Loading...
HomeMy WebLinkAboutCAG2022-169 - Original - Evergreen Asphalt & Concrete Construction, Inc. - City Hall Annex Parking Lot Seal Coating - 05/02/2022ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: Director or Designee Date of Council Approval: Grant? Yes No Type:Review/Signatures/RoutingComments: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? Yes No* Business License Verification: Yes In-Process Exempt (KCC 5.01.045) If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? Yes No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 Budget Account Number: Budget? Yes No Sup/Mgr: rev. 20210513 FOR CITY OF KENT OFFICIAL USE ONLY * Memo to Mayor must be attached Jan Apple 4 Leah Bryant Parks, Recreation & Community Services 04/20/2022 ASAP N/A 54026905.64850.5820 4 4 N/A Contract 213355 Original April 2022 Other 8/31/2022 4 4 4 $15,903.95 WM WM PUBLIC WORKS AGREEMENT between City of Kent and Evergreen Asphalt & Concrete Construction, Inc THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Evergreen Asphalt & Concrete Construction, Inc organized under the laws of the State of Washington, located and doing business at P.O. Box 867, Ravensdale, WA 98051, 253-670- 9072, Shane Gilbertson (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I.DESCRIPTION OF WORK. The Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Evergreen Asphalt & Concrete Construction, Inc shall provide all labor and materials to remove, replace, re-stripe and sealcoat the parking lot at Kent City Hall Annex in accordance with Proposal 9103 dated 03/18/2022, which is attached and incorporated as Exhibit A The Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above within 10 calendar days after the City issues its Notice to Proceed. Upon the effective date of this Agreement, all physical work shall thereafter be completed by August 31, 2022. The term of this Agreement shall continue until all work has been completed, final acceptance has occurred, and all Contractor obligations have been fulfilled. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed 15903.95. Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20-171 and its related rules for the work contemplated in this Agreement. The City shall pay the Contractor eighty-five percent (85%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. Card Payment Program. The Contractor may elect to participate in automated credit card payments provided for by the City and its financial institution. This Program is provided as an alternative to payment by check and is available for the convenience of the Contractor. If the Contractor voluntarily participates in this Program, the Contractor will be solely responsible for any fees imposed by financial institutions or credit card companies. The Contractor shall not charge those fees back to the City. PUBLIC WORKS AGREEMENT - 1 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) PUBLIC WORKS AGREEMENT - 2 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) A.No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $150,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final ten percent (10%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B.Retainage. The City shall also hold back a retainage in the amount of five percent (5%) of any and all payments made to the Contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of the Contractor’s signature on the Agreement. C.Defective or Unauthorized Work. The City reserves its right to withhold payment from the Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City’s written approval. If the Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and the Contractor shall be liable to the City for any additional costs incurred by the City. “Additional costs” shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D.Final Payment: Waiver of Claims. THE CONTRACTOR’S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR’S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS M ADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A.The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B.The Contractor maintains and pays for its own place of business from which the Contractor’s services under this Agreement will be performed. C.The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained the Contractor’s services and is a serv ice other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D.The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 3 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by the Contractor’s business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.2 7 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. “Good cause” shall include, without limitation, any one or more of the following events: A. The Contractor’s refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor’s failure to complete the work within the time specified in this Agreement. C. The Contractor’s failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor’s persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor’s filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor’s breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor’s possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. The Contractor shall file a “Statement of Intent to Pay Prevailing Wages,” with the State of Washington Department of Labor & Industries prior to commencing the Con tract work. The Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by the Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, the Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, Section XVI(D), within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order w ork; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section IX, Claims, below. PUBLIC WORKS AGREEMENT - 4 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by the Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. FORCE MAJEURE. Neither party shall be liable to the other for breach due to delay or failure in performance resulting from acts of God, acts of war or of the public enemy, riots, pandemic, fire, flood, or other natural disaster or acts of government (“force majeure event”). Performance that is prevented or delayed due to a force majeure event shall not result in liability to the delayed party. Both parties represent to the other that at the time of signing this Agreement, they are able to perform as required and their performance will not be prevented, hindered, or delayed by the current COVID -19 pandemic, any existing state or national declarations of emergency, or any current social distancing restrictions or personal protective equipment requirements that may be required under federal, state, or local law in response to the current pandemic. If any future performance is prevented or delayed by a forc e majeure event, the party whose performance is prevented or delayed shall promptly notify the other party of the existence and nature of the force majeure event causing the prevention or delay in performance. Any excuse from liability shall be effective only to the extent and duration of the force majeure event causing the prevention or delay in performance and, provided, that the party prevented or delayed has not caused such event to occur and continues to use diligent, good faith efforts to avoid the ef fects of such event and to perform the obligation. Notwithstanding other provisions of this section, the Contractor shall not be entitled to, and the City shall not be liable for, the payment of any part of the contract price during a force majeure event, or any costs, losses, expenses, damages, or delay costs incurred by the Contractor due to a force majeure event. Performance that is more costly due to a force majeure event is not included within the scope of this Force Majeure provision. If a force majeure event occurs, the City may direct the Contractor to restart any work or performance that may have ceased, to change the work, or to take other action to secure the work or the project site during the force majeure event. The cost to restart, change, o r secure the work or project site arising from a direction by the City under this clause will be dealt with as a change order, except to the extent that the loss or damage has been caused or exacerbated by the failure of the Contractor to fulfill its obligations under this Agreement. Except as expressly contemplated by this section, all other costs will be borne by the Contractor. IX. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided i n this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been wai ved by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. PUBLIC WORKS AGREEMENT - 5 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). X. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR’S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. XI. WARRANTY. The Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials: (1) when the Contractor knows or should have known of the defect, or (2) upon the Contractor’s receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work. The Contractor shall begin t o correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XII. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. The Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. PUBLIC WORKS AGREEMENT - 6 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) XIII. INDEMNIFICATION. The Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of the Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's duty to defend, indemnify, and hold the City harmless, and the Contractor’s liability accruing from that obligation shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event the Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor’s part, then the Contractor shall pay all the City’s costs for defense, including all reasonable expert witness fees and reasonable attorneys’ fees, plus the City’s legal costs and fees incurred because there was a wrongful refusal on the Contractor’s part. The provisions of this section shall survive the expiration or termination of this Agreement. XIV. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XV. WORK PERFORMED AT CONTRACTOR'S RISK. The Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at the Contractor's own risk, and the Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XVI.MISCELLANEOUS PROVISIONS. A.Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B.Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishm ent of those covenants, agreements or options, and the same shall be and remain in full force and effect. C.Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties’ performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the PUBLIC WORKS AGREEMENT - 7 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) parties' performance of this Agreemen t, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XI II of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unl ess notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in t his Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non -assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of thi s Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and the Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to the Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Contractor acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Contractor in its performance of this Agreement may be subject to public review and disclosure, even if th ose records are not produced to or possessed by the City of Kent. As such, the Contractor agrees to cooperate fully with the City in satisfying the City’s duties and obligations under the Public Records Act. J. City Business License Required. Prior to commencing the tasks described in Section I, the Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 8 (Roadway/Pedestrian Path - $20K or Less and No Performance Bond) K. Counterparts and Signatures by Fax or Email. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearing the original signature was received in person. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and affirmed, and the terms of the Agreement shall be deemed to have applied. CONTRACTOR: By: Print Name: Its: DATE: CITY OF KENT: By: Print Name: Brian Levenhagen Its: Deputy Parks Director DATE: NOTICES TO BE SENT TO: CONTRACTOR: Shane Gilbertson Evergreen Asphalt & Concrete Construction, Inc PO Box 867 Ravensdale, WA 98051 (425) 584.7890 (telephone) (253) 639-3779 (facsimile) NOTICES TO BE SENT TO: CITY OF KENT: Will Moore City of Kent 220 Fourth Avenue South Kent, WA 98032 (253) 856-5081 (telephone) (253) 856-6080 (facsimile) ATTEST: Kent City Clerk [In this field, you may enter the electronic filepath where the contract has been saved] Shane Gilbertson (Apr 26, 2022 16:16 PDT) Shane Gilbertson Shane Gilbertson President Apr 26, 2022 Brian Levenhagen (May 2, 2022 09:36 PDT) May 2, 2022 EEO COMPLIANCE DOCUMENTS - 1 DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City’s equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City’s sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: __________________________________________ For: _________________________________________ Title: ________________________________________ Date: ________________________________________ Shane Gilbertson (Apr 26, 2022 16:16 PDT) Shane Gilbertson President Evergreen Asphalt and Concrete Construction Inc. Apr 26, 2022 EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City’s nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City’s equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 3 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: __________________________________________ For: _________________________________________ Title: ________________________________________ Date: ________________________________________ BIDDER RESPONSIBILITY CRITERIA - 1 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded . The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (Insert Date), the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Insert Bidder's Business Name By: __________________________________________ Signature of Authorized Official* Printed Name: _________________________________ Title: ________________________________________ Date: ________________________________________ City and State: _________________________________ *If a corporation, proposal must be executed in the corporate name by the president or vice- president (or any other corporate officer accompanied by evidence of authority to sign). If a co- partnership, proposal must be executed by a partner. Shane Gilbertson (Apr 26, 2022 16:16 PDT) Shane Gilbertson Shane Gilbertson President Apr 26, 2022 Ravensdale wa PROPOSAL Date 3/18/2022 Proposal# 9103 PROPOSAL SUBMITTED TO: City of Kent 220 Fourth Avenue Kent, WA 98032 Attn Nate Harper Evergreen Asphalt & Concrete, Inc. P.O. Box 867 Ravensdale, WA 98051 Ph: 425 584-7890 Fax: 253 639-3779 TERMS Due on receipt SUBMITTE... SG JOB ADDRESS Signature E-mail: evergreen.shane@comcast.net Web Site: Evergreenasphalt.com Total Sales Tax (10.1%)***Due to extreme market volatility all prices and availability are subejct to change without notice. Work to be scheduled on first come first serve basis acording to approval date*** DescriptionQty Rate Total 5,810.00 5,810.00T 1,280.00 1,280.00T 950 5.90 5,605.00T City Hall Annex 15000 Sq/Ft Sealcoating with Commercial Grade Pavement Sealer. Price includes applying 2 coats of sealer. Includes treating grease, oil or gasoline stains with PetraSeal prior to applying sealer. Includes cleaning parking lot of debris, moss and dirt prior to sealing Re stripe as per existing layout SQ FT Asphalt Remove and Replace Ln Ft Remove and Replace extruded concrete curbing33 53.0303 1,750.00T _____________________________________ The above prices, specifications and conditions are satisfactory and are herby accepted. You are authorized to do the work as specified. 100% Payment is due within 30 days. 1.5% PER MONTH SERVICE CHARGE ON ALL PAST DUE ACCOUNTS. IN THE EVENT LEGAL ACTION IS TAKEN TO COLLECT ANY AMOUNTS DUE, YOU AGREE TO PAY ALL LEGAL FEES & EXPENSES. THIS QUOTATION IS ONLY VALID FOR 10 (10) DAYS. $15,903.95 $1,458.95 EXHIBIT A EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor’s Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers’ Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $1,000,000 general aggregate and a $1,000,000 products-completed operations aggregate limit. 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $2,000,000 per accident. EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor’s insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor’s insurance and shall not contribute with it. 2. The Contractor’s insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor’s Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? INSR ADDL SUBRLTR INSD WVD PRODUCER CONTACTNAME: FAXPHONE(A/C, No):(A/C, No, Ext): E-MAILADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person)$ OWNED SCHEDULED BODILY INJURY (Per accident)$AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH-STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD 3/28/2022 (206) 838-1015 24465 Evergreen Asphalt & Concrete Construction, Inc. PO Box 867 Ravensdale, WA 98051 15377 A 1,000,000 X X CPP 1213195 9/15/2021 9/15/2022 100,000 5,000 1,000,000 2,000,000 2,000,000 X WA Stop Gap 1,000,000 1,000,000B X X CPP1212799 9/15/2021 9/15/2022 Comp ded $1000 Collision ded $1000 2,000,000A UMB1035977 9/15/2021 9/15/2022 2,000,000 10,000 A CPP 1213195 9/15/2021 9/15/2022 1,000,000 1,000,000 1,000,000 Re: City of Kent City Hall, KMP & Riverbend The City of Kent, its officials, employees and volunteers are additional insured for general liability, but only if required by written contract or written agreement and insurance is primary and non contributory per the attached. Waiver of subrogation applies per the attached. City of Kent 220 4th Ave South Kent, WA 98032 EVERASP-02 LBUSCIO Hub International Northwest LLCPO Box 3018Bothell, WA 98041 Laura Buscio laura.buscio@hubinternational.com Western National Assurance Company Western National Mutual Insurance Company X X X X X X X X X X COMMERICAL GENERAL LIABILITY WN GL 39 08 18 WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 1 of 10 COMMERCIAL GENERAL LIABILITY ENHANCEMENT ENDORSEMENT The Commercial General Liability Enhancement Endorsement is an optional endorsement that provides coverage en- hancements. The following is a summary of broadened coverages provided by this endorsement. No coverage is pro- vided by this summary, refer to following endorsement for changes in your policy. SUMMARY OF COVERAGES PAGE Bodily Injury And Property Damage Liability Non Owned Watercraft Up To 50 Feet ............................................................................... 2 Property Damage Liability Elevators.......................................................................................................................... 3 Fire, Lightning, Explosion Or Sprinkler Leakage Exception .................................................. 3 Borrowed Equipment ($25,000 Per Occurrence, $50,000 Aggregate, $2,500 Deductible Per Occurrence ................................................................................. 3 Supplementary Payments Amended Bail Bonds Up To $5,000................................................................................................... 4 Loss of Earnings Up To $500/Day ..................................................................................... 4 Who Is An Insured Amendments Employee Bodily Injury To A Co-Employee......................................................................... 4 Newly Formed Or Acquired Organizations For Up To 180 Days ........................................... 4 Blanket Additional Insured Vendors As Required By Contract ........................................ 4 Blanket Additional Insured Lessor Of Leased Equipment .................................................. 6 Blanket Additional Insured Managers Or Lessors Of Premises .......................................... 6 Blanket Additional Insured State Or Governmental Agency Or Subdivision Or Political Subdivision Permits Or Authorizations ......................................................... 7 Blanket Additional Insured State Or Governmental Agency Or Subdivision Or Political Subdivision Permits Or Authorizations Relating To Premises ........................ 8 Damage To Premises Rented To You $300,000......................................................................... 9 Medical Payments Increased Limit $10,000 Or Amount Shown on Declarations ........................... 9 Conditions Knowledge of Occurrence, Offense, Claim Or Suit Amended ............................................... 9 Unintentional Failure To Disclose Hazards ......................................................................... 9 Waiver of Subrogation..................................................................................................... 10 Insured Contract Amended .......................................................................................................... 10 Personal And Advertising Injury Redefined Televised, Videotaped Or Electronic Publication ............................................................... 10 COMMERCIAL GENERAL LIABILITY WN GL 39 08 18 WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 2 of 10 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY COMMERCIAL GENERAL LIABILITY ENHANCEMENT ENDORSEMENT This endorsement modifies the insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM With respect to the coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. The SECTIONS of the Commercial General Liability Coverage Form identified in this endorsement will be amended as shown below. SECTION I COVERAGES AMENDMENTS COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY A. Non Owned Aircraft Or Watercraft Item 2. Exclusions, Paragraph g. is replaced by the following: g. Aircraft, Auto Or Watercraft the ownership, maintenance, use or entrustment craft owned or operated by or rented or loaned to any This exclusion applies even if the claims against any insured allege negligence or other wrong - doing in the supervision, hiring, employment, training or monitoring of others by that insured, if maintenance, use or entrustment to others of any operated by or rented or loaned to any insured. This exclusion does not apply to: (1) A watercraft while ashore on premises you own or rent; (2) A watercraft you do not own that is: (a) Less than 50 feet long; and (b) Not being used to carry persons or prop - erty for a charge; This Subparagraph (2) applies to any person, who with your expressed or implied consent, either uses or is responsible for the use of the watercraft; (3) is not owned by or rented or loaned to you or the insured; (4)- of aircraft or watercraft; or (5) out of: (a) The operation of machinery or equipment that is attached to, or part of, a land vehicle that would qualify under the not subject to a compulsory or financial responsibility law or other motor vehicle insurance law where it is licensed or principally garaged; or (b) The operation of any of the machinery or equipment listed in Paragraph f. (2) or f. (3)- B. Damage To Property Coverage Extensions Item 2. Exclusions, Paragraph j. is replaced by the following: j. Damage To Property (1) Property you own, rent, or occupy, including any costs or expenses incurred by you, or any other person, organization or entity, for repair, replacement, enhancement, restora - tion or maintenance of such property for any reason, including prevention of injury to a (2) Premises you sell, give away or abandon, if of those premises; WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 3 of 10 (3) Property loaned to you; (4) Personal property in the care, custody or con- trol of the insured; (5) That particular part of real property on which you or any contractors or subcontractors working directly or indirectly on your behalf da (6) That particular part of any property that must be restored, repaired or replaced because Paragraphs (1), (3) and (4) of this exclusion do not fire, lightning, explosion or sprinkler leakage) to premises, including the contents of such premises, rented to you for a period of seven or fewer consecutive days. A separate limit of insurance applies to Damage To Premises Rented To You as described in SECTION III LIMITS OF INSURANCE. However, the provisions of this paragraph do not apply if coverage for Damage To Premises Rented To You is excluded by endorsement. Paragraph (2) of this exclusion does not apply if the rented or held for rental by you. Paragraphs (3) and (4) of this exclusion do not apply to the use of elevators. Paragraphs (3), (4), (5) and (6) of this exclusion do not apply to liability assumed under a sidetrack agreement. Paragraph (4) of this exclusion does not apply to being used to perform operations at the jobsite. Subject to Paragraph 2. of SECTION III LIMITS OF INSURANCE, the rules below fix the most we will pay (1) number of persons or organizations who sustain (2) $50,000 annual aggregate; and (3) We will pay only for damages in excess of $2,500 gardless of the number of persons or organizations who We may, or if required by law, pay all or any part of any deductible amount, if applicable, to effect our payment of a deductible amount, you shall promptly reimburse us for the part of the deductible amount we paid. Paragraph (6) of this exclusion does not apply to -com- borrowed equipment is excess over any other valid and collectible property insurance (including any de- ductible portion thereof) available to the insured whether primary, excess, contingent or on any other basis. C. Damage To Premises Rented To You Item 2. Exclusions, the last paragraph is replaced by the following: Exclusions c. through n. do not apply to damage by fire, lightning, explosion or sprinkler leakage to premises while rented to you or temporarily occupied by you with permission of the owner. A separate limit of insurance applies to this coverage as described in Paragraph 6. of SECTION III LIMITS OF INSURANCE. COVERAGE B PERSONAL AND ADVERTISING INJURY LIABILITY D. Personal And Advertising Injury Item 2. Exclusions is amended by replacing Sub- paragraphs b. and c. with the following: b. Material Published With Knowledge Of Falsity oral, written, televised, videotaped or electronic publication, in any manner, of material, if done by or at the direction of the insured with knowledge of its falsity. c. Material Published Prior To Policy Period oral, written, televised, videotaped or electronic publication, in any manner, of material whose first publication took place before the beginning of the policy period. SUPPLEMENTARY PAYMENTS COVERAGES A AND B E. Supplementary Payments Coverages A and B Item 1. is amended by replacing Subparagraphs b. and d. with the following: b. Up to $5,000 for cost of bail bonds required be- cause of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or of earnings up to $500 a day because of time off from work. WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 4 of 10 SECTION II WHO IS AN INSURED AMENDMENTS A. Employee Bodily Injury To A Co-Employee Paragraph 2. a. (1) is replaced by the following: However, none of these (a) To you, to your partners or members (if you are a partnership or joint venture), to your members (if you are a limited liability company), to a co- employment or performing duties related to the conduct of your business, or to your other related to the conduct of your business; (b) To the spouse, child, parent, brother or sister of the co- consequence of Paragraph (1)(a) above; (c) For which there is any obligation to share damages with or repay someone else who must pay damages because of the injury described in Paragraph (1)(a) or (b) above; or (d) Arising out of his or her providing or failing to provide professional health care services. - and in the course of the co- related to the conduct of your business, or a suit seeking damages brought by the spouse, child, parent, brother or sister of the co- - the reasonable costs that you incur in providing a defense to the co- against such matters. Any reimbursement made pursuant to this sub-section will be in addition to the limits of liability set forth in the Declarations. B. Newly Acquired Organizations Paragraph 3.a . is replaced by the following: a. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier; The following are added: C. Blanket Additional Insured Vendors As Re- quired By Contract 1. Section II Who Is An Insured is amended to include as an additional insured any person(s) or organization(s) (referred to throughout this endorsement as vendor) with whom you have agreed in a written contract, executed prior to loss, to name as an additional insured, but only with respect to "bodily injury" or "property damage" arising out of "your products" which are distributed or sold in the regular course of the vendor's business. However, a. The insurance afforded to such vendor only applies to the extent permitted by law; and b. If coverage provided to the vendor is required by a contract or agreement, the insurance afforded to such vendor will not be broader than that which you are required by the contract or agreement to provide for such vendor. 2. With respect to the insurance afforded to these vendors, the following additional exclusions apply: a. The insurance afforded the vendor does not apply to: (1) "Bodily injury" or "property damage" for which the vendor is obligated to pay dam- ages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement; (2) Any express warranty unauthorized by you; (3) Any physical or chemical change in the product made intentionally by the vendor; (4) Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container; WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 5 of 10 (5) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; (6) Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; (7) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or (8) "Bodily injury or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: (i) The exceptions contained in Subparagraphs (4) or (6);or (ii) Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. 3. This Provision C. does not apply: a. To any insured person or organization from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products; b. To any vendor for which coverage as an addi - tional insured specifically is scheduled by endorsement; or c. When liability included within the "products- completed operations hazard" has been ex- cluded for such product either by the provi - sions of the coverage part or by endors e- ment. 4. With respect to the insurance afforded to these vendors, the following is added to Section III Limits Of Insurance: If coverage provided to the vendor is required by a contract or agreement, the most we will pay on behalf of the vendor is: a. The minimum amount required by the contract or agreement; or b. The Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. 5. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to: a. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys , field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against an additional insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the offense whic rendering of or failure to render any professional services by you with respect to your providing engineering, architectural or surveying services in your capacity as an engineer, architect or surveyor. WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 6 of 10 D. Blanket Additional Insured Lessor Of Leased Equipment 1. Section II Who Is An Insured is amended to include as an additional insured any person(s) or organization(s) from whom you lease equipment when you and such person(s) or organization(s) have agreed in writing in a contract or agreement, executed prior to loss, that such person(s) or organization(s) be added as an additional insured on your policy. Such person(s) or organization(s) is an insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). However, the insurance afforded to such additional insured: a. Only applies to the extent permitted by law; and b. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. A person's or organization's status as an addi - tional insured under this endorsement ends when their contract or agreement with you for such leased equipment ends. 2. With respect to the insurance afforded to these additional insureds, this insurance does not apply to any "occurrence" which takes place after the equipment lease expires. 3. With respect to the insurance afforded to these additional insureds, the following is added to Section III Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is: a. The minimum amount required by the contract or agreement; or b. The Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. 4. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to: a. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys , field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against an additional insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the involved the rendering of or failure to render any professional services by you with respect to your providing engineering, architectural or surveying services in your capacity as an engineer, architect or surveyor. E. Blanket Additional Insured Managers Or Les- sors Of Premises 1. Section II Who Is An Insured is amended to include as an additional insured any person(s) or organization(s) with whom you have agreed in a written contract, executed prior to loss, to name as an additional insured, but only with respect to liability arising out of the ownership, maintenance or use of that part of the premises leased to you, subject to the following additional exclusions: This insurance does not apply to: a. Any "occurrence" which takes place after you cease to be a tenant in that premises. b. Structural alterations, new construction or demolition operations performed by or on behalf of such additional insured. WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 7 of 10 However: a. The insurance afforded to such additional insured only applies to the extent permitted by law; and b. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. 2. With respect to the insurance afforded to these additional insureds, the following is added to Section III Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is: a. The minimum amount required by the contract or agreement; or b. The Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. 3. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to: a. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys , field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against an additional insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the involved the rendering of or failure to render any professional services by you with respect to your providing engineering, architectural or surveying services in your capacity as an engineer, architect or surveyor. F. Blanket Additional Insured State Or Governmental Agency Or Subdivision Or Political Subdivision Permits Or Authorizations Section II Who Is An Insured is amended to in- clude as an additional insured any state or governmental agency or subdivision or political subdivision with whom you have agreed in a written contract, executed prior to loss, to name as an additional insured, subject to the following provisions : 1. This insurance applies only with respect to op- erations performed by you or on your behalf for which the state or governmental agency or sub- division or political subdivision has issued a permit or authorization. However: a. The insurance afforded to such additional insured only applies to the extent permitted by law; and b. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. 2. This insurance does not apply to: a. "Bodily injury", "property damage" or "per- sonal and advertising injury" arising out of op- erations performed for the federal govern - ment, state or municipality; or b. "Bodily injury" or "property damage" included within the "products-completed operations hazard". 3. With respect to the insurance afforded to these additional insureds, the following is added to Section III Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is: a. The minimum amount required by the contract or agreement; or b. The Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 8 of 10 4. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to: a. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys , field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against an additional insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the involved the rendering of or failure to render any professional services by you with respect to your providing engineering, architectural or surveying services in your capacity as an engineer, architect or surveyor. G. Blanket Additional Insured State Or Governmental Agency Or Subdivision Or Political Subdivision Permits Or Authorizations Relating To Premises Section II Who Is An Insured is amended to in- clude as an additional insured any state or governmental agency or subdivision or political subdivision with whom you have agreed in a written contract, executed prior to loss, to name as an additional insured, subject to the following provision: 1. This insurance applies only with respect to the fol- lowing hazards for which the state or governmental agency or subdivision or political subdivision has issued a permit or authorization in connection with premises you own, rent or control and to which this insurance applies: a. The existence, maintenance, repair, construction, erection or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoist away openings, sidewalk vaults, street banners or decorations and similar exposures; or b. The construction, erection or removal of elevators; or c. The ownership, maintenance or use of any elevators covered by this insurance. However, a. The insurance afforded to such additional insured only applies to the extent permitted by law; and b. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. 2. With respect to the insurance afforded to these additional insureds, the following is added to Section III Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is: a. The minimum amount required by the contract or agreement; or b. The Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. 3. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to: a. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys , field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 9 of 10 This exclusion applies even if the claims against an additional insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the involved the rendering of or failure to render any professional services by you with respect to your providing engineering, architectural or surveying services in your capacity as an engineer, architect or surveyor. SECTION III LIMITS OF INSURANCE AMENDMENTS A. Damage To Premises Rented To You Paragraph 6. is replaced by the following: 6. Subject to Paragraph 5. above, the most we will pay under Coverage A for damages because of rented to you, or in the case of damage by fire, lightning, explosion or sprinkler leakage, while rented to you or temporarily occupied by you with permission of the owner is the greater of: a. $300,000; or b. The amount shown next to the Damage To Premises Rented To You Limit in the Decla- rations. However, the provisions of this paragraph do not apply if Damage To Premises Rented To You Coverage is excluded by endorsement. B. Medical Expense Limit Paragraph 7. is replaced with the following: 7. Subject to Paragraph 5. above, the most we will pay under Coverage C for all medical expenses person is the greater of: a. $10,000; or b. The amount shown next to the Medical Ex- pense Limit in the Declarations. This insurance does not apply if coverage for Medical Expenses is excluded either by the pro - visions of the coverage part or by endorsement. SECTION IV COMMERCIAL GENERAL LIABILITY CONDITIONS AMENDMENTS A. Knowledge Of Occurrence Item 2. Duties In The Event Of Occurrence, Of- fense, Claim or Suit is amended by adding the fol- lowing: e. You must give us or our authorized representa- known to: (1) You, if you are an individual; (2) A partner, if you are a partnership; (3) An executive officer or insurance manager, if you are a corporation; or (4) A member or manager, if you are a limited liability company. B. Other Insurance Item 4. Other Insurance, b. Excess Insurance (1) (a) (ii) is replaced by the following: (ii) That is fire, lightning, explosion or sprinkler leak- age insurance for premises rented to you or temporarily occupied by you with permission of the owner; C. Unintentional Failure To Disclose Hazards Item 6. Representations is replaced by the following: 6. Representations And Unintentional Failure To Disclose Hazards a. By accepting this policy, you agree: (1) The statements in the Declarations are accurate and complete; (2) Those statements are based upon repre - sentations you made to us; and (3) We have issued this policy in reliance upon your representations. b. If you unintentionally fail to disclose any haz- ards existing at the inception date of your policy, we will not deny coverage under this Coverage Part because of such failure. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or non-renewal. WN GL 39 08 18 Includes copyrighted material of the Insurance Service Office, Inc., with its permission. Page 10 of 10 D. Waiver of Subrogation Item 8. Transfer of Rights of Recovery Against Others to Us is hereby amended by the addition of the following: We waive any right of recovery we may have because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a written contract, executed prior to loss, requiring such waiver with that person or organization and included in the "products-completed operations hazard". However, our rights may only be waived prior to the "occurrence" giving rise to the injury or damage for which we make payment under this Coverage Part. The insured must do nothing after a loss to impair our rights. At our request, the insured will bring "suit" or transfer those rights to us and help us enforce those rights. SECTION V DEFINITIONS AMENDMENTS A. Insured Contract Amended Paragraph 9. a. is replaced by the following: a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion or sprinkler leakage to premises while rented to you or temporarily occupied by you with permission of B. Personal And Advertising Injury Redefined Paragraph 14. d. and e . are replaced by the following: d. Oral, written, televised, videotaped or electronic publication of material that slanders or libels a e. Oral, written, televised, videotaped or electronic publication of material that right of privacy; COMMERCIAL GENERAL LIABILITY WN GL 139 06 18 WN GL 139 06 18 Page 1 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. ADDITIONAL INSURED CONTRACTORS OPERATIONS AND COMPLETED OPERATIONS WITH ADDITIONAL INSURED REQUIREMENT IN CONSTRUCTION CONTRACT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART 1. Additional Insured Operations A. Section II Who Is An Insured is amended to include as an additional insured: (1) Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and (2) Any other person or organization you are required to add as an additional insured under the contract or agreement de- scribed in Paragraph 1. above. Such person(s) or organization(s) is an add- tional insured only with respect to liability for "bodily injury", "property damage" or "per- sonal and advertising injury" caused, in whole or in part, by: a. Your acts or omissions; or b. The acts or omissions of those acting on your behalf; in the performance of your ongoing opera- tions for the additional insured. B . With respect to Additional Insured - Opera- tions, coverage is limited as follows: This insuran bodily in- j (1) All work, including materials, parts or equipment furnished in connection with such work, on the project (other than ser- vice, maintenance or repairs) to be per- formed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or (2) the injury or damage arises has been put to its intended use by any person or or- ganization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. 2. Additional Insured Completed Operations A. Section II Who Is An Insured is amended to include as an additional insured: (1) Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and (2) Any other person or organization you are required to add as an additional insured under the contract or agreement de- scribed in Paragraph 1. above. Such person(s) or organization(s) is an addi- tional insured only with respect to liability for "bodily injury", "property damage" or "per- sonal and advertising injury" caused, in whole or in part, by: a. Your acts or omissions; or b. The acts or omissions of those acting on your behalf; and included -completed op- WN GL 139 06 18 Page 2 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. B. With respect to Additional Insured Com- pleted Operations ,coverage is limited as fol- lows: (1) sured under Additional Insured Com- pleted Operations continues only for the period of time required by any written con- tract or agreement. (2) The insurance provided to the additional for which a consolidated (wrap-up) insur- ance program has been provided by the prime contractor-project manager or owner of the construction project in which you are involved. 3. Primary and Noncontributory The following is added to the Other Insurance Condition and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek con- tribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured un- der such other insurance; and (2) You have agreed in writing in a contract or agreement that this insurance would be pri- mary and would not seek contribution from any other insurance available to the additional insured. 4. Other Provisions Applicable to Additional In- sured Operations and Additional Insured Completed Operations A. The Amendment of Insured Contract Defini- tion (Endorsement CG 24 26) does not apply to an additional insured. B. The coverage provided under Paragraph f. of Sec- tion V Definitions does not apply to an ad- ditional insured under this endorsement un- less required by a written contract or agreement. C. The insurance afforded to such additional in- sured only applies to the extent permitted by law; and If coverage provided to the additional insured is required by a contract or agreement, the in- surance afforded to such additional insured will not be broader than that which you are re- quired by the contract or agreement to provide for such additional insured. D. With respect to the insurance afforded to these additional insureds, the following is added to Section III Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is: (1) The minimum amount required by the contract or agreement; or (2) The Limits of Insurance shown in the Dec- larations; whichever is less. This endorsement shall not increase the ap- plicable Limits of Insurance shown in the Dec- larations. E. With respect to the insurance afforded to these additional insureds, the following addi- tional exclusion applies: This insurance does not apply to: "Bodily injury", "property damage" or "per- sonal and advertising injury" arising out of the rendering of, or the failure to render, any pro- fessional architectural, engineering or survey- ing services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop draw- ings, opinions, reports, surveys, field or- ders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against an additional insured allege negli- gence or other wrongdoing in the supervision, hiring, employment, training or monitoring of rendering of or failure to render any profes- sional services by you with respect to your providing engineering, architectural or survey- ing services in your capacity as an engineer, architect or surveyor. J J LL LL W a U F 0 a wi W a W J a O O A t" N N 0 N a a U O 914 0 w a w O U O H Q U) U) w Z Fn- in m W "W ' 'Od L U >. >. C 8 O N C N W"' W O m N C C d n-p arTo° = E J Q o >. p c C O N C N L L N C 3 TJ o d a N (Cpa C 2)N �.c W> 2 O Of d WaiO cd m'o ycU� t 7 W w C> .._T. (OjOd �M-==_O ,n-yL-'c C U W o N~ W E ° U W O W O) O C 3 W O La U) v OL c�oa oa°o"=p5 O 9 Wn N 3 d C O m d Old N C W O as T N T E ` N E d C C m M 0 n�� n n 0 n C 0 .L.. W U a r0y_ too O y y d d m d c o-.p T O E E Qoaci10 cad a-'_ 0.J V T.N.. y N .p O C y N 3 N d y C D N W O fn O N 75 fl. L U W O 7 t� C Q m 12 N W d E a O o C O C `5 C> d 3 y jF d a dW is WU o'N Amy yco > nm Lu d N u'i d U N� °aai 10w d us to _ O - W yj s 0 w G {Np =p Ol g U Y Z a OQ BE OL>u �aat acdo a.d.,dL Ma d w0 x E"S a^ J 1 fn U W W S U 16 d J J 7 iO O N 'O C C W O d 0. a J'� O j .• d '- 3 L m m C > O O d d_ J O C d `O-' d 0 y :E J J Q 'u0'! ?o TL M OO °U 00 WON 0TU° x N Cy '0 O Q Oy M. L 10a c ca ow O 0dn j Q �� NL 0 W "6 r W 'O W to ._ N L> O a a .-y. 3 C W N o 0 3: W O' O) (5 `1 '6 L.. = O C E 0 2 O E > o 0 0= a� O tyil W~ >LL,`d aE y�acLo 3cQ >.wL �,dd >.N� a.=c0iE TR5 55 > Z 0> N O O° O 3 `= C W L O°~ n n C W G O 3 N y .p J O W ci N T E N E O>` d :-� °- L d C (p W a U a d U° d C G� O O y N> d C d J p V W~0 a) L N O o L O j C V >> J C! W .o. !0 O '� _ Z. N O U W a 0 !. (a d d N W 3 C N d C N W C to L n O C od T CE LO T E py .r. T N6. OO �6Z U . E QT 3 �O Lu U0 QO> Q UE0 E.L L WO W ULL, ai> w W O in U a W Q7 7 N N N N N M u M V u M M V N N M LL d N 0) W 0 W O v LL 0 Ca CC G y N d J C a n d d d U N C E2 E O O N N d d d ¢ q - O O W U a p y 0 J N m E U p N o 0 o > o m y d E a d 3 U E (Tp N N n > a d H U O. N N d C W wt0 a LL, U 3 d ``C E W m N C W d E ° m _� W m d m 4 a T W Q N C N a C d O No C n• • C C N W U W )i 2 Y J d K (A H D N W d+� U [S d d W L C d O) d d >, d LC _ a O`0 m W 1m Aai C� p� noocoi W N O j m 0 Cp N OO iOOO U` VO m L a O d > 8'UJL Of > W yUw. m 2 2 zu �U coQP c am O:s > .oaod E ❑> a hoc 0 �o ya' A 4 0 ; OE >, c a U oaf >dm« T J a d O d d N❑ 0« N E Q N X N O J d U Q N C y❑ C U y d a O) N m d a m n V (� y d d m d d m m O N >_ m 9 m C L_ y d N O O Ol N 0'mO C O a« a d Ol S a O Q O N N 0. N J N N y e= C 0 3 T C N Q m c a^,oP2 W E >> >>> 0 =0 O 0 >0 a>i10dEm m _ U Z J Cd DL NO d aC dOO NO pU Cc y y O U y M. = O LU Ld 0<n 0 avwi¢� U EFU a'ai�w�o c� _ d O_ a z a as t c d y a LD 0 0 o `¢ a o nm d n ai N 2 d U N .2y> .y E y C C C N m O. L m C UOj > x N= nXL r75m O a 3 y N N O wo> c0� my `mm m >E owNm 0Z IL d d U) d 0 0❑ 2 U3 C L d C d a W O C m O N C f0 Qm d N mU U idn= L Ed n « N m aatom �.>��-E>� ` E W >i d T y „d„ +m-' d > O C y« 9 0 Y C O Y O p- 3 O->a dLrY yNNO Cd2--'m d2 N m X _'0�a w f, O r d ... 2 d L d w m n 5 d d 0- U O) d a M J « J m � a M 15 dT�mMOOmU L= NCyC m2 O rO >, O _ N C U E d O O aA O3 C Q a m y d o a J C U N d O n C C a E d d H Y Um dO �-O�na TV dO0 dd N�a �N� mC m d f/1 C m ad T� C OL aw C=^ Ol - 9 ,- m- _ Y da 3 �0 a GEf 2 E 3 m 0 C-C y,r �N >z �G-�'QL 3 � n� 0 y nm 5,t0 Vi 5 E OM. d i a y E 1 n m a d 0 C O a Ol _n « d m C d� j� E "m6 m -0 'm0 T 9 o ai m d m a`i m m' � m y o y c« c ca-.`�° c o.Q-.`�° r0i 0-3 z 2cm N»<n z2 m Un9 �wnn w ma0 , �a`d _ O > c w O m H O Q' « a3 a ti 0 W U LL' VJQ m LL y 0w 10 O m E-m I Q NL_ m J «dp 'o 0rncoi`�=W aEi� E m y.0. LNL CyO 41 zC aOoE t0 cog O 2 m 0 m nm C ` I-, W Om R_ U OyS >> >ULU Uomod�LU a «moQ m Nc��N ` y d C ryw m yr' Oa N Z j O« 3 0 N 'O Q i y a ,0 N a N y N O >i d a 3 Q O Y L C O d` C - d ... X`❑ U O U 60 d >n,.Ld. d � J V N 2 3 G-OID«L d 2 O L J G> L d iA }> O] > 3 Of O O p) O) J m S O Z 2_ > O N a N ll U Ol-m0 C y 3 O O as2 m y KQd :c� Q K� m0�f040 00i�>a J �..o w O7 N d d z w p d C 0 _ E L d d d .0 d N C V E L O « Ow N U ,Z'-' r2 Y 0. O O d d U C N U w O) - m 3 p> (ODo « c n y O 3 E 0 m Q ❑ Lu NV L V5N�d>'3 C>y wO TU0 20) V«L a I O L N <ao� O O l0 d 0 E R L d O d T an d - a 0 T 41 .. uyi� 2v m adc�❑_�° wed �0Qa 'E°c0i E->0 Lao° E 0 Eyo�0o« mm� ad f0 ❑d md�'o o�� Q m O U U .G C C T N N�¢ 0 d w 01 U0ow a U O d U .S q U N A O a u d;�oc c0 d0 T da�Nc Lc c m00m N❑o 3 y0=« a d}� W m '- a yc a m mda Ym V>_ d T M 6 mn 'L-' X y an>0... am ' m V a w `m «wa`_ c � d f 2, - 1 OI S U' C- oa Cj LL a 3 `1 d S E r iN C y �' C d O N T a 3 m J d 0 0 O V O O d d= > N O¢ O L �' > w Cmo y O d« y a d oc m0 Eo`3 0 y -0�«�� a0 V y> d0�0� a a =m-TaO� n ` S m E d j y M a. d 0 Z d d N a O a fA a Lom H a w a n 2 d d U N N d V d J >c-0 Q d�°> '0oc x a 2-a CJ0 , w E Om.s �wUU> w (7 y¢Od zw� 2 fnQ vi o ui N 'I CCCOLt0-ccLaL W wyN0 y WOdyOj Wy T O m d d U« S ... m ... �:i O` Vi O :� Vi O" A 0 a `O O y m0 U O Q T.� O d C E W S H C T O 9 J N t>,0 E E2 d o _ d « Q E � 5 0 o y° > 3 0° > d> o 0 m > d a > 0 0 m J OW 0 Ea O"a10* OaO.L. NC` U Uy 3 O° `o'�°m E LLJ w 'O'o 70 mmt9TEcm U 1o�ao as°d c�>ma-Tm00' �L..¢a ooa❑m UMQy m gMw'2E QxamEmd Qif O W Ga' GSZ 0 2dQ Lu 302M> E 110. U0d>o � y KEYd'0r 0E0E Uon w a = in S U OC y _ �U O >Iam msdwO'yy =WavcaE anT T , ma00 R> 00 !O W 2ntd 0W6o l =rny E_)E 0 y- m xO dm cLLj :Ez 0.9 EOn�a mo Lrnw mdUo> mm0>0E9,-.>aymo vW n 82 >Oc Q i Lu 0«Uonoy`� LLJ W aWw co� 0) Il F. uid�0 H«« W O M Q Q m U N O a U z m A a U z m L a C c 0 m U 0) L O ° O L 00 11 d 0 C N'OaM z M Hy Ou Loaz zip ONO C U 3 L j N Z C 9 S O t0 c O y Z U o O L L an d 2 d a �j O W O C C y l0 a 0 0 C .+L_• d N .L... C 0 3 d Or O t�0 E d C C 0 V C d -6 °> O '- l0 T L VI Q O E Ord-• V O— a O 0 U N W w C C N W d T Zcd LaEi °E�3ii �`° VJc�t • �02 a mncoaoi c$-cy U).2m d'dd Q 7—d d d= mL d ca IL m= LL O C O- N a m a a JO N > > j, W y G C .0 d N I C tO10 C OO y d 3 N 0 0 1 0 N 2 �U d C U U Q3 E y 1 EL `d ozUc°'cm83m •cp— C rL„ d adz a23oQa°Q°on° T2 TE O` `o pc 3m—yd TO`d o3 0 n m Uc'�o •C d — Nyn-rn T._ y N d a0cm LL E w d a w d1 V' N w w N :E -w N w W (D s U 0 Z O Q O a O N C E L Q o m N L d N O L O p f y. Z d E - ywo uiwa E�moS~m .> w— d�O 'N O y ya d O w N ZL'd0 C n N O cc` o N` O� z U•q V Z d f0 d C 3 C d ; m C, d C 0 ci O H d L... n 0 V N Z 0 N U 'C U d_ U O d Op H O c d U C N O c y N T C O y U y m U 0 L C d O. 3 O e m p 0_ N` j N 7 Q Cf W' d d 0 J 'c C C d U U C=, YO- U N a a J y3 2 � n `o `o m oot rnaHi� �cdmca d� ca3 y US o 0 Lu ° c d o m man Tya �a�d O` yLU O Z N •7 N d tC m E T O O d U) ? O d o o j� O. d > > m W N ai 'Q 7 N C n 3 0 o c O O. O N d _N >, a ._ °. w d m 0 0 N d y C T �r 'C E C L wa moE'310�Mw>o o-own moc'3 �a �onyco� 005 E �y au d •� laae d. VJ He>`oUo zo«d'aY Od cc d yew ow �oZy c° w Q O U m 8 axi`m 3 0 ° E a o° d c V d d m 2 K o d m N .p i Q Q T Q— t) �> O O w H Z Q J 0 U N y J Q ta0 H y .r. N. .M.., a. - m F-• N � w V a d 0] C m N J S N 2 L N N G O i0 'd0 Uw w 22 w a a au A a U z 4114122,9:50 AM about:blank State of Washington Department of Labor & lndustries Prevaiting Wage Section - Tetephone 360-902-5335 PO Box 44540, Olympia, WA 98504'4540 Washington State Prevailing Wage The PREVAILING WAGES tisted here inctude both the hourly wage rate and the hourty rate of fringe benefits. On pubtic works projects, worker's wage and benefit rates must add to not less than this totat. A brief description of overtime catcutation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 0311812022 :County rKing King King tKing King King King King King Trade Asbestos Abatement Workers Boilermakers Brick Mason ,Brick Mason : Buitding Service Emplsyees Bui ldi ng Service Emp&yees Building Service Emp&yees Bui lding Service Empfsyeeg Cabinet Makers (ln Shop-). carpsnlers CarpenlgfE CarpenlEggg Eafpenters CafpSnters Carpenters Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement.Masons Cement Masons Cement MAsgns Cement Masons Cement Masons Job Classification W"ge Holiday Overtime Note *Risk Class View View View View View View View View View View , View King King King King King King King King Journey Level Journey Level Journey Level Pointe r- Cau Iker-Cleaner Janitor Traveti ng Waxer/ Shampooer Window Cteaner (Non-Scaffotd) Window Cteaner (Scaffotd) Journey Level :Acousticat Worker Bridge, Dock And Wharf Carpenters Carpenter Floor Finisher Floor Layer Scaffotd Erector ;Application of atl Composition Mastic Apptication of att Epoxy Material Apptication of all Plastic MateriaI ' Apptication of Seating Compound Application of Undertayment Buitding GeneraI Composition or Katman Floors Concrete Paving Curb & Gutter Machine Curb & Gutter, Sidewatks Curing Concrete 554.62 5p 572.54 sN 563.32 7E s63.32 7E 527.23 sS 527.68 55 531.18 sS s32.18 sS 522.74 568.19 15J 568.19 1sJ 568.19 15J s68.19 15J 568.19 15J s68.1 9 1 5J 567.41 15J s66.91 1sJ 567.41 1sJ s66.91 15J 567.41 15J s66.91 1sJ s67.41 15J 566.91 1sJ 567.41 15J 566.e1 151 s66.91 15J 1H 1C 1N 1N 2F 2F 2F 2F L 4C 4C 4C 4C 4C 4C 4U 4U 4U 4U 4U 4U 4U 4U 4U 4U 4U View ry View View View View View View View View View View View King King King King King View View Cement MasonsKing King King King about:blank 1117 4l'14122,9:50 AM King King King King King King King King King King King King King King King King ,King lKing King ,King King Cement Masons Cement Masons Cement Masons tCement Masons Cement Masons Cement Masons rCement Masons Cement Masons Cement Masons Cement Ma$ons Cement Masons ,Cement Masons 'Cement Masons :Cement Masons Cement Masons Cement Masons ,Cement Masons Cement Masons Divers & Tenders Divers & Tenders :Divers & Tenders Divers & Tenders Divers & Tenders Divers & Tenders Divers & Tenders 'Dredge Workers Dredge Workers Dredge Workers ,Dredge Workers Dredge Workers Dredge Workers Dredge Workers DrreMPPicator l)rytuall-Iapers Workers Etectricians - lnside Etectricians - lnside Electricians - lnside ,Etectricians - lnside about:blank Finish Cotored Concrete Ftoor Grinding Ftoor Grinding/ Potisher Green Concrete Saw, self- powered Grouting of atl Ptates Grouting of att Titt-up Panels Gunite Nozzleman Hand Powered Grinder Journey Level Patching Concrete Pneumatic Power Toots ,Power Chipping & Brushing Sand Btasting Architectural Finish Screed & Rodding Machine Spackting or Skim Coat Concrete : Troweting Machine Operator Troweling Machine Operator on Cotored Stabs Tunnel Workers Bett/Vehicte or Submersible Operator (Not Under Pressure) Diver rDiver On Standby Diver Tender ,Manifotd Operator rManifold Operator Mixed Gas Remote Operated Vehicte Operator/Technician Remote Operated Vehicle Tender Assistant Engineer ,Assistant Mate (Deckhand) Boatmen Engineer Welder Leverman, Hydrautic Mates Oiter ,Journey Level Journey Level Journey Level :Cabte Spticer Cabte Spticer (tunnet) Certified Wetder Certified Welder (tunnet) 567.41 15J 567.41 1sJ 566.91 15J s67.41 15J s66.91 566.e1 s67.41 567.41 s66.e1 s66.e1 567.41 567.41 567.41 15J 15J 15J 15J 15J 15J 15J 15J 15J King King King King 567.41 l5l 566.91 1sJ 567.41 15J 567.41 15J s67.41 1sJ 5122.46 1sJ 5122.49 581.04 s73.60 s73.60 578.60 s73.60 15J 15J 15J 15J 15J 15J 15J 5D 5D 5D 5D 5D 5D 5D 15J 5P 5L 7C 7C 7C 7C King King Divers & Tenders Electrical Fixture Maintenance King King King King King King King King King King s68.64 s73.62 573.0s 573.62 57s.03 $76.s3 s73.62 573.0s 568.1 e 567.91 s3s.1 9 s97.21 5104.49 s93.91 s100.86 King King King about:blank 2t17 View View View Ury View View View View View View View rery View View View View View View View View View View View View View View View 8V 4114122,9:50 AM King Etectricians - lnside rKing Etectricians - lnside King Etectricians - lnside King :Etectricians - Motor Shop- :King Electricians - Powerline about:blank Construction Stock Person Journey Level Journey Level (tunnet) Journey Level Cabte Spticer Journey Level Mechanic Mechanic ln Charge At[ Classifications - ln-Factory Work Only Fence Erector Fence Laborer Journey Level Journey Level Journey Level Journey Level Journey Level Journey Level Boat Operator Cook Deckhand Deckhand Engineer Launch Operator Mate Cteaner Operator, Foamer Operator Grout Truck Operator King ,King King 'King King King .Xing King King King King KinB King King King King King King King King , King King King King King King King Construction Etectricians - Powerline :Construction Etectricians - Powertine Construction Etectricians - Powertine Construction Electricians - Powerline Constructiqn Etectricians - Powerline ConstrUction Etectricians - Powerline Construction Etectricians - Powertine Construction :Etectricians - Powertine Construction Electronic Technicians Elevator Constructors Etevator Constructors , Fabricated Precast Concrete Products ,Fence Erectors Fence Erectors Ftaggers Glaziers Heat & Frost lnsulators And Asbestos Workers Heating Equipme$l$echanics :Hod Carriers & Mason Tenders lndustrial Power Vacuum ,Cteaner ,lntand Boatmen lntand Boatmen lntand Boatmen :lntand Boatmen lntand,Boatmen lntand BoAtmen I nspection /Cteanjng/Seating Of ,Sewer & Water Systems-By , Remote Control I nspselion/Cteanj-ng / Seating Of Sewer & Water Syslems By Remote Controt I nspection / Cteaning/ Seating Of Certified Line Wetder s81.6s 5A Groundperson 552.91 5A Heavy Line Equipment Operator Journey Level Lineperson s81.65 sA s81.6s 5A Line Equipment Operator 570.02 5A Meter lnstatter ss2.91 sA Pote Sprayer 581.6s 54 Powderperson 560.75 5A 547.03 7C s90.59 7C 597.21 7C s48.68 sA s88.89 sA s59.10 7E $103.81 7p 5112.09 7p s18.25 sB s46.29 15J s46.29 1sJ 546.29 15J 572.41 7L s82.02 1sH se1.83 557.31 514.49 561.41 556.48 ss7.48 558.81 s58.8e 557.31 531.49 4E E 4E 1B 4D 4D 4D 4D 4D 4D 4D 4D 4D 1E 4A 4A 1R 4V 4V 4V 1Y 11C 1E 4V L 1K 1K 1K 1K 1K 1K 1 View View View View View View View View View W. 8W View View View View View View 8Y View 8Y View 8Y View View View View View View View View View View View 7F 15J 5B 5B 5B 5B 5B 5B View View View View 1 L 514.49King King about:blank Head Operator 524.e1 View 3117 4114122,9:50 AM Sewer & Water Systen5 Jy Remote Control King King I nspection /Cteaning/Seating Of Technician iSewer & Water Systems By Remote Control lnspection/Cteanjng/Seating Of Tv Truck Operator ,Sewer & Water Splems By ,Remote Control I nsulation Appticators lronwgrkers Laborers Laborers Laborers Laborers ,l==M Laborers Laborers 'Laborers Laborers Laborers :Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers about:blank Journey Level Journeyman Air, Gas Or Electric Vibrating Screed Airtrac Drit[ Operator Battast Regular Machine Batch Weighman Brick Pavers Brush Cutter Brush Hog Feeder Burner Caisson Worker Carpenter Tender Cement Dumper-paving Cement Finisher Tender Change House Or Dry Shack Chipping Gun (30 Lbs. And Over) Chipping Gun (Under 30 Lbs.) Choker Setter Chuck Tender Ctary Power Spreader 'ctean-up Laborer Concrete Dumper/Chute Operator Concrete Form Stripper ,Concrete Ptacement Crew Concrete Saw Operator/Core rDri[[er Crusher Feeder ,Curlng Laborer Demotition: Wrecking & Moving (lnct. Charred Materiat) Ditch Digger Diver Drit[ Operator (Hydrautic, Diamond) Dry Stack Walts Dump Person 'Epoxy Technician Erosion Control Worker s19.33 s20.4s 568.19 1sJ s80.28 7N 554.62 1sJ View View L 1 King King King s46.29 15J s54.62 151 5s4.62 15J 554.62 15J s56.31 1 sJ 555.62 1 5J ss4.62 15J 5s4.62 15J 554.62 1sJ 554.62 1sJ View View View View View View View View View View View View View View View View View 4117 King King King King King King .King King King King King King King King King King King ss6.31 554.62 546.29 554.62 554.62 554.62 s54.62 5s6.31 s54.62' ss5.62 554.62 554.62 sss.62 5s4.62 554.62 554.62 s5s.62 554.62 555.62 554.62 55s.62 15J 15J 151 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 151 15J 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y King King King King King King King King King King King King King King King : l Laborers ,Laborers :Laborers Laborers Laborers Laborers Laborers Laborers Laborers 'Laborers about:blank 4114122,9:50 AM King King King King King Laborers Laborers Labgrers Labor:ers Laborers Labofers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers Laborers ,Laborers Laborers rLaborers Laborers Laborers Laborgr,s :Laborers Laborers iLaborers Laborers ,Laborers Laborgrs ,Laborers ,Laborers ,Laborers Laborers Laborers Laborers Laborers Laborers Laborers King Laborers ,King lKing ,King ,King King , King lKing , King King King King King King King King 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y 8Y King 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V N) 4V 4)1, 4V King King King King King King King King King King King King King King King King King about:blank :Fatler & Bucker Chain Saw Fine Graders Firewatch Form Setter Gabian Basket Builders GeneraI Laborer Grade Checker & Transit Person Grinders Grout Machine Tender Groutmen (Pressure) lnctuding Post Tension Beams GuardraiI Erector Hazardous Waste Worker (Level A) Hazardous Waste Worker (Levet B) Hazardous Waste Worker (Levet c) High Scaler Jackhammer ,Laserbeam Operator Maintenance Person rManhote Builder-Mudman Material Yard Person , Motorman- Dinky Locomotive nozzteman (concrete pump, green cutter when using combination of high pressure air & water on concrete & rock, sandbtast, gunite, shotcrete, water btaster, vacuum blaster) Pavement Breaker Pitot Car Pipe Layer (Lead) Pipe Layer/Taitor Pipe Pot Tender Pipe Retiner Pipe Wrapper Pot Tender ,Powderman Powderman's Helper Power Jacks Railroad Spike Putter - Power Raker - Asphatt Re-timberman Remote Equipment Operator Rigger/SignaI Person Rip Rap Person 5s5.62 1 sJ 554.62 1sJ 546.29 15J s54.62 15J 554.62 1sJ 554.62 15J 5s7.31 1 sJ 554.62 15J 554.62 15J sss.62 1 5J 554.62 1sJ s56.31 1 sJ sss.62 1 5J 554.62 15J s56.31 1 5J 5s5.62 1 sJ 5ss.62 1 5J 554.62 1sJ sss.62 15J 554.62 1sJ sss.62 1sJ 5s7.31 1sJ 555.62 l5l 546.2e l5l 557.31 1 5J 5ss.62 1 sJ 555.62 l5l s5s.62 1 sJ 5s5.62 l5l 554.62 15J ss6.31 1 sJ 554.62 15J 555.62 1 sJ s55.62 1sJ ss7.31 1 5J 5s6.31 1 5J 555.62 1 5J 555.62 1 sJ 554.62 1sJ 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V 4V N 4V 4V Ss View View View View View View ryry View View View View View View View View View View View View View View View View View View View View View ry View ry View View Yiry View View View about:blank 5t17 4114122,9:50 AM . King ,King , King King King ,King :King 'King :King King King Laborers Laborers Laborefs Laborers Laborers Laborers I,aborers , Laborers Laborers Laborers Laborers , Laborers rLaborers Laborers Laborers iLaborers King King Laborers Laborefs Laborers ,Laborers ,Laborers Laborers Laborers Laborgrs Laborers Laborers Laborers Laborers Laborers Laborers Laborers about:blank Rivet Buster 555.62' Rodder 555.62 scaffotd Erector 554.62 Scate Person 554.62 lstoper (Over 20") 555.62 Stoper Sprayer 554.62 Spreader (Concrete) 555.62 Stake Hopper 554.62 Stock Piter 55q.oz Swinging Stage/Boatswain 546.29 Chair Tamper & Similar Etectric, Air 555.62 & Gas Operated Toots Tamper (Muttipte & Setf- 555.62 propetled) Timber Person - Sewer (Lagger; 555.62 Shorer & Cribber) Tootroom Person (at Jobsite) 554.62 Topper 554.62 Track Laborer 554.62 Track Liner (Power) 555.62 Traffic Control Laborer 549.50 Traffic Control Supervisor 552.45 Truck Spotter 554.62 Tugger Operator 555.62 TunnelWork-CompressedAir 5142.82 Worker 0-30 psi TunnetWork-CompressedAir 5147.85 Worker 30.01-44.00 psi Tunnel Work-Compressed Air 5151 .53 Worker 44.01-54.00 psi TunnetWork-CompressedAir 5157.23 Worker 54.01-60.00 psi TunnelWork-CompressedAir S159.35 ,Worker 60.01 -64.00 psi TunnetWork-Compressed Air 5164.45 Worker 64.01-68.00 psi Tunnel Work-Compressed Air Worker 68.01-70.00 psi Tunnel Work-Compressed Air Worker 70.01-72.00 psi Tunnel Work-Compressed Air ., 5166.35 51 OA.rS 5170.3s Worker 72.01-74.00 psi Tunnet Work-Guage and Lock Tender nnel Work-Miner 557.41, :TunneI Work-Miner Vibrator Vinyl Seamer Watchman 5s7.41 557.41 s55.62 554.62 s42.08 l5l l5l l5l 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 7A l5l 15J 15J King King King King King King King ,King King ,King Kins Laborers :King Laborers King Laborers King I Laborers : Laborers ,King King King King iKing King Xing about:blank King 15J 15J 15J 15J View View View View View View View View View View View Sry View View View View View View View View View View View View View View View View View View View Vielv View , View View View 6117 4114122,9:50 AM ,King Laborers King Laborers King Laborers King Laborers - Underground Sewer ,King & Water Laborers - Underground Sewer & Water La ndscape_.!eqns!rucU o n about:blank Wetder Wet[ Point Laborer Window Washer/Cleaner General Laborer & Topman Pipe Layer Landscape Construction / Landscaping Or Ptanting Laborers Landscape Operator Groundskeeper Journey Level Journey Level Fitter/Certified Wetder GeneraI Laborer Mechanic Wetder/Burner Journey Level Cabinet Assembty Electrician Equipment Maintenance Plumber Production Worker Toot Maintenance Utitity Person Wetder Journey Level Crew Tender Crew Tender/Technician Hyperbaric Worker - Compressed Air Worker 0-30.00 PSt Hyperbaric Worker - Compressed Air Worker 30.01 - 44.00 PSr Hyperbaric Worker - Compressed Air Worker 44.01 ' 54.00 PSr Hyperbaric Worker - ,Compressed Air Worker 64.01 - 68.00 PSr Hyperbaric Worker - Compressed Air Worker 68.01 - 70.00 Pst Hyperbaric Worker - ,Compressed Air Worker 70.01 ' 72.00 PSr Hyperbaric Worker - Compressed Air Worker 72.01 - 74.00 PSI View View 8Y 8Y 8Y 8Y 8Y 8Y 8X King 5s5.62 15J 5s5.62 1 sJ s42.08 1sJ 554.62 15J 555.62 1 sJ s42.08 15J s7s.s0 517.87 568.1 e s63.32 542.17 s30.07 543.63 539.28 56e.74 514.4e 514.49 514.4e 514.49 s14.49 514.4e 514.4e 514.49 s47.70 562.6e s62.69 585.00 15J 15J 7E 15r 15t 15t 15t 15J 6Z 15J 15J 15J 4V 4V 4V 4V 4V 4V 11G ! 4C 1N 11E 11E 11E 11E 4C t t ! L L L ! L 28 4C & 4C 4C 4C 4C 4C 4C 4C View View View View View View View View View View View View View View View View View View View View View View View View View View King King King King King King King King King King King King King King King King Land scapS-.lesns ! ruclien Landscape_.lMai n lCnance Lathers Marbte Setters Metal Fabrication (ln Shop-). ,Metat Fabrication (ln Shop-). Metal Fabrication (ln Shop-). Metal Fabrication (ln Shop-) ,Mittwright Modutar Buitdingg Modutar BuitdingS Modutar Buitdjngs Modutar Buitdingg Modutar Buitdingg ,Modular Building5 Modutar BuitdingS Modular Buitding5 Painters Pite Driver Pite Driver Pile Driver King Pite Driver King King Pile Driver King ,Pite Driver Kine Pite Driver King King King King King Pite Driver Pile Driver 590.00 1sJ s94.00 15J 5106.s0 15J s108.50 1sJ 51 10.50 1sJ View View View View about:blank s1 12.50 1 5J View 7t17 4114122,9:50 AM King Pite Driver ,King Ptasterers King Ptasterers King Ptayground & Park Equipllte$ lnstaIters King Ptumbers & Pipefitters King Power Equipmenl-.lQpgators King PowerEquip:men!-.lQperatoE King Power Equipmen!-.lQpe6lors Kinp Power Eouioment Ooerators King PowerEquiptrnen'!-.lQperators ,King PowerEquipmen!-.1Qpgalors:King PowerEquipnfcn!-QperalgIs Power Eq ui pmen!_.lQprators Power Eouioment Ooerators Power Eq ui pmen!-.lQrcIalSrs Power Eq ui ptmen!_.lQ pe ratoE Power Eq ui pment_.lQpsrators Power Eouioment Ooerators Power Eq ui pmen!..l0Fra!9r5 Powe r Eq ui p m enllQpt ralqrs King , Power Equipment Operato6 Power Equi pmeg!-.lQperators Power Equipmen!_.lopsIalArs ,King Power Equipment Orcralgf5 King Power Equipmen!-.lQrc1qlors Power Eq ui pment_.lQpslatoE Power Eq ui p:rnen!_.l8pe ralelE Power Equi pmen!-lQpslators about:blank Journey Level Journey Level Nozzleman Journey Levet Journey Level Asphatt Plant Operators Assistant Engineer Barrier Machine (zipper) Batch Ptant Operator: concrete Boat Operator Bobcat Brokk - Remote Demolition Equipment Brooms Bump Cutter Cabteways Chipper Compressor Concrete Finish Machine - Laser Screed Concrete Pump - Mounted Or :Traiter High Pressure Line Pump, Pump High Pressure 'Concrete Pump: Truck Mount With Boom Attachment Over 42 M Concrete Pump: Truck Mount With Boom Attachment Up To 42m Conveyors Cranes Friction: 200 tons and over Cranes, A-frame: 10 tons and under Cranes: 100 tons through 199 tons, or 150'of boom (inctuding jib with attachments) 'Cranes: 20 tons through 44 :tons with attachments Cranes: 200 tons- 299 tons, or 250' of boom inctuding jib with attachments :Cranes: 300 tons and over or ,300' of boom inctuding jib with attachments Cranes: 45 tons through 99 'tons, under 150'of boom(inctuding jib with attachments) Cranes: Friction cranes through King King King King King King King King 568.64 l5l s64.14 re. 567.64 7!. 514.49 5e4.69 62 576.77 1sJ 572.20 l_s.l 576.09 15J 576.09 15J 576.87 7A 572.20, 15J s72.20 1sJ 572.20 15J 576.09 15J 576.77 15J 576.09 15J 572.20 1sJ 572.20 15J s75.50 1 5J 576.77 1sJ 576.09 1sJ 57s. s0 579.20 572.30 s77.63 576.1e 578.44 579.20. 576.87 View 8X View8Xry8Xry 8X View 8X View 8X View 8X View 8X View 8x gry 8X View 8X View8Xry 8X View View View View View 8X View 8X View 8X View 8X View 4C 1R 1R L IG 11G 11G 11G 11G 11H 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11H 11H 11H 11H 11H 11H 11H 11H 8X 8X 8X 8X 8X 8X 8X 8X 15J 7A 7A 7A 7A 7A 7A 7A 7A Powe r Eq u i ptmen!_.lQpe rato rs King King King King King King View View View View View View View ViewKing about:blank 8117 Power Eq ui prnen!..lopsrators 578.44 4l'14122,9:50 AM King Power Eouioment Ooerators King King Power Equipment Operato6 Power Eq ui plmen!-Qpe rato rs Power Eq ui pmen LlQp€IalgIE Power EqUip-nen!..lQperators Power Eq uipmenllQperators Power Eqgipmen!_.10p ralgrs Power Eq ui p_menllQpe rators King Power Equipmen!_.lQperators Powe r Eq ui prnen !-.!QpS raton Power Equi pmenllQpsgtors Powe r Eq ui p_men!_.lope ratoE Power Eouioment Ooerators Powe r Eq ui p:rngn'!_.lQpe rato6 : Powe r Eq ui plmg!!_Qpe rato rs Power Equiprnen!_Qpe rators Power Equipment Opgators Powe r Eq u i ptrne n !-.lQps.f atoc Power Equipmen!.1Qrc6lAls Powe r Eq u i p:men!_.lQpe rato rs Powe r Eq ui @!_.lQFIatgrS Power Eq uipment!_.lQpelalgrs about:blank 199 tons Cranes: through 19 tons with attachments, a-frame over 10 tons Crusher Deck Engineer/ Deck Winches (power) Derricks, On Buitding Work Dozers D-9 & Under Dritl Oiters: Auger Type, Truck Or Crane Mount Dritl,ing Machine Etevator and man-tift: permanent and shaft type Finishing Machine, Bidwett And Gamaco & Simitar Equipment Forktift: 3000 tbs and over with attachments Grade Engineer: Using Btue Prints, Cut Sheets, Etc Gradechecker/Stakeman Guardrait Punch Hard Tait End Dump Articutating Off- Road Equipment 45 Yards. & Over Hard Tait End Dump Articutating Off-road Equipment Under 45 Yards Horizontat/ Directionat DritI Locator : Horizontat/ DirectionaI Dritl Operator Hydratifts/Boom Trucks Over 10 Tons Hydratifts/boom trucks: 1 0 tons and under Leverman Loader, Overhead, 6 Yards. But Not lnctuding 8 Yards Loaders, Overhead Under 6 Yards Loaders, Ptant Feed Loaders: Etevating Type Bett Locomotives, AtI Material Transfer Device Mechanics: A[[ (Leadmen - 50.50 per hour over mechanic) Motor Patrol Graders ,Mucking Machine, Mote, Tunnel Dritl, Boring, Road Header And/or Shietd s75.60 7A 11H 8X s76.09 1sJ s76.09 15J 11G 11G 11G 11G 11G 't1G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11H 11H 11G 11G 11G !9 11G 11G 11G 11G 11G 11G View View View View View View v!ry View View View View View View View View View View View View ry View View View View ry View 15J 15J 15J 50 s0 Szs 575 King King King King King King King King King King s76.77 577.53 15J 572.20 15J 576.09 15J s7s.50 15J s76.09 15J s72.20 1sJ s76.09 1sJ 576.77 1sJ 576.09 1sJ 575.50 1 sJ 576.09 1sJ s75.60 7A s72.30 7A s78.33 15J 576.77 1sJ s76.09 1sJ 576.09 1sJ 575.50 l5l 576.09 15J s76.09 1sJ 577 .s3 15J 576.77 15J 576.77 15J View ' View King King King King King King King King View King .King , King . King King King King Power Eq uipmen !_.lQperators Power Equipment Orc.rato6 Power Eq ui pmenllQperators Power Eq uipmen !_lQperators Powe r Eq ui p rnenj!_.lope ralqrs Powe r Eq ui Uen'LQpgatoIs Power Eq uipmen!_.lQperators about:blank 9117 4114122,9:50 AM King Power Equipmen!_.lQpelalon Power Equi pmen!_.lQperators Power Eq ui p:men!_.tQp€Iillglt Power Eq ui pment_.lQperators about:blank Oit Distributors, Btower 572.20 15J Distribution & Mutch Seeding Operator Outside Hoists (Etevators and 575.50 15J Mantifts), Air Tuggers, Strato Overhead, bridge type: 100 577.63 7A ,tons and over 'Overhead, bridge type: 45 tons 576.87 7A through 99 tons View View 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X King King King 572.20 1sJ 576.09 15J s75.50 1sJ 572.20 1sJ 572.20 15J 572.20 l5l 576.77 15J 576.77 1sJ 572.30 7A s7s.60 7A 576.77 1sJ 572.20 15J s7s.s0 15J s76.09 15J $7s.s0 15J s76.09 1sJ s7s.50 1sJ s76.77 15J 57s.50 15J 572.20 15J 57s.s0 15J s76.77 15J 576.09 1sJ 577.53 15J 578.33 15J 576.77 1sJ 576.77 15J View View View View View View View View Yicryry View View 8X View 8X View View View View View View View View View View View View View View View View 11G 1"tG 11H 11H 11G 11G 11G 11G ]-1-E 11G 11G 11G 11H 11H ls 11G 11G 11G 11G 11G 11G 11G !G 11G 11G 11G 11G 11G 11G 11G 11G King King King rKing ,King ,King King King ,King King King ,King King Power Equipment Operators Power Equipment Op3rato6 : Power Equipment Operators King King King Power Eq ui pn0en!_.10rcc[An King King Power Eq ui p men!_Qp€ ralg rs Power Equipment Operato6 PoWer Equipmen!_.lQperato6 Power Eq ui pmen!-.lQp€fato rs Power Eq uipmen!_Qpe.falels Power Eq ui pmen!..QpsIators Power Eq ui pmen!_.lQperators Powe r Eq ui prnen!_.lQpgalqs Powe r Eq ui pmen!-.lQpgalqfs Power Equipmen!_.lQ@ Pglver Eq gr p m edL]Q pe ralAE Power Eq uipmen!_.lQperators ; Power Eq uiUnCn!_OpeIalAIS Power Equi pmen!_.lQperators Power Eq ui p:rnen !_.lQpsla!q fS Power Equi pmen!_.lQperators Power Eouioment Ooerators Power Equiprnent Operators Pavement Breaker Pile Driver (other Than Crane Mount) Plant Oiter - Asphalt, Crusher Posthote Digger, Mechanical Power Ptant Pumps - Water Quad 9, Hd 4'1, D10 And Over Remote Control Operator On Rubber Tired Earth Moving Equipment Rigger and Bettman Rigger/SignaI Person, Betlman(Certified) Rollagon Rotter, Other Than Ptant Mix :Rotter, Ptant Mix Or Mutti-tift Materials Roto- mitt, Roto-grinder Saws - Concrete Scraper, Self Propelted Under :45 Yards Scrapers - Concrete & Carry Att Scrapers, Setf-propetted: 45 iYards And Over ; Service Engineers: Equipment : Shotcrete/Gunite Equipment Shovet, Excavator, Backhoe, ,Tractors Under 15 Metric lrcns Shovet, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons Shovet, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons Shovet, Excavator, Backhoes: Over 90 Metric Tons 'Stipform Pavers ,Spreader, Topsider & Screedman fing King King Powe r Eq gi plmgn!-.1Qpt ralo rs Power Equipmen!_.lQperators Power Equi prneg!_lQperators King King King King King King Power Eq ui pmen!_.lQpe rators Power Eq ui pmen!_.lQperators 10117about:blank 4114122,9:50 AM King PowerEquiptrngn!_.lQperators King Power Equipment Opsralgfg King Power Equip_nnen!..lQperatoru King PowerEquip:men!-.lQpgators King Power Eq ui pmen!_lQperators King PowerEquiptrnCn!-.l0perators about:blank Subgrader Trimmer Tower Bucket Etevators Tower Crane: over 175'through ,250'in height, base to boom Tower crane: up to 175' in height base to boom Tower Cranes: over 250' in height from base to boom Transporters, A[[ Track Or Truck Type Trenching Machines Truck crane oiter/driver: under 100 tons Truck Mount Portabte Conveyor Welder Wheel Tractors, Farmatl Type ,Yo Yo Pay Dozer Asphatt Plant Operators s76.0e l5l s7s.50 1 sJ s78.44 7A 577.63 7A 579.20 7A 576.77 15J s75.s0 1 5J s75.60 7A s76.09 15J 576.77, 15J 572.20 15J 576.09 15J 576.77 1sJ 572.20 15J s76.09 1sJ 576.77 1sJ 576.09 15J s75. s0 576.77 11G 11G 11H 11H 11H 11G 11G 11H 11G 11G ry 11G 11G 11G 11G 11G 11H 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G View View View View View View View View ry View View View View View View View View View View View View View View View View View View View King King King King King King King King King King King King King King King King 'King King :King ,King Power Eq ui pmen!..lQperators Power Eq ui pmen!_.l0rcfaleIs Power Eq ui pJmC1!_Qpe rato rs : Power Equipment Operators Power Eq ui pmenl!_.lQrcGtors Power. Eq ui pment_.lQperato6 , Power Eq ui pllfen!_Qpgators-. Underground Sewer & Water : Power Equipment Operators-. Underground Sewer & Water Powe r Eq ui pJlen!_Qpgato rs -. Underground Sewer & Water Power Equi pmen!.lQpe6lA rs-. Underground Sewer & Water : Power Equipment gperatolt: Underground Sewer & Water Power EquipJent OE!ors.. Underground Sewer & Watqr , Power Equipment Ops.faleIt Undergrgund Sewer & Water Assistant Engineer s72.20 15J Barrier Machine (zipper) 576.09 15J Batch Plant Operator, Concrete 576.09 15J ,Boat Operator 576.87 7A Bobcat 572.20 1sJ Brokk - Remote Demotition :Equipment :Brooms 572.20 15J Power Eq uipmen!_.lQperatoIs-. Underground Sewer & Water Power Eq uiprnCn E_.lQp€rators-. Underground Sewer & Water Power Equi @!_.lQperators-. Underground Sewer & Water Power Equi pmen!_.9psG!SIS: Underground Sewer & Water Cabteways Bump Cutter Chipper Compressor Concrete Finish Machine - Laser Screed Concrete Pump - Mounted Or Traiter High Pressure Line Pump, Pump High Pressure Concrete Pump: Truck Mount With Boom Attachment Over 42 M Concrete Pump: Truck Mount With Boom Attachment Up To 42m , Power Equi Enen!_Qperators -. Unclgfground Sewer & Water Power Eq ui pmen!_.lQps ralgl5: Undersround Sewer & Water : Power Equipment Opsfators-. Underground Sewer & Water Power Eq ui prne$_Qpelators- 'Underground Sewer & Water Power Equiprngnt Orcralgf5: Underground Sewer & Water 572.20 572.20 15J 15J 15J 15J 15J King King 11 t17about:blank s76.0e 4114122,9:50 AM King Power Equipmen!_.lQperators- Underground Sewer & Water King Power Equipmen!_.lQperators-. Underground Sewer & Water King PowerEquiprnCn'L-.lQFIi[qIS: Underground Sewer & Water ,King PowerEquipmeq!_.lQp€ralq6: Underground Sewer & Water Power Eq ui prneqllQpsralq rs -. Underground Sewer & Water Power Eq ui pmen!_.lQperators-. Underground Sewqr & Water Power Eq ui pmenj!-.lQperatoI!: Underground Sewer & Water Power Eq ui pmen!_.lQperators-. Underground Sewer & Water Powe r Eq ui p_men'!-.lQ pgato rs -. Underground Sewer & Water Power Equi p_mgn llQperalors -. Underground Sewer & Water Power Eq ui pmen!_.lQpe rators -. Underground Sewer & Water Power Eq uipmen!_.lQperators-. Underground Sewer & Water Powe r E q u i p_men!_Q p€ratot Underground Sewer & Water Power Equipment Operators-. Underground Sewer & Water Powe r Eq Uipme!!_Qpgato rs: Underground Sewer & Water Power Eq ui pmen!-.lQperatofS: Underground Sewer & Water Power Eq ui plnen!_Qpe rato rs -. Underground Sewer & Water Power Equi pmen!_.lQperators-. Underground Sewer & Water Power Equi pmen!_.lQperators-. Underground Sewer & Water Powe r Eq ui p men!_.lQpgfalql5; Underground Sewer & Watgr Power Eq ui prngq!_.lQperators-. Underground Sewer & Water Power Eq ui pmenj!..lOpsrators-. Underground Sewer & Water Power Eq ui prne1!_.lQperators-. UnclCfground Sewer & Water Powe r Eq u i p_men!_.lQ pgalo rs -. about:blank Conveyors 575.50 15J 11G 8X View Cranes Friction: 200 tons and over Cranes, A-frame: 10 tons and under Cranes: 100 tons through 199 tons, or 150' of boom (inctuding jib with attachments) Cranes: 20 tons through 44 tons with attachments Cranes: 20 tons through 44 tons with attachments Cranes: 200 tons- 299 tons, or 250' of boom inctuding jib with attachments Cranes: 300 tons and over or 300' of boom inctuding jib with attachments Cranes: 45 tons through 99 tons, under 1 50' of boom(inctuding jib with attachments) Cranes: Friction cranes through 199 tons Cranes: through 19 tons with attachments, a-frame over 10 tons Crusher 579.20 7A 1 1H 8X View 572.30 7A 11H 8X View 577.63 7A 11H 8X View 576.19 7A 11H 8X View 576.19 7A 11H 8X View 578.44 7A 11H 8X View 579.20 7A 11H 576.87 7A 11H 578.44 7A 11H 575.60 7A 11H 576.09 15J 1 1G Deck Engineer/ Deck Winches (power) Derricks, On Buitding Work s76.09 1sJ 11G 576.77 1sJ 11G Dozers D-9 & Under s75.s0 15J 11G Drit[ Oiters: Auger Type, Truck 575.50 15J Or Crane Mount Dritting Machine 577.53 15J Etevator and man-tift: 572.20 permanent and shaft type Finishing Machine, Bidwett And 576.09 Gamaco & Simitar Equipment Forktift: 3000 tbs and over with S75.50 attachments Forktifts: under 3000 tbs. with 572.20 attachments Forktifts: under 3000 tbs. with 572.20 attachments Grade Engineer: Using Blue 576.09 Prints, Cut Sheets, Etc Gradechecker/Stakeman 572.20 King King King King King King King King King 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X View View View View View View View View View View View View View View View View View 12117 King King King King 11G 11G 11G 11G 11G 11G 11G 11G 11G 15J 15J 15J 15J 15J 15J 15JKing about:blank 4114122,9:50 AM Underground Sewer & Water 'King PowerEquipmen!-.lQperators-. Underground Sewer & Water King Power Equipmen[.Qpsfalgls: Underground Sewer & Water King Powe r Eq ui p men!_.lQp3 ralqll: Underground Sewer & Water about:blank GuardraiI Punch 576.09 15J 11G 8X View Hard Tai[ End Dump Articutating Off- Road Equipment 45 Yards. & Over Hard Tai[ End Dump Articutating Off-road Equipment Under 45 Yards Horizontat/ Directionat Dritt Locator Horizonta[/ DirectionaI DritI Operator Hydratifts/boom trucks: 1 0 tons and under Hydratifts/boom trucks: over 10 tons Leverman 576.77 15J 11G 8X View 576.09 15J 1lG 8X View 575.50 15J 11G 8X View s76.09 15J 11G 572.30 7A s7s.60 7A s78.33 1 5J Loader, Overhead, 6 Yards. But Not lnctuding 8 Yards Loaders, Overhead Under 6 Yards Loaders, Ptant Feed 576.77 1sJ 576.09 15J 576.09 15J Loaders: Etevating Type Bel,t 575.50 15J King King King King King King King King King King King King rKing King King Powe r Eq ui p_menlQpe rato rs -. Underground Sewer & Water Power Eq ui pmen!_.lQperators-. Undergroqnd Sewer & Water Powe r Eq ui pmenl".lQ pSIalA rs -. Underground Sewer & Water Powe r Eq ui pjrnen!_.lQpe rato rs -. Underground Sewer & Water Powe r Eq ui p:rnen !_.lQ pslato rs -. Underground Sewer & Water Power Eq Uipmen!_.lQperators-. Underground Sewer & Water Power Eq ui pmen!-.lQp€Ialg rs -. Underground Sewer & Water Power Eq ui pme nLlQpSIalgIS: Underground Sewer & Water Powe r Eq u i p_men!_.lQpe rato rs -. Unclggground Sewer & Water Power Eouioment Ooerators- Underground Sewer & Water Power Equipment Operators-. Underground Sewer & Water Powe r Eq ui ptrngn!-lQpe rato rs -. Underground Sewer ft Water Powe r Eq ui p me n'!_.!Op€ rato rs -. Underground Sewer & Water , Power Equipment Operators-. Underground Sewer & Water : Power Equipment OrcralgI5: :Underground Sewer & Water Powe r Eq ui p:meq!..lQpe rato rs -. Underground Sewer & Water Powe r Eq ui p_men!_.lOpe ratols: Underground Sewer & Water Power Eq ui pmen!..lQperators-, Underground Sewer & Water Power Eq ui pmen'!-]Qperalers-. Underground Sgwer & Water Power Equipment OperatoIs: Underground Sewer & Water Power Eq uipnen!_.lQperators-. Underground Sewer & Water Locomotives, At[ Material Transfer Device Mechanics: At[ (Leadmen - 50.S0 per hour over mechanic) Motor Patrot Graders Mucking Machine, Mole, Tunnel Drilt, Boring, Road Header And/or Shietd ' oit Distributors, Blower Distribution & Mutch Seeding Operator Outside Hoists (Etevators and Mantifts), Air Tuggers, Strato Overhead, bridge type: 100 tons and over Overhead, bridge type: 45 tons through 99 tons Pavement Breaker Pite Driver (other Than Crane Mount) Ptant Oiter - Asphatt, Crusher 11H 11H 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11H 11H 11G 11G 11G 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X View View View View View View View View View View View View View View View View View View View View King 576.09 15J s76.09 15J 577.53 15J 576.77 15J s76.77 572.20 $7s.50 577.63 576.87 572.20 576.0e 575.50 King King King King 15J 15J 15J 7A 7A 15J 15J 15J 13117about:blank 4114122,9:50 AM King PowerEquip:rnen'!_.lQps.falors-. Underground Sewer & Water King Power Equipmen!-.lQperators-. Underground Sewer & Water King Power Equiprngn'!..lQperators-. UndglJrgund Sewer & Water King,PowerEquipmen!_QpIalgrs-. Undqrground Sewer & Water King,PowerEquiprnentOperators-. Underground Sewer & Water King about:blank Posthole Digger, Mechanical 572.20 15J Power Ptant 572.20 15J Pumps - Water 572.20 15J Quad 9, Hd 41 , D10 And Over 576.77 15J Remote Control Operator On Rubber Tired Earth Moving Equipment Rigger and Betlman 77 15J 572.30 7A Rigger/Signal Person, Bellman(Certified) Rotlagon 57s.60 7A 576.77 15J Rotler, Other Than Plant Mix 572.20 15J Rotler, Ptant Mix Or Mutti-tift Materials Roto-mitt, Roto-grinder s75.50 15J 576.09 1sJ Saws - Concrete Scrape[ Self Propetted Under S 45 Yards 'scrapers - Concrete & Carry Att S Scrapers, Setf-propetted: 45 Yards And Over Shotcrete /Gunite Equipment 572.20 Shovel, Excavator, Backhoe, Tractors Under 15 Metric Tons Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons Shovel, Excavator, Backhoes, Tractors: 15 ]'c 30 Metric Tons Shovet, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons Shovel, Excavator, Backhoes: Over 90 Metric Tons Stipform Pavers s7s.50 576.77 , 576.77 Spreader, Topsider ft Screedman Subgrader Trimmer 576.77 s76.0e 576 11G 11G 11G 11G 11G 11H 11H 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G 11G View View View View View View View View View View View View View View View View View View View View View View View View View King Power Equi pmen!_.lQperators-. Underground Sewer & Water Powe r Eq ui p_ne n!_.lQ ps ralo rs -. :Underground Sewer & Water Power Equipment Operatol!: Underground Sewer & Water Powe r Eq ui p:men!_.lQ pgato rs -. Undergrqund Sewer & Water Power Equipment Operators-. Underground Sgwer & Water Power Equip:rnen'L-.lQperators-. Underground Sewer & Water : Power Equi pllre!!-0pga!ors-. Underground Sewer & Water Power Equi pmen!_0rcrale6: Underqround Sewer & Water Power Eq ui p31en!_.1Qpe rato rs -. Underground Sewer & Water r Power Eq ui pmen!_8Ha!ars: Underground Sewer & Water Powe r Eq ui p_men!_.lQ pe rato6: Underground Sewer & Water Powe r Eq ui p_neqllQpe rato rs -. Underground Sewer & Water Power Eq ui pmen!_.lQperators-, Underground Sewer & Water Powe r Eq ui p men!..1Qpga!o rs -. Underground Sewer & Water Power Equi pmen!_.lQpslators-. Underground Sewer & Water Power Equipment Operators-. Underground Sewer &, Water Power Equi pme$_Sperators-. Underground Sewer & Water , Power Eq ui pmen!_Qrc1qlAl5; Underground Sewer & Water Power Eq ui prnen!_QpratAIS: Underground Sewer & Water King King King King King , fing King King : King King King King King s7s.s0 15J 76 75 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 15J 1sJ 15J 576.77 King 09 53 |td. 577. Underground Sewer & Water 578.33 about:blank 14t17 Tower Bucket Etevators s7s. s0 King King King ,King l ,King King King , King . King King :King King King King King , King ,King ,Kine King s63.32 536.44 546.64 s68.1 e s36.36 s48.80 s28.93 s28.1 8 11H 11H 11H 11G 11G 11H 11H 11G 11G 11G 11G 4A 4A 4A 4A 4A 1G 1N L t 4C t t t t ! L L 1G 1G 1E 4114122,9:50 AM King PowerEquip_ned_8pgalsrs-. ng Underground Sewer & Water Power Eq u i pmenj!_.lQp€ralSff. UnglgJground Sewer & Water Power Equi p-mgnt Operators-. Underground Sewer & Water Powe r Eq ui UtfC!!_QpeGtoIt: Underground Sewer & Water Power Eq ui prngg!_.lQperators-. Underground Sewer & Water : Power Equipment Op3rators-. ,Underground Sewer & Water Power Eq ui p men!-.lQpgaIQ rs: Underground Sewer & Water Power Equipment Operatofs: Underground Seyver & Water Power Equi prnCn!-.lQpslators-. Underground Sewer & Water Power Equipment Operators-, Underground Sewer & Water Power Eq ui pmen!-QrcIators-. ,Underground Sewer & Water ,Power Line Ctearance Tree Trimmers Power Line Ctearance Tree Trimmers 'Power Line Ctearance Tree Trimmers Power Line Ctearance Tree Trimmers rPower Line Clearance Tree ,Trimmers Refrigeration & Air Conditioning Mechanics Residential Brick Mason Residential CarpenleIs King Residentiat lnsutation Apptlcalgls :ResidentiaI Laborers Residentiat Marbte Setters ResidentiaI Painters Residential Plumbers & PipSfilters King about:blank rResidential Refrigeration & Air Conditioning Mechanics Residential Sheet Metal about:blank Tower Crane: over 175'through 578.44 7A 250'in height, base to boom Tower crane: up to 175' in 577 .63 7A height base to boom Tower Cranes: over 250' in 579.20 7A height from base to boom Transporters, Atl Track Or Truck 576.77 15J Type Trenching Machines 575.50 15J Truck Crane Oiter/Driver: 100 576.19 tons and over Truck crane oiter/driver: under S75.60 100 tons Truck Mount Portabte Conveyor 576.09 Wetder 576.77 Wheet Tractors, Farmatl Type 572.20 Yo Yo Pay Dozer 576.0e Journey Level ln Charge 557.22 Spray Person 554.32 Tiee Equipment Operator 557.22 Tree Trimmer s51 .1 8 Tree Trimmer Groundperson 538.99 Journey Levet King King King King King King King 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 7A 7A 15J 15J 15J 15J 5A 5A 5A 5A 5A 6Z 7E 15J View View View View View View View View View View View View View View View View View View View ry View View View View View View View View View View , 15117 05go. Residentia[ Cement Masons Journey Levet Residential Drvwatl Appicato6 Journey Level Residentiat Dr:r&[!-.Iapers Journey Leve[ Residential Etectricians Journey Level Residential Gtaziers Journey Level ,Journey Level Journey Level Journey Leve[ Journey Level Journey Level Journey Level Journey Level Journey Levet Journey Levet sze.73 527.38 523.47 5e4.6e seo.01 View 6Z 6Z 7F591.83 ,King King King King King King 'King 4114122,9:50 AM Workers ,King Residentiat Soft Ftoor Laye6 King Residential SEnkletFitters {Fire Protection} King about:blank Journey Levet Journey Level Journey Level Journey Level Journey Level Journey Level Journey Level Using lrritabte Bituminous Materials Journey Levet (Fietd or Shop) ' New Construction Boilermaker New Construction Carpenter New Construction Crane Operator 'New Construction Etectrician New Construction Heat & Frost lnsutator New Construction Laborer New Construction Machinist New Construction Operating Engineer , New Construction Painter : New Construction Pipefitter New Construction Rigger New Construction Sheet Metal New Construction Shipfitter 'New Construction Warehouse/Teamster ,New Construction Wetder / Burner Ship Repair Boitermaker Ship Repair Carpenter Ship Repair Crane Operator Ship Repair Electrician Ship Repair Heat & Frost ,lnsutator Ship Repair Laborer Ship Repair Machinist Ship Repair Operating Engineer Ship Repair Painter Ship Repair Pipefitter Ship Repair Rigger Ship Repair Sheet Metat Ship Repair Shipwright 'Ship Repair Warehouse / Teamster Residential Stone Mqsons Residential Terrazzo Workers ResidentiaI Terrazzo /Ti [e Finishers Residential Tite Setters Roofers Roofers Sheet Metal Workers shipbu Llelng e ship_Bepair Shi pluilding e shi p_3emjl shipiuileling e Ship_Sepajl Shipbuilding e Ship Repijl : Ship_bu i tcling & Ship_Bepa!r Shipbui tding & Ship-Bcpair Shipiurlding e Ship- xcp3ll Shjpluilding & shi p-Bcpajr , Shi piujldjng e Shi p_Bcpair Shipbu itcling e Ship-Bepair Shipiu:Iding e ship_3emjl Shipluilding & ship_Bepa lr Shipbuilding e ShitBepajr shipluildjng e ship RepajI shipbullding e shi p_Bepa ir Shiplulldlng e Snlp- repair shipbuitdjng & ship_lspaiI shlpbuildlne & shiLBepajl Shiobuil,dine & Shio Reoair Shi pluj_tdrng e Shi p_Bcpa ir i Shjpluilding e ship_Bepair Shiplujlding & Shi p_Rcpa ir Shiobuil.dins & Shio Reoair shipbullding e Ship_Bepair Shi plujldjng & Shi p_Bcpa ir : Shipiulldi ng & Ship-Bepair Shiobuildine & Shio Reoair shipiudding e Ship- sepajl King King King King 5s1.91 sA 5s3.04 sc 563.32 7E 558.71 7E 524.39 521.04 559.0s 5A s62.os 5A 591.83 7F s39.58 TV s39.s8 7V s39.s8 7V 539.s8 TV s82.02 15H 547.45 547.35 s45.06 548.92 582.02 547.35 7X 547.35 7X s45.06 T( 547.35 7X 547.35 7X 547.45 7X 547.35' 7X 547.35 7X 54s.06 T( View View View 3J 2R 1N 1N L t 3H 3H 1E t t L t 11C L L t L L L ! t t 1 4J 4J 4K 4J 11C 4J 4J 4K 4J 4J 4J 4J 4J 4K View View View View View ury View View View View View View View View View View View View View View View View View View View Srv View View View View View View View View King King King King King 58 58 58 58 58 58 58 58 58 5rs s3e Sls 53e S3e 5rq 5rs 53e 5rg 7V 7V 7V 7V 7V 7V 7V 7V 7V 7V 7X 7X 7{ 7X 15H King King King Shiplujldjng e Ship_Bepa ir Views3e.58 King :King King King King King King King King King King King King King 16117about:blank 4114122,9:50 AM 'King Sign Makers & lnstaltersr lEtectricat). Xlng Sign Makers & lnstatters (Non- ,Etectricat) ,King Soft Floor Layers , Xing Sotar Controts For Windows Surveygq Surveyors Surveysrs King Surveyp6 King Tetecqm m unication Technicians Teteohone Line Construction - ,Outside Teleohone Line Construction - Outside Tetephone Line Construc ,Outside Teleohone Line Construction - Outside Terrazzo Workers Tile Setters rTite, Marbte & Terrazzo iFinishers King King King King Truck Dfivers Truck Drivers Truck Drivers Truck Drivers Truck Drivers Truck Drivers - Ready_..tMjx Wett Dritters & lrrigation Pump lnstatters Wett Dritters & lrrigation Pump lnstatters Wet[ Dri[[ers & lrrigation Pump .lnstalters about:blank Journey Levet Journey Level Journey Level Journey Level Assistant Construction Site Surveyor Chainman Construction Site Surveyor Drone Operator (when used in conjunction with survey work onty) Ground Penetrating Radar Operator Journey Level Cabte Spticer Journey Level Journey Level Finisher ss3.62 I 3J ! 1X 1 I ! 534.42 0 554.41 5A 514.4e 589.4e 5C 514.49 King Sp_ftnkler Fitters (Fire Journey Level Protection). King Stage Rigging Mechanics (Non Journey Level Structura[) :King Stone Masons Journey Levet King Street And Parking Lot Sweepsl Journey Level 'Workers King Surveys6 s63.32 7E 519.09 s75.60 7A s72.30 7A 576.87 7A 572.30 7A s72.30 7A 559.10 7E s38.27 5A 558.71 7E 558.71 7E 549.54 7E $s0.s1 7A 569.9s 1sJ 56e.11 l5l 569.1 1 1sJ 569.9s 1sJ s69.9s 1 5J 569.95 1 sJ 517.71 514.4e View View View View View View View View 8X View 8X View8Xry 8X View 8X View lN t 11H 11H 11H 11H 11H 1E 28 28 28 28 1N 1N 1N 1K 1! 111 11t 11J 11t 11t L King King King King Hote Digger/Ground Person $25.66 5A Tetephone Equipment Operator S31.96 5A (Light) Tetephone Lineperson 536.17 5A View View View View View View View View View View View View View View View View View View King King King King King King King King King King King Traffic Control Stripers Journey Level Asphatt Mix Over 16 Yards Asphatt Mix To 16 Yards Dump Truck Dump Truck & Traiter Other Trucks Tiansit Mix lrrigation Pump lnstatter Oiter 8L 8L 8L 8L 8L 8L ! t about:blank Wet[ Drilter 518.00 17117 Signature: Email: Signature: Email: Signature: Email: Will Moore (Apr 26, 2022 14:39 PDT) Will Moore wmoore@kentwa.gov rlashley@kentwa.gov Melissa McCormick (May 2, 2022 10:45 PDT) Melissa McCormick cityclerk@kentwa.gov FAC-EVERGREEN-CITY HALL ANNEX- CONTRACT Final Audit Report 2022-05-02 Created:2022-04-26 By:Leah Bryant (lbryant@kentwa.gov) Status:Signed Transaction ID:CBJCHBCAABAA7-wwbdZ5qXLJHJ_Zp-lzRzXY5nBJFObq "FAC-EVERGREEN-CITY HALL ANNEX-CONTRACT" History Document created by Leah Bryant (lbryant@kentwa.gov) 2022-04-26 - 7:00:01 PM GMT Document emailed to Will Moore (wmoore@kentwa.gov) for signature 2022-04-26 - 7:04:35 PM GMT Email viewed by Will Moore (wmoore@kentwa.gov) 2022-04-26 - 9:35:36 PM GMT Document e-signed by Will Moore (wmoore@kentwa.gov) Signature Date: 2022-04-26 - 9:39:59 PM GMT - Time Source: server Document emailed to Shane Gilbertson (evergreen.shane@comcast.net) for signature 2022-04-26 - 9:40:03 PM GMT Email viewed by Shane Gilbertson (evergreen.shane@comcast.net) 2022-04-26 - 11:15:33 PM GMT Document e-signed by Shane Gilbertson (evergreen.shane@comcast.net) Signature Date: 2022-04-26 - 11:16:56 PM GMT - Time Source: server Document emailed to Ronald Lashley (rlashley@kentwa.gov) for signature 2022-04-26 - 11:17:00 PM GMT Email viewed by Ronald Lashley (rlashley@kentwa.gov) 2022-04-28 - 9:47:57 PM GMT Document e-signed by Ronald Lashley (rlashley@kentwa.gov) Signature Date: 2022-04-28 - 9:48:50 PM GMT - Time Source: server Document emailed to Brian Levenhagen (bjlevenhagen@kentwa.gov) for signature 2022-04-28 - 9:48:54 PM GMT Email viewed by Brian Levenhagen (bjlevenhagen@kentwa.gov) 2022-05-02 - 4:35:46 PM GMT Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date: 2022-05-02 - 4:36:06 PM GMT - Time Source: server Document emailed to Kim Komoto (kkomoto@kentwa.gov) for signature 2022-05-02 - 4:36:09 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2022-05-02 - 4:55:52 PM GMT Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date: 2022-05-02 - 4:56:21 PM GMT - Time Source: server Document emailed to Melissa McCormick (cityclerk@kentwa.gov) for signature 2022-05-02 - 4:56:25 PM GMT Email viewed by Melissa McCormick (cityclerk@kentwa.gov) 2022-05-02 - 5:39:05 PM GMT Document e-signed by Melissa McCormick (cityclerk@kentwa.gov) Signature Date: 2022-05-02 - 5:45:28 PM GMT - Time Source: server Agreement completed. 2022-05-02 - 5:45:28 PM GMT