Loading...
HomeMy WebLinkAboutCAG2020-345 - Amendment - #1 - J.A. Brennan Associates PLLC - Kherson Park Renovation Final Design & Construction Administration - 01/05/2022ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: Director or Designee Date of Council Approval: Grant? Yes No Type:Review/Signatures/RoutingComments: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? Yes No* Business License Verification: Yes In-Process Exempt (KCC 5.01.045) If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? Yes No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 Budget Account Number: Budget? Yes No Sup/Mgr: rev. 20210513 FOR CITY OF KENT OFFICIAL USE ONLY * Memo to Mayor must be attached Dir. Assist: 4 N/A 4 Other P21035 Contract 12/27/2021 Amendment33184 Parks, Recreation & Community ServicesLynn Osborn $204,724.20.00 10/31/2022 4 Earliest possible please N/A 11/09/2020 4 4 4 01/06/2022 AMENDMENT - 1 OF 2 AMENDMENT NO. 1 NAME OF CONSULTANT OR VENDOR: J.A. Brennan Associates CONTRACT NAME & PROJECT NUMBER: Kherson Park Renovation Final Design & Construction Administration, PK20-01 ORIGINAL AGREEMENT DATE: 10/29/2020 This Amendment is made between the City and the above-referenced Consultant or Vendor and amends the original Agreement and all prior Amendments. All other provisions of the original Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force and effect. For valuable consideration and by mutual consent of the parties, Consultant or Vendor’s work is modified as follows: 1. Section I of the Agreement, entitled “Description of Work,” is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, the Consultant or Vendor shall: Provide additional geotechnical investigation and coordination services and extend contract duration. 2. The contract amount and time for performance provisions of Section II “Time of Completion,” and Section III, “Compensation,” are modified as follows: Original Contract Sum, including applicable WSST $197,707.00 Net Change by Previous Amendments including applicable WSST $N/A Current Contract Amount including all previous amendments $197,707.00 Current Amendment Sum $7,017.20 Applicable WSST Tax on this Amendment $0.00 Revised Contract Sum $204,724.20 AMENDMENT - 2 OF 2 Original Time for Completion (insert date) 12/31/2021 Revised Time for Completion under prior Amendments (insert date) N/A Add’l Days Required (±) for this Amendment 300 calendar days Revised Time for Completion (insert date) 10/31/2022 The Consultant or Vendor accepts all requirements of this Amendment by signing below, by its signature waives any protest or claim it may have regarding this Amendment, and acknowledges and accepts that this Amendment constitutes full payment and final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Amendment, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and warranty provisions of the original Agreement. All acts consistent with the authority of the Agreement, previous Amendments (if any), and this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed, and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this Amendment, which is binding on the parties of this contract. IN WITNESS, the parties below have executed this Amendment, which will become effective on the last date written below. CONSULTANT/VENDOR: By: Print Name: Its DATE: CITY OF KENT: By: Print Name: Brian Levenhagen Its Parks, Recreation & Community Svcs. Deputy Director DATE: ATTEST: ___________________________ Kent City Clerk APPROVED AS TO FORM: (applicable if Mayor’s signature required) Kent Law Department \\PKUPFPP1V\PKPublic\Planning\Kherson Park\Redevelopment 2019-20\Construction\JA Brennan-Design ConstructionAdmin-AMENDMENT 1 Brian Levenhagen (Jan 5, 2022 12:59 PST) Jan 5, 2022 Drew Coombs (Jan 5, 2022 14:59 PST) Drew Coombs Landscape Architect Drew Coombs Jan 5, 2022 1 December 23, 2021 Scope of Work: KHERSON PARK REDEVELOPMENT – CONTRACT DOCUMENTS AND BIDDING Extra Service #1 – Additional Site Inventory and Analysis. Prepared For: City of Kent - PARKS, RECREATION & COMMUNITY SERVICES Michael Espenan Park Planning and Dev | Parks, Recreation & Community Services 220 Fourth Avenue South, Kent, WA 98032 Cell 206-635-5807 | Office 253-856-5058 | Fax 253-856-6050 MEspenan@KentWA.gov Refer to Exhibit A fee spread sheet for more information. To Michael, Thank you for the opportunity for the extra service to this important downtown park. After field work by JAB during the 60% design phase it became apparent an underground gas utility line was not picked up by Survey, as the gas utility locate was not provided at the time of Survey performing the field work. This required some additional coordination with Survey and locate service to be on site to pick up the Gas line. To expedite the work JAB provided initial PSE Gas utility coordination to verify and confirm the gas line; including filling out request forms to verify the utility and meeting on site. This resulted in it becoming apparent the gas line had no easement to be on the park property. Parks is currently working with PSE to remedy the utility easement on the park property and relocate the gas line to avoid any potential conflicts with the proposed park design improvement. The city pre-application summary is requesting that geo-tech work support the infiltration needs for feasibility assessment for permeable paving as a BMP stormwater solution to the site. This requires additional work from Geo-engineers to provide infiltration rate analysis to support Civil. This Extra service work will be billed under the existing Task B – Site Inventory and Analysis. Task A – Administration/ Coordination Minor time to coordinate with City and Design team members and prepare invoicing. Landscape Architects & Planners 2701 First Avenue Suite 510 | Seattle, WA 98121 206.583.0620 | jabrennan.com Attachment A 2 Task B – Site Inventory & Analysis, Additional field work and investigation has been required for survey and Geotech. Additional Geotechnical investigation by Geoengineers The purpose of our additional services is to use laboratory data collected in our initial study at the project site and our experience to provide an infiltration estimate of native site soils. Based on discussions with you and the project civil engineer (LPD Engineering PLLC), it is our understanding that permeable paver best management practices (BMPs) are planned for the project. We understand that design of the permeable pavers requires a design infiltration rate. In our Geotechnical Report for the project dated March 29, 2021, we concluded that on-site facilities requiring full infiltration were likely infeasible due to relatively shallow groundwater at the site (on the order of 5 feet below ground surface). It is our understanding that the proposed BMPs will be on the order of 12 inches deep and will not require full infiltration. We anticipate that a design infiltration rate can be provided based on information from nearby studies and grain size correlations of soil samples collected in our initial study. However, if these infiltration BMPs will require full infiltration, we anticipate that additional field studies (i.e. Pilot Infiltration Tests [PITs]) would need to be performed in accordance with the City of Kent Surface Water Design Manual (SWDM). Our specific scope of additional services will consist of the following: 1. Review existing soil information collected from our previous study at the site. 2. Use particle-size gradation analyses results from our previous study and nearby infiltration data from other sites to provide a design infiltration rate of native site soils for design of the proposed BMPs. 3. Prepare an addendum to our geotechnical report presenting our findings, conclusions and recommendations. Additional Survey by Parametric (formerly PGS) Underground gas utility pick up and PSE coordination. 3 EXTRA SERVICE SCOPE ASSUMPTIONS: 1. Survey of new gas location after PSE relocate is not included. 2. Geo-Engineers scope and budget does not include any construction management, monitoring, inspections or Pilot Infiltration Tests (PITs). We will provide a scope and budget for these services as needed and upon request. Signature: Email: Signature: Email:rlashley@kentwa.gov Melissa McCormick (Jan 6, 2022 11:33 PST) Melissa McCormick cityclerk@kentwa.gov E-TRANSMITTAL: Admt. 1 for Kherson Park CA Agmt. Final Audit Report 2022-01-06 Created:2021-12-27 By:Lynn Osborn (losborn@kentwa.gov) Status:Signed Transaction ID:CBJCHBCAABAAbDC57VB-ejg7quJLrDVg7dPAtLlKnKpk "E-TRANSMITTAL: Admt. 1 for Kherson Park CA Agmt." History Document created by Lynn Osborn (losborn@kentwa.gov) 2021-12-27 - 11:13:08 PM GMT- IP address: 146.129.252.126 Document emailed to Ronald Lashley (rlashley@kentwa.gov) for signature 2021-12-27 - 11:15:19 PM GMT Email viewed by Ronald Lashley (rlashley@kentwa.gov) 2022-01-05 - 1:35:51 AM GMT- IP address: 146.129.252.126 Document e-signed by Ronald Lashley (rlashley@kentwa.gov) Signature Date: 2022-01-05 - 1:38:33 AM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Brian Levenhagen (bjlevenhagen@kentwa.gov) for signature 2022-01-05 - 1:38:35 AM GMT Email viewed by Brian Levenhagen (bjlevenhagen@kentwa.gov) 2022-01-05 - 8:58:14 PM GMT- IP address: 146.129.252.126 Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date: 2022-01-05 - 8:59:19 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Drew Coombs (drew@jabrennan.com) for signature 2022-01-05 - 8:59:21 PM GMT Email viewed by Drew Coombs (drew@jabrennan.com) 2022-01-05 - 9:05:16 PM GMT- IP address: 76.121.208.140 Document e-signed by Drew Coombs (drew@jabrennan.com) Signature Date: 2022-01-05 - 10:59:55 PM GMT - Time Source: server- IP address: 76.121.208.140 Document emailed to Kim Komoto (kkomoto@kentwa.gov) for signature 2022-01-05 - 11:00:00 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2022-01-05 - 11:07:16 PM GMT- IP address: 146.129.252.126 Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date: 2022-01-05 - 11:07:31 PM GMT - Time Source: server- IP address: 146.129.252.126 Document emailed to Melissa McCormick (cityclerk@kentwa.gov) for signature 2022-01-05 - 11:07:33 PM GMT Email viewed by Melissa McCormick (cityclerk@kentwa.gov) 2022-01-06 - 7:26:10 PM GMT- IP address: 146.129.252.126 Document e-signed by Melissa McCormick (cityclerk@kentwa.gov) Signature Date: 2022-01-06 - 7:33:51 PM GMT - Time Source: server- IP address: 146.129.252.126 Agreement completed. 2022-01-06 - 7:33:51 PM GMT