HomeMy WebLinkAboutCAG2021-397 - Change Order - #2 - OMA Construction, Inc. - Willis Street & Fourth Avenue Landscape - 04/22/2022ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: Director or Designee Date of Council Approval: Grant? Yes No Type:Review/Signatures/RoutingComments: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? Yes No* Business License Verification: Yes In-Process Exempt (KCC 5.01.045) If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? Yes No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 Budget Account Number: Budget? Yes No Sup/Mgr: rev. 20210513 FOR CITY OF KENT OFFICIAL USE ONLY * Memo to Mayor must be attached Dir. Assist: 4 Lynn Osborn Parks, Recreation & Community Services 03/11/2022 Earliest possible please N/A P21050.64110.530 4 4 N/A 2448752 Contract Change Order $1,300.073.44 09/07/2021 Bid 04/22/2022 4 4 4 BH BH 03/17/2022 CHANGE ORDER - 1 OF 3 CHANGE ORDER NO. 2 NAME OF CONTRACTOR: OMA Construction Inc. (“Contractor”) CONTRACT NAME & PROJECT NUMBER: Willis Street & Fourth Avenue Landscape ORIGINAL CONTRACT DATE: 09/07/2021 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled “Description of Work,” is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: As described in attached Exhibit A, incorporated herein, contractor shall install a lighted flagpole on the NE corner at Willis Street and Fourth Avenue. 2. The contract amount and time for performance provisions of Section II “Time of Completion,” and Section III, “Compensation,” are hereby modified as follows: Original Contract Sum, (including applicable alternates and WSST) $1,230,999.47 Net Change by Previous Change Orders (incl. applicable WSST) $45,000.00 Current Contract Amount (incl. Previous Change Orders) $1,275,999.47 Current Change Order $21,865.55 Applicable WSST Tax on this Change Order $2,208.42 Revised Contract Sum $1,300,073.44 CHANGE ORDER - 2 OF 3 Original Substantial Completion Date (insert date) 11/21/2021 Revised Time for Completion under prior Change Orders (insert date) 04/15/2022 Days Required (±) for this Change Order 5 Working days Revised Substantial Completion Date (insert date) 04/22/2022 In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: By: Print Name: Its DATE: CITY OF KENT: By: Print Name: Brian Levenhagen Its Parks, Recreation & Community Svcs. Deputy Director DATE: Brian Levenhagen (Mar 16, 2022 11:31 PDT) Mar 16, 2022 Austin Shope (Mar 16, 2022 11:35 PDT) Mar 16, 2022 Project Engineer Austin Shope CHANGE ORDER - 3 OF 3 ATTEST: ___________________________ Kent City Clerk APPROVED AS TO FORM: (applicable if Mayor’s signature required) Kent Law Department \\PKUPFPP1V\PKPublic\Planning\4th and Willis Roundabout\PK21-01 Landscape Construction\OMA Construction-CO2 Kim Komoto (Mar 17, 2022 08:05 PDT) Kim Komoto FA No.:10 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name:Project No: Item No.:Date: Description of Work: Work by Subcontractor?:YES Prime Contractor: OMA Construction Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT -$ -$ -$ -$ -$ -$ SUBTOTAL - LABOR:-$ LABOR OVERHEAD & PROFIT @ 29%-$ LABOR TOTAL -$ EQUIPMENT HOURS HOURS ADJUSTED STANDBY DOLLAR EQUIPMENT OR ATTACHMENTS WORKING STANDBY RATE RATE AMOUNT -$ -$ -$ -$ -$ -$ SUBTOTAL - EQUIPMENT -$ EQUIPMENT OVERHEAD & PROFIT @ 21%-$ EQUIPMENT TOTAL -$ MATERIALS MATERIALS INVOICE # QUANTITY UNIT PRICE DOLLAR AMOUNT -$ -$ -$ Quantities as measured in the field SUBTOTAL - MATERIALS -$ MATERIALS OVERHEAD & PROFIT @ 21%-$ MATERIALS TOTAL -$ SUBCONTRACTOR SUBCONTRACTOR INVOICE # QUANTITY UNIT PRICE DOLLAR AMOUNT 4746-1 1 LS 19,522.81$ 19,522.81$ -$ -$ -$ Quantities as measured in the field SUBTOTAL - MATERIALS 19,522.81$ SUBCONTRACTOR MARKUP @ 12%2,342.74$ SUBCONTRACTOR TOTAL 21,865.55$ Verification of Hours Worked: Contractor's Representative Date SHEET TOTAL:21,865.55$ Owner's Representative Date Pay Estimate Entered: Date: By: Totem Electric Totem Electric Willis St & 4th Ave Landscape PK21-01 A1 Minor Change 3/2/2022 Flag Pole Install EXHIBIT A Change Order Request 4746 — Willis St & 4th Ave Landscape COR Subject: Added Flagpole w/ trenching, concrete To Austin Shope OMA Construction Inc. 22412 SE 231st Street Mapple Valley, WA 98038 206-262-1721 Return To Fred Duke Totem Electric of Tacoma Inc 2332 Jefferson Ave Tacoma, WA 98402 253-722-2840 253-272-5214 (FAX) fduke@totemelectric.com Contract No: PK21-01 COR Number: 4746-1 COR Revision Number: 1 COR Date: 3/1/2022 Work Type: Price / Do Not Proceed Other Reference No: submittal 040, flagpole Days Valid: 5 Details Description Cost / Rate Qty / Hrs Workers Ext OP, FM, JW crew for trench, BF, j-box $96.64 8.00 Hrs 3.00 $2319.36 includes conduit placement OP, FM, JW crew for install flagpole $96.64 8.00 Hrs 3.00 $2319.36 includes wiring FM, JW crew F, P, S concrete pad $103.52 8.00 Hrs 2.00 $1656.32 includes curing T238 - 2016 Utility Truck $19.54 24.00 -$468.96 Foreman rig T228 - 2008 Utility Truck $18.72 24.00 -$449.28 JW rig T646 - 2018 Deere Excavator $31.16 16.00 -$498.56 mini Description Cost / Rate Qty / Hrs Workers Ext T334 - 1997 Boom Truck $45.32 8.00 -$362.56 boom flagpole $5,603.70 1.00 LUMP SUM -$5603.70 per quote j-box $736.20 1.00 EACH -$736.20 type 2 conduit, bends, bell ends, wire, etc.$700.00 1.00 LUMP SUM -$700.00 concrete $500.00 1.00 LUMP SUM -$500.00 Breakout Labor : $6,295.04 Overhead Percent @ 31%: $1,951.46 Equipment : $1,779.36 Overhead Percent @ 21%: $373.67 Material : $7,539.90 Overhead Percent @ 21%: $1,583.38 _____________ Total: $19,522.81 Reservation of Rights This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for any of these items. Signed By:Dated: 3/1/2022 Fred Duke Project Manager GLABAL UNUMMM 800-962-0956 W W W.GLMAULAGSUNIMRED.COM Global Flags Unlimited, LLC 3600 Cantrell Industrial Court Acworth, GA 30101 800.962.0956 www.flagco.com I www.flagpolewarehouse.com www.globalflagsunlimited.com Sell To: Totem Electric Fred Duke 2332 Jefferson Ave Tacoma, WA 98402 USA Sales Quote Number: Sales Quote Date: Sales Quote Page: 1 S-Q0002106 2/3/2022 Ship To: Totem Electric Fred Duke 2332 Jefferson Ave Tacoma, WA 98402 USA Tax Ident. Type Legal Entity Customer ID 000199050 Sales Person Michele Philips Ship Via Terms PREPAY Item No. Description Unit Quantity Unit Price Total Price 204737 Illuminator Contractor Series Internal Each 1 4878.35 4878.35 Halyard Flagpole 30' Clear - ILXIH30 Freight-S 1 725.35 725.35 Amount Subject to Sales Tax 0 Amount Exempt from Sales Tax 5,603.70 Quotes are valid for 30 days from Quote date Subtotal: 5603.70 Invoice Discount: 0.00 Total Sales Tax: 0.00 Total: 5,603.70 NO. OPTION 1 c:'� - SPLICE INTO o I' PED LUMINAIRES 11 POWER., EP - INSTALL NEW 2" CONDUIT AND WIRING TO NEW N FLAGPOLE J-BOX. II - INSTALL NEW W 2�+00 FLAGPOLE J-BOX BETWEEN BENCH ° CONCRETE AND �I FLAGPOLE. it UNPAVED AREAS--�--fAVED *REAS LANDSCAPE RESTORATION UTILIZE NATIVE BACKFlLL OR CSTC WHERE NATIVE IS UNSUITABLE AND AS DIRECTED BY THE ENGINEER (OTHPWVU `JNWAIASPHALT EXISTING PAVING ASPHALT EXISTING SUBGRADE SEE TYPICAL SECTIONS AND-3RNL DETAJLS FOR RESTORATION 'T COMPACTED CSTC PER ;.. WSDOT STD SPECIFICATION 9-D3-90) 2' 2' CONDUITS PER PLANS MIN VARIES MIN BEDDING SHOULD BE COMPACTED CSTC PER WSDOT STD SPECIFICATION 9-03.9(3) I. EXISTING ASPHALT PAVEMENT MUST BE SAWCUT TO PROVIDE A CLEAN -STRAIGHT EDGE BEFORE OOIJDINT PLACEMENT. 2. EXISTING MATERIAL DISTURBED UNDER THE CONDUIT SHALL BE REPLACED WTH BEDDING MATERIAL AND COMPACTED TO 95% MAX DENSITY (MODIFIED PROCTOR). 3. BACKFlLL MATERIAL SHALL BE INSTALLED IN AN APPROVED MANNER TO ENSURE NO DAMAGES TO THE CONDUIT. 4. IF NATIVE MATERIAL IS DETERMINED UNSATISFACTORY BY THE ENGINEER, USE CRUSHED SURFACING TOP COURSE. PER WSDOT STD SPEC 9-03.9(3). CONDUIT TRENCH DETAIL NTS WIRE NC1TFc OPTION 1: - CONNECT POWER TO t;+ SPARE BREAKER. -RUN NEW FLAG POLE WIPING THROUGH 1, r.L `Y`K EXISTING CONDUIT TO PED I%�T I 10 LUMINAIRE JBOX. FINSTALL NEW 1" CONDUIT ROM PED LUMINAIRE JBOX TO FLAG POLE JBO::. I " j OPTION lb (NO SPARE BREAKER): SPLICE INTO PED LUMINAIRE POWER 4 SCHEDULE B ■ ■ o . 1V (1i INSTALL WHEY 2" C;OI\IUUIT 10 PP. I- E 11ROX. � � ONcr,ET E :i;=',LT.. j'.; �i�; 1,;11;1i lr7 ; OIFJ,� i t;ULFTUF;E ,1G X -10 FLAG POLE.------ \1k ilk, IL mF\ -�1-F_----��r—T-Y� T TI iiT T Cam, \� \a_'OPTION 2a T:�z \(} -(2) #10 wires to service cabinet -1.5 dia, conduit with #8 ground wire from - pole to existing JB on other side of sidewalk rs)`, -bring wire from existing JB to service cabinet. 0 10 20 40 60 SCALE IN FEET ® RACEWAY/ CONDUIT SIZE CONDUCTORS COMMENTS 1 2- 1-CAT5(iPLAYER) 2 2- 2-/8 (BOL) 3 2' 2-18 (ILL), 2-/8 (BOL) 4 EX2-/8 (BOL), FX (ILL) EXISTING WRING TO REMAIN 5 6 2- 3/4' 2-110 (UPLIGHTS), 1-CAT5(iPLAYER) 2-(10 (UPLIGHTS), 1-CATS(iPLAYER) EXISTING WRING TO REMAIN 7 2' 2-/8 (ILL) B unTrc. 1' RMC SPARE fART PAD 1. ALL PVC CONDUIT CONTAINING CONDUCTORS SHALL CONTAIN GROUND WRE (GROUND WRE NOT SHOW). WRE SIZE SHALL MATCH THE LARGEST CONDUCTOR (MIN /8 AWG OR AS OTHERWSE NOTED IN THE WRE NOTES). CONDUITS THAT DO NOT CONTAIN ELECTRICAL CONDUCTORS SHALL INCLUDE A DETECTABLE PULL TAPE AND SHALL BE LABELED 'CITY OF KENT'. 2. ALL CONDUIT SHALL BE RIGID PVC SCH 80 UNLESS NOTED OTHERMSE. ----- �W ..�c�ncv �C KENT PROJECT N0. p 19029E BID RAR IS ONE INCH CN ORANTJ: JW PROJECT ENGR: CONST. IAGUT. REti" DOCUMENT ORIGINAL SCALES City of Kent JW AACCORDINGLT'S � � er DATE OATS 06/25/21 G. - KIEE T Parks Department _EGEND EXISTING ffy DESCRIPTION EXISTING ROADWAY LUAi AIR] O ILLUMINATED BOLLARD DECORATIVE PEDESTRIAN L M LINEAR UPLIGHT 90 JIJNC11ON BOX TYPE 1 & 2 ELECTRICAL SERVICE CABINET _ — — CONDUIT Q WRE NOTE O CONSTRUCTION NOTE STA 231+50 TO STA 235+00 ILLUMINATION PLAN FLAG POLE INSTALLATION: LOCATION: 10'-0" FROM EDGE OF BENCH PAD TO CENTER OF FOUNDATION. 2'-0" FROM BACK OF WALK. WORK ELEMENTS: -EXCAVATION & BACKFlLL -CONCRETE FOUNDATION -POLE -UPLIGHTING -CONDUIT -JBOX -WIRING -LAWN RESTORATION -CONCRETE PAD FROM WALK TO FOUNDATION. ® LOCATION OF�` XISTING ELECTRICAL SERVICE CABINET. USE EXISTING :SPARE BREAKER FOR NEW 120V CIRCUIT FOR BOLLARD AND UPUGHT SYSTEM. CIRCUITQLL BE CONTROLLED BY EXISTING CONTACTOR. COORDINATE WORK 4TH THE TRAFFIC OPERATIONS AND MAINTENANCE REPRESENTATIVE. D ADD NEW CONDUIT AND WRING TNGI NG JUNCTION BOX. 10 SPLICE BOLLARD AND UPLIGHT WTHE SAME CIRCUIT. \ LOCATION OF GATEWAY LINEAR UPUGHT SYSTL .SEE URBAN DESIGN 2�5 11 DETAILS SHEET 24 FOR LINEAR UPUGHT INSTA ON. INSTALL SYSTEM SURGE PROTECTION PER MANUFACTURER'S RECOMMENDATIONS. SEE SPECIAL PROVISIONS, 13 LOCATION OF EXISTING CABINET, HOUSING EXSMNG IPLAYER. TERMINATE CAT-5 WRING IN THE EXISTING IPLAYER, COOR919TE WTH THE CITY ENGINEER FOR SETTING UP COLOR SEQUENCES."\ �— OPT 1 CONDUIT I � 1 ® NEW JBOX � ® I 36" diam pole ' I I I foundation I 1 � 1 2' I 5' � { I Conc 1 edge of walk ; OF'T 2 CONDUIT � -----------` ---- ---- ------ WILLIS STREET AND 4TH AVE S FINAL LANDSCAPE DESIGN I SHEET18 OF32 FILE NO. 19029B Signature:Email:Signature:Email:Signature:Email:bhiggins@kentwa.govrlashley@kentwa.govkkomoto@kentwa.gov E-TRANSMITTAL: C.O. 2 for Willis & 4th Landscapes Final Audit Report 2022-03-17 Created:2022-03-11 By:Lynn Osborn (losborn@kentwa.gov) Status:Signed Transaction ID:CBJCHBCAABAA3YtXpOxnhbGFKEssVHg7IC8haxBMFwd5 "E-TRANSMITTAL: C.O. 2 for Willis & 4th Landscapes" History Document created by Lynn Osborn (losborn@kentwa.gov) 2022-03-11 - 11:40:01 PM GMT- IP address: 146.129.252.126 Document emailed to Bryan Higgins (bhiggins@kentwa.gov) for signature 2022-03-11 - 11:42:11 PM GMT Email viewed by Bryan Higgins (bhiggins@kentwa.gov) 2022-03-14 - 2:16:24 PM GMT- IP address: 146.129.252.126 Document e-signed by Bryan Higgins (bhiggins@kentwa.gov) Signature Date: 2022-03-14 - 2:17:22 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Ronald Lashley (rlashley@kentwa.gov) for signature 2022-03-14 - 2:17:28 PM GMT Email viewed by Ronald Lashley (rlashley@kentwa.gov) 2022-03-16 - 4:44:47 PM GMT- IP address: 146.129.252.126 Document e-signed by Ronald Lashley (rlashley@kentwa.gov) Signature Date: 2022-03-16 - 4:49:34 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Brian Levenhagen (bjlevenhagen@kentwa.gov) for signature 2022-03-16 - 4:49:38 PM GMT Email viewed by Brian Levenhagen (bjlevenhagen@kentwa.gov) 2022-03-16 - 6:31:05 PM GMT- IP address: 146.129.252.126 Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date: 2022-03-16 - 6:31:38 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Austin Shope (a.shope@omaconstruction.com) for signature 2022-03-16 - 6:31:40 PM GMT Email viewed by Austin Shope (a.shope@omaconstruction.com) 2022-03-16 - 6:32:55 PM GMT- IP address: 73.42.243.67 Document e-signed by Austin Shope (a.shope@omaconstruction.com) Signature Date: 2022-03-16 - 6:35:05 PM GMT - Time Source: server- IP address: 73.42.243.67 Document emailed to Kim Komoto (cityclerk@kentwa.gov) for signature 2022-03-16 - 6:35:07 PM GMT Email viewed by Kim Komoto (cityclerk@kentwa.gov) 2022-03-16 - 9:09:40 PM GMT- IP address: 146.129.252.126 Document e-signed by Kim Komoto (cityclerk@kentwa.gov) Signature Date: 2022-03-17 - 3:05:11 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Kim Komoto (kkomoto@kentwa.gov) for signature 2022-03-17 - 3:05:15 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2022-03-17 - 3:05:48 PM GMT- IP address: 146.129.252.126 Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date: 2022-03-17 - 3:08:04 PM GMT - Time Source: server- IP address: 146.129.252.126 Agreement completed. 2022-03-17 - 3:08:04 PM GMT