Loading...
HomeMy WebLinkAboutL011-09 - Other - Sprint T Mobile - Blue Boy Tank Site SE04724A North East Hill: Fiber Project - 05/11/2022LDC I Surveying Engi neering Planning May 6,2022 Sean Bauer, Water System Manager City of Kent Pubtic Works Department 220 Fourth Avenue South Kent, WA 98032 RE: Sprint T Mobile at Blue Boy Site SEO4724A North East Hill - Kent Public Works - Fiber Project Dear Sean, I am writing to request your approval of Utitity work that Sprint T Mobite wishes to perform regarding fiber instattation to the T Mobite compound from the access road to the T Mobite Lease area for new fiber utitities at the Btue Boy Site Water Tank property located at 11302 SE 236th Place, in Kent. This request is made pursuant to the Lease Agreement between the parties. The proposed Utitity work is as fo[lows: Putt fiber from existing vautt at property access gate through existing conduits to a vautt near the T Mobite compound. Trench a short distance from the existing vautt to the T Mobite h-frame to ptace a fiber box on the h-frame inside the lease area (ptease see attached ptans). lf the above meets your approvat, please sign and date this tetter and email to me. ptease feel free to catt me at 253-218-9017 if you have any questions or email to rcardoza@ldccorp.com . Thank you. Sincerely, \- o O O' c c)v .-.o o ::_ = i-o 6) o- 6 ruU o c c)v NNo Ol g.; .=-o o uiz C) =c(l) E N o N N qI Rick Cardoza Senior Project Manager LDC, lnc The Civil Engineering Group 1851 Central Pl. South, Suite 101 Kent, WA 98030 The above requested modifications are hereby approved. Signature: Name/Title: "Boue-tz Date 5 il Lo LL Service ABOVE the Standard 1,4/kt-7-{2- 425.806.1869 . fx: 425.482.2893 ' www.LDCcorp.com 1 1 1 Address: 1 1 1 1 1 See Below 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 Project Manager:- Route Overview PRIVATE Completed By:AARON HINES Completion Date:7/21/2021 Survey Revision Date: Survey Revision Task ID:Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab.Engineered For: P2 ID:JB0000686387 Are Additional Pages Needed:No Legend Provide Clear Construction Details TIE IN AT SPLICE CASE SP.WAKV.0321 PROOF AND PULL FIBER THROUGH EXISTING ~1,296' O'LASH FIBER 967' DIRECTIONAL DRILL 1(2") CONDUIT WITH FIBER 150' FROM THE ROW TO THE PRIVATE CELL SITE. PLACE NEW VAULT WITH SPLICE CASE NEAR EXISTING VAULT. CUSTOMER TO PLACE 25' FROM EXISTING VAULT TO CELL SITE SPLICE BOX IN GATE. 11302 SE 236TH PL KENT WA 98031 Existing Vault/Ped New Vault/Ped Existing U/G Existing Aerial New U/G New Aerial Interior Path Footage Break Fiber Splice Point Storage Loop Riser Pole Lock Box Footage Text Box Callout Arrow New Tap Phase Identifier Utility Closet Hard Surface Cut Abandoned CableR V V 1 C 1 150' TEXT UC V V BEGINNING OF PRIVATE. REPLACE PEDESTAL WITH NEW VAULT CELL SITE 150' 1(2") V 65' 1(2")200' 1(4")25' 1(2")V PLACE NEW VAULT AND SPLICE CASE FOR FUTURE 1 1 Address: 1 1 New Aerial Coax:0 Overlash Coax:0 New UG Fiber:150 1 New Aerial Fiber:0 Overlash Fiber:0 Existing UG Fiber:440 1 Empty Conduit Only:0 New UG Coax:0 Existing UG Coax:0 1 1 See Below 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11302 SE 236TH PL KENT WA 98031 Private Exterior Footages: Are Additional Pages Needed:No -Project Manager: Completed By: Completion Date: Survey Revision Date: Survey Revision Task ID: Private Exterior AARON HINES 7/21/2021 Engineered For: P2 ID:JB0000686387 Legend Provide Clear Construction Details TIE IN AT SPLICE CASE SP.WAKV.0321 PROOF AND PULL FIBER THROUGH EXISTING ~1,296' O'LASH FIBER 967' DIRECTIONAL DRILL 1(2") CONDUIT WITH FIBER 150' FROM THE ROW TO THE PRIVATE CELL SITE. PLACE NEW VAULT WITH SPLICE CASE NEAR EXISTING VAULT. CUSTOMER TO PLACE 25' FROM EXISTING VAULT TO CELL SITE SPLICE BOX IN GATE. Existing Vault/Ped New Vault/Ped Existing U/G Existing Aerial New U/G New Aerial Interior Path Footage Break Fiber Splice Point Storage Loop Riser Pole Lock Box Footage Text Box Callout Arrow New Tap Phase Identifier Utility Closet Hard Surface Cut Abandoned CableR V V 1 C 1 150' TEXT UC V V V PLACE NEW VAULT AND SPLICE CASE FOR FUTURE V PULL THROUGH EXISTING CONDUIT NEW BORE EXISTING T-MOBILE VAULT EXISTING T-MOBILE VAULT PULL THROUGH EXISTING CONDUIT 200' 1(4") PULL THROUGH EXISTING CONDUIT V TRUE COMPASS TO TRENCH NEW 2" CONDUIT 25' TO CELL SITE LOCATION TRUE COMPASS TO PLACE BACKER BOARD AND SPLICE BOX HERE TO PULL FIBER INTO 1 2 43