Loading...
HomeMy WebLinkAboutCAG2019-084 - Change Order - #28 - Scarsella Brothers, Inc. - LID 363: S 224th Street Project - 01/10/2022KENT Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper)WasHtNcroN G oLoo Originator: Stephanie Anderson Department: PW Engineering Date Sent: 319122 Date Required N/A Authorized to Sign: El Director or Designee E MaYor Date of Council Approval: 2t19t2019 Budget Account Number: R90094.64110.120 Grant? EYes E No Type: N/A tro l,o ELrorhs*,g o Eoo.Lgt Vendor Name: Scarsella Bros, lnc Category: Contract Vendor Number: 34547 Sub-Category: Change Order 28 ProjectName: LID 363: S 224th St Project project Deraits:Remove and replace the curb ramp at 94th Place South and S. 218th Street per Revision #17 . Tracked as force account on sheets 207 through through 208. Agreement Amount: $9,27 4.67 Start Date: N/A Basis for Selection of Contractor: Sid Terminarion Date: 225 working days Local Business? E Yes E No* *lf meets requirements per KCC 3.70.100, please complete 'Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? EYes E No Contract Number: cAG2019-084 Comments:RE D lt|AR 9 2022 CITY OF KENT CITY CLERK Date Received by City Attorney: Date Routed to the Mayor's Office: trlc ]P J\ro .a -so=EEoc .9UI Date Routed to the City Clerk's Office: ad(W221/l_1_20 Visit Documents.KentwA.gov to obtain copies of all agreements CHANGE ORDER NO. #28 NAME OF CONTMCTOR: Scarsella Bros' Inc' ("Contractor") CONTRACT NAME & PROJECT NUMBER: Lid 353: 5 2?4th SITECT PTOJECT ORIGiNAL CONTRACT DATE: February 19' 2019 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this change order sharr remain in effect. For valuable consideration and by mutual consent or tn" parties, the project contract is modified as follows: l. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement a.nd.any prior Amendments, contractor shall provide all labor, materials, and equiPment necessary to: Remove and replace the curb ramp at 94th Place South and S' 218th Streel per nevision #L.7. Tracked as force account on sheets 207 through through 208. 2. The contract amount and time for performance provisions. of Section II "Time of Completion ," and Section III, "Compensation," are hereby modified as follows: KENT $8,423,301.61Original Contract Sum, (including aPPlicable wssr) alternates and $778,31s.I5Net Change bY Previous (incl. applicable WSST) Change Orders $9,201,622.82Cu rrent Contract Amount incl. Previous Change Orders)( $9,274.61Current Change Order $0.00Applicable WSST Tax on this Change Order $9,210,897.49Revised Contract Sum CHANGE ORDER - 1 OF 3 In accordance with sections 1-04.4 and 1-04.5 0f the Kent and wsDoT standard Specifications, and Section ViI of the Agreement, the Contractor accepts all requirements of this Change Order OV signing below. nlsoi pursuant to tftg above-referenced contract, Contractor agrees to waive any protest it may h.u" ."gurding this change order and acknowledges and accepts that this change order constitutes dnal setttement of all claims of any kind or nature arising from or connected with any work either: covered or affected by this Change order, including' without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Changl Otaut, uni"ss otherwise provided, does not relieve the contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date' All acts consistent with the authority of the Agreement, previous Change Orders (!f ?nv), and this Change order, prior to the effective date oitnis Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Ordels (if any), and this Change Order shall be deemed to have aPPlied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract' 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above' IN WITNESS, the parties below have executed this Agreement' which will become effective on the last date written below' Original Time for ComPletion (insert date) 130 working daYs Revised Time for ComPletion under prior Change Orders (insert date) 225 working daYs Da ys Req u I red (+)for th ts ch a ng e o rde r 0 calendar daYs Revised Time for Completion (insert date) 225 working daYs K? Print Name: Chad Bieren, P'E' , -DATE: -" - CITY OF KENT: tu t sEid 4 chdd s'arei Chad Bieren ffi";$i'iffiftLY"#"*i""'By EC (title) (signature) CONTRACTOR: DATE: Print Name By: CHANGE ORDER - 2 OF 3 (applicable if MaYor\ signature requlred) Kent Law Department APPROVED AS TO FORM:ATTEST: Kent City Clerk {h this field, you say ent€r the electonlc Rlepath wheG the 'ontFd hds b@o 56vedl CHANGE ORDER - 3 OF 3 File No. 2OO.2 KENT CHANGE ORDER WORKSHEET NO. 28 Construction Engineering Division - Public Works Project: LID 363 224th St Improvements Project Engineer: StePhen Lincoln Project No: Fed-Aid No: Contractor: 14-3010 ScarsellaCapital Projects Manaoer:Jason Bryant Date: L2/Ll202I I.P Chan e Remove and replace the curb ramp @ 94th Pl S an d S 218th St per Revision #IT.Tracked as force account on sheets 207 through 208 II. Reason and Bac round for Chan III. Method of Payment NEW PAY ITEMS E Notapplicable curb ramp as originally designed at theintersection of 9 constructed in compliance ADA standards' Revision No. 17 DA crub ramp design shown on "Curb Returns 94th Pl S" detail show on Sheet 5 of 34' Demo of the reviously constructed curb ramp and construction of the replacement was tracked for payment via Force Account sheets 207 and 208 4th Pl S and S 218th St could not be added Plan Sheet 58 which replaced the p Sch. No Item Description Total Est. Qtv Unit Unit Price Total Estimated Cost of Item 1 move an p Pl S and S 218th St 1 FA $9,274.67 $9,274.67 $ $ New Pay Items Total: $9t274.67 DELETE EXISTING PAY ITEM(S) per 1-O9.5 E Notappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item Page 1 $ $ Delete Existing Pay Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) E Notappricabre Sch No.Bid Item No Item Description Qtv Unit Unit Price Cost of Item $ $ $ Increase / Decrease to Existing Pay Items Total: $ *TOTAL ESTIMATED COST OF CHANGE ORDER:$9,274.67 * Total of the Cost of ltem Columns IV. WORKING DAYS Original Contract:130 Due This Change Order:o Previous Total:L75 Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS:L75 * This Change Order + Previous Total Date: n/A/ZtCapital Projects Manager: / 4-r- u-'{a=',a-/ for Jason Bryant Construction Engineering Supervisor:forPaul Kuehne Date: n/A/Zt s/- 4-t- -r{-.az,t,a-/Construction Manager: Eric Connor Page 2 Date: t2/t4/21 LID 363 224th St Impprovements (Ph 2) FA # Date Amount CO # 207 208 8ls/2o2L LOl2Ll2021 2,507.8L 6,766.86 #28 #28 9,274.67 FA Sheet 207 ->\,-. KENTFORCE ACCOUNT WORKED DAILY REPORT OF Item No.: Description of Work: Prime Contractor: Project Name:LID 363 224th St Phase 2 Project No:14-3010 Date:8t512021 Pour was cancelled due to ADA ra on 94thForm and conflict Work by Subcontractor?: b-Contractor:Scarsella OVERTIMESTRAIGHT TIME DOLLAR AMOUNTOT RateHrsHrsRateCODEOCCUPATIONNAME $65.5 $80.32ForemanMAtt L $'100.55 Truck Driver 73DriverH Q59.96 Driverivan C $100.5580.32 F LABOR OVERHEAD & PROFIT @ 29o/. $ SUBTOTAL - LABOR: LABOR TOTAL STANDBYOPERATED DOLLAR AMOUNTHrsEOUIPMENT OR ATTACHMENTS Equipment #Description 70.27 71.65 Hourly Rate 71.65 Hrs $ EQUIPMENT TOTAL S SUBTOTAL - EQUIPMENT EOUTPMENT OVERHEAD & PROFIT @21% 3 " 07.81 of Hours Worked: .81SHEET TOTAL: 2t1t2021 unitsQuantitY EA Date $ Date 2 -57#06241invoiceConcreteWilson Representative Jwon OVERHEAD & PROFIT @ 21o/o $ Unit Prlce MATERIALS / SERVICES 435.24 .81 DOLLAR AMOUNT $ $ SUBTOTAL TOTAL 12% MARKUP (for Prime when subcontract work) Pay Estimate Entered: Date: By: TOTAL $ '\pDAILY FORCE ACCOUNT / EXTRA WORK REPORTSUBTOTAL LABOR:$$$$$$$0.00SUBCONTRACTORSSUBTOTAL SUBCONTRACTORS:SCARSELLA BROS., INC" REPRESENTATIVEDATES. 224th St ProiectCitv of Kent8tst2021Wilson Concrete lnvoiceSUBTOTAL EQUIPMENT:SUBTOTAL MATERIAL:P.O. Box 68697Seattle, WA 98168-0697Oftice: (253)472-7173Fax: (253) 395-1209CONTMCT NAME, NO.:OWNER / CONTRACTOR:DATE:Bid ltem#:DESCRIPTION OF WORK:Paid on PE#EXTENDEDAMOUNTS$$$$$$$$$$C$$LOADEDHOURLY RATEHOURSLABOR - Name, ClassificationREGo/TREGo/TREGo/TREGonREGo/TREGo/TEXTENDEDAMOUNTS$$$$$$$$b$$$$HOURLYRATE$0.00$0.00$0.00$o.oo$0.00$0.00HOURSOPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBYOWN orREI,ITAL?EQUIPMENTEQUIPNO.EXTENDEDAMOUNTS$ 2,072.57$$$$$ 2,072.57UNITCOST$ 2,072.57QTY1MATERTALWilson Concrete lnv. #10624$0.00$$$$$ 2,072.57$ 43s.24$2,507.81SUBTOTAL SUBCONTRACTORS:12% MARKUP SUBCONTRACTORS:SUBTOTAL LABOR:29%MARKUP IABOR:SUBTOTAL EOUIPMENT:MARKUP EQUIPMENT:SUBTOTAL MATERIAL:MARKUP MATERIAL:21%TOTAL THIS REPORT:OWNER / CONTRACTOR REPRESENTATIVEDATE FFlEqr?lEtd;t ffiFllqFllil#ilsl ffit1 .'r?Gi=t ffilft*;E1lFtl p# 8#x 275 E!$AM{LAW. WA 9#*22 SCARSELLA BROS., INC P.O. BOX 68697 SEATTLE, WA 98168-0697 lnvoice #GG Job #Date 81512021 1062414-3010 WCCI Job #TermsProJect 19-2354Net 302354-LID 363 S. 224th (88th Ave. AmountQuantityunit CostUnitItem Description 32.85 64.45 27,20 98.00 1,210.00 1,450.00 12.00 29.10 1.00 29.10 597.56 27,20 26.82 14.82 5,02s.96 2,072.57 -s.00% 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,072.57 2,072.57 - I 03.63 SY SY SY LF EA EA LF LF LS LF LS SY LF LF LS LS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I Schedule i 1 135 Cement Concrete Driveway, 6 Inch Depth i 140 Cement Concrete Driveway, 8 Inch Depth, Reinforced I145 Cement Concrete Sidewalk 1146 Thickened Edge Cement Concrete Sidewalk 1200 Cement Concrete Sidewalk Ramp Type Single Direction A 1202 Cement Concrete Sidewalk Rarnp Type Cornbination i205 Cement Concrete Curb & Gutter 1206 Cement Concrete Traffic Curb T&M Reset Forms For Curb & Gutter Repour Curb & Gutter Added Cost For Wall Under Thickened Edge Repour Sidewalk Repour Curb & Gutter (June 2020) Hand Formed Curb Premiutn T&M Work ON 10/9/20 Design Conflicts: Standby / Cancel Pour 815121 SUBTOTAL Amount deducted for retentton $ 1,968.94Total Payments/Gredits $0.00 Balance Due $ 1,968.94 Terms:All Invoices are due and payable in 30 Days. Finance charge - 1.5Yo Per rnonth F.$" Eox 2?5 &nuruexaw, wA 98fl;'.22-8,fli&n Phrprue ?s3-863-&&ES FaN 253-S26-*3S9 FA Sheet No.:./A\../ KSNT DAILY REPORT OF FORCE ACCOUNT WORKED r ADA ra Project Name:LID 363 224th St Phase 2 Prime Contracto r: Scarsella Project No: 14-3010 Work by Subcontractor?: Su Description of Work; Form and on 94th Item No,:Date; 1012112021 OVERTIMESTRAIGHT TIME DOLLAR AMOUNTOT RateRateHrsHrsOCCUPATIONCODENAME 391$55.75442"14 179.40100.5589,72P 1 00"5573,49rew $79.35 Driver 59.Driverlvan C $1 00,80 Asu F 570.80 1 65"53 LABORTOTAL $ LABOR OVERHEAD & PROFIT @ 29% SUBTOTAL - LABOR: STANDBYOPERATED DOLLAR AMOUNTRateEOUIPMENT OR ATTAC HMENTS Equipment # $71Trailer8-036 71.65Treiler 70,27Solo Mack Truck $70.27Solo Mack Truck 16.26w/ MowerJD13-12 $ $ EQUIPME NT TOTAL SUBTOTAL. EQUIPMENT EQUIPMENT OVERHEAD & PROFIT @ 21% DOLLAR AMOUNTUnit PriceUnitsQuantity MATERIALS / SERVICES I#0681invoiceConcreteWilson 5,482.30$$ 5,482.30EA1 $ $ $ SUBTOTAL oVERHEAD&PROFIT@10% TOTAL $ $ of Hours Worked: OateConlraslol9 Jaon Dap- 121112021 Representalive 12% MARKUP (for Prime when subcontract work) TOTAL $ 6 766 SHEETTOTAL: $ Pay Estimate Entered: Date: By: ?)dDAILY FORCE ACCOUNT / EXTRA WORK REPORTP.O. Box 68697Seattle, wA 98168{697Otfice: (253)872-7173Fax: (253) 3951209EXTENDEDAMOUNTS$ 179.40$$ 168.40$ 223.00$u$$g$$$$$s$$ 570.80LOADEDHOURLY RATE$89.7C$42.10$55.75HOURS2A4.CLABOR . Name, cla$ificationREGo/IREGonREGoiTREGonREGorTREGo11REGonREGo/TREGofiREGofiREGot1Jared Pratt, Op ForemanEstelle Howard, 600/6 Labor ApSUBTOTAL LABOR:$ 5.482.30$$$$$5,482.30SUBCONTRACTORSW,ilson Concrete lnv #10681 +labor & materialsSU BTOTAL SU BCONTRACTORS:SCARSELLA BROS., INC. REPRESENTATIVEDATES 224th St PrciectCitv of Kent10t21no21SideMlk revisionsSUBTOTAL MACONTRACT NAME. NO,:OWNER / CONTRACTOR:DATE:Bid ltem#:DESCRIPTION OF WORK:Paid on PE#EXTENDEOAMOUNTSu$$$s$$$s$$$u$$$$$HOURLYRATE$0.0c$0.00$0.00$0.00$0.00$0-0c$0.0c$0.00$0.00$0.0c$0.0cHOURSOPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBY'OPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBYOPERSTDBYRENTAL?EQUIPMENTEQUIP.NO.SUBTOTALEXTENDEDAMOUNTS$$$$ssUNITcosTOTY,MATERIAL$5,482.3054A.23$ 570.80$165.53s!$$6.766.86SUBTOTAL SUBCONTRACTORS:10%MARKUP SUBCONTRACTORSSUBTOTAL LABOR:29.hMARKLJP LABOR:SUBTOTAL EQUIPMENT:210/.MARKUP EQUIPNIENT:SUBTOTAL MATERIAL:210kMARKUP MATERIAL:TOTAL THIS REPORT:OWNER / CONTRACTOR REPRESENTATIVEDATE FA+--EG-!ll?i MFTiFr}EI:l p& {s0x 275 ENAM{LAW. WA #8fi22 SCARSELLA BROS., INC P.O. BOX 68691 SEATTLE, WA 98168.0697 lnvoice #GG Job #Date 1068114-30 1 0 1012U2021 WCCI Job #TermsProJect 19-2354Net 302354-LID 363 S. 224th (88th Ave. AmountQuantityUnit CostUnitItem Descriptlon 32.85 64.45 27.20 98.00 1,210.00 1,450.00 12.00 29.10 1.00 29.10 597.56 27.20 26.82 t4,82 5,025.96 2,072.57 5,482.30 -5.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,482.30 5,482.30 -274.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I SY SY SY LF EA EA LF LF LS LF LS SY LF LF LS LS LS Schedule i 1135 Cement Concrete Driveway, 6 Inch Depth 1 140 Cement Concrete Driveway, 8 Inch Depth, Reinforced I145 Cernent Concrete Sidewalk 1146 Tliickened Edge Cement Concrete Sidewalk 1200 Cement Concrete Sidewalk Ramp Tlpe Single Direction A 1202 Cement Concrete Sidewalk Ramp Type Combination 1205 Cement Concrete Curb & Gutter 1206 Cernent Concrete Traffic Curb T&M Reset Forms For Curb & Gutter Repour Curb & Gutter Added Cost For Wall Under Thickened Edge Repour Sidewalk Repour Curb & Gutter (June 2020) Hand Fomed Curb Premiuur T&M Work ON 10/9/20 Design Conflicts: Standby lCancel Pour 8/5/21 T&M Work on l0l2ll2l SUBTOTAL Amount deducted for retention $5,208.1 8Total Payments/Gredits $0.00 Balance Due $5,208.1 8 Terms:Alt Invoices are due and payable in 30 Days. Finance charge -l.5o/o per month F.$. &ox 2?5 K*uruaelaw, W.4 g&822-E,s;{{r1 F}aome 2S3-E{t3-ES&8 }rax 2$3-S26""&3Eg Labor and Materials Calculations Sheet DATE 10t21t21 363 S 224TH ST OF WORK AND POUR RAMP HOURS TOTAL COST AMOUNT EMPLOYEE NAME CLASSIFICATION STRAGHT OVR. TIME DBL TIME STRAIGHT OVRTIME DBLTIME $ 687.47 Miouel Santana Concrete Specialist Foreman 5.75 2 $ 80.59 $ 112.04 $ Jesus Santana Cement Mason Journeymen 5.75 I $ 76.36 $ '102.97 $$ 542.04 Jaime Santana Concrote Speclalist 5.75 2 $ 77.17 $ 106.95 $$ 530.08 Juan Colmenares Group lV Laborer 5.75 2 $ 62.55 $ 85.21 $$$$ $$$$ $$$$ LABOR $ 2,417.20 AMOUNTRATEHOURSsrzE$ 306,1 3$ 39.507.7516000 GVW122020 F-450 266.6339.506.75,lBOOO GVW342000 F-450 39.50 $ 306.137'16000 GVWED200554 $ 39.50 $ 306.13716000 GVW2016SUPER DUry80 1 185.00 RATE AMOUNTowUNITMATERIALS$ 1r7.15 $ 351.453CYSAND & GRAVEL 417 768.9'l .20LABOR700.9929 0/o SUBCONTRACTOR MARK-UP OF 'l 185.00 EQUIPMENT $ 248.8521 %OFSUBCONTRACTOR $ 768,81MATERIAL$ 161.4521 0/.MARK-UP OF Wilson concrete construction, tnc. p.o. Box 275 Enumclaw,Wa.gSo22 Phone 253-863-8888 Fax 253-826-0389 Vu 400 Valley Ave NE Puyallup, WA 98372-2516 INVOICE CUSTOMEN NO,DATF lNvolcE No.PAGE o6l-929 Lo /2L/202L t896222 1$tlltES 253-833-3705 SANII & GNAVEL WILSON CONCRETE CONSTRUCT]ON, PO BOX 275 ENUMCI,AW, WA 98022 ^- l-,!,) ) r OO].354 S 224TH ST & EAST VAI,LEY HWY ]MPROV KENT Lo /2 L0 /2 LA /2 2354 3 L 3 PO NUMBER: 1_ 202-265282 I 202-265282 1 2A2-265282 50 50 45 45 3 r-3 L6 2t 3s1 .00 .00 .00 CY 6SK,AIR LD TUEI, SURCHARGE.READY MI CY ENVTRONMENTAL COMPLIANC JOB TOTAL LINE 95.000 1-5.000 6. s00 28.50 t-.50 t-.95 PRODUCT RECAP 3.00 04c4A 1.00 5401- 3 .00 5300 . \ \tt " fli; -, &ts::.15 6SK, AfR FUEIJ SURCHARGE-READY MIX ENVIRONMENTA], COMPI,TANCE - RM Remit Payment to 400 valley Avenue NE, Puyallup, wA 98372-?516 Milos Sand & GravelComPanY wlltw.MlLES.ROGKS JOB NUMBER . JOB LOCATION . ADDBESS TAX TOTALPRICE DESCRIPTIONTICKET NO.OUANTITY UNITDATE AMOUNT DUE >35r-.45 IruASTSIDA lnvoice lnvoice Number: lnvoice Date: Order Number: Ship To: SHOP 12557 SE GREEN VALLEY RD Auburn, WA 98092 Page 1 of 1 1494318-lN 10t11t2021 58OO SE ALEMNDER ST, HILLSBORO OR, 97123 oFFICE:(503)-591-0203 FAX:(503)€4$9724 PACIFIC WAREHOUSE 108 FRONTAGE RD NORTH Pacific WA 98047 (253) 804-9439 Sold To: WILSON CONCRETE CONSTRUCTION PO BOX 275 Enumclaw, WA 98022 ii Customer P.O. JEREMY Ship VIA DEL thip Date 10h?/2421 Salesperson HOUSE ACCOUNT Terms 2O/O 1OIH PROX, NET 1 .ITH Tax whse Unlt Ordered AmountItem Code Descriotion ENTERED 8Y: DONNIE BUCKLES N oo2 EACH 1.00 0,00 0.00DBUCKLES 128.00ADAYELLOW 24"x36"CIPADA2436PAV 002 EACH 96.00 12,288.00 $96ea. / 6sf + B.7o/o tax = 917.39/sf 6 BXS 6 BXS EO END OF ORDER, THANK YOUI N 002 EACH 1.00 0.00 54,738.00 0.00 4,762.21 59,500.2,| RE"IT PAYMENT TC 5SOO SE ALEX^NDER ST. }{ILLSBORO OR, 971?3 feng and Conditions. Read beforcsigning. By signing you agfte that: L fhb invotca is accepted subied ro lhe lerms and mndilions on lhe allached page' 2. soeclal oder or fabricated iioms are non'rarumableandnon'refuNable' i.*f"',iliiiitt oiiaii iitni i days, End accompanied by origtnat invoice and are subiect to a 5 % rcstackcharga- ;. i;;;;i;;;r* b"i;i icrnowtedgis recelpt and ienities ma@iats tisted M'll be used at tho sbove shb to sddress ' Nel lnvolce: Freight: Sales Tax: lnvoice Toial: Doing'Whatever it takes' Slnce 19Bg www.westsideca,com Signature: KENT PUBLIC WORKS DESIGN ENGINEERING Carla MaloneY, P'E' Design Engineering Manager 400 West Gowe Kent, WA 98032 Fax; 253-856-6500 PHONE: 253-856-5500WASHINGTON Date To: cc: From: August L9,202L Eric Connor, Construction Engineering Manager Paul Kuehne, Construction Supervisor Eric Knowles, CitY SurveYor Jason Bryant, Capital Project Manager carla Maloney, Desis n Ensi neeri ns vunuo{$E\yl?4t Brunye'Adams, Engineering Designer II BAA/A 8/19/2ozl s.224th Street Improvements - BBth Ave s/s 218th St s 222nd St to 94th Pl' s' Project No. 14-3010C Revision No. 17 shown on "Curb Returns 94th PL S" detail Regarding ADD NEW SHEET 5B - Replaces ADA curb design shown on Sheet 5 of 34' Attachments: Sheet 58 City of Kent Public Works Department Chad Bieren, P.E., Public Works Director 58fgs 21ATH SI & g'tTH PL SNW CORNERCURE RAUP DETAII-SWorlsPROUDE INETs{@+WMNG $RFA€sTt 55+1 9.4 ffF: 3O-4PROGCT ilsNNGs 218TH STattJe-Fo-)BMKr:25.81ASmG h,i*,rt.*^ l^Jn ,,l"-l l,'liMESNINSTA:ffi:1TAru fiSNNGSTA:S$,0 F:51.CI 1f,.MATCHsT&55+S.O1Idre RMP TP*$Nff DIRECISPSESRINENSTCURB RAMP DETAIL