Loading...
HomeMy WebLinkAboutCAG2020-137 - Change Order - #10 - Active Construction, Inc. - Willis St & 4th Ave S Roundabout - 08/19/2021Agreement Routing Form KENT For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper)WasHrNcroN t oLo.c Originator: C. Frame Department: PW Engineering Date Sent: 8t2412021 Date Required N/A Authorized to Sign: E Director or Designee E Mayor Date of Council Approval: N/A Budget Account Number R901 12.641 10.120 Budget? EIYes E No Grant? EYes E No Trrna N/A =.9t,.,o ELorts E flEo EooLol Vendor Name: Active Construction, lnc Category: Contract Vendor Number 231 9336 Sub-Category: Change Order #10 Project Name: Willis Street and 4th Ave S. Roundabout project Detaits:Remove portions of the ADA ramps and install additional pedestrian curbs in four locations. Agreement Amount: $1 5,453.73 Start Date: N/A Basis for Selection of Contractor Termination Date: Bid NiA Local Business? E Yes El No* *lf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? EYes EI No Contract Number: cAG2020-137 ttltr 'P)\roIE.gD 0t=Ei otrgl tn Date Received by City Attorney:Comments: Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: adcw22lil I 20 Visit Documents.KentwA.gov to obtain copies of all agreements LWt< KENT !VASHINGTC\ CHANGE ORDER NO. 10 NAME OF CONTRAGTOR: active construction' inc' ("contractor") CONTRACT NAME & PROJECT NUMBER: willis street and 4th Ave' s' Roundabout ORIGINAL CONTRACT DATE: MAY 15, 2O2O This change order amends the above-referenced contract; ail other provisions of the contract that are not inconsistent with this change order shall remain in effect' For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled..Description of Work,,, iS hereby modified to add additional work or revise existing work as follows: InadditiontoworkrequiredundertheoriginalAgreementandanyprior Amendments, Contractoi shall providi all Iabor, materials' and equiPment necessary to: RemoveportionsoftheADArampsandinstalladditionalpedestrian curbs in four locations to prevent pedestrians crossing in the wrong locations.Thischangeorderwillcovertheadditionalmaterials,labor and equiPment' 2. The contract amount and time for performance provisions of section II "Time of completion,,, and section III,..comfensation," are hereby modified as follows: $4,759,759.00 (including aPPlicable wssr) alternates andOriginal Co ntract Sum, $2s0,880.41 cl. rseOrdcsrePvrounhangeChaetbyNge wssT)n applicable( $5,010,639.41Current Contract Previous Change Orders) Amount (incl. $15,453.73Current Change Order $oApplicable W this Change Order SST Tax on $5,026,093.14Revised Contract Sum CHANGE ORDER. 1 OF 3 100Original Time (inseft date) for ComPletion 100 prior Change Orders letion underRevised Time for ComP (insert date) 0 calendar dayserOrdisCha*thforred ngeuDa()Reqys 100Revised Time (inseft date) for ComPletion InaccordancewithSectionsL-o4,4andl.04.5oftheKentandWSDoTStandard specifications, and section VII of tne agieement, the contractor accepts all requirements of this change order by signing bergw. niso, pursuant to the above-referenced contract, contractor agrees to waive any protest .it may GvL regarding ihl -r'"ng. order and acknowledges and accepts that this change order .onrtiirt"s final settlement or att claims of any kind or nature arising from or connecte]d with any work either.ou"rui or affected by this change order, including' without limitation, claims related to contract time, contri.t acceleration, onsite or home office overhead, or rost profits. This chang; o.d"r, uni"tr oinerwise provided, does not relieve the contractor from strict comprian." *iin the guarantee and warranty provisions of the original contract, particulaily tno.u pertaining to subsiantial completion date' Ail acts consistent with the authority of the Agreem_e.nt, previous change orders (if any)' and this change order, prior to *,"ln".iive date oiinir cnahge order, are hereby ratified and affirmed, and the terms of the ngr".r"r't,-irevious cnange orde-rs (if any), and this change order shall be deemed to have aPPlied' The parties whose names appear belo.w swear under penalty of perjury that they are authorized to enter into this contracl'modification, wtricn is binding on the parties of this contract' 3. The contractor will adjust the amount of its performance bond (if any) for this proiect to be consistent w-iin tne revised contract sum shown in section 2' above' INWITNESS,thepartiesbelowhaveexecutedthisAgreement'whichwill become effective on the last date written below' Print Name: Chad Bieren CITY OF KENT: DATE: (signature) (title) CONTRACTOR: DATE: By Print Name: CHANGE ORDER . ZOF 3 (applicable if Mayor's signature required) Kent Law DePartment APPROVED AS TO FORM:ATTEST: Kent City Clerk t flo lhis neB, yqu n.y enlet the electrunic fflepath where the enka't has ben savedl CHANGE ORDER - 3 OF 3 KENT CHANGE ORDER WORKSHEET NO. construction Engineering Division - Public works Project No: Fed-Aid No: Contractor: 10 18-3020 ACI Project: Willis St & 4th Ave S Roundabout Project Engineer: Thomas LeYrer Capital Projects Brian Shields M er: Dater 8/3/202L I.P Chan ew ped!2, L3, and 14. Pour nDA RamP 11, direction. ing domes on A c in the correct nd detectable warn the traveling Publi Remove the curb and sig ped curb a ns to direct II. Reason and Ba round for Chan e III. Method of PaYment ehsontofortioveremenmtopteundaborqipaaanmteriadadols,itircovehetrdoretotsshacneThg nttosaesaWnecprevesomaVrYeThresnonufolocatirucrbanstriaddtonandstalpednramasp ocaI stionrownnethrofcromssrngastrisgnped NEW PAY ITEMS I NotaPPlicable E EXISTING PAY ITEM(S) per 1-O9'5 fl Notappricabre New PaY Items Total: $L5,453.73 Sch, No Item DescriPtion Total Est. Qtv Unit Unit Price Total Estima ted Cost of Item Ramp Modifications 1 FA $15,453.73 $75,453.73 $ $ DELET Sch No.Bid Item No.Item DescriPtion Qtv Unit Unit Price Cost of Item Page 1 $ $ Detete Existing PaY Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) E Notappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of ltem $ $ Increase / Decrease to Existing Pay ltems Total: XTOTAL ESTIMATED COST OF CHANGE ORDER: IV. WORKING DAYS $ x Total of the Cost of ltem Columns 15 453.73 ro0oPrevious Total100Due This Change Order:Original Contract: Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS: * This j.}--.. 100 Change Order + Previous Total Capital Projects Manager: Construction Engi neering Supervisor: 4/L Construction Manager: Shields Paul hne Date: Date: Date: thA/.- afrt Eric nor Page 2 ACI ACTIVE CONSTRUCTION INC. CEAI{GE ORDER I ADDMONAL WORK OI]MMARY A.C.I. PROJECT JOB # 20-014 f,QUtP. NO. 161 497 530 589 Willis St. and 4th Ave. S Roundabout DA'IT WORK PENRORMED : DESCRIPTION OF IVORK TBD 2O2I Concreteremoval andnewpedcurbsof Ramp ll, 12, 13, l4perdrawings (noconcretestampwork) $85.82 $82.17 $64.49 $64.49 SUETOTAL LABOR @ RATE @ $31.33 @ s27.s6 @ $21.52 @ $t7.32 SUBTOTAL EQUIPMENT @ RATE TN @ $45.00 LS @ $1,000.00 LS @ $Er0.34 SUBTOTAL MATERIALS @ RATE LS @ $25,00 SERYICE SUBTOTAL @ RATE l,s @ $3,366.00 LS @ $s00,00 SUB CONTRACTOR SUBTOTAL A.C.I. PHASE CODE TBD TOTAL $1,373. I 2 tt,it4.72 $ r,03 r.84 s1,03 r.84 s4,13t.s2 .I'OTAL $501.28 s,r40,96 s344,32 s21't,t2 $r,s63.58 TOTAL $675.00 $r,000.00 $810.34 $21485,34 TOTAL s0.00 s0.00 TOTAL $3,366.00 $500.00 $3,866,00 Miu\POYYER woRKrNG FOREMAN @ 1.0 oPEMTOR @ l.o I-ABORER @ 1,0 LAAORER @ r,o LABOR CLASS i NATES HOURS t 6.0 16.0 t6,0 t6.0 EQUTPMENT DESCRTPTION / RATES @ @ @ @ @ EQUIPMENT DESCRIPTION CAT 41 6C Baokhoe Deerc 50G Mini Excavator Chery Tluck Dump Trailer HOURS 16.0 16.0 16.0 16.0 MA 'ORIAL COSTS DESCRIPTION UNTT CSTC (gruding & oub interiorbackfill rs. slamp€d concrele) 15,00 Concrete Haul-Of?DisPosal 1.00 Highway Specialties (signs/posts.&ardwue) 1.00 DESCRIPTION SERVICE COSTS UNIT SUB CONTRACTOR DESCRIPTION UNIT Wilson Concrete Construction lnc. (no siamp work inc)uded, CSTC backfill) 1.00 Sawcutting 1.00 MARK-UPONLABOR 3I% SUBTOTAL LABOR $1,412.97 $6,22449 fi32E.37 $I,892.05 s0.00 $521,92 $3,007.26 s0.00 $0.00 s463.92 $4329.92 MARK-UP ON EQUIPMENT 2I% SUBTOTAL EQUIPMqNT TAX ON MATERTALS (N/A ON WATER & SEWER) 0.00o/o MARK.UT ON MATERIALS 21% SUBTOTAL MATERIALS MARK-UP ON SER\TICE COST 2IO/' SUBTOTAL SERVICE COST MARK-UP ON SUB.CONTRACT0R COS'I'>X25'000 (Vrries) t2vt SUBTOTAL SUB.CONTRACTOR COST cR NDTOTAL $15,453.73 NNMCA CERTIFIED PERVIOUS INSTIII'LER llfilson Conctete Gonstructionr Inc Curb & Gutbr lSld.eualk lPo;uhtg lCustom Stampl Pentlous P,O. Box 2i5 Enumclaw, Wf, 98022 - Phone 253.863-8888 - far 253.826.0389 - Email leremy@WCclconctele.com QUOTEDate: June 9, 2021 Project: WILLIS Contractor: ACTIVE ASSUMPTIONS AND CLARIFICATIONS (to be included ln contract): r PER CONTRACT . QUOTE INGLUDES 1 MOBILIZATION EXCLUSIONS (to be included In contract): r DETEGTABLE WARNING SURFACE r STAMPED CONCRETE I PER CONTRACT Respectfully, Jeremy Wilson Item No. Descriptlon Esfd Qtv Unlt Unit Price CURB MODIFICATION FORRAMPS iI - 1.1 LS $3.366,00 TOTALT $3,366.00 SALE$ ORDER Date R.O. No 6lt4l2D2l 67426TIES LLC PO Box 65468 Port Ludlow, WA 98365 360-437-1 900 37-1 Fax Physical Address: 10534 Rhody Dr. Port Hadlock, WA 98339 Ship To BillTo Active ShoP/PuYalluP Jim Holland r-253-495-8286 Active Conshrotion, Inc' Po Box 430 Puyallup, WA 9837 Contact NamecolContact PhoneUSDOT#Date RequiredRepTermsP.O. No. Jim Holland6ltsl202l(253) 49s 82865052936/1412021RDHNet 30Willis RD TotalPrice EaShip'dOrder'dDescriptionItem 168.00 104.00 240.00 200.00 8,00 r 6.00 42.00 26,00 60.00 50.00 2.00 2.00 4 4 4 4 4 8 Perm Signs / Change order 24'X24"N B/W, HI.I, ALUMINUM SIGN, NEW' R9-3 (SYMbOI) "No Pedestrian Crossing" 18"X12',, BAil, HI-I, ALUMINUM SICN, NEW, R9-3B(Right)' "Use Crosswalk W Right Arrow" STEEL PERFORATED POST, 2u x 10" 126A iinrr" aNcHoR,2'112" x 36*,7 GAUGE 2.5" Comer Bolt & Hex Flange Nut Senatcd 3/8" Drive Rivet AssemblY A24X24Blw Al2Xl8B/W 2.5" Comer Bolt Asse,. 3/8 Drive Rivet Asse... sP2Xl0 sP2.5"X36" $736.00SubtotalBY MY SIGNATURE ITIONS ON THE BACK' THE TERMS ANDI AGREE TO COND Sales Tax (10.1%)$74,34 Received BY: $8 10.34TotalTO FOLLOW, Please pay from invoice INVOICEThis is for Your records only. 5.JsnP€ silqr mflur A urRBRrp PB 6D0T glD. r-ro.lHs+11 ArE S COllEilr€CAflER F RAIIP$A 1++l.?0, 3t.?o' LTEWWLLIS STsr^ r+5&t 2,3.2fE-Isr*a[rJS nPf, s!+ RfllP Ph 4fi AvI\ CINIERSr l+,s.0d5.dAe.d4EP5f {+€o6+ J9.0t'E"c0 llAltot dn8W SAAR STRllf tB4llt lE sco{18 0Fca{IRl€RAP Sr {+&+.8t,A2{ LIGmt $D- F-{Lt{-O:tsI 1+9,ti5r,2a4'E.eU)[rJI\tADARAI'P11 l^SC.\IE f=5'ffi\NI*lEl uoclo-s-:r::::d#J-ffilst!& usL cRosswALK (aElow R$3t Isr6Ns InodElPEDESTRTAN CROSSTNG (SYr'.r8OL)use cRosswALK (8ELow R93) l- .s.93' -,r-EP,, ll7\\sTA 4+96.7&,bC)doortl*l23.9EL 42.95\.22 LF 1{ STORM\COM B I NAT1 OR -CU NB-RAM P.PER WSDOT STD. F-40.14-034TH AVE S CENTERLINCENTER OF RAMPsTA 4+90.21,30.11'R9,oo,/'-\isTA 4+86.65, 37.55, EL 43,11sDcB #34 TYPE 141204080CURB RAMP 147.1%-1RANSs/wgl(tlO5%1!'|(rloc,olJto-7F\INSTALLR9-3 NO PEDESTRIAN CROSSING {SYMBOL)R9-3bPr USE CROSSWALK (BELOW R9-3)SIGNS\LNDGTRANS S-1.4%-6.REMOVE EXISTINGLANDING, CURB, ANDGUTTER%LNDGNo*1-5z(o.+1.5%CURB & GUTTER PER WSDOTSTANDARD PLAI{ F.40.1 6-03(stNGLE DTRECT|ON CURB RAMFILL AREA BETWEEN CURBS WISTAMPED CEMENT CONCRETEDP).THD ITEM # 1211llIaISCALE: 1' : 5'W SAAR ST