Loading...
HomeMy WebLinkAboutCAG2020-418 - Change Order - #5 - T. Bailey, Inc. - West Hill Reservoir Construct New 5.0 Million Gallon - 01/07/2022Agreement Routing Form KENT For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper)WASHINGToN E oLrq Originator: S. Anderson Department: PW Engineering Date Sent: 2t8t2022 Date Required N/A Authorized to Sign: E! Director or Designee E Mayor Date of Council Approval 12t08120 Budget Account Number: w20054.641 10.330 Budget? EnYes E No Grant? E Yes EI No Type: N/A E .9,Ft! ELobE-ELa EooL ID Vendor Name: T. Bailey Construction Category: Contract Vendor Number: 294554 Sub-Category: Change Order #5 Project Name: West Hill Reservoir project Deraits:Deductive Change Order - Price adjustment for the changing of 16 inch offset gear driven gate valves (GV)for butterfly gate valve (BFV) valves. Ag reement Amou nt: -$7,244.01 start Date: 1212312020 Basis for Selection of Contractor: $i6l Terminarion Dare: 366 Working Days Local Business? E Yes E No* *lf meets requirements per KCC 3.70.100, please complete 'Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? EYes E No Contract Number: cAG2020-418 Comments:Date Received by City Attorney: Date Routed to the Mayor's Office: ttlca!4H3 EEl!E.9UI Date Routed to the City Clerk's Office:ad ad(W72l7l_l_)0 Visit Documents.KentwA.gov to copies of all agreements KENT WasHtNoroN CHANGE ORDER NO, #5 NAME OF CONTMCTOR:T. Bailey, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER:West Hill Reservoir ORIGINAL CONTRACT DATE :December 23, 2020 This Change Order amends the above-referenced contracU all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Deductive Change Order - Price adjustment for the changing of 16 inch offset gear driven gate valves (GV) for butterfly gate valve (BFV) valves. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and wssr) $8,493,470.72 Net Change by Previous Change Orders (incl, applicable WSST) $218,313.53 Current Contract Amount (incl. Previous Change Orders) $8,7Lr,794.2s Current Change Order $-6,579.48 Applicable WSST Tax on this Change Order $-664.s3 Revised Contract Sum $9,704,540,24 CHANGE ORDER - 1 OF 3 Origin'al Time for: Completion (insert date) 350 workingdnys, Revised Time for Completion under prior Change Orders (insert date) 16 working daye Days Required (*) for: this Change Order 0 calendar days Revised Time for Completion (insert date) 366 working days In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT :standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order. by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement, of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without llmitation, claims r:elated to contract time, contrect acceleration, onsite or home office overhead, or lost proflts. This Change Order, unless otherwise provided, does not relieve the Contraetor from strict compliance with the guarantee and warranty provisions of lhe original contract, particular"ly those pertaining to substantial com pletion' date. A,ll acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, ar,e hereb-y ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deenled to have applied. The parties whose names appear below swear under':penalt'!/ of perjury that they are authorized:to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust th€ amount of its performance bond (if any) for this project to be,consistent,wlth the revis.ed contract sum shown in section 2, above. IN WITNESS, th€ parties below have executed this Agreementr which will beeome effective on the last date written below. L. CITY OF KENT: au : chad aiereffi"*;*h##r;e':'"'' (signature) By (signature) Bonie WardlawPrint N Print Name:Chad Bieren, P.E. Its Contract Manager Its Public Works Director . (tiile)(titlel DATE:'ll4l22 CHANGE ORDER. 2 OF 3 K? ATTESTI Kent City Clerk APPROVED AS TO FORM: (appllcable If Mayorb slgnature requlred) Kent Law Department lrn thls fleld, you may enter the €lecttonlc filepath wh€re the @ntract has been savedl CHANGE ORDER - 3 OF 3 File No. 2OO.2 KENT w^sHrN0lo{ CHANGE ORDER WORKSHEET NO. 5 Construction Engineering Division - Public Works Project: West Hill Reservoir Project No: L9-3027 'L Project Engineert RH2 - Drew Holcomb Fed-Aid No: N/A capital Projects phir Mcconnel contractor: T BaileyManageru, , -. , Date: Various I Pro sed Chan e inch offset gear driven gate valvesDeductive Change Order - Price a djustment for the changing of 16 (GV) for butterfly gate valve (BFV) valves,. IL Reason and Bac round for Chan e IIf . Method of Payment NEUI PAY ITEMS f NotaPPlicable 2 GV's were missed on the contractors original parts o City has allowed the changing of GV's to BFV's, The change allowed the project to stay on schedule. The lead time for the GV's was 16 weeks or greater. lead time for the GV's, therder. Due to the long Total Estimated Cost of ItemUnitUnit PriceTotal Est. Qty Sch No Item Description (6,579.48)-$6,579.48LS $ $ $ 11000, Site Utilities; changed from 15 inch Gate Valves to 16 inch Butterfly Valves t1 Change - Line Item New Pay Items Total: $(6F7e.4f3) DELETE EXISTING PAY ITEM(S) per 1-09.5 [ Notappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item Page 1 _$_ Delete Existing PaY Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) E ruotappricabre Sch No.Bid Item No.Item DescriPtion Qtv Unit Unit Price Cost of Item $ $ $ Increase / Decrease to Existing Pay Items Total: $ *TOTAL ESTIMATED COST OF CHANGE ORDER:-$6t579.48 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract:3so Due This Change Order:o Previous Total:366 Exp lanation /Justification for Add itional Worki ng Days I *TOTAL WORKING DAYS:366 x This Change Order + Previous Total Capital Projects Manager: Construction Engineering Supervisor: Ph McConnell I Kuehne Date: Date: )L - L ' L, Date: dfu, Construction Manager: 4--"_-/L, Eric Gonnor Page 2 l.rll %- co;- Gate / Butterfly Valve Pricing Adjustment 16 inch GV 16 inch GFV Price adjustment Price Each Total Price 8084.74 16169,48 4795 9590 5579.44 Qty 2 2 Original Project Material Quotation Bld No: M430833.1 Page 4 of 10 9,090.24 708.56 * 8,084.74 24.40 39.26 10.09 433.66 584.78 323.22 325.64 r94,72 265.90 1,429.56 103 104 105 106 1 EA NS-69660-4451 EA IFATTMFL EA tFx7777FFtF EA NS-MHHZ-14727 EA VBB24 EA VBTg4OB EA VBLg4O C* IFRT2FF EA IFRT5FF EA BNGKITT EA USFTGTFF EA NS-FGF-35293 EA NS-ROZ-25621 FT lPs2sGTl 2 t 1 1 T 1 1 I 6 6 1 2 36 16" FXF FLEX TEND DBL SALL EXP JOINT W8" EXPANSION 4X6F2O, 4-6 WEEK 9,090.24 LEADTIME NOT INCLUDUNG TRANSIT 16" MJ X F|-ADAPTER Dl, AwwA c1s3, c/L LESS ACCESSORIES {166 LBS) 354.28 x6" Ft CROSS Dt, AWWA C110, C/L t,5t2.64 X,6'' FXF GATE VALVE WBEVEI GEAR OPERATOR & 2" NUT HORIZONTAL 8'084,74 rNSrAluTloN i:::YliY:l3xi3i'n*,,u,,,,, xbv,Lw't0"1;12 LrD FoR 940 vALvE sox DEE' sKtRT MARKED "*ATER" ' I 10.09 16" X 6" FL CONCENTRIC REDUCER Dl, AWWA C110, c/L 433.66 16" X 12" FL CONCENTRIC REDUCER Dl, AWWA C110, C/L (285 LBS) 584'78 16" PTATED BOLT & NUT KlT, A307 GRADE A, (16EA 1" X 4-L/2" BOLT WITH 53'87 NUT) IMPORT 16' FLANGE-TYTT FULL FACE GASKET SBR NSF RATED IMPORT 54.44 16.. FLANGE ISOIATION KIT G-10 SLEEVE AND WASHER SETS T94.72 16" WEDGE AcrloN MJ Klr FoR Dl PIPE w/BoLTs, WEDGE AcrlloN GLAND, 132'95 MJ GASKET, ARMORGUARD E.COAT, UFRX4OO.DA-1GI IMPORT 12" CL 52 Dr PIPE TJ 18.25' LENGTH ASPHALTIC COATED ANSI/AWWA 39'7L c15uA21.51AND CEMENT LINED ANSI/AWWA C104/A21.4 WlrH sBR GASKET LOl 108 109 110 111 7t2 113 114 115 116 tL7 118 119 120 721 722 131 132 133 r"34 135 136 t37 138 139 2EA 4EA 1EA 1EA 2EA lEA t23 124 t25 726 727 128 LZg 130 *r* EA 1EA 1EA 1EA IFLSsMML NS-ROZ-26624 NS-rSS-1.70727 NS-tss-170728 N$.ROCP-38773 NS-CW-13352 NS-CW-13360 Ns-835s0-1598 MH4O67FF77 |F.riTSFFFP EA NS-lss-170729 EA BNGKITT EA USFTGTFF EA MH4O67FF55D EA NS-ROCP-38774 EA NS-|SS-X70730 EA EN6KlTs USFTGSFF NS-ELM-4931 GFN7X12 wwLs360s MSQUOTE NS-HrUV-30529 MSNSNOBID PP30341114 MCPVC1lPSM 12" MJ 90 ETBOW Dl, AWWA CX53, C/L LESS ACCESSORIES (141 LBS) 12" WEDGE ACTION Ml Klr FOR Dl PIPE wBOtTs, WEDGEACTION GLAND, MJ GASKET, ARMORGUARD E.COAT, UFR14OO.DA.12-I IMPORT 16" X 6'0" FXPE Dl SPOOL CLftNX PRIMER COATED W/SEEP RING IMPORT 16" X 5'O' FXF Dl SPOOL CL,rrNl PRIMER coATED W/SEEP RING IMPORT 16" FDJ-D16E.R DISM JNT WCLASS D FLG, NSF.61 COATED, GALV N&8, IMPORTOK 16'' CLA-VAL 21OG-178DFYKC ALTITUDE VALVE WITH SOLENOID OVERRIDE AND CHECK FEATURE, DI BODY, SS TRIM, EPOXY LINEO & COATED, 15Of FTANGED, W/X1OsLCW DPDTMICRO SWITCH, J.1G16O RANGE CLA-VAL START.UP AND TMINING SERVICES PER DAY J.6.'FXF MAG METER ].6,' FIANGE GATE VALVE M&H #4067{2 AWWA C515 RESILIENT SEAT WITH 2" OP-NUT (1140 LBS) 16' X X2' FL TEE Dl, AWWA C110, C/L (s90 LBS) W/TNEMEC SERIES TN140 PRIME COATING 16,' X 3.0'' FXF DI SPOOL C TNI PRIMER COATED IMPORT ],6'' PI.ATED BOLT & NUT KIT, A3O7 GRADE A, (16EA 1.' X 4'T12" BOLT WITH NUT) IMPORT 15" FTANGE-TYTE FULL FACE GASKETSBR NSF RATED IMPORT 12' DUCTILE IRON FLX FL GATE VALVE AWWA C515 NRS,RESIUENT SEAT WITH 2,'OP-NUT 12'' FDJ-D1zE.R DISM JNT, CLASS D FLG, NSF-61 COATED, GALV N&8, IMPORT 12' X 3'O' FXPE DI SPOOL CWN1 PRIMER IMPORT 12' PLATED BOLT & NUT Klr. A3O7 GRADE A, ll2EA7/8' X 3-314" BOLT WITH NUT) IMPORT 12. FTANGE.TYTE FULL FACE GASKET SBR NSF RATED IMPORT 16" 58916 FIANGE PIPE SUPPORT HDG IMPORT 2., X 12" SCH 40 GALVANIZTD NIPPTE A53 ERW LINK-sEAL 15.360.5 EPDM & 315SS FASTENERS rv,iiq - z iEIi oi ez unrs Eaci, r ilr or ir iir'rxs 8X8OTA VAULT, 818 SOIID WALI CENTER 48'' COALTAR EXTERIOR, 818 TOP X2'' RISER COAL TAR EXTERIOR, 8X8 TOP WITH I2I6OX72 LW HATCH AND VALVE BOX, 5, IADDER WITH 8'STANDOFTS, IADDER-UP ALUM TU-4 SENSING LINEs, SST CONDUIT, PVC SPLIT CASING 4'' SDR35 3034 GASKETED PVC SEWER PIPE 14'LENGTH 4" PSM PVC SANDED MANHOLE COUPLING & GASKET FOR PVC SEWER PIPE 225.12 74.08 1,156.98 r,320.O1 7,277.73 28,990.22 1,630.43 6,154.43 1,061,94 921.07 53-87 54.44 L,819.77 700.39 400.30 28.00 26.66 24r.84 L2.37 L9.L7 33,692.70 1,16 18.70 45O.24 296.32 1,156.98 1,320.07 2,555.46 28,990.22 't** No Bid 6,154,43 7,061.94 921.07 430.96 43s.52 1,819.17 700.39 400.30 84.00 79.98 483.58 24.74 r,437.75 Note 33,692.70 No Bid 16,24 37.40 1 8 8 t I 1 3 3EA 2EA 2EA 75 EA 1EA 140 L4L 142 1 t4 2 d H.D. FOWLER COMPANY REMIT: PO Box 84368, Seattle, WA 98124 Gorporate Office 3633 136th Pl SE, Ste 100, Bellevue, WA 98006 PO Box 160, Bellevue, WA 98009-0160 Phone 425-654-8800 . Fax 425-641-BBB5 Bellevue Branch 13440 SE 30th st Bellevue, WA 98005 (42s)746-8400 Fax (425) 641-8885 Page 1 of 1 2,723.92 4,795.00 100.00 7,618.92 lnvoice Number r5840650 BEWH # 143940 TO: NORTHWEST CASCADE PO BOX 73399 PUYALLUP WA 98373-0399 Ship to:10412 JOHN BANANOLA WAY E PUYALLUP WA 98374 Order# C-7101714 lnv Date: 07113121 Order Writer: Ben Pimentel Terms: NET 1OTH PROX FoB: H, D. FOWLER COMPANY Due: 08110121 Ship Via: CH ROBINSON PO/JOB: #4299 WEST HILL RESERVOIR Qtv Ship'd Qtv BO'd UoM Part # Description Unit Price Extended T Price XLine 1 4 EA IFATTMFLD 16'' MJ X FL ADAPTER DI, AWWA C153, C/L LESS ACCESSORIES (166 LBS) DOMESTIC MH45OMF77L 16" MJ X FL BUTTERFLY VALVE, M&H #4500-13' CL15OB, AWWA C504, LESS MJ ACCESSORIES' FUSION BONDED EPOXY COATED IN AND OUT * MAY NOT BE 100% DOMESTIC. (645 LBS) MSOUTBOUND OUTBOUND FREIGHT CHARGE FREIGHT ON LTL TO OFFICE. 680.98 1 EA 4795.00 xLqsq 6 1 EA 100.00 Sub total Freight Tax Grand Total CHRIS Serving the Pacific Northwest since 191 1 www. hdfowler.com 7,618.92