HomeMy WebLinkAboutCAG2022-146 - Change Order - #2 - Olson Brothers Excavating, Inc. - Downey Side Channel Restoration Final Phase - 08/24/2022KENT Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cheny colored paper)WaSHtNGToN 3 oLo.c Originator: S. Anderson Department: PW Engineering Date Sent: 8t31t2022 Date Required: N/A Authorized to Sign: E Director or Designee E MaYor Date of Council Approval: 4t5t2022 Budget Account Number: D20074.641 1 0.330 Budget? EYes trNo Grant? EYes E No Type: N/A tr .9*.o ELo55vco EooLtrl Vendor Name: Olson Brothers Excavating, lnc. Category: Contract Vendor Number:Sub-Category: Change Order #2 Project Name: Downey Side Channel Restoration Final Phase project Details:Furnish 36 timber piles for the Type 2 log structures at the unit price of $650.00 each. Agreement Amount: $25,763.40 starr Dare: 411512022 Basis for Selection of Contractor: !!id Termination Dare: 100 Working Days Local Business? E Yes E No* *lf meets requirements per KCC 3.70.100, ptease complete"Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? EYes El No Contract Number: 0AG2A22-146 Comments:Date Received by city Attorney: Date Routed to the Mayor's Office: C'lca-at3\o asagE,i GEgl vt Date Routed to the City Clerk's Office: adcclv22l/l_1_20 Visit Documents.KentwA.gov to obtain copies of all agreements' KENT WaaHrrotor CHANGE ORDER NO, #2 NAME oF coNTMCToR: olsso*Brcrhers'-lng ("contractor") GoNTMCT NAME A PROJECT NUMBER: Downqy slde. channel Resqoration-Ejnal PhEFe ORIGINAL CONTRACT DATE: AOTII 15. 2022 This Change Order amends the above-referenced contract; all other provlslons 9f !!" contract that are not inconslstent wlth thls change order shall remain ln effect. For valuable consideration and by mutual consent of the parties-, the project contract is modlfied as follows: l, Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revlse existing work as follows: In addition to work required under the original Agreement and any prior Amendrnents, Contractor shall providC all labor, materials, and equiPment necessary to: Furnish 36 timber pites for the Type 2 log structures at the unit price of $650.00 each. 2. The contract amount and time for performance provisions of Section ll "Time of Completion," and Section III, "Compensation," are hereby rnodified aS followS: Original Contract Sum, (including applicable alternates wssr) and $3,129,996.M Net Change by Previous Change Orders (incl.applicable WSST) $13,212.0o Current Contract Amount (incl, Previous Change Orders) $3,143,20E.E4 Current Change Order $23,a00.00 Applicable WSST Tax on this Change Order $2,363.40 Revised Contract Sum $3,169,972,24 CHANGE OROER - 1 OF 3 lfil worklng dlYrRevlsed Tlme for ComP prlor Change Orders letlon under (lnsert date) 0 calendar daysChaorderelrfothlsngired()RequDays 100 worklng daYsRevlsed Tlme for Co (insert date) mpletion OriglnalTime for Completlon (lnsert l{Xl worklng dryr In accordance wlth Sections 1-04.4 and 1'04.5 0f the Kent and wsDoT standard speclflcaflons, and section VII of the Agreement, the,contractor accepts all requlrements of this ihing" ordei ov rlg"t;g below. NsoJ pursuant, to !lt: above-referenced contract, Contractor agrees to walve any protest it may triv! regarOing thls Change Older and acknowledges and aEcipts that this Cfiange Order constitutes flnal settlement of all clalms of any klnd or nature arlsing from or.onn"*ff*ttn uny work either covered or affected by thls Change order, includlng, without llrnitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Changl ord.r, uniess otherwise provided, does not relieve the contractor from slrlct compliance wiln tne guarantee and warranty provlsions of the orlginal contract, particularly those pertalning to substantial completion date' All acts consistent wlth the authority of the Agreement, previous Change orders.!f 9ny), and this Change OrOei, prior to the effective date oitnis Change order,. are hereby ratified and afflrmed, and the terms of the Agreemenl, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury -that they are authorized to enter into this contract modification, which ls binding on the parties of this contract' g. The Contractor will adjust the amount of its perforrnance bond (if any) for this project to be consistent with the revised c6ntract sum shown in section 2, above' It{ WITFIESS, thc pertlae bclow havc axccuted thls Agrccmcnt, whlch will bccoma cl?rctlvq on thc lert deto wrlttcn balow' COI{TRACTOR: Byr Print Name: DATE: CITY OF By:frrt- (slgnature) Print Name; Ghad Bieren. P.E. DATE:2 AFec KP CHANGE ORDER. 2 OF 3 ATTT3f,: Kent Clerk APPROVED AS TO FORII: (appllccble tf Mayo/s ggtulura requkld) Kent Law DePartment €(ln $lr i.ld, Fo nt fflt thr .Lrlrtdt tilttrli rinaQ Ull Etlnd hr ler uvrdl CHANGE ORDER.3 OF 3 File No.2OO.2 KENT Wassrroto{ CHANGE ORDER WORKSHEET NO, 02 Construction Engineering Division - Public Works Project:Downey Side Channel Phase ration Final Project No: Fed-Aid No: Contractor: 18-3007.1 N/A Olson Brothers Project Engineer: Melissa Dahl Capital ProjectsManaoe* Jason BrYant Date: 7/t8/2022 I. Pro osed Chan e Furnrish 36 EA timber piles for the Type 2 log Structures at the unit price $6s0.00/EA fI. Reason and Bac round for Chan e IfI. Method of Payment NEW PAY ITEMS . Notapprrcaore The original contract has the City suppliying the piles for the Type 2 log structures. The timber piles were stored on site from previous projects. Upon inspection by the project consultant Herrara, it was determined the stored piles had decayed and were not suitable for use. Olson Brothers has agreed to supply more Type 2 timber piles @ $650.00 per each, honoring the existing Bid Item # 8040 unit price for $20.00 per foot for the installation. This change records reason for additional quantities. Sch No Item Description Total Est. QtY Unit Unit Price Total Estimated Cost of Item 8 Supply Type 2 timber piles 36 ea $6s0.00 $23,400.00 $ $ $ $ Page 1 New Pay Items Total: $23,4OO.OO DELETE EXISTING PAY ITEM(S) per 1-O9.$ E Notappricabre Sch No.Bid ltem No.Item Description Qtv Unit Unit Price Cost of Item $ $ Delete Existing PaY Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) M Notappricabre Sch No-Bid ltem No.Item Description Qtv Unit Unit Price Cost of Item $ Increase / Decrease to Existing Pay ltems Total: $ XTOTAL ESTIMATED COST OF CHANGE ORDER:$23,4OO.OO x Total of the Cost of Item Columns IV. WORKING DAYS Original Contract:100 Due This Change Order:o Previous Total:100 Capital Projects Manager: Capital Projects Supervisor: *TOTAL WORKING DAYS:100 x This Change Order + Previous Total Date:L0Lu J B J Barry Page 2 Date: 4,1= Construction Manager:Date: Eric Connor Page 3 Bryant, Jason From: Attachments: To: Cc: Sent: Subject: Bryant, Jason Tuesday, June,28, 202210:40 AM Dahl, Melissa Harris, Josh; Murillo, Alex Downey-Timber piles IMG-901 1.JPG; IMG-901 B.JPG Melissa, I'm not sure if anyone needs to inspect the timber piles prior to installation? If we do need someone to take a look can you late me know ASAP? I'm expecting the pile subcontractor this week. I put some pictures in the P drive as well: p:\public\PROJECTSLIn Construction\l8-3007.1 Downey Final phase\600 Inspection Reports\600.4 Photos\Construction Thank you, Jason Bryant, Capital Proiects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 JBrvant(oKentWA.qov CITY OF KENT, WASHINGTON KentWA.gov Facebook r"r'ii|i*r' YouTube PLEASE CONSIDER THE ENVIRONMEIVT gEFORE PRINTING THIS E-MAIL 1 Bryant, Jason From: Sent: To: Cc: Subiect: Bryant, Jason Wednesday, July 6,2022 12:10 PM Bryce Sturrock Harris, Josh; Joni Dombrowski Downey-Type 2 Structures Bryce, Have you heard back from your supplier for the Type 2 timber piles? Do you happen to have a schedule for the pile subcontractor? I want to keep everyone in our office up to speed with how things are progressing. Thank you, Jason Bryant, Capital Proiects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 JBryant@KentWA.qov CITY OF KENT, WASHINGTON KentWA.gov Facebook I 11/il.i.i YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 1 Bryant, Jason From: Sent: To: Cc: Subject: Dahl, Melissa Tuesday, luly 12,20227:47 AM Bryant, Jason Harris, Josh RE: Downey logs Thanks for the update Jason, I'm going to reach out to Herrera to see if they have any recommendations regarding use of the logs on the site. Kelly and Mike Mactutis are pushing for use on site in some capacity as a first choice, I will keep you and Josh CC'd on that follow up. Thanks, Melissa Dahl EIT, Environmental Engineer II Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-6511 | Cell Phone 206-482-4461 M Dahl@KentWA.qov CITY OF KENT, WASHINGTON KentwA.gov Facebook ir'..ri: YouTube reff3ffi From: Bryant, Jason <J Bryant@kentwa.gov> Sent: Tuesday, July L2,20227:4L AM To: Dahl, Melissa <M Dahl@kentwa.gov> Cc: Harris, Josh <JHarris@kentwa.gov> Subject: RE: Downey logs Melissa, We have not discussed doing anything with the logs. I asked Olson again yesterday about the pile driving methodology. They have not yet responded. I'll reach out to them again today' Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 JBrvant@KentWA,qov CITY OF KENT, WASHINGTON KentwA.gov Facebook i''.'i.::i"?,:, YouTube PLEASE CONSIDER TTIE ENVIRONMFruT BEFORE PR:ruT;NG T|-{IS E-M.AIL From: Dahl, Melissa <MDahl@kentwa.gov> Sent: Monday, July LL,2022 4:42 PM To: Bryant, Jason <JBrva nt@kentwa.gov> Subject: Downey logs Hello -Jason, There's been some chatter on my end regarding the stockpiled logs we have on site and different alternatives we can do with them. Before I start looking into that, has there been any discussion on your end outside of what I've seen from Herrera? Also, has there been any updates on the pile methodology discussion? Thanks, Melissa Dahl EIT, Environmental Engineer II Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-6511 | Cell Phone 2O6-4a2-4461 M Dahl@ KentWA.oov CITY OF KENT, WASHINGTON KentwA.sov Facebook r-'.,, :;. YouTube trn-staq{Am 2 Bryant, Jason From: Sent: To: Cc: Subject: Bieren, Chad Thursday, luly 14,2022 1:35 PM Connor, Eric; Peterson, Kelly Barry, Jason; Bryant, Jason RE: Downey side channel Please proceed, thanks. And, nice work @ Chad Bieren, P.E. Public works Director Engineering Administration I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 | Cell 253-740-9139 cbieren@KentWA.qov CITY OF KENT, WASHINGTON KentWA.oov Facebook .1 ,,=,til-r::. YouTube Instaoram From: Connor, Eric <EConnor@kentwa.gov> Sent: Thursday, July 'J.4,2022I2:I7 PM To: Peterson, Kelly <KPeterson@kentwa.gov>; Bieren, Chad <CBieren@kentwa'gov> Cc: Ba rry, Jason <J Ba rry@ kentwa.gov>; Brya nt, Jason <J Bryant@kentwa.gov> Subject: FW: Downey side channel Good Afternoon, Are you guys okay with Olson supplying 36 timber piles in place of the City supplied piles for the price of $650.00/ea? The contract bid item unit price to supply the other 94 timber piles is $1,336.00/ea. Please let me know if you have any questions or need any additional information. Thank you, Eric Eric Connor r Construction Engineering Manager Phone 253-856-5533 | Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant, Jason <JBrvant@kentwa.gov> Sent: Thursday, July 'J.4,202211:20 AM To: Barry, Jason <J Barrv@kentwa.gov> Cc: Connor, Eric <EConnor@ kentwa.gov>; Ha rris, iosh <J Ha rris@ kentwa.gov> Subject: Downey side channel 1 Jason, Olson has agreed to supply the timber for the Type 2 structures for $650.00 ea. The total for the piles is $23;00.00. The instailation will be paid under bid item # 8040. Shall we proceed with? Thank you, Jason Bryant, Capital Proiects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 JBryant@KentWA.qov CITY OF KENT, WASHINGTON KentWA.gov Facebook i 'r1/iilr ',lj I YouTube PLEASE CONSIDER THE ENVIRONMENT SEFORE PRI|'ITING THIS E-MAIL From : Bryce Stu rrock <brvces@o lso n brothe rs. net> Sent: Thursday, July 'J.4,202210:36 AM To: Bryant, Jason <J Brvant@ kentwa.gov> Cc: Ha rris, Josh <J Ha rris@ kentwa.gov>; Joni Dom browski <ionid @olsonbrothers.net> Subject: RE: Downey side channel Yes the numbers are good. Line item; 36 EA Timber Pile, Furnish - Side channel Habitat Structure Type 2 EA s23,400.00 S6so per Give it an 8000 item number and we can run with it. Then at the time of billing the L0.1 % sales tax will be applied. I do agree the driving of the piles will be in the #8040 bid item. this item willjust be to get the additional piles. Just as the other lines items are for the piles. Thank you, €Ir lffit rrrruttEfll flfa t6ll {llf fi" I' PqYclqF! lY^' t€t?8 omf{! tr531 rt0-it84{ F n 12531 ?7O.CO{S 9ryco Sturrock c.ell: (254-V43-4b50 Ewt a\l: b rycssR>olsonbr other s.vot From: Bryant, iason <iBrvant@kentwa.gov> Sent: Thursday, July 14,2022 L0:27 AM To: Bryce Sturrock <brvces@olsonbrothers. net> Cc: Harris, Josh <JHarris@kentwa.gov> Subject: FW: Downey side channel 2 EXTERNAL EMAIL Bryce, Just wanted to follow up on this one and make sure I have the numbers correct? That way I can get it approved. Thank you, Jason Bryant, Capital Proiects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 JBrvant@KentWA.qov CITY OF KENT, WASHINGTON KentWA.gov Facebook .T'itil:r.:::r YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant, Jason Sent: Friday, July 8, 2022 L2:O4 PM To:' Bryce Stu rrock' < bryces @ o lso n brothe rs. net> Cc: Harris, Josh <JHarris@kentwa.gov> Subject: RE: Downey side channel Bryce, Thank youll I'm going to let my up-chain know that we are looking at $650.00 x f$ =$23,400 plus tax. The driving of tne piles will be paid by the foot per bid item # 8040. Is your subcontractor driving the piles or is Olson placing the 30'? Thank you, Jason Bryant, Capital Proiects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 JBrvant@KentWA.oov CITY OF KENT, WASHINGTON KentWA.gov Facebook x',i,'li;lrr YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryce Sturrock <brvces@olsonbrothers'net> Sent: Friday, July 8, 2022 LL:5t AM To: Bryant, Jason <JBrvant@kentwa.gov> Cc: Harris, Josh <JHarris@kentwa.gov> Subject: RE: Downey side channel 3 EXTERNAL EMAIL ItlL ilciffiHffl HA C{tel {{f {r, e" Puy.lk* lilt' Sltl?9 omcc! {2Exl r1l}38{4 Frrc (e58' ?Tlt'3846 $rr4co Sturrock uu: (z5V)-V4V-4b50 Evna\l: b r4c esd.olsonbr other s.not From: Brya nt, Jason <J Brvant@ kentwa.gov> Sent: Friday, July 8, 2O22 LO:25 AM To: Bryce Stu rrock <brvces@olso n brothe rs. net> Cc: Harris, Josh <JHarris@kentwa.gov> Subject: RE: Downey side channel Bryce, Does this include the L2o/o Prime mark up? Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 JBryant@KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook : i',iii.:r: YouTube PLEASE CONSIDER THE ENVTRONMENT BEFORE PRINTING THIS E.MAIL From : Bryce Stu rrock <brvces @olso n brothe rs. net> Sent: Wednesday, July 6, 2O22 3:33 PM To: Brya nt, Jason <J Brvant(o kentwa.gov> Cc: Harris, Josh <JHarris@kentwa.gov> Subject: Downey side channel <#Ir dllr Type 2 Structure piles. We can get them at 5650 ea. Assuming a count of 36 ea currently l*ot rnGeffilr' lila 662* i{tF !t, E, ftryClup' lYl. ggAT$ ome.:{2Ell, rtl}il84it Fr* {353} 770qt8il6 4 EXTERNAL EMAIL 9rr.1co Sturrock cou: (z5v)-v43-4b60 Ewt a\l : b r u c es d' ols owb r oth e r s.u' et 5 Bryant, Jason From: Sent: To: Cc: Subject: Dahl, Melissa Wednesday, July 6, 2022 9:03 AM lan Mostrenko; Mark Ewbank; Bryant, Jason Harris, Josh RE: Downey timber piles Sounds good Ian, Jason or JoSh will be in touch with you when we're closer to needing you. Also what is the timeline to receive the next invoice? We'd like to start tracking the budget for the field work. Thanks, Melissa Dahl EfT, Environmental Engineer II Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-6511 | Cell Phone 2O6'482-446L M Dahl@KentWA,qov CITY OF KENT, WASHINGTON KentwA.gov Facebook t,,.,r i:,:rr YQ.uI!-bg Instaoram From: la n Mostrenko <imostrenko@ herrerainc.com> Sent: Wednesday, July 6, 2022 8:22 AM To: Dahl, Melissa <MDahl@kentwa.gov>; Mark Ewbank <mewbank@herrerainc.com>; Bryant, Jason <J Brya nt@ kentwa.gov> Cc: Harris, Josh <JHarris@kentwa.gov> Subject: Re: Downey timber piles Yes. Email is best lf you need to talk you can also try my cell. (4251922-8564. IBM Get Outloo k for iOS From: Dahl, Melissa <M Dahl@kentwa.gov> Sent: Wednesday, July 6, 20227:45:03 AM To: Mark Ewbank <mewbank@herrerainc.com>; Bryant, Jason <JBrvant@kentwa'gov> Cc: la n Mostrenko <imostrenko @ herrera inc.com>; Ha rris, Josh <J Harris@ kentwa.gov> Subject: RE: Downey timber piles 1 EXTERNAL EMAIL Hello Mark, Thanks for the update, will email be the best way to reach Ian as we get closer to scheduling? Thanks, Melissa Dahl EIT, Environmental Engineer II Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-6511 | Cell Phone 2O6-4a2-446L M Dahl@KentWA.oov CITY OF KENT, WASHINGTON KentwA.gov Facebook ir'riir:gr YouTube Instaoram From: Mark Ewbank <mewbank@herrerainc.com> Sent: Tuesday, july 5,2022 8:02 PM To: Dahl, Melissa <M Da hl@ kentwa.gov>; Brya nt, Jason <J Brvant@kentwa.gov> Cc: lan Mostrenko <imostrenko@herrerainc.com>; Harris, Josh <JHarris(okentwa.sov> Subject: RE: Downey timber Piles lan Mostrenko will be our point person for pile driving inspection support. We are likely to involve others in inspecting the log structures as they are built around the piles in the weeks down the line. lan will provide info in email tomorrow regarding our findings of inspecting logs stored onsite that are intended for use as piles From: Dahl, Melissa <MDahl@kentwa.sov> Sent: Tuesday, July 5,2022 4:I4 PM To: lan Mostrenko <imostrenko@herrerainc.com>; Mark Ewbank <mewbank@herrerainc.com> Cc: Brya nt, Jason <J Brva nt@ kentwa.gov>; H a rris, J osh <J H a rris@ kentwa.gov> Subject: RE: Downey timber piles Hello Ian, Mark, I heard one of your team visited the project site last week and provided feedback regarding the stockpiled logs. We are working on resolving that issue, but would like to figure out who would be the Herrera inspector moving forward when we're ready to begin pile driving the logs' Can you send the contact information of who this will be? Thanks, Mef issa Dahl EIT, Environmental Engineer II Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-6511 | Cell Phone 2O6,'482-446L M Dahl@KentWA.qov CITY OF KENT, WASHINGTON KentwA.gov Facebook lrrr,::,:' YouTube Instaqram 2 EXTERNAL EMAIL From: Dahl, Melissa Sent: Tuesday, June 28,2022 5:25 PM To: lan Mostrenko <imostrenko@herrerainc.com>; Mark Ewbank <mewbank@herrerainc.com> Cc: Wadsworth, Chris <CWadsworth@kentwa.sov>; Bryant, Jason <JElye-n!@-k@g4y>; Harris, Josh <JHarris@kentwa.gov>; Maloney, Carla <CMalonev@kentwa.gov> Subject: Downey timber piles lmportance: High Hello Ian, Mark, The City is expected to begin pile driving for the Type III structures later this week and into next week and would like to begin coordinating the inspection from Herrera staff to come onto site' While onsite we would also like Herrera to inspect the stockpiled logs we have onsite for the Type II timber piles, there is some concern regarding their age and we would like confirmation they will work for these purposes. They are stockpiled near the 516 overpass. Jason, can you provide Mark and Ian with the pile driving schedule when finalized to help with planning? Finally, I will actually be out of the office starting tomorrow (6/29) but will return by Tuesday, 7/5. Feel free to reach out to Chris Wadsworth by email for any urgent questions you have on this process. Thanks, Mef issa Dahl EIT, Environmental Engineer II Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-6511 | Cell Phone 2O6-4a2-446L M Dahl@KentWA.qov CITY OF KENT, WASHINGTON KentwA.gov Facebook I r,'it:r:i YouTube Instaoram 3 Bryant, Jason From: Sent: To: Cc: Subject: Dahl, Melissa Thursday, June 30, 2022 8:46 PM Maloney, Carla; Murillo, Alex Bryant, Jason Re: Downey- Type 2 piles Hello Carla, Thank you for sharing this update. This is my mistake solely, I was the one who initially directed that the on-site logs be used for pilings without confirming it with Herrera in advance. Regarding the budgeting for the new pilings we are fine to move ahead with negotiations with Olson on the needed type 2 timber piles. We have some money so if we're in the ballpark of the other bid cost we should be fine. l'lltry and monitor as that dollar figure comes in. Thanks, Melissa Dahl, Environmental Engineer ll Environmental Engineering I Public Works Phone 253-856-65L1 | Cell Phone 206-482-4461 MDahl@KentWA'gov From: Maloney, Carla <CMaloney@kentwa.gov> Sent: Thursday, June 30,2022 5:04 PM To: Dahl, Melissa; Murillo, Alex Subject: FW: Downey- Type 2 piles FYI From: Connor, Eric <EConnor@kentwa.gov> Sent: Thursday, June 30,20223:47 PM To: Peterson, Kelly <KPeterson@kentwa.gov>; Maloney, Carla <CMaloney@kentwa.gov> Cc: Barry, Jason <JBarry@kentwa.gov>; Bryant, Jason <JBryant@kentwa.gov>; Harris, Josh <JHarris@kentwa.gov> Subject: FW: Downey- Type 2 piles Kelly / Carla, Please accept my apologies, but I had misunderstood our log problem that has been a topic this week. We had indeed intended to provide 36 logs for 30'piles in the 18 each Type 2 Habitat Structures. Herrera was on site today and determined that none of the logs on site are suitable for use as piles (nor are they suitable for the above ground logs). We will need to ask the contractor to provide these logs. As Jason has shared below, that will cost the project $48,096.00 if the contractor agrees to provide them at an existing bid item price for providing similar logs. please let us know if you are okay with moving forward and seeking the contractor's concurrence to provide the needed 36 logs. Note that availability may be a problem. 1 I am off tomorrow, so feel free to reach out to Jason, Jason, or Josh if you have questions regarding this issue. Thank you, Eric Eric Connof , Construction Engineering Manager Phone 253-856-5533 | Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant, Jason <J Bryant@ kentwa.gov> Sent: Thursday, June 30,20222:37 PM To: Ba rry, Jason <J Ba rrv@kentwa.gov> Cc: Co nno r, E ric < ECon nor@ ke ntwa.gov>; Ha rris, Josh <J Ha rris@ kentwa.gov> Subject: Downey- Type 2 piles Jason, Thea from Herrera visited the site today to inspect the pile logs. Thea informed us that the logs stored on site for the type 2 structures are no good. She is putting together a full report for us when she returns to her office. This means we will need 36 30' logs for the type 2 piles' If we can get Olson to use the original bid prices. It will cost $48,096 (36 x $1336.00). Please give us a call to discuss. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 | Cell 253-261-5663 lBryant@KentWA.oov CITY OF KENT, WASHINGTON KentwA.gov Facebook Twitter YouTube PLEASE CONSIDER THE ENVTRONMENT BEFORE PRINTING THIS E-MAIL 2