HomeMy WebLinkAboutCAG2020-418 - Change Order - #2 - T. Bailey, Inc. - West Hill Reservoir Construct New 5.0 Million Gallon - 10/04/2021KENT
Agreement Routing Form
For Approvals, Signatures and Records Management
This fornt iombines & repiaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)WASHINGToN
f
oLoe.
Originator:
S. Anderson
Department:
PW Engineering
Date Sent:
10t5121
Date Required
N/A
Authorized to Sign:
E Director or Designee El Mayor
Date of Council Approval:
12t8120
Budget Account Number:
\M0054.641 10.330
Budget? EYes tr No
Grant? El Yes E No
Type: N/A
c
.91H
G
ELoh5
{r,Eo
EooLtrt
Vendor Name:
T. Bailey lnc.
Category:
Contract
Vendor Number:
294554
Sub-Category:
Change Order #2
Project Name: West Hill Reservoir
project Detaits:Upsize PRV, vault, and associated components due to the PRV being
undersized for its intended usage in the plans.
Agreement Amount: $64,055.74
Start Date: DeCember 23,2020
Basis for Selection of Contractor: Bid
Termination Date: 357 Working Days
Local Business? E Yes El No*
xlf meets requirements per KCC 3.70.100, please complete'Vendor Purchase-LocalExceptions'form on Cityspace.
Notice required prior to disclosure?
EYes E No
Contract Number:
cAG2020-418
gl
tra-{.-J\,o
a*
o=EEoc.9UI
Date Received by City Attorney:Comments:
t:
li
Date Routed to the Mayor! Office:
Date Routed to the City Clerk's Office:
ad(W22173,1,20 Visit Documents.KentwA.gov to obtain copies of all agreements
''
KENT
WASHtNGToN
CHANGE ORDER NO. #2
NAME OF CONTRACTOR:T. Bailey, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER:West Hill Reservoir
ORIGINAL CONTRACT DATE :December 23. 2020
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equiPment necessarY to :
Upsize PRV, vault, and associated components due to the PRV being
undersized for its intended usage in the plans.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(including applicable alternates and
WSST)
$8,493,470.72
Net Change by Previous Change Orders
( i ncl. applica ble WSST)
$25,800.15
Current Contract Amount
(incl. Previous Change Orders)
$8,519,270.87
Current Change Order $58,179.60
Applicable WSST Tax on this Change
Order
$5,876.14
Revised Contract Sum $8,583,326.61
CHANGE ORDER - 1 OF 3
Original Time for Completion
(insert date)
350 working days
Revised Time for Completion under
prior Change Orders
(insert date)
0
Days Required (*) for this Change Order 7 calendar days
Revised Time for Completion
(insert date)
357 working days
In accordance with Sections L-O4.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
aicepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract'
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement' which will
become effective on the last date written below.
llr/
CITY OF KENT:
(titte). ta/u /2,
Print Name:Chad Bieren.P. E.
4,.^
(signature)
Contract Manaoer
(title)
By
Bonnie Wardlaw
DATE: 9127121
Print Na
Its
CHANGE ORDER - 2AF 3
ATTEST:
Kent City Clerk
APPROVED AS TO FORMI
(appllcable lf MayorE slgnature requlred)
Kent Law Department
lln thls R6ld, you may enterthe electmnlc flleoath wher€ the contract has been savedl
CHANGE ORDER. 3 OF 3
File No. 2OO.2
KENT
CHANGE ORDER WORKSHEET NO. 2
Construction Engineering Division - Public Works
Project: West Hill Reservoir
Project Engineer: RH2 - Drew Holcomb
Capital Projects Phil McConnell
Project No:
Fed-Aid Nor
Contractor:
L9-3027.t
N/A
T Bailey
Man
Date: Various
I. Pro ed Ghan e
Upsize PRV, vault and associated components
If. Reason and Bac round for Cha e
IIf. Method of Payment
NEW PAY ITEMS E ruotapplicable
Revision 2 increased the size of the PRV from a 3 i nch to an 8 inch PRV, The PRV in the plans was
undersized for its intended usage.
Sch
No Item Description Total Est.
Otv Unit Unit Price Total Estimated Cost of
Item
21000 Rev 2 in the size of the PRV from
an 3 inch to an B inch 1 LS $58,179.60 $58,179.60
$
$
New Pay Items Total: $58,179.60
DELETE EXISTING PAY ITEM(S) per 1-O9,5 E ruotappricabre
Sch
No.Bid Item No.Item Description Qtv Unit Unit Price Cost of ltem
Page L
$
$
Delete Existing Pay ltems Total: $
INCREASE/DECREASE TO EXISTING PAY ITEM(S) fl ruotappricabre
Sch
No,Bid Item No.Item Description Qtv Unit Unit Price Cost of Item
$
$
$
Increase / Decrease to Existing Pay Items Total:
*TOTAL ESTIMATED COST OF CHANGE ORDER:
$
$58,179.60
x Total of the Cost of Item Columns
IV. WORKING
Capital Projects Manager:
Construction Engineering
Supervisor:
1
*TOTAL WORKING DAYS:f 3tn*
x This Change Order + Previo 'W.*--,L
fuPaul Kuehne
Date:
Date: g/s/zr
Date 8/'/q
dt\*
3{1I
Previous Total:tDue This Change Order:Original Contract:5'r.J
Explanation/Justification for Additional Working Days:
Construction Manager:
Connor
Page 2
McConnell Phil
Sent:
To:
Cc:
From
Thank you,
Chad
Bieren, Chad
Wednesday, luly 7, 2021 4:47 PM
Connor, Eric
McConnell, Phil; Peterson, KellY
RE:WH Res - REV2 - PS3 PRV Pricing
Chad Bierenr P.E' PublicWorks Director
Engineering Administration I Public WorksDepartment
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5534 | Cell 253-740-9139
cbieren@KentWA'oov
www.KentwA.qov tI El @
flt..EAS[i c$Nsrr]$:R Tl4ffi mN\IrRc]NMf;gdT SRii$RA pR]$*TX$d$ Tf"lr$ fr'Mes["
Subject:
Hi Eric,
As I understand the situation, we have developed the separate change order proposals to meet
the timelines of the 2021 overlay project. This will save the west Hill Reservoir project on
roadway restoration costs, and those savings will exceed the additional costs of separate change
orders due to mark uP.
Please proceed with the separate change orders'
il{EHT
ldrlFthQ.sg{
From: Connor, Eric <EConnor@kentwa.gov>
Sent: WednesdaY, JulY 7,20212:43 PM
To: Bieren, Chad <CBieren@kentwa.gov>
Cc: McConnell, Phil <PMcConnell@kentwa.gov>; Peterson, Kelly <KPeterson@kentwa'gov>
Subject: FW: WH Res - REV2 - PS3 PRV Pricing
Attachments:- Original Plan Sheet M201
Good Afternoon Chad,
As a result of the below communication, we requested our contractor to provide separate pricing
for the storm work and the water work associated with Revision No. 2 for west Hill Reservoir' or
contractor has provided proposals in the amount of $58,r79.60 to upsize the PRV vault (water
work) and g42)664.70 for the associated additional storm work, combined these total
$100,844.30.
There is a small increase to the price shared below ($1,105.00) due to the wsDoT
Subcontractor Markup Rate structure (L2o/o for lst $25k, L\o/o for next $75k, and 7olo for next
$75k), With the 2 separate proposals iheru is a larger sum of money subject to the L2o/o rate'
Are you okay with proceeding with these 2 separate change orders?
1
- Revision 2 Plans- COP 664-03 (original proposal quoted below)
- COP 664-04 (separated pricing for storm)
- COP 664-O3a (separated pricing for PRV revisions)
please let me know if you have any questions or need any additional information
Thank you,
Eric
Eric Connor t Construction Engineering Manager
Phone 253-856-5533 | Cell 253-797'0693
CITY OF KENT, WASHINGTON
PL€ASm C()ru$XmER TIE$ nFdVIR.$0dMfrNT' SEFSRfi pRgNTIr*S trF$x$ n"M'$SL
From: Connor, Eric
Sent: Thursday, June IO,2021' 3:31 PM
To: Howlett, Mark <MHowlett@kentwa.gov>
Cc:Bieren,Chad<CBieren@kentwa.gov>;McConnell,Phil<PMcConnell@kentwa'gov>
Subject: FW: WH Res - REV2 - PS3 PRV Pricing
Eric
Eric Connor I Construction Engineering Manager
Phone 253-856-5533 | Cell 253-797-0693
CITY OF KENT, WASHINGTON
pLsA$H C$NSXpSlt T$ E Sl\VIl{.(}slMF$*Y BHFoR8 p&rrNTXNG "$',FiXS fr -MAlL
From : McCon nel l, Phil <PMcConnell @ kentwa.gov>
Sent: WednesdaY, June 2, 20212:2IPM
To: Connor, Eric <EConnor@kentwa.gov>
Cc: Kuehne, Paul <PKuehne@kentwa.Fov>
Subject: WH Res - REV2 - PS3 PRV Pricing
Good Afternoon Mark,
we may have spoken about this revision/pricing but I do not recall sending it to you. In order to
get the'project,s pRV at pump Station 3 constructed to our Standards, Revision No. 2 was
[roduced. ihe Revision was provided to our contractor and the resulting proposed premium
pricing for this revision is $99,739'30'
This pricing includes a new storm crossing across Lk Fenwick Rd. In orderto complete this work
prior to ttre upcominj wort< on Lake Fenw'ick Rd associated with our 202L Asphalt overlay project
we are requesting th; contractor to provide separate pricing for this storm work. Are you okay
with this uppro..i that will result in 2 separate CO's for Revision No. 2?
We will share the revised pricing with you upon receipt'
Thank you,
2
Eric,
T Bailey has presented a price proposal for the changes at PS3's PRV. Attached are the original
plans, Revision 2 and the price proposal. The revision has the storm as a 4 inch PVC this will be
changed to B inch. I will ask T Bailey for a new estimate,
Their proposal shows the price difference between the old PRV and the new one' It is more of a
lump sum then a specific breakdown on parts, etc, We did add a lot of additional components
has part of the revision.
Phil McConnell, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5542 I Cell 253-261-5685
pmcconnel I @ KentWA.qov
CITY OF KENT, WASHINGTON
KentwA.gov Facebook Ts{rl{--i.ei YouTu be
PLfiASS C$N$!NER TI'f € ANVTRONM&NY SEFC}ft'f PRgNTTT$G TFIIS F'MAXL
3
T BAILEY, lNG. Change Order Proposal
Gity of Kent
West Hill Reeervoir
ADDIT|oNAL WORK TO THE CONTRACT: Revision to PSs PRV Vault. Utilities and associated work including restoration
MAT / INV
NITS
1 Survey - layout 1.0 LS
Northwest Cascade - Original bid scope see attached
Northwest Cascade - Revised scope see attached
Electrical
Mark-Up Rates (WSDOT 1-09'6)Mark-up
Total
Date:
COP #:
61212021
664-03
TOTAL
$
$ (s2,ooo.oo)
$ 101,350.00
$ 3,086.00
LS
LS
0
0
1.0 LS
5,743.60
58,1 79.60
$
Labor
Material
Equipment
Subcontractor
Subcontractor
Subcontractor
29o/o
21o/o
21o/o
12% 1st $25,000
1 070 next $75,000
770 next $75,000
CONTRACT TIME EXTENSION: 14 WD
COMMENTS: N/A
Exclude: WSST; Tree Replacements; Traffic Control measures beyond cones, warning signs (no PCMS, Arrow Boards, Flaggers); Therminion Coating on Hatch
3,086.00
(52,000.00)
'101,350,00
I@
dftn, NORTHWEST CASCADE lNC,
\!}" " posl orr_tct Box i3399. pUvALLUt), WASHtNctoN 98373 / rOLL FIEE 8QO-56?.-4442
Date:
To:
Action Request
6t22t2021
Chris Parker
Project Manager
T, Bailey,lnc.
9628 S. March PointRd.
Anacortes, W A 98221
(360) 630-s831
From: Chris Quesenbury
RE: Forward Price PS3 PRV Plan Revision
West Hill Reservoir
Action Request# 12R
NWC # 4299
Chris,
The purpose of this Action Request is to provide T. Bailey, Inc. with a forward price for the
addei cost associated with the project Construction Revision #2 thatmodified the scope of
work at PS3 PRV Vault. The following breaks out the revised scope of work.
NWC originally quoted a 6-inch PRV per the project plans and specifications at a lump sum
cost of $51,OOfj.OO. Upsizing the PRV line to an 8-inch diameter with a 2-inch bypass line
added restoration limits account for a lump sum increase of $49,350'00.
Specific conditions and exclusions are as follows: no sales or use tax is included, no survey
o) testing, NWC has inctudedflagging our work only, no arborvitae tree replacement, no
fence ret;nstallation, no hydroieeding, no electrical work, no thermion coating of vault hatch,
'NWC
has not budgetedfor the use of PCMS or awow boards, and no concrete curb & cutter
or sideu,alk restoration is included'
NWC is requesting that a change order be issued in the amount of $49,350.00 for to cover the
added ,"op. urro"iated with PS3 PRV upsizing at your earliest convenience. Please provide
NWC with timely response to this Action Request so that we may coordinate any submittals
and material procurement in a timely manner with the overall project schedule and
Bid TotalI$ 13,980.00
UnitsI
EA
Unit Price
$ 6,990.002 000
QuantityBid ltem
601 to ExistingWater -
$ 1s3,00 $ 9,1 80.0060.000 LF6028i".h Dr"ttl" lro" RJ Water Line
$ 74,375.00I .000 LS $ 74,375.00PS3 PRV Vault Complete603
$ 2.240.00EA$ 1,120 002.000PS3 PRV Vault'Ihrust Blocks604
$ 1,575.00EA$ 3ls 005.000605Standard Thrust Blocks
$101J50.00Bid Total
VAT'LT
sequencing. If you would like to discuss this matter in more detail, I can be reached af 253-
2ss-7728.
Respectfully,
cj-0
Chris
Bainbridge lsland Electric
West Hills Reservoir: West Hikll add handhole
Page 1
511912021 6:02:39 AM
Totals (Sum - Bid Summary: Default
Material
Non-Quoted
Quotes
Total Material
Labor
Direct (8.71 hours @ $99.25)
Non-Productive Labor
Total Labor (8.71 hours)
Direct Job Expenses
Hand tools and safetY
Subcontracts
Job Subtotal (Prime Cost)
Overhead (15.00%)
Profit (10.00%)
Sales Tax (0.007o)
Job Total
Actual Bid Price
Material to Direct Labor ratio: 0.65
Prime Cost per square foot
Job Total per square foot
Actual Bid Price Per square ft
Labor cost Per square foot
Labor hours per square foot
$1,574.89
0.00
$1,574.89
$864.47
0.00
$864.47
$0,00
0.00
0.00
$2,439.36
365.90
280.53
0.00
$3,085.79
$3,085,79
$o.oo
$0.00
$0.00
$o.oo
0.00
511912021 6:04:05 AM Bainbridge lsland Electric
West Hills Reservoir : West Hikll add handhole
Job Number: CO2850'1
Extension BY Phase
QuantitY Price U
Page 1
Ext Price Labor Hr U Ext Lab Hr
Item #Description
1 390
1603
1647
1770
2025
1242964
1 6546886
3107
6643
6650
69646
461495
1242560
T0001
-- 01 Raceway, Fittings & Boxes --
2" PVC Coated Rigid Elbow 2'00 6'300'00 C
2" Plastic Bushing 2'O0 95'21 C
2" Grounding Bushing 2'00 1'568'30 C
2" Cut & Thread 2'00 0 00 E
2" PVC Coated Rigid Coupling 2'00 1,897'50 C
2" Unistrut Strap galv 2'00 260'00 C
2" PVC Coated Rigid Steel u/ground 2'00 1'760'00 C
-- 01 Raceway, Fittings & Boxes Total --
-- 07 Special Systems --
126.00
1.90
31.37
0.00
37.95
5.20
35.20
237.62
0.10
4.67
0.00
97.50
25.00
100.00
227.27
1 ,1 1 0.00
1 ,1 1 0.00
1,574.89
0.70 E
0.14 E
0.50 E
0.20 E
0.15 E
3.00 c
4.80 c
1.75 M
7.00 c
0.10 E
OPEN
OPEN
0.50 E
4.00 E
1.40
0.28
1.00
0.40
0.30
0.06
0.10
3.54
0.00
0.07
0.10
0.00
0.00
'1.00
1.17
4.00
4.00
8.71
1/8" Poly Pull Line 22
Unistrut (Shallow) Galvanized
Cut 12 Gauge 1-5l8x1-5/B Channel (labor)
1/2 Ton pick up truck Per daY
Ferry fare car, driver, and passenger round trip
Link seal 1/2 through 2 1/2 inch conduit
-- 07 Special Systems Total --
set handhole
-- 18 Phase #18 Total --
Job Total
-- 1B Phase #18 --
1.00 1,110.00 E
2.00
1.00
1.00
0.75
0.50
2.00
50.00 M
466.76 C
0.00 E
130.00 E
50.00 E
50.00 E
" Target, Labor column 1
O oldcastle Precast'*Deliverin g ReliabilitY
3030-LA
fi"
2'-0"
2'-4"
Full 180' Open
,eit -)-
I
Cover
No.3030-P
'110 lbs.
Base
No.3030-8
7O0 lbs.t-rl"
t-r)"
Bose ond Cover
PSE Code #7664900
2'-6"
2'-6"
2'-6"
2'-6"
'' //\\>.
Full 180' Open
\
Q,,
Cover
No.3030-P
110 lbs.
OptionalSolid Base
No.3030-5B
950 lbs.
Non Skid Covers Available
FOR DETAILS, SEE REVERSE >>
Items Shown Are Subjoct To Changs Without Notice
lssue Dals: Augusl 201 2 @1 983-201 2 Oldcastle Procast, lnc'
Mailing Address
PO Box 588
Auburn, WA 98071
Phone: 800-892-1 538
Faxl 253-735'4201
Email: opauburn@oldcastle com
opauburn.com
{.
Cl oHcastle Precast'Deliveri ng ReliabilitY
2'-6"
(4) 1/2" Dio. Bolts
For Frome Hold-Down
PLAN VIEW
Cover Not Shown
2'-o/"
9"r'-04"9"
l- r-r|"
FRONT VIEW
2'-o&"
1'-01"
r-f)"
9"*l
3030-TA
@
I
N
Diqmond Plote Cover
Lotch
PLAN VIEW
Shown With Cover
{
o
9"
FRONT VIEW
Shown With OPtlonol Solid Bose
*
SCALE: 3/4" =1''0"
2'-ol"
r-rl"
SIDE VIEW
2'-o&"
t-rl"
SIDE VIEW
Shown With OPtionol Solld Bose
L
o
Ih
Flr.l
o
I
a'l +
I
N
o
t--n
5" Dio, Knockouts
2 Eoch Slde, 4 Sldes
-l_
T-t
L fL Lift Hole
1 1/2"
fr----n
5" Dio, Knockouts
2 Eqch Side, 4 Sides
I
I
I
I
I
"l
JI
1 1/2"
f,,Hole
II
opauburn.com
1.1 @1983-2012 Oldcastlo Precast, lnc.