HomeMy WebLinkAboutPW17-369 - Change Order - #15 - SB Structures, LLC - LID 363: S 224th St Improvements - 02/16/2022KENT
Agreement Routing Form
For Approvals, Signatures and Records Management
This form iombines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)WaSHTNGToN
E
oLec
Originator:
Stephanie Anderson
Department:
PW Engineering
Date Sent:
3t1t2022
Date Required:
N/A
Authorized to Sign:
E Director or Designee [1 MaYor
Date of Council Approval
N/A
Budget Account Number:
R90101 .64110.120
Grant? EYes @ No
Type: N/A
g
.9+,o
ELroq-
E
thtco
EooL
tD
Vendor Name:
SB Structures, LLC
Category:
Contract
Vendor Number
1374695
Sub-Category:
Change Order 15
project Name: LID 363: S 2241h St. lmprovements - 84th Ave S to 88th Ave S
orniart naiaitc. Compensation for work added to remove graffiti and repaint the affected areas on lhe 2241h Street bridge
rruJeLL t'to"t Thi, work was tracked on force account sheets 65 and 66. Compensation for repairing the fence in
WSDOT ROW. This work was tracked on force account sheet #64'
Agreement Amount: $2,$A.92
srarr Date: 712312017
Basis for Selection of Contractor: $i6l
Terminarion Dare: 424 working days
Local Business? EYes E No*
*lf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
EYes E No
Contract Number:
PW17-369
ttlc
IJ
J\.otts
.9
-a-o=Ei otr
.9t/|
Date *".",u.&,EGGLV&'D
tt|AR 2 llj?f,
CITY OF KENT
CITY CLERK
Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk's Office:
ad(W22l7l_1_20 Visit Documents.KentwA.gov to obtain copies of all agreements
KENT
WasslilGton
CHANGE ORDER NO, #15
NAME OF CONTRACTOR: SB Structures' LLC' ("Contractor")
coNTRAcr NAME & pRoJEcr NUMBER: LID:363 s. 224rh st Improvements 84th to 88tl'l
ORIGINAL CONTRACT DATE: JUNE 23,2QL7
This Change order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this change order shall remain in effect' For valuable
consideration and by mutual consent or tn" partieJ, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, contractor shall provide all labor, materials, and
equiPment necessarY to:
compensation for work added to remove graffiti and. repaint the affected
ur"ui;;th" zz4th street bridge. This work was tracked on force account
sheets 65 and 66. Compeniation for repairing the fence in WSDOT
RoW'Thisworkwastrackedonforceaccountsheet#64.
z. The contract amount and time for performance provisions of Section II "Time of
completion," and section [II, "Compensation," are hereby modified as follows:
$ts,3go,7z9.zsOriginal Contract Sum,
(including aPPlicable
WSST)
alternates and
#19t,702.48Net Change bY Previous Change Orders
(inct. aPPlicable WSST)
$1s,s24,431.73Current Contract Amou
Previous Change Orders)
nt
(incl.
$2,380.69Current Change Order
$s0.23Applicable WSST Tax on this Change
Order
$15,526,862.65Revised Contract Sum
CHANGE ORDER - 1 OF 3
Original Time for ComPletion
(insert date)
400 working daYs
Revised Time for ComPletion un der
prior Change Orders
(insert date)
24 working daYs
Da v S Req U I red (+)fo r t h is ch a nge Ord e r 0 calendar daYs
Revised Time for ComP letion
(insert date)
424 working daYs
In accordance with sections L-04.4 and 1-04.5 0f the Kent and wsDoT standard
specifications, and section VII of the ngreement, the contractor accepts atl requirements of this
change order by signing below. nlso, pursuant to the above-referenced contract, contractor
agrees to waive any protest it may #uL regarding. this change order and acknowledges and
accepts that this change order constitutes final settlement of all claims of any kind or nature
arising from or connecte]d with any work either covered or affected by this change order, including,
without limitation, Jaims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits, This chanle order, uni"ss otherwise provided, does not relieve the
Contractor from strict complianc" *''In the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date'
All acts consistent with the authority of the Agreement, previous change orders -(if any),
and this change order, prior to the effective date of tnis change order, are hereby.ratified and
affirmed, and the terms of the ngreement, previous Change orders (if any), and this Change order
shall be deemed to have apPlied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contracl modification, which is binding on the parties of this contract'
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above'
IN WITNESS, the parties below have executed this Agreement' which will
become effective on the last date written below'
Its Public Works Director
(title)
CITY OF KENT:
By
Print Name:c
DATE
Chad Bieren
PF.d Bieren
(signature)
fts FTZLIH rtAalMgr
(title)
DAT1: r,io/ct-
CONTRACTOR:
By
Print Name:Stattf.ttt
(signature)
CHANGE ORDER . 2 OF 3
Kent Larv D€DEfrm€nt
%Q}vil-
(applicable Mayorb
APPROVED AS TO FO R.M:
[In this feld. you tray enter the elest onie fl€path where ti€ @ntcct ha been eavedl
CHANGE ORDER. 3 OF 3
File No. 2OO.2
KENT*N""'*O"ONCHANGE
ORDER WORKSHEET NO. 15
Construction Engineering Division - Public Works
Project: LID 363 224th St Bridge Project No: 99-3003
Project Engineer: Carla Maloney Fed-Aid No:
Capital Projects Jason Bryant Contractor: SB Structures
Manaq er:
Date: L/7/2 021
I. Pro sed Chan e
tn eh 22 t4 SthreaoasrentteheffectedeOVraaffitidnWedrkoretompansaentiorfodIadmCop
fene cerforithmnsatienoCorepan956na6d6pcconustetsheonkedrcefoThWOskrsWAractebridgtnheS#et 64noaccfoceoutrawaskedciThsorkWROniSWDOT
II. Reason and Ba round for Change
IIL Method of PaYment
NEW PAY ITEMS E NotaPPlicable
is work was tracked on force account sheets 65 and 66
mpensation for repairing the chain link fence in the wsDor Row per the punchlist. This work was
tracked on foce account sheet # 64
on the 224th St bridged repaint the effected areasCompensation for added work to remove gra ffiti an
Co
Sch
No Item DescriPtion Total Est
Qtv Unit Unit Price Total Estimated Cost of
Item
9
4A
Remove Graffiti and RePaint
RePair Fence
1
1
FA
FA
$1,883.34
$497.3s
$
$
1,883.34
497.35
$
New Pay Items Total: $2,38O.69
DELETE EXISTING PAY ITEM(S) per 1-O9,5 E Notappricabre
Sch
No.Bid Item No.Item DescriPtion Qtv Unit Unit Price Cost of Item
Page 1
$
$
$
Delete Existing PaY Items Total: $
INCREASE/DECREASE TO EXISTING PAY ITEM(S) r Notappricabre
Sch
No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item
$
$
$
Increase / Decrease to Existing Pay Items Total: $
XTOTAL ESTIMATED COST OF CHANGE ORDER:$2,38O.69
x Total of the Cost of Item Columns
IV. WORKING DAYS
L75oPrevious Total:Due This Change Order:130Original Contract:
Explanation/Justification for Additional Working Days:
XTOTAL WORKING DAYS:t75
x This Change Order + Previous Total
Date: 1nOl2O22Capital Projects Manager:Jaon Krgant
Jason Bryant
Construction Engineering
Supervisor:
€"rt^"I Kuehne
Date:
Date:
tt I
t f n/zzConstruction Manager:
c Connor
Page 2
FA Sheet No.:AAGDAILY REPORT OF
FORCE ACCOUNT WORKED
LID 363 224th sT
Prime Contractor:SB Structures
Project No: 99-3003
fence in WSDOT ROW
Sub-Contractsl; $e*rl*bP
Subcontractor?: no
Project Name:
Item No.:
Description of Work:
Date: 121112021
OVERTIMESTRAIGHT TIME DOLI.AR
AMOUNTHrsOT RateHouRateHrsOCCUPATIONCODENAME 299.43sOA3.5Foreman
$83.7661
s80.21B
61.07Laborer
$bt
LABOR OVERHEAD & PROFIT @ 29% $
299.43
386,26
86.83
LABOR TOTAL $
SUBTOTAL. LABOR: S
STANDBYOPERATED DOLLAR
AMOUNTRate
EOUIPMENT OR ATTAC
Equipment DescriPtion
HMENTS
Equipmenl #
$19.Fl 502-223
19.77F1 502-305 b33.1 3F3503-132 91.81$26.231AF350102-334 $
$
$
SUBTOTAL -EQUIPMENT
EOUIPMENT TOTAL
91.81
1 11.09
19,28EQUIPMENT OVERHEAD & PROFIT @ 21%
DOLLAR AMOUNTUnit PriceUnitsQuantity
MATERIALS / SERVICES
$
$
$
c
$
TOTAL $
oVERHEAD&PROFIT@21%
SUBTOTAL $
of Hours Worked
I
Date
Jwon 5rgant e61s 11712022
497.35
497.35SHEET TOTAL:
$
TOTAL: $
subcontract work)
I2% MARKUP (for prime when
Pay Estimate Entered:
Date:
By:
FA Sheet No 65/A\./ r<ENT
DAILY REPORT OF
FORCE ACCOUNT WORKED
OCCUPATIONNAME
5
CODE
Project Name:LID 363 224th ST lmprovements
Sub-C ontractor: €##a>
Raie Hrs
Project No: 99-3003
of int 148.65 eachDescription of Work:Remove raffitti
Prime Contractor: SB Structures
I-ABOR
OVERTIMESTRAIGHT TIME
OT RateHrs
no
tn mber 2020
walls
wasbuckets of100 5
Work
DOLLAR
AMOUNT
Item No.:Date: 811712021
335.60$83.7683.94ForemanDon V 259.64$83.76464.91LaborerJerrod W
$80.21ForemanJeff B
$61.07LaborerJerry M
STANDBY
Laborer
OP
Rate
LABOR OVERHEAD & PROFIT @ 29% $
LABOR TOTAL $
$61.07
595.24
767.85
172.62
EQU IPMENT OR ATTACHMENTS
Equipment #Equipment DescriPtion
DOLLAR
AMOUNT
SUBTOTAL. LABOR: $
$19.70F1 502-223
$19.77F1 502-345
$33.13F3503-132
$26.23F350fi2-334
1 03-31 4
DOLLAR AMOUNTUnit Price
MATERIALS / SERVICES
van
UnitsQuantity
b
$
a
133.40
161.41
'133.40
28.01
33.354
EQUIPMENT OVERHEAD & PROFIT @ 21%
EQUIPMENT TOTAL
SUBTOTAL - EQUIPMENT $
148.65ee$ 148.651Rodda Paint 5 gals
$
$
$
on of Hours Worked:
Date
ownefs
1
$
t o^r" 1t7r2o22
$
$
$
$
1 109.14SHEETTOTAL: $
Jason
148.65
1 09.1 4
31.22
179.87
12% MARKUP (for Prime when
subcontract work)
Pay Estimate Entered:
Date:
By:
SUBTOTAL
oVERHEAD&PROF1T@21%
TOTAL
TOTAL: $
FA Sheet No.bo{aFORCE ACCOUNT WORKED
DAILY REPORT OF
buckets of
ASure
Project Name:LID 363 224th ST lmProveme4!1
Prime Contractor:SB Structures
Description of Work: Remove
Project No: 99-3003
of int 148,65 each
2A2A
Item No
lnwas
Work by Subcontractor?: nO
Sub-Contractor:
100 5
Date: 121312021
OVERTIMESTRAIGHT TIME DOLLAR
AMOUNTOT RateHrsRateHrsOCCUPATIONCODENAME 335.60$834Foreman
$83,7664.91
80.21
$61.07Laborer
$61.07Laborerriah C SU BTOTAL - LABOR: $
LABOR OVERHEAD & PROFIT @29% $
335.60
432.92
97.32
LABOR TOTAL
STANDBYOPERATED DOLLAR
AMOUNTRateEOUIPMENT OR ATT ACHMENTS
Equipment DescriptionEquipment #
$19.F1 502-223 $19.77F1 502-305 $13F3503-1 32 $
F3501 02-334 133.40$van1 03-31 4
EQUIPMENT OVERHEAD & PROFIT @ 21%
EQUIPMENT TOTAL $
$
133,40
161.4{
28.01
SUBTOTAL - EOUIPMENT $
DOLLAR AMOUNTUnit PriceUnitsQuantity
MATERIALS / SERVICES 148.65$ea $ 148.651Rodda Paint 5
$
$
s
$
SUBTOTAL
OVERHEAD&PRoFlr@21%
TOTAL
$
$
$
148.65
179.87
31"22
Verification of Hours Worked
DateContracto/s
Jwon firgant p21s 117 12022
12% MARKUP (for Prime when
subcontract work)
774.20
774.20SHEET TOTAL:
TOTAL:
Pay Estimate Entered:
Date
B Jason
From:
Sent:
To:
Subject:
Attachments:
Bryant, Jason
Friday, July 16, 2021 11:41 AM
Bryant, Jason
FW: FA Sheets for 99-3003 S 24th ST lmprovements
0692-001.pdf
From: Brenda Ketcherside <brenda.k@SCARSELLABROS'com>
Sent: Thursday, JulY 8,202111:03 AM
To: Bryant, Jason <JBryant@kentwa.gov>
Cc: Matthew Scarsella <matthew.s@SCARSELLABROS'com>
Subject: RE: FA Sheets for 99-3003 S 24th 5T lmprovements
Hello Jason,
per our phone conversation, back in september 2020 we purchased 100 5 gallon buckets of paint at 5148'65 each so we
can use the attached invoice for the force account sheets. Disregard the previous invoices I sent'
Thank you
&'
Brenda Ketcherside
Ad m inistrative Assistant
Scarsella Bros, lnc,
PO Box 68697
seattle, wA 98168-0697
Direct Line 253-234-0316
Fax Line 253-479-L356
1
EXTERNAL EMAIL
SIANSTI LA
clt.ls I STONE |NVOTCE t
1045 18(X)18788954
Clro?Olttln JO0rP.O' NUMBEF onDlnEo SHIPPED ,IIIED TENMS
73026 09f2s129 asn+no osn4n0 NET 30 DAYS
REMITTO:
PO Box 24425 . PASAOENA, CALIFoRNIA Si t 85-4425
503.521.4300' Fax 503.521'441 1
PLEASE DETACH ANO REiURN TH'S PORT'OII MTH YOI'R PAYTIENI
REMITTOI
PO Box 24425 ' PASADENA, CALIFORNIA 91 185-4425
503.52'l ,4300 ' Fsx 503.5?1 '441'l
l\u tJJLl(-i
PAGE 1
A Flnance Charge of 1 .5% per month (18% per annum)
wlll be charged on all pasl due accounls'
conxrnci^L . lt{oulrtrlAL r RltlDeNTtAL
5g Lr.qqs;
?q.t30
f ' . ' rtI lt "'tI
r 0s t$11
14885.00
n
U
231,4S
li\t
PO:73025
JOB: lock 263"261'1338
JOB: 19440 84lh avc s
JOBI KENT WA OEO32
CON SEAL WASHINGTON STATE €RAY
PRICE PER GALLON
Barctr# P20H6009
RBGB\NPu
0t1 - t lunr
SS $'$da)to9'tt0'
gnaa{o"#-
Fc".,^* -fo-><- J tttru'o
100?3!r286t
14805.00TOTAL
.00rA)( 0.'100
1,188!t.00TOIAL ll{volcE
III ddu
PnINI ACCOUNT#660793
TA)(.00
14s66.00
':t,.,',,'tr1ili{il6ll'i:. I
.i.'\:l,l,r . !r:
'rorAt. lNVOlcF8BgfrtXfiHIt8tb"*
68i1$f$9{'*'*
AMT ENCLO I
Bryant, Jason
From:
Sent:
To:
Cc:
Subject:
Johnson, Richard <JohnsoR@wsdot.wa'gov>
Wednesday, October 13,2021 1:46 PM
Bryant, Jason
Frantz, Randy; McColloch, Duffy; Golden, Micheal; Durst, Gary; Hall, Kevin; Munoz,
Joseph; Maloney, Carla
SR 167 - MP 21 .39-21.73 GCB2393 224thSt. Bridge PUNCH LIST
Jason,
Please see outstanding punch list items to be addressed
I know Carla Maloney is working to address water in median issue NB and SB SR167 (at structure)
WSDOT Maintenance has observed homeless activity in the project area, RoW fence has been cut on NW side of
structure
Has your contractor addressed any of the punch list items?, including, but not limited to:
Contractor,s project staging area located at west side of 224th st Bridge, construction debris cleaned up and WSDOT
ROW fence restored to preexisting condition.
Damaged pavement marking replaced and track out removed, residual pavement marking completely removed from
rechannelization. NB and SB, SR167. (Project limits)
Rumble strips restored NB and SB, SRL67, under 224rh St Bridge'
Remove grout/concrete from sB sR167 HOV Lane north of 224th St Bridge'
Restore any roadside areas disturbed by project activities. (Project limits), there is a drop off on SB right shoulder (North
of structure)that was not restored when widening was removed, there is a8"-!2" drop off in this area'
Please forward a copy of AS Built Plans you have for the project to me,
Thank you Jason
Richard (Rick)Johnson
Developer Services
Local Construction ReP.
15700 Dayton Ave N,
Shoreline, WA 98133
206-44A-4717(A)
206-200-8350(C)
JohnsoR@wsdot.wa.gov
Mon.- Fri. 0600-1430