HomeMy WebLinkAboutCAG2021-372 - Other - WSDOT - Grant Funds for City Safety Road Diets Program - 09/01/2021 FOR CITY OF KENT OFFICIAL USE ONLY
Sup/Mgr:
i
Agreement Routing Form DirAsst:
• For Approvals,Signatures and Records Management
Dir/Dep:
KE N T This form combines&replaces the Request for Mayor's Signature and contract cover (Optional)
W A 9 N 1 N O TON Sheet forms. (Print on pink or cherry colored paper)
Originator: Department:
Cheryl Viseth for Drew Holcomb Public Works
Date Sent: Date Required:
9.1.21 9.8.21
0
a Authorized to Sign: Date of Council Approval:
C F71 mayor orDesignee March 2, 2021
Budget Account Number: Grant? YesW] NoE]
R20099 STATE
Budget? Yes ONo Type: N/A
Vendor Name: Category:
WSDOT OtherGrant: Non-Real Property
Vendor Number: Sub-Category:
38139 Original 0
aProject Name: City Safety Road Diets
cProject Details: Grant Funds from WSDOT for City Safety Road Diets program in
W. the amount of $750,000 for three projects.
c
all Basis for Selection of Contractor:
£ Agreement Amount: $750,000 Other
4) "Memo to Mayor must be attached
do Start Date: Sept. 2021 Termination Date: Jan. 2023
v�
Q Local Business DesF_JNo*If meets requirements perKCC3.70.100,pleasecomplete"VendorPurchase-LocalExceptlons'formonGlyspace.
Business License Verification; 1:1 Yes In-Process❑Exempt(KCC 5.01.045)
Notice required prior to disclosure? Contract Number:
FiYesmNo 21-3003 CAG2021-372
Comments: Am
L Okay to sign 9/3/2021
M IM
C __
lT
0
3 �
a,
.40
oc
Date Received:City Attorney:9/2/2021 Date Routed:Mayor's Office City Clerk's Office
adccW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20210513
8.G
K E N T
W ASH 1 N G T ON
DATE: March 2, 2021
TO: Kent City Council
SUBJECT: Highway Safety Improvement Program - City Safety Road
Diets Grant - Authorize
MOTION: Authorize the Mayor to accept grant funds from the Washington
State Department of Transportation for the Highway Safety Improvement
Program - City Safety Road Diets program, in the amount of $735,000
dollars, amend the budget, authorize the expenditure of the grant funds
accordingly, authorize the expenditure of up to $75,000 dollars in local
matching funds from the B&O fund, and authorize the Mayor to sign all
necessary documents, subject to final terms and conditions acceptable to
the City Attorney and Public Works Director.
SUMMARY: The Washington State Department of Transportation (WSDOT) sends
out a call for safety projects every two years, with funds available through the
Highway Safety Improvement Program (HSIP). In March of 2020, the City applied
to WSDOT for City Safety funds through the HSIP. Accompanying these applications
was the City's Local Road Safety Plan, an engineering document that includes
analysis of traffic accident data. WSDOT selected from the projects and
countermeasures identified in the Local Road Safety Plan and has chosen to award
two City Safety projects to the City of Kent: (1) City Safety Road Diets, and (2)
108th Avenue S.E. / S.E. 264th Street Compact Roundabout per award letters
dated December 23, 2020.
The City Safety Road Diets Project would re-stripe existing 4-lane and wide 2-lane
roadways to 3-lanes plus bike lanes on three corridors where bike lanes are planned
as part of the Transportation Master Plan. Those three corridors are:
■ 4th Avenue North (South 228th Street to West James Street)
• West Meeker Street - Lincoln Avenue North - East Smith Street (Washington
Avenue North to 4th Avenue North)
InSouth 260th Street - South 259th Place (Pacific Highway South to Military Road
South)
The three projects are estimated to total $750,000 and a 10% local match is
required for all phases; however, the 10% match may be waived for the
construction phase if construction funds are obligated by April 30, 2023. The
preliminary project schedule assumes that construction will be completed by
Packet Pg.1 77
8.G
December of 2022 and every effort will be made to ensure this schedule is met.
While the total City match may be up to $75,000, the resulting local match is only
expected to be $15,000 for the Preliminary Engineering/Design phase. Staff
proposes that the required match funds be paid from the B&O fund.
BUDGET IMPACT: Minimum budget impact is $15,000 to match federal funding for
project design. If obligation of construction funds occurs after April 30, 2023, then
a $75,000 match would be required. Local matching dollars would come from the
B&O Tax fund.
SUPPORTS STRATEGIC PLAN GOAL:
Evolving Infrastructure - Connecting people and places through strategic investments in physical
and technological infrastructure.
Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and
inviting parks and recreation.
ATTACHMENTS:
1. HSIP Grant Awards Map (PDF)
02/23/21 Committee of the Whole RECOMMENDED TO
COUNCIL BY CONSENSUS
RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS
Next: 3/2/2021 7:00 PM
Packet Pg.108
as Aq
64AvS
44 Av 9
W
68Av S cc
oo
i:
Washington AvS Washington Av.N ak
'J-A,S 70 A S-
L A,
,.y N
ROG.,
6 Ay S
Pacfflc Railroadd
Unjw
SAv
76Av S
4 ' S
AV-S
2: JAVN
Ipp
%AVq Q10,15,jl�
Pn,,�j, A, OT iFf*vq A!Y
Central A v N
pntra[Av S 3 A"4
84AvS
%
-A,01
ti
0 Av
AAA,S
WA p A,
94 A S .1 A-5
MAY;
Pt A
IV 1.
rV11 A.3F
V.
107 PI NC se Ar
rri
104 Av SE
X
Se
rn 0
4
'D,4.SE
W A. CA WPA.�4 11�1
lie,P,
Grant Acceptance)
,rant Awards Map (2613 : Highway Safety Improvement Program—City Safety Road Diets
CWashington State Local Agency Federal Aid
ADepartment of Transportation
Project Prospectus
Prefix Route ( ) Date 9/1/2021
Federal Aid DUNS Number 020253613
Project Number
Local Agency 21-3003 WSDOT 1 Federal Employer 91-6001254
Project Number Use Only J Tax ID Number.
Agency CAAgency Federal Program Title
City of Kent ❑✓ Yes ❑ No ❑✓ 20.205 ❑Other
Project Title Start Latitude N See attached Start Longitude W See attached
City Safety Road Diets End Latitude N See attached End Lon itude W See attached
Project Termini From-To Nearest City Name Project Zip Code(+4)
See attached See attached Kent 98032-5895
Begin Mile Post End Mile Post Length of Project Award Type
N/A N/A See attached ❑Local❑✓ Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
N/A N/A N/A 0615 17 KING
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 33 9 80389
Total Local Agency Phase Start
Phase Estimated Cost Funding Federal Funds Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. $150,000 $15,000 $135,000 October 2021
RIW
Const. $600,000 $0 $600,000 January 2023
Total $750,000 $15,000 $735,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
See attached See attached
See attached
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
See attached
Local Agency Contact Person Title Phone
Drew Holcomb Project Engineer 2535611587
Mailing Address City State Zip Code
220 Fourth Ave. S. Kent WA 98032
By
Project Prospectus Approving Authority
Title Public Works Director Date 9ll/
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
---------:[
Agency Project Title Date
City of Kent City Safety Road Diets 9/1/2021
Cy -- - _-
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
❑ New Construction ❑ Path /Trail ❑ 3-R
See attached See attached
❑ Reconstruction ❑ Pedestrian / Facilities ❑2-R
❑ Railroad ❑ Parking L( Other
❑ Bridge -
Geometric Design Data _
Description Through Route Crossroad
❑ Principal Arterial Z] Principal Arterial
Federal ❑✓ Urban Minor Arterial Urban ❑ Minor Arterial
❑Collector Collector
Functional ❑ Rural Major Collector ❑ Rural major Collector
Classification ❑ NHS ❑ Minor Collector NHS ❑ Minor Collector
❑ Local Access ❑ Local Access
Terrain W] Flat ❑ Roll ❑ Mountain Z✓ Flat ❑ Roll ❑ Mountain
Posted Speed _
Design Speed
Existing
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
City of Kent % 100
Construction Will Be Performed By Contract Agency
Contractor 100 % %
Environmental Classification
❑Class I - Environmental Impact Statement (EIS) Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
-- -- - - - -
DOT Form 140-101 Page 2
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
City of Kent City Safety Road Diets 9/1/2021
Right of Way _ _
[v No Right of Way Needed ❑ Right of Way Needed
*All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
❑✓ No utility work required �] No railroad work required
❑All utility work will be completed prior to the start ❑All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑All utility work will be completed in coordination ❑All the railroad work will be completed in coordination
with the construction contract with the construction contract
-- -
Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project
Roadway striping and channelization is not anticipated to impact existing utilities.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project?❑Yes [V] No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency r
Date 09/03/2021 By Mairperson
DOT Form 140-101 Page 3
Revised 04/2015 Previous Editions Obsolete