oLo.c
Originator:
S. Anderson
Department:
PW Engineering
Date Sent:
7t19121
Date Required:
7t19t21
Authorized to Sign:
EI Director or Designee E Mayor
Date of Council Approval
10t6120
Budget Account Number
R20091.641 1 0.120
Budget? ElYes tr No
Grant? EYes ENo
Type: N/A
C
.9lyo
Ef.o5g
tco
EaoLgl
Vendor Name:
Axum General Construction, lnc.
Category:
Contract
Vendor Number:Sub-Category:
Change Order #6
Project Name: Meet Me on Meeker (Russell - GRE) Sidewalk lmprovements
Project Details:Grind existing asphalt on Russell Rd on the south side of Meeker Street for repaving to match the new
crosswalk grade. Compensation is included for asphalt grinding, sweeping, trucking and disposal of
grindings (LS #20)
Agreement Amount: $7,280.00
starr Date: 1012012020
Basis for Selection of Contractor: fligl
Termination Date: 82 WOrking DayS
Local Business? E Yes @ No*
*lf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
EYes ENo
Contract Number:
cAG2020-329
io't
oE
trltr
'|JIoE
UIoL
=]P
Gtr.9vt
Date Received by City Attorney:Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk s Office
ec((W)1171 1 n Visit Documents.KentwA.gov to obtain copies of all agreements
KENT
Wa 5 a I h c r e N
CHANGE ORDER NO. #6
NAME OF CONTMCTOR: Axum General Construction, Inc. (*'Contractor")
CONTMCT NAME & PROIECT NUMBER: Meet Me on Meeker Sidewalk Imp. (Russell to GRE)
ORIGINAL CONTRACT DATE: OCIObCT 20. 2O2O
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Grind existing asphalt on Russell Road on the south side of Meeker
Street for repaving to match the new crosswalk grade. Compensatation
is included for asphalt grinding, sweeping, trucking and disposal of
grindings (LS #20).
Z. The contract amount and time for peformance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(including applicable alternates
wssr)
and
$1,428,431.77
Net Change by Previous Change Orders
(incl. applicable WSST)
$11,5E9.77
Current Contract Amount
(incl. Previous Change Orders)
$1,440,021.54
Current Change Order $7,280.00
Applicable WSST Tax on this Change
Order
$0.00
Revised Contract Sum $1,447,301.54
CHANGE ORDER - 1 OF 3
Original Time for ComPletion
(insert date)
75 working daYs
Revised Time for ComPletion under
prior Change Orders
(insert date)
4 working days
Da ys Re q u t red (*)for th I s Ch a n g e Order 3 calendar daYs
Revised Time for ComPletion
(insert date)
82 working daYs
In accordance with Sections t-04.4 and 1-04.5 of the Kent and WSDOT Standard
specifications, and section VII of the Agreement, the contractor accepts all requirements of this
change order by signing below. elsol pursuant to the above-referenced contract, contractor
agrees to waive any protest it may have regarding this change. order and acknowledges and
accepts that this change order constitutes flnal se-ttlement of all claims of any kind or nature
arising from or connectJd with any work either covered or affected by this change order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. rhis chingu oro"r, uniess otherwise provided, does not relieve the
Contractor from strict compliance wiin the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date'
All acts consistent with the authority of the Agreement, previous change orders (if any),
and this change order, prior to the effective date oitnis change order, are hereby ratified and
affirmed, and the terms of the Agreement, previous change orders (if any), and this change order
shall be deemed to have aPPlied.
The pafties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contraci modification, which is binding on the parties of this contract'
3. The Contractor will adjust the amount of its peformance bond (if any) for this project
to be consistent with the revised c6ntract sum shown in section 2' above'
IN WITNESS, the parties below have executed this Agreement, which will
becomeeffectiveonthelastdatewrittenbelow'
CTTY OF KENT:
(tttle)
Print Name:C Bieren
Its
P.E.
(signature)
CONTRACTOR
ame:
DATE:
Print
By:
CHANGE ORDER - 2 OF 3
N
APPROVED AS TO FORM:
(appllable If Mayor"s slgnaturc rcqulred)
Kent Law DePartment
ATTEST:
Kent City Clerk
(*-
fin tilt t€ld. yor mly 6ter ths d€drcnlc flleodh *he tbe contsrd h's bc6r lwedl
CHANGE ORDER - 3 OF 3
File No. 2OO,2
KENTwasHlNotoN
CHANGE ORDER WORKSH
Construction Engineering Division _ p
EET NO. 6
ublic Works
Project: Meet Me on Meeker
Project Engineer: Mark Madfai
Capital Projects
Project No:
Fed-Aid No:
Contractor:
19-3028
STPUL-1068(002)
Axum General
Jason Bryant
Date: 5/t9/2021
I Pro ed Chan e
nG dn Xe sti n a has tg no Rp ussel Rd no ht Se o uth ides Mof ee rke St for repa to mng atc th eh CWncrosswakraedcmoetnsaIonsnpcueddrfosahItafldnpgsnanngdrtucweepIkin&d osasg ofnfldnpLSg20gs()
ff. Reason an d Back round for Chan e
fff . Method of payment
NEW PAY ITEMS ! ruotappticabte
uD nri co n stru octi ng it W as d cos e red t ah t the r da e betwe eg n erh sEX iti adwro a na dng th ne eY W con creteSWsacroWkuodotnWorkeThamtchntspouWOcatdUsenodnWpaertItgWsatoreedndnIethUbogeastdnanenadthseouththofetenegorsectiandntoerepaamhtchtcesrosaWk
Sch.
No ftem Description Total Est.Unit Unit Price Total Esti mated Cost of
Itemng/ anngarng/ sweep fr9,
dis osal 1 LS $7,280.00 7,280.00$
$
$
New Pay ftems Totall $
DELETE EXISTING PAY ITEM (S) per 1-09.5 fl ruotappricabre
Page 1
7 tzgo.oo
Sch
No.Bid Item No.ftem Description Qtv Unit Unit Price Cost of Item
$
Delete Existing pay ftems Total: $
INCREASE/DECREASE TO EXISTING pAy ITEM (S) fl t'tot appticabte
Sch
No.Bid ftem No.Item Description Qtv Unit Unit Price Cost of Item
$
$I ncrease / Decrease to Existing pay ftems Total:
XTOTAL ESTIMATED COST OF CHANGE ORDER:
rV. WORKING DAYS
$
7 280.OO
*Total of the Cost of item Columns
Original Contract:75 Due This Change Order:o Previous Total 82
na tio n JustExpl/catiofi n for Ad dit o na nWorki DaI ys
*TOTAL WORKING DAYS: a2*fnirCffi
Date:2
Capital Projects Manager:
Construction Engineering
Supervisor:
Construction Manager:
Paul Kuehne
Eric Connor
Date:
Date:
f- ZI€-z-,1
thl/a
Page 2
Bryant,Jason
From:
Sent:
To:
Subject:
AXUM <axumgc@gmail.com>
Friday, March 19,2021 9:33 AM
Connor, Eric; Bryant, Jason; Wakefield, Wendy
19-3028 MMOM extra work
Hello Folks,
Please see attached quote from Becker to do the extra work that the City needs'
we would like to complete this work the first nice day next week
Please confirm receiPt and advise
Thank you,
EXTERNAL EMAIL
J$slrJher^fifrf,r,fr#ag
F.il,^Scx ggFS
.Trrrumeri ffif ..#SS.?
,Hfraff*s gUS*g*S*S$.fg *'S?am I
Mnrch I S{lt, 202 t
tNlleeker
we are pleased tr submit the fal*owing preip'usal
t firind npprnxi:nrat€ly ?40S square feet
I Sw*ep and haH! off grindings
r Spray tnck *nat and ov*rEaY
frwoteprdceJbr swtlined Hlflr*.' Pnrymten t terms- {#c{am
S45{}il {grilnding}
$5$lS {sweePinng}
$1560*00 {tr$cking nnd dirpasnl sf grindings
we flrs iluokilng at ?0 tons of HMA fnr ffue curh patt
thils ndded u**ilay E,rss sf our no$tracted price. All
*tsndnrd xnix design of ?il-Il oilI'
Exslusions and clerificali*ns;
2
Darcee Sanders I Owner
DBE I D2F0O24547 WBE I W2F0024547
Axum General Construction, lnc.
27474 210th Ave. SE, Maple Valley, WA 98038
p.2O6.786.5383 ' f .424,433.7928
www.axumgc.com
3
No
Work by Sl*conlractor? nO
T
nme r1
OT
haul
Project No;
Date:
DOLTAR
AMOUNT
DAILY REPORT OF
FORCE ACCOUNT WORKED
Project Name: Me.et Me on Megker (Rusgel RD to GRE)
Item No.:
Description of Work:
93.iODerator
$72.65Lsborer
s65.8?l-b6rer
$
$
$
EOUIPMENT OR ATTACHMENTS
AL
Rat€
$UBTOTAL- TABOR:
IAEOR OVERHFAD & PROFIT @ 29,o/o
DOLTAR
AMOUNT
44.92006 Cat 420 EIT Backlps
$49.7r2006 70 Kob€lco Excavator
$63.4t2004 lnternatioflal Dwn P Trtrk
s26.51415 Ford fuck
SUBTOTAL. EAUIPMENT
EQUIPMENT OVERHEAD & PROFIT @ 21%
Air
DOLT.AR AMOUNTUnil PriceUnllsQuantity
s 6,500.00* 9.5m00e{t1
a
s
$
n of Hours Worked
1?/O MARKUP
SH€ET TOTAL:
7
2
1
TOTAL:
0n
SUETOTAL
OVERHEAD & PROFIT @ 129lo
(ftr primo whon subcontracl
work)
Pay Estimate Entered:
Date:
By:
B Jason
From:
Sent:
To:
Cc:
Subject:
Bryant, Jason
|londaV, March 22,20212;08 pM
Madfai, Mark
fmportance:
Connor, Eric; Almaroof, Abdulnaser; Wakefield, WendyFW:19-302g MMOM extra work
Hish
lvlark,
From: Darcee Sanders <axumgc@gmail.com>
Sent: Mond ay, March zz, ZOZI iZ,oi or"To: Connor, Eric <ECr
<wwakefietd@k";;::;Skentwa'gov>; Brvant, Jason <JBrvant@kentwa.gov>; wakefield, wendySubject: Re: 19-302g MMOM extra worklmportance: High
Hello,
Checking in on this
:1i# tii.i$ : ".],:"il": ??jj: : i :i HJ'i;# i ?ll H :"3: f., i,,;:d o n M e e ke r st r be, i e ve th escheduled to pave ilrisiriaJi:"'=" rrre Know lryou agree and if we can proceed, They are
Thank you,
Jason Bryant, Capital projects ManagerConstruction Management I public Works Department220 Fourth Avenue South, Kent, *O nUOrI-"Ptrone 253-8s6-ss4t 1 cerr zis_zoi:ilu,JBryant@KentWA.qov
CITY OF KENT, WASHINGTONKentWA.gov Facebook .! 1,,s;,.p,;,,. youTube
pt-sA$H *r)f{$it$ii& Ti{e fN1/Ift.sNMSF*T a&F$eF pRtNTrF6$ r}Jrs F-M&It"
Darcee Sanders I Owner f Axum GeneralConstruction, lnc.DBE I D2F0024s7 &wBE I W2F0024s47
P _l 206.786.s383 F I 42s.433.7s28,ry
l1O" Avenue Sf, Mapte Vaitey, WA 98038frItgG] axumsc.com
EXTERNAL EMAIL
From: AXUM <axuD".;; ;;;;;;'ffi'ro,
To: Eric Connor <er
,"'
Hello Folks,
Jason Bryant .l grurnt@ k"nt*r.A*>, Wen dy Wa kefie ld
Please see aftached quote from Becker to do the extra work that the city needs.
we wourd rike to comprete this work the first nice day next week.
Please confirm receipt and advise.
Thank you,
2
futarcll I grh, ZilZt
iltf,eeker
We are pleased tc subrnit &e fcl$ow mg propcsal
I$es,lser^fif,rf#ffrtr#
"F,#" IFlrxg4f.i
fiko*res t"
: Crind approxima$ety ?40CI square fterI Sweep and haul offg*i*jing*r SpraSr fack aonf and nver$ay
fiwote pricef*r aw#ined work:Fnyment {erws- {Batan
flfgil {srinding}
fl99 {sweepinsJ'
sl5tl0"#0 {trrucfirog nnd dispnsal af grindimgr
lve sre fookimg nt ?0 tnns nf HJTIA fsr frre curb pnfcthis ndded oo*ftay ur** ut CI$r **nt"**fed price. AxIstandsrd rnix derign _r if_zl nil.
Exclusions nnd clarifications;
3
Darcee Sanders I Owner
DBE I D2FOO24s47 WBE I w2FOO24s47
Axum General Construction, lnc.
27474 210th Ave. SE, Maple Valley, WA 9g03gp.206.786.5383 . f .424.433.792.8
www.axumgc.com
4
I
Brya nt Jason
From:
Sent:
To:
Subject:
Attachments:
Bryant, Jason
Tuesday, January 19,2021 11:21 AIVIConnor, Eric
MMoM- Additional HMA and removal
I MG _87 9 2.J pG;
I M G_B 790.1 pC;
r rrrr C_gi g 1 .J p G
Eric,
I was talking with Erik from Axum and we began discussing the HMA on either side of the new
fancy crosswalk' If you look at my aftached pictures you'ilsee that the existing roadway is in
pretty bad shape' I would like to extend the HMA removal limits to address this. I would rike to
extend the removal to the eno or the new .r.o on the south side and to the existing trench rine
on the north side' The additional removar estimated cost is E:ooo.oo. The additionar HMA is$13'000' I'm sure we will need some crushed rock as we, I estimate @ g 2000.00. I think forless than $20K we could have a way better rooki"g finished o-:".i. aet me know what youthink.
Thank you,
Jason Bryant, Capital projects ManagerConstruction Management I public Works
-Department
220 Fourth Avenue South, *""; ;;;;r;=",Pione 2s3-8s6-ss41 I Cerr zis_zor:ir?,JBrvant@KentWA.gov
CITY oF KENT, WASHTNGTON
KentWA.gov Facebook, ... : . .; youTube
pL*A$is c$t*$r&*f i't'tg gs{l,r*$N*$N? BHF(!*ts ,{rnf'}drr*{d"i.Nf$ {:-fl4Arl
1