HomeMy WebLinkAboutCAG2020-133 - Change Order - #17 - Northwest Cascade, Inc. - 76th Ave S Improvements - 10/05/2021Agreement Routing Form
KENT For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)WAsHtNoroN
IE
oLo.o.
Originator:
S. Anderson
Department:
PW Engineering
Date Sent:
10t6t21
Date Required
N/A
Authorized to Sign:
EI Director or Designee E Mayor
Date of Council Approval
N/A
Budget Account Number:
R20082.64110.120
Budget? ElYes trNo
Grant? EYes ENo
Type: N/A
tro.-+.
G
El-otF
E
+,tro
EooL
EI
Vendor Name:
Northwest Cascade, lnc.
Category:
Contract
Vendor Number:
72783
Sub-Category:
Change Order #17
Project Name; 76th Ave. S. lmprovements - S. 220th St. to S. 214th St
Drniact Dorzit(.Compensation for repairs of a private leak that was excavated by Northwest Cascade. TheI rvrL!L """"''Uusiness complex didn't have waterso Northwest Cascade was directed to complete the repairs.
Agreement Amount: $3,61 7.06
Start Date: N/A
Basis for Selection of Contractor: $id
Terminarion Date: 188 Working Days
Local Business? El Yes E No*
*lf meets requirements per KCC 3.70.100, please complete 'Vendor Purchase-Local Exceptions" form on Cityspace
Notice required prior to disclosure?
trYes E No
Contract Number:
cAG2020-133
gl
Ea-tp
J\o
a*agE,E.tEE
.9ln
Date Received by City Attorney:Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk's Office:
dd(W22iil_1_20 Visit Documents.KentwA.gov to obtain copies of all agreements
KENT
WASHTNcToN
CHANGE ORDER NO. #L7
Northwest Cascade, Inc. ("Contractor")NAME OF CONTMCTOR:
CONTRACT NAME & PROJECT NUMBER:
ORIGINAL CONTMCT DATE:May 5,.2020
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the pafties, the project contract is modified as follows:
1, Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equiPment necessary to:
Compensation for repairs of a private leak that was excavated by
Northwest Cascade. The business complex didn't have water so
Northwest cascade was directed to complete the repairs.
Z, The contract amount and time for performance provisions of Section II "Time of
Completionr" and SeCtion ItrI, "Compensation," are hereby modified as follows:
Original Contract Sum,
(inctuding applicable alternates and
wssr)
$4,,472,667.25
Net Change by Previous Change Orders
(incl. applicable WSST)
$2t4,310.45
Current Contract Amount
(incl. Previous Change Orders)
$4,687,037.70
thI
Current Change Order $3,285.25
Applicable WSST Tax on this Change
Order
$331.81
Revised Contract Sum $4,690,654.76
CHANGE ORDER . 1 OF 3
Original Time for ComPletion
(inseft date)
120 working days
Revised Time for ComPl etion under
prior Change Orders
(insert date)
67 working days
Days Required (*) for this Change Order 1 calendar daYs
Revised Time for ComPletion
(inseft date)
188 working days
In accordance with Sections L-04.4 and 1-04.5 of the Kent and WSDOT Standard
specifications, and section VII of the Agreement, the contractor accepts all requirements of this
ih"ng" Ordei by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may niv'e re,garding this change. order and acknowledges and
aicepts that this cnange order constitutes final settlement of all claims of any kind or nature
arising from or connectdd with any work either covered or affected by this change order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost'profitr. This Change order, uniess otherwise provided, does not relieve the
Contractor from sirict compliance with the guarantee and warranty provisions of the original
iontract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change orders (if any),
and this change order, prior to the effective date of this Change order, are hereby ratified and
affirmed, and ihe terms of the Agreement, previous Change orders (if any), and this Change order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury _th.at they are
authorized to enter into this contracl modification, which is binding on the parties of this contract'
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above'
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below'
Print Name: Chad H.!-eren, P.E'
CITY OF KENT:
(titte)
E;,*
Public WoIts Director
DATE: /
(signature)
CONTRACTOR:
(tiUe)
DATE:
Print Name:
Its
CHANGE ORDER - 2 OF 3
ATTEST:
t tlrL
Kent City Clerk
APPROVED AS TO FORMr
(appllcable tf Mayor's signature requlred)
Kent Law DePartment
Un lhls fldd, you ftay trterthe ekctlonlc fllep3th wh€re the cqntGct has been $v€dl
CHANGE ORDER - 3 OF 3
File No. 2OO.2
KENT
CHANGEoRDERWoRKSHEETNo.LT
construction Engineering Division - Public works
Project: 76th Av S Project No: 19-3006
Project Engineer: Mark Madfai Fed-Aid No: N/A
Capital Projects phil McConnell Contractor: Northwest Cascade
Date: Various
I. Pro osed Chan e
NWC workmanship but a private service leak
s exposed it wasn'tOnce the leak waworkmanshiP leakNorthwest Ca scade excavated an aPParent
II. Reason and Bac round for Chan e
III. Method of PaYment
NEW PAY ITEMS [ ruotaPPlicable
ice. Since the business
rs.
e on the existing water serv
ractor to comPlete the rePai
it was found to b
directed the cont
Once the leak wa
complex was out
s exposed,
of water, I
Sch
No
Item DescriPtion Total Est.
OtY Unit Unit Price Total Estimated Cost of
Item
2
CXCAV an
apparent workmanship leak. Once the
leak was exPosed it wasn't NWC
k.
1 LS $3,285.25 $3,285.25
$
$
New Pay ltems Total: $3t285.25
DELETE EXISTING PAY ITEM(S) per 1-O9'5 p ruot applicable
Sch
No Bid Item No.Item DescriPtion Qtv Unit Unit Price Cost of Item
Page 1
$
Detete Existing PaY Items Total: $
DECREASE TO EXTSTTNG PAY rrEM(S)E ruot applicable
Sch
No.Bid Item No.Item DescriPtion Qtv Unit Unit Price Cost of Item
TNcREASE/
IV. WORKING DAYS
Increase / Decrease to Existing Pay Items Total: $
*TOTAL ESTIMATED COST OF CHANGE ORDER:2A5.25
x Tota I of the Cost of Item Columns
L78Previous Total:1Due This Change Order:t20Original Contract:
Days:n WorkiAddrito n9fonustificatioJanationIExp
Construction Manager:
Ph McCon
au I Kue ne
Capital Projects Manager:
Construction Engineering
Supervisor:
*TOTAL WORKING DAYS:
x This
L79
Change Order + Previous Total
Date:
Date:?/qil/
Date
-&
Eric Connor
Page 2
./x\-/KENTFORCE ACCOUNT WORKED
DAILY REPORT OF
CODENAME
Hrs
$
$
Hrs Hourly Rate
LABOR
STRAIGHT TIME
90.01I
64.1 I s13.52
720.08
OVERTIME
OT Rate
OCCUPATION
laborer
Foreman
DOLLAR
AMOUNT
LABOR OVERHEAD & PROFIT, INCLUDING SICKLEAVE FOR THE MEDICAL LEAVE @ 31%
LABOR TOTAL
STANDBY
$
$
o
$
$
$
$
$
1 233.60
EQU IPMENT
EQUIPMENT OR ATTACHMENTS
Equipment DescriPtion
1,616.02
382.42
SUBTOTAL. LABOR:
OPERATED
Hou
300.72Equipment #
Foremans Trcuk
Rate
37.59
DOLLAR
AMOUNT
$
$
$
$
EQU IPMENT TOTAL
300.72
363.87
63.1 5
SUBTOTAL - EQUIPMENT
EQUIPMENT OVERHEAD & PROFIT @ 21%
DOLLAR AMOUNTUnit PriceUnitsQuantitY
1,165.50$MATERIALS / SERVICES $ 1,165.50LS1
$
75481#66 1lnvoiceFlohawks
$
$
SUBTOTAL
Subcontractor @ 12%
TOTAL
$
$
$
1 ,165.50
1,305.36
139.86
Verification of Hours Worked
Contractor's
Date
efs RePresentative
Date
g92O 120,000 = 0.196
285.25
285.25
TOTAL:
SHEET TOTAL: $
Project Name
Item No.
76th Av S lmP rovements
FA Sheet No.
Project No:19-3006
Date: 91912021co 18
DescriPtion of Work:The contractor
Prime Contractor:NW Cascade
that indication of bei fromto a leak
The lea k wasn't caused the contractor and therefore their work is bein
Work bY Subcontractor?:
Sub-Contractor:
FA Sheet No.:
Proj ect No: 19-3006
Date: 91912021
Project Name:76th Av S lmprovements
Item No.:co 18
Description of Work: The
The leak wasn't caused the contractor
Work bY Subcontractor?:
Prime Contractor:NW Cascade Sub-Contractor:
to a leak that lndication of from
and therefore thelrwork is
{x\-../ 1<ENTFORCE ACCOUNT WORKED
DAILY REPORT OF
OVERTIMESTRAIGHTTIME
513.52
DOLLAR
AMOUNTOT Rato
OCCUPATIONCODENAME
Hourly Rate
90.01
&.19
HrsHrs
LABOR OVERHEAD & PROFIT, INCLUDING SICKLEAVE FOR THE MEDICAL LEAVE @ 31%
LABOR TOTAL
SUBTOTAL - LABOR: $
$
382.42
6.02
STANOBYOPEMTED DOLLAR
AMOUNTHrsRateHrs
EOUIPMENT OR ATT ACHMENTS
Equipment #
37IForemansTrcuk
$
$
EQUIPMENT IOTAL $
SUBTOTAL - EOUIPMENT
EQUIPMENT OVERHEAD & PROFIT @ 21%63.15
363.87
DOLLAR AMOUNTUnit Pric€UnitsQuantity
MATERIALS / SERVICES 1,165.50$$ 1,165,50LSI17548#661nvoiceFlohawks
$
SUBTOTAL
Subcontractor @'127o
TOTAL $
139.86
1,305.36
of Hours Worked;
DateRepresentative
3920 120,000 = 0.196
SHEETTOTAL: $
TOTAL:
5.25
o WE C A EI
posl ofncg Box 7s399.puYArluP. wASt{Netofi I lotl FetE A00'66?'/0{4r
DAILY FORCE ACCOUNT
/(i7 *,/*;2
I
PO BOX 735457
DAILAS, TX 75373
P:253'446-8485
F:253-848-2399
lnvoice 66154817
lnvolce Date 9/9/2O2L
Completed Date 9 / 9 / 2O2I
Customer PO
Job Address
orofit center 1 #
27B4O76th Avenue South
Kent, WA 98032 USA
PARTS WERE IN HAND...'PC1TO
Quantity YourPrice YourTotal
1.OO $17.50 $17.50
4.so $198.00 $B91.00
4.50 $1s.00 $67.50
1,OO $772.00 $L72.00
1,00 $17.s0 $17.s0
1.OO $0.00 $0.00
Fl**a\rvks- - - PlumHng+Sqptr
Billing Address
PROFIT CENTER 1 #
Tom B to email lnvoices
PuyalluP, WA 98374 UsA
Description of Work
ET TO HYDRO EXCAVATE WATER
nrpetn wnre n LINE. ' DUMP AT
ON SITE FOR WATER CONTROL. UNTIL
Taskf DescriPtion
MP-E/T CONSUMABLES ET
L-ET ET TRUCK (Hourly Rate' after 2 hour minimum)
F-ETFS FUEL SURCHARGE (PER HOUR BILLED)
D-ErcPS DUMP FEE(S) PER roN (solids) (cP)
F.ETW E/T FRESH WATER FEE (H2O)
s-Nocusr customer was Hot onritufo, readily available) To Provide Access For FLo-cHEcK' N/c
Water/Waste
Water Systems Evaluation
LINE FOR REPAIR. REMANDED
CANYON PIT. 1TON.'
Sub-Total
Tax
Total Due
$ 1,165.50
$0.00
$mtso
BalanceDue $1,165.50
9/9/2027
L(''r'o"*'r"a*"tent of work/Service to be performed',
r. on beharf of profit center il'heieby icrinowredge that the work at 21840 76th Avenue south, Kent, wA 98032 USA has been completed as
lr"rlJiljii"i. ''ri*"
iitip"tt"i ir'" *""rt ttJit is c6mplete to mv satisfaction'
9/9/202t