HomeMy WebLinkAboutCAG2021-412 - Change Order - #1 - Northwest Cascade, Inc. - Skyline Sanitary Sewer Extension - 04/19/2022 Agreement Routing Farm * For Approvals,Signatures and Records Management ENTThis form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. W A S N I N O T O N (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: 4/20/2022 N/A IL O L Authorized to Sign: Date of Council Approval: C El Director or Designee ❑Mayor 9/7/2021 Budget Account Number: Grant? ❑Yes El No S20045.64110 330 Budget? 0 Yes []No Type: N/A Vendor Name: Category: Northwest Cascade, Inc. Contract Vendor Number: Sub-Category: C 72784 Change Order#1 AProject Name: Skyline Sanitary Sewer Extension E L a Project Details: Relocate new sewer main to the southbound lane due to unidentified *, Lumen fiber optic duct bank. C 40 Agreement Amount: $28,303.00 Basis for Selection of Contractor: E Bid to i Start Date: N/A Termination Date: 30 Working Days Im a Local Business? ❑Yes ❑No* *if meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number- 0 Yes I]No CAG2021-412 Date Received by City Attorney: Comments. p1 C .� L � O A p� Date Routed to the Mayor's Office: / N Date Routed to the City Clerk's Office: a aaaw22373,.zo Visit Documents.KentWA.gov to obtain copies of all agreements y • KENT W A D H IN 010 N CHANGE ORDER NO. #1 NAME OF CONTRACTOR: Northwest Cascade, Jnc• ("Contractor") CONTRACT NAME & PROJECT NUMBER: Skyline Sanitary Sewer Extension ORIGINAL CONTRACT DATE: September 21,_2021 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Relocate the City's new sewer main to the southbound lane due to unidentified Lumen fiber optic duct bank was in close proximity to the proposed sewer layout. Revision work prevented installation being complete, this work also captures price escalations to the permanent sewer materials. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $515,218.46 (including applicable alternates and WSST) Net Change by Previous Change Orders $0.00 (incl. applicable WSST) Current Contract Amount $515,218.46 (incl. Previous Change Orders) Current Change Order $25,706.63 Applicable WSST Tax on this Change $2,596.37 Order Revised Contract Sum $543,521.46 CHANGE ORDER - 1 OF 3 Original Time for Completion 20 working days (insert date) Revised Time for Completion under 0 working days prior Change Orders (insert date) Days Required (f) for this Change Order 10 calendar days Revised Time for Completion 30 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: Get«� CITY OF KENT: Nd+k•eri w wewwn ,9w►e Chad Bieren°R;� ignature} (signature) Print Name: Print Name: Chad Bleren, P.E. Its 4V aw Its Public Works Director r (title) (title) DATE: 't �2�22_ DATE: EC KF CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) e Kent City Clerk Kent Law Department [In this nerd,you may enter the electronic fllepath where the contract has been saved) CHANGE ORDER - 3 OF 3 File No. 200.2 i KENT WA3H'NOTON CHANGE ORDER WORKSHEET NO. 01 Construction Engineering Division - Public Works Project: Skyline Sanitary Sewer Extension Project No: 11-3003 Project Engineer: Thomas Leyrer, P.E. Fed-Aid No: N/A Capital Projects Jason Bryant Contractor: NW Cascade, Inc. Manager: Date: 3/28/2022 I. Proposed Change This Change makes the following revisions to the Contract Documents and provides compensation for added work: Create new pay items to address extra work and sewer material cost escalations due to Revision No. 1 changes. II. Reason and Background for Change The original plan was to place the new gravity sewer line in the northbound land of Military Road. During locate requests for initial pothole work, a previously unidentified Lumen fiber optic duct bank was marked in close proximity to the proposed sewer layout. Upon gathering pothole data on this utility, as well as other existing utilities, it was determined relocation of the City's new sewer main to the southbound lane would be necessary. Since revision work prevented installation being complete in December per the Contractor's original schedule and due to historically high inflation conditions, this work also captures price escalations to permanent sewer materials. This change order provides compensation for the following extra work items: 1 Supply and install 20 foot long, 16 inch DI casing with spacers and end seals to cross an existing Highline Water District 12 inch water main; 2 Sewer material price escalation; 3 Sewer pipe installation impacts related to revised layout, including crossing the Lumen fiber optic bank twice, crossing a lane of traffic twice and removal and disposal of approximately 40 LF of existing sewer pipe; 4 Installation of one new survey monument; and 5 Additional permanent channelization not included at time of bid, thermoplastic crosswalk. Page 1 IIl. Method of Payment NEW PAY ITEMS ❑ Not applicable Sch. Item Description Total Est. Unit Unit Price Total Estimated Cost of No Item I FFFF nd install new survey monument 1 LS $1,687.36 $ 1,687.36 III sing and appurtenances 1 LS $5,473.68 $ 5,473.68 III aterial price escalation 1 LS $4,476.81 $ 4,476.81 III Increased sewer installation costs 1 LS $10,843.18 $ 10,843.18 V Additional permanent channelization 1 LS $3,225.60 $ 3,225.60 New Pay Items Total: $ 25,706.63 DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑� Not applicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. 7 $ - $ Delete Existing Pay Items Total: $ - INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑� Notapplicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item $ Increase / Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER: $25,706.63 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 20 7Due This Change Order: 10 Previous Total: 20 See attached work schedule dated October 22, 2021. *TOTAL WORKING DAYS: 30 Page 2 * This Change Order + Previous Total Capital Projects Manager: r - Date: z Jason ant Acting Construction Date: Engineering Suoervisor: 3 Zq ZZ 7a n Barry Construction Manager: Date: Eric Connor Page 3 CNW NORTHWEST CASCADE INC . POST OFFICE BOX 73399, PUYALLUP,WASHINGTON 98373/TOLL FREE 800-562-4442 Action Request Date: 3/8/2022 To: Jason Barry Capital Projects Administrator Public Works Department 220 Fourth Avenue South Kent,WA 98032 (253) 856-5500 From: Chris Brazda RE: Extra Work Forward Price for Plan Revisions Skyline Sanitary Sewer Extension Project—City of Kent NWC#4335 Action Request#2-1 Jason, The purpose of this action request is to provide a forward price for Revision Number 1 for Skyline Sanitary Sewer Extension.The pricing is based on revised plan sheet 05,and Serial Letter 002 dated January 21,2022.Attached are breakdowns for various work and additions. Please review attached forward price breakdowns. Brief description of each extra work is below. Extra Work#1 —The addition of casing pipe with spacers and end seals. Labor,Equipment and f.. Materials for this work total 5 473.68.This does not include the filling of annular space between pipe and casing wall,which may be deemed necessary and would be an additional cost. This has been accepted as proposed. < EpAAA I Extra Work#2-Weekend connection to Existing Sewer Manhole at St 5+78.84.A Force Co Account for delta overtime labor rates will be done on the day of work. Included will also be any VC,L,L01 SeaTac inspector premiums,and police officer weekend premiums if applicable.This work will Fly U be performed on a Saturday during dayshift, so as not to impact the school and buses. Coring and j Rechanneling will be performed during normal work hours,while keeping the school driveway open.NWC estimates the delta of OT/Regular labor rates to be approximately$1,700.00,but understands the city wants to track this work on Force Account. Extra Work#3 -This is material escalation price from original bid date,since materials could not be ordered until plan revision finalized. The total is 4 173.37. I have included original quotes and new quotes from Shope and Ferguson for reference. 13 of Extra Work#4—Paving area and price revision. The paving area has been reduced approximately 20%by volume. This pricing also includes NWC's subgrade prep and finish grading.NWC is W requesting a unit pricing change to $185.00 per ton, for bid item#1095. I have included Miles updated pricing. Extra Work#413—This coincides with extra work#4. A Force Account sheet for actual support labor hours will be done on day of work. This will be the delta OT labor rates.NWC sees the base `Ti+ Acvgf- lift of asphalt being done on one Saturday.The final overlay will be done on a following Saturday.Additional paving premiums will apply, as the asphalt plant will have to open on two different Saturdays. Current quote from Miles is $5,000 premium per weekend day,attached,plus applicable markup. Extra Work#5—A Force Account will be done for the additional pothole.The added Manhole 1 A will be paid per bid item.Manhole escalation is included in Extra Work#3. I've included a breakdown for the added work of installing the Monument, and the North and South Sewer crossings on Military Road.Pricing takes into consideration that Military will have to be crossed twice.This involves laying Sewer one lane at a time, flipping traffic, and crossing the Lumen Fiber Bank twice, as well as 42 linear feet of pipe removal on the North side.Forward pricing for the Monument installation, and road crossings, $12,530.54, attached. Extra Work#6—Pricing for Permanent Channelization modifications based on delta between original bid and revised is ` 3225.60. This has been accepted as proposed. We understand that all other contract work will be paid at the unit pricing set forth in the contract. Items broken out above to be completed on Force Account will include WSDOT standard markups. Please issue a change order in the amount of$25,706.63 plus applicable sales tax on pricing above, at your earliest convenience,where we can start procuring materials. We have also requested 10 additional working days per the attached CPM schedule, which has been accepted. If you would like to discuss the matter in more detail,I can be reached at 253-370-0669. Respectfully, Chris Brazda ll AL 1' NORTHWEST CASCADE,INC. Bill to: ' City of Kent NWC PROJECT#4335 EW# 1 J DESCRIPTION: Casing Pipe with Spacers @ Station 0+07.96 LOCATION: Skyline Sanitary Sewer Extension 20 LF Casing LABOR HOURS RATE AMOUNT Laborer Group 4-Pipe Layer REG 4 4 $65.36 $261.46 O.T. 0 $89.70 $0.00 Foreman REG 4 4 $90.01 $360.03 O.T. 0 $122.96 $0.00 Operator Group 3-Light REG 4 4- $81.67 $326.69 O.T. 0 $110.69 $0.00 Operator Group 2-Heavy REG 4 4 $81.85 $327.40 O.T.. 0 $111.69 $0.00 LABOR SUBTOTAL: $1275.58 29% MARKUP: $369.92 2% Sick Leave: $25.51 0% Small Tools: $0.00 LABOR TOTAL: $1671.01 1'QU1PMENT HOURS RATE AMOUNT D220 2014 JOHN DEERE 245G LC CRAWLER REG 4 4 $117.77 $471.08 MOUNTED STNBY 0 $32.98 $0.00 C886 2019 CHEVROLET F-350 FOREMAN TRUCK REG 4 4 $12.89 $51.56 STNBY 0 $2.61 $0.00 D219 2013 JOHN DEERE 644K ARTICULATED REG 4 4 $83.98 $335.92 WHEEL LOADER STNBY 0 $22.25 $0.00 EQUIPMENT SUBTOTAL: $858.56 21% MARKUP: $180.30 EQUIPMENT TOTAL: $1038.86 MATERIALS HRS/UNITS RATE AMOUNT 16"CL52 DCL DI Fastite16"CL52 DCL DI Fastite Pipe 20LF 20 2020LF 20 20 _S80.54 $1610.80 8x16"Calpico Model M-8-SS Spacer 3 3 '�140.00 5420.00 8X16"End Seal Model W 2 2 $126.67 $253.34 MATERIAL SUBTOTAL: $2284.14 21% MARKUP: $479.67 MATERIAL TOTAL: $2763.81 LATEST REV1S1ON I1/18/2020 TOTAL 55473.68 This does not include filling of annular space between pipe and casing wall that may be deemed necessary All other contract work paid forth with unit price of contract ' FEIR(3 U S 0 N® FEL-TACOMA WW#3156 sliver To: ShariNagrodski a@nwcas 2042 SOUTH 112TH STFrom: Lance Hayes WATERWORKS TACOMA,WA 98444-0000Comments: Phone:253-538-8275 Fax:253-531-9909 12:29:46 DEC 13 2021 Page 1 of 1 FERGUSON WATERWORKS#3011 Price Quotation Phone: 253-538-8275 Fax: 253-531-9909 Bid No: B410497 Cust Phone: 253-848-2371 Bid Date: 12/13/21 Terms: NET 10TH PROX Quoted By: LJH Customer: NORTHWEST CASCADE INC Ship To: NORTHWEST CASCADE INC PO BOX 73399 PO BOX 73399 PUYALLUP,WA 98373-0399 PUYALLUP,WA 98373-0399 Cust PO#: CASING SEWER Job Name: SKYLINE SEWER Item Description Quantity Net Price UM Total DR18BPX 8 C900 DR18 PVC GJ BLUE PIPE 20 21.130 FT 42260 AFT52PD16 16 CL52 DCL DI FASTITE PIPE 20 80.540 FT 1610.80 SP-CBX16M8SSSPCR BX16 CALPICO MODEL M-8-SS SPACER 3 140.000 EA 42000 CARRIER PIPE-9 05 OD CASING PIPE- SP-8X16ENDSEALW BX16 END SEAL MODEL W 2 126 670 EA 253.34 SUBTOTAL 2706.74 Net Total: $2706.74 Tax: $0 00 Freight: $0.00 Total: $2706 74 Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE.QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBE/WBE/SMALL BUSINESS REQUIREMENTS Seller not responsible for delays,lack of product or increase of pricing due to causes beyond our control,and/or based upon Local,State and Federal laws governing type of products that can he sold or put into commerce. This Quote Is offered contingent upon the Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either follawing this document,or on the web at https://www.ferguson.com/content/website-info/terms-of-sale Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING:it is illegal to install products that are not"lead free"in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption.Products with'NP in the description are NOT lead free and can only be installed in non-potable applications.Buyer is solely responsible for product selection- HOW ARE WE DOING? WE WANT YOUR FEEDBACK! Scan the QR code or use the link below to t complete a survey about your bids: https://survey.medallia.com/?bidsorder&fc=3156&on=55652 NORTHWEST CASCADE,INC. Bill to: City of Kent NWC PROJECT# 4335 3 DESCRIPTION: Pipe Material Escalation Pricing-Original Bid LOCATION: Skyline Sanitary Sewer Extension WORK DATE(S): MATERIALS HRS/UNITS RATE AMOUNT Delta between Ferpson Ori ' and Revised Quotes i 1 $2195.10 $2195.10 Delta between Sbo a Original and Revised Quotes ! 1 $1504.74 $3 504.74 MATERIAL SUBTOTAL: $3699.84 21% MARKUP: $776.97 MATERIAL TOTAL: $4476.81 LATEST REVISION 11/18/2020 TOTAL $4476.81 Ferguson Original Quote OFERGUSONLOCATION: NDwW WAREHOUSE:1539 WATERWORKS 24025 WOODINVIL E WA198072-8 877 1 i Phone:425-488-9500 Fax:425-808-8510 Project: Skyline sanitary sewer extension Job Location: Kent, WA Bid Date: 08/24/2021 Bid Time: 11:OOAM Quoted By: David Freeze Plans Dated: Addendum: 0.00 Job Notes: ALL PRICES QUOTED FOR PVC ARE FOR ESTIMATION ONLY. PRICES QUOTED FOR PVC PRODUCTS WILL BE VALID FOR 7 DAYS FROM THE DATE OF THIS QUOTATION WITH BUYER TO TAKE DELIVERY OF DIRECT SHIPMENT FROM THE MANUFACTURER WITHIN 30 DAYS OF QUOTATION,AND ARE SUBJECT TO AVAILABILITY OF PRODUCTS. ALL QUOTATIONS FOR PVC OUTSIDE OF THE STATED TERMS ARE SUBJECT TO REQUOTING. THIS QUOTATION DOES NOT CONSTITUTE A BINDING AGREEMENT AND THE PRICING OFFERED SHALL BE BINDING ONLY UPON ISSUANCE OF A PURCHASE ORDER BY BUYER AND ACCEPTANCE IN WRITING BY SELLER. Materials(to include but not limited to Pipe,Wire, Geotextiles, Service Pipe)and the quantities have been rounded up to full lengths/rolls/units,etc. Quantities listed might not reflect those shown on the bid form, contractor is to adjust his estimate accordingly. Due to the volatility of the plastic resin and pipe market price and availability of plastic pipe will be determined at time of purchase and is subject to change without notice. This quote is not a contract to supply material or a guarantee of product or availability. 8/19/2021 Page 1 of 3 y OFERGUSON Skyline sanitary sewer extension WASHINGTONWATERWORKS WATERWORKS QUOTE Qty UM Description/Comments Bid Price Ext Price Item 3005 PVC Sewer Pipe,8 Inch Diameter 560 FT 8 X 14 SDR35 PVC Gasket Joint Sewer Pipe $8.10^ $4,536.00 1,000 M 12 Gauge 500 FT Irrigation Underground Feeder WIRE Green $235.07 $235.07 3 EA 8 X 6 PVC Sewer Gasket X Gasket X Gasket Tee $87.31 $261.93 PVC Sewer Pipe,8 Inch Diameter: 5$ ,033_. Item 3006: $5,033.00 Item 3035 PVC Side Sewer Pipe,6 Inch Diameter 140 FT 6 X 14 SDR35 PVC Gasket Joint Sewer Pipe $4.47 $625.80:i PVC Side Sewer Pipe,6 Inch Diameter: $626.80 Item 3035: $626.80 Item 3100 Sewer Cleanout 3 EA 6 PVC Sewer Gasket X Gasket X Gasket Wye $63.68 $191.04 3 EA 6 PVC Sewer Gasket X Gasket 45 Bend $32.66 $97.98 28 FT 6 X 14 SDR35 PVC GJ Sewer Pipe $4.47 $125.16 3 EA 6 PVC Sewer Raised Head Thread Cleanout Plug $17.41 $52.23! 3 EA 6 PVC Sewer Hub Female Cleanout Adapter $26.91 $80.73 3 EA 6 PVC Sewer PLUG $12.02 $36.06 3 EA Cast Iron Cleanout Body With Sewer Cover $89.10 $267.30 3 FT 12 X 14 SDR35 PVC GJ Sewer Pipe $18.14 $54AZ Sewer Cleanout: $904.92 Item 3100: $904.92 Item 3805 Locking Manhole Frame and Cover 5 EA 24 X 6 Manhole 1 Handle Ring &Cover DT Sewer $388.30 $1,941.50 Locking Manhole Frame and Cover: 1 9$ . 4'f,50 Item 3805: 1$_ ,941.50 Grand Total: $8,506.22 Quoted prices are based upon receipt of the total quantity for immediate shipment (48) hours. SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT THE TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBE/WBE/SMALL BUSINESS REQUIREMENTS. 1. NO TAXES INCLUDED 2. PER FERGUSON'S STANDARD TERMS AND CONDITIONS 3. PRICES IN EFFECT AT TIME OF SHIPMENT 8/19/2021 Page 2 of 3 r N' Skyline sanitary sewer extension wATERWOWS Qty UM Description/Comments Bid Price Ext Price 4. DUE TO THE VOLATILITY OF THE COPPER PIPE AND PVC/RESIN MARKET ALL PRICES ARE SUBJECT TO CHANGE WITHOUT NOTICE. PRICES MAY BE REQUOTED AT TIME OF PURCHASE 5.ALL BURY DEPTH LENGTHS ARE ESTIMATES, CONTRACTOR TO FIELD VERIFY 6. THIS QUOTATION IS OUR INTERPRETATION OF THE PLANS AND SPECIFICATIONS WE HIGHLY RECOMMEND THAT THE CONTRACTOR PERFORM HIS/HER OWN TAKEOFF OF ITEMS AND QUANTITIES FOR THE ABOVE PROJECT, WE ALSO RECOMMEND THE CONTRACTOR CONFIRM THE MATERIAL LIST PRIOR TO ORDERING MATERIAL FOR PROJECT. 7.ALL SPECIAL-ORDER ITEMS MAY NOT BE CANCELED AFTER RECEIPT OF ORDER 8.THIS IS NOT A GUARANTEED LIST OF MATERIALS 9. MATERIAL ORDER IS BASED UPON RECEIPT OF APPROVED SUBMITTALS 10. MATERIAL ORDER IS BASED UPON CUSTOMER APPROVAL 11.ALL DI PIPE, SPOOLS AND FITTINGS ARE QUOTED AS CL153-CUBIT COATED 12.ALL ITEMS ARE SUBJECT TO FACTORY RETURN TERMS 13. CUSTOMERS TO VERIFY ALL SPOOL AND NIPPLE LENGTHS PRIOR TO ORDERING **14. FERGUSON DOES NOT QUOTE FITTINGS PER POUND. FOR ESTIMATING PURPOSES ONLY PLEASE USE 7.00 PER LB. CONTRACTOR TO VERIFY PRIOR TO ORDERING.** General Notes& Exclusions The above represents the interpretation of the plans and specs provided at bid time. Not all information was provided on the plans to create a complete quote, some assumptions were made. Contractor to verify quantity of material needed prior to order. Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either following this document, or on the web at http://wolseleyna.com/terms_conditionsSale.htmi. Govt Buyers: All items quoted are open market unless noted otherwise. Job Terms: 8/19/2021 Page 3 of 3 Ferguson Revised Quote FERGUSON LOCATION: WAREHOUSE: 24025 SNOHOMISH-WOODINVILLE RD T/1 rj�t�yrjr oiks WOODINVILLE,WA 98072-8787 ��/ �Y/[[��lL CCE WW�Vf I/J y Phone:425-486-9600 a WDLSELEY company Fax:425-806-8510 Project: Skyline sanitary sewer extension Bid Date: 8/24/2021 Bid Time: 11:00 AM Estimator: Lance Hayes Job Notes: Updated on 2-17-2022 Ferguson -Your NEW Direct Source for Erosion Control Needs , ,., -Visqueen - Catch Basin Inserts ' -Wattles - High Vis Fence Silt Fence -Woven / Non Woven Fabrics Contact your local sales associate for more information 2/17/2022 Page 1 of 3 WASHINGTON WATERWORKS QUOTE OFERGUSON Skyline sanitary sewer WESTERN WASHINGTON Waterworks a WOLSELEY company extension WOODINVILLE,WA 98072 Item 3005 PVC Sewer Pipe, 8 Inch Diameter Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price SDR35PX14 8 X 14 SDR35 PVC Gasket Joint Sewer Pipe FT 560.00 $10.570 $5,919.20 TW12SLDUFG500 12 Gauge 500 FT Irrigation Underground Feeder M 1,000.00 $235.070 $235.07 WIRE Green MUL063096 8 X 6 PVC Sewer Gasket X Gasket X Gasket Tee EA 3.00 $96040 $288.12 PVC Sewer Pipe, 8 Inch Diameter Average Price: INF/ Subtotal: $6,442.39 Item 3005 $6,442.39 Item 3035 PVC Side Sewer Pipe, 6 Inch Diameter Alt Description/ UM City Final Bid Extended Bid Comments Price Price SDR35PU14 6 X 14 SDR35 PVC Gasket Joint Sewer Pipe FT 140.00 $5.910 $827.40 PVC Side Sewer Pipe,6 Inch Diameter Average Price: INF/ Subtotal: $827.40 Item 3035 $827.40 Item 3100 Sewer Cleanout Alt Description/ UM City Final Bid Extended Bid Comments Price Price MUL063306 6 PVC Sewer Gasket X Gasket X Gasket Wye EA 2.00 $70.050 $140.10 MUL063506 6 PVC Sewer Gasket X Gasket 45 Bend EA 2.00 $35.930 $71.86 SDR35PU14 6 X 14 SDR35 PVC GJ Sewer Pipe FT 27.00 $5.910 $159.57 MUL040926 6 PVC Sewer Raised Head Thread Cleanout Plug EA 2.00 $19.150 $38.30 MUL040952 6 PVC Sewer Hub Female Cleanout Adapter EA 2.00 $29.600 $59.20 MUL043736 6 PVC Sewer PLUG EA 2.00 $13.220 $26.44 OM1007SWR Cast Iron Cleanout Body With Sewer Cover EA 2.00 $95.040 $190.08 SDR35P1214 12 X 14 SDR35 PVC GJ Sewer Pipe FT 14.00 $18.560 $259.84 Sewer Cleanout Average Price: INF/ Subtotal: $945.39 Item 3100 $945.39 Item 3805 Locking Manhole Frame and Cover Alt Description/ UM Qty Final Bid Extended Bid Comments Price Price 011291 OAS ET 24 X 6 Manhole 1 Handle Ring &Cover DT Sewer EA 6.00 $414.190 $2,485.14 2/17/2022 Page 2 of 3 FERGUSON Skyline sanitary sewer WASHINGTON WATERWORKS QUOTE Watawor� WESTERN WASHINGTON aWOLSELEYcompany extension WOODINVILLE,NA 98072 Locking Manhole Frame and Cover Average Price: INF/ Subtotal: $2,485.14 Item 3805 $2,485.14 Grand Total: $10,7004 Job Terms: ALL PRICES QUOTED FOR PVC ARE FOR ESTIMATION ONLY. PRICES QUOTED FOR PVC PRODUCTS WILL BE VALID FOR 7 DAYS FROM THE DATE OF THIS QUOTATION WITH BUYER TO TAKE DELIVERY OF DIRECT SHIPMENT FROM MANUFACTURER WITHIN 30 DAYS OF QUOTATION , AND ARE SUBJECT TO AVAILABILTY OF PRODUCTS. ALL QUOTATIONS FOR PVC OUTSIDE OF THE STATED TERMS ARE SUBJECT TO REQUOTING. THIS QUOTATION DOES NOT CONSTITUTE A BINDING AGREEMENT ANSD THE PRICING OFFERED SHALL BE BINDING ONLY UPON ISSUANCE OF A PURCHASE ORDER BY BUYER AND ACCEPTANCE IN WRITING BY SELLER. "ANY REFERENCE TO OR INCORPARATION OF EXECUTIVE ORDER 14042 AND/OR THE EO-IMPLENTING FEDERAL CLAUSES (FAR 52.223-99 AND/OR 252.223-7999) IS EXPRESSLY REJECTED BY SELLER AND SHALL NOT APPLY AS SELLER IS A MATERIALS SUPPLIER AND THEREFORE EXEMPT UNDER THE EXECUTIVE ORDER." Ferguson Field Division - Hot Taps - EZ Valve Installation - Line Stops - Chlorination/Declorination - Large Meter Testing - Hydrant Testing and Repair - Fusion Welding - Mechanical Taps Contact Barney Gibbs for more information: (206) 310-5051 Barney.Gibbs@ferguson.com WA Contractor#FERGUE1976RW Ready to Setup the Job? Click HERE to Start! 2/17/2022 Page 3 of 3 Shope Original Quote s4e Quote Number: 33475 ConCrsfa PradUCIS Order Date: 8/23/2021 Office 1618 E Main Puyallup,WA 98372 Phone:(253)848-1551 Fax:(253)845-0292 BIII to: PLANHOLDERS Delivery to: SKYLINE SEWER EXTENSION BID DATE 8/24/2021 KENT, Contact: Site Contact: Phone: Phone: Fax: Fax: Customer No: 1755 PO: Terms: 1%10TH,N111TH Sales Rep: DerekR Structure Product ID Description Oty Price/Average Amount BID ITEM 3050 5 $947.22 $4,736.08 GR424 4"X 24"GRADE RING 6 $47.20 $283.20 GR024 6"X 24"GRADE RING 1 $54.88 $54.88 KS10612AWP-INS KOR-N-SEAL BOOT S106-12AWP 7.00"-8.50"PIPE 10 $62.00 $620.00 O.D.RANGE INSTALLED LAHH POLY STEP HAND HOLD 1 $15.00 $15.00 MG48 48"MANHOLE GASKET 9 $0.00 $0.00 MH4815WS 48"X 1'MH SECTION-STEP 1 $168.00 $168.00 MH482BSPL 48"X 2'MH BASE-SPL 5 $311.00 $1,555.00 MH4828WS 48"X 2'MH SECTION-STEPS 1 $221.00 $221.00 MH483EC 48"X 3'MH ECCENTRIC CONE 5 $240.00 $1,200.00 MH483SST 48"X 3'MH SECTION-STEPS 1 $276.00 $276.00 MH484SST 48"X 4'MH SECTION-STEPS 1 $343.00 $343.00 Page 1 of 3 Quote Number: 33475 Concrete Prnducts Order Date: 8/23/2021 Office 1618 E Main Puyallup,WA 98372 Phone:(253)848-1551 Fax.,1253)945-0292 $4,736.08 Taxable $0.00 Non-Taxable $4,736.08 Sub Total $4,736.08 Tax $0.00 Total $4,736.08 CHANNEL COATINGS NOTICE***"I INTERIOR COATING OF WALL[WITHIN 2-INCHES OF CHANNEL)PROVIDED BY SHOPE CONCRETE.COATING OF CHANNEL AND MISCELLANEOUS REPAIRS ARE THE RESPONSIBILITY OF THE CONTRACTOR.CAST CHANNELS REQUIRE A CURE PERIOD OF 14 DAYS PRIOR TO COATING.THIS SPECIFICATION APPLIES TO MC-AEROSHIELD PRODUCTS ONLY. DELIVERIES THAT ARE LESS THAN FULL TRUCK AND TRAILER LOAD QUANTITIES WILL BE SUBJECT TO A DELIVERY CHARGE. PRICES ARE BASED ON PURCHASE OF ENTIRE QUOTATION. LIFT GEAR DEPOSIT A temporary Equipment deposit of$5,000.00 will be charged to the Customer upon request for use of the Equipment.The Customer will be credited the deposit in full once the Equipment is returned to Shope.In the event that the Customer Is unable to return the Equipment to Shope and it is deemed necessary for Shope Concretee to retrieve the Equipment from the Customer,an Equipment pickup fee wil be assed the Customer at the rate of$125.00 per hour. The customer will sign a paper agreeing to return the Equipment by a specific date. The customer will be granted a return grace period of five(5)working days following that date. Upon expiration of the grace period,the Equipment deposit of$5000.00 will not be refunded. This quotation is our Interpretation of the plans and specifications and Is ONLY AN ESTIMATE. Shope Concrete is not responsible for any changes that may occur before or after the time of order that may affect this quote. The pricing herein is reflective only of the material listed on this quote and not necessarily of all the materials that may be required on the Job. Please notify us if you discover any errors and/or omissions. Castings not included unless otherwise noted. When casting prices are provided,it is the responsiility of the contractor to confirm size and type of casting. if changes are required,please contact your sales representative. Returns shall be first-quality only and prior approval will be required.A 25%handling charge and all transportation costs will be deducted. DUE TO THE VOLATILE NATURE OF THE METALS MARKET,ANY CASTING PRICES QUOTED ARE ONLY GOOD FOR 30 DAYS FROM THE DATE OF THE QUOTE. "FHir*rHHHHh*6f.."....".M..►..H...*M...•.rrr.r*ar[*.Rr*A...*.r•a...*....y�.*r...aa..�r[*.[F/e................................wx.r*..• Coatings Specifications Statement:Tnemec Hi-Build Series 46H-413 Shope Concrete uses Tnemec Hi-Build Series 46H-413 Tneme Tar coating when bituminous coal tar is required for structure coating.In order to meet manufactures specification recommendations,a DFT of 16-20 dry mil's is required to qualify for Tnemec's coating warranty. Any coating thicknesses applied outside of the recommended 16-20 mils dry directly voids the Tnemec warranty and adversely impacts the performance of the 46H-413 Tneme-Tar coating. With proven advancements In precast concrete coating technologies,many Washington State cities and counties have abandoned the 50 mils dry thickness coating specification.Today's high performance coating technologies provide greater performance at lower costs over old coating technologies.Coating manufacturers require specific guidelines for their products in order to meet manufacture warranties. Meeting these specific guidelines provides our customers exceptional product performance as well as warranty specification requirements for structure immersion type environments. ........a...............*......r............a........rr.iww,++�+ "+ra►►��+"+t+.+ra.a.rrr.a.r.a.►r..+ra..aair++tr"raa:.rHa*rrrHrr.r.r Page 2 of 3 sh.^ e Quote Number: 33475 Concfele Ptaducts Order Data: 8/23/2021 Office 1618 E Main Puyallup,WA 98372 Phone:(253)848-1551 Fax:(253)845.0292 IMPORTANT NOTICE FOR 2014,15—PLEASE READ Customer Notice Predl Systems of North America manufactures polypropylene and fiberglass liners specified for State counties.Shope Concrete Products does not stock or inventory liners. Each Predl Systems liner is custom made to order specific to the plans provided by our customers. Any manufacture errors,defective,or damaged liner produced and shipped by Predl Systems will not be the responsibility of Shope Concrete. Shope Concrete is not responsible for any delays or costs that may occur for the customer due to the Predl Systems manufacturing errors,scheduling,re-order fulfillment time,or shipping issues. All GU liners delivered to Shope Concrete from Predl Systems will undergo an in-house quality control test before being cast into our manhole products.This quality control process is used to find any possible manufacturing flaws,defects,errors,or damage.This service is performed for our customers,and not for Predl Systems. Prior to casting into a manhole,if a liner does not pass our inspection,Shope Concrete will immediately notify our customer before further manufacturing occurs. At this stage the customer has three available options: 1.11he customer may approve the liner"as Is"regardless of the defect,manufacturing error,or shipping damage,or any other possible discrepancy In the manufactured liner. 2f the liner is defective due to a Predl Systems manufacturing error,and Predl Systems agrees they are at fault for the defect,the customer may request a replacement liner from Predl Systems. 33apalrs may be performed by a third-party for a defect,error,or damaged liner.Any repairs made by a third-party are the responsibility of the customer,and not of Shope Concrete. [Please note:In most cases,specialized repairs will require prior-approval by the represented county) Page 3 of 3 Shope Revised Quote spFpe Job Number: 33475 uc:ls Order Date: 8/23/2021 1618 E Main fficcc Puyallup,WA 98372 Phone: (253)848-1551 Fax: (253)845-0292 Bill to: NORTHWEST CASCADE INC. Project: SKYLINE SEWER EXTENSION P O BOX 73399 SKYVIEW APARTMENT HOMES UPDATED 03/03/2022 3322 S 222ND PL (ON MILITARY ROAD) PUYALLUP,WA 98373-0399 KENT,WA 98032 Contact: Site Contact: CHRIS BRAZDA(253)370-0669 Phone: (253)848-2371 Phone: Fax: (253)848-2545 Fax: Customer No: 1460 PO: I "Terms; -1%-MTH,_Nn1TH Sales Rep: Deanne Erickson Oty Item Description Unit Price Extension Structure: DELIVERY Item: Rim to Invert: Top Elevation: Out Elevation: 2 DELIVERY DELIVERY CHARGE $125.00 $250.00 Note: $250.00 Structure: GASKET LOBE Item: Rim to Invert: Top Elevation: Out Elevation: 2 GLBLB GASKET LUBE 8 LB.PAIL $22.50 $45.00 Note: $45.00 Structure: SSMH01 Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 10.14 Top Elevation: 406.2 Out Elevation: 396.06 1 MH482BCSPL 48"X 2'MH BASE CORED-SPL $311.00 $311.00 1 MH484SST 48"X 4'MH SECTION-STEPS $343.00 $343.00 1 GR624 6"X 24"GRADE RING $54.88 $54.88 1 GR424 4"X24"GRADE RING $47.20 $47.20 1 GR424 4"X24"GRADE RING $47.20 $47.20 1 MH483EC 48"X T MH ECCENTRIC CONE $240.00 $240.00 1 LAHH POLY STEP HAND HOLD $15.00 $15.00 2 KS10612AWP-INS KOR-N-SEAL BOOT 5106-12AWP 7.00"- $62.00 $124.00 8.50"PIPE O.D.RANGE INSTALLED 3 MG48 48"MANHOLE GASKET $0.00 $0.00 1 MH482SWS 48"X 2'MH SECTION-STEPS $232.05 $232.05 Note: $1,414.33 Structure: SSMH0IA Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 10.35 Top Elevation: 407 Out Elevation: 396.65 1 MH482BCSPL 48"X 2'MH BASE CORED-SPL $326.55 $326.55 1 MH485SST 48"X 5'MH SECTION-STEPS $442.05 $442.05 1 GR424 4"X 24"GRADE RING $47.20 $47.20 1 MH483EC 48"X 3'MH ECCENTRIC CONE $252.00 $252.00 2 KS10612AWP-INS KOR-N-SEAL BOOT S106-12AWP 7.00"- $62.00 $124.00 8.50"PIPE O.D.RANGE INSTALLED 2 MG48 48"MANHOLE GASKET $0.00 $0.00 Thursday,March 3,2022 03:01 PM Page 1 of 5 s4pp,e Job Number: 33475 c.Ps Order Date: 8/23/2021 1618 E Main ' ( ' Puyallup,WA 98372 Phone: (253)848-1551 Fax: (253)845-0292 Qty Item Description Unit Price Extension Structure: SSMH01A Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 10.35 Top Elevation: 407 Out Elevation: 396.65 Note: $1,191.80 -----------------•-----------------------------------.-. ._...-•-_- Structure: SSMH02 Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 5.34 Top Elevation: 399.73 Out Elevation: 394.39 1 MH482BCSPL 48"X 2'MH BASE CORED-SPL $311.00 $311.00 1 GR624 6"X 24"GRADE RING $54.88 $54.88 1 MH483EC 48"X 3'MH ECCENTRIC CONE $240.00 $240.00 2 KS10612AWP-INS KOR-N-SEAL BOOT S106-12AWP 7.00"- $62.00 $124.00 8.50"PIPE O.D.RANGE INSTALLED 3 MG48 48"MANHOLE GASKET $0.00 $0.00 1 MH483SST 48"X 3'MH SECTION-STEPS $289.80 $289.80 1 MH483SST 48"X 3'MH SECTION-STEPS $289.80 $289.80 1 GR624 6"X 24"GRADE RING $54.88 $54.88 Note: $1,364.36 Structure: SSMH03 Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 6.34 Top Elevation: 400.43 Out Elevation: 394.09 1 MH482BCSPL 48"X 2'MH BASE CORED-SPL $311.00 $311.00 1 MH483SST 48"X 3'MH SECTION-STEPS $289.80 $289.80 1 GR624 6"X 24"GRADE RING $54.88 $54.88 1 MH483EC 48"X T MH ECCENTRIC CONE $240.00 $240.00 2 KS10612AWP-INS KOR-N-SEAL BOOT S106-12AWP 7.00"- $62.00 $124.00 8.50"PIPE O.D.RANGE INSTALLED 2 MG48 48"MANHOLE GASKET $0.00 $0.00 Note: $1,019.68 ----------- ----------- -- Structure: SSMH04 Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 7.43 Top Elevation: 386.87 Out Elevation: 379.44 1 MH482BCSPL 48"X 2'MH BASE CORED-SPL $311.00 $311.00 1 MH482SWS 48"X 2'MH SECTION-STEPS $221.00 $221.00 1 GR424 4"X 24"GRADE RING $47.20 $47.20 1 MH483EC 48"X 3'MH ECCENTRIC CONE $240.00 $240.00 2 KS10612AWP-INS KOR-N-SEAL BOOT S106-12AWP 7.00"- $62.00 $124.00 8.50"PIPE O.D.RANGE INSTALLED 2 MG48 48"MANHOLE GASKET $0.00 $0.00 Note: $943.20 _..._.--- ---------------- Structure: SSMH05 Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 8.31 Top Elevation: 385 Out Elevation: 376.69 1 MH482BCSPL 48"X 2'MH BASE CORED-SPL $311.00 $311.00 1 MH481SWS 48"X 1'MH SECTION-STEP $176.40 $176.40 1 GR424 4"X 24"GRADE RING $47.20 $47.20 1 MH483EC 48"X 3'MH ECCENTRIC CONE $240.00 $240.00 2 KS10612AWP-INS KOR-N-SEAL BOOT S106-12AWP 7.00"- $62.00 $124.00 8.50"PIPE O.D.RANGE INSTALLED Thursday,March 3,2022 03:01 PM Page 2 of 5 s4pplicts a Job Number: 33475 Order Date: 8/23/2021 1618 E Main Puyallup,WA 98372 Phone: (253)848-1551 Fax: (253)845-0292 Qty Item Description Unit Price Extension Structure: SSMH05 Sanitary WSDOT Type 1 48"Sanitary Manhole Item: Rim to Invert: 8.31 Top Elevation: 385 Out Elevation: 376.69 2 MG48 48"MANHOLE GASKET $0.00 $0.00 1 GR624 6"X 24"GRADE RING $54.88 $54.88 Note: $9W.48 Thursday,March 3,2022 03:01 PM Page 3 of 5 S � Job Number: 33475 Cvncrefo Products Order Date: 8/23/2021 1618 E Main ,'k Puyallup,WA 98372 Phone: (253)848-1551 Fax: (253)845-0292 Taxable $0.00 Non-Taxable $7,181.85 Sub Total $7,181.85 Tax $0.00 Total $7,181.85 All applicable Federal,State and Local taxes will be added to these prices. "'"""CHANNEL COATINGS NOTICE"*—I INTERIOR COATING OF WALL[WITHIN 2-INCHES OF CHANNEL]PROVIDED BY SHOPE CONCRETE.COATING OF CHANNEL AND MISCELLANEOUS REPAIRS ARE THE RESPONSIBILITY OF THE CONTRACTOR.CAST CHANNELS REQUIRE A CURE PERIOD OF 14 DAYS PRIOR TO COATING.THIS SPECIFICATION APPLIES TO MC-AEROSHIELD PRODUCTS ONLY. Coatings Specifications Statement:Tnemec Hi-Build Series 461-1d13 Shope Concrete uses Tnemec Hi-Build Series 46H-413 Tneme Tar coating when bituminous coal tar is required for structure coating.In order to meet manufactures specification recommendations,a OFT of 16-20 dry mil's is required to qualify for Tnemec's coating warranty.Any coating thicknesses applied outside of the recommended 16-20 mils dry directly voids the Tnemec warranty and adversely impacts the performance of the 46H-413 Tneme-Tar coating. With proven advancements in precast concrete coating technologies,many Washington State cities and counties have abandoned the 50 mils dry thickness coating specification.Today's high performance coating technologies provide greater performance at lower costs over old coating technologies.Coating manufacturers require specific guidelines for their products In order to meet manufacture warranties.Meeting these specific guidelines provides our customers exceptional product performance as well as warranty specification requirements for structure immersion type environments. �R"11111Nk11kNk"1fR""/►"""N"""KHkwwM"wkkkwN" �""""""►"""w"�wrrhM►w"lRRfrRM4y►""""►"M"Mwww"►wwkH+• Prices include gaskets as required. PRICES ARE BASED ON PURCHASE OF ENTIRE QUOTATION. Castings not included unless otherwise noted. When casting prices are provided,it is the responsiility of the contractor to confirm size and type of casting. If changes are required,please contact your sales representative. Returns shall be first-quality only and prior approval will be required.A 25%handling charge and all transportation costs will be deducted. Due to the volatile nature of the metals market,any casting prices quoted are only good for 30 days from the date of the quote. LIFT GEAR DEPOSIT A temporary Equipment deposit of$5,000.00 will be charged to the Customer upon request for use of the Equipment.The Customer will be credited the deposit in full once the Equipment is returned to Shope.In the event that the Customer is unable to return the Equipment to Shope and it is deemed necessary for Shope Concretes to retrieve the Equipment from the Customer,an Equipment pickup fee wil be assed the Customer at the rate of$125.00 per hour. The customer will sign a paper agreeing to return the Equipment by a specific date. The customer will be granted a return grace period of five(5)working days following that date. Upon expiration of the grace period,the Equipment deposit of$5000.00 will not be refunded. Thursday,March 3,2022 03:01 PM Page 4 of 5 Sh^ne Job Number: 33475 concrpla Pra[lucfs Order Date: 8/23/2021 1618 E Main office Puyallup,WA 98372 Phone: (253)848-1551 Fax: (253)845-0292 ----- ----------------_........-------- IMPORTANT NOTICE FOR 2014,15—PLEASE READ Customer Notice Predl Systems of North America manufactures polypropylene and fiberglass liners specified for State counties.Shope Concrete Products does not stock or inventory liners. Each Predl Systems liner is custom made to order specific to the plans provided by our customers. Any manufacture errors,defective,or damaged liner produced and shipped by Predl Systems will not be the responsibility of Shope Concrete. Shope Concrete is not responsible for any delays or costs that may occur for the customer due to the Predl Systems manufacturing errors,scheduling,re-order fulfillment time,or shipping Issues. All GU liners delivered to Shope Concrete from Predl Systems will undergo an in-house quality control test before being cast into our manhole products.This quality control process is used to find any possible manufacturing flaws,defects,errors,or damage.This service Is performed for our customers,and not for Predl Systems. Prior to casting into a manhole,if a liner does not pass our inspection,Shope Concrete will immediately notify our customer before further manufacturing occurs. At this stage the customer has three available options: 1.IDhe customer may approve the liner"as is"regardless of the defect,manufacturing error,or shipping damage,or any other possible discrepancy In the manufactured liner. 2.If the liner is defective due to a Predl Systems manufacturing error,and Predl Systems agrees they are at fault for the defect,the customer may request a replacement liner from Predl Systems. 3.Repairs may be performed by a third-party for a defect,error,or damaged liner.Any repairs made by a third-party are the responsibility of the customer,and not of Shope Concrete. [Please note:in most cases,specialized repairs will require prior-approval by the represented county] Thursday,March 3,2022 03:01 PM Page 5 of 5 NORTHWEST CASCADE,INC. Bill to: City of Kent NWC PROJECT#4335 tiWn 5 DESCRIPTION: Added Work for Revision LOCATION: Skyline Sanitary Sewer Extension Two Street Crossings- Two Fiber Bank North Side Pipe Activity North and South Crossings Removal Monument LABOR HOURS RATE AMOUNT REG 6 6 4 16 $65.36 $1045.83 Laborer Group 4-Pipe Layer O.T. 0 $89.70 $0.00 � � Laborer Group 5-Grade Checker/Pipe Layer Lead REG 3 3 $66.17 $198.52 O.T. 0 S90.91 $0.00 Foreman REG 6 6 4 3 19 $90.01 $1710.12 Z"10 •of Q.T. 0 $122.96 $0.00 Op=Wr Group 3-Uobt REG 3 3 $81.67 S245.02 O.T. 0 $110.69 50.00 Operator Group 2-Heavy REG 12 12 8 32 $91.85 $2619.23 O.T. ❑ $111.69 $0.00 LABOR SUBTOTAL: $5818.72 713,S7 29% MARKUP: $1687.43 TOr..IY 2% Sick Leave: $116.37 1°I.Z7 0% Small Tools: SO.00 -� LABOR TOTAL: $7622.52 93q,7$ EQUIPMENT HOURS RATE AMOUNT D211 2013 JOHN DEERE 310SK TRACTOR 1REG 3 3 $4333 $130.59 t 30-SCI LOADER STNBY 0 $11.16 $0.00 C886 2019 CHEVROLET F-350 FOREMAN REG 6 6 4 3 19 S12.89 S244.91 aa.G7 TRUCK STNBY 0 $2.61 $0.00 D220 2014 JOHN DEERE 245G L(CRAWLER REG 6 6 4 16 $117.77 S1884.32 MOUNTED STNBY 0 $32.99 $0.00 D219 2013 JOHN DEERE 644K ARTICULATED REG 6 6 4 16 $83.98 $1343.68 WHEEL LOADER STNBY 0 $22.25 SO.00 CRAWLER REG 3 3 $62.04 S 186.12 186, t Z D226 2016 DEERE 85G MOUNTED HYDRAULIC STNBY 0 $19.55 $0.00 45. M232 0 WACKER RD11A ASPHALT REG' 3 3 $15,21 $45.63 ROLLER STNBY 0 S4.62 SOAO EQUIPMENT SUBTOTAL: 5383525 21% MARKUP: $805.40 8t( y EQUIPMENT TOTAL: $4640.65 y s22 MATERIALS HRSIUNITS RATE AMOUNT Monument Box i 1 S167.37 S167.37 Monument Cover 1 1 $53.59 S53.59 MATERIAL SUBTOTAL: $220.96 21% MARKUP: $46.40 MATERIAL TOTAL: $267.36 Z67.3C LATEST REVISION 11/18/2020 TOTAL $12530.54 P1,6g7 36 -I,C-87,3G O M�kx�4� /o,8y3.18 Sc.k- TII NORTHWEST CASCADE,INC. Bill to: City of Kent NWC PROJECT#4335 F W-' 6 DESCRIPTION: Permanent Channelization LOCATION: Skyline Sanitary Sewer Extension WORK DATE(S): SUBCONTRACTORS HRS/UNITS RATE AMOUNT Apply A Line(Revised Price) ] 1 $5745.00 $5745.00 Apply A Line(Original Credit) 1 1 ($2865.00) ($2865.00) 0 $0.00 $0.00 0 $0.00 $0.00 SUBCONTRACTOR SUBTOTAL: $2880.00 12% MARKUP: $345.60 SUBCONTRACTOR TOTAL: $3225.60 LATEST REVISION 11/18/2020 TOTAL $3225.60 APPLY-A-LINE, LLC 175 Roy Rd SW Bldg C Pacific WA 98047 Tel:253-299-1200 Fax:253-299-1250 mail@applyaline.com LTC.#APPLYLL8340J Original PROPOSAL ATTENTION: CHRIS-NORTHWEST CASCADE PROJECT: SKYLINE SANITARY SEWER EXTENSION BID DATE: 11/12/2021 ITEM DESCRIPTION PLAN UNIT TOTAL # QTY BID BID 5005 PERMANENT CHANNELIZATION 1.00 LS 2700.00 $ 2,700.00 PAINT LINE RAISED PAVEMENT MARKER TYPE 2 5080 TEMP PAVEMENT MARKING-SHORT DURATION 650.00 LF 030 $ 165.00 TOTAL $ 2,865.00 STIPULATIONS: 1.GENERAL CONTRACTOR TO PROVIDE TRAFFIC CONTROL 2.GENERAL CONTRACTOR TO PROVIDE PRELIMINARY MARKING FOR STRIPING LAYOUT 3.THIS PROPOSAL TO BE INCLUDED WITH CONTRACT DOCUMENTS 4.STANBY TIME$100.00 PER HOUR PER PERSON 5.WHEN PROJECTS ARE LESS THAN$10,000.00 APPLY-A-LINE REQUESTS A PURCHASE ORDER IN LIEU OF A FORMAL SUBCONTRACT. BOND NOT INCLUDED ITEM # 5080 REMOVAL OF TEMP TAPE ON FINAL LIFT THANK YOU FOR THE OPPORTUNITY TO QUOTE THIS PROJECT WITH YOUR COMPANY SINCERELY, PRICES INCLUDE MATERIAL, INSTALLATION&INSURANCE. PRICES GOOD IF CONTRACT IS RECEIVED WITHIN 30 DAYS OF AWARD MIKE"SUS"SU5NEF2 AFTER 30 DAYS PRICES MUST ESTIMATOR BE RENEGOTIATED. APPLY-A-LINE, LLC 175 Roy Rd SW Bldg C Pacific WA 98047 Tel:253-299-1200 Fax:253-299-1250 mail@applyaline.com LIC.#APPLYLL8340J REVISED PROPOSAL ATTENTION: CHRIS-NORTHWEST CASCADE PROJECT: SKYLINE SANITARY SEWER EXTENSION BID DATE: 2/15/2022 ITEM DESCRIPTION PLAN UNIT TOTAL # QTY BID BID 5005 PERMANENT CHANNELIZATION 1.00 LS 2700.00 $ 2,700.00 PAINT LINE RAISED PAVEMENT MARKER TYPE 2 5080 TEMP PAVEMENT MARKING-SHORT DURATION 550.00 LF 0.30 $ 165.00 PLASTIC CROSSWALK 1.00 LS 2880.00 $ 2,880.00 TOTAL $ 5,745.00 STIPULATIONS: 1.GENERAL CONTRACTOR TO PROVIDE TRAFFIC CONTROL 2.GENERAL CONTRACTOR TO PROVIDE PRELIMINARY MARKING FOR STRIPING LAYOUT 3.THIS PROPOSAL TO BE INCLUDED WITH CONTRACT DOCUMENTS 4.STANBY TIME$100.00 PER HOUR PER PERSON 5.WHEN PROJECTS ARE LESS THAN$10,000.00 APPLY-A-LINE REQUESTS A PURCHASE ORDER IN LIEU OF A FORMAL SUBCONTRACT. BOND NOT INCLUDED ITEM # 6080 REMOVAL OF TEMP TAPE ON FINAL LIFT THANK YOU FOR THE OPPORTUNITY TO QUOTE THIS PROJECT WITH YOUR COMPANY. SINCERELY, PRICES INCLUDE MATERIAL, INSTALLATION&INSURANCE. PRICES GOOD IF CONTRACT IS RECEIVED WITHIN 30 DAYS OF AWARD. MIKE"SUS"SUSNER AFTER 30 DAYS PRICES MUST ESTIMATOR BE RENEGOTIATED. A - ti, ,' I � r — _ _yam _ f .' y,;,�'�r �`•, r�� x. -.3•� ." � ' ,j�■fir, x.. "�' '�`�'�''��_``-: '+�_ e-o-! • -- - - �.` � •��: � r'�'-f ��+� •ate.. . ..ls _ � -`icy -7•• .•�'`•.: -J �" _ N' 1�- •��1� it [� •.1 k �- - �}��:7 1