Loading...
HomeMy WebLinkAboutCAG2022-217 - Change Order - #1 - Lakeside Industries, Inc. - S. 212th St Preservation (Green River Bridge to Orillia Road) - 07/26/2022KENT Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cheny colored paper) ? oLcc Originator: C. Frame Department: PW Engineering Date Sent: 7t2712022 Date Required: N/A Authorized to Sign: E Director or Designee u MaYor Date of Council APProval 5t19t2022 Budget Account Number: R90122.641 10.120/D901 22.641 1 0.330 Budget? ElYes E No Grant? E Yes EI No Type: N/A t .9I G ELor*rs*.Eo EooLgl Vendor Name: Lakeside lndustries, lnc. Category: Contract Vendor Number 34030 Sub-Category: Change Order #1 project Name: S 212th St. Preservation - Green River Bridge - Orillia Rd projecr Detaits:Removal of curb and gutter between stations 48+85 and 51+85. Partially remove existing HMA sidewalk to form a new curb and gutter. Agreement Amount: $1 5,550.00 Start Date: N/A Basis for Selection of Contractor: $id Termination Date: 70 Working Days Local Business? E Yes E No* xlf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? EYes E No Contract Number: cAG2022-217 Comments:Date Received by City Attorney: Date Routed to the Mayor's Office: g|ta-IJ3\o a-qagEEoe .9 UI Date Routed to the City Clerk's Office: ad(W22l7l l_20 Visit Documents.KentWA.gov to obtain copies of all agreements KENT WaSHTNGToN CHANGE ORDER NO. #L NAME OF CONTRACTOR: Lakeside Industries, Inc. ("Contractor") CoNTRACT NAME & PROJECT NUMBER: S. 212tn St. Preservation-Green River Bridge-orillia Rd ORIGINAL CONTMCT DATE: MAV L9, 2022 This Change Order .amends the above-referenced contract; all other provisions of the contract that arg' not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the pafties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equiPment necessarY to : The plans call for the removal of curb and gutter between stations 48+85 and 51+85. There is an existing HMA sidewalk behind this curb, which needed to be partially removed to form the new curb and gutter' This existing HMA sidewalk was 3.5-4'wide and had deteriorated. Due to the deterioration, the City determined it would be unlikely to remain in a servicable condition after placing and compacting the new HMA' The City elected to upgrade to cement concrete sidewalk to closer match the City's standards and ease meeting ADA cross slope reqirements' 2. The contract amount and time for performance provisions of Section Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and WSST) $1,380,875.00 Net Change by Previous Change Orders (incl. a ppl icable WSST) $0.00 Current Contract Amount (incl. Previous Change Orders) $1,380,875.00 Current Change Order $1s,s50.oo Applicable WSST Tax on this Change Order $o.oo Revised Contract Sum $1,396,425.00 II "Time of CHANGE ORDER - 1 OF 3 In accordance with Sections L-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the contractor accepts all requirements of this-[rng" ordei by signing below. Also, pursuant to the above-referenced contract, contractor agrees to waive any protest it may have regarding this Change order and acknowledges and aicepts that this change order constitutes final settlement of all claims of any kind or nature arising from or connecteld with any work either covered or affected by this Change order, including, without limitation, claims related to contract time, contract acceleratibn, onsite or home office overhead, or lost pioiit.. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance w'rih the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date' All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change orders (if any), and this Change order shall be deemed to have aPPlied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. B. The Contractor will adjust the amount of its performance bond (if any) forthis project to be consistent with the revised contract sum shown in section 2, above' Original Time for ComPletion (insert date) 70 working days Revised Time for ComPletion u nder prior Change Orders (insert date) 0 working days Days Required (t) forthis Change Order o calendar days Revised Time for ComPletion (insert date) 70 working days IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below' EC CONTRACTOR: By: Print Na Its DATE CITY OF KENT: By O6lV sEnod bYchd BE'on C h ad B i e ren ff%q:{iiilTl?;ffdrr":;""'" (signature) Print Name:Chad Biprpn - P.E. Its Public VLgrks Director (title) DATE: CHANGE ORDER - 2 OF 3 KP ATTEST. Kent City Clerk APPROVED AS TO FORM: (applicable If Mayorb signature required) Kent Law Department ltn thlr icld, yoq my cnt r tha.lctt onlc fllepath where the @nt.act has beD svedl CHANGE ORDER - 3 OF 3 File No. 2OO.2 KE T CHANGE ORDER WORKSHEET NO. 1 Construction Engineering Division - Public Works S, 212th St. Preservaion Green River BridgeProJect: to orillia Rd Project Engineer: AbdulnaserAlmaroof Project No: Fed-Aid No: Contractor: 20-3012 srPUL-1250(010) Lakeside Industries, Inc. Capital ProjectsManader: Cameron Bloomer (KBA, Inc.) Date: 7/12/2022 I. Pro ed Cha e II. Reason and round for Cha III. Method of Payment NEW PAY ITEMS E Notapplicable is change order creates bid items to provide compensation for the remova existhg HMA sidewalk and replacement with a concrete sidewalk for the removal of curb and gutter between stations 48+85 and 51+85 sting HMA sidewalk behind this curb, which needed to be partially removed to form the new curb utter. This existing HMA sidewalk was 3.5-4'wide and had deteriorated. Due to the deterioration, the determined it would be unlikely to remain in a servicable condition after placing and compacting the new HMA, The City elected to upgrade to cement concrete sidewalk to closer match the City's standards and ease meeting ADA cross slope reqirements. ere rs anplans ca Sch. No Item Description Total Est. Otv Unit Unit Price Total Estimated Cost of Item VIII HMA Sidewalk Removal Clearing and Grubbing 130 SY $3s.00 $4,550.00 VIII 1 LS $4,500.00 $4,500.00 + New Pay ltems Total: $9,O5O,OO DELETE EXISTING PAY ITEM(S) per 1-O9.5 E rrrotappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of ltem Page 1 $ Delete Existing Pay Items Total: $ TNGREASE/DECREASE TO EXISTTNG pAy rTEM(S ) tr ttot appticabte Increase / Decrease to Existing pay ltems Total: *TOTAL ESTIMATED COST OF CHANGE ORDER: rV. WORKING DAYS *TOTAL WORKING DAYS: $6,5OO.OO $1 00 Total of the Cost of Item Columns 70 x This Change Order + Previous Total Date: 7/L212022Capital Projects Manager:hr,,tt , Z. Eb,st Ca meron Bloomer (KBA, Inc.) Construction Engineering Supervisor: Barry Construction Manager: ;.;r:,- ".-,i:,,.-. - Date: ?t)LL Date: 7n2122 Sch No.Bid Item No.ftem Description Qtv Unit Unit Price Cost of ltem VIII 8145 Cement Concrete Sidewalk 130 SY $s0.00 $6,500.00 $ Original Contract:70 Due This Change Order:o Previous Total:70 anation/Justification for Additional Working Days:Expl ch occu torrednge rkWO utsideo of th criticale th dan idd otn tmpa ct ratidu onpa No beare nproejctdays gthiswithhacnge Eric Connor Page 2 KENT WAsHlNcroN Request for Proposal RFP OO1. srPUL-12s0(010) 6/17/2022 Project Name: Contractor: Subject: S. 272th St. Preservation Green River Bridge to Orillio Rd Lakeside lndustries, lnc. H MA Sidewalk Replacement PW Project Number: 20-3072 FederalAid Number: Date: Provide a cost proposal for the following: o Remove existing HMA sidewalk from approximately 48+84 to 51+85, a 10' length at approximately 53+00 LT, and a 24' length at approximately 54+75 RT. o Clear and Grub/Grade as needed o Alternate L: Restore with 4'wide section of HMA, 2" depth. o Alternate 2: Restore with 4'wide section of Kent standard sidewalk. Measurement and Payment: o Provide a LS cost proposal for the HMA removal, clearing and grubbing, and grading. lnclude detail sufficient to evaluate the proposal. Provide a price for HMA, and price for Conc. Sidewalk' o Provide a per ton price for the 2" section of HMA, including compaction. o Provide a per SY price for sidewalk, or indicate if existing unit pricing can be used. Attachment(s): o None Requested Cameron Bloo r. KBA lnc Date 6117 22 THIS REQUEST FOR PROPOSAL DOES NOT PROVIDE FOR EITHER A TIME EXTENSION OR A CHANGE IN THE CONTRACT PRICE. LABOR, EQUIPMENT, AND/OR MATERIAL OUTLINED SHALL BE PAID BY A CHANGE ORDER. Cameron Bloomer From: Sent: To: Cc: Subiect: Cameron Bloomer Wednesday, June 22,2022 4:42 PM Shaun White Jamie Masters; Mary Lynum; Ronald Snider RE:212th GRB to Orillia - RFP 01 Replacement HMA Sidewalk Hello Shaun, The City accepts the LS and SY pricing for the 4" concrete option. We will put together a change order Thank you, Cameron Bloomer, PE C 206.879.71,48 | cbloomer@kbacm.com KBA, lnc. I Construction Manogement Speciolists I www.kbacm.com From: Shaun White <Shaun.White@ lakesideindustries.com> Sent: Monday, June 20,2022 9:08 AM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Jamie Masters <jmasters@kbacm.com>; Mary Lynum <LynumM@jts-seattle.com> Subiect: RE: 212th GRB to Orillia - RFP 01 Replacement HMA Sidewalk Cameron, We would request L53 SY of Removal at 35 S per SY Clearing and grubbine LS 53000 for 2 lnch depth prep for pave or LS 54500 for 4 inch Depth prep for concrete S2ZS per ton for paving 2 inch depth pathway fed with backhoe SSO per SY for 4" depth concrete sidewalk (Jorge agreed to current unit price) Please let me know if you have any questions or comments Shaun white, project Manager I Lakeside lndustries, lnc. I t 253.631.3611 | c 206.396.5371 | shaun.white@la ideindustries.com Kent Division | 18808 SE 256th Street I Covington, WA 98042 | www.lakesideindustries.com LAKESIDE lNDTt(tIRlES{E From: Cameron Bloomer <cbloomer@kbacm.c > Sent: Friday, June !7,2022 71:20 AM To: Shaun White <Shaun.White@ lakesideindustries'com> Cc: Jamie Masters <imasters@kbacm.com>; econnor@kentwa.gov; Mary Lynum <LvnumM@its-seattle.com>; Ronald 1 Snider <Ronald.Snider@la > Subject: 212th GRB to Orillia - RFP 01 Replacement HMA Sidewalk Caution! EXTERNAL SENDER Do not cliok links or open attachments unless you KNOW that the sender and oontent are safe. Hello Shaun, Attached is a request for proposal to replace the HMA sidewalk where the curb is being replaced. Let me know if there are any questions. Thank you, Cameron Bloomer, PE C 206.819.7148 | cbloomer@kbacm.com KBA, lnc. I Construction ManagementSpecialists I www.kbacm.com 2 Connor, Eric From: Sent: To: Cc: Subject: Bieren, Chad Wednesday, June 22,20221:38 PM Connor, Eric; Peterson, Kelly Madfai, Mark; Almarool Abdulnaser; Barry, Jason RE:212th GRB to Orillia - RFP 01 Replacement HMA Sidewalk Hi Eric, Thank you for the analysis, given the difference in cost versus the difference in lifespan, please proceed with concrete sidewalks. Chad Ghad Bieren, P.E. puolic works Director Engineering Administration I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 | Cell 253'74O-9139 cbieren@KentWA.oov CITY OF KENT, WASHINGTON KentWA.qov Facebook .-!,tiy-Lt!ti-l- YouTube Instaqram From: Connor, Eric <EConnor@ kentwa.gov> Sent: Wednesday, June 22,202211:28 AM To: Peterson, Kelly <KPeterson@kentwa.gov>; Bieren, Chad <CBieren@kentwa'gov> Cc: Madfai, Mark <MMadfai@kentwa.gov>; Almaroof, Abdulnaser <AAlmaroof@kentwa.gov>; Barry, Jason <JBarry@kentwa.gov> Subject: FW: 21-2th GRB to Orillia - RFP 01 Replacement HMA Sidewalk Good Morning, We received the below pricing to replace the asphalt sidewalk on the North side of 212th where it is below the current (and new) curb grade, We requested the contractor provide pricing for replacing it in kind (HMA) in addition to an alternate price for replacing with Kent standard concrete sidewalk, Here are the totals based on an estimated 300 LF: - 2" Depth Asphalt (HMA) - $t2,765 - 4" Depth Concrete - $16,605 I like the idea of replacing this section of asphalt sidewalk with concrete but that comes with a premium cost. In addition, please consider that there will be asphalt at each end of the new concrete if we go that route. please let me know your preference at your earliest convenience and we will get things moving forward with our contractor. Let me know if you have any questions or need any additional information. 1 Thank you, Eric Eric Connor, Construction Engineering Manager Phone 253-856-5533 | Cell 253-797-o693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Cameron Bloomer <cbloomer@kbacm,com> Sent: Monday, June 20,20221:34 PM To: Connor, Eric <EConnor@ kentwa.gov> Subject: FW 2L2lh GRB to Orillia - RFP 01 Replacement HMA Sidewalk FYl, see prices below for the sidewalk replacement items Cameron Bloomer, PE C 206.819.71"48 | cbloomer@kbacm.com KBA, lnc. I Construction Manogement Specialists I www'kbacm'com From: Shaun White <Shau n.White@ la kesideindustries.com> Sent: Monday, June 20,2022 9:08 AM To: Ca meron Bloomer <cbloomer@ kbacm.com> Cc: Jamie Masters <imaSlgE@kbg-cm.com>; Mary Lynum <LvnumM@its-seattle.com> Subiect: RE: 212th GRB to Orillia - RFP 01 Replacement HMA Sidewalk Cameron, We would request L53 SY of Removal at 35 S per SY Clearingandgrubbine LS53000for2lnchdepthprepforpaveorLS54500for4inchDepthprepforconcrete $ZZS per ton for paving 2 inch depth pathway fed with backhoe S50 per SY for 4" depth concrete sidewalk (Jorge agreed to current unit price) Please let me know if you have any questions or comments Shaun White, Project Manager I Lakeside lndustries, lnc. I t 253.63L.36I1 | c 206.395.537L1 shaun.white@la ideindustries.com Kent Division | 18808 SE 256th Street I Covington, WA 98042 | www,lakesideindustries.com TAKESIDE INDl'flnlEg From: Cameron Bloomer <cbloomer@ kbacm.com> Sent: Friday, June L7,2022 tL:20 AM To: Shaun White <Shau n.White@ lakesideindustries.com> {E 2 EXTERNAL EMAIL Cc: Jamie Masters <imasters@kbacm.com>; econnor@kentwa.gov; Mary Lynum <LvnumM@its-seattle.com>; Ronald Snider <Ronald.snider@lakesideindustries.com> Subject: 212th GRB to Orillia - RFP 01 Replacement HMA Sidewalk caution! EXTERNAL SENDER Do not click links or open attachments unless you KNOW that the sender and content are safe. Hello Shaun, Attached is a request for proposal to replace the HMA sidewalk where the curb is being replaced' Let me know if there are any questions. Thank you, Cameron Bloomer, PE C 206.879.7148 | cbloomer@kbacm.com KBA, lnc. I Construction Monagement Speciolists I www'kbacm.com 3 ROUTING FOR SIGNATURES (Please review, sign, and pass on to the next person on list ASAP) 2L2th St Preservation (Green River Bridge-Orillia Rd) Jason Barry Preliminary Approval: Emall for Raview: Design Engineer Carla MaloneY Jason Barry Final Approval: Email for Sionaturee: S Angie Fealy { rri, connor { xetty Peterson 3 Chad Bieren Email Slcned PE to: Angie Fealy Stephanie Anderson Corey Frame AF 7t26,t2e2, Initial and date FC 7 t26/22 Initial and date K" 7/26/2022 Initial and date Initial and date NOTES 7/21- CO onlv, olease route for siqnatures-CF