HomeMy WebLinkAboutCAG2021-223 - Change Order - #3 - Lakeside Industries, Inc. - S. 212th Street Preservation - 11/18/2021KENT
Agreement Routing Form
For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayorb Signature and Contract Cover Sheet forms.
(Print on pink or cheny colored paper)WASHINGToN
G
oL
CL
CL
Originator:
C. Frame
Department:
PW Engineering
Date Sent:
12t7t2021
Date Required:
N/A
Authorized to Sign:
E Director or Designee El Mayor
Date of Council Approval:
4t20t2021
Budget Account Number:
R901 13 641 10.120
Budget? @Yes tr No
Grant? EYes E No
Type: N/A
co
IH
.E
EfrorF
E*,ca
EooLt'l
Vendor Name:
Lakeside lndustries, lnc
category:
Contract
Vendor Number:
34030
Sub-Category:
Change Order #3
Project Name: S 212th St. Preservation - 72nd Ave. S. to 84th Ave. S
projectDetaits:Create a new Bid item to provide compensation for replacing the HMA
pavement
Agreement Amount: $-2,365.07
Start Date: N/A
Basis for Selection of Contractor: $id
Termination Dare: 72 Working Days
Local Business? El Yes E No*
xlf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
EIYes E No
Contract Number:
cAG2021-223
Comments:Date Received by City Attorney:
Date Routed to the Mayor! Office:
gl
E
ilJ
J
E$o=E,i
IEE
.9ut
Date Routed to the City Clerk's Office:L
ad(W22l7l_1_20 Visit Documents.KentwA.gov to obtain copies of all agreements
Auxu
KENT
WagHtNotoN
CHANGE ORDER NO. #3
NAME OF CONTMCTOR: Lakeside Industries, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: S. 212th St, Preservation-72n9 Ave. S. to B4th Ave. S.
ORIGINAL CONTMCT DATE: May 06. 2021
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to :
Create a new bid item to provide compensation for replacing the HMA
pavement between BNSF RR tracks due to deterioration.
2. The contract amount and time for performance provisions of Section II "Time of
Completionr" and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(including applicable alternates and
wssr)
$1,859,869.10
Net Change by Previous Change Orders
(incl. applicable WSST)
$8,067.06
Current Contract Amount
(incl. Previous Change Orders)
$t,t67,93s.16
Current Change Order $-2,36s.07
Applicable WSST Tax on this Change
Order
$0.00
Revised Contract Sum $1,865,570.09
CHANGE ORDER. 1 OF 3
Original Time for Completion
(insert date)
70 working days
Revised Time for Completion under
prior Change Orders
(insert date)
72 working days
Days Required (+) for this Change Order o calendar days
Revised Time for Completion
(insert date)
72 working days
In accordance with Sections L-04.4 and 1-04,5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation. claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied,
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTORI
By {ada,*
Print Name:Its QF+t*rnee K,t*udatz
DATE Zoz
CITY OF KENT:
By:
.i ftbryJsndbychad 8b€n
C h a d B i e re n i ffiiti1|r.r"fl"'11,f,$##';r's' "
(signature)
Print Name : Chad Bieren. P.E.
Its Public Works recfor
(tiile)
DATE:
AF EC
CHANGE ORDER - 2 OF 3
KP
Fife No.2OO,2
KENT
ry^3rrnGroi
CHANGE ORDER WORKSHEET NO. OO3
Construction Engineering Division - Public Works
S. Zlzth StProject:B4th Ave. S. (East ValleY HighwaY)
Project Engineer: Drew Holcomb
Capital Projects Cameron Bloomer (KBA, Inc.)
Preservation / 2n d Ave. S. to Project No:
Fed-Aid No:
Contractor:
19-3003
sTPUL-12s0(009)
Lakeside Industries,
Date: 70/L4/202t
I Pro d Chan e
cks
HMA pavement between BNSF RRCreate a new bid item to Prov ide compensation for replacing the
II. Reason and Bac round for Cha e
III. Method of Payment
NEW PAY ITEMS [J Notapplicable
nsibility of BNSF to maintain'Pavement between the BNSF RR trac ks had deteriorated, but is the respo
eth a envem tctontrarerlaceVChacthetscopaueficabentopcheareeitdaWmstityuSBNaFdntlygity
ar dn e torraVdenaexcavatoBFNSroidopflaRRrVsececostspBrSNWAFnivithencCXnhafogInggge
snd f fla neressomervefufueteddelIg Ito1BI21is2otnebtnthehmreovaNtevpoasswitgst
services are required for any punchlist work.
Sch.
No Item Description Total Est
Qtv Unit Unit Price Total Estimated Cost of
Item
I CO 003 - Paving Between BNSF Tracks 1 LS $11,884.93 $11,884.93
$
$
New Pay Items Total: $
DELETE EXISTING PAY ITEM(S) per 1-O9"5 E Notappricabre
Page 1
11,884.93
Sch
No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item
$
$
$
Delete Existing Pay ltems Total: $
INCREASE/DECREASE TO EXISTING PAY ITEM(S) E Notappricabre
Sch
No.Bid Item No.Item Description Qty Unit Unit Price Cost of Item
I Lt22 BNSF Railroad Flagging -0.75 FA $19,000.00 $(14,250.00)
$
$
Increase / Decrease to Existing Pay Items Total: $(14,25O.OO)
*TOTAL ESTIMATED COST OF CHANGE ORDER:-$2,365.O7
x Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract:70 Due This Change Order:o Previous Total:72
Explanation/Justification for Additional Working Days:
This change was fit into the working days scheduled for pavement at the UPRR tracks and no working days are
being added.
M.,*
XTOTAL WORKING DAYS:
-6 ,4/)/2, Wa*<
72
x This Change Order + Previous Total
Capital Projects Manager:
Construction Engineering
Supervisor:
Ca.Jmevq\ Etoorne.r, p e" kBA tr.c-
I Kuehne
Dater tofn/z.t
Date:
talxv/a/
{*n'
Construction Manager:
ic Connor
Page 2
Date:trp/zv/w
-1 DAILY REPORT OF FORCE ACCOUNT WORKED
l
lndustries OATE 9114nA21
PAY ESN
Ito.:
lTElt I cosTPUL.t25010o0l
DESCRPTION tnD rnd p.tch HlrA bdtF.o RRtrckr p.r FWO 003
FAI
Conlnctor
EB
4
fiffi--_---.---._..]TOTAL COST $fi,884.93
WORKER'S NAJT'E REG RATE OT HRS OT RATE AIUOUNT
5 at,u8 $l38C.r l
5 83.32 t974.9{
l/llqh€d Chismrr 8t.85 $2Tf.17
ll)t u-lo t 53U1,1
s tr:9 t208.31
MK a3.32 t374.34
Edcl( Flulz s 61.85 ,z1a,47
I 51,€6 T tztL4t
s 83.32 3t6a-&
ard a 81.70 32t1-75
5 74.87 5 1262.0!
t I4.At $2S0,48
3 71.A7 tt87.t8
Mnlr Gillo $74.8f $112.3r
74.8f T s74.r
SUBTOTAL s3 075.t4
s1.232.2t
iorIPtlENT I
ITOTAL I a6,z07ri
REG RATE STDBY RATI AMOUNT
45342- 2013 Hsmm Hd12w Rotrer $27 -18 s108,72
t 61.40 t284.90
$ 7t.g t204,16
2.5 s 69.S Nt72.85
$ 56.90 t100.35
82.0t s82.01
s1.032,7s
;EA9 'S 1216.8r
I TOTAL EqUIPI'ENTI $'t,t49.8t
MA'ERIALS rndt* sERVbEa I
v4DpR & |NVO|CE r MAHIAL SUS TOTAL NAUM
t41 1,s{ a65 80
t0.00 s0.00
$o.o0 t0.00
1,4,185.80
2106 OVERHEAD AND PROFN, BONDING. INSURANCE AI.ID TAx 1942.02
IOTAL t5.127,t2
WORK DESCRIPIION AITOUNT
i0 00
$0.00
E0.00
TAX t0.00
611_884.9:
SUBCONTRACTOR Suhtol.l ot Lrbor, EqulDment, ilitrrtrl, a Subcontnctor lovll6ed Wodr 50.0c
ME*ups on work p.rtomcd bySubcontEclor up to 525.000=12%, t25.00G$100,000 ! 10% GEa'l6r thsn t100,000 = 7%0o,4
i0.00
TO T 31 1.88ir.93
m ll ciek€4 ihlr work h ln dllpule, By llgnlng ihl! lortrl, p{rth! sr! rgrBelng io 01. llm€ rnd etlort
ndded to ec@mDllsh thc talk Entltlanrnl to be dolemlnod al a htrr drlq -
7'-Vr4
Fom Oal€ TQUO
! ,^,
Customer
/'tll. t1ot Date
'/ -lt| 7 |
#i ?
I t l' /"'"(I , ru^
Project Name
',,- j,,
EWO #
@LAKEsTDE luousTRrEs, INc.
Employees on Project Clasr Total Hrs R"g OT
r ''r ,1 lr./
r t,,,,r-l
,Yr 1.,, {
'"1.5-
!-i -'
i,'9, t dl \i
t,t 'l f''t I
ft it";l t r ,i "''l l t{
I .j i 'l r
,ri i.l. i ', ,..-
\,.ld 7-l:v/r/'l f ,l
,l l.il ltrr,r ,l {",^l
krl l{ rj{ 1,.,,,! ',..,,,,}-
y rt,.1 r.r ;-']r i'i;"7.i".r t-
LSI Equipment LsI#Total Hrs
ll.,,no' l? ,,','!J iif,t-t
Trucking LSI #Total tlrs
n ', il ..',,,'L' .:"'
I a t i{J ': ,,'ti 'i) :"'-.)"
',, .'' \t!
.. i, !r. i
i': t- {
'l '! ,i ,,Ll
i t ":..t,tt'
i)ti- iti ,1!.t:L
ti :
;,iit :]'.. ji
.:l
/t t ;',, i :;.,I
iti,'lr '.; lti I
Extra Work Veification*
Forerpans Signature
t*-L.- L.
Date
f -1?-,tr
Description of Work
r, 1., i ,', r t '; { .'i , 'ti' i"; r,il
r 1 ,. ,I 1l:J
rl! 4,.
Materials Qty UOM Tot4l
I !t,r1 I {,r ()/,i !,t, ,, j )r
Subcontractors / Suppliers / Rental Equipment
I
* Markup p€r WSDOT specification unless otherwise agreed upon in writingl
Labor, Materia.ls, and Equipmenf Markup - 29% / Subcontractor Markup - 2 I %
Ownert Representa tive Signature
//a',,,"./,iu",-/.:'
Date
P.O. Box 7016, Issaquah, WA 98027 '('t25) 313-2600 . (425) 3\3-Z|ZZ/FAX
AN ti(lun l- OH,()KI'UNITY fl\IPLOYUR . WA $-1" CONT. RECi. NO' ztl'ul LA-K[ 'Sl-rzt'tJl) . OR. $T CONT REG N1'1, cct' tos51?
#IAKESIDE
llrlDUSTRlES
Progress Billing lnvoice
Kent Division
253-631-361.L
To City of Kent Public Works
400 West Gowe
Kent, Wa 98032
lnvoice #: 50006280
Datei 1O/5/2021
lnvoice Due date: ltlLOlzOZI
Payment Terms: Paid on 10th of next month
Remit To:PO Box 7016
lssaquah, WA 98027
425-313-2600
contract: 722L0L8- S. 212th St Preservation- Project 19-3003
Item NO. Description
Unit of Unit Price
Measure
Current BillingCuffent
QTY
co3 HMA Ct 1./2" -Kent Plant TON $ er.OO 50,30 s
Total Due this lnvoice $
4,474.30
4,474.3O
Greater Seattle/Eastside Divison *5505 226th Place SE; Ste 150 - lssaquah WA 98027*425-313-2600 Page 1 of 1
KENT
WAsBtil6toN Field Work Directive FWD OO3 R1
PW Project Number: 19-3003
Federal Aid Numberz STPUL-7250(009)
Date: 9/7/2021
R19t15t2421
Project Name:
Contractor:
Subject:
S. 272th St. Preservation 72nd Ave. S. to
84th Ave. S. (East Valley Highway)
Lakeside lndustries
Pavement at BNSF Tracks
Scope: Make the following changes to the Contract Documents:
. Replace the existing HMA in the 2 sections between BNSF's 3 tracks. BNSF has agreed to remove the
existing material and place it in a contractor provided dump truck for hauling off with the pavement
grindings. R1 - Use HMA in place of concrete for the 4' to 6' of sidewalk nearest the RR tracks.
Measurement and Payment:
r Track Time and Material efforts for reimbursement using standard markups from 1-09.6.
Attachment{s}:
r None
Contractor
By Date
q /t 2l
Eric Mock, Project Manager
Owner Approval:
By:$r,rr*rt g&ftul 9t812021 R19t15t2021
Date:
Cameron Bloorner, KBA lnc.
By -//*9f712021
Date:
Eric Connor, City of Kent
THIS FIELD WORK DIRECTIVE DOES NOT PROVIDE FOR EITHER A TIME EXTENSION OR A CHANGE IN THE CONTRACT PRICE. I.ASOR, EQUIPMENI AND/OR
MATERIAL OUTLINED IN THIS FIETD WORK DIRECTIVE SHALT BE PAID BY BID ITEM{S) OR A CHANCE ORDER SHALL BE OEVELOPED FOR TIME EXTENSION OR
CONTRACTPRICEINCREASES. ANYPROTESTTOTHEFIELDWORKDIRECTIVESHALLFOLLOWl.O4.SOFTHEWSDOTSTANDARDSPECIFICAIIONS.
S 212th St. Preservation
Owner:City of Kent
Prlme Contractor:Lakeside I ndustries
Subcontractor:
Date:9/2/202r
Ppjggt No;
Fed Aid No:
19-3003
wsDoT HLP-1215 (009)
INDEPENDENT COST ESTIMATE
Description of Work:
Haul off existing HMA and lnstall new between BNSF RR Tracks. Assume 2 sections, 5'wide, 110' long, 6"
depth, placed in 2lifts. Hand Work. BNSF Does removal before/concurrently. Traffic Control Flagging costs
excl uded
OVERTIMESTRAIGHT TIME DOLLAR
AMOUNTPRODUCTION RATE OCCUPATION HOURS WWR HOURS WWR
2ss.00sSuper3$ Bs.oo
246.00sForeman3$ sz.oo
585.00sTeamster (3)9 $ os.oo
567.00(Laborer (3)9 s 63.00
702.00sOperator (3)9 S 78.00
(
(
s 2,3ss.00 27%OHP: S 635.85 TOTAL: I 2,990.85LABOR SUBTOTALSI
HOURS
WORKING
HOURS
STANDBY
ADJUSTED
RATE
STANDBY
RATE
DOLLAR
AMOUNTEOUIPMENT DESCRIPTION
100 900.00sDump Truck and Trailer I
25 1s0.00sCrew Truck 5
65 1-95.00sRoller3
65 195.00$Backhoe 3
s
TOTAL: S 1,684.80EQUIPMENT SUBTOTALS:5 L,440.00 17% oHP 5 ZAA.SO
PRICE
DOLLAR
AMOUNT
REFERENCE
tNVOtCE #QUANTITY UNITDESCRIPTION s 3,7s0.00TonHMA5U
50
75.00
10.00 s00.00sDump Fees Ton
s
s
17% OHP: 5 722.50 TOTAL; 5 4,972,59MATERIAL SUBTOTALS:5 4,250.00
QUANTIW UNIT
ESTIMATED
COST DOLLAR AIVlOUNTDESCRIPTION
EST, DATE OF
SERVICE
$
$
5
s
TOTAL:$17% OHP: 5SERVICE SUBTOTALS:
Resident Engineer (RE)Date ICE SUBTOTAL: S 9,648.L5
9,648.L5
ADJUSTMENT (see comment): $
ICE TOTAL: 5
Comments / Notes:
LABOR
EOUIPMENT
MATERIALS
SERVICES
1of 1 P-60 (Rev.2019 Mar)