Loading...
HomeMy WebLinkAboutCAG2020-418 - Change Order - #4 - T. Bailey, Inc. - West Hill Reservoir Construct New 5.0 Million Gallon - 12/23/2020Agreement Routing Form KENT For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cheny colored paper)WASHINGToN G of.oe Originator: S. Anderson Department: PW Engineering Date Sent: 10t19121 Date Required: N/A Authorized to Sign: E Director or Designee E Mayor Date of Council Approval 12t8t20 Budget Account Number: w20054.641 1 0.330 Budget? EYes ENo Grant? EYes ENo Type: N/A tro iU G ELorF5 j tro Eog Lgl Vendor Name: T. Bailey Construction Category: Contract Vendor Number: 294554 Sub-Category: Change Order #4 Project Name: West Hill Reservoir D.^i^-+ n^,-;r.. Revision 5 - Provide and install a PAX Water Technologies PAX PWM500 Mixer. Replace sheetsrruJeLL'"to"t E1o3-E106, E113, E114,E118-E120. Modify the electrical plans to accommodate the PAX mixer. Adjust the electrical system based on the shift of the Auxiliary building under Revision 4 Agreement Amount: $81,483.80 starr Date: 1212312020 Basis for Selection of Contractor: $id Termination Date; 366 Working Days Local Business? E Yes E No* *lf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? EYes ENo Contract Number: cAG2020-418 trlc I J -OTE=\-rv ul'5 S'o=EEt!trg| UI Date Received by city Attorney:Comments Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: ad(W2217l_1_20 Visit Documents.KentWA.gov to obtaln copies of all agreements {jyv KENT WAsHtNotoN CHANGE ORDER NO. #4 NAME OF CONTRACTOR:T. Bailey, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER:West Hill Reservoir ORIGINAL CONTRACT DATE:December 23, 2020 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessarY to : Revision 5 - Provide and install a PAX Water Technologies PAX PWM500 Mixer. Replace sheets E103-E106, El13, ELI4, El18-E120. Modify the electrical plans to accommodate the PAX mixer. Adjust the electrical system based on the shift of the Auxiliary building under Revision 4, 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and WSST) $8,493,470,72 Net Change by Previous Change Orders (incl. applicable WSST) $136,829.73 Current Contract Amount (incl. Previous Change Orders) $8,630,300.45 Current Change Order $74,008.90 Applicable WSST Tax on this Change Order $7,474.90 Revised Contract Sum $8,711,784.25 CHANGE ORDER - 1 OF 3 Original Time for ComPletion (insert date) 350 working days Revised Time for Completion under prior Change Orders (insert date) 14 working days Days Required (t) for this Change Order 2 calendar days Revised Time for ComPletion (insert date) 366 working days In accordance with Sections L-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and aicepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and fhe terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have aPPlied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CITY OF KENT: (title) L Print Name ' Chad Bieren P F tu (signature) CONT 10t11121 e (title) Bonnie DATE Print By: CHANGE ORDER. 2 OF 3 /4 I ATTEST: Kent City Clerk APPROVED AS TO FORM: (appllcable lf Mayor's slgnature regulred) Kent Law Depaftment lln thls field, !,ou may enter tfie el€ctronlc tllepath where th€ ontract has been sav€dl CHANGE ORDER - 3 OF 3 File No. 2OO.2 KENT CHANGE ORDER WORKSHEET NO. 4 Construction Engineering Division - Public Works Project: West Hill Reservoir Project Engineer: RH2 - Drew Holcomb Capital Projects Phil McConnell Project No: Fed-Aid No: Contractor: L9-3027.r N/A T Bailey Manao Date: IO|T/2021 I t sed Cha e E106, E113, ELL4, El18-E120. Modifythe electrical plansto accommodate the PAX mixer. Adjustthe electrical system based on the shift of the Auxillary Building under Revision 4. nologies PAX PWM500 Mixer. Replace Sheets E103-Revision 5 - Provide and insta ll a PAX Water Tech II. Reason and Bac round for Chan e IIL Method of Payment NEW PAY ITEMS E Notapplicable will allevieate any tank mixing and water age concerns that may arise based on how quickly the turnover of the water in the tank is in the future. ioniss ma namnndanuthtiltraensmfututhetrarerssnsmronmdsesrednforTidTheexefltxtmIsysteng m benotTiiximntowatertsthntathkedeflexaymoanredrovtIsystemndaoosterbstatipngpup theto ctaddinPaMAXrxerdAdaproJeitionconcethisrnlytIMPAXrixewladdersscientsuffidanthe Sch. No ftem DescriPtion Total Est. QtY Unit Unit Price Total Estimated Cost of Item I Revision5-PAXMixer 1 LS $74,008.90 $74,0O8.9O $ $ New Pay Items Total: $ DELETE EXISTING PAY ITEM(S) per 1-O9.5 E Notappticabre Page 1 74,OO8.9O Sch No Bid Item No.Item Description Qtv Unit Unit Price Cost of Item $ $ $ Delete Existing PaY ltems Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) E Notappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item $ $ $ Increase / Decrease to Existing Pay ltems Total: $ *TOTAL ESTIMATED COST OF CHANGE ORDER: x Total of the Cost of Item Columns IV. WORKING DAYS 74,0O8.9O Original Contract:3so Due This Change Order:2 Previous Total:357 Explanation/Justification for Additional Working Days: Capital Projects Manager: *TOTAL WORKING DAYS:3s9 x This Change Order + Previous Total Date:/o/i/z/ Date: l0 7 >t /r,t-Phil McConnell Construction Engineeri ng Supervisor:0,."1 Paul Kuehne Construction Manager: c Connor Page 2 Date:to/t/t/ T BAILEY, lNG.Change Order ProposalGity of KentWest Hill ReservoirADDITIONAL WORK TO THE CONTRACT: Provide Pax mixer, electrical, tank nozzle, and set up as requiredITEMDESCRIPTIONQTY UNITS LABOR1 Pax Mixer1.0 LSMAT/ INVSERVICES SUBCONTRACTDate:COP #:Updated:73.50423.50612212021664{1sRl9t2t2021TOTALWeld nozzle thru shell and provide securement points forcontrol panel mounted to ReservoirSet up Pax in tank, pull cord thru nozzle, install retrievalchain on ladder, test submerged equipmentUpsize SS Plate at top of ReservoirElectrical changes for controlsForeman1.0 LS8.0 MH1.0 LS1.0 LS1.0 LS$$$$42,28s.00728.00600.001,200.0017,248.75450.001115Mark-Up Rates (WSDOT 1-09.6)Labor 29o/oMaterial 21%Equipment 21%Subcontractor 12% 1sl$25,000Subcontractor 10% next$75,000Subcontractor 7% next $75,000CONTRACT TIME EXTENSION:2WDGOMMENTS: N/AExclude: WSSTSubtotalMark-upTotal298.121,326.129,21s.8s53,100.851,909.6819,158.43100.0017,248.751,200.00100.00100.00250.00300.0042,285.00328.00600.00 T BAILEY, lNG. Gity of Kent Change Order Proposal ADDTTTONAL WORK TO THE CONTRACT: Provide Pax mixer, eloclrlcal, tank nozzle, and set up a3 tsquired Date: COP #: Updated: 73.50 423.50 6/.22i2021 064-05Ri 9t2t2021 MAT/ INV UNITS SUBCONTRACT 1,909.68 19,158.43 TOTAL 42,285.0O 728.00 600.00 1,200.00 17,248.75 450.00 15 I Pax Mixer Weld nozzle lhru shell and provide securement points for control panel mounted to Roservoir Set up Pax in tank, pull cord thru nozzle, install retrieval chain on ladder, test submerged equipment Upsize SS Plate at top of Roservoir Electrical changes for controls Foreman Mark-Uo Rates MSDOT 1{19.6) '1.0 Ls 1.0 LS 8.0 MH $ $ $ $ $ s $ $ $ 1.0 LS 1.0 LS 1.0 LS Mark-up Total 298.12 1,326.12 9,215.85 53,1 00.85Labor Material Equipment Subcontractor Subcontrac{or Subcontractor 29o/o 21% 21o/o 12% 'lst $25,000 1 0% next $75,000 7olo next $75,000 CONTRACT TIME EXTENSION:2WD COMMENTS: N/A Exclude: WSST 100.00 1,200.00 17,248.75 100_00 42,285.0O 300.00 250.00100.00 328.00 600.00 f,-[tr[Er,r,l 9ru2021 10:05:01 AM Balnbrldge lsland Electric West Hllls Reseruoir: Add pax mlxer revised Totals (Summary) - Bid Summary: Default Page I Material Non-Quoted [by category factor: 10.00%] Quotes Total Material Labor Direct [by cat. factor: 20.00o/o) (70.49 hours @ $99.25) Non-Productive Labor Total Labor (70.49 hours) Direct Job Expenses Hand tools and safety Subcontracts Job Subtotal (Prime Cost) Overhead (15.00%) Profit (10.00%) Sales Tax (0.00%) Job Total Actual Bid Price Material to Direct Labor ratio: 0.49 Prime Cost per square foot Job Total persquare foot Actual Bid Price per square ft Labor cost per square foot Labor hours per square foot $6,639.44 0.00 $6,63e.44 $17,248.75 $6,995.93 0.00 $6,995.93 $0.00 0.00 0.00 $13,635.37 2,045.31 1,568.07 0.00 $17,248.75 $0.00 $0.00 $0.00 $0.00 0.00 o PAX WaterTechnologies A UGS' SO LUTI OIVS COMPANY FIRM PROPOSAL PAX PWMsOO MIXER FOR 5MG WEST HILL RESERVOIR PAX 5OO SENES MIXER PAX Water Technologies, lnc. File No.: P21-5168 (FIRM) Prepared on: JulY 20,2021 AUTHORIZED SALES REPRESENTATIVE : Correct Equipment Dean Brown 14576 NE 95th St Redmond, WA 98052 T: (425) 869-1233 Email : deanb@correctequipment.com Phone: (866) 729-6493 Email : sales@paxwater.com Web: paxwater.com o PAr( Water Tech n ologi es A UGS' SO LUTI O'VS COMPANY TABLE OF CONTENTS Cover Letter Section 1: Section 2: Section 3: Scope of Supply Proposal Acceptance Terms and Conditions IMPORTANT NOTIGE: All the information in this Proposal or supplied in connection with this Proposal (including drawings, designs and specifications) (collectively, the "lnformation") is confidentialand has been prepared for Buyer's use solely in considering the purchase of the goods and services described. Transmission of att or any part of this Proposal to others or use by Buyer for other purposes is unauthorized without Seller's advance wriften consent. Phone: (866) 729-6493 Email : sales@paxwater.com Web: paxwater.com PAX WaterTechnologies Re: A UGS, SO LUTI OttrS COMPANY July 20,2021 PAX PWM500 Mixerfor City of Kent, WA PAX Water Technologies, lnc. File No.: P21-5168 (FIRM) To whom it may concern, Thank you for your interest in PAX Water Technologies, lnc., a UGSI Solutions company. We are pleased to provide a Proposal for a PAX PWMSOO mixer for the 5 MG Kersey tank. Our Proposal is based on the following design criteria: Gallons of Stored Water, in Millions 5 Tank Diameter, in feet 79 Tank Height, in feet 137 The pAX PWM5O0 mixer is a submersible active mixing system for potable water storage tanks and reservoirs. When operated correctly, the PAX PWM500 mixer can rapidly eliminate thermal stratification, decrease ice formation, rapidly blend and distribute doses of residual disinfectant, and maintain uniform chemical and temperature'conditions. Under some conditions, the mixing action can also reduce the rate of residual disinfectant loss and lower volatile disinfection byproduct levels inside the tank when used as part of an in-tank aeration system. lnstallation of the PAX PWM500 mixer is very simple. The utility or contractor can perform the "wet-side" mixer installation while the tank is full by lowering the mixer into the tank access hatch using a stainless steelchain. Equipment start-up may be provided by PAX or the local PAX representative. PAX will provide installation a start-up checklist form. A detailed scope of work and firm price for the complete system is listed in Section 1 of this Proposal. All pricing is based on the scope of work described in Section 1 and the Terms and Conditions in Section 3. The PAX line of water mixers offers many advantages, including: . Eliminates thermal stratification, short-circuiting and "dead zones" . Eliminates chemicalstratification and residual loss . Lowers surface water temperature and combats biofilm growth . Reduces variability in water taste and odor . Reduces nitrification risk in chloraminated water systems . Lowers rate of disinfection by-product (DBP) formation . Delivered and installed quickly, with minimal construction and installation cost . Proven track record supported by years of successful operational experience We look forward to working with you on this project. lf we can be of any further assistance, please do not hesitate to contact our salds representative, Dean Brown at Correct Equipment, or me at (917) 501-7358. Thank you Phone: (866) 729-6493 Email : sales@paxwater.com Web: paxwater.com o PAX WaterTechnologies A UGS' SO LUTI O'I'S COMPANY Sincerely Ethan Brooke RegionalSales Manager cc: Joshua Kurniawan, PSI Water Technologies, lnc- Phone: (866) 729-6493 Email : sales@panruater.com Web: paxwater.com o PAN WaterTechnologies A. B. c. A UGSI SO LUTIOTVS COMPANY sEcTloN 1 SCOPE OF SUPPLY PAX PWMsOO MIXER Scope of Work by PAX Scope of Work by Others Clarifications Phone: (866) 729-6493 Email: sales@panvater.com Web: paxwater.com O r*I',Y,f!,ff ,lrs!:r,oto s i es A. SCOPE OF WORK BY PAX The following equipment and services comprise our scope of work: No ltem Description 1. PWM500 Mixer Wet Assembly, including:. Stainless steel316 impeller. Passivated to minimize corrosion. The ability to function continuously regardless of tank cycles . 230V three phase t horsepower water-cooled motor power provided by the PAX Control Center 2.Control Genter Dry Assembly with SCADA Compatibility, including: NEMA 4 Enclosure:. Lockable and weather resistant . Overall weight of control center 55 lbs. . Operating temperature range -4 oF to 129 oF (-20 oC to 55 oC) . Green and Red LED lndicator lights to display motor status . White LED lndicator light to display power ' Cooling fan Motor Controller/VFD:. Allen Bradley ' 11SVAC single phase, rated to 1.0 HP . HOA Switch ' Manual speed control . Thermal shut-off protection built-in . Current overload protection built-in . 300mA trip level GFCI . Sine filter . Branch-circuitprotection SCADA outputs included : . Digital Output signal indicating motor running . Digital Output signal indicating fault . Digital lnpuUOutput signal for remote motor on/off . RS-485 or Dry Contact connections . 4-20mA signal Gable 17 0 fl., including:. Flat-jacketed4-conductor Tripod Assembly, PWM500, including:. Stainless steel 316 legs ' Chlorine/chloramine resistant rubber foot pad to avoid scratching tank floor. Stainless steel knobs for tool-less installation 5. Long BailHandle & Ghain 1 . Stainless steel 316 handle and 50' chain to deploy mixer in full tanks Phone: (866) 729-6493 Email:sales@paxwater.com Web: paxwater.com Qtv. 1 1 3. 4. O r/;I,,Y,f!,?{,Ts,s!:rP to s i es 7 6. Extra Chain Kit (50') Tank Penetration Accessories. Stainless steel strain relief for 4 wire flat-jacketed cable I Submittaland Operation & Maintenance Manualas Follows. Submittals: Qty. One (1) Sent Electronically. O&M Manual: Qty. One (1) Hard Copy Please notify us if an alternate quantity is required so that we can modify our Proposal accordinglY. 10. 2 lncluded lncluded 1 9 Manufacturer's Field Seruices (1 Day(s) at the Jobsite), including. System Start-Up. Operator Training FOB Factory, Richmond, GA with Full Freight Allowed to Jobsite, City of Kent, WA lncluded F|RM PRIGE ITEMS 1-101 lusl$42,285 B. SCOPE OF WORK BY OTHERS '1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Equipment unloading and installation. All civil works and concrete pad for equipment. Any underground or structural work. Anchor bolts and seismic restraints. Heat tracing and insulation of all interconnecting equipment. Room ventilation, air conditioning or lighting. Any video recording. Electrical power to control panel. Any electrical conduit runs. Any tank recoating services, labor, or parts. Any tank hatch penetrations. Allelectrical conduit, wiring, electrical material, etc. between control panel, SCADA, etc. Alltaxes, fees, lien waivers, bonds and licenses. Any permifting or regulatory approvals. Any items not explicitly listed under Scope of Work by PAX above. C. CLARIFICATIONS 1. lf transaction is tax-exempt, please submit Tax Exemption Certificate to PAX. 2. pAX requires a minimum of two (2) weeks notification prior to performing onsite installation inspection, system start-up and training. PAX will work with you to attempt to accommodate your scheduling needs. Contact the Service Department at (866) 729-6493 to schedule the onsite visit' 3. Once the on-site service has been scheduled, PAX requires a minimum of one (1) week notification in the event of a delay. Notice of delay received less than one (1) week prior to a scheduled site visit may result in a change fee. Phone: (866) 729-6493 Email:sales@paxwater.com Web: paxwater.com o PAI( Water Tech n ologi es A UGSI SO LUTI O'VS COMPANY D. TERMS OF PAYMENT/PRICE VALIDITY ' Payment terms are 100% net 30 days after shipment of equipment. . Price valid for 90 days. PAX may reprice this Proposal thereafter or if delivery occurs more than 365 days after PAX receives a mutually agreed order. E. DELIVERY F. WARRANTY PAX will warrant the equipment as set forth in its standard warranty included in the Terms and Conditions at Section 3 of this Proposal. I . Submittals: ' Equipment ShiPment: 2 weeks after receipt of mutually agreed order 2 weeks after approval of submittals Phone: (866) 729-6493 Email: sales@paxwater.com Web: paxwater.com PN( Water Technologies A UGS' SO LUTIOA'S COMPANY SE N2 PROPOSAL ACCEPTANCE PAX Water Technologies, lnc. File No.: P21-5168 (FIRM) i) This Proposal by PAX Water Technologies, lnc. ("Selle/') is contingent upon the undersigned buyer ("euye/') bxecuting this Proposal, including without limitation agreeing to the terms and conditions contained in this Proposal. 2l Please return a signed copy of this Proposal to: PAX Water Technologies, lnc. 550 SYcamore Drive Milpitas, CA 95035 Attn:Orders Phone: (510) 550-7100 E-mail: orders@ugsicorP.com Thank you for your interest in PAX. We are committed to meeting your expectations. Proposal Acceptance An authorized signature indicates Buyer's acceptance of this Proposal, including without limitation the Terms and Conditions in Section 3 below. Company Name Buyer's Name (printed) Date Buyer's Authorized Signature Requested Arrival Date BillTo Name:Ship To Name BillTo Email:Ship To Email: BillTo Phone:Ship To Phone: Bill to Address:Ship to Address: City zipState City zipState Phone: (866) 729-6493 Email: sales@paxwater.com Web: paxwater.com PAX Water Technologies A UGS' SO LUTI OAJS COMPANY sEcTloN 3 TERMS AND CONDITIONS 1. Applicable Terms. These terms govern Seller's sale, and Buyer's purchase, of the products and/or seruices referred to in Seller's proposal or quotation (collectively, the "Products"). The front page of Buyer's purchase order (disregarding any reference to terms and conditions and any provisions that conflict i"rerewith), if any, ioget[er with the description of the Products in Seller's proposal or quotation and these terms and conOitions comprise the complete and exclusive agreement between the parties (the "Agreement") related to the purchase and sale of the Products. All prior communications, documents, neiotiations and representations, if any, are merged herein. Whether these terms are included in an offer or in acceptance by Seller, such offer or acceptance is conditioned on Buyer's assent to these terms. Any additional, different or conflicting terms contained in Buyer's request for proposal, specifications, purchase order or any other written or oial communication from Buyer shall not be binding in any way on Seller, whether or not they would materially alter this document, and Seller hereby objects thereto. All orders are subject to prior credit approval by Seller. 2. pricing. The prices shall be: (a) as stated in Seller's proposal or order acknowledgment, or (b) if none are stated, Seller's standard prices in effect at the time of release for shipment. 3. payment. Unless othena/se stated, all payments shall be nel 30 days from invoice date payable in United States Dollars. lf Buyer fails to make any payment to Seller when due, Buyer's entire account(s) with Sellerwill become immediately due and payable without notice or demand. Buyerwill pay lTzo/o interest per month, compounded monthly, on all amounts not received by the due date. Buyer hereby grants Seller a purchase money security inteiest in the Products until such time as Seller is fully paid. Buyer will assist Seller in taking aition to perfect and protect Seller's security interest. Seller may make partial shipments, in which case, Buyer shall pay for each shipment in accordance with the terms hereof. 4. Taxes, Shipping, Packing. Except to the extent expressly stated otherwise in these terms or in Seller's proposal or quotalion, pricel do not include any freight, storage, insurance, taxes, excises, fees, duties or other government chaiges, and Buyer shall pay such amounts or reimburse Seller for any such amounts Seller-pays. lf Buyer claims a tax oiother exemption or direct payment permit, it shall provide Seller with a valid exemption certificate or permit and indemnify, defend and hold Seller harmless from any taxes, costs, and penalties arising out of same. Prices include the costs of Seller's standard domestic packing only. Any deviation from standard packing (domestic or export) shall result in extra charges. Any and all increases, changes, adjustments, or surchaiges (including fuel surcharges) which may arise in connection with the freight chargres, rates or classification included as part of this Agreement, shall be for the Buyer's account' 5. Delivery. Products shall be delivered F.O.B. Seller's point of shipment or Ex Works Seller's point of shipment if Oeing delivered outside the United States. All delivery dates are estimated and are dependent in part upon prompt receipt of all necessary information from Buyer, including submittal approvals, if applicable, and all required commercial documentation. Seller will make a good faith effort to complete Obiivery of the Products on the date and to the location specified in writing by Buyer, but Seller assumes no liability for loss or damage due to delay or inability to deliver, whether or not such loss or damage was made known to Seller. lf Buyer causes or requests a shipment delay, or if Seller ships or delivers the products erroneously as a result of inaccurate, incomplete or misleading information supplied by Buyer or its agents or representatives, storage and all other additional costs and risks will be borne solely by Buyer. Anyitaims for Froducts damaged or lost in transit ("Transit Losses") must be made by Buyer to the carrier and reported to seller within one business day following delivery to Buyer. 6. lnspection and Acceptance. Buyer will have seven days from the date Buyer receives any Products to inspect such Products ior defects and nonconformance which are not due to Transit Losses, and to notify Phone: (866) 729-6493 Email:sales@paxwater.com Web: paxwater'com PAX Water Technologies A UGS' SO LUTI OA'S COMPANY Seller, in writing, of any defects, nonconformance or rejection of such Products. After such seven-day period, euyer w'iti be de-emed to have irrevocably accepted the Products, if not previously accepted. After such acceptance, Buyer will have no right to reject or revoke acceptance of the Products for any reason. 7. Returns and Cancellation. Buyer may not return custom engineered Products. Buyer may return other Products only with Seller's prior written approval, which may be withheld in Seller's sole discretion. Any authorized return will be subject to payment of a restocking charge and will be allowed only if the subject Product: (i) is in new condition, suitabie for resale, and (ii) has not been used, installed, modified, altered or damaged. The restocking charge for authorized returns will be no less than (x) 25o/o of the purchase price, nel of any freight chaiges inctuded in the purchase price, plus (y) 100% of freight costs incurred by belbi. Buyer ii responsible for the payment or reimbursement of return freight charges. Returns will be shipped f.b.A. Seller's location. Seller may, but will not be obligated to, treat any cancellation of an accepted order as an authorized return. 8. Force Majeure. Seller will have no liability for any breach caused by extreme weather or other act of God, strike or other labor shortage or disturbance, fire, accident, war or civil disturbance, delay of carriers, failure of normal sources of supply, act of government, epidemic or other public health crisis, or any other cause beyond Sellefs reasonable control. 9. Warranty. Seller warrants to Buyer and the initial end-user of the Product (collectively, the "Owne/') for the Warraniy Period (as defined below) that each Product is free from defects in material and workmanship and conforms to Seller's specifications applicable to the Product. Seller's warranty is conditioned on (i) Seller's verification of the alleged breach; (ii) the Product being stored, handled, installed, started-up, operated and maintained in accordance with Seller's instructions, (iii) no repairs, modifications or alterations being made to the Product other than by Seller or its authorized representatives, (iv) Owner providing promlpt written notice of any warranty claims within the Warranty Period, and (v) at Selleds discretion, Owner eithei removing and shipping the Product or non-conforming part thereof to Seller, such freight cost to be paid by Seller, or Owner grinting Seller access to the Products at all reasonable times and locations to assesi the warranty claiml. Seller's warranty does not cover damage due to (x) acts of nature or third parties, or (y) ordinary wear and tear. The sole remedy for any breach of Seller's warranty is limited to Seller's choice of repair or replacement of the Product, or non-conforming parts thereof, F.O.B. jobsite, or refund of the purchase price for the subject Product or part. Seller reserves the right to provide new or reconditioned replacement Products or parts. The warranty on repaired or replacement Products or component parts is limited to the remainder of the original Warianty period and otherwise subject to the terms of this warranty. This warranty includes labor of Seller or its authorized contractor to install repaired or replacement Products or components; provided that labor of divers and labor required to drain the storage tank or reservoir is excluded. lf Seller determines that any alleged damage is not covered by this warranty, Seller will charge, and Owner will pay, Seller's normal'rates-for any inlpection or repair performed by Seller, and for any materials provided or used in connection therewith. The "Warranty Period" applicable to each Product begins on the date of installation or three (3) months after shipmeni, whichever comes first, and continues for 60 months thereafter. THE WARRANTY SET FORTH IN THIS SECTION IS INTENDED TO BE SELLER'S SOLE AND EXCLUSIVE WARRANry AND SELLER'S WARRANW IS SUBJECT TO SECTION 1O BELOW. SELLER MAKES NO OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WARRANTIES REGARDING SERVICES RENDERED, IF ANY, OR ANY WARRANTIES THAT MIGHT ARISE FROM COURSE OF DEALING OR USAGE OF TRADE. IF IT IS ALLEGED OR DETERMINED THAT SELLER HAS MADE ANY OTHER WARRANTIES, SUCH OTHER WARRANTIES SHALL BE SUBJECT TO ALL THE CONDITIONS, LIMITATIONS, AND PROCEDURES SET FORTH IN THIS SECTION 9 AND SECTION 1O BELOW. Phone: (866) 729-6493 Email:sales@paxwater.com Web: paxwater.com PN( WaterTechnologies A UGS' SO LUTI OiJS COMPANY 10. LIMITATION OF LIABILITY. NOTWITHSTANDING ANYTHING ELSE TO THE CONTRARY, SELLER WILL NOT BE LIABLE FOR ANY CONSEQUENTIAL, INCIDENTAL, SPECIAL, PUNITIVE OR OTHER INDIRECT DAMAGES, AND SELLER'S TOTAL LIABILIry ARISING AT ANY TIME FROM THE SALE OR USE OF THE PRODUCTS WILL NOT EXCEED THE PURCHASE PRICE PAID FOR THE PRODUCTS. THESE LIMITATIONS APPLY WHETHER THE LIABILITY IS BASED ON CONTRACT, TORT, STRICT LIABILITY OR ANY OTHER THEORY, THE REMEDIES SET FORTH IN THIS AGREEMENT ARE INTENDED TO CONSTITUTE A COMPLETE ALLOCATION OF THE RISKS BETWEEN THE PARTIES, AND BUYER ACKNOWLEDGES THAT IT IS KNOWINGLY LIMITING THE REMEDIES THAT MIGHT OTHERWISE BE AVAILABLE TO BUYER. BECAUSE THIS AGREEMENT AND THE PRICE PAID REFLECT SUCH ALLOCATION, THE REMEDIES PROVIDED TO BUYER HEREUNDER WILL NOT HAVE FAILED OF THEIR ESSENTIAL PURPOSE EVEN IF THEY OPERATE TO BAR RECOVERY FOR CERTAIN DAMAGES THAT BUYER MAY INCUR. 11. Remedies of Seller. Any of the following will constitute an event of default which will enable Seller, at its option and without liability to Buyer, to cancel any unexecuted portion of the order that is the subject of this Agreement and to exercise any other right or remedy expressed herein or otherwise available at law or in equ'ity: (i) the failure of Buyer to make any payment required hereunder when due ("Payment Default") or to'perfoim any other term or condition contained herein; (ii) the insolvency of Buyer or its failure to pay its OeUts as they mature, an assignment by Buyer for the benefit of its creditors, the appointment of a receiver for Buyer or for the materials covered by this Agreement, or the filing of any petition to adjudicate Buyer bankrup[; (iii) a failure by Buyer to provide adequate assurance of performance within ten days after a justified OemanO-by Seller; or (iv) if Seller, in good faith, believes that Buyer's prospect of performance under this Agreemeni is impaired. Seller's obligations under Section t hereof will be suspended during the pendency oiany Payment Default. No such suspension will extend Seller's obligations under Section 9 beyond t'he Warranty Period provided therein. Seller's election of any remedy in the event of a default by Buyer will not preclude Seller from exercising any other remedy available to Seller hereunder or at law or in equity for the same or any other default. ln the event it becomes necessary to incur any expense for collection of any overdue aciount, Selle/s collection charges, including attorneys' fees and expenses, will be added to the balance due and Buyer will pay all such charges together with interest thereon from the date incurred in accordance with Section 3. 12. Equal Employment Opportunity. Seller is an equal opportunity employer. lhe parties shall, as appticable, abide by the requirements of 41 CFR 60-1.4(a), 41 CFR 60-300.5(a), 41 CFR 60-741.5(a) and Executive OrOer t5+96 (29 CFR Parl471, Appendix A to Subpart A) (relating to the notice of employee rights under federal labor laws), and these laws and regulations are incorporated herein by reference. 13. Export Compliance. Buyer acknowledges that Seller is required to comply with applicable export laws and regulations relating to the sale, export, transfer, assignment, disposal, and use of the Products provided under Ihis Agreement, including any export license requirements. Buyer agrees that such Products shall not at any tifie directly or indirectlybe used, exported, sold, transferred, assigned, or otherwise disposed of in a manner which will result in non-compliance with such export laws and regulations. lt shall be a condition of the continuing performance by Seller of its obligations hereunder that compliance with such export laws and regulations be maintained at all times. BUYER WILL INDEMNIFY, DEFEND AND HOLD SELLER HARMLESs FRoM ANYAND ALL cOSTS, LIABILITIES, PENALTIES, SANCTIONS AND FINES RELATED TO NON-COMPLIANCE WITH APPLICABLE EXPORT LAWS AND REGULATIONS, 14. Miscellaneous. No part of this Agreement may be changed or cancelled except by a written document signed by Seller and Buyer. As usedln this Agreement, "including" and its variants mean "including without limitatiof and its variants. No course of dealing or performance, usage of trade, or failure to enforce any term will be used to modify the Agreement. Buyer acknowledges that it has not relied upon any letters of intent, agreements, promiies, negotiations, statements or representations other than those expressly set forth in t[is Agreement and that no such extraneous document or other communication shall be of any force or effect. Buyer agrees and warrants that in entering into this Agreement, Buyer is relying solely upon the information contained in this Agreement and not in reliance upon any other information. lf any of these Phone: (866) 729-6493 Email:sales@paxwater.com Web: paxwater.com PAX Water Technologies A UGSI SO LUTI OA'S CAMPANY terms is unenforceable, such term will be limited only to the extent necessary to make it enforceable, and all other terms will remain in full force and effect. Buyer may not assign this Agreement without Seller's prior written consent. This Agreement will be governed by the laws of the State of California without regard io its conflict of laws provisions. The application of the United Nations Convention on Gontracts for the lnternational Sale of Goods is excluded. Any bond issued by Seller in connection with the sale of the Products shall remain in effect for a maximum of two (2) years after acceptance of the Products, and the only warranty, guaranty or Product performance obligations covered thereby shall be those at Section 9 above. Buyer covenants to return any such bond to Seller upon the earlier to occur of (x) the expiration of the Warranty Period, and (y) the expiration of the aforesaid two-year period. All Product performance obligations of Seller are contingent on the conditions of and within the tank in which the Products are instlt6d being as specified by Seller and will be considered satisfied and discharged upon successful completion oithe initial Product performance testing. EACH OF THE PARTIES IRREVOCABLY AND UNioNDITIoNALLY WAIVES ITS RIGHT To TRIAL BY JURY IN RESPECT OF ANY LEGAL PROCEEDING DIRECTLY OR INDIRECTLY ARISING IN CONNECTION WITH THE TRANSACTION CONTEMPLATED HEREBY. Phone: (866) 729-6493 Email : sales@paxwater.com Web: paxwater.com Connor, Eric Sent: To: Cc: Subject: From:Peterson, Kelly Wednesday, October 6,2021 4:43 PM Connor, Eric Bieren, Chad; Holcomb, Drew; McConnell, Phil; Bauer, Sean RE: Pax Mixer Change Order Update Eric- Chad and I discussed this issue, Please proceed with the change order' Thank you, Kelly Kelfy Peterson, AICP, Deputy Director-Engineering Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5547 - Cell 253-740-8066 Kpeterson@KentWA.qov CITY OF KENT, WASHINGTON KentwA.oov Facebook l'.,7ir 1.1; YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Connor, Eric <EConnor@ kentwa.gov> Sent: Tuesday, October 5,20219:19 AM To: Peterson, Kelly <KPeterson@kentwa.gov> Cc: Bieren, Chad <CBieren@kentwa.gov>; Holcomb, Drew <DHolcomb@kentwa.gov>; McConnell, Phil <PMcConnell@kentwa.gov>; Bauer, Sean <SBauer@kentwa.gov> Subject: FW: Pax Mixer Change Order Update Good Morning Kelly, Attached is an updated proposal for the Pax Mixer at West Hill Reservoir. The original proposal was provided to us back in July (based on a written description of the work) in the amount of g7L,>22.15. At that time we requested that the design team provide a formal Revision for this work since the scope appeared complicated and had a fairly significant cost. The Revision was received (Revision 5), and with the information provided on new plan sheets the contractor has revised their proposal to $74,008.90. Sean Bauer's agreement with the pricing is attached. Do you agree with moving forward with a Change Order to incorporate this added work into the project? please let me know if you have any questions or need any additional information. Thank you, Eric 1 Eric Connor I Construction Engineering Manager Phone 253-856-5533 | Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Holcomb, Drew <DHolcomb@kentwa.gov> Sent: Monday, October 4,2021- 10:13 AM To: Connor, Eric <EConnor@kentwa.gov> Cc: McConnell, Phil <PMcConnell@kentwa.gov>; Barry, Jason <JBarry@kentwa.gov> Subject: FW: Pax Mixer Change Order Update Hello Eric, Phil and Jason are out this week. TBailey sent over an updated pax mixer cost (attached). They addressed Phil's last comment and Phil has already documented the approval for the PAX mixer Can I accept this and tell TBailey to proceed? Drew Hofcomb, P.E. oesign Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 | Cell 253-561-L587 dholcomb@kentwa.gov CITY OF KENT, WASHINGTON KentwA.qov Facebook r',, ' ,', YouTube fnstaoram From: Bonnie Wardlaw <bwardlaw@tbailev.com> Sent: Monday, October 4,202710:02 AM To: McConnell, Phil <PMcConnell@kentwa.gov>; Holcomb, Drew < DHolcom b@ kentwa.sov> Cc: Chris Pa rker <cpa rker@tbailev.com>; J ustin Rawls <irawls@tba ilev.com> Subject: RE: Pax Mixer Change Order Update I apologize, attached please find Revision 3 removing the 'City provided quote' wording. I am copying Drew in your absence in case this one is able to be moved along. Thank you, Bonnie Wardlaw CONTRACTS MANAG E R/PROJ ECT ASSISTANT CONSTRUCTION GROUP T BAILEY, INC. (360) 630-s804 DTRECT (360) 420-s309 CELL (360) 293-3893 FAX BWARDLAW@TBAILEY.COM www,TBAILEY.COM 2 EXTERNAL EMAIL Connor, Eric lo: Cc: Sent: Subject: From:Bauer, Sean Friday, September 10,2021 8:02 AM McConnell, Phil; Connot Eric Reed, James PAX Mixer Cost Proposal Bauer Acceptance 2021-9-10 Thanks Phil, I'm good with the revised/final proposal Sean M. Baugrt watersystem Manager Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-855-5610 | Cell 253-740-7089 sbauer@KentWA.oov CITY OF KENT, WASHINGTON KentWA.oov Facebook j r';ri'. :, YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: McConnell, Ph il <PMcConnell @ kentwa.gov> Sent: Thursday, September 9,2O214:08 PM To: Con nor, Eric <ECon nor@ kentwa.gov>; Bauer, Sean <SBauer@ kentwa'gov> Cc: Reed, James <JReed@kentwa.gov> Subject: WH Res - PAX Mixer Cost Proposal Eric and Sean, Attached is T Bailey's cost proposal for the PAX Mixer per Revision 5. Please review, comment and or approve their ProPosal. Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 | Cell 253-261-5685 pmcconnell @ KentWA.aov CITY OF KENT, WASHINGTON KentWA.qov Facebook i'.','iLrrr YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL KENT PUBLIC WORKS DESIGN ENGINEERING Carla Maloney Design Engineering Manager 400 West Gowe Kent, WA 98032 Fax: 253-856-6500 PHONE: 253-856-5500 WrtHrx€ron Date: To: July 29,2OZL Eric Connor, Construction Engineering Manager Cc Paul Kuehne, Construction Supervisor Eric Knowles, City Surveyor Phil McConnell, Capital Project Manager Carla Maloney, Design Engineering Manager Derek Hawkes, Engineering Supervisor From Drew Holcomb, Project Engineer Regarding: West Hill Reservoir Project Project No. 19-3027.1 Revision No. 5 Note: Revision 5 will be indicted by a #6 triangle on the plans. The Tideflex mixing system is designed for the future transmission main and until the transmission main and booster pump station are providing water to this tank the Tideflex mixing may not be sufficient and the PAX mixer will address this concern. Additionally, adding a PAX mixer to the project now will alleviate any tank mixing and water age concerns that may arise based on how quickly the turnover of the water in the tank is in the future. REPLACE Sheet E103-E106, E113, ELt4, E118-E120 This revision modifies the electrical plans to accommodate the specific PAX mixer. This revision also adjusts the electrical systems based on the shift of the axillary building under Revision 4. Attachments: Sheet E103-E106, E113, ELL4, E118-E120 Drew Holcomb Project Engineer W.k + City of K€nt Public Works Departm€nt Chad Bieren, Public Works Director aHe 22tn an M *,tutu 10 Rt-t2 PROJECTIIO. I 19209 BH3 ELECTRICAL NOTES 1 . EXISTING PAD.I.IOUN' IRANSFORI'ER' CONIRACTOR STiALL COOROINATE wnn iusEr souno TNERGY To IERMII.In'IE SEcoNDARY coNDucroRs' 2, SEE DWG NO. E114 FOR CONDUITAND CONOUCTOR SCHEDULE. 3. SEE DWG NO. E113 FOR ELECTRICAL EOUIPMENT SCfIEOULE, @ oSUILDING ROOF OUTLINE PROPOSED STNDBY GENE&qTOR EXISNNG PA}MOUNT TRANSFORMER a j ! : I I ji I t l: l : i.; i 1 CONTROURE-CHLORINATION EUII"JING POLE MOUNTED ANTENNA .r'l #r--tf '*$99'*n==*! 1*.$i$ '.a'"t \f' + ry- t{.*r '- t ll , f,*: [, :-- I I INLETALTITUDE VALVE VAULT ! i i -l I OUILET CHECK VALVE VAUTTlrn. / l. j A ELECTRICAL SITE PI.AN I 4 il l 1' = l0' (MS KMS Er0l PERMIT KES TIBDIAN RCVISIAN 5 H0RIZ, - VERI, - ENGR,FILE NO.VHR-D-ELEC03KES VEST HILL RESERVOIR ELECTRICAL SITE PLAN City of Kent Public Works Departrnent Engineering Divisisn 1',0' 8AR IS ON€ TNCH ON ORIGINAL DRAVING AIJUST SCALES ACCORDINGLY 7 /29/2021 BY DATE aPPR0VED,CITY N0. u3 RH2 PROJECT NO. I I 9Z'9 ?2n22q W*gde210 ROOF VENT TYP, A gUIIOING ROOF OIJILINE RESERVOIR ROOF STANDBY GENERATOR ROOF _E__9,==--'- -::: -RESERVOIR /-- lil1 SPIRAL STAIRCASE li r :,-1,i ,ll .l .,-. ! ,tl: : .: _ ff ES.i : a.: i16' :i I I ?. \ OI.JTLEIMEIERVAULT, iiJ \ SEEoUTLETMFTER . ON DWG NO. E1('5, A INLEiAIIN'DE VALVE VAULT. SEE INLET ALTI1UDE VALVEVAUIT ELEC]EICAL PLAN oN DWG N0. E105. SECURE CONDUITS BELOW RESERVOIR SPIRAI- STAIRCASE WTH CONDUIT SUPPORTS, WP. g i'l OLTTLET CHECK VALVE VAULT. SEE OU]L6T C}IECK VALVE VAULT EISSIRICAL PI.AN ON owc N0. E10s. A .9:-t SEE RESERVOIB ELEC'IRICAL PLAN, THIS SHEET, FOR cot{TtNuATloN. ;: WEA1HER PROOF UGHT gtMTCH TO CONIROLAIL STAR TANDING LIGHTS. SECURE TO GUARD RAIL USING SST MRDWARE, If I A RESERVOIR ELECTRICAL ELEVATION VIEIV A RESERVOIR ELECTRICAL PI.AN RESERVOIR FOUNDANON 3/32 =1'-0" t/8" = 1'-0-r I ELECTBICAL NOTES @ o A# I. SEE ELESIRIGAL SITE PLAN DWG NO. E1O3 FOR CONTINUATION. 2. SEE OIYG NO. E114 FOR CONDUIIAND CONDUCTOR SCHEDULE, 3. SEE DWG NO. E113 FOR ELEClRlCiqr EQUIPMENT SCHEDULE' 4. SEE DWG NO, E1 13 FOR LIGHTING FIXIURE SCHEOULE. INSTALL LIGIiT FIXTURE TO RAILING, WPICAL EACH STAIR LANDING. SEE DETAIL ON E112. WFA]HER PROOF LIGHT SMTCH ROOF ACCESS LANOING ROOF ACCESS HATCH KMS |/Er04 KHSKES 07 /29/HBDREV1SION 5 wrz'--. VERI, ---ENe, HVB ftLE N0.VHR-D-ELEC0aDRAUN.KES WEST HIT I.RESERVOIR RESERVOIR ELECTRICAL PLANS 1 City of Kent Public Works Department Engineering Division BAR IS ONE INCH ft ORIGINAL DRAVING AOJUST SCALES ACCOR!INGLY natt 1/29/2021CIfYDATE APPROVED' BYNO.REVISION RHz PROJECT NO. ' I *2O9 BH3 22/22 th Otue SE. SMe 210 ACCESS HATCH OIJTLINE, TYP. SECURITY GATE INIRUSION SWTCH. MOUNT ON STATIONARY POLE. CONTRACTOR SHAI-L SUPPLY LEVER ARM BEST SUITED FOR THIS APPLICATION. CONTAC1 SMII BREAK WHEN GATE IS OPENED. INTRUSION SWITCH II'ISTALLED IN VENT IMTERIOR. CONTRACTOR SHAI PROVIDE MANUFACTURER'S ERACKET BESTSUITED FOR THIS APPTICATION, CONTACT SHAII BREAI( W.IEN HATCTI IS OPENED. CONDUIT TO TELEMFTRY PANEL SECURE CONDUIT TO FENCE POST EVERY 2 FEET USING GAIVANIZED P.ARDWARE. SEAL CONDUI PENEIRATION WAIERNGHT, TYP.o PROPOSED NEMA X JUNCTION BOX RESERVOIR ROOF .*- dD VENT INTRUSION SWITCH DETAIL VAULT LADDER INLET ALTITUDE VALVE VAULT JUNCTION BOXSECURIW GATE INTRUSION SWTCH DETAIL NOT TO SCAU NOI IO 5UALL INLET ALTITUDE VALVE VAULT ^A PLAN :v- 1/2" = 1 -0" ACCESS HATCH OUTLINE OIJTLET CHECK VAL\IE VAULT CONTROL AND INSTRUMENTATION JUNCTION BOX ACCESS HATCH OUILINE OUILET CHECK VALVE VAULT POWER JUNCI]ON BOX OUTLETMflERVAULT JUNCTION BOX VAULT LAODER OUTLET METER VAULT OUTLET CHECK VALVE VAULT 4H-.a-.PLANELECTRICAL PLAN -Y-1/2" = 1'-A't/2'= 1-0' ELECIR'CAL I'IOTES @ o ,I. SEE RESERVOIR ELECTRICAL PLAN DWG NO. E1O4 FOR CONIINUATIOI{. 2. SEE DWG NO, E114 FOR CONDUIT AND CONDUCTOR SC}IEDULE' 3. SEE DWG NO- E1'I3 FOR EIECIRICAL EQUIPMENI SCHEDUI'"E. @ /6\RESERVOIR JUNCTION BOX DETAILS N0l l0 SCALT HAI,IDRAIL, TYP ROOF ACCESS LANDING LIGHT FIXIURE AND POLE'M" SEE LIGHTING SCHEDUTE 18'WX 24't X g8'THICKSS PLATE. SECURE TO RAILING IN 2 TOCATIONS uslNc (3) 1/?" SST BoLTS NEMA 3R, MIXER DISCONNECT SWTCH SECUREO TO SST PI3'IE WTH 1/4'STAINI.fSS SIEEL MRDWARE, NEMA 4X, 8' X 8' JUNCTION BOX SEGURED TO SST PISTE WITH 1/4' STAINLESS STEEL HARDWARE. COI.IIRACTOR SHALL ENSURE JUNCTION BOX IS ACCESSIBI.E FOR MAINTENANCE PURPOSES. SPIRAL STAIRCASE INTRUSIOI{ SWITCH INSTALI.ED IN ACCESS HATCH INTERIOfu CONTMCTOR SHAI.L PROVIDE MANUFACTURER S BRAC(ET AND LEVER ARI' BEST SUITED FOR THIS APPLICATION. CONTACT SHAIL BREAK WHEN HATCH IS OPENED MORE 1HAN 1//f. 36'W X 24't X 3A THIGK SS PIATE. SECURE TO RAILING IN 2 TOGATIONS uslNG (3) llt SSTBOLTS. MIXER CONTROL PANEL SECURED TO SST PLATE WI1H 1/4'STAINLESS STEEL HAROWARE. POLE MOUNIED IIGHT, SECURE TO GUARD RAIL USING SST HARDWARE, FOR TOCATION SEE RESERVOIR ELECTRICAL PLAN DWG NO. E104. lVFJfi ER PROOF LIGHT SWITCH. SECURE TO GUARD FEIL USING SST TIARDWARE. FOR LOCATION SEE RESERVOIR ELECTRICAI PI-AN DWG NO. E104. NEMA4X, 12'X 12'JUNCTION BOX SECURED TO SST PLATE WTH 1/4' STAINIESS SIEEL HARDWARE, CONTRACTOR SHALL ENSURE JUNCTION BOX IS ACCESSIBLE FOR MAII{IEMNCE PURPOSE$. WEATHERPROOF DUPLEX SFI RECEPTACLE, SECURE TO GUARO RAIL WII]] SST HARDWARE. ROOF ACCESS HATCH MIXER CONDUIT PENETRAIION INTOACCESS HATCH . -i-:: - VAULT LADDER MBD Et05CECKED. KMSKES SCALE. HffiIZ, - VERT, -- FJLE Ntr VHR-D-ELEC04EW,KES WEST HILL RESERVOIR RESERVOIR ELECTRICAL PLANS 2 City of Kent Public Works DePartment Engineering Division 8AR IS OM INCH BN ORISINAL DRAVING ADJUST SCALES ACCORDINILY DAI| 't/29/2021APPRBV[0,CJTY BY DATENA.REVISIDN 07 22/2?Nhha* w42t0 FH2PROJECTNO. I I*2O9 BH3 POLE MOUNTED ANTENNA SEE OWG NO. E112 FOR DETAILS. MAIN SERVICE DISCONNECT VENTITATION CONIROI PANEL, VCP.1' UTIUTY ME]ER :''r - -.7---'r"" I /\,z,-/I@ { EXHAUSTFAN, EFz" 'lzovAc,ls EXHAUSTLOUVER CHEMICAL METERING PUMP OEDICA"TED RECEPTACLE EXHAUST FAN, 'EFl" 120VAC,1g LIGHI]NG PANEL,'L'@i i ACTUATOR,'LAi'" 120V,o,10 CHEMICAL MEIERING PUMP CHEMICAL MFTERING PUMP JUNCTION BOX TRRIGATION CONTROUER STANDBY GENEBATOR il _1. :' l:: i' r:..:..1 .li'.':r':' :l 'MS"+r @ EftNUSTLOT'I'ER AgTlrAtoR 1Af, 120\rAc, l0 @ --?--D-1'?-_SODlUlvl HYPOCHTORIIE STORAGd]ANK RE.CIRCULATION PUMP 6--VENTITATION CONTROL PANEL, VCP.2'--rG' ->3nr WATER QUAIITY AMI- ,RTU.< f-c)@ rZER @ DEDICATED RECEPTACLE GFI @ 'nru"<- I cnr'L^-6 @WA'TER QUATITY ANALYZERBOARO RE-CITLORINATION ROOM '\!CP-2' IMAIGTO'VER ASIUA]0RLAf, r2wAc.'lo INTAKE LOLIVER ACTUATOR,'LAt" 1mvAc,1g "RTU' I @_J o ':l'-::rl:1:I l EUILDING ROOF OUruNE A CONTROURE.CHLORI NATION BUILDING -_sL_/t' =1 -0" ? I I o @ ? j -&O BATHROOM 'RIU'< 9 -d @ 'o**I 'RTLr+?- lln) 'RTU'-<-?-oo @ ELECTRIC TANKLESS TELEMEIRY PANEL, RTU" AMTROL PRESSURE TANK PUMP @ "L'; INSTANT.HOT WAIER HEATER (IOCATED UNDER SINK} EOUIPMENT PAD CONTROLROOM LIGHTING -4--o-*o,-t -{)4A\\:lt re !9CP-f Ire 'RTU"I ^l(c1r clD "Dr<f[-o +"RT[J'@ 60 RE.CIRCUTATION PUMP MOTOR STAR]ER ENCLOSURE,1!IS' AUTOMATIC TFANSFER SVVITCH.'ATS' POWER DISTRIBUllON PANEL,'DP" CF e- o- ELECTRICAL NOTES 1 1. SEE ELECTRICAL SIIE PLAN DWG NO. E1O3 FOR CONTINUATION. 2- SEE DWG NO. E1 14 FOR CONDUIT AND CONDUCTORSCHEDULE' 3. SEE OWG NO. E1 1 3 FOR ET.ECTRICAL EOUIPMENT SCHEDUIE. 4, SEE DWG NO. E1t3 FOR HEA1ER SCHEDULE. @ @ o KMS KENT Er06 KMS PERMIT KES HBD i7REVISION 5 HERIZ; - FtLE NO.VHR-l-ELfC05EMR, MV8 WEST HILLRESERVOIR CONTROL BUILDING - POWER DISTRIBUTION AND SIGNAL PLAN CifY of Kent Public Works DePartment Engineering Division BAR IS ONE TNCH CN ORIGINAL DRAVIN6 ADJUST SCALES ACCDRDIN6LY t'0'1 /29/2021APPR0VED,CITY BY DAIENB,REV RH2 PROJECT NO' I ' $2O9 BH3 RH? 22722 th W SE Wa 210 PATIIEL SCHEDUIE L J0 4 WRI208/120 V0LTS 125 AMP MAIN CONTROL ROOM BUITDING AND RESERVOIR LOADS N0. L KVAAMP 0.72 CONTROL ROOM RECEPTACLES200.r2 20CONTROT ROOM TIGHIS BAIHROOM RECEPTACLES200.720.20 20BATHROOM LICHTS AND FAN RE-CHLORINATION ROOM RECEPTACLES200.54200.12RE-CHLORINATION ROOM LIGHTS 2A 0.54 OU1DOOR R€CEPTACTES 10.96 20OUTDOOR BUILOING LICHIS 20 0.01 EMERCTNCY UGHIS0.54 20RECEPTACIfS 2 0.5J VENTILAIION CONTROT PANEL,'VCP.I"200.J0 ?oSTAIRIYAY LAND'NC LICHTS VENIILATION CONIROL PANEL, .'VCP.2" 20 0.5J200.06ROOF POte MOUNITD LIGHI 20 0.07 OUATITY ANALYZER DEDICA'ED RECEPTACLE0.50 20TELEMETRY PANEL. 20 o20 GENERATOR EAT1TRY CHARCTR3_50 JORECEPTACLEOEDICATEOHEATERYIAlERTANKLESSELECTFIC t.00 20STANOBY CENERATOR BLOCK HTAIER r.0J TANK MIXER200.50 20fiEMICALMETERINC PUMP OEOICATED RECEP'TACLT 200.53AMTROL PRESSURE TANX 20 SPARE20SPARE 20 SPARE20SPARE 20 SPARE20SPARE SPARE2020SPARE SPACE SPACE SPACE SPACE SPACE 2 4 6 8 t0 12 14 16 18 20 22 24 26 28 30 32 l4 36 38 40 42 1l 1J 15 t7 19 21 23 25 27 29 J1 55 37 4i SPACE 37,C DEMAND: LIGHTING & RECEPTACLE LOAD KVA 31.0 /0\ * NUMSER OF LAMPS PER flXruRE scHEDUtgIilSTBUiIENTAnOflANDEOUIPIIEI{TELECIRICAL iroDEt N0.MANUFACTURERrIEilDESCRIPTION HM6 OF EQUAL$EMENS@AMP, 480 s'liICH. 4X s5NEMAs$1TCHMAINSERVICT 200RAIID,ENTRANCESERVICEMACNElICIHTRMALBREMER, EREAKERCiRCUITWIHSTAND,42 KAIC3QVOLT, sEE SPECIFICANONsSEE SPECIFICATIONS@ _ NEMA !2AUTOMATIC 200 AMP, 480 VOLI,I PHASI, J PoLt, 42 KAIC 4WIAR'8 OR EOUALSYSIEMS SENSORo- PHOIOELECIRIC, 24 POMREO [IlH FOR REMOIE$GNALALARM AND CONTACTSAUor8t€AND RTU.TO9iREFOUR SEE SPECIFICA1IONSSEI SPECIFICAIIONSoHYPOCT-IIORIT€ STORACE TANK TEVEL TRANSMITIER SEE SPTCIFICATIONSstt SPECIRCAIoNSMEIER LW'20 OR EOUALOMEOArn20 YA. StE N0. Etl DETAILS. 5\11TCH - N,O, REEO TYPE FLOAT SEE SPECIFICANONSst€ sPtclFlcAlloNsPRESSURE TRANSMITIER TH6il001005/U 0R EOUALHONEYMLL * 24V, SPST, RANGE: 40' AEOVE FINISHEO FLOOR. MOUNTED HEANNG IHERMOSIAI - 9OT. SET AT 60T, MOUNT 4 FEET@ 't175A2009/u 0R EOUALHONEY\lELt AT 73f. MOUN] 4 A8O\f NNISHED T - SNAPMOUNlEO SPOT - l00TIINE VOLTAGE AIR S$ITCH CONTROLLER. RANCE:o E49U11UPlIATON@ INMUSON ALARU 5I'TTCH - CONTRACTOR SHALI STLECT ACIUA1OR tfVER ARM BEST SUI]EO FOR MOUNTING CONflGURAIION. SI$ICH SHALL BE WAIERPROOT' TYPI P1 OR EOUALSEMENS@ 3f3Y0J0C0r6 0R EQUALSEMENSo T].ICLOSURE. UL TIGH1INC IRANSTORMTR _ DRY TYPT, COPPER WNOINCS, VTNIILAIIO. PAD 480-208V/120V, J{, VilTH MOUNTED, NEMA 3R 9gMENS IYPE Pl OR EOUAL @ UCTITING PANEL - CIRCUIT SNEAKERS 208vlrr0v, lo, 4u NEMA 12 ENCLoSURE. AS SHOH\ ON PANEL SCHEDULE COPPER BUSSING. sEE SPECIFICANONSSEE SPECFICAIIONSCONTROL VAL\[ SOLTNOIO sEE SPECIf]CANONSS€E SPECIFICAIIONSVALIE UMtl SvilTCH sEt SPtclFlcAllotlsstE sPtcrFlcAMNSstllIcH LUl 0- r J05FLO}ILINE 10'MANUFACTURER'5NPT 0wG FORcABtt. SENSOR I\IIHLEAK SIVITCH _ UL RAITO RETAY CON1ACT OUTPUT. 24WC SUPPLY @UGHNNG FTXTT'RE SCHEDUIj R€MAR(SLAUP OTY. LAMP CATALOC NO.ilANUFAC1UREF CATALOG NO.MANUTACTURER NAMEl^/PE OESCRIPTlON I INTEGRATEO L[0FEM 148 oOOOLTI IMAFLLITHONIA Lfo ucfiT FlxIuRE, 120 UAC, 4'-4" LoNG. 45 WATl 60'000 H-oun igo, Hron iiRct$tcv ontvEn, HIGH-IMPACT AcRYLlc LENS. lioioro-iiernclAss HoustNc, ctlLlNc MotNIED, u.t LlsTEo roR trfT LocAlloNs. l INIEGRATID LED $IlH VANOAL GUAROosxwl LEo loc 1000 40K TJM 120 BBW DBLXD VGUlHONIAT€MPERATURE, I2OVAC, DOOR, U.L, LIS1ED FOR 4000r(1000mA.rEo.t0c0Jr000RLEDLIGHTARfA(1)-27w I'OFBOITOM RXITJRE -0"UOUNT Itfl TOCATIONS.A80\[ A2 2 I.5 WATT DCEU2 LM M12LITHONIAA3 MOUNT BOIIOM OF FIXTURI 1,-O'' ABOVE DOOR, U'L' UsIID FOR OAMP LOCAIIONS. 5/8" vt, BANERY, |NPUT |20VAC/277VAC. 5 3/4" H,14 HOUSING, INTEGRATTD RECHARCEABLE 8W LAMPS,LEOEUERGENCYHTAOLIGHI(2)- DUAL_VOLTAGE.IH€RMOPLASNC N/A 49 WATTLIIHONIA LICHT - OSXO L€D 7OO 5OK IT]V 120 sPA 5F DOBXD PO|T - SSS 12 4C ODB OR EOUAL LEo PotE MOJNIED LICHT - (l)-491Y 20C LED 700mA' 124 luvniFrn wATT, s000K coLoR TEMPERATURE 120vAc' wlu niii pnoiecnor. PR0vlDE FIxTURE $4IH BRAc(EIRY I0 MoUNT IO LICHI POLT. U,L. USTEO FOR SET LOCAIIONS.' I2FT HOT-ROI.LED CARBON SITET POLE. AOJUST BRIGHTNESS T0 o$lrtR's PREfTRENCE 1 47 WATTLIIHONIA]\{RI TEO ALO 5OK MVOLI DDBI"IOI-ED }IALL PACK - I,100-6,200 LUMENS AOJUSTABIT OUIPUT' sobox coLON TEMPERATURE. I2OVAC, U.L. LISTEO FOR YtrT LOCATIONS, A5 HEATEASCHEOUIf MOOEL HO.MANUFACTURER ITEM DESCRTPIT0N MUH0341QMARK FLOOR. ETECTRICAL HEATER WTH UNIVTRSAL MOUNI]NC BRACI(EI _ 3{W' 18OV' nllrsfOnufn ANo P0vt€R CONTRACIoR FoR BERM0SIAT C0iINECI]C[{' THREE PHASE. WI]H 24V CONTROL r,laUNT 80TT0til Of HTATER 7'-0" @ KXS KMS El15mslGMD' KES HB!REVISION 5 HoRIZ' -.- VERT' - EN6R, MV B FILE NE.vHR-D-ELECIIKES grg51 flrrr RESERVOIR ELECTRICAL SCHEDULES CitY of Kent Public lVorks Department Engineeriug Division 9AB IS gNE INCH & ORIGINAL DRAVIN6 ADJUST SCALES ACCORIINGLY t'0'1 /2s/2021 DATE APROVE}CITY REVISII]N RHz PROJEST HO. I I T}2O9 BH3 Pt?zWW* We2t0 ra porwi co[DulTAt{o co}lDucTon scHEDUlS NOlES(ouANltfi) CoNDUCT0RSlRAot stztOESTINATIONSOURCIcrRcurT (3) - #r/0, (1) - #3/0 N2"MAIN SERVICE OISCOi\]NECTUIILITY IRANSFORMER N, (t) -- #3/0. l1l -cR02"UTILITY ME-IERMAIN SERV]CT DISCONNECT (3) - frlo, (1) - #r/0 N, (r) -GFD2'TRANSFER S$TCHMETER (3)- #1. (r) - #J N, (1) - #8 GRo GENERA'ORIRANSFER STITCH 2')-#6CFD(3) - #3/0, (1) - #3/o N. OISTRIBU'IION PANEL, "DP" AUIOMA]IC IRANSFER S\IITCH 3/4'(3) - fr2, (1) - #12 GRo RE-CIRCUIA]ION PUMP MOTOR STARTTR INCLOSURE,'MS" POMR DSTRISUTION PANEL, "DP" 3/4"- #12, (l) - ,t2 GRo RE_CIRCUIATION PUMP'MS'ENCIOSURE,il0T0R STARTfRPUMPRE_CIRCULAIION 3/4"(3) - #8, (1) - #10 cRD UGHNNE NANSFORMERPOIIER DISTRIBUTION PANEL, "OP" (5) - #1, (r) - #r N. (1) - f6 GRo1 1/2"LICH]ING PANEL, "L LIGHTING IRANSFORMTR 3/4"(J) - #r2. 0) - #12 GRD CONTRO{- ROOM HEA1ERPOITER OIS'IRIBUT]ON PANTL,"DP' (3) - #12, (1) - #12 cRD3/4RE.CHLORINATION ROOM HEATER POt|lER DISIRIBUTION PANEL,'DP' (2) - #12, (r) - #12 cRo3/4ITLEMEIRY PANEL, "R]U" LIGHINC PANEL, .L BLOCK HEAER AND SAT]ERY CHARGER- #12, (l) - #12 cRD3/4"STANOBY CENTRATORLIGH1ING PANEL, 'L - #10, (r) - #10 GRD3/4"TANXLESS HOT WATER HIA'IERPANTL, ,1. - #r2. 0) - #12 GRD3/4OUALI]Y ANALYZER DEOICATED RECEPTACLE PANEL. "1, (2\ - f12, (1) - 4\2 CRD3/4MTTERING PUMP OEDICATED RTCEPIACLE LICHTINC PANEL, ,1" (2) - #r2, (r) - #r2 cRDJ/4"V€NTILAI]ON CON IROL PANEL,"VCP-I" IICH1ING PANEL, '1" (2) - fl2, 0) - #12 cRD3/4"EXHAUST FAN. "EFI" VENILANON CONTROL PANEL, .VCP_1' 3/4"(2) - #12, 0) - #12 cRD EXHAUST LOUVER ACI\JAIOR.'tA1" \ENTLANON CONIROL PANTL, "VCP.I" 3/1"(2) - #r2, 0) - #r2 cRD INTAKE LOUITR ACTUATOR, "1A2" \r€NTILAIION CONTR0L PANEL,'VCP-|" 3/4"(2) - #12.- #r2 cRD VENTILA1ION CONTROL PANEL, "VCP-2" UCT|TING PANEL, "L 3/4 (2) - #12, (l) - ,r2 cRD EXHAUST FAN, 'EF2'' \TNIILATION CONTROL PANTL'"vcP-2' (2) - frz, (r) - #12 GRD3/4EXHAUST LOUVER ACIUAIOR, -tA3" \EN]]LAIION CONTROL PANEL."vcP-2" (2) - $2. (1) - #2 eRo3/4INIAKE LOJWR ACTUATOR, "144. VENIILATION CONTROL PAI'IEL,"vcP-2' (2) - #12, 0) - #12 oRD3/4"PRESSURE IANK LIGHTING PANII, "L CIRCUITS P?8A, P288, ANO P28C SHARE CONDUIT P28- #12PO"[R JUNCIION BOX (LIGHT CIROJIT)@ PANEL, .1,' CIRCUITS P28A, P289, ANO P28C SHARE CONDUIT P28(2) - #10RESERVOTR POIIER .lJNCrloN 8ox (R€CEPTACIE CIRCUIT) LIGHTING PANEL. "1"@ CIRCUITS P26A, P268, AND P28C SHART CONDUIT P28(2) - #6. (1) - #6 GRo1"RESERVOIR POWTR JUNCIION BOX (MIXER CIRCUII} LIGHTING PANEL, .L@ - #r2, 0) - #12 GRo3 /4'RESERVOIR ROOF RECEPTACLTRESERVOIR POIER JUNCTION BOX - #t2, (r) * #12 GRo3 /4"RESERVOIR ROOF POLE MOUNTED UGHT RESERVOIR POIifR JUNCIION BOX (2) , #12, (r) - #r2 cRD3/4"RFSERVOIR STAfiWAY LANDINC LIGHTSLIGHIING PANEL, "L SPARE CONOUIT FOR FUTURT UsE(r) NYIoN PUlr CofiDOUIIST CHEC( VALVE VAULI PolliER JUNCTIoN 80X UGHTINC PANEL, "L (3) - dr2. 0) - #12 cRo BA]HROOM HEAIERPOMR OISTRIEUIION PANIL, ,'OP' (2) - #r2, 0) - ,12 GRo3/4IRRIGATION CON]ROLLERLICHTING PANEL. "L 1"(2) - f6, (1) - #6 GRo MIXER OISCONNECI SWIICHRESERVOIR PO$ER JUNCTION BOX 1"(2) - #6. (1) - #6 cRD MIXER CON'IROL PANELDISCONNECT SWITCH AT PENEIRAI]ON PERIERMINAIf 1 1/2"MANUFACTURER'S MIXgR CABLT ACCESS HATCH PENETRATION CON]ROL PANEL@ COI{TNOL CONDI'TT AHD COT{DUCTOR SCHEDULE (QUANITY) CoN0ucToRSlRAot srzt CIRCUII 1/4"(4) - #t4, (l) - fr4 cRD CONIROI ROOM SMO(E DE1ECTORPANEL, .RTU" - #r4, {l) - #14 GRD BAIHROOM SMOKE DEIECTOR]ELEMITRY PANTL, 'Rru- 3 /4'- #14 GRo(4) - #14,RE-CHLORINATION ROOTI SMOKE OETECTORTELEMETRY PANEL, "RIU' 3/4',, fr4. (r) - #14 CRo CON'ROL ROOM INTRUSION SI$TCHIELEMEIRY PANET, "RTU' 3/4"- f14, (l) -cR0 RT_CTILORINATION ROOM INTRU$ON S}ITCHTELEMEIRY PANEL, "RT\J" 3/4'(2)- #r4, 0) - #14 CRD CONIROT ROOM HEATERCONTROL R@M HEAIING THERMOSTAT 3/4"(2) - #14, (l) -GRD BAIHROOM HEATERBAI}IROOII HEAIINC THERMOSTAT (2) - f14, (t) - #4 eno3/4"RE.CHLORINATION ROOII HEATERRE.CHLORINAIION ROOM HTATING THERMOSTAT (4) - #4, (l) - #14 GRD3/4"\ENTILAI]ON CONTROL PANEL, .VCP_I CONTROL ROO}., COOLINC BIRMOSTAI (4) - #r4, (r) - #14 eRo3/4"IENTILATION CONTROL PANEL,'vcP-2' RE-CHLORINA-I]ON ROOM COOLINC 1HERMOSTAI (r0) - f14, (1) - fl4 cRD3/4"RE-C|RC1JLAT|G,] PUMP M0T0R SIARTER ENCL0SURI.'MS' TTLEMEIRY PANEL, "RTU" 3/4"(4) - #14, (l) - #14 cRD FLOW SWTCH]TLEMEIRY PANEL, "RIU" J/4'- #r4, 0) - #14 cRD AUTONAIC IRANSFER ST,ITCH, "ATS" TELEMTIRY PANEL, "RTU" 1/4"- #r4, {1) - #14 cRo STANDBY GENIRATORTELTMEIRY PANEL, "R'iU" t"- #14. (r) - #14 cfio STANOSY GENERATORIRANSFTR SI\ITCH,'AT5" o)- #14, (1) - t14 6RD INTEI ALIITIJDE VALVE VAULT JIjNCIION BOXALEME]RY PANTL, 'RTU" J/4'4) - #14, (l) - #14 GRD OUILIT MEIER VAUL1 JUNCTION BOXITLEMETRY PANEL, .RTU. J/ 4"(6) - fl4. 0) - tr4 cRDINSIRUMENTA'IIONOUTLET CHECK VALVE VAULT CONAOL JUNCIION BOX@ELEME]RY PANEL, "R]U' JH (2) - 114.- #r4 oRD INLET ALIIIUOE VALVE VAULT FLOOO S$TCHINLEI ALTI]UDE VALVT VAULT JUNCIION 8OX 3/4"- #14 CRD(2J - t14.INLET ALIITUDE VALVE VAULT INTRUSION SIVTCH I INLET ALTITUDI VALVE VAULT JUNCIION 8OX 3/4 (2)- #r4, 0) - f14 GRD TNLTT ALTI1UOE VATVE VAULT INIRUSION S\IITCH 2INLET ALIITUOT VALVT VAULT JUNCTION 8OX 3/4"(2) - #11, () - f14 GRD ALII1UDE VAL!€ SOLENOIDINLET ALTITUDE VALV€ VAULI JUNCNON BOX (2) - #14, (l) - f14 GRO3/4"ALIIfuDE VALVE UI'IIT SVSTCHINLET ALTITUDI VALVE VAULT JUNCIION BOX - #r4, (r) - *14 GRD3/4"OUTLET MEIER VAULI FLOOO S\IITCHOUILET METER VAUTT JUNCTION BOX (2) - #r4, (l) - #14 cRD3i4"OUTLEI ME]ER VAULT INTRUS'ON SI{ITCHOUTLET METER VAUTI JUNCIION 8OX (2) - #14, (!) - #14 GRD5/4'OUTLET CHECK \ALVE VAULT FLO@ SIIITCH INSIRUMENTATION OUTLET CHECK CONIROT ANO B0x@ - fr4. 0) - #14 CRD3/ 4'CHTC( VALVE VAULT INTRUSION SWTCHOUILET CHECX VALW CONTROL AND 80x@ (2) - ft4, (l) - #14 CRD3 /4"CHFCX VAL!€ LIMIT S'fi'TCH@ {2) - #14, {l) - #14 GRo3/4VENT INIRUSION SMTCHCONIROL JUNCTION 8OX 3/4'(2) - #r4, (l) - #14 GRo RESERVOTR HATCH INAUSION SWTCHRESERVOR CONTROI JUNCTION BOX 5/4'(2) - #r4, (1) - #14 GRD RESIRVOIR GROUND LEVEL SECURITY GA]E INTRUSION SW]TCH TELEMETRY PANEL, 'RTU" 3/4"(2) - fr4, 0) - #14 cRD RES€RVOIR LAND'NG SECURITY CATE INIRUSION SIIITCHIILEMEIRY PANEL, "RTU" 1/4"(4) - #r4, 0) - #14 cRD RESERV0IR LEAK S',$TCHTELEWTRT PANEL, .RIU" J/4'(2) - #r4, (r) - #14 GRD RE.CHLORINATIG.{ ROOM FLOOO SIITCHTELEME]RY PANEL, 'RTU. IXSTBUTEIITATIOI{ COI{DU'T AND CONDUCTOR SCHEDUI.E NOTESCONDUCTORSIRAOE SIZEOES.llNANONCIRCUITso{JRct - #r4, 0) - #r4 cRD, - 2-CONDUCToR SHltLotD CABttS1 1/2"CHEMICAL METERING PUMP JUNCTION SOX@TELEMETRY PANEL, "RTU" t 1/2"- t14, (1) - #!4 cRD, _ 2.CONOUCTOR SHIEIOEO CASLESWA]ER OUALIfi ANALYZTRTTL€METRY PANEL,''R]U"@ CABLE.SHITLDEO CAELEME1ER2"INLTI ALI]TUOE VALW VAULT JUNCTION BOX@TELEMETRY PANEL, "RN'" MANUFACTURER'S FLOW MT]ER CABIfI t/2"OUTLII ilTTER VAULI JUNCNON BOX TELEMEIRY PANEI, 'R]U" 1'(r) - 2-c0N0ucT0R sHltLDEo CABLEANOCHICK VALVE VAULT .ftJNCII0NTELEMTIRY PANEL, "RTU"@ 1 1/2"MANUFACTURER'S ILOW MEIER CABL:ALIiIUDE VAIVE VAULI FTOI{ METERAL1IIUDE VALVE VAULT .AJNCT]ON 8OX 3/4"(1)- 2-CONDUCTOR SHIELDEO CAEIE AL1IIIJOE VALW VAULT PRESS1JRE TRAN5I.II-IIEF AL]IIUOE VALVE VAUL' .ruNCIION gOX 1 tl2'MANUFACTURIR'S FLOll I/EIER CA9I.LUEIEF VAUTT FLOW UI]ER IJETER VAULI JUNCTION gOX (1) - 2-C0N0UCT0R SHIELDED CABTE3/4"C}IECX VALVI VAULI PRESSURE IRANSIIITIER@CHECX VALVE JUNCTlO! CONTROL ANO 80x USE LARC€ RAOIUS EENDS1 1/2"COAXIAL ANTENNA CABTT POLT MOUNIED ANIENNATETTMETRY PANEL, "Rru' (1)- 2-CONDUCTOR SHIETDEO CABLE3/tSOI}IUM HYPOCHLOflI1E S]ORAGE TANK LEVTL IRANSMITIER IELEMETRY PANEL, "RTU' t"4) - f14, (r) - #14 CRD, ) 2-C0NDUC10R SHlEt0to cABtERESERVOR COfl]RO 'J.,INCIION BOX TtLElilElRY PANEL, "RIU"@ 0) - #!4, 0) - #i4 GR0, ) z-CoNDUCToR SHIELDE0 CAB[-€3/1"MIXTR CONIROL PANEL@RESIRVOIR CONIROL JUNCTION gOX Ell4 KilS tl/CHECKED, KMs T KES 07HBDCBNSTRUCTIT]N REVISION 5 HORIZ. - VERIj _--FILE Ng.VHR-D'ELEC11EN6R' MVBKES WEST HIT .IUSSEBVOIR CONDUIT AND CONDUCTOR SCHEDULESCity of Kent Public Works DePartment Engineering Division AAR IS &E TNCH S OFIgINAL DRAVI{G ADJUST SCALES ACCERDIML1 I'0'7 /2s/2021CITYDATE FPRBVfD' NO.REVISiON RH2PfloJEgTNO. I lezot BH3 22722MWff.w210 FAIL _) -_-lNrE_j_vryq _ INIRUSON ALARM TB INTRUSION ALARM 18 FLOOD SIIITCH J uMtT sl$Tcli OUNET METER VAULT INIRUSION ALARM FLOOD SWTCH ) VAULT f-ALARI,l FLOOO SII]TCH LIMIT SWTCH r -^t*ur* *u- | ) RESTRVOIR IN1RUSION ALARM INIRUSION ATARM rN0 tN1 rN2 IN3 tN4 lN6 tN7 DC CoM 1 INE rN t0 rN tl rN 12 IN IJ rN 14 tN:5 SLOT J 5 0c 24!OC lllPuls 6ts752r-18H00-0A80 gEMENS 16 PTS 24\OC INPUTS 6ES7521-10H00-0A80 SE},IENS rl PTS R€SERVOIR METIRING PUMP RESTRVOIR LANOING SECURIT' GAIE INTRUSION ALARM INTRUSION ALARM CHEMICAL METERINC PUMP RUN RUN CHEMICAL METERING PUMP FAIL WATIR QUAUTY ANALYZERrFAIL rREg CHLORINE RESDUAL IRANSMITIER FAIL pH IRANSMITTER FAIL INTET AL'flTUOE VAL\[ VAULT INIRU9ON ALARM 1 A INLET ALTITUOE VALVE VAULI INIRUSON ALARM 2 SPARE INLET AtIruDE VAL\€ VAULT F1000 slilTcll SPAR€ SPARE ALTITUDI VAL\E IIMII S$IICH OUTLET ME'IER VAUTI INIRU$ON ALARM SPARE OJTLET M€TER VAULT FL00D Slllrcl{ SPARE SPART OUTLEI CHTCK VALVI VAULT IN]BU9ON ALARM SPARE OUILEI CHECI( VALVE VAULI FLOOD SUTCH SPART OUII.-ET CHECK VALVT UMIT SWIICH SPARE RESERVOIR VENT INIRUSION ALAfiI.f SPARE RESERVOR HATC}I INIRUsIOI'I ALARII SPARE REsIRVOIR GROUND TEVTL SECURIIf CAIE IN]RU$O,I ALARI.'_l DIGITAL INPUTS, SLOT 3 ---------------mT i seAt-- DIGITAL INPUTS, SLOT 4ffi E118 KMS KMSKES ffBDREVISION 5 ffiRIZ, -..-VERT, _-_FJLE NO.VHR.D.ELEC14EN6R MVBKES VEST HIIJ, RESERVOIR RTU . PLC INPUT AND OUTPUT WIRING 2 Engineeriug Division City of Kent Works Department BAI IS T}TE IrcH ON oRIclML 0*vlx6 ADJUS' SCALES €C(NDIilGLY 7 /2s/m21 DATE APPR]Ve0,CITY NE,REVlSION ,. BH3 nHz PROJECT NO. I t 9200 22ln&M.* WA| t SIEMB,IS 6ES7522-!8H01-0A80 24 VoC filrPUTS ]6 PTS FLOW MffENNANSMITTER INSTALLED IN RN', TYP. ANALOG INPUTS 6Es75Jl-7NF00-0A80gtM$ls 8 PTS MASIER ALARM UCHT INTIT AL1IIUDE VALVT VAULT FLOI{ UETER IRANS}JIIIERON MASTER ALARM LICIIT RI_CIRCULAIION PUMP CALL OUiLEI METER VAULT FLOW METER IRANS'{IIIIR. frB-l cR2rL_i rBl METERINC PUMP CALL vAc FRoil 7cB (uPs L2) _ILEL0_ r.oN\gqn0N1 cR3 ALIINJOE VALVE sOLENOID (ENERoZE r0 closE) METERING PUTIP SP€TO fEEOBACK A FREF CHLORINE RESIOUAT ]RANSMIIIER pH IRANSMITIER NLII A]T]TUDT VALVI VAULT PRESSURT IRANSMITIER OUN€T CHICK VALVT VAULT PRTSSUR€ IRAN$.dTER sO'IUM HYPOCHLOflI1E STOflAGT TANX LTVEL.IRANSMIIIER .) ANALOG INPUTS, SLOT 6_=-____,,oafdEair.-'-- \ ( I TB-l cR4-t---@ r-- E cR5--r-*_le_l 1--@cR6-r+ql MIXIi CALL SPART SPARE OUT 1 OUT 2 OUT 5 vDc 2 0 .OUT3 .OUT 7P .ouT 6P .0u1 93 .OUIP ,0uTP .oUTe ,OUTP ,NTe + GND * FLOW IN CND rt€0BAcK + t +tj!j+ -.1 cND tr- GND + TRANSMiTIER + pH + + IRANSMI TIER S,l0 24P6 DtGtrAL OUTPUTS, SLoTqff 24N ,l EI9 KMSKES amIZ! -- VERI -- FILE NO.VHR-!-ELeCl4EN6R, MVBnRAS'KES WEST HILL RESERVOIR RTU - PLC INPUT AND OUTPUT WIRING 3CitY of Kent Public Works Department Engineering Division 8AR rs a€ NcH aN ORTG1NAL DRAVIM ADJUST SCALES ACCERDINGLY 0'7 /2s/202tAPPROVED,CIIY BY DATENE. z2n2fr,M*MoA0 ${2PROJECTN(I- I l*2O9 LWBH3 P:r n ANALOC INPUIS A SPARE ANALOC OUTPUTS 6ES7532-5HF00-0A80 SJEMENS 4 PTS FIELD COI'INECNONS MEIERING PUMP SPE€D CONTROL SPARE SPARE SPARE SPARE SPARE SPAFE SPARE SPARE ANALOG SLOT 8 SPARE GNO MIXER + ilIXER CURRENT FEEOBAG{ (AUPS) FiILD CONNEC1IONS Tts GM ta GNO T8 cN0 I-l- IBII Gl[] t8 s,r0 ,N 6+ SLOI 7 IN IN IN IN IN IN tN l+ lN 2+ IN J+ tN 7+ lN 4+ tN 4- t-SPEED + I SLOT 8 coilo 0- I oui 5+ l@t0+ I out l+ I oul 2+ 2- ANALOG INPUTS, SLOTTffi 5 KMS fl20 DESIGNED, KES ffilz'-- vfRt' - ENGR' MVB FJLE N0.vHR-I-ELECl4KES WEST HILLRESERVOIR RTU . PLC INPUT AND OUTPUT WIRING 4City of Kent Engineering Division public Works BAR IS O}E INCH I}I ARGIflAL DRAVING ADJUST SCALES ACCMDIN6LY 0'7 /2e/2A21CITYgYDATE APPR0vED, NO.