HomeMy WebLinkAboutCity Council Meeting - Council Workshop - Minutes - 09/15/2020
Approved
City Council Workshop
Workshop Regular Meeting
Minutes
September 15, 2020
Date: September 15, 2020
Time: 5:03 p.m.
Place: THIS IS A REMOTE MEETING
I. CALL TO ORDER
Attendee Name Title Status Arrived
Toni Troutner Council President Present
Bill Boyce Councilmember Present
Brenda Fincher Councilmember Present
Satwinder Kaur Councilmember Present
Marli Larimer Councilmember Present
Zandria Michaud Councilmember Present
Les Thomas Councilmember Excused
Dana Ralph Mayor Present
II. PRESENTATIONS
1 Sound Transit Federal Way Link
Extension Update
Kelly Peterson 30 MIN.
Link Light Rail Liaison, Kelly Peterson provided an update on the Sound
Transit Federal Way Link Extension project. The plan for this project initially
started back in 2012 when there was 6 years of planning done. The project is
nearing the end of the design phase and has entered the building phase, with
start of service slated for 2024.
Peterson reviewed the permitting process for this massive project. This
process includes weekly permitting meetings, weekly task force meetings, as
well as technical and field meetings. This has been in full swing since May of
2019 and will continue through February of 2021.
Peterson discussed the plans for the Midway project waste removal and
backfill, which should be complete by October of this year. He also discussed
the current state of the Star Lake Station area. Peterson noted that heavy
construction will be taking place between now and 2023, followed by a
number of months of testing.
To conclude his presentation, Peterson spoke about the Operations and
Maintenance Facility - South. He noted that there are still three potential
sites for this, one in Kent and two in Federal Way. The opening date for this
will likely be pushed back to sometime between 2026 and 2028.
Councilmember Boyce commended Peterson for awesome leadership
City Council Workshop Workshop Regular
Meeting
Minutes
September 15, 2020
Kent, Washington
Page 2 of 3
regarding this project.
2 Transportation Master Plan Financial
Plan
April Delchamps
Fehr & Peers
60 MIN.
Senior Transportation Planner, April Delchamps provided an update on the
public outreach effort, detailed progress on project development and
discussed the Transportation Master Plan financial plan, specifically the
capital project funding sources and budget.
Delchamps reviewed the outreach efforts that began in mid-August and will
conclude on September 21. She indicated that equity was at the forefront of
the outreach campaign. Staff engaged underserved populations via virtual,
print, location and partnership strategies and translated the fact sheet into
four different languages. Print materials, a survey and webmap were
developed to facilitate feedback from the public. Posters and flyers were
distributed at parks, trails, and community grocery stores. Multiple social
media platforms were utilized to get the message across as well as advocacy
and fellowship organizations, neighborhood councils as well as the many City
of Kent boards and commissions.
The webmap received just over 500 upvotes for priority project corridors and
intersections. The most popular projects on the webmap are:
1. S.E. Hill-3: S.E. 256th Street
2. S.E. Hill-1: 132nd Avenue S.E.
3. S.E. Hill-2: S.E. 248th Street
4. N.E. Hill-2: S.E. 240th Street
5. N.E. Hill-5: 132nd Avenue S.E.
The survey received 234 responses. The top 6 projects on the survey are:
1. S.E. Hill-1: 132nd Avenue S.E. (21%)
2. DSA-3: James Street (19%)
3. DSA-2: James Street (18%)
4. N.E. Hill-5: 132nd Avenue S.E. (18%)
5. S.E. Hill-8: S.E. Kent-Kangley Road (16%)
6. DSA-10: Central Avenue (16%)
Delchamps indicated that part of the project side of the capital project
budget planning level cost estimates were completed for the top 37 potential
project corridors which included 120 individual projects. The total cost of the
projects is well above the current capital and forecasted budget. Delchamps
indicated that maximizing outside funding opportunities is a critical part of
developing the draft prioritized project list.
Delchamps provided a finding update, which included anticipated trends in
City Council Workshop Workshop Regular
Meeting
Minutes
September 15, 2020
Kent, Washington
Page 3 of 3
revenues as well as information on where funds for capital projects come
from: business and occupation tax, grants and appropriations, local
improvement districts and transportation impact fees. Delchamps also
reviewed a few couple of existing and potential future funding sources to
include a property tax levy lid lift and Transportation Benefit District.
Delchamps concluded her presentation by reviewing next steps that include
survey and outreach, future City Council meetings, developing a draft
prioritized project list and a detailed cost estimate for the prioritized project
list.
Councilmember Boyce inquired about the Council's input on the final list of
projects, to which Delchamps confirmed Council will review and approve the
draft list.
Meeting ended at 5:59 p.m.
Kimberley A. Komoto
City Clerk
Federal Way Link Extension
Update
Council Workshop
September 15, 2020
FWLE
Packages
Segment 1
S1.05 –KDM Early Site Work
S1.06 –KDM Station
S1.07 –KDM Garage
S1.08a –Early Utilities
S1.09 –Drainage
S1.10 –Guideway Grading and Walls
S1.11 –Roadway Site Grading and Walls
S1.12 –Maintenance of Traffic
S1.13 –Demo Clear and Grade
Segment 2
S2.01 –Structure B
S2.02 –Structure C
S2.03 –Structure SL
S2.04 –Structure Z
S2.05 –Star Lake Station
S2.06 –Star Lake Garage
S2.07 –SL Sta. and Gar. Site Clearing,
Grading and Utilities
S2.08 –Not used
S2.09 –N and S of Midway Civil
S2.09b –Midway Landfill Civil
S2.10 –Roadway and Walls at SL Station
S2.11 –SL Maintenance of Traffic
S2.12 –Demo Clear and Grade at SL
Corridor Wide
CW.01 –Track
CW.02 –Systems Design
CW.03a –Early Ductbank
CW.04e –Standard Drawings –Structures
CW.04g -Standard Drawings –Sta. and Gar.
CW.04h –Standard Drawings –Walls
CW.04i –Standard Drawings –Drainage
CW.05 –Geotech Lab/Field Services
CW.06 –Not used
CW.07 –Landscaping
CW.07a –Kent Mitigation and Restoration
•1 to 20+ permits per package
•Permitting revisions are anticipated with most packages
•All packages beyond 60% review
Permitting
•Since May 2019
•Package Review –30%, 60%, 90%, Final Plans
•Permit requirements for each package identified
•Comment Resolution
•Weekly Permitting Meetings
•Weekly Task Force Meetings
•Technical Meetings and Field Meetings
•Currently in the peak of permitting
•Permitting through February 2021
•Design Build Process
KDM Station Area
•Permitting on-going
•Demolition complete
•Contaminated soil removed
•Utility relocation has commenced
•PSE transmission poles relocated
•Staging area
•Guideway column mock-up complete
•TESC, TESC, TESC
S. 240th Street
FWLE Alignment
S. 240th Street
Highline
Community
College
August 28, 2020
TOD Site
TOD Site
KDM Garage
Kent Pond
Joint Use
Utility Trench
Column
Mock-up
ST Pond
Guideway
Landfill Excavation
Midway Landfill
Station
Excavation
Casing
Transmission
Pole
115KV Transmission Lines
To be removed
Joint Use Utility Trench
(Looking South)
Rebar cages for Structure B
Casings for Structure B
FWLE Alignment
(looking south)
Wall behind Lowe’s
Midway Landfill Removal
-Excavate landfill along rail line
-Backfill with good soil
-Dispose of waste off-site
-Re-install environmental protections
-Gas collection system
-Landfill cover
-Liner
-Stormwater control
Legend:
-Guideway
-Work Area
-Future I-5 Lane (SR509)
N
Star Lake Station Area
•Permitting on-going
•Demolition Complete
•Clearing and Grading has begun
•Utility relocation soon
•TESC, TESC, TESC
Star Lake Clearing
Community Outreach Action Log
•Logs complaints and status
•Public outreach through the project.
•More calls expected as construction expands
•FWLE Project Hotline –1-888-298-2395 (24 hours)
FWLE Art –KDM Station
•58 Murals to be installed on the construction fence
•Installation planned for October
•8 artists
•In place for three years
•ST to maintain the artwork
Tommy SegundoGabriel MarquezJasmine Iona Brown
Cecelia De Leon
Moving Forward
•Permitting through February 2021
•Finish utility relocates at KDM
•Begin Structure B
•Rebar cages
•Drilling for column shafts –Next
•Column and Cap work begins in October
•Finish Midway Landfill waste removal –October 2020
•Clearing and Grading on-going (Star Lake has begun)
•Heavy construction 2020 –2023
•Testing 2023 –2024
•Revenue Service Begins 2024
FWLE and Covid-19
•Remote working
•web based meetings
•e-mail
•phone
•Takes more time to complete reviews, more challenging
•Kent Team
Operations and
Maintenance
Facility -South
•DEIS Process still underway
•Three sites (one in Kent, two in Federal Way)
•Draft EIS –Public Comment Q1 2021
•Opening date likely to be pushed back 2026 -2028
City Council Workshop
City of Kent
April Delchamps, AICP
Senior Transportation
Planner
Fehr & Peers
Kendra Breiland, AICP
Emily Alice Gerhart, AICP
September 15, 2020
Public Outreach
Striving for Equity and
Racial Justice in Public
Outreach
•Engagement with traditionally underserved populations is
foundational to the plan development.
•In previous outreach efforts, we were able to engage in person
through pop-ups, meetings, and drop-ins.
•Developed strategies for virtual engagement through mass
communications.
•High-touch strategies for targeted groups.
Outreach Timeline
Outreach
Method
Week 1
Aug 17-23
Week 2
Aug 24-30
Week 3
Aug 31-
Sept 6
Week 4
Sept 7-14
Week 5
Sept 14-21
Step 1
Email Blasts
& Phone Calls
X X X X
Step 2
Posters &
Flyers
X X
Step 3
Social Media X X X X
Website
•Online webmap
•Online survey
•Fact sheets (5 languages)
•Potential projects by
subarea brochures
•Detailed project
descriptions
•Posters and postcards
Posters & Flyers
•Community grocery
stores (visited 20
locations)
•Parks and trails (13
locations)
•Briscoe Park
•Green River Trail
•Clark Lake Park
•Foster Park
•Lake Fenwick Park
Social Media
•E-connect Bulletin
•Monday, September 14th: 2,446 recipients
•Monday, September 14th: 3,479 recipients
•Monday, September 21st: TBD
•Facebook
•Posts twice a week
•2 Ads (2nd Ad focused on translated equity populations)
•Instagram
•Posts twice a week
•Twitter
•Posts twice a week
Partnerships & Interviews
•Advocacy and Fellowship Organizations
•Neighborhood Councils (50)
•Cultural Communities Board
•Kent Bicycle Advisory Board (KBAB)
•Land Use and Planning Board (LUPB)
•TMP Transportation Advisory Board (TAB)
•Parks and Recreation Commission
•Human Services Commission (Pending)
Public Feedback
•The webmap received just over 500 upvotes for priority project
corridors and intersections. The most popular projects on the webmap
are:
•SEHill-3: SE 256th St
•SEHill-1: 132nd Ave SE
•SEHill-2: SE 248th St
•NEHill-2: SE 240th Street
•NEHill-5: 132nd Ave SE
•The survey received 234 responses. The top 6 projects on the survey
are:
•SEHill-1: 132nd Ave SE (21%)
•DSA-3: James St (19%)
•DSA-2: James St (18%)
•NEHill-5: 132nd Ave SE (18%)
•SEHill-8: SE Kent-Kangley Rd (16%)
•DSA-10: Central Ave (16%)
Project
Development
Process
Project List Development Flowchart
Public
Outreach
Prioritized Project List
5 Subareas
37 Project
Corridors
120 Projects Capital
Project
Budget
Public
Outreach
Feedback Prioritized
Project List
? Projects
? Corridors
Planning Level Cost Estimates
Manufacturing and Industrial Subarea
•6 Project Corridors
•20 Projects
•~$143.6M
Downtown Subarea
•11 Project Corridors
•39 Projects
•~$167.1M
Midway Subarea
•4 Project Corridors
•13 Projects
•~$124.2M
Northeast Hill Subarea
•7 Project Corridors
•21 Projects
•~$196.3M
Southeast Hill Subarea
•9 Project Corridors
•27 Projects
•~$204.9M
37 Project
Corridors
120
Projects
~$836.1M
Implications
The capital budget will determine the number of funded projects.
Not all projects in the top tier can be funded.
The project list should be strategic to maximize funding.
Project funding decisions should consider public feedback.
Ensure the project list is nimble to respond to changes in grants
and other funding.
Long Range Plan to Short Range Plan
Transportation Master
Plan (TMP)
Transportation
Improvement
Program (TIP)
•TMP
•Long Range
Transportation Plan
•20-year Planning
Horizon
•TIP
•Short Range
Transportation Plan
•6-year Planning
Horizon
Funding
Update
Anticipated Trends In Revenues
What does this mean to the TMP?
•Be realistic about what we can afford
•Update transportation impact fees
•Think creatively about funding sources
•Explore partnerships
Aspirations
Funding Capital Projects
Grants &
Appropriations
Local
Improvement
Districts (LIDs)
Transportation
Impact Fees
(TIFs)
B&O Tax
B&O Tax for Preservation/Grant Match
2017:
$4,433,520
2018:
$4,418,540
2019:
$3,740,600
2020:
$3,193,870
2021 &
2022:
~$3,193,870
Grants & Appropriations
Partnerships -
Federal, State,
County, Local
State/Legislative
AppropriationFMSIB -StateTIB -StateWSDOT-Federal
& State
Puget Sound
Regional Council
(PSRC) -Federal
Grant Funding Revenue
Grant
Opportunities
Grant Eligible
Projects
Match Funding
Availability
Applications +
Funding
Competitions
Awarded
Projects
•Highly competitive
•Highly variable year to year
•Grants can only fund 50-60% of most projects due to caps on grant requests,
funding limitations, etc.
•Scoring criteria impact project competitiveness
•Based on past success and competitiveness of the project list, the estimated revenue
over 20 years is $40-80M ($2-4M/year) –but this is NOT guaranteed
Local Improvement Districts (LIDs)
What
is a
LID?
Analysis
of top
37
Corridor
Projects
2-4 LIDs
Feasible
Anticipated
Revenues
Dependent
on Project
Transportation Impact Fees (TIF)
2011*:
$93,316
2012:
$338,309
2013:
$645,397
2014:
$820,226
2015:
$1,159,055
2016:
$1,126,738
2017:
$1,701,533
2018:
$1,760,973
2019:
$2,850,181
2020:
$626,313 (as of
8/26)
TIF Rate Comparison
Peer City Current TIF Rate
Federal Way $3,999 (City updating its rate)
Puyallup $4,500
Auburn $4,895
Kent $5,097
Des Moines $5,573
Fife $6,413
Bellevue $7,060 (rate on 1/1/21)
Renton $7,820
Future TIF Funding Scenarios
Current codified
rate
•2020 Rate: $5,097 per trip
•Estimated Annual Revenue: $1.3-2.5M
Peer rate
•Update rate to ~$6,200 per trip
•Estimated Annual Revenue: $1.5-3.0M
Regional mid-high
rate
•Update rate to ~$7,200 per trip
•Estimated Annual Revenue:$1.8-3.5M
Building a TMP Capital Budget
Grants &
Appropriations $2M/year $4M/year
Transportation
Impact Fee (TIF)$1.3M/year $3.5M/year
Capital Project
Budget
$6.3M/year $11M/year
B&O
Local
Improvement
Districts (LIDs)$?M/year $?M/year
$3M/year $3.5M/year
Capital Budget Funding
$6.3 -$11
million/year
Annual
Capital
Project
Budget
$41.8
million/year
Project
Estimates in
2020 Dollars
(Annualized)
Potential
New
Funding
Sources
Property Tax Levy Lid Lift (Voted) ~$4.5M/year
Transportation Benefit District
(TBD) –Sales and Use Tax ~$5.5M/year
New Funding Source for Cities ?
Next Steps
Next Steps
•Survey and webmap open through September 21
•Continue focused outreach including calls and
emails
•Update City Council on additional feedback
•Develop draft prioritized project list
•Detailed Cost Estimates for draft prioritized
projects