HomeMy WebLinkAboutCAG2019-220 - Change Order - #25 - Scarsella Bros, Inc - 228th St UPRR Grade Separation Bridge & Roadway - 01/11/2022KENT
Agreement Routing Form
For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)WaSHTNGToN
E
oLee
Originator
C. Frame
Department:
PW Engineering
Date Sent:
3t1t2022
Date Required:
N/A
Authorized to Sign:
E Director or Designee E MaYor
Date of Council APProval:
N/A
Budget Account Number:
R90067.641'10.120
Budget? @Yes E No
Grant? EYes E No
Type: Federal
c
.9tP
G
Elror'|-
E
tPg
o
EooLgl
Vendor Name:
Scarsella Bros, lnc.
Category:
Contract
Vendor Number:
34547
Sub-CategorY:
Change Order #25
projectName: S. 2281h St. Union Pacific Railroad Grade Seperation Bridge and Roadway
Phase 5
project oetaits:Seal coat on parking lot asphalt 7509 S. 228th due to public construction
vehicles.
Agreement Amount: $4,595.98
Start Date: N/A
Basis for Selection of Contractor: $i6l
Termination Date: N/A
Local Business? EYes E No*
*lf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions' form on Cityspace.
Notice required prior to disclosure?
EYes E No
Contract Number:
cA2019-220
C'ltr
iHf\.o:G.l .rr-
o=Ei oc
E'l
UI
Date Received by €t#flr6.mfi-.
l,i ;1 ir 'i '-illt3lr,,:li ., {.VL,L
Comments:
Date Routed to the Mayor's Office:
Daie Routed to the City Clerk's Office:
ad(W22l7l l_20 Visit Documents.KentWA.gov to obtain copies of all agreements
CW{L
KENT
WASHINGToN
CHANGE ORDER NO. #25
NAME OF CONTRACTOR:Scarsella Bros. Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER:c ttqth c.I lninn Drrifin Dril aA l?raAa Canarrftn Elrialaa = n
oRIGINAL CONTRACT DATE: April 19, 2019
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect' For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to l
Seal coat on parking lot asphalt located at 7509 S. 228th due to public
and construction vehicles. Total cost split between City, Contractor and
Property Owner, this is the City's portion.
Z. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(inctuding applicable alternates and
wssr)
$13,802,146.40
Net Change by Previous Change Orders
(incl. applicable WSST)
$475,371.82
Cu rrent Contract Amount
(incl. Previous Change Orders)
$14,277,518.22
Current Change Order $4,595.98
Applicable WSST Tax on this Change
Order
$0.00
Revised Contract Sum $14,292,114.20
Original Time for ComPletion
(insert date)
240 working days
CHANGE ORDER - 1 OF 3
(insert date)
Revised Time for Completion under
prior Change Orders
(insert date)
0 working days
Days Required
Order
(+) for this Change 69 calendar days
Revised Time for ComPletion
(insert date)
309 working days
In accordance with Sections L-O4.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
C|ange Ordei by signing below. Also, pursuant to the above-referenced contract, Contractor
agreel to waive any protest it may have regarding this Change Order and acknowledges and
alcepts that this Ctiange Order constitutes final settlement of all claims of any kind or nature
arising from or conneited with any work either covered or affected by this Change order,
includTng, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below'
CONTRACTOR:
By vL.dx>
(signature)
Print Nam e: szt4fufiU SarutcflIts f'4fr7 zzArYA6/il
(title)
DATE
CITY OF KENT:
By
Uddydsd ry M *6.. Chad Bieren ilryit?Tffiffishts
(slgnature)
Print Name: Cha.d Bieren. P.E.
Its Public Works Direcff
(titte)
DATE
CHANGE ORDER .2 OF 3
KP
AT]EST: '
t
Kent City Clerk
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
, P.E.Un this field, you may enter the electronic filepath where the contract has been savedl
CHANGE ORDER - 3 OF 3
FILE NO: 2OO.2
KENT
CHANGE ORDER WORKSHEET NO. O25
Construction Manage ment Division - Public Works
Project s. 228th St Union Pacific Railroad 07-3022
: HLP-FMSIB-1216 (005)Grade Separation Phase 5
Project Engineer:Cameron Bloomer, PE
Project No':
Fed-Aid No.
Contractor:Scarsella Bros. Inc.Owners ReP:KBA, Inc
Date: 9/27/2421
I. PROPOSED CHANGE
This Change makes the follow ing revisions to the Contract Documents and Provides
compensation for the added work:
create a new bid item to provide reimbursement of shared costs associated with placing a seal
coat on the asphart parking rot at piop"rtv rocated at 750g s 228th St, commonry referred to as
Pietromonico.
II.REASON AND BACKGROUND FOR CHANGE
rt f rh 7 5 0 9 S 2 z 8t h P ro p e rty (P etro m o n a co )co m pl a I n e d o f e h cl ES bothTheOWneSoestructioTheyre q u e st ed
nstru ct nd p u b cr u s n g rh e I r pa r k I n g o t t h ro u9 h o ut p roJ ect co n n
co o n a Afte oti t n s a th re e
th t b d a S a re med Y Ea g e Asp h a It p rov ided a q U ote r n e g a o
e o e S e a e
h U 3 of the cost.S ea I n g th e ot
p a rti e s (Ci ty Co nt r a cto r Pro p e rty Ow n e r )a g re e d to e a c p ay
,
W a s n ot n c u d e d I n rh e co n st r u cti o n co nt ra ct
III. METHOD OF PAYMENT
NEW PAY ITEM(S)Not Appllcable Y
Unit Unit Price Total Estimated Cost of
Item
LS 595.98 595.98
Cmnge Order No.
Sch. No.
I
Item Description Total Est.
Qtv
QW this
PE
- 75O9 Sealcoatco 025 1 1
Pay me nt to be made PAY TH IS PAY ESTIM ATE
Estimate Attach edIndependent etiontalaterum
New Sub Req rd ?No
ONI.Y
Change Order No.Cost of Item
ruK Avwvrrt,
Unit PriceUnitSoh. No.$$
Item DesoriPtionB.l. No.
Not Appllcable
L
DELFfE EXISTING PAY per 1-09.5
REV. DATE: 3/t5/19
FILE NO: 2OO.2
KENT
AttachedEstimateI REQUIREDdependent
USENo.
Cost of ltemUnit PriceItem DescriptionB.l. No.Sch. No.Unit
Attached REQUIREDEstimatetnIdependen
TNCREASVDECREASE TO EXTSTING PAY ITEM(S Not
TOTAL ESTTMATED COST OF C HANGE ORDER X
*Total of the Cost of Item Columns
THIS PAY ESTIMATE s9s.98
IV. WORKING DAYS
4 s95.98
309oDue This Change Order *240
DATE
Original Contract
DATE
*
Previous Total
TOTAL WORKING DAYSX 309
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the standard specifications
and Coniract Special Provisions for the type of work described'
Prepared BY:Jaso Barrv Date: 9127l2O2L
a z7 Li
Construction SuPervisor:Date:
Construction Manager:Date:
2 REV. DATE: 3/t5/1.9
Eagle Asphalt Sealcoating Co., LLC
Complete Commercial Residential Asphalt Maintenance'
AprilT,2021
Attention:
Contractor:
Address:
City:
State:
zip:.
Matt
Scarsella Brothers
8404 s 196th st
Kent
WA
98031
Job#
Customer PO#
Phone:
Cell:
Fax:
E-Mail:
(206) 817-1765
mathew.s@scarsellabros.com
Job Name:
Address:
Kent
7503 s 228th st
Kent, WA 98032
Weekend Work AmountUnitUMQTY
$1,750.00$1.00LF1750.00
Crack Fill: Prep & clean cracks 1/4" or wider up to 3/4" prior to placing
Durafill HS sealer wilh one or more of the following methods; Mechanical
bensink brooms ,wire brushes, hand scrapers & blowers. Pour hot Durafill
sealer from into or broom flush with surface'1
$8,145.00SF$0.1845250.002
spray. Remove all work related
disposal. (1) Mobilization(s) no
garbage & debris from site for proper
charge, additional mobilizations al
&cones asribbondelineators,workoffBlockofarea(s)
1A-commercial00coats2ArmorforASlotneededapplyneeded.Prep
coat2nd byne,machirstficoalTheappliedsqueegeebyseale
Each.$1
$1,500.00$1,500.00LS1.00
ASribbon&coneswithworkdelineators,offBlock ofarea(s)
tobacklottoRe-stripeascleanre-striping.needed priorSpot
alloveintRemkafficDOTnratioEnwithpanrsuapprovedconfig
forsite (1 )debris&from roperp disposal.related garbage
Each$750.00atitionaladdmobilizationson3
$11,395.00
TOTAL:4
On-site:
Quote valid
Terms:
Exclusions
Eagle Asphalt Sealcoating Company LLC and the General Contractor'
Any changes, additions, deletions to this original contact u!|sI-be approved in writing by the Project Manager and the
authorized on-site representative or General contractot, Approved changes to the original contract must have verified field
measurements and approved by both parties'
This quote does not include any items not listed on this quote'
The undersigned agrees to pay EAGLE ASPHALT SEALCOATING COMPANY,LLC interest of 1'5% per month' ot at the
maximum rate allowed by law if less on any past due accounts, plus reasonable attorney's fees, and cost incurred
in collection of said account'
30 Days
Net 30 unless agreed otherwise and specified by contract
Priced per current producer pricing.-subject to Escalation'
This quote does not include the following:
y"x""l;::::,',?f.,::51;il';:::fi"","I'1""1";':H'"'"%i#ririation costs' Suttv 7t't'
Material testing, soil sterilization, surveying, staking or layout. Not responsible for others prep work or subgrade failures'
Holiday, night, weekend work or overtime wages or special plant openings for weekend work'
A city, county or state approved traffic control plan or certified flaggers'
Water/vacuum trucks or pressure-washing' Sprinkler or gate loops'
Security during or after hour, we are not responsible for any damages caused by others'
"Stand by time" lf required $250'00 per hour'
Paving repairs that exceed quoted depth will be invoiced at $250'00 per ton'
Nowafrantyonsealerappliedoveroilspots,alligatedasphaltareasolreversepercolation.
Material pricing is subjectto change, and shall be adjusted by documented material costs from suppliers'
This document & the exclusions/inclusions listed above shall be included as an appendix to any subcontract between
f s,nss3'n'1.1{
ng "?s
Sincerely,Thls quote & its terms have been approved by:
Jason Drake Date
Jason Drake
Office: 253-862-9554
Cell: 253-414-2163
Fax: 253-862-3855
jaso n@eagle-asP halt'com
Customer Signature
Eagle Asphalt sealcoating co., LLC - PO. Box 1564 Sumner, wA 98390'1564