Loading...
HomeMy WebLinkAboutCAG2020-085 - Change Order - #1 - Northwest Playground Equipment, Inc. - Morrill Meadows Art Installation Safety Surfacing - 03/23/2020ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: o Director or Designee o Mayor Date of Council Approval: Budget Account Number: Budget? o Yes o No Grant? o Yes o No Type:Review/Signatures/RoutingDate Received by City Attorney:Comments: Date Routed to the Mayor’s Office: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? o Yes o No* *If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? o Yes o No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper) Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 ■ KEN T W A 5 H I N G T O N CHANGE ORDER NO. 1 NAME OF CONTRACTOR: CONTRACT NAME & PROJECT NUMBER PK20-11 ORIGINAL CONTRACT DATE: Northwest Playground E ui meet ("Contractor") Morrill Meadows Art Installation Safety _Surfacing_: 03/10/2020 This Change Order amends the above -referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: As described in attached Exhibit A, incorporated herein, contractor shall install poured -in -place rubber safety surfacing under outdoor art installations at Morrill Meadows. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable WSST) alternates and Net Change by Previous Change Orders (incl. applicable WSST) Current Contract Amount (incl. Previous Change Orders) Current Change Order Applicable WSST Tax Order Revised Contract Sum $30,346.80 $0.00 $30,346.80 $6,054.70 on this Change 1 $605.47 $$37,006.93 CHANGE ORDER - 1 OF 3 Original Time for Completion 013/31/2020 (insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion N/A (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: By :Chris McGarvey (Mar23, 2020) ((s� nature) Print Name: Chris McG�arvey ItsVP Operations (title) DATE: Mar 23, 2020 CITY OF KENT: By: (/ (signature) Print Name: Julie Parascondoia Its Parks Recreation & Comm. Svcs. Director (ti e) DATE: CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department PIP Rubber Surfacing -NW Playground -CO 1P:\P1anning\Morri11 Meadows\Art work installation\ CHANGE ORDER - 3 OF 3 EXHIBIT A A,P Northwest Playground Equipment, CHANGE ORDER FORM Inc. Billing Contact & Number: Bryan Higgins 253-856-5113 bhiggins@kentwa.gov Proiect Name: Morrill Meadows PIP Shipping 24hr Contact & Number: Bryan Higgins / 253-856-5113 / bhiggins@kentwa.gov BillinxAddress: City of Kent 220 4th Ave S Kent WA 98032 Shipping Address: Morrill Meadows 10600 SE 248th St., Kent, WA 98030 CO # QTY ITEM # VENDOR ADDITIONS/ DEDUCTIONS FROM ORIGINAL ORDER LIST PRICE 1 1 TotTurf Upgrading to Premium Color & Changing to Aiphatic Binder $ 6,373.33 5% Discount: $ (318.67) Bond: $ - Freight: $ - 10% Tax: $ 605.47 Additional Cost to Customer: $ 6,660.13 ELECTRONIC TRANSMITTAL: PIP Rubber Surfacing -NW Playground-001 Final Audit Report 2020-03-23 Created: 2020-03-23 By: Lynn Osborn (losborn@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAAi3xKoDgv_dyGAxMr1QILgJE6QgKsJQQW "ELECTRONIC TRANSMITTAL: PIP Rubber Surfacing -NW Pla yground-COV History E Document created by Lynn Osborn (losborn@kentwa.gov) 2020-03-23 - 10:10:53 PM GMT- IP address: 146.129.252.126 Document emailed to Chris McGarvey (chris@nwplayground.com) for signature 2020-03-23 - 10:14:44 PM GMT E Email viewed by Chris McGarvey (chris@nwplayground.com) 2020-03-23 - 10:21:31 PM GMT- IP address: 23.25.133.181 q Document e-signed by Chris McGarvey (chris@nwplayground.com) Signature Date: 2020-03-23 - 10:23:01 PM GMT - Time Source: server- IP address: 23.25.133.181 Signed document emailed to Lynn Osborn (losborn@kentwa.gov) and Chris McGarvey (chris@nwplayground.com) 2020-03-23 - 10:23:01 PM GMT E Adobe Sign