Loading...
HomeMy WebLinkAboutCAG2020-266 - Change Order - #1 - Quigg Bros., Inc. - Frager Road/Midway Creek Bridge Repair - 11/13/2020KENT Agreement Routing Form For Approvals, Signatures and Records Management - This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper)WASHINGTON -o oLaa Originator: S. Anderson Department: PW Engineering Date Sent: 3htl21 Date Required: N/A Authorized to Sign: E Director or Designee E MaYor Date of Council APProval N/A Budget Account Number: R20092.641 1 0.120 Budget? EYes E No Grant? EYes E No Trne N/A Category: Contract Vendor Name: Quigg Bros, lnc. 5ub-Category: Change Order #1 Vendor Number: 160288 Projecr Name: Frager RoadiMidway Creek Bridge Repair n-^i^-r n^+^;r.. The intent of the specified sheet pile coating is to protect the exposed steel to the environment. The rroleLL uetdll5: ., conrracror recognized that only th'e top portion of the piles would be exposed. lt was agreed that only coating the top 10 feet of the piles would be acceptable' Basis for Selection of Contractor: $id Terminarion Date: 45 Working DaYS Agreement Amount: $$-9,360.00 Start Date: N/A Local Business? EYes E No" xlf meets requirements per KCC 3.70.100, ptease complete "vendor Purchase-Local Exceptions' form on cityspace' Contract Number: cA2019-084 Notice required prior to disclosure? ElYes E No Comments:Date Received by City AttorneY: Date Routed to the MaYor's Office Date Routed to the City Clerk's Office: id(W/ll7l_l_20 Visit Documents.KentwA.gov to obtain copies of all agreements 'tpf KENT wasHtNctor CHANGE ORDER NO. #1 NAME oF CoNTRACTOR: Ouiqq Bros" Inc' ("Contractor") CONTMCT NAME & PROJECT NUMBER: Midway Creek Bridge Repair/Frager Road ORIGINAL CONTRACT DATE: AUgUSt 18, 2O2O This Change order amends the above-referenced contracu all other provisions of the contract that are not inconsistent with this change order shall remain in effect' For valuable consideration and by mutuar consent or tnu parties-, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Rmen?ments, contractoi shall provide all labor, materials, and equiPment necessary to: The intent of the specified sheet pile coating is to pfotec! the exposed steel to the environment. The contractor recognized. that only the top portion of the piles would be exposed. It was agreed that only coating the top 10 feet of the piles would be acceptable' 2. The contract amount and time for peformance provisionl. of section II "Time of completion," and section III, "Compensation," are hereby modified as follows: Current Change Order $-9,360.00 Applicable W SST Tax on this Change Order $o.oo Revised Contract Sum $378,574.00 $387,934.00Original Contract Sum, (inctuding aPPlicable wssT) alternates and $0.00Net Change bY P Change Orders ( incl, applicable WSST) revious $387,934.00Current Contract Amou . Previous Change Orders) nt (incl CHANGE ORDER - 1 OF 3 Original Time for Completion (insert date) 45 working days Revised Time for Completion under prior Change Orders (insert date) 45 working days Days Required (*) for this Change Order 0 calendar days Revised Time for Completion (insert date) 45 working days In accordance with Sections L-O4.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, pafticularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the pafties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the pafties below have executed this Agreement which will become effective on the last date written below. //*, B-k- DATE: (signature) (title) CONTRACTOR: By u-i LPrint Name:Its Interim Public Wor By ,ln.ts' fu E*** Print Name Chad Bieren. P.E. DATE t Gitle): ilhs/noprt crw OF KENTr ehl"k (signature) CHANGE ORDER - 2OF 3 (applicabte tf Mayor's signature rcquired) Kent Law DePartment APPROVED AS TO FORM:ATTEST: Kent City Clerk i [In this ietd, y@ mry oter Sle €lectonlc nlap.th sh'c tlrr @ntm hd be€r wedl CHANGE ORDER. 3 OF 3 FILE NO: 2OO.2KENT CHANGE ORDER WORKSHEET NO. 1 Construction Engi Division - Public Works Project: Frager Road / MidwaY Creek Bridge Repair Project Engineer: Mark Madfai, PE Capital Projects Eric Connor Project No.: 20-3004 Fed-Aid No.: Contractor: N/A Quigg Brothers Manager: Date: 9/9/20 X. PROPOSED CHANGE Reducing required area of coating on t he sheet pi les to only the top 10 feet of the piles. II. REASON AND BACKGROUND FOR CHANGE rTI. METHQD OF PAVMENT NEW PAY mM(S)Not DELEIE EXISTING PAY 1{)9.5 NotAppllcable L Th e nte n t of th e s p e c ified s h eet p e c oat I n I s to p rotect t h e expo S ed stee to t h e e n V ro n ment. Th e con t ractor recog n EE d th at o n v th e top p o fti o n of th e p i le S wo u td b e exposed It was a I re e d by city of Kent staff a n d th e E n I n eer of Record th t on Y coa tin I th e to p 1 0 feet of th e p es wou d be a c ce pta b le Th s cred it WA s p ro p o sed a s a res u It. change order No.FORACCANNNNG USEONLY Sch. No.Item Description Total Est. Qty Qty this PE Unit Unit Price Total Estimated Cost of Item I Credit for Reduced Sheet Pile Coatinq 1 LS ($9,360.00)($9,360.00) n Independent Estimate Attached . REOUIRED X CREATE PAY ITEM ONLY - Payment to be made at a later date upon completion of work U PAYTHIS PAY ESTIMATE New Sub Reqrd?No FORACCOUNNNG USEONLYChange Order No. ost of ltemUnit PriceQtyUnitItem DescriptionSch. No B.l. No. Independent Estimate Attached - REQUIRED REV. DATE:3/27h8 FILE NO: 2OO.2KENT TO E)OSTING PAY Not Appllcable TOTAL ESTIMATED COST OF CHANGE ORDER * ,*Total of the Cost of ltem Columns THIS PAY ESTIMATE IV. UIIORKING DAYS TOTAL WORKING DAYSX 45 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Capital Projects Manager:Date: Construction Engineering Supervisor: 2 FORACCOUNNNG USEONLYChange Order No. Unit Price CostQtvUnitB.l. No.Item DescriptionSch. No. tr Independent Estimate Attached - REQUIRED 9 360.OO Original Contract 45 Due This Change Order*o Previous Total 45 r*The n on the no work Construction Manager: ric Connor Date: REV. DATE:3/27118 UIGG BFICIS.lNc. RO. BOX 17OT t AEERDEEN. WASI'{INGTON 98520-0281 PHONE {36O} 533-1530 r FAX 3s0-532-3449 www.guiggbros.corr City of Kent SL-001 220 4rh Avenue S. September 4,2020 Kent, WA 98032 Attn: Eric Connor Re: Paint Proposal Eric; We have discussed eliminating the coating on the outside face of the sheet pile and replacing it with a coating on the top 10 feet. Attached is my back up information for the proposed cost proposal, We propose to credit back to the City of Kent the S17,360.00 from Nucor-skyline to eliminate the entire coating system. We then propose to utilize the paint system proposed in RFI 001 for the top 10 feet. The sheet pile would be prepared in the field and coated in the field. We would hold the sheets 10 feet high and perform the paint system and then drive the sheets to grade. Our proposal for this work is 58,000.00. This would represent a savings to the City of Kent in the amount of 59,350.00 and aid in meeting the HPA October 15, 2020 date. Please do not hesitate to contact me with any questions or concerns. Sincerely, { Hans Breivik Quigg Bros. lnc. /?-i/*-*, (3'ar''1'7 I Quigg Bros., lnc.LOADEDWAGE RATES2(n4i} FRAGER RDLABORERFLAGGERTRAFFIC CONTROL SUPERVISORPILEDRIVERSUPERVISORoPERATOR (10G.199 TON)OPERATOR EXCAVATOR 1$.30 MTOPERATOR EXCAVATOR 15 MTTRUCK DRIVER - SOLOTRUCK DRIVER - TRUCKAND TRAILERWAGE RINGE SUTA0.0548FUTA0.006FICA0.0620PFML0.1s00INDUSTRIALINSURANCEOR USL&HTOTALLOADEDcosrTOTAL0.T.COSTTOTALD.T.cosT0.15oVERTTME (T|ME AND A HALF) tS FTGURED BY MULTTPLYTNGWAGE AND ALL BURDEN EXCEPT FRINGE AND INDUSTRIALINSURANCE BY 1.5. FRINGEAND INDUSTRIAL INSURANCE RATESARE THE SAME FOR REGULAR TIME AND OVERTIME.98.0879.7293.29126.11145.28142.91139.83138.5812't.51123.510.000.000.000.000.000.0078.72u.7175.O7100.11114.77112.96110.61109.6596.6198.120.000.000.000.000.000.00$59.52$49.85$57.00$74.26$84.41$83.16$81.14$80.88$71.85$72.89$0.15$0.15$0.1s$0.1s$0.15$0.154.27213.31184.O2185.73786.73406.61016.44906.38335.49745.60150.00000.00000.00000.00000.00000.00000.150.150.150.150.150.150.150.150.150.150.150.150.150.150.152.141.662.012.873.373.313.233.192.752.800.000.000.000.000.000.000.210.160.190.280.330.320.310.310.27o.270.000.000.000.000.000.001.891.61.782.U2.982.922.852.822.432.480.000.000.000.o00.000.0016.3816.3816.3816.3816.5016.50't6.5016.5016.3816.38u.4826.7332.4445.3154.3553.3552.0551.s244.3745.21 Dc.:7nt 2020Ai& ?n&ltm - Cil, o{ K.or lritu.y CtGl f.idg. R.p.i.A! PFlFctiv. Bkld.Eftn: gliHlrgQ-l85!h. 1@ lb&B Mtu PhATt & g- 9dn F Fdet 'rJffi r&M2aHfldpll*ffiFFcedksrsdy d-d frs rrh sdd brddly { tm d ne C6ffi tu S S.e 'diPaC dG ld F@.&Er di€drd *eySoFrbdffiddq|Indtmd4& ts@M!8ffiIscca$lrcshs $all & cetd v/ith a n{nlruo of two ccB ot csat cr epoxyssrc Paxrt t6 (Blacki wltlr nn apprded lnorgank prltrE..Dcky F.qh lffi - cPT{km3 rtl sdk. Leds xflr' WAdst**fuss?i , 1.-,-*fiC€btuhirE!--lsglltFtucclF[SXYLIIIEMm NtuFnPH:53-9??-27??nn.Ew4r€nu.or*vlie.cd1-'f tl,ab(',8-w ITEMNO.1234557I910111213141515L7l61920PAY IT€MTOTATo.o3,190.603,096.(Do-000.(nomo.o0o-00o.mo.mo_{noooomo.00o-(x'0.000.mo.m0-@0-00UNITPRICEf.773.60trrARGlN0440ooooo000o000o000TOTATcofls3,1943.713,0933-60oo.mo0,6oomo0.@oo.@oo.Iboo.m0o-(n0o-u,oo.No0.4oo-u'0o.Noo-m00.no0.dt0o.mCOMPANYOWNEDOJTSID€BAREWAGESs€RVrcEsSUPPTIESoursrDEOPERAIED(TRUCKII{GIPERM SU8MATERIAL CONTRACT0o000oo0000000o312a36oo.tu2,582f.722mo.23o0Co.m0.No.m2000.2i0o-m2,233150o.17o,o7o.592.4o.ooo-moo.mo.m0o.m000o.ma.momomo.No.@0.mo,@o.@400o.&a.mo.momomo,momomomnmomomomnmomo.No.m0.ooo.@0.@0.@o.(no.mo.@o.mo.@0.uo.mo.No.&o.mo.mo-6o.d)o.@0.@0-mo.mo,(no.fr0.No.No.m0-mo.mo-(nD.mo.mANo.@o.@o-@o.dJo.No.@o.@o.q)0.mo.d)a.@o.@0.No.o0o.(no"Mo.mo.mo.N0.00o.No.mD-mo.mo.mD.d)0.&o.(no.@omnmomorno.mo-mo.mo.fro.ul0.(n0.mo.N0.No.uomomo.mo.mo.No.tua@omomomo.mo.uo.mo.mUNfTsMOMOl(xf,MOMOMOLstrloitoiro15tsMOtststsSFSFlstststsLStst-sLsLS15tsrsLSt5t5tsl<quA|lIo.m0.001.m1.m1_Oo.55oooIo0oI1211I8608601111111I11I117111Sne.ltptle CethgMobiliratimSUPERVISIONADMINISTRANONINSURANCEOCP INSURANCEBONDB&OTAXESOFFICE EXPENSESEtfclRlclTYPHOIE./CEI"T PHONE8U9NES5 lrCEf{S6SAFETY SUPruEsSANKANSOFFICE INAURL&I FIUNG FEESUSETA)(SECURIWOUTSIDE PROF€SSIONAI.PERMITSEQUIPMENT MOVEI NATIOVEO{'Ichao slEetpile - 10 ftPaint top 10 fetTEM1734567891011!2131415L7181920 2!ooo-q)uo.ND.NoS 61e.s2 S0s 6,343.50 soo0o00Markup423.s0S 513.835 8,m.3s22B242526272a29300-s6,257o.mo-60.00o-m0.000,6o-m0-droooooooooo0.m960otu00.m0o-m0om0o-m0om0o.&oo.(noOM6,47o.mo.m0.mo.mo.n0.@o.@a.mo.(no-(no.dt0.tno.mo.@0.m0.No.mo.n0.mo.@o.(nu.d)o.@o.&o.N0.mo.mo.&nfromo-mo.mo.dlo.m0-Nomomo,mo.mo.mo.mo.d)omo.mo-mo.m0.mo.(no.(na@o.&0-(na-(nQ,tno.tno.no.d)o.u,oln0-@o.N0-@o.00497178.2296o.qD6so78.07t600.m9(3SOs.5nL00.00,651?ssl5L5lsrsL5tsLS1I11111IIEal22232425t52728 |TEM# J1_aUANT ITEM DESCRIPTION: ACflVIW DESCRIPTION: 860 UNIT ffilprteforPaint Clean Sheetplle for Paint 1SF Outside Wages SF EqUIPMENT Code Void Lton tools gen Void Void Void Void Void fore Carp Void Void Void Void Void Void Comp Owned So.oo s15.00 $s,oo Se.oo so.oo So.oo So.oo $o.oo $o.oo Bare So.oo $o.oo So.oo $o.oo $o.oo So.oo 5o.oo So.oo s0.00 sTs Szoo Outside Operated So.oo So.oo s0.00 $o.oo s0.00 s0.00 So.oo So.oo 5o.oo Perm, Material Perm. Subs So So Unit Price Total $o.oo s1s,00 $s,oo $5,00 So.oo 9o.oo $o.oo So.oo 9o.oo # 1 1 1 t 1 1 1 t 7 LABOR Wages s7s.oo s148.s2 so.oo So.oo 50.00 5o.oo $o.oo so.0o 1 2 1 I 7 1 1 7 sT&s Misc PERMANENT MATERIALS 1 S2oo Outslde Number Unit Cost 0 SUBCONTRACTORS I So MaterialWages s2,682 s2,682 $o Outside Operated $o $o $o 1 Comp Owned Szs Ssrz $srz sTs $2oo S2oo $zoo Szza Bare 5o So So So So So Subs So So Total $3,194 S3,194 CRW, HRS. 72 BID ITEM TOTAT ITEM # 3 qUANT ITEM DESCRIPTION: ACTIVIW DESCRIPTION: 1 UNITffiiot.t Paint top 10 feet 1LS LS EQUIPMENT Code lton void tools void void Void Void Void Void fore carp Void Void Void Void Void Void Comp Owned S1s.oo So.oo $s'oo $o.oo So.oo So.oo 5o.oo So.oo So.oo Outside Bare 9o.oo $o,oo 5o,oo So.oo So.oo $o,oo 5o.oo So.oo So.oo Wages STS $lso Outside Operated 5o.oo s0.00 So.oo $o.oo $o.oo So.oo 5o.oo 5o.oo s0.00 Perm. Material SsoT Perm. Subs Paint SO SO Unit Price Total s1s.00 $o,oo Ss.oo 9o.oo 5o.oo So.oo So.oo $o.oo So.oo fr t 1 7 1 L 1 t t t LABOR Wages s7s,00 s148.52 s0.00 $o.oo s0.00 So,oo $0.00 s0.00 t 2 L 1 1 1 1 7 sT&s Misc 1 PERMANENT MATERIALS Comp Owned Szo $200 51so Outside Bare 5o So $o Number Unit Cost 10 50.73 SUBCONTRACTORS sTs Srso $rso s224 1, Wages S2,23s S2,23s s1s0 SO Outside Operated SO So So Material Subs So $o Total s3,og3 $a,CIs CRW. HRS. 10 BID ITEM TOTAL Szoo $soz ss07 Ssoz From: Tor Cc: Bcc: Subjectr Date: Attachments! Connor. Eric Hans Breivik David shearer (david@shearerdesign.net); clinton J. Lindgren: Madfai. Mark Howlett. Mark l4als[ey,-Cada; Bieren - Chad FW: Frager Road - SL-001 Paint Proposal Wednesday, September 09,2020 9:18:00 AM qBI SL-001 - Paint Proposal.Qdf Good Morning Hans, The City of Kent has accepted your proposed credit for coating on the sheet piles. We will be issuing a change order in order to incorporate the credit into the contract. Please let me know if you have any questions Thank you, Eric Connor Eric Connor I Construction Engineering Manager Construction Management I Public Works Department Phone 253-856-5533 | Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFOR€ PRINTING THlS E.MAIL From: Connor, Eric Sent: Friday, September 04,2020 12:18 PM To: Madfai, Mark; Howlett, Mark Cc: Maloney, Carla; Bieren, Chad Subject: FW: Frager Road - SL-001 Paint Proposal Good Afternoon, The attached letter from Quigg Bros. is offering a credit of 59,360-00 to only provide coating on the top 10 feet of the sheet piles rather that the full length as specified on our Frager Rd Bridge Repair project. Please let me know if you have any objections to accepting this proposal Thank you, Eric Connor Eric Connor I Construction Engineering Manager Construction Management I Public Works Department Phone 253-856-5533 | Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE COilSIDER THE ENVIRONMENT BEFORE PRINTI'{G THIS E-MAIL From: Hans Breivik lmailto:HansB@quiggbros.com] Sent: Friday, September 04,2020 11:31 AM To: Connor, Eric Subject: Frager Road - SL-001 Paint Proposal Eric, Please see attached SL-001 outlining our paint proposal Hans Breivik Quigg Bros. lnc. 360-507-6455 EXTERNAL EMAIL