Loading...
HomeMy WebLinkAboutCAG2021-193 - Original - CenturyLink - MOU re:Rock Creek Culvert Replacement - 02/22/2021ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: Director or Designee Mayor Date of Council Approval: Grant? Yes No Type:Review/Signatures/RoutingDate Received by City Attorney: Comments: Date Routed to the Mayor’s Office: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? Yes No* Business License Verification: Yes In-Process Exempt (KCC 5.01.045) If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? Yes No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper) Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 Budget Account Number: Budget? Yes No Dir Asst: Sup/Mgr: Dir/Dep: rev. 200821 FOR CITY OF KENT OFFICIAL USE ONLY (Optional) * Memo to Mayor must be attached Qwest Corporation d/b/a CenturyLink QC MEMORANDUM OF UNDERSTANDING REGARDING UTILITY ADJUSTMENTS OR RELOCATION FOR City of Kent -- Rock Creek Culvert Replacement This Memorandum of Understanding (MOU), entered into this 2a day of February, 2021, by and between City of Kent ("City"), and Qwest Corporation d/b/a CenturyLink QC ('CenturyLink"), and referred to herein collectively as the "Parties", sets forth a non -binding statement of the Parties' intent with respect to establishing the relationships, clarifying lines of communication and outlining the general procedures for adjustment of CenturyLink's utility facilities located in public rights -of -way ("Utility" or "Utilities") that may be in conflict with the construction, operation and maintenance of the City of Kent's project known as Rock Creek Culvert Replacement ("Project"), as more particularly described below. The term "adjustment" as used herein encompasses CenturyLink's relocation, deactivation and/or abandonment, protection, removal, replacement, reinstallation and/or modification of a Utility in order to accommodate the Project, including the design and construction work necessary for such actions. SECTION 1. Project The Project will be removing the existing culvert at Rock Creek along Summit Landsburg Rd and replacing with a new bridge over the Creek. In general, the Project will increase flow capacity of Rock Creek under Summit Landsburg Rd. The Project extends into both City of Kent and unincorporated King County Rights of Way. The Project is expected to affect the Utilities listed in Section 2. SECTION 2. Potential Utilities Conflicts The following lists the potential conflicts between the Utilities and the Project and the planned resolution: A. Cable [HO51 : Relocate buried communications line to a location that will not affect the removal of the existing culvert and construction of new bridge. B. Cable [H041: Relocate buried communications line to a location that will not affect the removal of the existing culvert and construction of new bridge. SECTION 3. Coordination The Parties acknowledge the following procedures have been developed to facilitate efficient coordination for the Project and adjustments of Utilities: A. The Parties will participate in Project task force meetings, exchange information and maintain open communications by and among City and CenturyLink. B. Design -Builder's obligations with respect to this coordination process are as set forth in the Design -Build Contract entered into between City and Design -Builder. C. CenturyLink's obligations are set forth in the CenturyLink Permits. D. The Parties acknowledge the following general process for the Project: Scanned with CamScanner i. Project Information. The City will provide to CenturyLink Project -specific information and will initiate and lead the coordination process. I Field verification. CenturyLink will assist the City in identifying the location of Utilities that may be impacted by the Project, and the information will be made available in a common datum for use in Project design. iii. Meetings. The City will implement a schedule of periodic meetings with CenturyLink, for coordination purposes. Such meetings will commence as early as possible in the Project design process and will continue until completion of the Project (or until adjustment of the Utilities is completed). Such meetings will include a preliminary design meeting for the City and utility owners to meet and familiarize themselves with design elements, utility facilities, and general features of the Project. Thereafter, the frequency of meetings between the City and CenturyLink will be appropriate to the matters under discussion. It is anticipated that subsequent meetings will include (i) design concept meetings to discuss potential Utility impacts and suggestions for cooperative solutions pending more detailed design, (ii) intermediate design meetings to trace the progress of ongoing design processes and discussion of right-of-way, and (iii) final design and initial construction coordination meeting to finalize the plans, specifications, and cost estimates for adjustment of the Utilities impacted by the Project. After the adjustment plans and specification are finalized, additional meetings are anticipated to coordinate the construction of the Utility adjustments and to establish a forum for the regular exchange of information during construction to minimize delays and provide for proper inspection. iv. Updates. The City will keep CenturyLink informed and involved in decisions affecting its Utilities through the contact person(s) provided by CenturyLink in subsection E, below. V. Disputes. In the event of a dispute, CenturyLink and the City intend to continue their respective performance to the extent feasible in. light of the dispute. Continuation of efforts shall not be construed as a waiver of any legal right. E. Contact Person. i. City' primary point of contact is: [Stephen Lincoln]. ii. CenturyLink's primary point of contact is: [Jesse Patjens]. SECTION 4. Miscellaneous Nothing in this MOU is to be construed as conflicting with existing laws, regulations, property rights and contractual agreements, nor a modification, relinquishment or waiver of any right or obligation of the Parties or CenturyLink under any such law, regulation, property rights or agreement. This MOU may be amended or supplemented only by written agreement between the Parties. Although this MOU is non -binding, its intent is to maximize the lines of communication, increase the mutual cooperation among Design -Builder and CenturyLink, and to enhance the effectiveness of procedures used for the mutual benefit and common good of both utility customers and the general public. SECTION 5. Responsibilities The following is a list of responsibilities of each party within the Project: 2 Scanned with CamScanner Dana Ralph Mayor Public Works DepartmentCity of KentEngineering Division11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.comCable [HO3]Cable [HO4]N.735707Rock Creek Culvert Replacement on SE Summit Landsburg Rd24610 SE Summit Landsburg Rd Maple Valley, WAENG : Jesse PatjensCPA : Roy ChanceSheet 1 - cable identifierSheet 3 - temporary relocation planSheet 9 - permanent relocation plan WELLHEAD IN RAISEDICV BOXPublic Works DepartmentCity of KentEngineering Division11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.comLumen to expose existing cables and oversetwith new 25-TA at approx STA 102+27Lumen to expose existing cables and oversetwith new 25-TA at approx STA 103+78Expose up to 40ft of existingcable [HO4] and shift into newalignment to place 25-TAExpose up to 40ft of existingcable [HO4] and shift into newalignment to place 25-TAPlace temporary ground lay 1.25" HDPE SDR11 innerduct between vaultsSecure in place using 3/4" wood stakes & 40# ballast bags as neededPlace new copper cable between vaults inside temporary duct to maintainworking circuitsPlace 4"x4" cedar post tosupport innerduct andcable over Rock CreekPlace 4"x4" cedar post tosupport innerduct andcable over Rock CreekUse 1/4" strand as supportingmessenger wire between postsLUMEN TEMP RELOCATION PLANNOTE*Support type for crossing over RockCreek may change depending on finalspan length of crossing Public Works DepartmentCity of KentEngineering DivisionSTATE OF WASHING T O N THOMAS LUKE EAR L Y L I C E N SED LANDSCAPE ARCHITECTN O . 1199 EXP. 07/08/202211241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.comNew 25-TA at STA 102+27*Placed as part of temporary relocationNew 25-TA at STA 103+78*placed as part of temporary relocationLUMEN PERMANENTRELOCATION PLANCity of Kent provided/placed (2) 4" conduitLumen to place new copper cables inCity placed conduit between vaultsCity contractor to install (2) 4"conduit into 2'3" end of vaultutilizing existing openingCity contractor to install (2) 4"conduit into 2'3" end of vaultutilizing existing openingConduit Specs :- 4" conduit should be Schedule 40 or better- All conduit shall have a minimum 36" coverexcept transition into 25-TA vault- All bends shall have a minimum 36" radius- Calibrated pull line shall be placed in conduitbetween vaults after placementRemove temporary facilities after newcable installation, splicing, and cut-over Engineer's Estimate of Probable CostWork to be performed under Memorandum of Understanding behneen the City of Kent and Lumen (formerly CenturyLinklfor the Rock Creek Culvert Replacement at Summit Landsburg RoadSchedule A: Work to be performed by the City of KentExpanded Prices 3,ooo.ooS g,soo.oos 4,000.00s 16,600.00s 1,575.50s 18,276.50s 3,655.32Subtotaltos 2L,93r.92Schedule B: Work to bethe LumenCenturyLinklItem NumberItemUnitsQuantityUnit PricePrices 3,ooo.oos 5,000.00s 5,ooo.oos 2,s00.00s 1,000.00S rz,soo.oo5 t,767.5O5 t9,267.5Os 3,853.50s 23,121.005 qs,osz.gzUnit PriceS 3,ooo.ooS +o.oos 1,ooo.oosubtotal ofschedulaASales Tax lL0.l%lTaxed SubtotalContineency (20%ls 3,ooo.ooS s,ooo.oos 5,ooo.oos 2,500.00s 1,000.00Subtotal (cost to LumenfSales Tax (10.1%lTaxed SubtotalContingency (20%lSubtotal (cost to Lumen)Total Estimated Value of Work to be Performed under Memorandum of UnderstandingQuantityL24041117tUnitsEachLFEachEachLFLSLSLSItem DescriptionFurnish 25-TA VaultFurnish and lnstall 4-lnch Diameter Schedule 40 ConduitConnect 4-lnch Diameter Schedule 40 Conduit in Vaultslnstal 25-TA VaultFurnish and lnstall 25-TA Vaultlnstall Temporary Cable through work-zonelnstall Permanent CableRemove Temporary Cable at end of workItem Number123L2345