HomeMy WebLinkAboutCAG2020-418 - Change Order - #3 - T. Bailey, Inc. - West Hill Reservoir Construct New 5.0 Million Gallon - 10/04/2021KENT
Agreement Routing Form
For Approvals, Signatures and Records Management
This form lombines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cheny colored paper)WASHtNGToN
?
oLo,o,
Originator:
S. Anderson
Department:
PW Engineering
Date Sent:
10t5t21
Date Required
N/A
Authorized to Sign:
EI Director or Designee EJ Mayor
Date of Council Approval:
12t8120
Budget Account Number:
r^/200s4.641 10.330
Budget? EYes E No
Grant? EYes ENo
Type: N/A
cov
G
ELorF
E
{Jco
E(rt
oLgl
Vendor Name:
T. Bailey lnc.
Category:
Contract
Vendor Number:
294554
Sub-Category:
Change Order #3
Project Name: West Hill Reservoir
project Detaits:Revision 2-Additional storm drainage system required to install the PRV at
Pump Station 3
Agreement Amount: $64,055.74
Start Date: DeCember 23,2020
Basis for Selection of Contractor: Bid
Termination Date: 364 Working Days
Local Business? EYes @ No*
*lf meets requirements per KCC 3.70.100, please complete'Vendor Purchase-Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
EYes E No
Contract Number:
cAG2020-418
g|ca-t,)
E$o=Ei
IE
C('l
a-UI
Date Received by City Attorney:Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerks Office:
adcw22l/3_1 20 Visit Documents.KentWA.gov to obtain copies of all agreements
$46,973.84
KENT
WasHtNotoN
CHANGE ORDER NO. #3
NAME OF CONTRACTOR:T. Bailev. Inc.("Contractor")
CONTRACT NAME & PROJECT NUMBER:West Hill Reservoir
ORIGINAL CONTRACT DATE:December 23. 2020
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with thls Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Revision 2-Additional storm drainage system required to install the PRV
at Pump Station 3,
2. The contract amount and time for performance provisions of Section [I "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(including applicable alternates and
wssr)
$8,493,470.72
Net Change by Previous Change Orders
(incl. applicable WSST)
$89,855.89
Current Contract Amount
(incl. Previous Change Orders)
$8,583,326.61
Current Change Order $42,664.70
Applicable WSST Tax on this Change
Order
$4,309.14
Revised Contract Sum $8,630,300.45
CHANGE ORDER. T OF 3
Original Time for Completion
(insert date)
350 working days
Revised Time for Completion under
prior Change Orders
(insert date)
357 working days
Days Required (+) for this Change Order 7 calendar days
Revised Time for Completion
(insert date)
364 working days
In accordance with Sections t-04.4 and 1-04,5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The pafties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract,
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
(signature)
Print Name: Chad Bieren, P,E.
CITY OF KENT:
(titte)
fuE;
l)ircctnrIlc Dr rhlin lAlnrlzcIts Contract Manager
Bonnie Wardlaw
coN
nt
DATE:
(title)
9t27t21
By
Pri
CHANGE ORDER - 2 OF 3
ATTEST:
c
Kent City Clerk
APPROVED AS TO FORM:
(appllcable lf Mayor's slgnature requlred)
Kent Law Department
lln thls Reld, you may €nter the el€ctlonlcfll€path where the @ntrdct ha8 beed savedl
CHANGE ORDER - 3 OF 3
File No. 2OO.2
KENT
W^sHrtroror
CHANGE ORDER WORKSHEET NO. 3
Construction Engineering Division - Public Works
Project:West Hill Reservoir Project No:
Fed-Aid No:
Contractor:
L9-3027.L
N/A
T Bailey
Project Engineer:
Capital Projects
Manaaer:
RH2 - Drew Holcomb
Phil McConnell
Date: Various
I. Pro sed Cha
Additional storm drainage system required to install the PRV at Pump Station 3
II. Reason and Bac round for Chan e
IfI. Method of Payment
NEW PAY ITEMS E ttotapplicable
Revision 2 added a storm drainage system required to operate the PRV at Pump Station 3
Sch
No ftem Description Total Est.
Qtv Unit Unit Price Total Estimated Cost of
Item
2 1000 Revision 2, added storm drainage system 1 LS $42,664.70 $42,664.70
$
$
New Pay Items Total: $42,664.7O
DELETE EXISTING PAY ITEM(S) per 1-O9.5 ! ruotappricabre
Sch
No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item
Page 1
$
$
Delete Existing Pay Items Total: $
INCREASE/DECREASE TO EXISTING PAY ITEM(S) f ruotappricabre
Sch
No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item
$
$
$
Increase / Decrease to Existing Pay Items Total:
*TOTAL ESTIMATED COST OF CHANGE ORDER:
$
$42,664,7O
* Total of the Cost of Item Columns
3fa,/Previous Total:3 Due This Change Order:Original Contract:
Explanation/Justification for Additional Working Daysl
IV. WORKING DAYS
Capital Projects Manager:
Construction Engineering
Supervisor:
*TOTAL WORKING DAYS:35
x This Change Order + Previous T
Phil McGonn ell
ftn*aul Kuehne
Date:
Date:a/"/.,
Date:al/"2
elslaon r
Construction Manager:Z,--'
4^Eric Connor
Page2
McConnell, Phil
From:
Sent:
To:
Cc:
Subject:
Thank you,
Chad
*$,F T
Hi Eric,
As I understand the situation, we have developed the separate change order proposals to meet
the timelines of the 2021 Overlay project. This will save the west Hill Reservoir project on
roadway restoration costs, and thoseiavings will exceed the additional costs of separate change
orders due to mark uP.
Please proceed with the separate change orders'
Bieren, Chad
Wednesday, July 7, 2021 4:47 PM
Connor, Eric
McConnell, Phil; Peterson, KellY
RE:WH Res - REV2 - PS3 PRV Pricing
Chad Bierenr P.E. public works Director
Engineering Administration I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5534 | Cell 253-740-9139
cbieren@KentWA.qov
www.KentwA.qov n E @
pa"a,,\sm eos$rflrsR F['i[: mNVrRo$lt4frwT AHp$RS 0'}Rr$cTlNG 'ff',!lrs fr-MA]:L
F4lO s
From: Connor, Eric <EConnor@kentwa'gov>
Sent: Wednesday, JulY 7 ,20212:43 PM
To: Bieren, Chad <CBieren@kentwa'gov>
Cc: McConnell, Phil <PMcConnell@kentwa.gov>; Peterson, Kelly <KPeterson@kentwa'gov>
Subject: FW: WH Res - REV2 - PS3 PRV Pricing
Good Afternoon Chad,
Attachments:- Original Plan Sheet M201
As a result of the below communication, we requested our contractor to provide separate pricing
for the storm work and the water work associated with Revision No. 2 for west Hill Reservoir' or
contractor has provided proposals in the amount of $58,L79.60 to upsize the PRV vault (water
work) and g42,664,70 for the associated additional storm work. Combined these total
$100,844.30.
There is a small increase to the price shared below ($1,105'00) due to the wsDoT
subcontractor Markup Rate structure (t2o/o for lst $25k, 10o/o for next $75k, and 7o/o for next
$75k). with the 2 separate proposals ihere is a larger sum of money subject to the L2o/o rate'
Are you okay with proceeding with these 2 separate change orders?
- Revision 2 Plans
- COP 664-03 (original proposal quoted below)
- COP 664-04 (separated pricing for storm)
- COP 664-03a (separated pricing for PRV revisions)
please let me know if you have any questions or need any additional information
Thank you,
Eric
Eric Connor I Construction Engineering Manager
Phone 253-856-5533 | Cell 253-797-0693
CITY OF KENT, WASHINGTON
pL8d{sffi c$N$rsFR Yf{{i #{vvlR$NM*NY SiHF(}RS P!drr$Trl$$ T}drs l*-Ml'{r{-
From: Connor, Eric
Sent: Thursday, June IO,2021 3:31 PM
To: Howlett, Mark <MHowlett@kentwa.gov>
cc: Bieren, chad <cBieren@kentwa.gov>; McConnell, Phil<PMcconnell@kentwa'gov>
Subject: FW: WH Res - REV2 - PS3 PRV Pricing
Good Afternoon Mark,
we may have spoken about this revision/pricing but I do not recall sending it to you. In order to
get the project,s pRV at pump Station 3 constructed to our Standards, Revision No. 2 was
firoduced, it.'u Revision was provided to our contractor and the resulting proposed premium
pricing for this revision is $99,739.30.
This pricing includes a new storm crossing across Lk Fenwick Rd. In order to complete this work
prior to the upcoming work on Lake Fenwick Rd associated with our 2o2L Asphalt overlay project
we are requesting thE contractor to provide separate pricing for this storm work. Are you okay
with this apptouc-h that will result in 2 separate CO's for Revision No' 2?
We will share the revised pricing with you upon receipt'
Thank you,
Eric
Eric Connot, Construction Engineering Manager
Phone 253-856-5533 | Cell 253-797-0693
CITY OF KENT, WASHINGTON
PLCA$E C$N$TSHR TI"Jf frSdVII{$NM€I*T ffiHF$${S P${T$!TIN{i fHT$i F-MATI-
From: McConnell, Phil <PMcConnell@kentwa'gov>
Sent: Wednesday, June 2, 202!2:21'PM
To: Connor, Eric <EConnor@kentwa,gov>
Cc: Kuehne, Paul <PKuehne@kentwa.gov>
Subject: WH Res - REV2 - PS3 PRV Pricing
2
Eric,
T Bailey has presented a price proposal for the changes at PS3's PRV. Attached are the original
plans, Revision 2 and the price proposal. The revision has the storm as a 4 inch PVC this will be
changed to 8 inch. I will ask T Bailey for a new estimate.
Their proposal shows the price difference between the old PRV and the new one. It is more of a
lump sum then a specific breakdown on parts, etc. We did add a lot of additional components
has part of the revision.
Phil McConnell, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5542 | Cell 253-261-5685
pmcconnell @ KentWA.qov
CITY OF KENT, WASHINGTON
KentwA.gov Facebook Yv'tr!tt'*:" YouTube
PLHASH C$I*SISER Tff € HNvTI{ONM*SIY Bf;F*S.g PRCNTT${G TTITS *'MATI'
3
T BAILEY, lNC.
1 Survey - layout
Traffic Control
Northwest Cascade - Revised scope see attached
Fence Replace / Patch
Sidewalk, Concrete Curb and Gutter repair
Hydro seed
Foreman
Mark-Up Rate8 (WSDOT 1-09.6)
Labor 29%
Material 21%
Equipment 21o/o
Subcontractor 12% 1st$25,000
Subcontractor 10% next$75,000
Subcontractor 770 next$75,000
CONTRACT TIME EXTENSION:2WD
GoMMENTS: N/A
Exclude: WSST
Change Order ProPosal
1.0 LS
1.0 LS
1.0 LS
Date:
COP #:
6t22t2021
664-04Gity of Kent
West Hill Reservolr
ADDITIONAL WORK TO THE coNTRAcT: Storm revision for pS3. lncludes excavation, saw cutting, piping, asphalt removal, concrete removal, flagging, and restoration
MAT / INV
DESCRIPTION RVICES EOUI
.0
.0
.0
LS
LS
LS
1,000.00
2,260.00
25,356.00
2,850.00
1,200.00
500.00
4,050.00
Mark-up
Total
1,334.00
5,934.00
516.60
2,976.60
3,440.60
32,846,60
750.00
157.50
907.50
70
1,600.00
750.003,000.00
25,356.00
1,000.00
660.00
500.00
300,00
2,850.00
1,200.00
I@
NOR THWEST CASCADE INC.
POS1 OFFICE 8OX 73399, PUYALLUP. WASHINGTON 98373 / TOLL FREE 800.562-4442
Action Request
6t2212021
Chris Parker
ProjectManager
T. Bailey,Inc,
9628 S, March Point Rd.
Anacortes, WA98221
(360) 630-s831
From: Chris Quesenbury
RE: Forward PricePS3 Storm Addition
West Hill Reservoir
Action Request# L5
NWC # 4299
Chris,
The purpose of this Action Request is to provide T, Bailey, Inc. with a forward price for the
added cost associated with the project Construction Revision #2 which expanded the scope of
stormwater collection and dispersal at PS3 PRV. The following breaks out the revised scope of
work.
Bid IternI
301
Description
Sawcutting
QuantityI
80
Unib
LF
Unit PriceI$ 7.00
Bid Total
$ 560.00
302 Asphalt Removal 23 SY $ 26.00 $ 598.00
303 Concrete Curb Removal 16 LF $ 20.00 $ 320,00
304I
501
Concrete Sidewalk Removal
Storm Connection
4I
I
SY
EA
$ 75.00I$ s75.00
$ 300.00
$ s75.00
s02 Type I Catch Basin 2 EA $ 1,345.00 2,690.00
503I
801
4 Line
Subgrade Prep
14t
270
LF
SY
$ 66.00I$ 12.s0
00
$ 3,37s.00
802 CSTC 31 TN $ s2.00 $ 1,612.00
803 I{MA Pavement T-Patch 23 SY $ I 16.00 $ 2,668.00
804I
901
Cota Vi* Sidewalk, Curb & Gutter (Temporary Patch)4 JYI
DY
$ 188.00I$ 2,600.00
$ 752.00I$ 2,600.00
Bid Total $2s3s6.00
The additional scope that includes increased site demolition, storm collection and conveyance
system, and added restoration limits account for a lump sum increase of $25,356.00'
Specific conditions and exclusions are as follows: no sales or use tax is included, no survey or
tisting, NWC has includedflagging our work only, no arborvitae tree replacement, no fence
reinslallation, no hydroseeiding, no PRV Vqult revision/upsizing, no electrical work, no thermion
&-
Date:
To:
coating of vault hatch, NWC has not budgetedfor the use of PCMS or srrow boards, and no
concrete curb & cutter or sidewalk restoration is included.
NWC is requesting that a change order be issued in the amount of S25,356.00 to cover the added
,rop" ur*o.iated with PS3 storrr work at your earliest convenience. Please provide NWC with
timily response to this Action Request so that we may coordinate any submittals and material
procuremint in a timely manner with the overall project schedule and sequencing. If you would
ilke to discuss this matter in more detaii, I can be reached at253-255-7728.
Chris Quesenbury