Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CAG2022-229 - Original - Golden Gate Construction LLC - West Fenwick Park Lighting System Modification - 05/24/2022
5/23/22 CAG2022-229 PUBLIC WORKS AGREEMENT - 1 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) PUBLIC WORKS AGREEMENT between City of Kent and Golden Gate Construction LLC d/b/a Golden Gate Electric THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Golden Gate Construction LLC d/b/a Golden Gate Electric organized under the laws of the State of Washington, located and doing business at 7600 SE 29th Street, #402, Mercer Island, WA 98040 (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. The Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: As described in attached Exhibit A, incorporated herein, contractor shall install three (3) new light poles and fixtures and modify existing field lighting at West Fenwick Park. The Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above within 10 working days after the City issues its Notice to Proceed. Upon the effective date of this Agreement, all physical work shall thereafter be completed by 10/31/2022. The term of this Agreement shall continue until all work has been completed, final acceptance has occurred, and all Contractor obligations have been fulfilled. III. COMPENSATION.The City shall pay the Contractor a total amount not to exceed $34,680.40. Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458- 20-171 and its related rules for the work contemplated in this Agreement. The City shall pay the Contractor eighty-five percent (85%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remainder upon fulfillment of the conditions listed below and throughout this Agreement. Card Payment Program. The Contractor may elect to participate in automated credit card payments provided for by the City and its financial institution. This Program is provided as an alternative to payment by check and is available for the convenience of the Contractor. If the Contractor voluntarily participates in PUBLIC WORKS AGREEMENT - 2 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) this Program, the Contractor will be solely responsible for any fees imposed by financial institutions or credit card companies. The Contractor shall not charge those fees back to the City. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $150,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the owner retain the final ten percent (10%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Retainage. The City shall also hold back a retainage in the amount of five percent (5%) of any and all payments made to the Contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of the Contractor’s signature on the Agreement. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from the Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City’s written approval. If the Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and the Contractor shall be liable to the City for any additional costs incurred by the City. “Additional costs” shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE CONTRACTOR’S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR’S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which the Contractor’s services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained the Contractor’s services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. PUBLIC WORKS AGREEMENT - 3 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by the Contractor’s business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. “Good cause” shall include, without limitation, any one or more of the following events: A. The Contractor’s refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor’s failure to complete the work within the time specified in this Agreement. C. The Contractor’s failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor’s persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor’s filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor’s breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor’s possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. The Contractor shall file a “Statement of Intent to Pay Prevailing Wages,” with the State of Washington Department of Labor & Industries prior to commencing the Contract work. The Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by the Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, the Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, Section XVI(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually PUBLIC WORKS AGREEMENT - 4 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section IX, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by the Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. FORCE MAJEURE. Neither party shall be liable to the other for breach due to delay or failure in performance resulting from acts of God, acts of war or of the public enemy, riots, pandemic, fire, flood, or other natural disaster or acts of government (“force majeure event”). Performance that is prevented or delayed due to a force majeure event shall not result in liability to the delayed party. Both parties represent to the other that at the time of signing this Agreement, they are able to perform as required and their performance will not be prevented, hindered, or delayed by the current COVID-19 pandemic, any existing state or national declarations of emergency, or any current social distancing restrictions or personal protective equipment requirements that may be required under federal, state, or local law in response to the current pandemic. If any future performance is prevented or delayed by a force majeure event, the party whose performance is prevented or delayed shall promptly notify the other party of the existence and nature of the force majeure event causing the prevention or delay in performance. Any excuse from liability shall be effective only to the extent and duration of the force majeure event causing the prevention or delay in performance and, provided, that the party prevented or delayed has not caused such event to occur and continues to use diligent, good faith efforts to avoid the effects of such event and to perform the obligation. Notwithstanding other provisions of this section, the Contractor shall not be entitled to, and the City shall not be liable for, the payment of any part of the contract price during a force majeure event, or any costs, losses, expenses, damages, or delay costs incurred by the Contractor due to a force majeure event. Performance that is more costly due to a force majeure event is not included within the scope of this Force Majeure provision. If a force majeure event occurs, the City may direct the Contractor to restart any work or performance that may have ceased, to change the work, or to take other action to secure the work or the project site during the force majeure event. The cost to restart, change, or secure the work or project site arising from a direction by the City under this clause will be dealt with as a change order, except to the extent that the loss or damage has been caused or exacerbated by the failure of the Contractor to fulfill its obligations under this Agreement. Except as expressly contemplated by this section, all other costs will be borne by the Contractor. IX. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN PUBLIC WORKS AGREEMENT - 5 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). X. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR’S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. XI. WARRANTY. Upon acceptance of the contract work, the Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City’s acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XII. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. PUBLIC WORKS AGREEMENT - 6 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) The Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XIII. INDEMNIFICATION. The Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of the Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. XIV. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XV. WORK PERFORMED AT CONTRACTOR'S RISK. The Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at the Contractor's own risk, and the Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XVI. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties’ performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XIII of this Agreement. PUBLIC WORKS AGREEMENT - 7 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and the Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to the Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Contractor acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Contractor in its performance of this Agreement may be subject to public review and disclosure, even if those records are not produced to or possessed by the City of Kent. As such, the Contractor agrees to cooperate fully with the City in satisfying the City’s duties and obligations under the Public Records Act. J. City Business License Required. Prior to commencing the tasks described in Section I, the Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. K. Counterparts and Signatures by Fax or Email. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page PUBLIC WORKS AGREEMENT - 8 (Roadway/Pedestrian Path - Over $20K, No Performance Bond) to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearing the original signature was received in person. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: By: Print Name: Its DATE: CITY OF KENT: By: Print Name: Dana Ralph Its Mayor DATE: NOTICES TO BE SENT TO: CONTRACTOR: Ken McEntyre Golden Gate Construction LLC d/b/a Golden Gate Electric 7600 SE 29 th St, #402 Mercer Island, WA 98040 206-383-1784 (telephone) kenmcentyre@goldengateec.com (email) NOTICES TO BE SENT TO: CITY OF KENT: Bryan Higgins City of Kent 220 Fourth Avenue South Kent, WA 98032 (253) 856-5113 (telephone) bhiggins@kentwa.gov (email) APPROVED AS TO FORM: Kent Law Department ATTEST: Kent City Clerk \\PKUPFPP1V\PKPublic\Planning\West Fenwick Park\West Fenwick Park Renovation Phase 2 PK20-03\Light Poles\Golden Gate Electric-Lighting Modification-CONTRACT 05/24/2022 EEO COMPLIANCE DOCUMENTS - 1 DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City’s equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City’s sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By:__________________________________________ For: _________________________________________ Title: ________________________________________ Date: ________________________________________ EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City’s nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City’s equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 3 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of , 200___. By: __________________________________________ For: _________________________________________ Title: ________________________________________ Date: ________________________________________ BIDDER RESPONSIBILITY CRITERIA - 1 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (05/04/2022), the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Golden Gate Construction LLC d/b/a Golden Gate Electric By:__________________________________________ Signature of Authorized Official* Printed Name: _________________________________ Title: ________________________________________ Date: ________________________________________ City and State:_________________________________ *If a corporation, proposal must be executed in the corporate name by the president or vice- president (or any other corporate officer accompanied by evidence of authority to sign). If a co- partnership, proposal must be executed by a partner. Ken McEntyre 206-383-1784 kenmcentyre@goldengateec.com 7600 SE 29th St #402 Mercer Island, WA 98040 UDBE Certified#D4F0025863 Date: 5/6/2022 Addendum:0 Item # Unit Price Quantity Total 1 LS 31,499.00$ 1 31,499.00$ 2 10.1%3,181.40$ 34,680.40$ Notes: Inclusions X X X X X X X X X X X Exclusions X X X Bond Survey Permits other than L&I electrical permit Pick up (3) three luminaire poles and fixtures from the City of Kent storage yard Description of Work Hydro excavate 3' dia. X 6' deep foundations for (3) three new light poles Provide and install 2" sch 80 conduit from foundations to nearest existing junction box Install & splice new conductors into existing lighting circuit for new lights and re-weld the junction box lids closed Form, pour, and finish concrete foundations per provided detail with city provided anchor bolts Install new luminaire poles and fixtures on new foundations (Poles and fixtures provided by the City of Kent) Remove conductors for the trail lighting from the Calsense controller and re-terminate in the existing time clock and add the existing parking lot light pole to the same circuit Temporary fencing around foundation locations Project /Job : To : Bryan Higgins Attention : West Fenwick Park Lighting City of Kent, Park Planning and Development Remove existing (white) neutral conductor from the electrical panel to the existing parking lot light pole and replace with a (black) phase conductor to convert the light from 120 volt to 240 volt operation Remove photocell from side of building and modify wiring for the light fixtures mounted to the exterior of the building to operate on the existing time clock inside the building L&I electrical permit Item of work Park Illumination System Modification Total: Sales Tax Page 1 of 1 EXHIBIT BINSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1.Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor’s Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2.Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3.Workers’ Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1.Commercial General Liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. 2.Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1.The Contractor’s insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor’s insurance and shall not contribute with it. 2.The Contractor’s insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3.The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor’s Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. N / A SUBR WVD ADDL INSD AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY (Mandatory in NH) LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB COMMERCIAL GENERAL LIABILITY CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD DBA: Golden Gate Electric Additional Named Insureds COPYRIGHT 2007, AMS SERVICES INC ADDITIONAL COVERAGES Ref # Description Edition DateForm No.Coverage Code Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref # Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Copyright 2001, AMS Services, Inc. COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US - AUTOMATIC STATUS WHEN REQUIRED IN CONTRACT OR AGREEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART The following is added to 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV - Commercial General Liability Conditions: We waive any right of recovery we may have against any person or organization because of payments we make for injury or damage caused, in whole or in part, by your acts or omissions, or the acts or omissions of those acting on your behalf in the performance of your ongoing operations or "your work" done under a written contract with that person or organization and included in the "products -completed operations hazard". This waiver applies only when you and that person or organization have agreed to such waiver in writing in a contract or agreement. All other terms and conditions of this policy remain unchanged. L609 (05/09) Includes copyrighted material of Insurance Services Office, Inc., with itspermission. CGL 0143136 - 21 05/01/22 MAR 04/14/22 POLICY NUMBER: 0143136-21 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED — PRIMARY AND NONCONTRIBUTORY - AUTOMATIC STATUS WHEN REQUIRED IN A WRITTEN CONTRACT OR AGREEMENT (Including Completed Operations) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Date: 05/01/2021 A. Section II - Who Is An Insured is amended to include as an additional insured any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy. Such person or organization is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions, or the acts or omissions of those acting on your behalf in the performance of your ongoing operations for the additional insured; or 2. "Your work" and included in the "products -completed operations hazard". but only for "occurrences" or coverages not otherwise excluded in the Coverage Part to which this endorsement applies. However the insurance afforded to such additional insured: 1. Only applies to the extent permitted by law; and 2. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. Status as an additional insured for the person -or organization to which -this endorsement applies commences during the policy period and after such written contract or agreement has been executed. C. With respect to the insurance afforded to the additional insured, the following additional exclusions apply: This insurance does not apply to: 1. "Bodily injury", "property damage", "personal and advertising injury" or medical payments arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failure to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional architectural, engineering, or surveying services. 2. "Bodily injury" or "property damage" included in the "products -completed operations hazard" and arising out of "your work" that was completed by or on behalf of any insured prior to the date shown in the Schedule of this endorsement. L807 (10/19) Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 2 D. With respect to the insurance afforded to the additional insured, the following is added to Section III - Limits Of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement you have entered into with the additional insured; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. E. The following condition is added to 4.a. of Other Insurance of Section IV - Commercial General Liability Conditions: If required in a written contract, the Coverage Part to which this endorsement applies is primary and noncontributory in the event of an "occurrence" caused, in whole or in part, by your acts or omissions, or the acts or omissions of those acting on your behalf that: 1. Occurs while performing ongoing operations for the additional insured, or 2. Is included in the "products -completed operations hazard" and arises out of "your work" that was completed by or on behalf of any insured after the date shown in the Schedule of this endorsement. All other terms and conditions remain unchanged. L807 (10/19) Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 2 of 2 Signature: F7-7*— Email: bhiggins@kentwa.gov Signature: L9- Email: rlashley@kentwa.gov Signature: A-'?;&= Brian Levenhage n (May20, 202211:56 PDT) Email: bjlevenhagen@kentwa.gov E-TRANSMITTAL: West Fenwick Park Lighting System Agmt. Final Audit Report Created: 2022-05-19 By: Lynn Osborn (losborn@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAA-V88WvlrZVo1XPHzKOPTe27rlkhHObhj 2022-05-20 "E-TRANSMITTAL: West Fenwick Park Lighting System Agmt." History Document created by Lynn Osborn (losborn@kentwa.gov) 2022-05-19 - 3:48:00 PM GMT- IP address: 146.129.252.126 Document emailed to Bryan Higgins (bhiggins@kentwa.gov) for signature 2022-05-19 - 3:56:03 PM GMT Email viewed by Bryan Higgins (bhi99Ins kentwa. ov ) 2022-05-19 - 4:22:03 PM GMT- IP address: 146.129.252.126 ='a Document e-signed by Bryan Higgins (bhiggins@kentwa.gov) Signature Date: 2022-05-19 - 4:24:25 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Ronald Lashley (rlashley@kentwa.gov) for signature 2022-05-19 - 4:24:28 PM GMT Email viewed by Ronald Lashley (rlashley@kentwa.gov) 2022-05-19 - 8:58:21 PM GMT- IP address: 146.129.252.126 Document e-signed by Ronald Lashley (rlashley@kentwa.gov) Signature Date: 2022-05-19 - 9:02:56 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Brian Levenhagen (bjlevenhagen@kentwa.gov) for signature 2022-05-19 - 9:02:58 PM GMT Email viewed by Brian Levenhagen (bjlevenhagen@kentwa.gov) 2022-05-20 - 6:56:08 PM GMT- IP address: 146.129.252.126 Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date: 2022-05-20 - 6:56:44 PM GMT - Time Source: server- IP address: 146.129.252.126 a Adobe Acrobat Sign Document emailed to kenmcentyre@goldengateec.com for signature 2022-05-20 - 6:56:46 PM GMT Email viewed by kenmcentyre@goldengateec.com 2022-05-20 - 7:09:22 PM GMT- IP address: 104.28.116.94 Document signing delegated to Yu Hong Wu (jenniferwu@goldengateec.com) by kenmcentyre@goldengateec.com 2022-05-20 - 7:15:39 PM GMT- IP address: 23.27.44.84 Document emailed to Yu Hong Wu Qenniferwu@goldengateec.com) for signature 2022-05-20 - 7:15:39 PM GMT Email viewed by Yu Hong Wu (jenniferwu@goldengateec.com) 2022-05-20 - 7:19:16 PM GMT- IP address: 63.135.61.163 E= Document e-signed by Yu Hong Wu (jenniferwu@goldengateec.com) Signature Date: 2022-05-20 - 7:23:45 PM GMT - Time Source: server- IP address: 63.135.61.163 {� Agreement completed. 2022-05-20 - 7:23:45 PM GMT 0 Adobe Acrobat Sign State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 05/04/2022 County_ Trade Job Classification Wage Holiday Overtime Note *Risk Class King Asbestos Abatement Workers Journey Level $54.62 5D 1 H View King Boilermakers Journey Level $72.54 5N 1C View King Building Service Employees Janitor $27.23 5S 2F View King Building Service Employees Traveling Waxer/Shampooer $27.68 5S 2F View King Building Service Employees Window Cleaner (Non -Scaffold) $31.18 5S 2F View King Building Service Employees Window Cleaner (Scaffold) $32.18 5S 2F View King Carpenters Acoustical Worker $68.19 15J 4C View King Carpenters Bridge, Dock And Wharf $68.19 15J 4C View Carpenters King Carpenters Carpenter $68.19 15J 4C View King Carpenters Floor Finisher $68.19 15J 4C View King Carpenters Floor Layer $68.19 15J 4C View King Carpenters Scaffold Erector $68.19 15J 4C View King Cement Masons Application of all Composition $67.41 15J 41J View Mastic King Cement Masons Application of all Epoxy $66.91 15J 41J View Material King Cement Masons Application of all Plastic $67.41 15J 4U View Material King Cement Masons Application of Sealing $66.91 15J 41J View Compound King Cement Masons Application of Underlayment $67.41 15J 4U View King Cement Masons Building General $66.91 15J 4U View King Cement Masons Composition or Kalman Floors $67.41 15J 4U View King Cement Masons Concrete Paving $66.91 15J 41J View King Cement Masons Curb Et Gutter Machine $67.41 15J 4U View King Cement Masons Curb Et Gutter, Sidewalks $66.91 15J 4U View King Cement Masons Curing Concrete $66.91 15J 4U View King Cement Masons Finish Colored Concrete $67.41 15J 4U View King Cement Masons Floor Grinding $67.41 15J 41J View King Cement Masons Floor Grinding/Polisher $66.91 15J 4U View King Cement Masons Green Concrete Saw, self- $67.41 15J 41.1 View powered King Cement Masons Grouting of all Plates $66.91 15J 41J View King Cement Masons Grouting of all Tilt -up Panels $66.91 15J 4U View King Cement Masons Gunite Nozzleman $67.41 15J 4U View King Cement Masons Hand Powered Grinder $67.41 15J 4U View King Cement Masons Journey Level $66.91 15J 4U View King Cement Masons Patching Concrete $66.91 15J 4U View King Cement Masons Pneumatic Power Tools $67.41 15J 41J View King Cement Masons Power Chipping Et Brushing $67.41 15J 4U View King Cement Masons Sand Blasting Architectural $67.41 15J 4U View Finish King Cement Masons Screed Et Rodding Machine $67.41 15J 41J View King Cement Masons Spackling or Skim Coat $66.91 15J 4U View Concrete King Cement Masons Troweling Machine Operator $67.41 15J 4U View King Cement Masons Troweling Machine Operator on $67.41 15J 4U View Colored Slabs King Cement Masons Tunnel Workers $67.41 15J 41J View King Electrical Fixture Maintenance Journey Level $35.19 5L 1 E View Workers King Electricians - Inside Cable Splicer $97.21 7C 4E View King Electricians - Inside Cable Splicer (tunnel) $104.49 7C 4E View King Electricians - Inside Certified Welder $93.91 7C 4E View King Electricians - Inside Certified Welder (tunnel) $100.86 7C 4E View King Electricians - Inside Construction Stock Person $47.03 7C 4E View King Electricians - Inside Journey Level $90.59 7C 4E View King Electricians - Inside Journey Level (tunnel) $97.21 7C 4E View King Electricians - Motor Shop Journey Level $48.68 5A 1 B View King Electricians - Powerline Cable Splicer $88.89 5A 4D View Construction King Electricians - Powerline Certified Line Welder $81.65 5A 4D View Construction King Electricians - Powerline Groundperson $52.91 5A 4D View Construction King Electricians - Powerline Heavy Line Equipment $81.65 5A 4D View Construction Operator King Electricians - Powerline Journey Level Lineperson $81.65 5A 4D View Construction King Electricians - Powerline Line Equipment Operator $70.02 5A 4D View Construction King Electricians - Powerline Meter Installer $52.91 5A 4D 8W View Construction King Electricians - Powerline Pole Sprayer $81.65 5A 4D View Construction King Electricians - Powerline Powderperson $60.75 5A 4D View Construction King Electronic Technicians Journey Level $59.10 7E 1 E View King Fabricated Precast Concrete All Classifications - In -Factory $18.25 5B 111 View Products Work Only King Fence Erectors Fence Erector $46.29 15J 4V 8Y View King Fence Erectors Fence Laborer $46.29 15J 4V 8Y View King Flaggers Journey Level $46.29 15J 4V 8Y View King Glaziers Journey Level $72.41 7L 1Y View King Heat Et Frost Insulators And Journey Level $82.02 15H 11C View Asbestos Workers King Heating Equipment Mechanics Journey Level $91.83 7F 1 E View King Hod Carriers Et Mason Tenders Journey Level $57.31 15J 4V 8Y View King Industrial Power Vacuum Journey Level $14.49 1 View Cleaner King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 View Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $14.49 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 View Sewer 8t Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 View Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $68.19 15J 4C View King Ironworkers Journeyman $80.28 7N 10 View King Laborers Air, Gas Or Electric Vibrating $54.62 15J 4V 8Y View Screed King Laborers Airtrac Drill Operator $56.31 15J 4V 8Y View King Laborers Ballast Regular Machine $54.62 15J 4V 8Y View King Laborers Batch Weighman $46.29 15J 4V 8Y View King Laborers Brick Pavers $54.62 15J 4V 8Y View King Laborers Brush Cutter $54.62 15J 4V 8Y View King Laborers Brush Hog Feeder $54.62 15J 4V 8Y View King Laborers Burner $54.62 15J 4V 8Y View King Laborers Caisson Worker $56.31 15J 4V 8Y View King Laborers Carpenter Tender $54.62 15J 4V 8Y View King Laborers Cement Dumper -paving $55.62 15J 4V 8Y View King Laborers Cement Finisher Tender $54.62 15J 4V 8Y View King Laborers Change House Or Dry Shack $54.62 15J 4V 8Y View King Laborers Chipping Gun (30 Lbs. And $55.62 15J 4V 8Y View Over) King Laborers Chipping Gun (Under 30 Lbs.) $54.62 15J 4V 8Y View King Laborers Choker Setter $54.62 15J 4V 8Y View King Laborers Chuck Tender $54.62 15J 4V 8Y View King Laborers Clary Power Spreader $55.62 15J 4V 8Y View King Laborers Clean-up Laborer $54.62 15J 4V 8Y View King Laborers Concrete Dumper/Chute $55.62 15J 4V 8Y View Operator King Laborers Concrete Form Stripper $54.62 15J 4V 8Y View King Laborers Concrete Placement Crew $55.62 15J 4V 8Y View King Laborers Concrete Saw Operator/Core $55.62 15J 4V 8Y View Driller King Laborers Crusher Feeder $46.29 15J 4V 8Y View King Laborers Curing Laborer $54.62 15J 4V 8Y View King Laborers Demolition: Wrecking Et Moving $54.62 15J 4V 8Y View (Incl. Charred Material) King Laborers Ditch Digger $54.62 15J 4V 8Y View King Laborers Diver $56.31 15J 4V 8Y View King Laborers Drill Operator (Hydraulic, $55.62 15J 4V 8Y View Diamond) King Laborers Dry Stack Walls $54.62 15J 4V 8Y View King Laborers Dump Person $54.62 15J 4V 8Y View King Laborers Epoxy Technician $54.62 15J 4V 8Y View King Laborers Erosion Control Worker $54.62 15J 4V 8Y View King Laborers Faller Et Bucker Chain Saw $55.62 15J 4V 8Y View King Laborers Fine Graders $54.62 15J 4V 8Y View King Laborers Firewatch $46.29 15J 4V 8Y View King Laborers Form Setter $54.62 15J 4V 8Y View King Laborers Gabian Basket Builders $54.62 15J 4V 8Y View King Laborers General Laborer $54.62 15J 4V 8Y View King Laborers Grade Checker Et Transit Person $57.31 15J 4V 8Y View King Laborers Grinders $54.62 15J 4V 8Y View King Laborers Grout Machine Tender $54.62 15J 4V 8Y View King Laborers Groutmen (Pressure) Including $55.62 15J 4V 8Y View Post Tension Beams King Laborers Guardrail Erector $54.62 15J 4V 8Y View King Laborers Hazardous Waste Worker (Level $56.31 15J 4V 8Y View A) King Laborers Hazardous Waste Worker (Level $55.62 15J 4V 8Y View B) King Laborers Hazardous Waste Worker (Level $54.62 15J 4V 8Y View C) King Laborers High Scaler $56.31 15J 4V 8Y View King Laborers Jackhammer $55.62 15J 4V 8Y View King Laborers Laserbeam Operator $55.62 15J 4V 8Y View King Laborers Maintenance Person $54.62 15J 4V 8Y View King Laborers Manhole Builder-Mudman $55.62 15J 4V 8Y View King Laborers Material Yard Person $54.62 15J 4V 8Y View King Laborers Motorman -Dinky Locomotive $55.62 15J 4V 8Y View King Laborers nozzleman (concrete pump, $57.31 15J 4V 8Y View green cutter when using combination of high pressure air Et water on concrete Et rock, sandblast, gunite, shotcrete, water blaster, vacuum blaster) King Laborers Pavement Breaker $55.62 15J 4V 8Y View King Laborers Pilot Car $46.29 15J 4V 8Y View King Laborers Pipe Layer (Lead) $57.31 15J 4V 8Y View King Laborers Pipe Layer/Tailor $55.62 15J 4V 8Y View King Laborers Pipe Pot Tender $55.62 15J 4V 8Y View King Laborers Pipe Reliner $55.62 15J 4V 8Y View King Laborers Pipe Wrapper $55.62 15J 4V 8Y View King Laborers Pot Tender $54.62 15J 4V 8Y View King Laborers Powderman $56.31 15J 4V 8Y View King Laborers Powderman's Helper $54.62 15J 4V 8Y View King Laborers Power Jacks $55.62 15J 4V 8Y View King Laborers Railroad Spike Puller - Power $55.62 15J 4V 8Y View King Laborers Raker - Asphalt $57.31 15J 4V 8Y View King Laborers Re-timberman $56.31 15J 4V 8Y View King Laborers Remote Equipment Operator $55.62 15J 4V 8Y View King Laborers Rigger/Signal Person $55.62 15J 4V 8Y View King Laborers Rip Rap Person $54.62 15J 4V 8Y View King Laborers Rivet Buster $55.62 15J 4V 8Y View King Laborers Rodder $55.62 15J 4V 8Y View King Laborers Scaffold Erector $54.62 15J 4V 8Y View King Laborers Scale Person $54.62 15J 4V 8Y View King Laborers Sloper (Over 20") $55.62 15J 4V 8Y View King Laborers Sloper Sprayer $54.62 15J 4V 8Y View King Laborers Spreader (Concrete) $55.62 15J 4V 8Y View King Laborers Stake Hopper $54.62 15J 4V 8Y View King Laborers Stock Piler $54.62 15J 4V 8Y View King Laborers Swinging Stage/Boatswain $46.29 15J 4V 8Y View Chair King Laborers Tamper Et Similar Electric, Air $55.62 15J 4V 8Y View Et Gas Operated Tools King Laborers Tamper (Multiple Et Self- $55.62 15J 4V 8Y View propelled) King Laborers Timber Person - Sewer (Lagger, $55.62 15J 4V 8Y View Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $54.62 15J 4V 8Y View King Laborers Topper $54.62 15J 4V 8Y View King Laborers Track Laborer $54.62 15J 4V 8Y View King Laborers Track Liner (Power) $55.62 15J 4V 8Y View King Laborers Traffic Control Laborer $49.50 15J 4V 9C View King Laborers Traffic Control Supervisor $52.45 15J 4V 9C View King Laborers Truck Spotter $54.62 15J 4V 8Y View King Laborers Tugger Operator $55.62 15J 4V 8Y View King Laborers Tunnel Work -Compressed Air $142.82 15J 4V 9B View Worker 0-30 psi King Laborers Tunnel Work -Compressed Air $147.85 15J 4V 9B View Worker 30.01-44.00 psi King Laborers Tunnel Work -Compressed Air $151.53 15J 4V 9B View Worker 44.01-54.00 psi King Laborers Tunnel Work -Compressed Air $157.23 15J 4V 9B View Worker 54.01-60.00 psi King Laborers Tunnel Work -Compressed Air $159.35 15J 4V 9B View Worker 60.01-64.00 psi King Laborers Tunnel Work -Compressed Air $164.45 15J 4V 9B View Worker 64.01-68.00 psi King Laborers Tunnel Work -Compressed Air $166.35 15J 4V 9B View Worker 68.01-70.00 psi King Laborers Tunnel Work -Compressed Air $168.35 15J 4V 9B View Worker 70.01-72.00 psi King Laborers Tunnel Work -Compressed Air $170.35 15J 4V 9B View Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $57.41 15J 4V 8Y View Tender King Laborers Tunnel Work -Miner $57.41 7A 4V 8Y View King Laborers Tunnel Work -Miner $57.41 15J 4V 8Y View King Laborers Vibrator $55.62 15J 4V 8Y View King Laborers Vinyl Seamer $54.62 15J 4V 8Y View King Laborers Watchman $42.08 15J 4V 8Y View King Laborers Welder $55.62 15J 4V 8Y View King Laborers Well Point Laborer $55.62 15J 4V 8Y View King Laborers Window Washer/Cleaner $42.08 15.1 4V 8Y View King Laborers - Underground Sewer General Laborer Et Topman $54.62 15J 4V 8Y View Et Water King Laborers - Underground Sewer Pipe Layer $55.62 15J 4V 8Y View Et Water King Landscape Construction Landscape $42.08 15J 4V 8Y View Construction/Landscaping Or Planting Laborers King Landscape Construction Landscape Operator $75.50 15J 11G 8X View King Landscape Maintenance Groundskeeper $17.87 1 View King Lathers Journey Level $68.19 15J 4C View King Metal Fabrication In Shop). Fitter/Certified Welder $42.17 151 11 E View King Metal Fabrication In Shop). General Laborer $30.07 151 11 E View King Metal Fabrication In Shop). Mechanic $43.63 151 11 E View King Metal Fabrication In Shop). Welder/Burner $39.28 151 11 E View King Millwright Journey Level $69.74 15J 4C View King Modular Buildings Cabinet Assembly $14.49 1 View King Modular Buildings Electrician $14.49 1 View King Modular Buildings Equipment Maintenance $14.49 1 View King Modular Buildings Plumber $14.49 1 View King Modular Buildings Production Worker $14.49 1 View King Modular Buildings Tool Maintenance $14.49 1 View King Modular Buildings Utility Person $14.49 1 View King Modular Buildings Welder $14.49 1 View King Painters Journey Level $47.70 6Z 2B View King Pile Driver Crew Tender $62.69 15J 4C View King Pile Driver Crew Tender/Technician $62.69 15J 4C View King Pile Driver Hyperbaric Worker - $85.00 15J 4C View Compressed Air Worker 0-30.00 PSI King Pile Driver Hyperbaric Worker - $90.00 15J 4C View Compressed Air Worker 30.01 - 44.00 PSI King Pile Driver Hyperbaric Worker - $94.00 15J 4C View Compressed Air Worker 44.01 - 54.00 PSI King Pile Driver Hyperbaric Worker - $106.50 15J 4C View Compressed Air Worker 64.01 - 68.00 PSI King Pile Driver Hyperbaric Worker - $108.50 15J 4C View Compressed Air Worker 68.01 - 70.00 PSI King Pile Driver Hyperbaric Worker - $110.50 15J 4C View Compressed Air Worker 70.01 - 72.00 PSI King Pile Driver Hyperbaric Worker - $112.50 15J 4C View Compressed Air Worker 72.01 - 74.00 PSI King Pile Driver Journey Level $68.64 15J 4C View King Plasterers Journey Level $64.14 7Q 1 R View King Plasterers Nozzleman $67.64 7Q 1 R View King Playground Et Park Equipment Journey Level $14.49 1 View Installers King Plumbers Et Pipefitters Journey Level $94.69 6Z 1G View King Power Equipment Operators Asphalt Plant Operators $76.77 15J 11G 8X View King Power Equipment Operators Assistant Engineer $72.20 15J 11G 8X View King Power Equipment Operators Barrier Machine (zipper) $76.09 15J 11G 8X View King Power Equipment Operators Batch Plant Operator: concrete $76.09 15J 11G 8X View King Power Equipment Operators Boat Operator $76.87 7A 11 H 8X View King Power Equipment Operators Bobcat $72.20 15J 11G 8X View King Power Equipment Operators Brokk - Remote Demolition $72.20 15J 11G 8X View Equipment King Power Equipment Operators Brooms $72.20 15J 11G 8X View King Power Equipment Operators Bump Cutter $76.09 15J 11G 8X View King Power Equipment Operators Cableways $76.77 15J 11G 8X View King Power Equipment Operators Chipper $76.09 15J 11G 8X View King Power Equipment Operators Compressor $72.20 15J 11G 8X View King Power Equipment Operators Concrete Finish Machine - $72.20 15J 11G 8X View Laser Screed King Power Equipment Operators Concrete Pump - Mounted Or $75.50 15J 11G 8X View Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators Concrete Pump: Truck Mount $76.77 15J 11G 8X View With Boom Attachment Over 42 M King Power Equipment Operators Concrete Pump: Truck Mount $76.09 15J 11G 8X View With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $75.50 15J 11G 8X View King Power Equipment Operators Cranes Friction: 200 tons and $79.20 7A 11 H 8X View over King Power Equipment Operators Cranes, A -frame: 10 tons and $72.30 7A 11 H 8X View under King Power Equipment Operators Cranes: 100 tons through 199 $77.63 7A 11 H 8X View tons, or 150' of boom (including jib with attachments) King Power Equipment Operators Cranes: 20 tons through 44 $76.19 7A 11 H 8X View tons with attachments King Power Equipment Operators Cranes: 200 tons- 299 tons, or $78.44 7A 11 H 8X View 250' of boom including jib with attachments King Power Equipment Operators Cranes: 300 tons and over or $79.20 7A 11 H 8X View 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 tons through 99 $76.87 7A 11 H 8X View tons, under 150' of boom(including jib with attachments) King Power Equipment Operators Cranes: Friction cranes through $78.44 7A 11 H 8X View 199 tons King Power Equipment Operators Cranes: through 19 tons with $75.60 7A 11 H 8X View attachments, a -frame over 10 tons King Power Equipment Operators Crusher $76.09 15J 11G 8X View King Power Equipment Operators Deck Engineer/Deck Winches $76.09 15J 11G 8X View (power) King Power Equipment Operators Derricks, On Building Work $76.77 15J 11G 8X View King Power Equipment Operators Dozers D-9 Et Under $75.50 15J 11G 8X View King Power Equipment Operators Drill Oilers: Auger Type, Truck $75.50 15J 11G 8X View Or Crane Mount King Power Equipment Operators Drilling Machine $77.53 15J 11G 8X View King Power Equipment Operators Elevator and man -lift: $72.20 15J 11G 8X View permanent and shaft type King Power Equipment Operators Finishing Machine, Bidwell And $76.09 15J 11G 8X View Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 lbs and over with $75.50 15J 11G 8X View attachments King Power Equipment Operators Grade Engineer: Using Blue $76.09 15J 11G 8X View Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/Stakeman $72.20 15J 11G 8X View King Power Equipment Operators Guardrail Punch $76.09 15J 11G 8X View King Power Equipment Operators Hard Tail End Dump $76.77 15J 11G 8X View Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $76.09 15J 11G 8X View Articulating Off -road Equipment Under 45 Yards King Power Equipment Operators Horizontal/Directional Drill $75.50 15J 11G 8X View Locator King Power Equipment Operators Horizontal/Directional Drill $76.09 15J 11G 8X View Operator King Power Equipment Operators Hydralifts/Boom Trucks Over $75.60 7A 11H 8X View 10 Tons King Power Equipment Operators Hydralifts/boom trucks: 10 $72.30 7A 11 H 8X View tons and under King Power Equipment Operators Leverman $78.33 15J 11G 8X View King Power Equipment Operators Loader, Overhead, 6 Yards. But $76.77 15J 11G 8X View Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $76.09 15J 11G 8X View Yards King Power Equipment Operators Loaders, Plant Feed $76.09 15J 11G 8X View King Power Equipment Operators Loaders: Elevating Type Belt $75.50 15J 11G 8X View King Power Equipment Operators Locomotives, All $76.09 15J 11G 8X View King Power Equipment Operators Material Transfer Device $76.09 15J 11G 8X View King Power Equipment Operators Mechanics: All (Leadmen - $77.53 15J 11G 8X View $0.50 per hour over mechanic) King Power Equipment Operators Motor Patrol Graders $76.77 15J 11G 8X View King Power Equipment Operators Mucking Machine, Mole, Tunnel $76.77 15J 11G 8X View Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $72.20 15J 11G 8X View Distribution Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (Elevators and $75.50 15J 11G 8X View Manlifts), Air Tuggers, Strato King Power Equipment Operators Overhead, bridge type: 100 $77.63 7A 11 H 8X View tons and over King Power Equipment Operators Overhead, bridge type: 45 tons $76.87 7A 11 H 8X View through 99 tons King Power Equipment Operators Pavement Breaker $72.20 15J 11G 8X View King Power Equipment Operators Pile Driver (other Than Crane $76.09 15J 11G 8X View Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $75.50 15J 11G 8X View King Power Equipment Operators Posthole Digger, Mechanical $72.20 15J 11G 8X View King Power Equipment Operators Power Plant $72.20 15J 11G 8X View King Power Equipment Operators Pumps - Water $72.20 15J 11G 8X View King Power Equipment Operators Quad 9, Hd 41, D10 And Over $76.77 15J 11G 8X View King Power Equipment Operators Remote Control Operator On $76.77 15J 11G 8X View Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger and Bellman $72.30 7A 11 H 8X View King Power Equipment Operators Rigger/Signal Person, $75.60 7A 11 H 8X View Bellman(Certified) King Power Equipment Operators Rollagon $76.77 15J 11G 8X View King Power Equipment Operators Roller, Other Than Plant Mix $72.20 15J 11G 8X View King Power Equipment Operators Roller, Plant Mix Or Multi -lift $75.50 15J 11G 8X View Materials King Power Equipment Operators Roto-mill, Roto-grinder $76.09 15J 11G 8X View King Power Equipment Operators Saws - Concrete $75.50 15J 11G 8X View King Power Equipment Operators Scraper, Self Propelled Under $76.09 15J 11G 8X View 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $75.50 15J 11G 8X View King Power Equipment Operators Scrapers, Self-propelled: 45 $76.77 15J 11G 8X View Yards And Over King Power Equipment Operators Service Engineers: Equipment $75.50 15J 11G 8X View King Power Equipment Operators Shotcrete/Gunite Equipment $72.20 15J 11G 8X View King Power Equipment Operators Shovel, Excavator, Backhoe, $75.50 15J 11G 8X View Tractors Under 15 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoe: $76.77 15J 11G 8X View Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $76.09 15J 11G 8X View Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $77.53 15J 11G 8X View Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $78.33 15J 11G 8X View Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $76.77 15J 11G 8X View King Power Equipment Operators Spreader, Topsider Et $76.77 15J 11G 8X View Screedman King Power Equipment Operators Subgrader Trimmer $76.09 15J 11G 8X View King Power Equipment Operators Tower Bucket Elevators $75.50 15J 11G 8X View King Power Equipment Operators Tower Crane: over 175' through $78.44 7A 11 H 8X View 250' in height, base to boom King Power Equipment Operators Tower crane: up to 175' in $77.63 7A 11 H 8X View height base to boom King Power Equipment Operators Tower Cranes: over 250' in $79.20 7A 11 H 8X View height from base to boom King Power Equipment Operators Transporters, All Track Or Truck $76.77 15J 11G 8X View Type King Power Equipment Operators Trenching Machines $75.50 15J 11G 8X View King Power Equipment Operators Truck crane oiler/driver: under $75.60 7A 11 H 8X View 100 tons King Power Equipment Operators Truck Mount Portable Conveyor $76.09 15J 11G 8X View King Power Equipment Operators Welder $76.77 15J 11G 8X View King Power Equipment Operators Wheel Tractors, Farmall Type $72.20 15J 11G 8X View King Power Equipment Operators Yo Yo Pay Dozer $76.09 15J 11G 8X View King Power Equipment Operators- Asphalt Plant Operators $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Boat Operator $76.87 7A 11 H 8X View Underground Sewer Et Water King Power Equipment Operators- Bobcat $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $72.20 15J 11G 8X View Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Bump Cutter $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Cableways $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Chipper $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Compressor $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine - $72.20 15J 11G 8X View Underground Sewer Et Water Laser Screed King Power Equipment Operators- Concrete Pump - Mounted Or $75.50 15J 11G 8X View Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators- Concrete Pump: Truck Mount $76.77 15J 11G 8X View Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Pump: Truck Mount $76.09 15J 11G 8X View Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes Friction: 200 tons and $79.20 7A 11 H 8X View Underground Sewer Et Water over King Power Equipment Operators- Cranes, A -frame: 10 tons and $72.30 7A 11 H 8X View Underground Sewer Et Water under King Power Equipment Operators- Cranes: 100 tons through 199 $77.63 7A 11 H 8X View Underground Sewer Et Water tons, or 150' of boom (including jib with attachments) King Power Equipment Operators- Cranes: 20 tons through 44 $76.19 7A 11 H 8X View Underground Sewer Et Water tons with attachments King Power Equipment Operators- Cranes: 20 tons through 44 $76.19 7A 11 H 8X View Underground Sewer Et Water tons with attachments King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $78.44 7A 11 H 8X View Underground Sewer Et Water 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $79.20 7A 11 H 8X View Underground Sewer Et Water 300' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 tons through 99 $76.87 7A 11 H 8X View Underground Sewer Et Water tons, under 150' of boom(including jib with attachments) King Power Equipment Operators- Cranes: Friction cranes through $78.44 7A 11 H 8X View Underground Sewer Et Water 199 tons King Power Equipment Operators- Cranes: through 19 tons with $75.60 7A 11 H 8X View Underground Sewer Et Water attachments, a -frame over 10 tons King Power Equipment Operators- Crusher $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/Deck Winches $76.09 15J 11G 8X View Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 Et Under $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $75.50 15J 11G 8X View Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $77.53 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Elevator and man -lift: $72.20 15J 11G 8X View Underground Sewer Et Water permanent and shaft type King Power Equipment Operators- Finishing Machine, Bidwell And $76.09 15J 11G 8X View Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 lbs and over with $75.50 15J 11G 8X View Underground Sewer Et Water attachments King Power Equipment Operators- Forklifts: under 3000 lbs. with $72.20 15J 11G 8X View Underground Sewer Et Water attachments King Power Equipment Operators- Forklifts: under 3000 lbs. with $72.20 15J 11G 8X View Underground Sewer Et Water attachments King Power Equipment Operators- Grade Engineer: Using Blue $76.09 15J 11G 8X View Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/Stakeman $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $76.77 15J 11G 8X View Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $76.09 15J 11G 8X View Underground Sewer Et Water Articulating Off -road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/Directional Drill $75.50 15J 11G 8X View Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/Directional Drill $76.09 15J 11G 8X View Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom trucks: 10 $72.30 7A 11H 8X View Underground Sewer Et Water tons and under King Power Equipment Operators- Hydralifts/boom trucks: over $75.60 7A 11H 8X View Underground Sewer Et Water 10 tons King Power Equipment Operators- Leverman $78.33 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But $76.77 15J 11G 8X View Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $76.09 15J 11G 8X View Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Mechanics: All (Leadmen - $77.53 15J 11G 8X View Underground Sewer Et Water $0.50 per hour over mechanic) King Power Equipment Operators- Motor Patrol Graders $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $76.77 15J 11G 8X View Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $72.20 15J 11G 8X View Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (Elevators and $75.50 15J 11G 8X View Underground Sewer Et Water Manlifts), Air Tuggers, Strato King Power Equipment Operators- Overhead, bridge type: 100 $77.63 7A 11 H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Overhead, bridge type: 45 tons $76.87 7A 11 H 8X View Underground Sewer Et Water through 99 tons King Power Equipment Operators- Pavement Breaker $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $76.09 15J 11G 8X View Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Power Plant $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Remote Control Operator On $76.77 15J 11G 8X View Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger and Bellman $72.30 7A 11 H 8X View Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, $75.60 7A 11 H 8X View Underground Sewer Et Water Bellman(Certified) King Power Equipment Operators- Rollagon $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi -lift $75.50 15J 11G 8X View Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $76.09 15J 11G 8X View Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $76.77 15J 11G 8X View Underground Sewer Et Water Yards And Over King Power Equipment Operators- Shotcrete/Gunite Equipment $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe, $75.50 15J 11G 8X View Underground Sewer Et Water Tractors Under 15 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoe: $76.77 15J 11G 8X View Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $76.09 15J 11G 8X View Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $77.53 15J 11G 8X View Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $78.33 15J 11G 8X View Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $76.77 15J 11G 8X View Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $76.09 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Crane: over 175' through $78.44 7A 11 H 8X View Underground Sewer Et Water 250' in height, base to boom King Power Equipment Operators- Tower crane: up to 175' in $77.63 7A 11 H 8X View Underground Sewer Et Water height base to boom King Power Equipment Operators- Tower Cranes: over 250' in $79.20 7A 11 H 8X View Underground Sewer Et Water height from base to boom King Power Equipment Operators- Transporters, All Track Or Truck $76.77 15J 11G 8X View Underground Sewer Et Water Type King Power Equipment Operators- Trenching Machines $75.50 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/Driver: 100 $76.19 7A 11H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Truck crane oiler/driver: under $75.60 7A 11 H 8X View Underground Sewer Et Water 100 tons King Power Equipment Operators- Truck Mount Portable Conveyor $76.09 15.1 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Welder $76.77 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmall Type $72.20 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $76.09 15J 11G 8X View Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $57.22 5A 4A View Trimmers King Power Line Clearance Tree Spray Person $54.32 5A 4A View Trimmers King Power Line Clearance Tree Tree Equipment Operator $57.22 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer $51.18 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $38.99 5A 4A View Trimmers King Refrigeration Et Air Journey Level $90.01 6Z 1G View Conditioning Mechanics King Roofers Journey Level $59.05 5A 3H View King Roofers Using Irritable Bituminous $62.05 5A 3H View Materials King Sheet Metal Workers Journey Level (Field or Shop) $91.83 7F 1 E View King Sign Makers Et Installers Journey Level $53.62 0 1 View .(Electrical), King Sign Makers Et Installers (Non- Journey Level $34.42 0 1 View Electrical), King Soft Floor Layers Journey Level $54.41 5A 3J View King Solar Controls For Windows Journey Level $14.49 1 View King Sprinkler Fitters (Fire Journey Level $89.49 5C 1X View Protection). King Stage Rigging Mechanics (Non Journey Level $14.49 1 View Structural). King Stone Masons Journey Level $63.32 7E 1 N View King Street And Parking Lot Sweeper Journey Level $19.09 1 View Workers King Surveyors Assistant Construction Site $75.60 7A 11 H 8X View Surveyor King Surveyors Chainman $72.30 7A 11 H 8X View King Surveyors Construction Site Surveyor $76.87 7A 11 H 8X View King Surveyors Drone Operator (when used in $72.30 7A 11 H 8X View conjunction with survey work only) King Surveyors Ground Penetrating Radar $72.30 7A 11 H 8X View Operator King Telecommunication Technicians Journey Level $59.10 7E 1 E View King Telephone Line Construction - Cable Splicer $38.27 5A 2B View Outside King Telephone Line Construction - Hole Digger/Ground Person $25.66 5A 2B View Outside King Telephone Line Construction - Telephone Equipment Operator $31.96 5A 2B View Outside (Light) King Telephone Line Construction - Telephone Lineperson $36.17 5A 2B View Outside King Traffic Control Stripers Journey Level $50.51 7A 1 K View King Truck Drivers Asphalt Mix Over 16 Yards $69.95 15J ill 8L View King Truck Drivers Asphalt Mix To 16 Yards $69.11 15J ill 8L View King Truck Drivers Dump Truck $69.11 15J ill 8L View King Truck Drivers Dump Truck Et Trailer $69.95 15J 111 8L View King Truck Drivers Other Trucks $69.95 15J 111 8L View King Truck Drivers - Ready Mix Transit Mix $69.95 15J 111 8L View King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 View Installers King Well Drillers Et Irrigation Pump Oiler $14.49 1 View Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 View Installers