Pa rk 7
- = Meeker St and 64th Ave S '
w i
Highli % 1 t 4
C.C. 1}
40th St i !—t�� 5 G' Russell J James`St 4 ¢' SE 240 th St #w+ U-
w Kent $ 4-1
ti
i Rive the nd Road 11G? Station Ciark
o�
� Goff Park uJ � Lake r �
nju f'� 5 _ Complex 4'J h'It:BLkerSt Kent Ur Park Meridian ra
rk r w SE 248tii St Valley ( f'
aS� try~'k .515 S Country Club I r--
!-!S1ni St ❑ hee d I -- 1
Hilk eat SE 256th S t
`y ! ••+a d Burial w
LakeY 1 4 F 1��1 F%A4 1
Fenw ick ..
are ¢
w
ti ! f v n La ke y
P, Meridian
ti .L 1 —gc)vi
--��.Awj6F&y}—+�+.a��— r-1 1 rer i 5, 16 SE-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 N
Nla
OI g
S 288th Si
2020 PSRC NON= MOTORIZED E -A IDE
'T'RANSI'T' AND NON-MOTORIZED IN'TERSEC'TION
IMPROVEMENTS AT MEEKER ST AND 64THAVE S
• Project ranked 51h on the contingency list
Y j =
• Grant request: $2. 13 million with a $334,000 F ;
local match
oca atc -
-
• Kent was awarded: $236,667
, , . �-� �•�-- .._ -.. �_ .'ram: _
• City match funds: $37,333
• Grant award and local match fund project
design
SUMMARY OF PREVIOUS YEARS ' GRANT
• 4 projects awarded funds
• I{ent was awarded: $9 , 332 , 347
• City match funds: $7 , 282 , 653
PR VTfITT-Q V ARS ' GRANTS
SUMMARY OF 2021 GRANT REQUESTS
2022 GRANT OPPORTUNITIES
idei
2 0 TIB URBAN ARTERIAL PROGRAM
N S 188 to -r J 1
SeaTac
�$ cn r t--- - -- - -�15
Angle Lake C 1 f 1
L J S 196th SF 1111 1 SE 1v6th St
1
Des S 200111$t
Moines 4 —
Jti a_ ���if The Boeing � y � � Llk
Creek �+ Company o M
Part: CO
--- 5 2C•8t;St SE 208th St `
y, 'Jolley Floor 11 r
n: Community
- - 1 Park 5 212th St �^
y T
5 216 th s1 m fork L LU
ul = ,f �� Green River rJ.
' Natural m a
r� Reaoumee 1
43 C�
St 1 Area �e SE 224th 5
J w
r s North `}
'09ridnn
Pa rk
1` ' Reith Rd, S 253rd St to Lake Fenwick Rd
t 1 CC, ti
Highli 0
g f '}.J � } v 4
C.C. I
40thSt i I "r*+ 'i
Russell 'NJamesat Kent 4 4 SE24GthSt Iw++
-2
� ti
i Rive the nd Park [107 station Cbrk ''
! Goff uJ r Lake I L
nju f'� 5 • _ Complex V4 h1L:e ker Sl Kent Ur Park Meridian ra
rk r r r w SE 248tn St Valley ( f'
cS try~'k d .516 CountryCluh I --
1-!S 4 12 rri Sthd
4 } 1 1 w 1
w Hilk est SE 256th S1 t
Burial w
LaI�Y 1 4 F 1�.1 F%nr 1
Fenwick .. # t 7 _ if
sre ¢
ti l f v n La ke y
P, Meridian +
$-jajF&St.+�+.a+a— r+1 1 rer i 5, 16 5E-272nd•St
+ S Star Lake S 2. Sl
Tr
cn
1 N
NIa 1
� OI g 1 i < 8
S 288th Si
2021 IB URBAN ARTERIAL PROGRAM
REI'TH RD, S 253RDST TO LAKE FENWICK RD
• Construct compact roundabouts on Reith Rd at
,d
S 253rd and Lk Fenwick Rd 'i `.
• Road diet will add protected bike lanes
• TMP project P-55
Rig
• Grant request: $ 1 .595 million with a $897,795
local match
• Kent was awarded $ 1 .595 million
idei
202;jTIB URBAN SXDEWALI� PROGRAM
N S 188th St
SeaTaccn
t •—.,
Angle Lake t 1 f 1
L J S 196th 81 1111 1 SE 1v6th St
1
Des S 200[h St �` :4 I } ' ' ¢� u i ti
Moines The Boein 4 —
�J�D ----lf g � y � � Llk
Creek Company o M
--- — 5 2H ;St SE 208th St
y, Valley Floor 11 r
n: Community
- - 1 Park 5 212th St �^
y T
5216th51 y� m fork L LU
ul = ,f Green Rver r J.
' Natural a
r� Reaoumee 1
i�
St 1 Area �e SE 224th 5
w North `}
�r r
trleridian
t Russell Rd Hogan Park Frontage Sidewalk '
i
Highli I 1 m 4
}
40th St i 1—►�� 5 o sell VV James st Kent L 4-1
SE 240th St 4 w ,% w
w
i Riverhend ork �1G? Station Cork
Goff uJ r Lake r L
nju 5 _ Complex VJ h1L:e ker St Kent Ur Park Meridian ra
rk r w SE 248tn St Valley ( f'
aS� try~'t 516 S CountryClu6 I r
! 1rxi St ❑ heed I -- 1
Hilk eat SE 256th S1
`y ! ••+a d Burial w
LaI�Y F%A4 1
Fenwick ..
w sr � t
P, Meridian
ti .L 1 � — ovi
--��.ga;y�y}—+�+.a��—� r—1 1 •- rer,1, i � 5, 165E-272nd•St
+ S Star Lake .,.�. — S 277th St
Tr
1 N
hie cn
OI g
L
S 288th Si
2021 TIB RBAN SIDEWALK PROGRAM
RUSSELL RD PEDES'TRIAN IMPROVEMENTS PHASE 2
HOGAN PARK FRONTAGE SIDEWALK
• Construct curb, gutter and 8-foot sidewalk on
the east side of Russell Rd along the Hogan
Park frontage
Diu 1
• Section of TMP project P-56
• Grant request: $465,000 with a $ 163,380 local - - -
match _
• Kent was awarded $465,000
OR-
idei
202;jTIB URBAN SXDEWALIC. PROGRAM
N S 188th St
SeaTaccn
t •—.,
Angle Lake t 1 f 1
L J S 196th 81 1111 1 SE 1v61h St
1
Des S 2001h St �` :4 I } ' ' ¢� u i ti
Moines The Boein 4 —
�J�D ----lf g � y � � Llk
Creek Company o M
--- — 5 2H ;St SE 208th St
y, Valley Floor 11 r
n: Community
- - J Park 5 212th St �^
y T
5216th51 y� m fork L LU
ul = ,f Green River r J.
' Natural w a
r� Reaouroee 1
m
St 1 Area �e SE 224th 5
S 240th St, Russell Rd to Lakeside Blvd E `}
1i � < Pa rk
�
Hignu., I 1 L
C.C. I f
40thSt i !—ICJ 5o ell ','JJanlesSt � t L SE240thSt 1-+�� w
w Kent
i Rive the nd Road [107 Station Cbrk
o�
' Goff Park uJ Lake r
nju 5 • _ Complex V4 h1L:e ker St Kent Ur Park Meridian ra
rk r w SE 248tn St Valley ( f'
~It .516 S CountryCluh I r--
!� ni S1 ❑ creed
1.
4r r 1 w u7 !
b x Hilkrest SE 256th 51
`y ! ••+a d Burial w
LakeY 1 4 F 1��1 F%A4 1
Fenw ick .. # t
w
ti ! f v n La ke y
L P, n
Meridia
ti .L 1 —gc)vi
5, 16SE-272nd•St
+ S Star Lake .,.�. — S 277[h St
Tr
cn
1 ry
IIa
� OI g < 8
�5 Firm,! + L L
S 288th Si
2021 TIB RBAN SIDEWALK PROGRAM
S240THST, RUSSELL RD TO LAKESIDE BLVD E SIDEWALK
• Construct a 5-foot shoulder, curb, gutter and 5-
foot sidewalk on the south side of S 240th St.
• Fills in a sidewalk gap
• Grant request: $312,000 with a $ 110,040 local rt.
match =
• l a
Kent was awarded $312,000
-inter
2021 WSDOT LOCAL BRIDGE PROGRAM
cn
Angle Labe f L i 1
AT L # S 196th 81 1 1 SE 156th St
Des S200[hSt
Moines ,rD.—---lr The Boeing 4 t
Creek I, Company o M
--- — 5 2C•8t St SE 208th St L
y, Valley Floor 11 r
n: Community
- - 1 Park 5 212th St �^
y T
5 216 th s1 y� ° fork L �
ul = ,f Green River rJ. aa`� 1 i
' Natural w a
r� Reawuroee 1
i�
St 1 Area �e SE 224th 5
.- r twin North �}
h1< e�d*n N '
% LU
-
Highli Meeker St Bridge
40thSt i— !—I Of, Russell 'NJames`u't Kent 4 4 SE240thSt 4w , U-
w 4-1[1G ~
i ive the nd Road -7 Stat io n Ciark Goff Park uJ Lake F
nju f'� 5�. - mplex wt. :e ker St Kent Ur Park Meridian � 4a
rk r w SE 248tn St Valley ( f'
cS fr�~'k .516 S CountryCluh I Ir
!� ni St iced I -- 1
1.
Hilk eat SE 256th S t
Burial w
LakeY 1 4 F 1��1 F A4 1
Fen wick ..
L P, Meridian
—govi
-- 4.ga;y� El yt.— m — r—1 1 rer i 5, 16�SE-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 N
Nola
OI g
L
S 288th Si
2021 WSDOT LOCAL BRI PROGRAM
MEEKER ST BRIDGE DECK REHABILI'TA'TION
• Rehabilitate bridge driving surface of the
Meeker St bridge
• Grant request: $ 1 .218,000 with a $ 18,900 local ,
q - -
match
• Kent was awarded $ 1 ,484,320 _
-inter
2021 WSDOT LOCAL BRIDGE PROGRAM
cn
Angle Labe f L i 1
AT L # S 196th 81 1 1 SE 156th St
Des S200[hSt
Moines ,rD.—---lr The Boeing 4 t
Creek I, Company o M
--- — 5 2C•8t St SE 208th St L
y, Valley Floor 11 r
n: Community
- - 1 Park 5 212th St �^
y T
5 216 th s1 y� ° fork L �
ul = ,f Green River rJ. aa`� 1 i
' Natural w a
r� Reawuroee 1
i�
St 1 Area �e SE 224th 5
.- r twin North �}
h1< e�d*n N '
% LU
-
Highli Meeker St Bridge
40thSt i— !—I Of, Russell 'NJames`u't Kent 4 4 SE240thSt 4w , U-
w 4-1[1G ~
i ive the nd Road -7 Stat io n Ciark Goff Park uJ Lake F
nju f'� 5�. - mplex wt. :e ker St Kent Ur Park Meridian � 4a
rk r w SE 248tn St Valley ( f'
cS fr�~'k .516 S CountryCluh I Ir
!� ni St iced I -- 1
1.
Hilk eat SE 256th S t
Burial w
LakeY 1 4 F 1��1 F A4 1
Fen wick ..
L P, Meridian
—govi
-- 4.ga;y� El yt.— m — r—1 1 rer i 5, 16�SE-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 N
Nola
OI g
L
S 288th Si
2021 WSDOT LOCAL BRI PROGRAM
MEEKER ST BRIDGE PAINTING
T
• Repaint the bridge over the Green River �-
W wt; ,X, 0�4ffj —6!i�
• Grant request: $3.0 million with a $238,320 , , - ' , ■ -�
local match i
• Kent was awarded $3.0 million _� .`' �; :r '•-. �.
"�`. f i; S. �~"•♦ ~� f.ram.- '! r:. I,: ! p
-inter
2021 WSDOT LOC 't BRIDGE PROGRAM
y5
Angle Labe f 1 I 1
# S 196th ti SE 15611-i St S
De 5 200111 st : : I S 212th St Green River Bridge .
Moines — `�''
T Boeing � t s
Creek ompany
f SE 208th St `
r
y, Valley Floor
n: Community
- - 1 Park 5 212th St �^
y T
5 216 th s1 - - w, + y� ° fork L LU
Gl = ,f �� Green River rJ. ,aa`� '" 1 i
' Natural w a
r� Reawuroee 1
i�
St 1 Area �e SE 224th 5
w North `}
n o
Meridian
1 i < Pa rk 7
v z o
U u,
Highli w / 1 f tow y
C.C. 1 _
40thSt i 1 56 Russell JJamesSt t 4-1SE240thSt 4w , U-
w Kent %
i Rive the nd Road 11G? Station Ciark
o�
Goff Park uJ Lake r
nju 5 _ Complex V4 h'�:eker St Kent Ur Park Meridian ra
r w � SE 248tn St Valley ( f'
aS� try~'k515 S CountryClu6 I r--
! 1IY1 St ❑ heed I -- 1
Hilk eat SE 256th S
`y ! ••+a d Burial w
LaI�Y 1 4 F 1�.1 F%nr 1
Fenw ick ..
.t j w t
v n La ke y
L— P, Meridian
ti .L 1 — ovi
rer,1, i 5, 165E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
f ry
Iola
� OI g < 8
�5 Firm,! + L L
S 288th Si
2021 WSDOT LOCAL BRI PROGRAM
S212 TH S'T' GREEN RIVER BRIDGE EXPANSION JOINTS
• Replace the bridge expansion joints and
flexible seals
• Grant request: $ 1 .038 million with a $30,000
local match
• This project was not selected for funding
F' E
idea
N Ridge �5 202 1�WSDOT SAFE ROUTES r
S 188th St
SeaTac t
. ,- -TO SCHOQL PROGRAM
$ Cn
0
L Angle Lake #� S 1913tr s; 1 1 SE 196th St 1
o l 1 1 w 1
Des S200tSt
h i
Moines 4 `' 'L
,4`D ----1r Llk
The Boeing < y
Creek Company m M �`
Pa rk u: .~ CO r _.
--- — 5 2C•8t;St SE 208th St
y, 'Jolley Floor 11
n: Community
- - Park 5 212th St #^
y T
5 216 th Si - - w, + y� m fork L LU
Gl = ,f �� Green River rJ. ,aa``� �„ y
' Natural m a
Lr� Reaoumee �, • i r
St 4- 1 —r Area �P4 _ m
SE 224ih 5
� 1 r w North Sunrise
1 hleridan Elementary
iVeely-O'Brien '-
Fiigt,li� - ' � Elementary
G Park Orchard
c.c. Sun ittV�*�YY�est N
40th St � TY� I Ruasall 'N Jame's St Elementary I SE 2 40tl,St I -�
i Elemen`tar� Rive rbe nd Road Kent r _ Cbrk 'u
Park off • C.
Lake r
nju a• 5j C mplex 4'J I.'k•t:- Elementary s Park Meridian CD
rk r .. SE 2d8m St valley ( f
•• aS� �'k51& S Country Club I r--
1 ni S t ❑ heed
1- ,z �7�y�,ppo � f 1 � r i
4r 1 w u7 1
x Hilk eat SE 256th S1
Burial w
F%nr 1
Fenw ick .. # t —7 Q _ y
+Ye <
w sr � t
i S I f v, e�'R - Lia key
• 1 i ti ��! Ly� , Meridian
—t
ff 1 r L e 1 L +Novi
- --- Star Lake -- ''i 1 •v ram, 1 °= 6 5, 16�SE-272nd•St
1 1 r
Elementar ke !_�. ! S 277th Lt ;� Millennium
t +_ Elementary
w
Cn
School Zone Beacon Locations LU
a
2021 WSDOT SAFE ROUTES
TO SCHOOL PROGRAM
NEW ELEMENTARY SCHOOL ZONE FLASHING BEACONS
• 14 new school zone flashing beacons
• Many locations would be on roads that
intersect existing school zones
• Grant request: $310,000 with a $20,000 local
match 21
• This project was not selected for funding FL H
idea
N Ridge �5 202 1�WSDOT SAFE ROUTES r
S 188th St
SeaTac t
. ,- -TO SCHOQL PROGRAM
$ cn
0
L Angle Lake #� S 1913tr s; 1 ! SE 196th St 1
o l 1 1 w 1
Des S2�JOth St e
Moines 4 `- 'L
,4`D ----1r Llk
The Boeing < y
Creek Company m M �`
I's r k u: .~ CO r _.
--- — 5 2C•8t St SE 2D8th St
V y, alley Floor 11 r
n: Community
- - 1 Park 5 212th St ^
y T
5 216 th Si - - w, + y� m fork 14 LL]
Green River rJ. ,ad`� �' it i
' Natural w S
r� Reaouroee �, r
St � 1 Area �P 4 iO
4- —,. _ SE 224th 5
1
w I .-
�; James St and 94th Ave S +
U c
Highu., % 1 L co4 -
1 J ,,ai <; SE 2 40 th St !+ w
40th St i I� Russell James 3't Kent 01
w �~
i Rive the nd Road [107 Station Cork
Goff Park uJ Lake I
nju 5 _ Complex V4 h7L:eker St Kent Ur Park Meridian ra
r w � SE 248tn St Valley ( f'
aS� tk .515 S CountryCluh I r--
!-!S1ni 8t ❑ tree d I -- 1
4r 1 1 w u7 !
b x Hilkrest SE 258th 51
`y ! ••+a d Burial w
LakeY 1 4 F 1��1 IF A4 1
Fenw ick .. # 'f
are
ti ! f v n La ke y
L— P, Meridian
ti .L 1 — ovi
--�£-j j6v& �+�+.a�a-— r—1 1 rer,1, i 5, 16 SE-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 N
IIa
� OI g < 8
S 288th Si
2021 WSDOT S ROUTES
TO SCHOOL PROGRAM
EAST HILL ELEMENTARY AND MILL CREEK MIDDLE SCHOOL
• Non-motorized improvements at the
intersection of James St and 94th Ave S. In
addition, left turn pockets would be installed `` p
on 94th Ave S.
• This intersection is on the walk routes for both
schools.
• Grant request: $980,000 with a $20,000 local - - r ,..•�:��
match
• This project was not selected for funding
in ter
� T.#39tIrEk�«.� _ �.. _ P •11 �
N Ridge �5 2021f`WSDOT PEDESTRIAN .'
S 188thst �r 1 # < _
rk
SeaTac k -
0 .� . AND BICYPLE PROGRAM
L Angle Lake ff S 1913tr S; ! ! SE 196th St
w• �
Des S 200111 St 4 } w t w•
Moines r
f The Boeing y Llk
Creek f� t Company nti o `ti _.
Ps rk CO N ti
--- - 5 2H ;St SE 268th.`.•t =
11
Woodford Ave N and Novak Ln
1.
T
5 21 " fork u-1
Ul 1 •f Green River t J. a\`� �, !
m I NiatursV ¢jlid a #
� 1
Central Ave N between P�
1 SE 224th
E George St and Woodford Ave N !
w North
4, ;r'' SE 240th St between 104th
z
r i o Ave S and 108th Ave SE
Highli Q
C.c.
1 It
414h St + E ta! Russell J James 3't L 4-1
SE 240 th St #-+ w
Road Kent
i Rive the nd Pak �1G? station Cbrk 1
p Goff uJ r Lake 1 L
nju 5 • _ Complex V4 h9t:e ker St Kent Ur Park Meridian ra
r w SE 248m St Valleyrk ( r'
.516 S CountryCluh I Ir
1�4�2rxi St ❑ tired �� � � I --.-. .1
x Hilk eat SE 256th S1
Burial w I
Lal�•Y � 1 4 F � 1�.� p4v nr °' 1
Fenwick .. # t 7
w 104th Ave SE between
S 256th St and S 260th St
gQVUj
7��—�$-Ha �F� Wa��� r�l ! c £erg i 516 SE'272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
f N
IIa
� OI g < 8
L
S 288th Si
2021 WSDOT PEDESTRIAN
AND BICYCLE PROGRAM
ENHANCED PEDESTRIAN CROSSINGS
• Install enhanced pedestrian crossings at:
• 104th Ave SE between S 256th and S 260th
• SE 240th St between 104th Ave SE and 108th Ave SE
• Central Ave N between E George St and Woodford - •
Ave N
• Central Ave N between Novak Ln and Woodford
Ave N
• Grant request: $ 1 , 163,588 with a $20,000 local
match
• Kent was awarded $ 1 , 163,588
in ter
� T.#39tIrEk�«.� _ �.. _ i •11 �
N icg �- 2021f`WSDOT PEDESTRIAN .
S 188thst �r 1 1 < _
rk
SeaTac k -
0 .� . AND BICYPLE PROGRAM
AT L Angle Lake f! S 1913tr S; 1 ! SE 1v61th St
s l 1 1 w �ti
w
Des S 200111 St
tv181M1e8 + '�2 f Llk
The Boeing
Creek J /----x CompanyPa rk
z /
CO
--- —y 5 2C•8t St SE 2D8th St
V, alley Floor 11 r
n: Community
- - 1 Park 5 212th St a^
y T
5 216 th Si - - w, + y� ° fork L U-1
ul Green River rJ.
Natural w 4tt S
r� Reaouroee C, r
St 1 Area
SE 224th 5
1
North
li w
Meeker St, 64th Ave S to Washington Ave `} +
Highli w / 1 L
C.C. 1}
40 th St !—t 5 G' Russell .1,1 nes St 4 <: SE 2 40 th St 1-+ w
w ~
i Rive the nd Road 11G. 54aton Cbrk
Goff Park uJ Lake l
nju f'� 5 _ Complex W I,�:e Kent Ur Park Meridian CO
rk r��w � � SE 248th St Valley ( f'
.516 S CountryCluh I r
-!S1
! ni St ❑ heed I -- 1
4r 1 1 U-
u7 !
SE 256th S1
`y ! ••+a d Burial w
Lal�•Y 1 4 F 1�.1 F%nr 1
Fenw ick ..
w sr � t
1 I � ram♦ L— P, Meridian
ti .L 1 —gc)vi
--�$-iwiw&y}� a��— r-1 1 rer i 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 27.74h Sl
Tr
cn
1 ry
Iola 1
� OI g 1 i—�—�.fi� < 8
S 288th Si
2021 WSDOT PEDESTRIAN
AND BICYCLE PROGRAM
MEEKER ST, 64TH AVE S TO WASHINGTON AVE,
BICYCLE, PEDESTRIAN, AND TRANSIT IMPROVEMENTS, DESIGN ONLY
• Fund the design of Meeker St and the south
frontage between 64th Ave S and Washington !;
AveS � .
• This would include the Kent Elementary
frontage and "Fast Food Row"
• Grant request: $580,000 with a $20,000 local
match
• This project was not selected for funding
in ter
� T.#39tIrEk�«.� � �.. � i •11 �
N icg �- 2021f`WSDOT PEDESTRIAN .'
S 188thst �r 1 1 < _
rk
SeaTac k -
0 .� . AND BICYPLE PROGRAM
L Angle Lake Itf S 1913tr S; 1 1 SE 156th St
I 1 i uu �ti
1 Y w•
Des S200111$t
..
tv181M1e8 J9 _ rf Llk
The Boeing y
Creek Company v
Park 'v; I m
l L
2[:•8:!;St SE 268t 1�.`.•t r
ti
- - . 108th Ave SE at Panther Lake Library ;^
I
5 216 th S1 - - + ti� ° tiorkLU
Green River
' Natural w a
� r� Resources � 1
43 i�
St f Area �e SE 224th 5
w North `}
n o
trleridtan
1 i < Pa rk 7
v z o
U u,
Highli w / 1 to
) y
C.C. 1}
/4� "I
40thSt i !—, 1 56 Russell ','JJaniesSt t 4-1SE240thSt 4w ,% L
w Kant
i Rive the nd Road [107 station Cbrk
F Goff Park uJ Lake I
nju f 5 _ Complex V4 h'It:e ker St Kent Ur Park Meridian ra
rk r w SE 248tn St Valley ( f'
aS� try~It S CountryCluh I r--
!-81ni St ❑ hee d I -- 1
4r 1 1 w W !
x Hilk eat SE 256th S1
`y ! ••+a d Burial w
Lal�•Y 1 4 F 1�.1 F%nr 1
Fenw ick ..
w
i ti ! f v n La ke y
L P, Meridian
ti .L 1 —govi
rerX, i co 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 ry
Ila
� OI g < 8
S 288th Si
2021 WSDOT PEDESTRIAN
AND BICYCLE PROGRAM
108TH AVE SE AT PANTHER LAKE LIBRARY
PEDESTRIAN HYBRID BEACON
• Fund a pedestrian crossing of 108th Ave SE at
r2'
the library
Yf
COS
®sway
• Grant request: $610,000 with a $20,000 local
match
• This project was not selected for funding.
in ter
� T.#39tIrEk�«.� _ �.. _ i •11 �
N Pdg �- 2021f`WSDOT PEDESTRIAN .'
S 188thst �r 1 1 < _
rk
SeaTac k -
0 .� . AND BICYPLE PROGRAM
AT L Angle Lake f! S 1913tr S; 1 ! SE 196th St
•"s l 1 1 w �ti
w
Des S 200111 St
tv181M1e8 + '�2 f Llk
The Boeing
Creek J /----x CompanyPa rk
z /
CO
--- —y 5 2C•8t St SE 2D8th St
V, alley Floor 11 r
n: Community
- - 1 Park 5 212th St a^
m � I
y T
5 216 th Si - - w, + y� ° fork U-1
ul Green River rJ.
Natural m a
r� Reawumee 1
i�
St 1 Area �e SE 224th 5
w North `}
n n
hleridtan �
1 i Pa rk47
7
Higt,li., 1 t. " Russell Rd, Meeker St to Hogan ParkC.C. 1 4
40th St i !—t 5 U' Russal J James 3't Kent
4 C SE 2 th St #�+ LU
w ~
i Riverbend Ro k [107 Station f Cork
� Goff � Lake I L
nju f'� 5 _ Complex 'J h'It:BLkerSt Ken Park Meridian
r r w � SE 248tn St Valley ( f'
aS� try~'k .515 S Country Club I r--
!-!S1ni St ❑ heed I -- 1
4r 1 1 w u7 !
b x Hilkrest SE 258th 51
y ! ••+a d Burial w
Lal�•Y 1 4 F 1�., F A-P 1
Fenw ick ..
w
i ti ! f v n La ke y
L P, Meridian
LLi
ti .L 1 — ovi
rerX, i co 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 ry
Ila
� OI g < 8
S 288th Si
2021 WSDOT PEDESTRIAN
AND BICYCLE PROGRAM
RUSSELL RD PEDES'TRIAN IMPROVEMENTS PHASE 1
MEEKER ST TO HOGAN PARK SIDEWALK
• Fund a new 5-foot planter strip and 5-foot �� # ti
Y
sidewalk on the east side of Russell Rd from
J
Meeker St to Hogan Park.
• Grant request: $565,886 with a $20,000 local
match
• This project was not selected for funding
idei
N S ,88thSt 1 WSDOT OILWAY-HIGHWAY
SeaTac —
.�r CROSSING, QGRAM
PR
$ cn
L Angle Lake f f S 196M.S; 1 ! SE 196th St S
Des S 200111 St
Moines Llk
.. t
,4`D ----1f The Boeing y
Creek 4F Company
--- —y 5 2C•89 St SE 208th St
Floor, 'Jolley oor 11 r
n: Community
- - 1 Park 5 212th St �^
y T
5216th51 - - w, + y� > m fork t LU
ul = ,f �� Green River r J.
' Natural a
r� Reaouroe6 1
i�
St 1 Area �e SE 224th 5
w North `}
n u
trleridtan
1 i Pa rk 7
1 � BNSF at Smith St]
Highli., % 1}.
C.C.
40thSt !—� 5° Russell 111)James`u't r ¢ SE240thSt 1r U-
w %
i Rive the nd Road 107 Stato Ciark t
Goff Park Lake l
nju 5 _ Complex V4 h1L:eker St Kent ;r Park Meridian CD
r w � SE 248tn St Valleyrk ( f'
aS� try~'t51& S Country Club I r--
!-!S1ni 8t ❑ tree d I -- 1
Hilk eat SE 256th S t
`y ! ••+a d Burial w
LaI�Y F nr 1
Fenwick ..
are ¢
w
i ti ! f v &J-. M La ke y
Ly� P, Meridian
ti .L 1 — ovi
-- £-Hr77�y}�+�+.a� — r—1 1 rer,1, i w 5, 165E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 ry
hia
� OI g < 8
S 288th Si
2021 WSDOT RA
CROSSING PROGRAM
BNSF SMITH ST PEDES'TRIAN GATES
• Install additional pedestrian gates to the BNSF
Smith St rail crossing
• Pass-through grant to BSNF
• Grant request: $315,000 with a $35,000 local -, -
match
7^ 19.iII' I
• BNSF revised the estimate to 650 000 after we _ --
$
submitted the application — -
• Additional funding was not available
SUMMARY OF 2021 GRANT REQUESTS
• Grant funds were requested for 13 projects
• Total 2021 requested funds: $ 12, 152,256 with a City match of
$ 1 ,613,435
• 6 projects awarded funds
• Kent was awarded: $8,019,908 with a City match of $ 1 ,448,435
• Total grant funding for 2021 with prior years' grants
• $ 17,352,255 awarded with a City match of $8,734,088
PREVIOUS YEARS ' GRANTS
SUMMARY OF 2021 GRANT REQUESTS
2022 GRANT OPPORTUNITIES
idea
Rd9{ 2022 P�SRC T '` NSPORTATION
N S 188th St Park
SeaTac
ALTERNATIVES P, ROGRAM
$ cn
e
L Angle Lake t 5 19u'tr S; 1 ! SE 196th St S
m • 1 1 uu t
Des S200thSt
Moines ,rD.—---rf The Boeing 4 t y r Llk
Creek Company o M �%
--- —y 5 2C•8t St SE 2D8th St, 'Jalley Floor 11 r
n: Community
P- - ark 5 212th St t^
3
y T
5216th51 - - w, + y� m fork �
ul = ,f �� Green River rJ. ,aa`� '"
' Natural m a
r� Reaoumee 1
i�
St 1 Area Ns
SE 224th 5
n —r 1 _
North `}
i; an
Meeker St, 64th Ave S and hleri Pa r rkk
Kent Elementary Frontage
Highli
C.C. 1}
40th St i !—� 5 o Russell James`u't Kent 4 4 SE 240 th St 1 w+ U-
w � ~
i Rive rhend Road 11G? Station Cbrk
o�
GoN Park uJ Lake I
nju f'� 5 _ Complex W I,�:e 't Kent Ur Park Meridian ra
rk r w � SE 248tn St Valley
( f'
aS� tr�~'k 51& S CountryClu6 I r
-!S1
! ni St ❑ heed I -- 1
Hilk eat SE 256th S1
`y ! ••+a d Burial w
LaI�Y 1 4 F 1�.1 F%nr 1
Fenw ick ..
are ¢
w
ti ! f v &J-. n La ke y
L— P, Meridian
ti .L 1
16SE-272nd•St
+ S Star Lake .,.�. — S 2774h Sl
Tr
cn
1 ry
IIa
� OI g < 8
�5 Firm,! + L L
S 288th Si
2022 PSRC TRA
ALTERNATIVES PROGRAM
MEEKER ST, 64TH INTERSECTION AND KENT ELEMENTARY FRONTAGE
• Federal funding for community-based _
transportation improvements
Grant request: $ 1 ,648,828 with a $257,332 local -
match � =
• Transportation Policy Board makes - -
recommendations on March 1Otn
PSRC Executive Board approves funding on
th
March 24
o-.
a
2022 TIB M PLE E STREETS
• State funds for agencies with an adopted
Complete Streets ordinance r
Local agencies are nominated by state agencies
and non-profit organizations
• TIB evaluates nominations and chooses agencies
and proposes funding levels ' -
• Agencies propose projects based on funding
levels
• TIB selects projects based on funding and merit
• Kent has been nominated and should hear from
TIB this month if we are selected - _
2022 PSRC REGIONAL COMPE'T'I'T'ION AND
LARGER JURISDIC'T'ION COMPE'T'I'T'ION
• Two grant opportunities
• Regional Competition
• Larger Jurisdiction
• Funds originate from the Federal Highway Administration and the Federal Transit
Authority
• 2022 grant applications will be awarded in 2025 and funding will be available in 2026
• Projects have a minimum of 13.5% local match.
• Proposed revisions to project selection framework place more emphasis on equity
and safety
2022 PSRC REGIONAL COMPETITION
• Projects must be in a regional growth center,
manufacturing center, or corridor serving a J .
center 1
• Streets must be in the federal functional
classification system (larger streets)
• Project selection is competitive —Urban:Other Freeway/Expressway:
Ir � I� N1
• or Collector
Number of projects is allocated by regional —Urban Minor Arterial RL
area
K NT 1I�_AND REGIONAL GROWTH AREA tad
} �� y,y pesrePKk
of I
1 1 t
SE 7061es
i
PF {
.Y ri r # ]Ua�4 St ram, ;r "�hS4
CnEklfal 1 Pa-k r #
j1C.Fr1O111�5 5 TtnK�i ` � � 5[ 21LIn51 1
1 N dal { t a: Legend
- $� l! , .�, Kent Industrial Valley
u 1 Regional Growth Center
1 q _ -
�� 14 --I City Limits
w
11 jADAhWL -1 Mi l r+F, Y 1443r?54 .4 SE 14Dkh$t y SC MOM 51
"% ■ Disclaimer: "This map is intended as a graphic
r1 �r< RLYerbendGdf _ Oak LarP L. 1 aid only, and is not a legal document,The City
alky Of Kent makes no representation or warranty
r � Kent hCu x�ryt as to its accuracy. Placement or IDwti❑n of
I �� E any map features thereon. The City Df Kent
1�4 If 1 rx disclaims, and shall not be held liable for any
SaskPrkStxt Ij 1 1 , 1 and aII damage, loss, or liability, whether
ti.v 1 SE r*IhSt * S[A+51 direct Indirect or consequential which arises
y 1 .1 �� *_1! WWWV r 1 or may arlse from this product 0r use thereof
ti 4arFgtwfF� 1 t � 1� prk k
' l 1 l by any person or entlty,"
U P ti s
# 1 # y rrrGL di fa 1
64 *1�-----_t rail nt}s.x� f� 1 G}Ur'gt❑n41
1 RrYar Pak 1jr
5ssae L ak tPy S27ne r4 --- mas � I de
A a 4-----+fl sl :srasl x
hAaroli Ih
ti
y r 46
V n 2yq r*}}
.25 4.5 Mlles King CaumY WA$7yla P s G ,Ew aglda,C}n.I i CRC,[,armin,WvGrop�ME T IJNASA,LJSC,5,Bureau of Land Managemrnt,CAA NP5.U$DA
i . I MT&51 NW Be rrjd all e
1 L
enter m
N 20`2 ,PSRC"REGI AL CO] ' TI ION
S 188th St . t
SeaTa.:
�$ N .r—.9E 1 2nd St 618 ft
� L Angle Lake
�� ti S 196th SE 19G[h St w
oa �f/
Des S 200th St
Moines f .-Y L �'4 Lak
' � 1
Creek S 216th St, 98th Ave S to 108th Ave SE r
SE 208th St
4` Community
- - _ Park 212in t
3
a N T
5216th51 > ° U-1
y •t y Green River r a\`� �, 4
If Natural m ¢iLid a
r Resoumea
m
St irea �e r SE 224th 5
Meeker St, 64th Ave S and North ;
Kent Elementary Frontage 2, Meridian
r Fm I; 7
z
r Meeker St, Lincoln to UPRR I;J J._
Fli,ll,lii�� r t•! �
',', e�
40th St ;� �—��# . Russell •`��James St d ¢ SE 2 dfi th St
1 Kent $ ti
Rive the nd Road [107 station �� Ciark
P GoN Park yJ Lake !
f 5j Complex 4'J I. :e Kent ;l, Park Meridian
I,k'r_r+ SE 248[I'i St Valley .�
r�~� d 516- Country Club ,
4 nd 2 Sty
y SE 256th St
Hilk re st
Meeker St, Kent Elementary ei w
r � s
to Washington Ave
N
', Meeker St and Lincoln Ave ke
Me an
±gI)ui
�£-Ha9r��F—��•+���— ' r r I 5, 165E-272nd•St ,
V•
i S Star Lake h'. -.—— — -I,. ..I Z y1� -
*r
� r L
es Olsq� Q
Firn-61 L w
S 288th Si
2022 PSRC REGIONAL COMPETITION
PO'TEN'TIAL PROJECTS
• Meeker St, 64th Intersection and Kent
Elementary Frontage Construction
• Meeker St, Kent Elementary to Washington Ave40
• S 216th St, 98th Ave S to 108th Ave S. - 228th
Corridor completion _.
• Meeker St and Lincoln Ave Compact 4
Roundabout and Meeker St Improvements,
Interurban Trail to Union Pacific Crossing - -
2022 PSRC LARGER JURISDICTION
COMPETITION
• Cities with population over 15,000
• Projects must be in a regional growth center or
corridor serving a center
• Local agencies may submit multiple
applications.
idei
N s ,satnsl 2022 PSRC LARGER JURISDICTION
r,' t
C COM ?ETI'TION-
Cn 7
d]
Angle Lake f t
S 196t:;ti ! ! SE 1v6[h St S
°' �, • 4E \
Des S 200th st Moines Lak
��k S 216th St, 98th Ave S to 108th Ave M
SE 208th St
m Community
- - _ Park 5 212th SL �^
5 216 to S1 - - — Fa ' m L w
ti
Gl I ♦� Green River r J. a\`�
r� Natural m
1 Reaour a '
i�
St - r Area `-e SE 224th 5
Meeker St, 64th Ave S and North ;
Kent Elementary Frontage M1leridtan
Pe rk
Meeker St, Lincoln to UPRR
Highli ! '}
401hSt C.
+� `IS�U' Russell Ja esst Kent
L 4 SE240thSt 4w ,, U-
i r 4 Rive the nd Road 11"; station Ciark
Goff Park - uJ Lake f
•nIu f 5� _ Complex W Nk'L Kent U) Park Meridian rp
SE 248[I'i St Valley
It _ 51&� S Country Club I Ir
a t
y SE 256th S1
'Meeker St, Kent Elementary 4 FHi t ,
Burial w
to Washington Ave ' .' !'. 1 '
s �
' + ' Meeker St and Lincoln Ave La idia m '
Mer n
+govi
���£-Ha7F�••�•a�� ■�I 1 1 5, 165E-272nd•St
+ S Star Lake -
rr t
*i
N
-�- - -1 w
I cn
L—
e - — 1 � g
Fnii��l ' t f w
S or
288th Si
2022 PSRC LARGER JURISDICTION
COMPETITION
POTENTIAL PROJECTS
• Meeker St, 64th Intersection and Kent
Elementary Frontage Construction
• Meeker St, Kent Elementary to Washington Ave +
• S 216th St, 98th Ave S to 108th Ave S. - 228th ••'"
Corridor completion ,
Meeker St and Lincoln Ave Compact
Roundabout and Meeker St Improvements,
Interurban Trail to Union Pacific Crossing '" '
2022 PSRC PRESERVATION SET=ASIDE
• Purpose is to preserve existing transportation
network
• Streets must be in the federal functional
t
classification system (larger streets)
Local match of 13.5 /o minimum r
• Prior competitions have had a limit of 2
�' I
applications per agency
. - 1
. ..-
�.
idei
N s lsstr,
2022 PSR ''` PRES 'AVATION SET-ASIDE
� _
S 212th St, Green River
F.1 11:F. �;. I � SE 1v61h St S
to 64th Ave S
—r-rt � 4
0} ————--
N
Des
Moinesf The oeing t s 1 Llk
Creek - ��---x Co pony
vt
Park - f `dallay Floor 2Li8t1;�t East Valley Highway, �1
ti Community S 196th St to S 212th St
Park
� T w
5 216th S1
coo Crean River - S 212th St, 64th Ave S "
' t Natural ;x #
." Resources to 72nd Ave S I -
St � 1 Area e 4 iO
SE 224th 5
#
w
North `}
h1ePa rk n7
� o
r I a co cn
Hignc I It { �
C.c. II
}'fit sell NJam sa s SE24GthSt #w+ � �
S 228th St, Russell Rd a 107 S 228th St, 64th Ave S CLark 3
n;u to 64th Ave S V4h':ekerSt to 72nd Ave S Pad Meridian �r CO
r SE 248tn St Valleyrk ( f'
I cs� tr�~'k d `51G < CountryClu6 I i--
Hilk ast SE 256th S1
y ! ••+a d Burial w
LaI�Y 1 4 F 1�., Anr
Fenwick ..
are
1V ! f v &J-. La ke y
1 ! Ly� P, �SE-272ndLSt
—govi
--�$-Ha7a�etyt�,�ra��— r-1 1 rer I W
+ S Star Lake .,.�. — S 2774h Sl
Tr
cn
1 N
II 1 �
� OI g 1 i—�—�.fi� < 8
LU
5288thSi s r�
2022 PSRC PRESERVATION SET=ASIDE
PO'T'EN'T'IAL PROJECTS
• East Valley Highway, S 196th St to S 212th St
• S 212th St, Green River to 64th Ave S } ��-
• S 212th St, 64th Ave S to 72nd Ave S
• S 228th St, Russell Rd to 64th Ave S
• S 228th St, 64th Ave S to 72nd Ave S
.r
2022 PSRC NON= MOTORIZED E -A IDE
• Open to cities, counties, transit agencies,
special districts, and tribal nations.
• 10% of available federal funds
• Allocated to county areas by population
• Local match of 13.5% minimum
idei
T.#39th�—�.— — �.. — 1 •n
N 2022�,"9PSRC NON-MOTORIZED SET-ASIDE
:,Tac -
�$ ul r t--- - -- - -y 15
Angle Lake C 1 f L
L J S 196th SF 1111 1 SE 1v611i St
it w �t
Des S 100111 St
Moines
r D ----1 The Boeing t y s
Creek Company o M ti,
Pa rt: ' m _.
--- — 5 2C•8t;St SE 208th St
y, "allay Floor 11 r
n: Community
- - J Park 5 212th St �^
y T
5 216 th Si y� > m fork L LU
ul = ,f Green River r J.
' Natural w a
L r� Resources 1 —
n m
St , Area �e SE 224th 5 Meeker St and 641h Ave S North
N Intersection Meridan
1; Park
Highli
C.C. 1}
40thSt LU
i !-0�J 5o Russell JJamesSt t L SE24GthSt #w+ t
w Kent
i Rive the nd Road �1G? Station Cork
Goff Park uJ Lake l
nju f'9 5 _ Complex W 10�,e t Kei't ;l� Park Meridian ra
rk r w p SE 248th St Valley ( f'
Country Club I r--
1 "y ISt z �°"°`",� ' Meeker St, Kent Elementary
to Washington Ave �E 256th 5,
Lal�•Y 1 4 F 1} p4vi 1
Fenw ick .. # t r —7 - y
are ¢
w r °OYsr 'R t
ti ! f v W.
n Lake y
L}� P, ° Meridian
+govi
-- $-jajF&St.—Eli+�—— •—1 1 r o uW 5, 1B SE-272nd•St
i S Star Lake .. — S 27.74In St ]
a
�r
M.a piI —7 L rn
—ti
Firnt.,! + L LU
s 288th Si s T_L �—
2022 PSRC NON= MOTORIZED PROJECTS
•d.. "• - %�� T� ..�.. r am • 41
• Meeker Stand 64th Ave S Intersection ;1 ;. ..�r
• ..: _�!'' fir_. •.. :�f', � � ' ` `��rx �- � ��•
Meeker St, Kent Elementary Frontage
• New and Enhanced Pedestrian Crossings in
Downtown, the MIC, and Interurban Trail
r ! a ~-•r`
2022 TIB RBAN ARTERIAL PROGRAM
• Projects must be consistent with state, regional
and local transportation plans
• Streets must be in the federal functional _
classification system (larger streets) _ - - � - -
• Local match of 20%
x '
de i
2022 TIB URBAN ARTERIAL PROGRAM
N S 188t .. L !
,:,T,
v$ N
a 7 1--- - -- - -'15
e r— ++I
Angle Labe
L C 1 1 L
f S 196th SF 1111 1 SE 1v6th St
Des S200[hSt
Moines 4 —
�J�D ----lf The Boeing
Creek Company o M
Pa r k ' CO
--- — 5 2C•8t;St SE 208th St `
y, "alley Floor 11 r
2 Community
Park 5 212th St �^
y T
5 216 th Si - - + y� > m fork L LU
1 •1 �y Green River r
I Natural a Q
r Reaoumes 1
i�
St 1 Area �e SE 224th 5
J w
� North `}
q' Pa rk 7
Meeker St, Lincoln to UPRR = '0
W i
Highli
1 If � 4
C.C.
40th St i !—��j 5 6' Russell "IJam 3't Kent 4 4 SE 240 th St 1 w+ �
i � ~
i I Rive the nd Road 16 station Ciark
— Goff Park uJ Lake I
nju f'� 5 _ Complex 4'J h'It:B 14Er St Kent U) Park Meridian ra
rk rrrw E2 Valley
~It .516 CountryCluh I r--
r i
SE 256th S1
" w
F�W Gk 116th Ave SE and SE 248th St
Q i
w N 1
ti ! f Er, ��'R � La y
L P, Meridian
--�$.gw;6F>. +raffia-- r-1 1 rer 5, 16 5E-272nd•St
i 5 Star Lake .,.,,. — S 2771h St
�r
! 1
�-- � w
M.a I —7 rn
of 1 L—ti--��� 8
I 1 w S Firm I L to
S 288th Si s —_L
2022 TIB URBAN ARTERIAL PROGRAM
POTENTIAL PROJECTS
• Meeker St and Lincoln Ave Compact
Roundabout and Meeker St Improvements,
Interurban Trail to Union Pacific Crossing
• 116t'' Ave SE and SE 248t'' St Intersection
Improvements (Roundabout)
2022 TIB I D EWALK PROGRAM
• Project must be transportation and not41w
recreation
Streets must be in the federal functional Y.- = -��, . AN
classification system (larger streets)
• Local match of 20%
idei
�. 022 TI�B SIDEWALI� PROGRAM
N S 188fh St Parma ! 1 1
SeaTaccn
t •—.,
Angle Lake t 1 1 1
L J S 196th 81 1111 1 SE 1v6[h St
1
Des S 200[h St
Moines 4 � r
,4�D.����If The Boeing y Llk
Creek Company o M
Pa rk CO
--- 5 21" h St SE 208th St
y, Valley Floor 11
n: Community
- - Park 5 212th St �^
y T
5 216 th Si m fork L LU
ul = ,f �� Green River rJ.
' Natural a
r� Reaouroee 1
i�
St 1 Area �e SE 224th 5
w North `}
n u
Meridian �
i Pa rk7
�
Fiighli., 1 t. " Russell Rd Meeker St to Hogan Park ' '� '• 'C.C. 1 4
40thSt 1���� 5°' Russell JJame's3't ¢ SE24GthSt �w+ LLI
w ~
i Rive the nd Roa �1G7 Station Cbrk
Goff Lake I L
nju f'� 5�• _ Complex 'J 1,'f�:eLkerf Kent ;r Park Meridian ra
its r w SE 248m St Valley ( f'
$ r�~ik .516 S CountryCluh I r--
�
r f
4� J + 1 w v I
1 SE 256th S1
w
Femvick Meeker St, Kent-Des Moines Rd to Frager Rd ly
k*� l�l 6 I S f 1 ilrfFG ice=
1 Idi f
QI
L— i P, Meridian
1 L EA 1 L _gc)vi
;�2w&St •+•��——— r+�1 1 1 5, 16 5E-272nd•St
+ S Star Lake S 277fn.Li. ]
a
Tr
w
cn
OI I �# i����.fi� 8
S 288th Si
2022 TIB I D EWALK PROGRAM
POTENTIAL PROJECTS
• Russell Road Pedestrian Improvements Phase
�-r'���•� '� � MEfkfR Si
1 , Meeker St to Hogan Park Sidewalk
• Meeker St, Kent-Des Moines Rd to Frager Rd
and Connection to Golf Course Trail, TMP
Project P-28 -
c�
2022 WSDOT HIG SAFETY
IMPROVEMENT PROGRA
• Agencies must have a Local Road Safety Plan
(LRSP)
4
• WSDOT selects projects from the LRSP based T
on available funding and each projects benefitswim
to cost ratio
• Local match of $20,000
r�
2022 WSDOT SAFE ROUT
TO SCHOOLS M
• Projects within 2 miles of a school
• To be most competitive project should be in A
the Local Road Safety Plan :
• Includes an equity evaluation criteria , L
• Local match of $20,000
�� .
2022 WSDOT S ROUTES
TO SCHOOLS PROG
PO'T'EN'TIAL PROJECTS
• Projects will be reevaluated when the Local r
■ r
Road Safety Plan is completed f
e�
■
• Meeker St, Kent Elementary Frontage _
ap
: .
�•: -
ss:sssr.: _ -_ -
• Three enhanced crosswalks (RRFBs) based on
LRSP
• Neely-O'Brien crossing of 64th Ave S
• Two other locations on school walk routes
j
• Sidewalk gaps near elementary schools -
2022 WSDOT PEDESTRIAN
AND BICYCLE PROGRAM
• To be most competitive project should be in
the Local Road Safety Plan
• Projects in the $750,000 to $1 .25 million tend to
be most competitive
• Local match of $20,000 BIKE LANE
• Categories for planning, design, and ki
construction
in ter
� T.#39tIrEk�«.— — �.. — 1 •11 �
N Ridge �5 2022 WSDOT-PEDESTRIAN r
S188thst �r 1 1 < _
rk
SeaTac k -
0 .� . AND BICYPLE PROGRAM
L Angle Lake ff S 1913M.S; 1 1 SE 196th St
l I 1 w �ti
w• �
Des S20Oth St A,"I 1 } _ - -'��•W••` w tw,
Moines f Llk
..
The Boeing t y
Creek f" l Company 4rt
M
—_- _Pa rk
SE 268th S1:
108th Ave SE at Panther Lake Library t�
Enhanced Crossing
a
5 216 th S1 - - y ;♦f a = �¢a[k i w
Gl ` Green River r J.
Natural w ,did a
r Resources 1
r - f
m
St 1 Area SE 224th 5
Meeker St, Kent + -
North `}
Elementary Frontage N19ridtan
116th Ave SE at SE 223rd St �r +,
r�1 ' �
Highlir� I t., Enhanced Crossing
�4
40thSt E_��� Russell JJames5t r S ¢ SE24GthSt Iw+ �
ti
1� Rive the nd Ro-rk [107 Station 7 Kent
Cork
! GoN uJ r Lake l L
nju f'� 5 _ Complex v wce ke 't Kent U) Park Meridian ra
rk r w SE 248tn St Valley ( 2
aS�� r�~'h d � �61. &: � CountryCluh I i--
1 412rd St ° -
4� r 1 L 1
� 1 SE 258th 51 I
6
Fenwi Russell Rd Meeker St to Hogan Par ,, �, +y
P-4k 1 1 i6 f f ke4l, <
U� fF¢�91
1 ti l f 1 u e�'R N La ke y
` __ V, ° Meridian
qQv
?e'? SF� 4"'+�___ ■�I 1 516 SE 2nd•St
+ 5 Star Lake;. 1 �.. 1 r�
Kent-Kangley Rd at Lake Meridian
Enhanced CrossingS
FirnLI twn
S 288th Si
2022 WSDOT PEDESTRIAN
AND BICYCLE PROGRAM
PO'T'EN'T'IAL PROJECTS
• Meeker St, Kent Elementary Frontage, +
construction
�4
• Kent-Kangley Lake Meridian and Panther Lake _
Library Enhanced Pedestrian Crossings r' • `'�
• Russell Road Pedestrian Improvements Phase 1 , F '"= y,
Meeker St to Hogan Park Sidewalk
• New and Enhanced Pedestrian Crossings in
Downtown, the MIC, and Interurban Trail
• Enhanced Pedestrian Crossing of 1161h Ave SE at .., _..
SE 223rd St
in ter
� T.#39tIrEk�«.� � �.. � i •11 �
N Ridge �5 2022 WSDOT-PEDESTRIAN r
S 188thst �r 1 1 < _
rk
SeaTac k -
0 .� . AND BICYPLE PROGRAM
Angle Lake f 1
c
Des S20otn$t :rb 4 t> w t w.
Moines ,rD.—---xf The Boeing t = .. �� Lak
Creek M1 Company n�ti _ M
Pa r k CO11
--- —y 5 2C•8t St SE 2D8th St, Valley Floor 11 r
n: Community
- - 1 Park 5 212th St a^
m � I
y T
5216th51 - - -- + `� ° fork
coI •l �� Green River r J. ,ad`� �' i i
' I histurel m a
Q h !
st -4- Planning:
�I SE 224th 5
Interurban Trail to Planning: + -
North
Kent Station Downtown to N19ridtan `}
Earthworks Park +,
Highli 1 L 4
}
40th St 'N James t Kent 4 4 SE 240 th St 1 w+ U-
�
r
i. ~
Road v Cork
! Rive the nd Park 107
Goff uJ Lake l L
nju f'� 5 _ Complex V4 h'It:e ker St f,� Park Meridian ra
r w SE 248tn St Valley ( f'
Uk try~ik .515 S Country Club I r--
! 1rid St ❑ hee d I -- 1
Hilk eat SE 256th S1
`y ! ••+fL d Burial w
Lai�•Y 1 4 F 1�.1 F%AP 1
Fenw ick A # t � � —7 -_ y
are ¢
w sr � t
L— P, Meridian
ti .L 1 —�ovi
co 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 2771h Sl
Tr
1 N
cn
< 8
�
S 288th Si
2022 WSDOT PEDESTRIAN
AND BICYCLE PROGRAM
POTENTIAL PLANNING PROJECTS
• Plan pathway and construct bicycle facilities to -41
connect the Interurban Trail and Kent Station, J7
TMP Project P-84
• Plan bicycle facilities to connect Downtown to
Earth Works Parks, TMP Project P-85
TO Downtown
idei
N S ,88thSt ZI
Q�,;_?N�DOT OILWAY-HIGHWAY
SeaTac " t •—— —— —
,e r .�rCROSSING, PR OGR-AM
f
A L Angle Lake f f S 1913tr S; 1 ! SE 196[h St S
� � ,•u, y 1 1 w t
' 1 n ,,; 1 t w• 1
Des S200111St
tv181M1e8 4 •,•
,4`D ----1f The Boeing y Llk
Creek Company
Pa rt: m -.
--- — 5 2C•8v1 St SE 208th St
y, Valley Floor 11 f
n: Community
- - 1 Park 5 212th St �^
y T
5 216 th Si m fork t U-1
ul = ,f �� Green River r J. aa`� 1 i
' Natural w a
Q Reaouroe6 1
i�
St 1 Area �e SE 224th 5
w North `}
n o
Illeridtan
1 i < Pa rk 7
v z cz
Highli w % 1 <
C.C. 1— 1 ,r a: SE 2 40 th St 4 r w
40th St i �� 5 o Russell v James St Kant _ cf,
wRoad
�+} ~
' Rive rbe nd Poffak 117 Ste UPRR 3t Willis till Lake r
nju f'� 5 • _ Complex V4 h1L:e ker St en c0 Park Meridian rp
r w SE 248tn St Valleyrk ( f'
aS� try~'t51G S Country Club I r--
!� ni St ❑ heed
1. � r i
4r j 1 1 w u7 !
1 x Hilkrest SE 256th 51
`y ! ••+a d Burial w
LaI�Y 1 4 F 1�.1 F%AP 1
Fenw ick .. # t —7 _ y
are ¢
17
i ti ! f v n La ke y
tiy� P, Meridian
ti .L 1 —govi
-- $-jajF&y}.—El. m — r—1 1 rer i 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 N
Ilia
� OI g� < 8
FirnL,! + L LU
S 288th Si
2022 WSDOT RA
CROSSING PROGRAM
UPRR WILLIS ST CROSSING GATES RELOCATION
• Project was identified in the UPRR Quiet Zone .`,.ITT..���� ��11
g
dia nostic7171
��
fy 1
• Funds design and construction
• Local match of 10% required
or
de i
N s i 2 UTC RAILl''I'llTAY-HIGH AY
5_aT��:
�$ cn !
LOSSINC PROGRAM-
f
P De S 2001h$t I 2,
81M1e8 The Boeing
r
.' _� 1r y Llk
MoinesCreek Company
Park
L
--- " — Valley Floor
52HVt St SE268t1 �t !
n: Community
- - 1 Park 5 212th Sty
y T
5216th51 - - w, + y� ° fork 1 U-1
Green River
' Natu rsI m
R a
r� esources !
i�
St 1 Area �e SE 224ih 5¢ 1 _
w North `}
n n
trleridtan
1 i Pa rk 7
Highli
C.C. 1_ 1; ,,� f � BNSF Smith to Meeker th St +-. w
40th St i t-& 5° Russell J James 3t Kent — cf,
w ~
i Rive the nd Road 1G7 Station Ciark
Go IF Park uJ Lake
• I
nju f'� 5 _ Complex wh'�:eker St Kell U, Park Meridian ra
r w SE 248tii St Valley ( f'
aS� try~'F .516 S Country Club I r--
! 1ni St ❑ heed I -- 1
Hilk eat SE 256th S
`y ! ••+a d Burial w
L. 1 4 F 1��1 IF A4 1
Fenwick ..
i ti ! f v ��'R M La ke y
Ly� P, Meridian _
—govi
--�$-jajF&st +.a�a-� r-1 1 rer i 5, 16 5E-272nd•St
+ S Star Lake .,.�. — S 2774h St
Tr
cn
1 N
hia
� OI g
LU
S 288th Si
2022 UTC RAILWAY= HIGHWAY
CROSSING PROGRAM
BNSF, SMITH TO MEEKER WEST SIDE FENCE
• Project was identified in the BNSF Quiet Zone
diagnostic
_.
lip T -
• Maximum grant award of $20,000
• Local match is the remainder of the project y
cost - - - • . .
USDOT REBUILDING AMERICAN
INFRASTRUCTURE WITH SUSTAINABILITY
AND EQUITY ( RAISE)
• Formerly TIGER grants
• Funds large, multi-agency projects with regional benefits
USDOT INFRASTRUCTURE FOR
REBUILDING AMERICA (INFRA)
• Funds large, multi-agency projects with regional benefits
• Shifting focus to rural areas that are historically underserved
2022 LEGISLATIVE REQUESTS
• Request of $20.5 million for 228th corridor
• Request of $3 million for the Quiet Zones � .
INFRASTRUCTURE INVESTMENT
AND JOBS ACT ( IIJA)
• Much is still unknown
• Grant agencies indicate they may see an additional 50% in federal grant funds for
existing programs
• Bill creates several new grant opportunities staff are evaluating