Loading...
HomeMy WebLinkAboutCAG2020-418 - Change Order - #7 - T. Bailey, Inc. - West Hill Reservoir Construct New 5.0 Million Gallon - 08/01/2022KENT Agreement Routing Form For Approvals, Signatures and Records Management This form -ombines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper) G oboc Originator: S. Anderson Department: PW Engineering Date Sent: 7t26t2022 Date Required N/A Authorized to Sign: El Director or Designee E Mayor Date of Council Approval 12t08120 Budget Account Number \M0054.641 10.330 Budget? EYes ENo Grant? EYes @No Type: N/A E .9{Jo ELorF E Pgo EooLgl Vendor Name: T. Bailey Construction Category: Contract Vendor Number 294554 Sub-Category: Change Order #7 Project Name: West Hill Reservoir Projectoetails:ClaVal Modifications to Pump Station 4 and 6. Agreement Amount: $28,873. 1 5 Srarr Date: 1212312020 Basis for Selection of Contractor: $id Termination Date: 388 Working Days Local Business? EYes E No* *lf meets requirements per KCC 3.70.100, ptease complete "Vendor Purchase-Local Exceptions" form on Cityspace' Notice required prior to disclosure? EYes @ No Contract Number: cAG2020-418 Comments:Date Received by City Attorney: Date Routed to the Mayor's Office: trlEa-1H Jo OE 6oL5Potrql vl t .g oG Date Routed to the City Clerk's office: id(W22l7l_1_20 Visit Documents.KentwA.gov to obtain copies of all agreements KENT !VAsRrflcroN CHANGE ORDER NO. #7 NAME OF CONTRACTOR: CONTRACT NAME & PROJECT NUMBER ORIGINAL CONTRACT DATE : T. Bailev, Ing. ("Contractor") West Hill Reservoir December 23, ?020 This Change Order amends the above-referenced contract; all other provisions of the contract that arg. not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: ClaVal modifications to pump station 4 and 6 which are required to operate the stations in conjunction with the new West Hill Reservoir. 2. The contract amount and time for pefformance provisions of Section II "Time of Completion ," and SectiOn III, "Compensation," are hereby modified as fOllowS: Original Contract Sum, (including applicable alternates and wssr) $8,493,470.72 Net Change by Previous Change Orders (incl. applicable WSST) $286,708.22 Current Contract Amount (incl. Previous Change Orders) $8,780,178.94 Current Change Order $26,224.48 Applicable WSST Tax on this Change Order $2,648.67 Revised Contract Sum $8,809,052.09 CHANGE ORDER - 1 OF 3 Original Time for Completion (insert date) 350 working days Revised Time for Completion under prior Change Orders (insert date) 36 working days Days Required (+) for this Change Order 2 calendar days Revised Time for ComPletion (insert date) 388 working days In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and aicepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connectdd with any work either covered or affected by this Change order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from sirict compliance wiih the guarantee and warranty provisions of the original contract, pafticularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any)' and this Change Order, prior to the effective date ol this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its pefformance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above' IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. : 0git4'lYsqned bY Chad Bieren C h ad B i e f e n 3:"f,;:'"i5T'J"J:lP'i:ffi ,T" i, ut imnoaot tz.unlzn Print Name: Chad Bieren, P.E. Its-- Public Works Director -(iile) DATE: CITY OF KENT: By (signature)Bv: F-ennz. k)a/ho'n (signature) Print Name! Bonnie Wardlaw Its Contract Manager . (title) CONTRACTOR: DATE : 7126122 CHANGE ORDER - 2 OF 3 K? ATTEST: \ Kent Clerk APPROVED AS TO FORM: (appllcable f Mayor's slgnature reguired) Kent Law Depaftment fln thls neH, yo! may enter the elect.onk nEpath wle€ the contract has been sawdl CHANGE ORDER - 3 OF 3 File No. 2OO.2 KENT CHANGE ORDER WORKSHEET NO. 7 Construction Engineering Division - Public Works Project: West Hill Reservoir Project Engineer: Holcomb / RH2 capital Projects phit McconnellManaoer: Project No: Fed-Aid No: Contractor: L9-3027.L N/A T Bailey Date: Various I Pro osed Chan e ClaVal Modifications to Pump Stations 4 a nd6 II. Reason and Bac round for Chan e III. Method of Payment NEW PAY ITEMS n ruotapplicable The modifications were required to operate the stations in con junction with the new West Hill Reservoir. Sch. No Item Description Total Est. Otv Unit Unit Price Total Estimated Cost of Item 1 a mo ons a p and 6 1 LS $26,224.48 $26,224.48 $ $ New Pay Items Total: $26t224.48 DELETE EXISTING PAY ITEM(S) per 1-09.5 E trtotappricabre Sch No.Bid Item No ftem Description Qtv Unit Unit Price Cost of Item $ Page L $ $ Delete Existing Pay Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) p ruotappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item $ $ $ Increase / Decrease to Existing Pay Items Total: *TOTAL ESTIMATED COST OF CHANGE ORDER: IV. WORKING DAYS $ x Total of the Cost of Item Columns $26,224.48 Original Contract:350 Due This Change Order:2 Previous Total:386 Explanation/Justification for Additional Working Days: Capital Proj ects Managen *TOTAL WORKING DAYS:388 x This Change Order + Previous Total Date Date: Phil c onnell Construction Engineering Supervisor: Construction Manager: frt Tassn BarrY 4/', '4, ' Date -,tr- Connor r' Page 2 McConnell, Phil From: Sent: To: Cc: Subject: Bieren, Chad Friday, April22,2022 8:43 AM Connor, Eric Barry, Jason; Peterson, Kelly; McConnell, Phil CO GC Systems Bieren Approval Hi Eric, I wanted to make sure that Dave Brock was aware of the situation, and get his concurrence, We've talked, and I'm good to go. Please proceed with the change order Thanks, Chad Chad Bieren, P.E. public works Director Engineering Administration I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 | Cell 253-740-9139 cbieren@KentWA.oov CITY OF KENT, WASHINGTON KentwA.oov Facebook,,r.,lr.,,-r: YouTube Instaqram From: Connor, Eric <EConnor@kentwa.gov> Sent: Wednesday, April20, 20223:57 PM To: Bieren, Chad <CBieren@kentwa.gov> Cc: Barry, Jason <JBarry@kentwa.gov>; Peterson, Kelly <KPeterson@kentwa.gov>; McConnell, Phil < PMcConnell@kentwa.gov> Subject: FW: WH Res - CO GC Systems Chad, Attached is a proposal to revise two 6" Cla-Val Pressure Reducing and Solenoid Shut-off Valves. The components added as part of this revision are an electronic interface pilot system with position transmitter, and anti-cavitation trim. These components must be installed by a representative from the manufacture in order to not void their warranty. As I understand it, these components were not included in the original plan set due to multiple disciplines being involved. With GC markup the cost for taking care of these 2 valves is $28,331.80. Are you okay with proceeding with this work as a change order to the contract? Please let me know if you need any additional information or have questions that I can track down for you. Thank you, Eric 1 Eric Connor I Construction Engineering Manager Phone 253-856-5533 | Cell 253-797-0693 clTY oF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRTNTING THIS E-MAIL From: McCo nnel l, Phil <PMcCon nell @ kentwa.gov> Sent: Tuesday, April L9,202212:15 pM To: con nor, Eric <ECon nor@ kentwa.gov>; Ba rry, Jason <J Ba rrv@ kentwa.gov> Cc: Bauer, Sean <SBauer@kentwa.pov> Subject: WH Res - CO GC Systems Eric and Jason, Due to the water system operation changes caused by the West Hill Reservoir, the Cal-Val at Pump Station 4 had to be reconfigured to accommodate them. The reconfiguring required a new Cla-Val, pilots, etc. I've attached the quote and Sean Bauer's approval to movelorward with the change. Move forward or wait for Kelly peterson's comments? Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 | Cell 253-261-5685 pmcconnell@KentWA.qov CITY OF KENT, WASHINGTON KentwA.oov Facebook r-q*r.i1;1' YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 2 McConnell, Phil From: Sent: To: Subject: Bauer, Sean Friday, March 18,2022 6:41 AM McConnell, Phil Bauer CO Approval The short answer is yes. Sean M. Bauer I water system Manager Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5610 | Cell 253-740-7089 sbauer@KentWA.qov CITY OF KENT, WASHINGTON KentwA.oov Facebook i,',',,r ' YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E'MAIL From: McConnell, Phil <PMcConnell @ kentwa.gov> Sent: Thursday, March 17 ,2022 3:12 PM To: Bauer, Sean <SBa uer@kentwa.gov> Subject: FW: additional questions RE: WH Res - RFI 35 follow up Sean, Are you good with GC Systems pricing? I will be asking for quotes/back up documentation to base this price from. Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 | Cell 253-261-5685 omcconnell@ KentWA.qov CITY OF KENT, WASHINGTON KentwA.oov Facebook l:;r1i:,i:)i YouTube PLEASE CONSTDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: McConnell, Phil Sent: Wednesday, March L6,2022 6:38 AM To: Bauer, Sea n <SBauer@kentwa.gov>; Reed, Ja mes <J Reed @ kentwa'gov> Cc: Barry, Jason <J Barrv@kentwa.gov> Subject: FW: additional questions RE: WH Res - RFI 35 follow up Sean and Jim, Contained below is a description of the additional parts and work needed to modify the ClaVal's at PS 4 and 6. Please review, making sure these are the changes desired. I will review the speci1cations to see if any of the costs are covered or mentioned there. Obviously this will have 1 to cover the operation of the system as it functions today and after the new transmission main and pump station is installed. That is not the final cost, the GC will get their markups. Phil McConnell, Capital projects Manager Construction Management I public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 | Cell 253-261-5685 pmccon nel I @ KentWA.oov crw oF KENT, WASHTNGTON KentWA.oov Facebook .r ::..,,1r i j. =,; youTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Chris Parker <cparker@tbailev.com> Sent: Tuesday, March 15,2O2Z 4:06 pM To: McConnell, Phil <PMcConnell@kentwa.gov> Cc: Bonnie Wardlaw <bwardlaw@tbailev.com> Subject: FW: additional questions RE: WH Res - RFI 35 follow up Phit see below pricing from GC systems for the modifications to the valves ln talking to the electricalsub they have no coverage and System lnterface did not provide as part of the quote. you can look at the SOV and the break out and see there just is no money in that line item. This bid item and description is deceptive. Reads more like controland electricalwork. Specific contract plans forthese modifications are in the E drawings. E201 and E30L have pictures and the modifications are listed under the "Electrical and lnstrumentation schedule." This schedule points you to the specification. lf you go to the specification s, 'J'5.34.42, this does provide guidance on additional solenoids and modify pilot system but no detail is provided on really what we now know needs to be done, the valves will need to be re-plumbed by a certified rep of the valve that knows how the valve works. The bid description could have been written better and the valves should have been shown in the mechanical drawings. I would like you to review and would like your opinion. Maybe we can talk next Monday. Thanks Chris Parker SENIOR CONSTRUCTION MANAGER T BAILEY, INC. (360) 293-0682 DtRECT 2 EXTERNAL EMAIL (-.-t (2oq 3a0'74s4 CELL (360) 293-3893 FAX cPARKE R(aTBAILEY.COM wrrw.TBAlLEY.COM F rom= DeFord, La rry Ima ilto : La rrv. De Ford @co rea nd ma in.co m] Sent: Thursday, March 3,2022 8:31AM To: Ch ris Parker <cparker@tbailev.com> Cc: Bonnie Wardlaw <bwardlaw@tbailev.com>; Justin Rawls <irawls@tbailev.com> Subject: RE: additionalquestions RE: WH Res - RFI 35 follow up Good rnorning, Please seethebelowandattachedfromGCSystemsinregardstothepricingforrebuildofthevalves. pleasereview and let me know if you have any questions. Thank you! please confirm receipt as the attachment is large (14M8) and l'd like to make sure it goes through **The Following Prices are firm for 30 days from date of Quotationxx VALVE MODIFICATIONS TO VALVES ON SITE AS DESCRIBED BELOW NET .$2L,7 64.7 7 LEAD TIME IS 5-6 WEEKS PS,A: INSTALL KO ANTI-CAVITATION KIT AND 131G-CGBCESY ELECTRONIC INTERFACE PILOT KIT W/PRESSURE RELIEF OVERRIDE AND X117D POSITION TRANSMITTER TO 6'CLA-VAL. EXISTING 90-01 PILOT SYSTEM SHALL REMAIN ON THE VALVE. PS6: INSTALL 131G-01BCESY ELECTRONIC INTERFACE PILOT KIT W/Xl17D POSITION TRANSMITTER ON EXISTING 6" 1OOG-01 HYTROL VALVE. ONE (1) DAY STARTUP/TRAINING DAY .....$1,650.00 PER Larrg CORE & MAIN Mobile: (253)204-1099 Direct Line: (253)319-5401 Main Office: (253)840-8558 CONFIDENTIAI.ITY NOTICE: This messoge is for intended oddressee(s) only and may contoin confidential, proprietory or privileged information, exempt from disclosure, ond subject to terms ot: http://e m a i lterms.coreand m oi n.com. From: Chris Parker <cparker@tbailev.com> Sent: TuesdaY, March 7,2022 2:58 PM 3 To: De Ford, Larry < La rry. De Ford @corea ndma i n'com> Cc: Bonnie Wardlaw <bwardlaw@tbailev.com>; Justin Rawls <irawls@tbailev.com> Subject: RE: additional questions RE: WH Res - RFI 35 follow up CAUTION: External Larry The district confirmed they do not want to remove the relief pilot system on the 6"' During the conference call between the City, RH2, and GC Systems Carrol (GC) stated that they could get a design from California to provide all requirements or needs outlined in RFI 35 by RH2. Please request a submittal and price for rebuild of the valves. Thanks, Chris Parker SENIOR CONSTRUCTION MANAGER T BAILEY, INC. (360) 293-0682 DIRECT (206) 310-74s4 CELL (360) 293-3893 FAX CPARKER@TBAILEY.COM www.TBAILEY.COM 4 FA Sheet No DAILY REPORT OF FORCE AGCOUNT WORKED ./^\-./ KENT Project Name: West Hill Reservoir Project No: l9-3027.1 Item No.: Schedule 1 Date: Various Description of Work: ClaVal Modifications to Pu Stations 4 and 6 Work by Subcontractor? Prime Contractor: T Sub-Contractor: GC STRAIGHT TIME OVERTIME DOLLAR AMOUNTNAMECODEOCCUPATIONHrsRateHrsOT Rate $ $ $ $ $ SUBTOTAL - LABOR: LABOR OVERHEAD & PROFIT @ 31% LABOR TOTAL $ EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR AMOUNTEquipment #Description Rate $ $ $ $ $ SUBTOTAL - EQUIPMENT EQUIPMENT OVERHEAD & PROFIT @ 21% NTTOTAL $ MATERIALS / SERVICES Quantity Units Unit Price DOLLAR AMOUNT GC Systems I LS s 23.4',t4.71 $23,414.71 $ $ $ $ SUBTOTAL $23,414.71 $ TOTAL $ 23,4',t4.71 Verification of Hours Worked rorAl: $ 23,414.71 ,I2% MARKUP prime when subcontract work) (for 809.77 SHEEr rorAl: $ 26,224.48Contractor's Representative Date Owner's Representative Date Comments P54 PROJECT: PS4 AND PS6 - WEST HILL RESERVOIR 1. 2Y." CONTROL VALVE WILL REMAIN THE SAME. NO WORK TO BE DONE. 2. ON THE 6" VALVE WE WILL REMOVE THE PRESSURE RELIEF PILOT SYSTEM AND REPLACE IT WITH A 131G-Ol BCSY ELECTRONIC INTERFACE PILOT SYSTEM W/X117D POSITION TRANSMITTER. THE PRESSURE REDUCING PILOT SYSTEM WILL REMAIN ON THE VALVE. ANTI- CAVITATION TRIM WILL BE ADDED TO THE VALVE. VALVE WILL BE ABLE TO FLOW loOOGPM WITH THIS TRIM. PS6: 1. WE WILL INSTALL A 131G-01 BCSY ELECTRONIC INTERFACE PILOT SYSTEM ON THE BACK SIDE OF THE EXISTING 9OG-OI PRESSURE REDUCING VALVE AND AN X117D POSITION TRANSMITTER THE PRESSURE REDUCING PILOT SYSTEM WILL REMAIN. Bid ProposalTBI Portion - West Hill ReservoirJob Location:Engineer:Bid Date:Bid Due Date:Addendum Number:Plan Sheet Date:Core & Main Bid #:Seq #17701 940Core & MainKENT, WA 602 ValleyAve NEPuyallup, WA 98372Phone: 253-840-8558Fax:253-840-11411 588007DescriptionotvWH RES. RFI 35** THE FOLLOWNG PRICES AREFIRM FOR 30 DAYS FROM DATE OFQUOTATTON * (03/03/22)VALVE MODIFICATIONS TO VALVESONSITE AS DESCRIBED BELOWuoMEASellExt SellVALVE MODS TO PS4/PS6P54:INSTALL KO ANTI.CAVITATION KITAND 1 31 G.CGBCESY ELECTRONICINTERFACE PILOT KIT WiPRESSURE RELIEF OVERRIDE ANDX1 1 7D POSITION TRANSMITTERTO 6'CLA-VAL. EXISTING 90.01PILOT SYSTEM SHALL REMAINON THE VALVE,P56:INSTALL 131G-OlBCESYELECTRONIC INTERFACE PILOT KITW/ X1 1 7D POSITION TRANSMITTERON EXISTING 6" lOOG-01HYTROL VALVE.oNE (1) DAY STARTUP/TRATNTNGEA21,764.7121,764.71GC markup0.12Printed 0311812022TBI Portion -West Hill Reservoir1,650"001,650.00Page'l of 2 Grand TotalUNLESS OTHERWSE SPECIFIED HEREIN, PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMERFOR MANUFACTURE WITHIN THIRTY (30) CALENDAR DAYS FROM THE DATE OF THIS QUOTATION. CORE & MAIN LP RESERVES THE RIGHT TO INCREASEPRICES TO ADDRESS FACTORS, INCLUDING BUT NOT LIMITED TO, GOVERNMENT REGULATIONS, TARIFFS, TRANSPORTATION, FUEL AND RAW MATERIALCOSTS. DELIVERY WLL COMMENCE BASED UPON MANUFACTURER LEAD TIMES. ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEADTIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES, THIS BID PROPOSAL IS CONTINGENT UPON BUYER'S ACCEPTANCEOF SELLER'S TERMS AND CONDITIONS OF SALE, AS MODIFIED FROM TIME TO TIME, WHICH CAN BE FOUND AT:https J/coreandmain.com/TandC/23.414.7126,224.48Printed 03118/2022TBI Portion - West Hill ReservoirPage 2 ot 2