Loading...
HomeMy WebLinkAboutCAG2020-133 - Change Order - #4 - Northwest Cascade, Inc. - 76th Ave S Improvements - 05/17/2021Agreement Routing Form KENT For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper)WaSHtNGToN Department: PW Engineering Originator: S. Anderson Date Required N/A Date Sent: 6t t21 Date of Council Approval N/A Authorized to Sign: E Director or Designee E Mayor Budget Account Number: R20082.64't10.120 Budget? ElYes E No Grant? EYes E No Type: N/A Category: Contract Vendor Name: Northwest Cascade, lnc. 5ub-Category: Change Order #4 Vendor Number: 72783 Project Name: 76th Ave. S. lmprovements - S. 220th St. to S. 214th St. project Details: Compensation for raising vault, repairing fire hydrant and water service to improve area near driveway. This includes extra work numbers 44, 45, 49, 51,52,53, and 59 Basis for Selection of Contractor: Bid Terminarion Date: 146 Working Days Agreement Amount: $1 6,433.86 Start Date: N/A Local Business? E Yes E No* *lf meets requirements per KCC 3.70.100, please complete 'Vendor Purchase-Local Exceptions" form on Cityspace. Contract Number: cAG2020-133 Notice required prior to disclosure? EYes E No Comments:Date Received by City Attorney: Date Routed to the Mayor's Office: Date Routed to the City Clerk's Oflice: id(W2237f_20 Visit Documents.KentWA.govto obtain copies of all agreements r1 y KENT WAsHINGTON CHANGE ORDER NO. #4 NAME OF CONTMCTOR: Northwest Cascade' Inc' ("Contractor") CONTRACT NAME & PROJECT NUMBER:76rh ve. S. Im vements - s. 220th t. to S. 21 4th st. ORIGINAL CONTRACT DATE; MaY 5' 2020 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this change order shall remain in effect' For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, contractor shall provide all labor, materials, and equiPment necessarY to : Compensation for raising vault, repairing fire hydrant and water service to improve area near dr-iveway. This includes Extra Work numbers 44, 45, 49, 5L, 52, 53, and 59. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates WSST) and $4,472,667.25 Net Change bY Previous Change Orders (incl. applicable WSST) $108,447.15 Current Contract Amount (incl. Previous Change Orders) $4,581,114.40 Current Change Order $14,926.30 Applicable WSST Tax on t his Change Order $1,507.56 Revised Contract Sum $4,597,548.26 CHANGE ORDER - 1 OF 3 , Original Time for Completion (insert date) 120 working days Revised Time for Completion under prior Change Orders (inseft date) L6 working days Days Required (+) for this Change Order 10 calendar days Revised Time for Completion (insert date) 146 working days In accordance with Sections L-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, pafticularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the pafties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: DATE: Print ame: By: Its Public Works Direct CITY OF KENT: Print Name:Chad Bieren Dtr (signature) DATE: (tttle) CHANGE ORDER - 2 OF 3 ,{ ATTESTI I Kent City Clerk APPROVED AS TO FORM: (appltable lf Mayor's signature requlred) Kent Law Depaftment lh thE nd4 lDU mry qrter the eledronlc tll€path ryhm ihe ontnd iE brsn iledl CHANGE ORDER.3 OF 3 File No. 2OO.2 I KENT w^SHrxoron CHANGE ORDER WORKSHEET NO.4 Construction Engineering Division - Public Works Project: 76th Ave S ImProvements Project No: 19-3006 Fed-Aid No: N/A Contractor: Northwest Cascade Project Engineer: Capital Projects Manager: Mark Madfai Phil McConnell Date: 4/20/2O2I I. Pro d Chan e Raised vault, repaired fire hydrant, and repaired water serv entrance. These changes created a better turning radius at the driveway. Includes Extra Work numbers 44, 45, 49, 5I, 52, 53 and 59. ice at Mill Creek Distribtuions southern II. Reason and Ba round for Cha III. Method of Payment N EW PAY ITEMS I t',tot applicable construct the driveway without creating a drop-off next to trucks that are regularly cutting the corner on the driveway radius. This change order allowed us to create a better turning radius. Existing vault grade was too low to properly the driveway. This driveway is used by semi Sch. No Item Description Total Est. Otv Unit Unit Price Total Estrmated cost or Item 2 Raise vault, repair fire hydrant and water service 1 LS $L4,926.30 $t4,926.30 $ $ New Pay Items Total: $L4t926.3O DELETE EXISTING PAY ITEM(S) per 1-O9.5 E Notappricabre Sch No.Bid Item No.Item Description Qtv Unit Unit Price Cost of Item $ Page 1" $ Delete Existing PaY ltems Total: $ TNCREASE/DECREASE TO EXTSTTNG PAY rTEM(S)[ ruot applicable Bid ltem No.Item DescriPtion Qtv Unit Unit Price Gost of Item $ Increase / Decrease to Existing Pay ltems Tota l:$ *TOTAL ESTIMATED COST OF CHANGE ORDER:L4 926.30 x Total of the Cost of Item Columns IV. WORKING DAYS 216Previous Total10Due This Change Order200Original Contract Workdontia DaysforronAdngnustificatJxnaoatiE/pl XTOTAL WORKING DAYS:226 x This Change Order + Previous Total e Date: Date: Date: 4'M,Capital Projects Manager: Construction Engineering Supervisor: Phi l,l Paul Kuehne <J-zl.Lt Construction Manager: Eric Connor Page 2 McConnell, Phil From: Sent: To: Cc: Subject: Clint Myers <ClintMyers@nwcascade'com> Thursday, APril 15,2021 5:06 PM McConnell, Phil Joseph Hawks RE:76 lmp - CO4 Phil, For settlement purposes, NWC accepts the City's CO#4' Thanks, Clint From: McCon nel l, Phil <PMcConnell @ kentwa'gov> Sent: FridaY, APril 9,2021L0:18 AM To: Clint Myers <ClintMyers@nwcascade'com> Cc: Joseph Hawks <JosephHawks@nwcascade'com> Subject:76 lmP - CO4 Clint, change order 4 is attached for your review, comment and or approvar. It covers Extra work #'s 44,45,49,5L,52,53 and 59. I',ve attached a synopsis tally sheet of the force account' These are related to the third party damage and associated work to raised the vault and make the driveway access safer at Mill creek Distribution center. Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856'5542 | Cell 253-261-5685 pmccon nell @ KentWA.oov CITY OF KENT, WASHINGTON KentWA.gov Facebook '? !'ri{l!}i YouTube pl.Itjh$fr cc)lv$T$$:R Tl{f [N\t:*$$tf4f,NT mFFCtRm pRrilI.IP{s rl{fs *-MArl- EXTERNAL EMAILT EW 44 EW 45 EW 49 EW 51 EW 52 EW 53 EW 59 Flohawks Electrical trouble shooting dig and rePair fire hYdrant Raised vault rePlace bollards Completed vault raise and assoc repairs removed old ladder and installed new or Complete fire hYdrant rePair Water service rePair NWC 962.86 2799.39 4275.64 2523.4L L470.82 Kent 962.86 22LL.86 4275.64 2523.37 L273.0L NWC had lr loader and 10 rolls of loader, bac207L.35 2L6L.5 L6265 1518.05 2L6L.5L L4926.3 EW 44 EW 45 EW 49 EW 51 EW 52 EW 53 EW 59 Flohawks Electrical trouble shooting dig and rePair fire hYdrant Raised vault rePlace bollards Completed vault raise and assoc repairs removed old ladder and installed new or Complete fire hYdrant rePair Water service rePair 207L.35 1518.05 2161.50 2161.51 16264.97 L4926.30 NWC 962.86 2799.39 4275.64 2523.4L L470.82 Kent 962.B6 22LL.86 4275.64 2523.37 L273.0t FA Sheet No TgK DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: Item No.: Description of Work: Prime Contractor: a turn nts76th Av S lm Trouble shoot electrical as rt of third Project No: 19-3006 and creatinvehicle radius at the Work by Subcontractor?: Sub-Contractor: FlohawksNorthwest Cascade Dale'. 1213112A24 LABOR OVERTIMESTRAIGHT TIME DOLLAR AMOUNTOT RateHrsHrsHourly RateOCCUPATIONCODENAME $ $ $ LABOR OVERHEAD & PROFIT @29% $ LABORTOTAL $ SUBTOTAL - LABOR: $ EQUIPMENT STANDBYOPERATED DOLLAR AMOUNTRateHo EQUIPMENT OR ATTACHMENTS Equipment DescriPtionEquipment # $ $ $ $ $ SUBTOTAL. EQUIPMENT EQUIPMENT OVERHEAD & PROFIT @ 21% EQUIPMENT TOTAL $ $ MA DOLLAR AMOUNTUnit PriceUnitsQuantityMATERIALS / SERVICES 859.70$LS $ 859.701Flowhawk invoice 661 26564 $ $ a SUBTOTAL OVERHEAD&PROFIT@21% TOTAL 859.70 859.70 $ $ Verification of Hours Worked: Contractor's Date Owner's Date 12% MARKUP prime when subcontract work) (for TOTAL: $859.70 962.86 103.16 SHEET TOTAL: $ NORTEWEST CASCADq INC.NWC PROJECT#4255DESCRIPTION: Troubleshoot Cut Underground WiresLOCAfiON: 76th Ave South ImprovementsEW#Billto: COK44WORKLABOR2'/. SICK LEAVE:29'/I MARKUP:I,ABORTOTAL:$0.00$0.00$0.00s0.00$0.002\N/C MARKUP:EQUIPMENTTOTAL:${t.002lt/a MARKUP:MATERIALTOTAT:$0.00fi,.00FloHawksAMdJNT70I.ATEST RE\,'6ION 1 I I S NOziI2A/C MARKUP:SUBCONTRACTORTOTAL:$103.15TOTA,L$962-85$162.E6 Fld{aw{$ Plumfing + tuptk i l$rtt rm..t grl,rcs Oc.lt Billino Addresspnorf crrurun t * 10412 John Bananola WaY East Puyallup, WA 98374 USA PO BOX 73399 PUYALLUP. WA 98373 P:253-446-8485 F:253-848-2399 Description of Work lnvoicc 66126564 lnvoice Dale 12131 /2020 com pleted D ate 1 zl31 /2020 Customer PO Job Address orofitcenter 1 #4255 21441 T6thAvenuc South Ken! WA 98032 USA Disoatch to troubleshoot cut wires underqround after inspection I found multiple.spices.buried under the gro-und I removed all soices and made it qood conirections color to color and then hooked up color to color to the PIV more worl( i;'ib1fi wiit 6JIo ilintili cuiidmaithen ihgt are open and see if the system is oferating properly because I was unable io tone out the wires due to locked fire box wifl also deed a Sinch cap fiof round Caison box. Task # MP PPEICOVID L-ELR L-EL2R Oescription CONSUMABLES PPElSANITIZATION ELECTRICIAN SERVICE CALL ( First 30 minutes ) ELECTRICIAN (After lst 30) Quantity 1.00 1.00 1.00 3.00 Your Price $14.7s $s.95 $239.00 $200.00 Your Total $14.7s $s.9s $239.00 $600.oo Sub-Total Tax Total Due i8s9.70 $o.oo $8srJo Bslance Due $859.70 please pay from thb invoice Termst due 30 deys trom invoice date. Delinquency Charge 1% Per month. FloHawks is hereby authorized to furnish all materials and labor required to complete the requested work/servicc at21441 76th Avenue South, Kent WA 98032 USA fid i;itiided heriin ihe estlmatcd cost to perform this work is $859.70 at ttre tirne of inspection and with the information available at itr" timioittre inipiaion. if cosi chanses, tlie customer will be made aware prior to invoicing. lf you Have any questions about this job please ask your seivice Expert MATT SfulTH, he or she will be happy to help! the work at21441 76th Avenue South, Kent WA 98032 USA has been complete to my satisfaction. \/\ 12/31/2020 FA Sheet No./A\../ KENTFORCE ACCOUNT WORKED DAILY REPORT OF a safe Project Name 76th Av S lmprovements Prime Contracto r: Northwest Cascade Description of Work:Di and reset rant as turn radius at the Proje ct No: 19-3006 Item No. of third e vehicle da and Work by Subcontractor?: Sub-Contractor: Dale'. 1212312A21 LABOR OVERTIMESTRAIGHT TIME DOLLAR AMOUNTOT RateHourly Rate HrsHrsOCCUPATIONCODENAIVlE 405.05$90.01Foreman 376.97$oJ., I 367.52$81.674.5 $ $ 149.54 356.36 505.90LABORTOTAL $ LABOR OVERHEAD & PROFIT @ 31 % SUBTOTAL. LABOR: $ EQUIPMENT STANDBYOPERATED DOLLAR AMOUNTHourly Rate EQUIPMENT OR ATTACHMENTS Equipment # Equipment Descri ption 152.28s4.5 33.84F350 foreman truck 86.27$19.17JD35G 281 .97bz.ooCAT 950 G SE Loader $ $ SUBTOTAL - EQUIPMENT EQUIPMENT OVERHEAD & PROFIT @ 21% $ $ $ EQU IPMENT TOTAL 520.52 629.83 109.31 DOLLAR AMOUNTUnit PriceQuantityUnits MATERIALS / SERVICES $invoice form EW 53HD Fowler 62.92$$ 62.92LS1HD Fowle.- lnv 15668093 $ $ $ SUBTOTAL OVERHEAD & PROFIT @ 21% TOTAL $ $ $ 62.92 76.13 13.21 Verification of Hours Worked DateContractor's Owner's Representative Date m 12% IVARKUP prime when subcontract work) 1.862 2 211.86$ $ TOTAL: (for SHEET TOTAL: $ NORTEWEST CASCADq rNC.NWC PROJECT#4255DESCRIPTION: Excavate Raa over fire hydrant and fix.LOCATION: 76th Avo South ImpmvementsBill to: COKEW#45IABDQAOFore,manOperatorGroup3-LightOper:atorGroup I - Heavy/Heavyo.To.TBFSo.T.REG04.5$122.96 $0.00 "-REG 4.5$81.67$l 10.69$83.77hrz.sz$0.00$376.99-.--.-.---$0:00$o.00- broz.sr$0.00 '"04.5000tYo$0.00SICKI.EAVE:MARKUP:LABORTOTAL:149-54s22.99$333.3729Yo$1505.90HOI.]RS4.5AMOUNTREG 4.5D233 2OI8 JOHNDEERE 35G0D179 2006 JOHNDEERE 31OSGI.OADERSTNBYREG 4.5Dz04. 2005 CATERPILU,R 950GSe$7.621.97I'ADER STNBYF35O FOREMANTRUCKsrrqnY4.5s33.84$6.?6cs24 2008 FORD$0.000$0.00o $o.ooEQUIPMENTSUBTOTAL: $672.75216 MARKUP: $t41.28EQUIPMENTTOTAL:0$814.03fuat€nalsRepair KitIIRS/I.]MTS$333.331F726MJKitHD2MATERIAL21VO MARKUP:MATERIALTOTAL:$83.21$479.46S{JBCONTRACTOR ST]BTOTAL:I2VO MARKUP:SUBCONTRACTORTOTAL:AMOI.JNT$0.00$0.00r-A,TESr REVTSTON 1 1il9l2020TOTAL*2799.39 lh" Ne RTH,W_E_$I _c-A$Q-AD-E lNe,- \.} ' post orFtce Box 733e9. PUVALIUP, wAsHlNeToN 983t3 / ToLL FREE 800'562'4!42 DAILY FORCE ACCOUNT SHEET EW#:WEef X en,f g- (,eTL-rJ/e'l PAGE: START TIME:n * tg:*t"f*L+z4'\2""hffif ,L# DATE: END TIME: tQ- * L#"t-+$*OWNERS REP; tl+ 4 at-- tt'+f .'t I "ua LABOR NOIIBI F TIMFWORKER'S NAME REG TIME Itir;u LALe-A-r"{eu";tll7r';€-&rffi#. il 14 4 *\d fr A Pr g-A-rb4. - &e.e,r..,q.qn"l "4"{d 6 L*"*f">w 6 iOUIPMENT FOI'IPMFNT NUMBER -*--6UIPMEM D Esc R IPTIO N HOURS STANDtsY T)%N"'L &Yn in"lg {*r,qtWoL "+. { p [?q i3*'cs-,+oe t"4.{" W %>'-*L{,&weR*t-4. {* {- 6?4 &&gN*L.&, *faj.r(.k*'--l q* t*K:t)/ {L\-"r ,?- r"\t tL.-li/-1 t-+",{ a-0" g* ro ?Mf;g+\ MA"TFRIAI S OR SERVICES VENDOR & INVOICE #z " M{1sr+11-l&r E*r k*z-r ffi REPRESENTATIVE TITLE: N}fVC REPRESENTATIVE:'{&*p-t{ L*,*" REPRESENTATIVE: \rJn.P Ed - uL.^ \vg jt>gwk p) fln-.--rr nr. Northwest Cascade Co nstructionJob Name: Gity of Kent 76th Ave S lmprovJob Code4255Daily ReportCold-(32-45);Sunny;Normal Ground;Ground Wet - WorkablePicked up 10 rolls of 1 inch mastic from Oldcastle lndustries will call in auburn at 7AMFinish graded PozziBrothers north driveway (12:4S3:30)- rolled and passed compaction-covered with plastic to protec{ from weatherRernoved gravel ramp from both ends of sidewalk from 27+50 lo 28+22 and sweetened grade to set forms. Compacted prior to sidewalk pour. (1 1 :4$1 2:00)Revised Traffic from Mill Creek north driveway to Blue Origin south drivev'tay to alloat OCO to cut joints in the east road panelsReturned C524lo shop for Exhuast sysiem issues, and picked up 665Extra Work:Excavated Ran over Fire Hydrant around 1'l+84. Removed lower hydrant assembly ffom valve completely. Gasket on valve side was shredded due to being prshed over. Had topurchase 2 additional 6" mega lug gasket kits and completely re.do hydrant. Hydrant repair kitwas lhe in proper kit, and new kit will be delivered to HD FowlerThursday 124.11:45)(12:00to 12:45)Tunneled sidewalk around 19+40. 2 feet deep and installed 8LF Scfr 80 conduit. Backfilled with Pea gravel to fill void.Workers used: (4.5 HOURS)LeaCorkeryWortmanEquipment Used: (4.5 HOURS)35G D242D179D204c524'c'- indicates acompleted item.lR)' - indicata. vwo* quantitY.Date:Printed on: fn021 0833:A4Page Job Code4255Northwest Gascade ConstructionJob Nams City of Kent 76th Ave S lmprovEQUIPMENT STANDBY: (4.5 HOURS)GPS GRADERDUMPTRUCKWATERTRUCKM317 ROLLERDaily Report77885694743901031410534010503LEA, ROBERTOPERATOR L 3.5/2CORKREY,JOSHUA OPER.FOREWORTMAN,WILLIAM OPERATR HHHANSON,JOHN APPR.LABRDEMELLO,JOEL APPR. LABRWAGNER,ELZADA FLAGTCSTotals for LaborTotals for EquipmentHours: 50Hours: 0Worked:50Worked:0Broken Out:Broken Out:4.54.54.5000(482/4)(0/0/0)3.53.581288I8IIIICodeTt885694743901031410534010s03NameLEA, ROBERTCORKREY, JOSHUAWORTMAN,WILLIAMHANSON, JOHNDEMELLO, JOELWAGNER,EIZADABegin EndStart07:0007:3007:3007:3007:30O7:30Ereak (1) Luneh Break (2) Meal (2)Diem SubsistEnce NotesEnd17:0015:3015:3015:3015:3015:30'c' - lndicates a completed item.TR)' - indhata" e. work quanlitY.\IDate:Printedon: jlnozt 08:33:(MPage Northwest Gascade GonstructionJob Name: City of Kent 76th Ave S lmprov1000.11 See diarylnspector Note50052 See diarylnspector Note50153 See Diarylnspeetor NoteEW-o434 See Diary / force account sheetInspector NotePC1LABOR-o001 5 SEE DtARy (GRADTNG POZZ DRWAY)lnspector Note'c'- indicates aDaily ReportJob Code4255I'(R)'- indicates ework quantity.Date:Printed on: :'7nO21 O8:33:04Page H.D. FOWLER COMPAI.IV REMIT: PO Box 84368, Seatttg, WA 98124 Corporate Office 3633 138tfr Pl SE, Ste 100, Bellevue, WA 98006 PO Box 160, BEllevue, WA 98009-0160 Phone 425-654-8800' Fa)( 425-641-8885w lnvoice Number 15670203 PAWH Psclflc Branch 1417 Thomton Ave SW Pacllic, WA 98047 (253) 863-8600 Fax (2s3) 86s€681 HD Fotrder Gompany - Paelfie NW CASCADE JAN O \ 2UI a2 Order Writer: MichaelOwens PolJoB: TRAFFIC KIT Aty Atv Psrt #Unit Extended 1 lllllrlhr;h,l,lltl'llhltl'll"hlllll'111,'l1llrlr,rllll,lllll NORTHWEST CASCADE PO Box 73399 Puyallup WA 98373-0399 T-1 Order# o6899246 lnv Date: 1U29120 Due: 01l10l21 *hln via' Wll I (iAI I Terms: NET 10TH PHOX FoB: H. D. FOWLER 333.33 333.33 0.00 0.00 333.33 10 EA Ns-z2szs-140s R16206s3 sFTy FLe RK s 1/4 MED, TRAFFIC REPAIR KIT FOB CLOW MED HYDRANT 333.330 PLEASE APPROVE JAN I 8 2021 ^[L tn ** Flemittance Address *" EFT Routing: 121000248 PO Box 84368, Seattle, WA 98124-5668 EFT Bank No:418 545 3362 Sub total Freight Tax Grand TotalServing the Pacific Northwest since 191 I www. hdfowler,comRUBSIDEBOB. 6 H.D. FOWLER COMPANY REMIT: PO Box 84368, Seattle, WA 98124 Corporate Office 3633 136th PISE, Ste 100, Bellevue, WA 98006 PO Box 160, Bellevue, WA 98009-0160 Phone 42$'654-8800 * Fax 425-6|1|W€ASCADE Paclflc Branch 1417 Thomton Ave SW Pacific, WA 98047 (253) 863-8800 Fax (253) 869-868'l HD Fowler Company - Pacilic JAN 0 tl 2021lnvoice Number 15668093 PAWH 3t4 Order Wrlter: Flnd Srrllivan Ordar# o68s87st lnv Date: 't2l2u2a llllplhrll,,Llllhlllll;hllnlrlllll,l1l,,lgll,;,,r;lll,lllll NORTHWEST CASCADE PO Box 73399 Puyallup WA 98373-0399 T-t PO/JOB: PO:4255 *^.lEE ?arLt Arrc er.\t t'rl.t litE'c}r.l\tE Due: OlnAl?l clta lr!-. lAfill-tiall lJara /flrr{ar Terms: NET 10TH PROX enn, lJ n trnlr\ri trP Unlt-Part #Extendeda$ ory 62.92 62.92 0.00 0.00 62.92 20 EA IFz26, coMPAcT BoDY MJ ACCESSORIES KIT ooMPLETE WrrH GLAND, GASKET AND (6) 3/4',X3. 1/2" T-BOLTS 31.460 PLEASE APPROVE JAN 13 2021 rlu tn '* Remittance Address *" EFT Routing: 121000248 PO Box 84368, Seattle, WA 98124-5668 EFT Bank No:418 545 3362 Serving the Pacific Northwest since 1911 www.hdfowler.com Sub total Frelght Tax Grand Total 1 FA Sheet No.49 T<€NTFORCE ACCOUNT WORKED DAILY REPORT OF and Project Name:76th Av S lmProvements Prime Contractor:Northwest Cascade Description of Work asrdslaboreandRaItSEvau dtheatradiusturninsafeacreati Project No:19-3006 Item No rt of third vehicle d Work by Subcontractor?: Sub-Contractor: Dale: 111212a21 LABOR OVERTIMESTRAIGHT TIME DOLLAR AMOUNTOT RateHrsHourly RateHrsOCCUPATIONCODENAME 450.05$90.01Foreman 491.10$81 .85o 408.35$81 .67 320,95$64.195eneral Laborer $ SUBTOTAL - LABOR: LABOR OVERHEAD & PROFIT @ 31 % 1,670.45 LABORTOTAL $ $517.84 1 88.29 EQUIPMENT STANDBYOPERATED DOLLAR AMOUNT H Rate EQUIPMENT OR ATTACHMENTS Equip ment DescriPtionEquipment # 225.54$37.59oF 450 foreman truck 135.32$33.834JD 310 SG tractor laoder 331,38$55.236CAT 308 E2 Excavator 12.89$12.89,1 85 cFMAir $ EQUIPMENT OVERHEAD & PROFIT @ 21% EQUIPMENT TOTAL $ $ $ 705.13 853.21 148.08 SUBTOTAL. EQUIPMENT MA DOLLAR AMOUNTUnit PriceUnitsQuantity MATERIALS / SERVICES 1.101.91$$1 101.91LS1FloHawks lnv 66126904 $ $ $ $ SUBTOTAL OVERHEAD&PROFIT@12% TOTAL $ $ $ 1.'101.91 1,234.14 132.23 Verification of Hours Worked Contractor's Date Owner's RePresentative Date 12% MARKUP prime when subcontract work) 275.64 $4 275.64 SHEET TOTAL: $ TOTAL: (for NORTHIYEST CASCADq INC.NWC PROJECT #4255DESCRIPTION: Fix PIV for Fire AlarmLOCATION: 76th Ave South improvanentsBlllto: COKEW# 49WORKllr2Dozt5Iaborer Group 3 - General IaborerForemanoperatorUroup J - LlghtOperatorGroup2-Heavyo.T-*RE-C-o.T.REGo.t."---REC- 6550506l9$64.19- - - ca0.0r912L96$81.67..-$-!!0.5ts81.85$450.03$orql$40-_8:36$0.00$491.1 1o.T..85LABOR2O/O SICKLEAVE:29O/O MARKIJP:I.ABORTOTAL:$33.41$484.43$21E8.29D224 2014CATERPILLAR 308E2D179 2006 JOHNDEERE 31OSCT3O4 2OO2 SULLAIRSTNBYLOADER.380$7.36$0.00EQUIPMENTSUBTOTAL: $705.132lo/o MARKUP: $148.08EQUIPMENTTOTAL: $853.214.62RATE2IVO MARKUP:MATERIALTOTAL:$0.00$0.00FloHawks 1 $1101.91 $1101.91SIJBCONTRACTOR SUBTOTAL: $1101.91l2o/o MARKUP:STJBCONTRACTORTOTAL:$132.23$1234.14I-ATEST REVISION I 1/I 9I2O2OTOTALvns.64 Northwest Gascade ConstructionJob Name: City of Kent 75th Ave S lmprovJob Code4255Daily Reportfrary: &b -fri{ilVin FueediviCool- (45 - 60);Heavy Rain;Rain;Ground Wet - WorkableForeman.77ii6Extra Work 0800 to 1500LF).Roe$chline - 6Lea-5Deustrabeck - 5Wyatt- 5D246-6/1D179-4f2c665 - 6/1T304-110Cleaned up site, picked up garbage and desbrisReinstalled 3 existing vrfieel stops in the Republic drivatay and replaced one broke Wheel stop (broken during construdion)Hauled away 1 load of Traffic Control back to the yard and put awayRaised Water blomff (site of future fire hydrant) in Pozzi Planterto grade, added Traffic rated box and lid.Finish muddled 3 CB's on ihe east side of the road.Hauled off 1 load of material back to the yard and put away'Time eard: 6ab - ifiRmdfi FuesdayiCostGodesDescdptlonPrcd.Aty.Code Name5926 LEWIS, JoDl010503WAGFIER,ELZADA FLAGTCS010512DEMAI{KO, JESSICA FIAG TCS'c'- indicates a campleted item.'(R)' - indicates a rework quantity.1005.1Cleanup Cr€$,1 DAYForernan - ?TE RevJsi6h,'2' Sffi .i5015 5005 Ew{48TraifcConffi Supervie TcdffioContri Labq Flx plvffre dafm d€ctl22.5 HR 6 HR 16.588ClassFLAG TCS1000.1Slte Supervision1 DAYTotala6.5IDate:Pintedon: B/A8AA21 16:16:51Page 1I Norfirwest Gascade eonstructionJob Name: City of Kent 76th Ave S lmprov'Time eard: 6aie - oiiiEzdli FuesdayiCostCodesD,escripfionProd. CEy.Code Name1053 DEMELLO,JOEL7916WYATT,MATTHEW APPR.LABR3416DUESTERBECK, CHRI LAB-FORE6590ROESCHLEIN,JOE OPERATORH7788LEA, ROBERTOPERATOR L 3/1.5D224CRAWLER MOUNTEDD179TRACTOR LOADER BAT304c665PORTABLE ROTARY SONE TON FOREMANONE TON FOREMAI'IDaily ReportJob Code4255Foreman -?f,dO Refrsion -I Sft-l5005 EW4$TfdcCqnfrd kbor Fix PVnrs alam ddl6HR IGlassAPPR. LABRNameLEWIS, JODIWAGNER, ELZADA FLAG TCSDEMANKO, JESSICA FT.AG TCSDEMELLO, JOEL APPR. LABRVVYATT,MATTHEW APPR. LABR 2DUESTERBECK, CHRI LAB-FORE 3ROESCHLEIN, JOE OPEMTOR HLEA, ROBERTcontptetea itemi.1000.1Sile Supervision1 DAYffiil.IfriffimlPCI IABOR PAYtLsr005.'lCl€anpCrew1 DAY5015Trdccontol Supewls22.5 HR06Totals68II8/1.564160Totals6.5II6881525b56416c66610534eo*CodesDeecriflionProd. Qty.Code5926010503010512cEsqFLAG TCS7916341665907788'c'- indicates aI'{R)'- indicates a rework quantity.OPERATOR LDate:Printed on: 03/08f2021 16:16:51Page 28/1.5 Northwest Cascade ConstructionJob Name: City of Kent 76th Ave S lmprovnme Cart: oaie . oiiTf[Oii FueedaviGostGodetleecrlptionProd, Clty.Code Nama GlaesD224 CRAWLER MOUNTEDD179TRACTOR LOADER BAbrAiw s__-- -*T304c665ONETON FOREMANc666ONE TON FOREMANDaily ReportJob Code4255Foreman-fTd Rwiaion-I Shm;'t -(60.5/1.5/o)(17lOtO)Foreman -??lFPerDiem Subsistence NotesPClt-480R{001FCT I,ABOR PAYlLSTohls6460nme eard froies: 6aie - iii?itr26f{ ffueudaviTotals for LaborTotals for Equipmentf,leter.Begin EndHouns: 62Hours: 17Worked:62Worked:17Broken Out:Broken Out:Code592601050301 051 2105347916341665907788Start07:3007:3007:3007:3007:3007:3007:3OO7:30NameLEWIS,JODIWAGNER, ELZADADEMANKO, JESSICADEMELLO, JOELWYATT, MATTHEWDUESTERBECK, CHRROESCHLEIN, JOELEA, ROBERTBreak (l) Lunch Break (2) Meal(2)End14:0015:3015:3t)13:3015:3015:3015:3017:00CosiGoi"e ltoies: bab - ffiffiIi Fu"e&viCode Slot NoEs1000.1 1 See diarylnspector Note1005.1See diaryI'C;- rnoidates a compiete} itemlR/- indicates a rcwotu guantitY.2Forbman -??66'Date:Printed on: A3/08n021 16:16:51Page 3 lNo rthwest Gascade Constru ctionJob Name: Cityof KentT6thAveS lmpnrvJob Gode4255Daily ReportlnsFctorNote5fi154 Seediarylmpector Hote50r53 Seedtarylnspector t{oGEW4485 Seediarylnspector NotePCILABOR.ffiI 6 Seefdbrylr,epectorHotex .. Daie:'C - indicates a camfreted item-'(R)' - indiqtes a rewo* quufly-Prtdedon: $fr8n021 16:16:51Pa-ge 4 r* Ptulnffing+&pdc r* l*rd laaqaxr r.lfr -. Ols-l' Billing Address PROFIT CENTER 1 # 10412 John Bananola WaY East Puyallup, WA 98374 USA PO BOX 73399 PUYAILUP, WA 98373 P:253-446-8485 Fr 253-848-2399 Description of Work lnvoice 66125904 lnvoice Dale 1/12/2021 Completed Dare 1 /12/2a21 Customer PO Job profit 21441 1 #4255 Kent W Task # L-EL2R M-3/4 CARFLIX M.3/4CARFLEXSRT M-3/4ECOUP Description ELECTRICIAN (After 1st 30) 3/4 INCH CARFLEX (sold bY the foot) 3/4 CARFLEX SRAIGHT 3 14 PVC CON DUIT COUPtING Quantity 5.25 9.00 2.00 2.00 Your Price $200.00 $3.e3 $7.08 $1.19 Your Total $1,050,00 $35,37 $14.16 $2.38 5ub-Total Tax Toial Due $ 1,1 o1 .91 $o.oo $ 1,101.e1 Ealance Due $1,101,91 Please pay from this lnvoice. Terms: due 30 days from invoice date. Delinquency Charge 1% per month' AI tul 7 PLEASH '* JANE, I 1 fuBv-+'t 1/12/2021 Ac[nbwteaoement of Work/Service to be performed,ffi'ffi;ii'#;;;fitd;;1-iir:i irireUllcrnoiiias"thattheworkat214417lthAvenuesouth,KentwAe8032USAhasbeen;fip];fii;;f;;;d;n. I nave inipea6a the work ina it is complete to my satisfaction, I 1112/2021 FA Sheet No 51{>>\.-Z KENTFORCE ACCOUNT WORKED DAILY REPORT OF Item No Project Name 76th Av S lmmP rovements Description of Work.danvaultRaise creati safeaand mdairedassociated dritheusatturninrad Proj ect No: 19-3006 Prime Contractor: eas of third vehicle Dale'. 1212812Q20 Work by Subconiractor?: Sub-Contractor: LABOR OVERTIMESTRAIGHT TIME DOLLAR AMOUNToT RateHrsHRateHrsCODEOCCUPATIONNAME 418.85$83.77Ao 408.35o 81 .675Operator 320.95$64.1 I5Laborer $ $ 148.15 LABOR OVERHEAD & PROFIT @ 31% $ 1,504.08 355.93 LABORTOTAL $ SUBTOTAL. LABOR: $ STANDBYOPERATED DOLLAR AMOUNTHourly Rate EQUIPMENT OR ATTACHMENTS Equipment DescriPtionEquipment #4a1 0q$37.59F450 Foremans truck 267.70$53.545CAT 308 Excavator 313.30$62.666CAT 950G Loader $ $ SUBTOTAL - EQUIPMENT EQUIPMENT OVERHEAD & PROFIT @ 21% $ b $ EQUI PMENT TOTAL 768.95 930.43 161 .48 DOLLAR AMOUNTUnit PriceUnitsQuantity MATERIALS / SERVICES 73.44$$ 73.44LS1Tacoma Screw lnv 15559982 $ $ $ SUBTOTAL ovERHEAD&PROFIT@21% TOTAL $ $ $ 73.44 88.86 15.42 Verification of Hours Worked Date Owner's RePresentative Date 12% MARKUP prime when subcontract work) 3.37 523.37 2 $ SHEET TOTAL TOTAL: (for NORTHVYEST CASCADE, INC.NWC PROJECT#4255DESCRIPTION: Water Vault Replaced BollardIOCATION: 76tb Ave South LnproverrrentsEW#Billto: COK51WORKlaborer Gmup 3 - General labserOperatorGroup 3 - LightoT.BPGo.T.55l9$64.19$s1.67'g. -_Q!!0_6e505$408.16_ _q0.90$418.87REC 5Operator Group I - Heavy/HeavyLABOR SIJBTOTAL:2o/o SICK LEAVE:29o/o MARKUP:LABORTOTAI:s22.96$332.97$ls{H.12D239 2OI9 CATERPILLAR 308Dl79 2006JOHNDEERE 3IOSGRECRATE00LOADERSTNBYD204 2005 CATERPILI-AR 950GS€3-30$?.36s0.00EQUIPMENTSUBTOTAL: $768.952lo/o MARKUF: $161.48EQUIPMENTTOTAL $93{t.4350Mat€rialgTacoma ScrewI.ATEST REVISION 7 I I I 9 IaO2O2lo/o MARKUP:MATERIALTOTAI:$15.42TOTALstt.t6$2523.41 G-NORT HWEST CASCADE INC, 73399, PUVALLUP,wAsHrNcloN 90!73 / TOLL FRE€ 600-S2-4442 DAILY FORCE ACCOUNT SHEET EW#:WEATHER: STARiTNE: 16:e.r^::d-^,?s* OWNER:PAGE: $r i-xfxaf zn DATE: END TIME:13'" u) q) 4a) " 6 ilt"trs ll* €.ffi t drd"d d I*^{"#- E'5 13 ch.{"^.M"s",wtP V09&c\"i^?-; I-ABOR WORKER'S NAME -Wb-FKEFISECCOFATION REG TIME F-e:,e:set-ueN&{ *{*a)fr$)tr 6 6 bF.s,*&-&L i2 lK 6 -Cpeet+4ift- { L / itfr:t,tf-*4 .q {6 EOUIPMENT -EduitrMtrhl'iDESCRIPTION'r)'e*q 43 n'2-rlq.4 *n&#e#*L^ { {at"g*$*gat*x*g- *fg:**"e*4\ fi'2*w';W:LL&* ,*-r ,t, ,-8 il ,'- f t 5 .' Ig M3\4 t*"* P* {sq&Aw { Tlcar"a 4-\)-l.\ \ s {qx L{ x 6WNER REPRESENTATIVE:NWC REPRESENTATIVE: W-*Wem;q' f-e4t AhN {r*t-{6lrtf ..,.-J .Aeg JWF-Frc v Northwest Cascade GonstructionJob Name: City of Kent 76th Ave S lmprcvDaily ReportJob Gode4255and put 1 yard of topsoil into road way. Picture were taken.Shoveled topsoil out of roadr,rlay.Sweetened the driveway grade in Blue Origin center driveway now that curbs were installed. Mudded both casting in the curb line.Supported Subs: fence guys, landscapers by prwiding traffic control as requested.Extra Wortc 8am to 1Pm-Removed Ladder in vault attached to the lid (vault around 11+30)-Went to Tacoma Screw to purchase Eye Bolts because the vault lid was an odd size.-Removed lidlnstalled 2 - 1'risers using mastic-reset lid on top-skaightened PIV-Repaired 2 - 1-114' inigation lines destroyed by the truck- re installed 1 Ballard that still had an extremely large concrete base poured around it, and plumbed it up.-dug hole to replace second Ballard, but concrete will be necessary to put it back into place and will be poured when hydrant pads and valve pads are poured.-compacfed around both the water vaull and nearby hydrant.77886590791601051210534010314010503'c' - indicates a completed item-'(R)' - indicates a rewoft guantity.LEA, ROBERTOPERATOR L 811.5ROESCHLEIN, JOE OPEMTOR HWYAfi, MAfiHEW APPR. LABRDEMANKO, JESSICA FLAG TCSDEMELLO, JOEL APPR. I.ABRHANSON,JOHN APPR. LABRWAGNER, EIZADA FLAG TCS8t18t18t18/155338/1.5I8t18t18t1IDate:Printedon: O1n7nO21 0S):25:O5Page I8t1 Northwest Gascade ConstructionJob Name: Clty of Kent 76th Are S lmprovDaily ReportJob Code4255D224D20/.c66sCRAWLER MOUNTEDARTICUI-ATED WHEELONE TON FOREMAN555555Totals for LaborTotals for EquipmentHours: 61.5Houns: 15Worked:61.5Worked:15Broken Out:Broken Out:(56/5.5r0)(15O/0)Code7788659079160r051210534010314010503NameLEA, ROBERTROESCHLEIN, JOEWYATT, MATTHEWDEMANKO, JESSICADEMELLO, JOELHANSON, JOHNWAGNER, ELZADABegin EndStart07:0007:3007:3007:3007:3007:3007:30Break (l) Lunch Bre,ak (2) Meal (2)End Diem Subsistence Notes16:3015:3015:3016:3016:3016:30f 6:301000.150051 See Diarylnspector Note3 See Diarylnspector Note'c'- indicabs a compbted item-lR)' - indicates a rcwotk quantity.Date:Pinted on: O1n7nA21 09:25:OSPage 2 Northwest Cascade GonstructionJob Name: Gity of Kent 76th Ave S lmprovDaily ReportiJob Code425550152 See Diarylnspector NoteEW-0334 See Diarylnspector NotePC1LABOR-0OO1 5 See Diarylnspector Note'c'-a completed item.'(R)'- indicates a rewoft quantity.Date:Pinted on: O1n7nA21 A9:25:05Page 3 Tacoma Screw Productso Inc.lnvoice slfl(c l9l(t REMIT TO lQtomQscrcht eom Screw Products, lnc Attn: Accdunts Receivable P,O. Box 35165 Ssattle. WA 98.124-5165 U.S'A' I iltill llill lllll f,lll llill llll lll llll I lllilil ffi llil lllll lllll lffi lllil llll llll llll BILL TO I ostgos NORTHWEST CASCADE INC ATTN ACCOUNTS PAYABLE PO BOX 73399 PUYALLUP, WA 98373-0399 -l-l SHIP TO | ruontuwesr cAScADE lNc ATTN ACCOUNTS PAYABLE PUYALLUP, WA S8373-0399 TNVO|CE # 15559982 LOCATION KENT DATE 12128120 PAGE 10F1faslenem . Tools ' Maintenance & Shop Supplies ORDER KEOsl 549 ORDER DATE 12128t20 ORIGINAL OUOTE CUSTOMEff PiO NUMBER 4255 PAYMENT TERMS 1o/o IOTH, NET 30 DAYS WRITTEN BY RSP SALES REP H CUST RELSASE#JOB NUMBER SHIP VIA CUSTOMEH PICK.UP o 18.3601 EA F 73.4444160-108-1 FORGED STL MACHINERY EYE BOLT 718" x 2-114" PLAIN 146A2 Thank you tor your order, be any questions, or if we MERCHANDISE TOTAL Please note thst all sales are subject to Tacoma Scr€w Products, lnc.'s Terms of Sale and Conditions of Sal€' lf there should can be of further service, please call (253) 5 INVOICE TOTALDEPOSITDEPOSIT AMOUNTFREIGHTTAXMISC CHARGEHANDLING o.ooo.ooo.00o.oo0.00o.oo \r*?5.tt(-PICK-UP SIGNATURE: ROBERT LEA 73.44 72-3444 or (8OOl 562-8192' We appreci ate and value Your continued business FA Sheet No 5? DAILY REPORT OF FORGE ACCOUNT WORKED ./A*\-/ I<ENT Project Nam e: 76th Av S lmprovments Project No: 19-3006 Item No.: Description of Work: Prime Contractor: Date Removed ladder and installed new full AS rt of third vehicle and a safe turni radius at the d NW Cascade Work by Subcontractor?: Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR AMOUNT CODE OCCUPATION Hrs Rate Hrs OT Rate NAI\4E operator heavy-heavY 2 83.77 167.54$ operator light 2 81.67 o 163.34 laborer 2 64.1 I $128.38 $ $ SUBTOTAL - LABOR: $459.26 LABOR OVERHEAD & PROFIT @ 31% $142.37 LABORTOTAL $601.63 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR AMOUNT Equipment #Equipment DescriPtion rs Hourly Rate F450 foremans truck 2 37.50 $75.00 $ $ $ $ SUBTOTAL - EQUIPMENT $75.00 EQUIPMENT OVERHEAD & PROFIT @ 21% EQUIPMENT TOTAL $15.7 5 $90.75 QuantitY Units LJnit Price DOLLAR AMOUNT MATERIALS / SERVICES a Screw lnv 15560094Tacom 1 LS s oJ., I 63.71$ Oldcastle 1/2 rotohammer bit 1 LS $ 315.95 $315.95 I LS $ 8.20 $8.20 $s2.00 1 $ 92.00 $ SUBTOTAL OVERHEAD&PROFIT@21% TOTAL $475.86 $100.77 $580.63 TOTAL: $I 73.01 Verification of Hours Worked (for12% MARKUP prime when subcontract work) SHEET TOTAL: $1 273.01 Contraclor's Date Owner's RePresenlative m Date NORTHWESTCASCADq rNC.NWC PROJECT #42J5DESCRIPTION: Pumped outwaterr.auft installed new LadderLOCATtrON: 76th Ave South ImprovementsBillto: COKEW# 52Laborer Gmup 3 - General IaborerOperatorGmup 3 - LightOperator Group I - Heavy/Heavym39 2019CATER"III.AR 308D179 2006 JOHNDEERE 31OSGD2O4 2OO5 CATERPILLAR 95OGc665 2015 FORDF450o.T.REC--_-z -. -ora.REG 2S1NBY0$1 12-82$0.00LABORSIJBTOTAL: $459.2?2Vo SICKLEAVE: $9.1929% MARKUP: Sl33.l9LABORTOTAL: S60r.650MOUNTEDLOADERTRUCK220STNBYl8$?.36$0.00EQUIPMENTS{JBTOTAL: $230.452to/o MARKUP: $48.40EQUIPMENTTOTAL:$278.86TacomaAnchors12" Rotohammcr Bit$8.20nolbdfdonseal 10 '- 10- $10.00 - $l00.0iioracan"rraaa.i -_ r -- - -T- Srij.ij- $ljss5MATERIALSUBTOTAL: $487.862lsh MARKUP: $102.45MATERIALTOTAL: 559031LATEST REVISION I V I 9 NOZOTOTAL$1{?0.E2 il G-NOR THWEST CASCADE INC. POS] OFFICE BOX 73399, PUYALLUP,WASHTNGTON 98373 /r TOLL FPEE 800-56?-4442 DAILY FORCE ACCOUNT SHEET #:60#PAGE:OF $:3e>.Sts ,,^, tft-!'Lb*fut$\€ft- lzs I s***1 : '3e & LABOR -woRRERlsoc.UPATION REG TIME TIME & A HALF DOUBLE TIME 4$e f>?G€.errq)&. { S /')t6 { 4 6 { L*/n @ms""{a.){su 2*d { FoIiIpMENT ffi:"dlt+&*ka L6&€S*ede{-€, ^!/"/ -'4-\ 4 2.44 {'l {} , 14',? -'" {n ,lv r?. T"/lX4 .. l$')*s/"t--)-r b4 % ttr& ffi@% {ne*a s ed*(f2 {?x,nn ?* NJU&,u*,'4t&e{)lrlt4# tF V-orc $t a' h\ba^t NWC REPRESENTATIVE: €'*w*r Wn" WE(V Vrf#r\r-.--r,l * ,,Lon 9(9 Jdq P *v *) Northwest Gascade ConstructionJob Name: City of Kent 76th Ave S lmprovDaily Reportrfrary: Eab - itrItrId'to ffueodayiCold-(32-45);Overcast;Ground Wet - WorkablePicked Up 8'galvanized vault ladder and mounting brackets from Oldcastle in Auburn: Ticket #SP213409Picked up 1/2" anchor bolts and 1/2" rotohammer bit from Tacoma Screw in Kent Order# KE051681Extra Work 7:30 to 9:30. ( 2 Hours)-Pumped out water vault-Cut out and removed old 6'vault ladder-Cut and trimmed new ladder to fit-rotohammered new anchors and installed new ladder.-lnstalled new plastic water rneter box to replace box destroyed by truckMatthewWyattJoe RoeschlineRobert LeaD20/.c665Raised existing Manhole to linish grade in Blue Origin center driveway at 19+70Graded 571 Sq Yards of roadway HMA section, to correcl work done by AES as part of a separate project. (North west HMA ramp)Sent Wyatt around with backhoe to clean iob site of garbage and debris'fime eard: Date - if,z5lfr'6 (TueedayiCoBtCod€sDeecrlpdonProd. Qty.Code ilame7788 LEA, ROBERTClasgOPERATOR LROESCHLEIN,JOE OPERATORHWYATT,MATTHEW APPR.LABRDEMANKO,JESSICA FLAGTCSDEMELLO, JOEL APPR. LABR5015T.fifFcConM Supewb25 HR808/.5Job Code4255Friremaii.ffiffiForemin-??6 Rsvlslbn-0 $fin-tEW.{t33 PCll,ABOR.(xlOrBhnkEdrawork.Wdl8 PCI IJqBOR PAY1t-s 1LS22t0(n.1Eite Supervlsbn1 DAY8t2.55005Trafice,onbol lsbor8.5 HR6590791601051210534'c'- indicates a2Totalr812.5I88'(R)'- indicates a rework quantity.Date:Printed on: 02/11f2021 10:41:034Page I8/0.5 N orthwest Cascade Constru ctionJob Name: City of Kent 76th Ave S lmprov'Time eard: Daie - iffiF61d (?ueedayiGostCodsstleecrlptionProd. Qty.CodeDaily ReportJob Code4255' Frireman-ff6'0-Rivieion -6 Shift -rEW{XB PCil.ABOR4mlBlank Edra Wolk - Wiite PCi IABOR PAYlLS lLS1000.1Sib Ssper$Bion1 OAY5015TrffcGanhd Superu's25 HR5005TrdfficCanbd l€bor8.5 HRD224D204c6655926010503or-az-Name ClassCRAWLER MOUNTEDARTICULATED WHEELONE TON FOREMANLEWIS,JODIFLAG TCSWAGNER,ELZADA FLAGTCSARTICULATED FRAMESINGLE DRUM VIBRATTRACTOR LOADER BANamELEA, ROBERTROESCHLEIN,JOE OPERATORH 4WYATT,MATTHEW APPR.LABRDEMANKO, JESSICA FLAG TCSDEMELLO, JOELAPPR. LABRCMWLER MOUNTEDARTICULATED WHEELONE TON FOREMANLEWIS, JODIFLAG TCSWAGNER,ELZADA FLAGTCS8/.58/.5{ffi6.t - I6sIFineG.a&lsconcr€ta CleanupcrB,U571 SY 1 DAY222Totals2228/0.58/0.5412Totals812.5III8/0.52228/0.5M194D1796oei6odegtlescriptionProd. Glty.Code77886590zsl-6ClasBOPERATOR L01051210534D224D204c6655926010503'c'- indicates a completed item-'(R)'- indicates a rcwotu quantity.2Date:Printed on: AAfin021 10:41:03Page 28/0.5 )Northwest Cascade ConetructionJob Name: City of Kent 76th Ave S lmprovJobCde4255Daily ReportD182M19+D179ARTICUIATED FRAMESINGLE DRUM VIBRATLOADER BA44122Totals for l-aborTotals for EquipmentHours: 60Houns: 13llllorked:60Wodcd:13Broken Out:Broken Out:(56/4n)(13/0/0)Code7788659079160105121053r592601m3NameLEA, ROBERTROESCHLEIN, JOEVVYAfi,MATTHEWDEMANKO, JESSICADEMELLO, JOELLEWIS,JODIWAGNER, ELZADABegin EndStart06:@07:3007:3()07:3007:3007:3007:30Break {1) Lunch Brcak (2} lleal (2)End Diem Subsistence Notes16:3015:3015:3015:3016:S16:tX)16;001000.11005.1Y1 See DiarylnspectorNob7 See Diarylnspeotor Note'c'-acompleted item.TR)'- idicates a rewa*.guanftY.Date:Printed an: W1nA21 fi:41:03Pagp 3 Northwest Cascade Constructio nJob Name: City of Kent 76th Ave S lmprovDaily ReportJJob Code42551096.16 Seed'rarylnspector Note50053 See DiarylnspectorNote50152 See Diarylnspector NoteEW{334 See Diarylnspector NotePCIIABOR-0@I 5 See Diarylnspector Note'c'-indicatesaitem.'(R)'-indicates a rcwo* quanti$.Date:Mntedut: 0A11n021 10:41:03Page 4 Taeoma Screw Products, fnc.lnvoice Slilc{, l9l(' REMIT TO ldc0moscfew.com Tacoma Scraw Products, lnc. Attn: A.ccounts R€ceivable P.O. Box 35165 s€attle, wA 98124-5165 U.S.A. r ilrfi illlllll llill ilill llil lil llll r ililil| lilr illl illl lllll lill lllll lill lil llll EILL TOrI o91805 NORTHWEST CASCADE INC ATTN ACCOUNTS PAYABLE PO BOX 73399 PUYALLUP, WA 98373-0399 _l-l SHIP TOrI NoRTHWEST CASCADE INC ATTN RECEIVING 162c7 SOUTH MENIDIAN PUYALLUP, WA 98371 109.3887 C F 54,69041-309-1 STEEL WEDGE ANCHORS 1/2" x3'3/4" 74225D1 tNvotcE # 15560094 LOCATION KENT DATE 1?t29120 PAGE 10F1Fasteners ' Tools ' Maintenatrce & Shop SuPplies ORDER NUMBER KEO51 68 1 ORDEF DATE 12t29120 ORIGINAL OUOTE CUSTOMER P/O NUMBER 4255 PAYMENT TEFMS 17o IOTH, NET 30 DAYS WRITTEN BY RAB SALES RFP AL CUST RELEASE#JOB NUMBER SHIP VIA WILL CALL KENT o 8.1956 EA 8.20 333-008 BOSCH HC2081 SDS-PLUS BIT 1/2' X €' K€f,a6q7 Thank you for your order'Please note that all sales are subject to Tacoma Screw Products, lnc''s Terms of Sale and Conditions of Sale' lf thsr€ should be uestions, or if we MERCHANDISE L INVOICE TOTATDEPOSITDEPOSIT AMOUNTFREIGHTTAXMISC CHARGEHANDLING o.ooo.ooo.oo0.82o.o00.00 PICK-UP SIGNATURE: boh 62.89 can be of further service, please call (263)572-3444 or (8OO) 562-8192. We and value r continued businees, sOtd FUe lnfrastructurd\:1ACnilcol|PANYwrtr oldcasfr€irgra*ucGts.co$r2808 A ST SE AUBURN, WA 98002 7501 Phone .: 251839-3500 Fax . . . . : 253-73U201Sold To : Norttwest Cascade, lnc.PO BOX 73399PUYALLUP,WA 983730399Packing slipBill of LadingContachSales Person: Kai JohnsonShip To: NW Cascade-76th ave S Kent21441 76th ave SStaging area, not PozziyardKENT, WA 98030 4928County: KINGSite: AuburnPhone:Reference :Customer PO4255Mode of DeliveryWillCallDelivery termsFOB Job SiteCustomer No000206Order No.s177008Terms of PaymentNet 30 DaysDate12t29t2020Packing Slip No.sP213409-.. Atv KitaSI UnitItem1.00 Kit 32000401.00 Ea 2291O8O2.00 Ea 2291000Total Freight in lbs.: 0.00Special No.Description8'Ladderwl 8" Standoffs8'Bolt-On Ladder8" Ladder Stand-off (Pair)nsnsnsGroup . . .Mark A$ Unit Weight1.00 Kit 0.001.00 Ea 54.312.00 Ea 3.98Shipping instructions: Paddy worthington 253 405 6891 call firstfteyand&fresned,attorneydrenibetr{€ssrroonablewdiliorr,inddtstggoodacc0snt$Jntsduedilallonco$edlonc[lllrcassssedbesi0twillcfrargesassociatedrndaiallisted on ftb Blll d kd*rg ha6 besn received in gcod coodition and'*ill bethr "St$ io" addt$s specified, urks otherwisa noted.toDated:IlrivcrLe{tJob SitesA$eestc lnvoice:0ktoAiliv€d atJob Site:LeftPlantLoadVsined:lnternal Usefic*hfta$nrcturd sOil Filc lnfrastructurdACNfiCOMPAI{Ytwh.olfu silleirffi rchneiom2808 A ST SE AUBURN, WA 98002 7501 Phone .: 253-839-3500 Fax ....: 253-7354201Sold To : Northwest Cascade, lnc.PO BOX 73399PUYALLUP, WA 983730399t i:1Packing slipBill of LadingGontact:Sales Person: Kai JohnsonPhoneReferenceShip To: NW Cascade-76th ave S Kent21441 76th ave SStaging area, not PoaiyardKENT. WA 98030 4928County: KINGSite: AubumGustomer PO4255Mode of DeliveryWillCallDeliverytermsFOB Job SiteCustomer No000206Order No.s177008Terms of PaymentNet 30 DaysDate12t29t2020Packing Slip No.sP213410arY _ {i!,9ry unitItemSpecial No-10.00 Ea 5130015 nsTotal Freight in lbs.: 0.00Shipping instructions: Paddy worthington 253 405 6891 call firstDescriotiohROLLS of Conseal 1" x 14.5 (CS-102)(8 Rolls/ctn)9joJp -MasticMar*Aty Unit Weight10.00 Ea 0.00Drivor Adurorledgrunt The piodu€t firbd on lhls Bill d Ladiqg haB been received h gmd condilion and wili bE delivered t<rlhe .Ship to" addess spec$fied, urrless o&reruise noted.llivsShnd: {PrHlDatod: -Curfufirr Agptr: Thd afl rt#r*d r€cdrred on thb paddrrg $fip ie !! good oondittm, triessr o*nm,ke nst€d, and try winindemrsi sdler for all costs assorinbd wifir tre coledion of this purc*rce iduding reconatb attomey k &finance cflarges. (Finanee ciarBes wflf be assessdon allpa$dae accourts-,}Rocafuod bY{skn}:lPrintlDatad: __--sib:LefiAgre6to lnvoice:CIN< iofurir/ed atJob $ite:LoadVeri$ed:lnternal UseOHc*k{rastucfi.:rc-U,l-Rlg18 t Oldcastle lnfrastructu re" A CRI{ COMPANY Telephone: 253-839-3500 INVOICE Page 1 of 1 Remlt to: Oldcastle lnfrastructure P.O. Box 742387 Los Angeles, CA 90074-2387 Tax exempt number: A17 4189 '19 Site: Aubum PO Box 688 Aubum, WA 98071 253-73fu'4W GA[, ['""." : JAN 0 6 2021 Fax..........: SOLDTO: 8681 I A80.419 E0070x 1011707032618223S2P7938271 0001:0001 l'1ll'lllhrhl,ll1h,,ll,;llllhlllllllllsll/111rlllllltl111s1 NORTHWE$T CA$CADE, INC. PO BOX 73399 PUYALLUP WA 98373.0399 SHIP TO; ffi NW Cascade-76th ave S Kent 21441 76th ave S Staging area, not Pozzi yard KENT, WA 98030 4928 l./Delivery Torms FOB Job Site Modo of Dellvery - Will Call 'ord6r-.No, s'177008 I 4255 Dat9 1U29t2020 Customsr-No. 010000206 .lnvolc€-No, 010244439 Packlng slip(r) .-.: SP213409,SPz13410 Oty Unlt Item Descrlptlon 1.00 Kit Group: MASTIC QtY Unlt 10,00 Ea 3200040 liem I'Ladderw/ 8" Standoffs Descrlption ROLLS ofConseal 1" x 14.5'(CS-102) Rolls/ctn) Mark Mark Unit Price Amount 315.95 Amount 100.00 315.95 Unlt Prlce 10.0051 3001 5 ,L 0]i TOTAL AMOUNT DUE BY: Oll28l21 US 415.95 The Cuslm€r Agre€g 1. THAT THE ASOVE TOTAL lS PAST DUE lF NOT PAIO WTIIN 30 DAYS OF OATE OF Ttlls INVOICEi: iii ihv;inNANcd aHARitd bF i E* pEn Morlrn t18.o4PER ANNUM) oN ANY PAsr D-uEA!,ouNr. 3. io FAV Colr.ecirorq cbSfsJi{cltjbiNA.NiqsciNneLE AnonNEY FEES, AFTER DEFAULT BY THE CUSTOMER tX]01:0001 FA Sheet No. DAILY REPORT OF FORCE ACCOUNT WORKED a safe turn radius at the Prime Contracto r. Northwest Cascade rant ir as of third Project No:19-300676th Av S lmProvements vehicle d and Project Name: Item No.: Description of Work: Work by Subcontractor?: Sub-Contractor: Dale: 121302A24 LABOR OVERTIMESTRAIGHT TIME DOLLAR AMOUNTHrsOT RateHourly RateHrsOCCUPATIONCODENAME 251.31$83.77 245.O181.67ht 192.57$64.1 9neral Laborer $ $ LABOR OVERHEAD & PROFIT @ 31% $ 688.89 902.45 213,56 LABORTOTAL $ SUBTOTAL - LABOR: $ EQUIPMENT STANDBYOPERATED DOLLAR AMOUNTndbyRate EQUIPMENT OR ATTACHMENTS Equipment DescriPtionEquipment # 112.7737.59JF450 foreman truck bz.bo$62.66195OG SE $ $ $ EQUIPMENT OVERHEAD & PROFIT @ 21% EQUIPMENT TOTAL $ $ o 175.43 212.27 36.84 SUBTOTAL - EQUIPMENT DOLLAR AMOUNTUnitsUnit PriceQuantitY MATERIALS / SERVICES 333.33$$ 333.33LS1HDFowler - lnv 15670203 $ $ $ $ SUBTOTAL ovERHEAD&PROFlr@21% TOTAL $ $ $ JJJ. JJ 403.33 70.00 Verification of Hours Worked DateContractor's DateOwner's 12% MARKUP prime when subcontract work) I ,518.05TOTAL (for $ 1 518.05SHEET TOTAL: $ NORTEWEST CASCADE, INC.NWC PROJECT #4255DESCRIPTION: RepatuFireHydnntTOCATION: 76th Ave South Inprovem€ntsBillto: COKEW# 53WORKtu30f20203Iaborer Gron 3 ; -fenml IaborerOperatorGrorp3-LightOperator Group I - Heavy4leavyD204 2005CATEMILI,,AR 95OG SEDl79 2006 JOHNDEEp.E 310SGo:.I'..-- .---REc.... f -" .o.T.REG 3o.T.REGLOADERSTNBY 31919 $0-00 __$192.s7.-***s21s.0200 $il2.82$l$83.77I,,ABOR SIJBTOTAL:2O/O SICK LEAVE:29Vo MARKIJP:I.,ABORTOTAL:14-44$0.00s2s1.32$0.00$688.91$r3.78$r99.78$902.4730.98C7O7 2OO7 KENWORTII TSOOB TOCYDUMPTRKD24O 2O2O DEERE772GPELEVATINGM317 N/ACATCB24Bc665 2015 FORDF450FOREMANTRUCKD239 2A19 CATERPILLAR 308CRAWLERMO1JNTED$61,1?_$9.35$0.00$28.05 - - --STNBY 303t$37.59$0.00$r12.77REGREG 3STNBY3 _._ -_3STNBY 0 $7.36 $0.00s53.54$r60.620 ""__ ....._$1+.98 _-___ $0.00 _EQUIPMENTSIJBTOTAL; $632.69zlyoMARKUF: $132.86EQUIPMENTTOTAL:$76s.55L"ATEST REVTSION 1 7 I I 9 DOzO21o/oSUBTOTALMARKUP:MATERI,ALTOTAL:$333.33$70.00TOTALs40333$20?135 /h^, NORTHWEST CASCADE INQ-- t>u" rost orrrc,'i,a";soe.TuvrLLiii'"wiisfiGioH ci;;;;t;tr'.;;;6 slt€'62'atA DAILY ACCOUNT SHEET #:PAGE:i)#s#4-7 t)f4 */sden !,'t + & D tii L, I.ABOR WORKER'S MME ATIr)N *W4"ey"$9" - F-{ J-"t )3 {rt fr $ffi U e ,b fr FOUIPMENT '& Lffio W*% x@Yp j McAtY MtaW 4 "9 {h-Lq\"s Q*re"l:t*-I\ rW1 1 *tr il -( Vl I s 4\ .rfa ct >C MATFRIAI S OR SERVICES VENDOR & INVOICE # {"i""*t s We*,x\3 #We,{ {-e.& 4r L \i u5 fi fr &r,'^.e/ilt[, hr,'UL(fr 5-.-,t Daily Report6iary: 6ab - {F5"dmA SietinesdaiiCool- (45 - 60);Rain;Heavy Rain;Ground Wet -WorkableFdremin -7f66ExtraWork-3hoursRepaired Fire hydrant around 1 1 +30 with Clow repair kit from HD Forv,ler. Removed 50SQ FT of sidewalk (1 8+28 to 18+38) Reset 2 water vahes in the sidewalk panel to finish grade-Sawcut 10 LF of sidewalk and r,nall. Raised traffic bearing water box lo grade that was ran over by truck. Backfilled 10LF of electrical trench wilh 1-1/4 crushRceschline - 3Wyatt - 3Lea-3D239 - 3D204 - 3c665 - 3Swept and cleaned entire roadway surface using street sweeper, shovels and brooms. Moved all traffic control devices and coordinated trafc stops to allow the whole street to becleaned.Supported subs: Castinada continued to topscil the planters with their cad truck.Northwest Cascade ConstructionJob l{ame: Gity of Kent 76th Ave S lmprov'fime eard': 6ab - {136ffi0 FedhesdayiCostGodesDencrlptionProd. Q$.Gode Narne7788 LEA, ROBERT6s90ROESCHLEIN,JOE OPERATCIRH7916WYATT, MAfiHEW APPR. LABR010512DEIvIANKO, JESSICAFLAG TCS10534DEMELLO, JOEL APPR. LABRD224CRAWLER MOUNTED*.ARTAULATED WHEELD204c665ONE TON FOREMANI8Job Code4255Foreman ;TiEA Rivielon -6 Shift -iEw.fit3 1375BhnkE*rawbrll-wib Sbe€tCleanlngI LS 4.5 HR34.5ClassOPERATOR Lt000.1Sile Supenidon1 DAY8/1.55015TraficConbol Superds24 HR6005Tfiatfccontd l€bor16 HRTotals8/1.57.57.58I54.533'(R)'- indicates a reonrk quantitY.Date:Printedon: OA11nO21 1a:44:04Page 13 N orthwest Cascade ConstructionJob Name: Gity of Kent 76th Ave S lmprovTimeeard: 6ab-{rymifo} ffiedn}s&tiCoEtGodeeDescdpfonPtod. Qty.Code Nams5926 LEWIS, JODID182ARTICULATED FRAMEM194SINGLE DRUM VIBRATD179TRACTOR LOADER BA010503WAGNER, EIZADA FLAG TCS010314HANSON, JOHNAPPR. LABRM316}WHEEL SWEEPERTDaily ReportJob Gode4255-7?6t Rivision-6 ghffi-i13766005TraficCarnrd tabq{6 HRForcmanETSO331rxto.1SiesuperUstn1 DAY5015TrafhCqlbd supetvb24 HRBlanl(ExfaWm-Wdb $fe€tCleaningI LS 4.5 HR4.5(63/1.s/0)(13.5/0/0)ClaseFLAG TCSTotals for LaborTotals for EquipmentBegin End88TotalsI00084.588Hours: 64.5Hours: 13.5Worked:64.5Worked:13.5Broken Out:Broken Out:Time 6ard iloieb: 6aie . iilf,dn0m ffledneiridvi -tlleterBreak {l} Lunch Break (2) Meal (2)Foreman -7?EiiPerDiem Subsistence NotesCode778865907316010512105345926010503010314NameLEA, ROBERTROESCHLEIN, JOEWYATT, MATTHEWDEMANKO, JESSICADEMELLO, JOELLEWIS,JODIWAGNER, ELZADAHANSON, JOHNStart06:0007:3007:3007:3007:3007:3007:3007:30End15:3015:001S:fi)15:3015:3015:3015:3015:30'i - indicates a completed item.'(R)'- indicates a rewok quantitYDate:Printed on: OA11nO21 10:44:04Page 2 )Job Code4255Northwest Gascade ConstructionJob Name: City of Kent 76th Ave S lmprovDaily Report10m.1137550055015Bi\t-033I See diarylmpeetor Note5 See diarylnspector Note3 SeediarylnspectorNote2 Seediarylnspector Note4 See diarylnspector NoteE{ffidsaW'(R)'- indicates a rcwo* quanffiY.Date:tuintedon: 0A112021 10:44:04Page 3 H.D. FOWLER eorpora{e Sffie* 3633 136th Pl SE, Ste 100, Bellevue, WA 98006 P0 Box 160, Bellevue, WA 98009-0160 Phone 425-654-8800 . Fax 425-641-8885 Pacific Branch 1417 Thomton Ave SW Pacific, WA 98047 (253) S63-8600 Fax (253) 863-8681 Page I of 1 COMPANY Seattle, WA 98124P0 Box 84368, 15670243Packing Slip 1417 Thornton Ave SW Pacific WA 98047 to: Michael Owens12t2W2Ao6899246 NORTHWEST CASCADE PO BOX 73399 PUYALLUP WA 98373'0399 (2531848-2371 o #,4;255 76TH AVE SOUTHWILL CALLFoB: H. D. FOWLER Aty OtY $hip'd BO'd Part# UoM Description Extended T Price X Line Unit Price 333,33 333.33 NS-72875-1 R1620653 SFTY FLG RK 5 1/4 MED, TMFFIC REPAIR KIT FOR CLOW MED HYDRANT Sub total Freight Tax Grand Total Serving the Paeific !{stthlir€st sin{€ 191 'l www.hdfowler"conr BOB - CRUBSIDE FA Sheet No />.>\--l I<E,NTFORCE ACCOUNT WORKED DAILY REPORT OF a safe 76th Av S lmProvem ents broken water setter due to the truck crossin Part of turni radius at the dri Prime Contractor: No rthwest Cascade Proj ect No: 19-3006 Date: 412 and 512021 e Project Name: Item No.: Description of Work: Work by Subcontractor?: Sub-Contractor: OVERTIMESTRAIGHT TIME DOLLAR AMOUNTHrsOT RateHourly RateHrsCODEOCCUPATIONNAME 192.57$64.19Jlaborer 128.38$2 64.19operator 90.01$90.011foreman $ $ LABOR OVERHEAD & PROFIT @ 31% LABOR TOTAL 410.96 538.36 127.40$ SUBTOTAL - LABOR: $ EQUIPMENT STANDBYOPERATED DOLLAR AMOUNTRateHou EQUIPMENT OR ATTACHMENTS Equipment DescriPtionEquipment #a $ $ $ $ SUBTOTAL - EQUIPMENT EQUIPMENT OVERHEAD & PROFIT @ 21% EQUIPMENT TOTAL a $ $ DOLLAR AMOUNTUniisUnit PriceQuantityMATERIALS / SERVICES AE 1$$ 1,341.45LSIHD Fowler - lnu 15737272 $ $ $ SUBTOTAL OVERHEAD&PROFIT@21% TOTAL a $ $ 341.45 1,623.15 281.70 Verification of Hours Worked DateConlractor's Owner's RePresenlalive Date 12% MARKUP prime when subcontract work) 2,161.51 161.51 $ TOTAL: (for SHEET TOTAL: $ NORTTTWEST CASCADE, INC. NWC PROJBST #4255 DESCRIPTION: Hild Dig Aroud watet Meter uf Setttr to t€plaoe later LOCATION: 76ih Avo Souih Inprcveocnts Laborer Gtorry 3 - Gcnral laborer BIU to: EW# coK 59 SICKLEAVE: $8.22 MARKUP: Sl19.18 LABORTOTAL: o.T. REG o.T. tFoftm 29o 29o/o $538.35 2t%MARKI,P: S0.00 EQIJIPIv{ENT TOTAL:$0,00 MATERTAL 31341 .45 zto/e MARKUP: 3281.?0 MATBRIAL TOTAI:$t623.rs t2vo MARKIJP: $0'00 STJBCONTRACTOR TOTAL: 't(JlAr 90.00 $2161.50LATEST R.EVISION O9 B I NOI I NORTHW T CASCADE INC. POSI OFFICE BOX 73399, PUVALLUP. WASHINGION 9E373 / TOLI- FREE 800. 2-u42 DAILY FORCE ACCOUNT SHEET if)UIPMENT EOUIPMENT NUMBER G- #:PAGE: t"h ry- J- )t s {. +d{' * LABOR WORKER'S NAME -W6HREREme0"PAf toN l"\a_*.1, *,..i t"i \r. il A r,n e* - dr* i,- ,{-T-f . r If\r'ilf Iu-It,1* ---TI Sa$$ ta; t t NORTHWEST CASCADE INC. POSI OFFTC€ 80x 73399, PUYA|IUP,loLL FREE 800-562-{442 DAILY FORCE ACCOUNT SHEET IIPMFNT EOUIPMENT NUMBER fii"FfiffiDE5eFiPrdtr- eq4ut *,r^ '|0" I Sr*.ck @* #:OWNER:PAGE: +t\L 4*s*t t -}{l L?' LABOR WORKER'S OCCUPATION RFG TIME TIME & A HALF DOUBLE TIME lE- ? f 6d {rt -f *, *i ^^n I Sr' f" ^ ll.r"rtol1 Arro fl', l- h I )Northupst Gascade GonstructionJob Nanre: Gig of lGnt 76*r Arre S lmprovJob Code4255Daily ReportXTRAGlean GB's, install ladders, and regrout CB's per punch list**"Note lndex Notes*KIRAI -E:dra Work / Force Account- Hand drg arcund broken water meter for swap out on Monday2laborers 2 hours01ffi677916c594010314HILL, JEFFREY OPER.FORE 8WYATT,MATTHEW APPR,LABR 6ONETON FOREMANIHANSON, JOHN APPR.I.ABR 6Totals fior LaborTotals for Equipnent288II2Hours: 24Hours: IWorked:24Worled:8BrokenBrckenOutOut (8/0/0)Code0106677916010314NameHILL, JEFFREYWYATT,MATTHEWHANSON, JOHNBegin EndStart07:0007:0007f0Brcak(1!Lunch Break(2)12:0S12:3012:0O'12:3012:0&12:30End Diem Subsistence Notes15;3015:3015:30Itleal {2)a'(R)'- indicates a rewokquantity.Dete:Printedon: Untr2021 11:01:19Page I )Northwest Gascade ConstructionJob Narne: Crty of Kent 76th Ave S lmprovJob Gode4255Daily Report1005.1Eln/-038E - idicates a completed item.'(R)'- indicates a rewo* quadity.1lnspectorNoteRegrout CB's install ladders and dean out CB's per punch list2lnspectorNobHand dig around broken uater meterMe:Printedon: U/06'2421 11:01:19Page 2 Northwest Cascade ConstructionJob Name: City of Kent 76th Ave S lmpovJobG*4255Daily ReportXTRAPaint airvac eandycaneFtxWzi padcing lotReplace meter setterFh storks on hyd.*Note lndex Ndes*"IXIRAI -Extra Work I Force Account- Replace meter setter d address 21840 2" seMceJeff hill t hourJohn Hansn t hrurlton tooltruck t hour010667010314c594HILL, JEFFREYOPER.FORE 9.5HANSON,APPR.LABR 4ONETON FOREMANoETotals forlaborT@lsforEquipment1110.5510.5Hours: 15.5Hours: 10.5Worked:15.5Worted:10.5Broken OuhBroken Out:(15.5/0e)(10.5/0/r))Go&010667010314c594NameHILL, JEFFRFTHANSON,JOHNONETON FOREMANBegh EndStart07:607:0007:$))Arcak{{) Lunch Break (2} Meal (2}1200-12:3012:0O12:306.5@000End Diem SubsiEtence Nobe18:0012:3018:00E{ffi6;@dEm.*TR)'- indieates a rewo* quantity.Date:Prirrtedon: 04n0n021 11:(N:09Page 1 Northwest Gascade ConstructionJob Name: City of Kent 76th Ave S lmprov1005.1EW{43'c'- indicates a1lnspector NotePaint air vac candy caneReplace meter sefrerFix pozi parking lotFix storks on hydTwo loads recycle tickets 721ffi8ft21502 35.38 ton2lnspector NoteReplace meter setter at address 28140 2" serviceOne ton t hourJefi hill t hourJohn Hanson thourDaily ReportJob Code4255lR)'- indicates a rewo* quantity.Date:Printedon: O/U06/2021 11:@:09Page 2 4t8t2021 H.D. Fowler Company Proof-of-Delivery corporate office 3633 136th Pl SE, Ste .l00, 8€llsvu€' WA 38006 PO Box 1€0. 8€llevue, WA 98009-0'160 Phone 425-654'8800 ' Fax 42S41-8885 COPY ffi I --1 1@JH.D. FoH*hF# neMlT: po Box 84368. Ssettla, atA 981?4 3il*'"n 1sr37272 Page 1 of I IN.HOUSE PAWH # 143940 1417 Thornton Av€ Pacilic WA 98047 to: Ben Pimentelo6960s2904t05r21 NORTHWEST CASCADE PO BOX 73399 PUYALLUP WA 98373-0399 (253) 848-2371 #4255 76TH AVE SOUTHWILL CALLFoB: H. D, FOWLER Fart # Uottl Dosctiption Unlt Prics Extended T Price Xaryatv Line ShlCd BO'd 1,341.45 1,341.45 FOVBH7615NL VBI.f76.1 S1 1-66-NL 1.1/2" ANGLE BALL VALVE X ANGLE CHECK VALVE FIP IN AND OUT LESS BYPASS METER SETTER 15" HIGH NO-LEAD FORD RECEIVED BY SIGNATURE: servlng the Pacitlc Notthwett since 1 91 1 ioshPRINTED NAME: Sub total Freight Tax Grand Total https ://ww5. hdfowler.com/POD.as px?inv oice=157 37 27 2 1t1