Loading...
HomeMy WebLinkAboutCAG2021-138 - Original - Apply-A-Line, LLC - 2021 Plastic Markings - 03/18/2021ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: Director or Designee Mayor Date of Council Approval: Grant? Yes No Type:Review/Signatures/RoutingDate Received by City Attorney: Comments: Date Routed to the Mayor’s Office: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? Yes No* Business License Verification: Yes In-Process Exempt (KCC 5.01.045) If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? Yes No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper) Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 Budget Account Number: Budget? Yes No Dir Asst: Sup/Mgr: Dir/Dep: rev. 200821 FOR CITY OF KENT OFFICIAL USE ONLY (Optional) * Memo to Mayor must be attached CAG2021-138 DATE: March 2, 2021 TO: Kent City Council SUBJECT: 2021 Plastic Markings Project Bid - Award MOTION: Award the 2021 Plastic Markings Project to Apply-A-Line LLC in the amount of $125,357 and authorize the Mayor to sign all necessary documents, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. SUMMARY: The project consists of refreshing existing plastic pavement markings at select locations throughout the City. The bid opening for the 2021 Plastic Markings Project was held on February 23, 2021 with four bids received. The lowest responsible and responsive bid was submitted by Apply-A-Line LLC in the amount of $125,357. Bid Tab Summary 01.Apply-A-Line LLC $125,357.00 02.Specialized Pavement Marking, Inc.$134,189.00 03.Stripe Rite Inc.$135,451.00 04.Northwest Traffic, Inc.$192,890.64 Engineer's Estimate $191,670.00 BUDGET IMPACT: Project is funded by B&O funds. SUPPORTS STRATEGIC PLAN GOAL: Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and inviting parks and recreation. ATTACHMENTS: 1.Plastic Markings Bid Tab (PDF) CONFORMED TO ADDENDUM 1 CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2021 Plastic Markings Project Number: 21-3011.2 BIDS ACCEPTED UNTIL February 23, 2021 11:00 A.M. BID OPENING IMMEDIATELY FOLLOWING DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 CHAD BIEREN, P.E. INTERIM PUBLIC WORKS DIRECTOR INDEX Section 1 Bidder’s Package Section 2 Payment and Performance Bond and Contract Section 3 Table of Contents Section 4 Kent Special Provisions Section 5 Kent Standard Plans Section 6 WSDOT Standard Plans Section 7 Appendix Section 9 Traffic Control Plans Section 10 Prevailing Wage Rates 'l BIDDER'S NAM A -A-Line, LLC CITY OF KENT KrNG COUNTY, WASHTNGTON KENT SPECIAL PROVISIONS FOR 2021- Plastic Markings Project Number: 2L-3O LL.z BIDS ACCEPTED UNTIL February 23, 2O2L 11:OO A.M, BID OPENING IMMEDIATELY FOLLOWING crrYorffirY HALL 22O 4th Avenue S., Kent, WA 98032-5895 TTMOTHY J. LAPORTE, P.E. PUBLIC WORKS DIRECTOR aKENT WASHINGTON ORDER OF CONTENTS Invitation to Bid Contractor Compliance Statement Declaration – City of Kent Equal Employment Opportunity Policy Administrative Policy 1.2 – Minority and Women Contractors City of Kent Equal Employment Opportunity Compliance Statement Proposal Subcontractor List (over $1 million) – HVAC, Plumbing, and Electrical Subcontractor List (over $1 million) – Structural Steel Installation and Rebar Installation Contractor’s Qualification Statement Statement that Bidder Has Not Been Disqualified Certification of Compliance with Wage Payment Statutes Proposal Signature Page Bid Bond Form Combined Declaration Form Non-Collusion, Minimum Wage Change Order Bidder’s Checklist Payment and Performance Bond Contract Table of Contents Kent Special Provisions Kent Standard Plans WSDOT Standard Plans Appendix Traffic Control Plans Prevailing Wage Rates INVITATION TO BID Notice is hereby given that the City of Kent, Washlngton, will receive sealed bids at the City Clerk's office through February 24 2O2L up to lfuO0 a.m. as shown on the clock on the east wall of the City Clerk's Office on the first floor of City Hall, 220 4th Avenue South, Kent, Washington. All bids must be properly marked and sealed in accordance with this "lnvitation to Bid." Bids must be delivered and received at the City Clerk's office by the above-stated time, regardless of delivery method, including U.S. Mail. All bids will be opened and read publicly aloud immediately following 11:00 a.m. for the City of Kent project named as follows: 2O2L Plastic Markings Project Number: 2l'3,OlL.2 The City of Kent will conduct the bid opening at the time and date as scheduled' however, due to the coronavirus disease 2019 (COVID-l9) and its impacts the bid opening process will take place as followsl Bidders shall call the City Clerk at (253) 856-5725 to drop off bids. The City Clerk will read the bids out loud from the Clerk's office. Individuals can stand in the lobby outside the Clerk's office during the bid opening to hear the bid results, but must stand 6 feet or more apart. The project consists of installing new and refreshing existing plastic pavement markings including stop lines, crosswalks, traffic arrows, traffic letters on various City of Kent Streets as detailed in the Appendices, including RPM removal and island curb painting at N Lincoln Street and W Meeker Street, all in accordance with Kent Special Provisions, and the WSDOT Standard Specifications. The City of Kent has determined the project is essential purcuant to the Governor Xnslee issued Proclamation 2O-25. Should a contract be executed and this Proclamation or a similar proclamation be in place, specialized plans and protocols must be established and implemented to meet the social distancing and sanitation measures set fofth by the United States Depaftment of Labor or the Washington State Department of Health. It is the contractor's responsibility to implement these measures. The Engineer's estimated range for this project is approximately $178,000 to $200,000. Bid documents may be obtained by contacting City of Kent Engineering Department, Nancy Yoshitake at 253-856-5508. For technical guestions, please call Joseph Araucto at 253-856- 5654. Bids must be clearly marked "Bid" with the name of the project on the outside of the envelope, addressed to the City Clerk , 22O 4th Avenue South, Kent, WA 98032-5895. Only sealed bids will be accepted. No facsimiles or electronic submittals will be considered. Each bid shall be in accordance with the plans and specifications and other contract documents now on file in the office of the City Engineer, City of Kent, Washington. Plans and specificationscanalsobedownloadedatnochargeat@ business/bidq-nrocurement, Copies of the WSDOT Standard Specifications are available for perusal only. Apprentice Utilization Requirements are mandatory for all public works estimated to cost one mitlion dollars or more, in which case no less than Llo/o of the labor hours must be performed by apprentices. KCC 6.01.030. A cashier's check, cash or surety bond in the amount of 5olo of the bid must be included with the bid. The City of Kent reselves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. Note: The award of the contract will not occur until the City of Kent has reviewed all bids for responsiveness and responsibility determinations and the Kent City Council has formally awarded the contract. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previously performed work subject to the President's Executive Order No. 11246. No bidder may withdraw his/her bid for a period of sixtv (60) days after the day of bid opening. Dated this 8th day of February, 202L. BYi Kim Komoto,lerk Published in Daily Journal of Commerce on February 9 and L6' zOZt. CONTRACTOR COM PLIANCE STATEMENT (President's Executive Order # LL246) This statement relates to a proposed contract with the City of Kent named 2O2L Plastic Markings Project Number: 2L-3OLL.2 I am the undersigned bidder or prospective contractor. I represent that - 1, I have,X have not, participated in a previous contract or subcontract subject to the President's Executive Order #IL246 (regarding equal employment opportunity) or a preceding similar Executive order, Apply -A-Line, LLC NAME OF BIDDER BY SIGNATURE/TITLE Ron Reill v. Assistant Vice President 175 Roy Rd SW Bldq C Pacific WA 98047 ADDRESS (Note to Bidders: The information required in this Compliance Statement is informational only) 2021 Plastic Markings/Araucto Project Number: 27-3OLL.2 1 February B,2O2l DECLARATION crw oF KENT EQUAL EMPLOYMENT OPPORTUNTW POLTCY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such, all contractors, subcontractors and suppliers who perform work with relation to this contract shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific contract to adhere to. An affirmative response is required on all of the following questions for this contract to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlined, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the contract; The questions are as follows: 1, I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this contract I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability, 3, During the time of this contract the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity emPloYer, 4. During the time of the contract I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5, Before acceptance of this contract, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above, By For:Applv -A-Line. LLC Title:Ron Reillv.Assistant Vice Preside Date:02/23/202t 2021 Plastic Markings/Araucto Project Number: ZL-3OI1.2 2 nt February B,2O2t CITY OF KENT ADMINISTRATIVE POLICY NUMBER: L.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment oppoftunity within their organization and, if holding contracts with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2, Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or paft of the contract' Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1, Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy, Z. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. 2021 Plastic Markings/Araucto Project Number: 2L-3OL1.2 MINORITY AND WOMEN CONTRACTORS SUPERSEDES: April 1, 1996 APPROVED BY Jim White, MaYor 3 February B,2O2L CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the contract. I,theundersigned,adulyrepresentedagentof Company, hereby acknowledge and declare that the before- mentioned company was the prime contractor for the contract known as 2O2L Plastic Markings/Project Number: 21-3011.2 that was entered into on the (Date) -, between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned contract. By For: Title Date 2021 Plastic Ma rkings/Araucto Project Number: 2L-3OIL.2 4 February 8,202t PROPOSAL To the City Clerk City Hall Kent, Washington 98032 The undersigned hereby certifies that Ap olv-A-Line. LLC has examined the job site and construct ion details of the work as outlined on the plans and described in the specifications for the project named 2O2L Plastic Markings/Project Number: 21-3011.2 for the City of Kent, Washington, and has read and thoroughly understands the plans and specifications and contract governing the work embraced in this improvement and the method by which payment will be made for that work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with the bid and contract, and at the following schedule of rates and prices: NOTE TO BIDDERS: 1) All bid items are described in the Kent Special Provisions (KSP) or the Standard Specifications (WSDOT). Reference the Section No. listed in this proposal, where the bid item is described. 2) Proposal items are numbered in sequence but are non-continuous' 3) Unit prices for all items, all extensions, and total amount of bid must be shown' 4) Should bid items with identically worded bid item descriptions, marked with asterisk (x), appear in more than one schedule of the proposal, the bidder must bid the same unit price on corresponding items for each schedule. If the Contractor enters different unit prices on these items, the City will unilaterally revise the bid amounts to the lowest unit price on each corresponding item and recalculate the Contractor's total bid amount. The corrected total bid amount will be used by the City for award purposes and fix the amount of the contract bond. EXAMPTE SCHEDULE I - STREET ITEM NO. SECTION NO. APPROX. OUANTITY UNIT PRICE TOTAL AMOUNT ITEM 1006 2-03.5 WSDOT 100 CU YDS $14.00 Per CY $1,400.00Roadway Excavation, Including Haul Any bids not filled out properly may be considered non-responsive. 52021 Plastic Ma rkings/Araucto Project Number: 2t-30tl.2 February B,2O2t ITEM NO. SECTION NO. APPROX. OUANTITY UNIT PRICE TOTAL AMOUNT ITEM 1000 t-09.7 WSDOT 1 LUMP SUM Mobilization $ rs,ooo.oo $ ts,ooo.oo Per LS 1005 8-22.5 WSDOT 305 LN FT $ ro.oo PeT LF $ 3,o5o.ooPlastic Stop Line (12 inch wide) 1010 8-22.5 WSDOT L,452 LN FT $ ts.oo Per LF $ zt,zao.ooPlastic Stop Line (24 inch wide) 1020 B-22.5 WSDOT 79 EACH $ os.oo Per EA $ s, t gs.ooPlastic Yield Line Symbol, Type 2 1025 8-22.5 WSDOT 6,964 sQ Fr $ o.oo Per SQ FT $ qlsa.ooPlastic Crosswalk Line 1030 8-22.5 WSDOT 15 EACH $ 275.00 PeT EA $ 4,125.00Plastic Traffic Arrow 1035 8-22.5 WSDOT 8 Plastic Traffic Letter $ tts.oo Per EA $ gzo.oo EACH 1040 8-22.5 KSP 482 LN FT $ g.oo Per LF $ t,g38.oo8 inch Wide Plastic Intersection Turn Extension Lane (White) 1045 8-22.5 KSP 110 LN FT $ rs.so Per LF $ r,zos.ooB inch Wide Plastic Intersection Turn Extension Lane (Yellow) 1050 8-22.5 KSP 1 LUMP SUM $ z,soo.oo Per LS $ 2,5oo.ooN Lincoln Street / W Meeker Street RPM Removal and Curb Painting 2021 Plastic Markings/Araucto Project Number: 2L-3OLL.2 6 February 8,2OZI ITEM NO. SECTION NO. UNIT PRICE TOTAL AMOUNT APPROX. OUANTITY ITEM 1080 8-22.5 KSP 250 SQ FT $ 5.00 Per SF $ 1,250.00Additional Plastic Traffic Marking Removal 1085 1-10.5 KSP 100 HOURS Uniformed Off-Duty Police Officer $ so.oo Per HR ($80.00 Min) $ B,ooo.oo 1090 1- 10.5 KSP 110 HOURS $ t.oo Per HR $ 11o.ooTraffic Control Labor 1095 1- 10.5 KSP 40 HOURS $ 1.oo Per HR $ 40.00Traffic Control Supervisor 1100 1- 10.5 KSP 1 LUMP SUM Temporary Trgffic Control Devices $ 12,5oo.oo Per LS $ 12,soo.oo 1 105 1- 10.5 KSP 80 DAYS $ 1.oo PeT DAY $ 80.00Portable Changeable Message Sign (PCMS) 1110 1-10.5 KSP 40 DAYS $ t.oo Per DAY $ ao.ooSequential Arrow Sign (SAS) 111s 1-7.1s(1) WSDOT 1 LUMP SUM SPCC Plan $ soo.oo Per LS $ 5oo.oo rr20 1-04.4(1) WSDOT Minor Changes $2,500.00x $2,500.00 Per CALC 1 CALC xCommon price to all bidders 2021 Plastic Ma rkings/Ara ucto Project Number: 2I-3OLL.2 7 Total $12s 357 00 February B,2O2t SUBCONTRACTOR LIST (Contracts over 1 million dollars) HVAC, PLUMBING AND ELECTRICAL Name of Bidder:Aoolv-A-Line. LLC Project Name:2O2I Plastic rkinos Project Number:21-3(l11.2 Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of heating, ventilation, and air conditioning; plumbing; and electrical, or name itself for the work. Failure of the Bidder to submit, within one hour after the published bid submittal time, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to peform the same work shall render the Bidder's Bid non-responsive and, therefore, void. Heating, Ventilation, and Air Conditioning Subcontractor Name:N/A Plumbing Subcontractor Name:N/A Electrical Subcontractor Name :N/A ozt23/202r Signature of Bidder Ron Reilly, Assistant Vi ce President 2021 Plastic Ma rkings/Araucto Project Number: 2I-3OL1-2 Date 8 February B,2O2L SUBCONTRACTOR LIST (Contracts over 1 million dollars) STRUCTURAL STEEL INSTALLATION AND REBAR INSTALTATION Name of Bidder:Apply-A-Line, LLC Project Name:2O2L Pla ic Markinos Project Number:2A-7'JL1-2 Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of structural steel installation and rebar installation. Failure of the Bidder to submit, within 48 hours after the published bid submittal time, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to peform the same work shall render the Bidder's Bid non-responsive and, therefore, void. Structural Steel Installation Subcontractor Name:N/A Rebar Installation Subcontractor Name :N/A 1 o21231202L Signature of Bidder Ron Reilly, Assista Date nt ce President 2021 Plastic Markings/Ara ucto Project Number: 2L-3OLI.2 9 February 8,202I CoNTRACTOR'S QUALTFTCATTON STATEM ENT (RCW 39.O4.35O) THE CITY WILL REVIEW THE CONTRACTOR'S RESPOAISES TO THIS FORM TO DETERMINE WHETHER THE BIDDING CONTRACTOR.Ts; RESPONSIBLE TO PERFORM THE CONTRACT WORK. THIS FORM INCLUDES CRITERIA ESTABLISHED BY STATE LAW THAT MUST BE MET TO BE CONSIDERED A RESPONSIBLE BIDDER AND QUALIFIED TO BE AWARDED THIS PUBLIC WORKS PROJECT AS WELL AS SUPPLEMENTAL CRITERIA ESTABLISHED BY THE CTTY THAT ARE APPLICABLE TO THIS PUBLIC WORKS PROJECT. THE BIDDER SHOULD READ AND RESPOND TO THIS FORM CAREFULLY, Indicia of contractor's responsibility inherently involve subjective determinations as to the contractor's ability to perform and complete the contract work responsibly and to the owner city's satisfaction. The city has an obligation and a duty to its citizens and its taxpayers to administer its budgets and complete its projects in a businesslike manner, Accordingly, it has a duty to exercise the type of inquiry and discretion a business would conduct when selecting a contractor who will be responsible to perform the contract work. The city's supplemental criteria are based, in large part, on the qualification statement form used by the American Institute of Architects. The city provides these criteria so as to provide the most objective framework possible within which the city will make its decision regarding the bidder's ability to be responsible to perform the contract work. These criteria, taken together, will form the basis for the city's decision that a bidder is or is not responsible to perform the contract work. Any bidder may make a formal written request to the city to modify the criteria set forth in this qualification statement, but that request may only be made within 48 hours of the date and time that the bidder first obtains the bid documents or three (3) business days prior to the scheduled bid opening date, whichever occurs first. If the city receives a modification request, it will consider any information submitted in the request and will respond before the bid submittal deadline. If the city's evaluation results in changed criteria, the city will issue an addendum establishing the new or modified criteria. If the city determines that, based on the criteria established in this statement, a bidder is not responsible to perform the contract work, the city will provide written notice of its determination that will include the city's reason for its decision. The bidder has 24 hours from the time the city delivers written notice to the bidder that the bidder is not responsible to perform the contract work to appeal the city's determination. No appeals will be received after the expiration of this 24 hour appeal period. The city may deliver this notice by hand delivery, email, facsimile, or regular mail. In the event the city uses regular mail, the delivery will be deemed complete three days after being placed in the U.S, Mail. The bidder's right to appeal is limited to the single remedy of providing the city with additional information to be considered before the city issues a final determination. Bidder acknowledges and understands that, as provided by RCW 39,04.350, no other appeal is allowed and no other remedy 2021 Plastic Markings/Araucto Project Number: 2L-3OLL2 10 February 8,2OZl of any kind or nature is available to the bidding contractor if the City determines that the bidder is not responsible to perform the contract work' If the bidder fails to request a modification within the time allowed, or fails to appeal a determination that the bidder is not responsible within the time allowed, the city will make its determination of bidder responsibility based on the information submitted. COMPLETE AND STGil THIS FORM AS PART OF YOUR BID, FATLURE TO PROPERLY COMPLETE THIS FORM MAY ALSO RESULT IN A DETERMINATION THAT YOUR BID IS NON-RESPONSIVE AND THEREFORE VOID' THrS DOCUMENT HAS IMPORTANT LEGAL CoNSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as isleading SUBMITTED BY: NAME: ADDRESS:175 Roy Rd SW BIdq C Pacific W 98047 PRINCIPAL OFFICE: ADDRESS: Aoolv-A-ne- LLC 175 Rov Rd SW Bldo C Pacific WA 9 8047 PHONE: FAX: 253.299-1200 253.299-L25 o STATUTORY REQUIREMENTS - Per state law a bidder must meet the fol lowing responsibi I ity criteria 1. Required Responsibility Criteria PLEASE SEE ATTACHED 1.1 Provide a copy of your Department of Labor and Industries certificate of registration in compliance with chapter 18'27 RCW' 1.2 Provide your current state unified business identifier number. 1.3 Provide proof of applicable industrial insurance coverage for your employees working in Washington as required in Title 51 RCW, together with an employment security department number as required in Title 50 RCW, and a state excise tax registration number as required in Title 82 RCW. Providing a copy of a state of Washington "Master License Service Registration and Licenses" form is typically sufficient evidence of the requirements of this subsection, 2021 Plastic Markings/Ara ucto Project Number: 2L-3OLL.2 11 February 8,202I L.4 Provide a statement, signed by a person with authority to act and speak for your company, that your company, including any subsidiary companies or affiliated companies under majority ownership or under control by the owners of the bidder's company, are not and have not been in the past three (3) years, disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3)' 1.5 Provide a signed statement, signed under penalty of perjury by a person with authority to act and speak for your company, that within the three- year period immediately preceding the bid solicitation date, your company is not a "willful" violator as defined in RCW 49.48.082, of any provisions of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction' 1.6 Provide proof that a designated person or persons with your company has either received training from the department of labor and industries or an approved training provider on the requirements related to public works and prevailing wages under chapter 39.04 RCW and 39.I2 RCW or provide proof that your company has completed three or more public works projects and have had a valid business license in Washington for three or more years and are exempt from this training requirement. SUppLEMENTAL CRITERIA - Established by the City to determine bidder responsibility ORGANIZATION 2.1 How many years has your organization been in business as a Contractor? 2.2 How many years has your organization been in business under its present business name? 2.2.L Under what other or former names has your organization operated? 2.3 If your organization is a corporation, answer the following: 2 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 Date of incorporation: State of incorporation : President's name: Vice-president's name(s) : Secretary's name: Treasurer's name: 2.4 If your organization is a partnership, answer the following: 2.4.I Date of organization: 2.4.2 Type of partnership (if applicable): 2.4.3 Name(s) of general paftner(s): 2,5 If your organization is individually owned, answer the following: 2021 Plastic Markings/Araucto L2 February B' 2O2L Project Number: 2L-3OLL.2 1 Date of organization: 2 Name of owner: 2.6 If the form of your organization is other than those listed above, describe it and name the princiPals: 3. LICENSING 3.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate license numbers, if applicable. 9.2 List jurisdictions in which your organization's partnership or trade name is filed. 4. EXPERIENCE 4.1 List the categories of work that your organization normally performs with its own forces, 4.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details,) 4.2.1 Has your organization ever failed to complete any work awarded to it? 4.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? 4.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? 4.9 Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) 4.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, owner, architect or design engineer, contract amount, percent complete and scheduled completion date. 4.4.1 State total worth of work in progress and under contract: 4.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, owner, architect or design engineer, contract amount, date of completion and percentage of the cost of the work performed with your own forces. 4.5.1 State average annual amount of construction work performed during the past five years: 4.6 On a separate sheet, list the'construction experience and present commitments of the key individuals of your organization. 2021 Plastic Markings/Araucto 13 February 8' 202L Project Number: ZL-3OLL.2 2.5 2.5 5 4.7 On a separate sheet, list your major equipment' REFERENCES 5.1 5.2 5,3 Trade References: Bank Referencesl Surety: 5.3.1 Name of bonding company: 5.3.2 Name and address of agent: 6. FINANCING 6.1 FinancialStatement. After bid opening, the City may require the following financial information from any of the three apparent low bidders. If so required, the selected bidder(s) must respond with this financial information within 24 hours of the City's request for that information. The City's request for this information shall not be construed as an award or as an intent to award the contract. A bidder's failure or refusal to provide this information may result in rejection of that bidder's bid. 6.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and income statement showing the following items: Current Assets (e.9., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g', capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 6.L.2 Name and address of firm preparing attached financial statement, and date thereof: 6.1.3 Is the attached financial statement for the identical organization named on page one? 6.L.4If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.9., parent- subsidiary). 2021 Plastic Markings/Araucto Project Number: ?I-3OLL.2 L4 February 8,2O2L 6.2 Will the organization whose financial statement is attached act as guarantor of the contract for construction? 7 SIGNATURE 7.1 Dated at this 23rd day of Febura 202L. Name ani n: By: Title: Ron Reillv Assistant Vice Preside nt 7.2 Ron Reil being duly sworn, deposes and says that the information provided herein is true and sufficiently complete so as not to be misleading. Subscribed and rn before me is 23rd day of February , zozu Notary Public: My Commission Expires: 2021 Plastic Markings/Araucto Project Number: 2t-301L.2 SANDRA L SAELAN Notary Public State of Washington Comnrission # 90877 My Cornrn. Expires Mar 29,2O23 15 February 8,2O2t ATTACHMENT City of Kenl - 2021 Plostic Morkings Projecl No. 2l -301I.2 l. STATUTORY REQUIREMENTS-Required ResponsibilityCrilerio t.l Copy of Deportment of Lobor ond lndustries certificote of regisirotion (ottoched) UBI Number: 600 553 94,l Proof of opplicoble industriol insuronce coveroge {ottoched) Woshington Moster License (otioched) Stotement regording disquolificotion from bidding (ottoched) Stotement regording willful violotion os defined in RCW 49.48.082 (ottoched) Exemption from troining requirement (ottoched) Proof of completed public works projects - AWP's (ottoched) Volid business license for 3 yeors (ottoched) 1.2 t.3 1.4 1.5 1.5 2. ORGANIZATON 2.1 2.2 Apply-A-Line hos been o Controctor for 36 yeors. Apply-A-Line hos been under its present business nome for 36 yeors. 2.2.1 N/A Corporotion - N/A Portnership - N/A lndividuol Ownership - N/A Other thon obove - Limited Liobility Compony Michoel Liljestrom, Chief Executive Officer ond Monoging Poriner 2.3 2.4 2.5 2.6 3. ilCENStNG 3.,l 4. EXPERIENCE 4.1 4.2 3.2 Apply-A-Line is legolly quolified to do business os o speciolty controctor in the scope of instollotion of troffic povement morkings. We ore licensed in the stotes of: Woshington-APPLYLL834OJ, Oregon-2,l 2.l80, Colifornio- I 03 I 889, Howoii-C-35005, ldoho-PCW-C- I I 1 62- AAA-4, Alosko- 1 279 42 ond Nevo do-0039 577 . Our trode nome is filed in oll the obove referenced jurisdictions. Cotegories of work we perform with our own forces (ottoched) Clqims ond Suits - None 4.2.1 No 4.2.2 No 4.2.3 No 4.3 Within the lost five (5) yeors no officer or principol of Apply-A-Line hos been on officer or principol of onother orgonizotion when it foiled to complete o construction controct. 4.4 Mojor construction projects in progress (ottoched) 4.4.1 Totol worih of work in progress ond under construction: Approximotely $5.0 million (WA) 4.5 Mojor projects completed in lost 5 yeors (ottoched). 4.5.1 Averoge onnuol omount of construction work in post 5 yeors: $9.5 million (WA) 4.6 Construction experience ond present commitments of key individuols (ottoched) 4.7 Mojor equipment (ottoched) 5. REFERENCES 5.1 5.3 Surety 5.3.l 5.3.2 6. FINANCING - Reserved Trode References: lnterstote Soles Ennis Flint Don Smoll & Sons, lnc Bonk Reference: Columbio Bonk Kit Gerwels 719 2"a Ave Ste 500 Seottle WA 98104 5.2 {530) 823-6020 (800) 8s5-3357 (253) 833-0430 (206) 223-4552 Bonding componies: The Hortford Everest Reinsuronce Co. North Americon lnsuronce Speciolty lnsuronce Co. Agent: Lockton Componies Aoron P. Clork 3657 Brior Pork Dr Ste 200 Houston TX 77042 l City of Kent- 2021 Plastic Markings#213011.2 Statutory Requiremenb 1.1 - DOL&I Certificate of Registration ' City of Kent - 2021 Plastic Marking s #21 -301 1.2 Statutory Requiremenb 1.3 - Proof of lndustrial lnsurance Coverage APPLY A LINE LLC Page I of2 $f*TE OFtY^[l{lNGTOl\l Department of Labor & lndustries Certificate of Workers' Compensation Coverage February 22,2021 WA UBI No.600 553 941 L&lAccount lD 879t987-00 APPLY A LINE LLCLegal Business Name Doing Business As APPLY A LINE LLC Workers' Comp Premium Status:Account is current. Estimated Workers Reported (See Description Below) Account Representative Employer Services Help Line, (360) 902-4817 Licensed Contractor?Yes License No.APPLYLLS34OJ License Expiration ogt11t2021 What does "Estimated Workers Reported" mean? Estimated workers reported represents the number of full time position requiring at least 480 hours of work per calendar quarter. A single 480 hour position may be filled by one person, or several part time workers. lndustrial lnsurance lnformation Employers report and pay premiums each quarter based on hours of employee work already performed, and are liable for premiums found later to be due. lndustrial insurance accounts have no policy periods, cancellation dates, limitations of coverage or waiver of Quarter 4 of Year 2020"51 lo75 Workers" https://secure.lni.wa.gov/verify/Details/liabilityCertificate.aspx?UBI:600553941&LIC:A... 212212021 APPLY A LINE LLC Page2 ofZ subrogation (See RCW 5l .12.050 and 51.16.r90). https://secure.lni.wa.gov/veri$/Details/liabilityCertificate.aspx?UBI:600553941&LIC=A... 212212021 City of Kent - 2021 Plastic Markings #21 -3011.2 Statutory Requiremenb 1.3 - Master License Service Registnation and License s lAl'; {]t 11/^5t-ttN{:;T(}r.j Limited Liability Company Di:ThCH BEFORE FO:il lNi; j 1l ,l t .'l I tt, 'i .,1,! ,l ,.1 I.l ii' i i I l\ . t I ti' .1 :tl ;i. 1,i a, ' ,l,l :l I l ,rl ! .'l I 1 I .1 il i ;.i ',i t I ,'l I,! ,l.,1.: APPLY.A-LINE, LLC 175 ROY RD SW STE C PACIFIC, WA 98047-2150 UNEMPLOYMENT INSURANCE - ACTIVE TAX REGISTRATION - ACTIVE INDUSTRIAL INSURANCE - ACTIVE CITY ENDORSEMENTS: FIFE GENERAL BUSINESS - NON-RESIDENT - ACTIVE KELSO GENERAL BUSINESS - NON-RESIDENT (EXPIRES 113112021) - ACTIVE MOUNT VERNON GENERAL BUSINESS - NON-RESIDENT. ACTIVE BATTLE GROUND GENERAL BUSINESS - NON-RESIDENT - ACTIVE ELLENSBURG GENERAL BUSINESS - NON-RESIDENT #8833 - ACTIVE MUKILTEO GENERAL BUSINESS - NON-RESIDENT - ACTIVE PUYALLUP GENERAL BUSINESS - NON-RESIDENT #9BO2B1 - ACTIVE LAKEWOOD GENERAL BUSINESS - NON-RESIDENT #BLO2-00166 - ACTIVE BAINBRIDGE ISLAND GENERAL BUSINESS - NON-RESIDENT #12389 - ACTIVE CHEHALIS GENERAL BUSINESS - NON-RESIDENT #16-0169 - ACTIVE YELM GENERAL BUSINESS. NON-RESIDENT #10401- ACTIVE SHELTON GENERAL BUSINESS #0025540 - ACTIVE KIRKLAND GENERAL BUSINESS - NON-RESIDENT #OBL-0002796 - ACTIVE ANACORTES GENERAL BUSINESS - NON-RESIDENT - ACTIVE BELLINGHAM GENERAL BUSINES S #022861 - ACTIVE BONNEY LAKE GENERAL BUSINESS - NON-RESIDENT - ACTIVE BUCKLEY GENERAL BUSINESS - NON-RESIDENT - ACTIVE EATONVILLE GENERAL BUSINESS - NON-RESIDENT - ACTIVE GIG HARBOR GENERAL BUSINESS - NON-RESIDENT - ACTIVE ISSAQUAH GENERAL BUSINESS - NON-RESIDENT #BUSO3-00415 - ACTIVE it ilii. sil*iliri+itl !i:;h the r'r:p;ir'1r'*lir-rtts, *ttiior; ., I l*;r,:rl .rllrlir. !i1' .lr:repiirtg {!:ir rlcttltrlertf , the ffirisEru ffi$s F_ fiiltrrusffi enrt rilr, artrl iirctt,ir.':; atrllr*r'iztd fot litr: hlr:;ittt:li; lir:l: n:e* *',*r'tifir: tlte ir{oltn,:ticit oil th+: appiir:.rlit:it i;i lris or lter krt*r,,'!t:clge, ;itrrl lhat busincris *'ili hc \t/"rstringtorr sfal*, {i}lrut}', trrrl cilf itgrrlalicns. lssue Date: Dec 1 1 ,2020 Unified Business lD #: 600553941 Business lD #: 001 Location:0001 Expires: Oct 31 ,2021 lc lhc hest ;rSiplicahle [)irci. I trr, lleli.:rtn1{-hi ri ilt'', l'ititi' UBI:600553941 001 0001 APPLY-A-LINE, LLC 175 ROY RD SW STE C PACIFTC, WA 98047-2150 5TATE OF WA$I- INC:TON UNEMPLOYMENT INSURANCE - ACTIVE INDUSTRIAL INSURANCE - ACTIVE TAX REGISTRATION . ACTIVE FIFE GENERAL BUSINESS - NON-RESIDENT - ACTIVE KELSO GENERAL BUSINESS. NON-RESTDENT (EXPIRES 1 13112021) Expires: Oct 31 ,2021 ; City of Kent - 2021 Plastic Marking s #21 -301 1.2 Statutory Requiremenb 1 .4 & 1.5 - Signed Statement APPLY.A-LINE, LLC 175 Roy Road SW, Bldg C . Pacific, WA 98047 Phone (2-53) 299-1200 ' Fax (253) 299-1250 mail@applyaline.com . LIC. #APPLLS34OJ Februory 23,2021 City of Kent 220 4th Ave S Kent WA 98032-5895 Re: 2021 Plostic Morkings Project No. 2l -301 I .2 To Whom lt Moy Concern: Apply-A-Line hos nol in the post three {3) yeors been disquolified from bidding on ony public works controct under RCW 39.06.010 or 39.12.065(3). Apply-A-Line hos not in the post three (3) yeor period immediotely preceding the bid solicitotion dote been o willful violotor os defined in RCW 49.48.082, of ony provisions of chopters 49.46,49.48 or 49.52 RCW os determined by o finol ond binding citotion ond notice of ossessment issued by the Deportment of Lobor ond lndustries or through o civiljudgement entered by o court of limited or generol jurisdiction. Respectively, Ron Reilly Assistont Vice President lity of Kent- 2021 Phstc lrarkings #21-3011.2 Statutory RoquircmenF 1.6 - Tnaining Requirement Exemption APPLY.A.LINE LLC -A u,**r""o-"mnn \.lLatrir a lndustrie: (https://lni.wa.oov) APPLY.A.LINE LLC License Gertifications & Endorsements Workers'Gomp Public Works Requirements Veriry th6 contractor is eligible to perform work on public works projec{s. Contractor Strlkes ild ;iiift!; iiaJd 6ien iseued agalnst thls contractor' Contractors not allowed to bid iiii; iii;tieirii;iiG ffiie iiCii iitiiued asainstthis contractor. Workplace Safety & Health Page I ofl hups://secure.lni.wa.govlverifylDetail.aspx?UBI:600553941&LIC:APPLYLL834OJ&SAW:2/2212021 Page 1 of3 City of Kent - 2021 Plastic Markings #21-3011.2 Statutory Requirements 1.6 - Proof of Completed Public Works Projects (AWP) State of Washington Department of Labor & lndustries Prevailing Wage Section - Tetephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Affidavit of Wages Paid Project Detail - Proiect hboard Document Received Date: 10/30t2020 Affidavit ld:977008 Status: Approved on 11/912020 lntent ld: 1 080009 Company Details Name Address WA UBI no. Contractor Registration no. lndustriat lnsurance Account ld OMWBE Certifications as of 811312020 Email Address Fited By Prime Contractor Prime contractor name Prime contractor registration no. Prime contractor Phone Number Project lnformation Awarding agency: Awarding agency contact: Awarding agency contact phone number: Contract no. Project name Project Description APPLY-A-LINE LLC 175 ROY ROAD SW PAC|F|C,WA,98047 600553941 APPLYLLS34OJ 87998700 No active certifications existed when lntent was submitted sandy@apptyaline.com Sablan, Sandra APPLY-A.LINE LLC APPLYLLS34OJ 253-299-1200 FEDERAL WAY, CITY OF/PUBLIC WORKS PO BOX 9718 FEDERAL WAY, WA - 98063-9718 Naveen Chandra 253-835-2729 AG 20-084 2020 Pavement Markings Project Dottar amount of your contract: Bid due date Contract award date Job site address/directions: Payment Details Check Number: Transaction ld: Project Details County where work was performed City where work was performed Prime contractor lntent form ld# for this project lntent fited date Job start date : lrtM- DD-YYYY Date work compteted : A4M- DD-YYYY Project Completion King Did your company hire any subcontractors? No Did your company have employees perform work on this Yes project? Did you use apprentice employees on this project? Yes Company Owner lnformation How many owner/operators performed work on the 0 project that own 3Q% or more of the company? No company owner added. Affidavit Subcontractor(s) No subcontractor is selected for this affidavit. Journeylevel Wages County Trade Occupation Traffic Control Stripers Page2 of 3 lnstattation of thermoptastic pavement markings. s 30,316.50 4t16t2020 5t19t2020 Various 107740071 King Federal Way 1 080009 8t1312020 7 t13t2020 7 t30/2020 Wages Fringes Workers Hours ## 2 75.5034.90 17.23Journey LevelKingTraffic Control Stripers Apprentice Wages Journey Level 31.90 17.23 8.50 Trade Name Traffic Control Stripers Begin EndStep#Hour Hour 5 2334 3499 County Name King Name Reg rd Begin Hours 197551 07 t13t2020 Page 3 oI J Program/Occupation Name Traffic Control Painter End Hours State WageS FringeS Hours 07 I 13t2020 WA s23.93 Stt.sz 8.50HAYES, BENJAMIN Public Notes e Show/Hide ns Notes No note exists 33.50WAs23.e3 s14.923499KAHULI, MRON- SCOTT 198952 07 t27 t2020 07 t30t202052334 33.50WAs20.74 513.e82333MAYOR, MYLES 203253 07 t27 t2020 07 t30t202041167 s16.31 8.5007 t13t2020 07 t13t2020 WA s28.71746675833,ELLIOTT JOSHUA 191146 Page I of4 State of Washington Department of Labor & Industries Prevaiting Wage Section ' Telephone 360'902-5335 PO Box 44540, Olympia, WA 98504-4540 Affidavit of Wages Paid Proj ect Detail - Proiect Dashboard Document Received Date: 3t6/2020 Affidavit ld: 926356 Status: Approved on 3t18t2020 lntent ld: 995274 Company Details Name Address WA UBI no. Contractor Registration no. lndustriaI lnsurance Account ld OMWBE Certifications as of 7 /29/2019 EmaiI Address Fited By Prime Contractor Prime contractor name Prime contractor registration no. Prime contractor Phone Number Project lnformation Awarding agency: Awarding agency contact: Awarding agency contact phone number: Contract no. Project name Project Description APPLY-A-LINE LLC 175 ROY ROAD SW PAC|FtC,WA,98047 600553941 APPLYLLS34OJ 87998700 No active certifications existed when lntent was submitted sandy@apptyatine.com Sablan, Sandra APPLY-A-LINE LLC APPLYLLS34OJ 253-299-1200 TACOMA PUBLIC WORKS 747 MARKET 5T, ROOM 332 TACOMA, wA - 98402 Jennifer Joyce 253-573-2332 460001 3803 2019 Striping Contract Dottar amount of your contract: Bid due date Contract award date Job site address/directions: Payment Details Check Number: Transaction ld: Project Details County where work was performed City where work was performed Prime contractor lntent form ld# for this project lntent filed date Job start date:MM-DD-YYYY Date work compteted:A{M-DD-Y\ YY Project Completion Did your company hire any subcontractors? Yes Did your company have employees perform work on this Yes project? Did you use apprentice employees on this project? Yes Company Owner lnformation How many owner/operators performed work on the 0 project that own 3Q% or more of the company? No company owner added. Affidavit Su bcontractor(s ) Company Name UBI ADVANCED GOVERNMENT SERV INC 6035854s4 Journeylevel Wages lnstattation of traffic pavement markings s 529,828.31 5t14t2019 6t18/2019 Various 1 07381 983 Pierce Tacoma 995274 7 t29t2019 8t12t2019 12/18t2019 License# ADVANGS834R9 # Workers Page 2 of 4 # Hours 4 124.2534.46 16.17Traffic Control Stripers Journey LevelPierce 1 8.5033.65 14.03 1Journey LevelPierceTraffic Controt Stripers 14.84 2 17.50Journey Level 32.84PierceTraffic Control Stripers County Trade Occupation Wages Fringes 16.07 4 142.25Journey Level 37.46PierceTraffic ControI Stripers 60.0036.65 14.03 2Traffic Control Stripers Journey LevelPierce 9.0035.97 14.O3 1Journey LevelPierceTraffic Control Stripers 1 21.0035.84 14.84Traffic Control Stripers Journey LevelPierce 30.0035.43 14.84 1Traffic ControI Stripers Journey LevetPierce 8 307.0034.61 16.07PierceTraffic Control Stripers Journey Level 10.0034.61 14.84 1Journey LevelPierceTraffic Control Stripers 7.0013.20 1Journey Level 34.48PierceTraffic Control Stripers Step#Hour Hour Pierce Traffic Control Stripers Journey Level Pierce Traffic ControI Stripers Journey Level Apprentice Wages Trade Name County Name Traffic Controt Stripers Pierce Begin End Name Reg rd Page 3 of4 31.61 16.07 9 276.75 35.69 14.84 8.00 Program/Occupation Name Traffic ControI Painter End Hours State WageS FringeS HoursBegin Hours 4 5 5 S7.66 31.0010t27 t2019 WA s18.975011000Heveroh, Patrick 206713 09t21t20192 520. ss s1 3.20 8.5020499208/23t2019 08t23t2019 WA411672333tSenner Jordan 20.25WAs20.s5 sl 3.20Kotlen, Jonathan 204790 08t19/2019 09t27 t2019411672333 81.0012t09t2019WA520. s5 s1 3.202333Tuttle, Kenneth 206721 09t30t20191167 sl 3.20 43.7512t03t2019WAs20.ss11672333Mayor Myles 203253 08t19t20194 520. ss s1 3.20 26.5010/28t2019 11 /01 t2019 WA11672333Lamb, Nicholas 1996314 523.40 s13.20 9. s070425808t281201908t28t2019WA411672333Nelson, Sean 8.00WAs23.40 s1 3.20Kotten, Jonathan 204790 10/22t2019 10t22/2019411672333 12.00WAs23.40 51 3.20Senner, Jordan 204992 09t03t2019 09t03t2019411672333 29.0011t23t2019WA523.40 s1 3.202333Tuttle, Kenneth 206721 10t271201941167 s1 3.20 8.0010t22t2019WAs23.4011672333Netson, Sean 204258 10/22/20194 s23.71 s14.03 58.0009t29/2019 12t18t2019 WA23343499Cameron, Amie 1985545 523.71 s14.03 24.5008t12/2019 10t25t2019 WA23343499Linders, Jonathan 1991705 WA 523.71 s14.03 32.25Them, Travis 1 98083 08t12t2019 09t25t201923343499 2334 3499 198554 09t05/7019 09t05t2019 WA s26. s6 s14.03 11.00 Page 4 of 4 6 3500 4666 191146 10t17 t2019 Cameron, Amie Elliott, Joshua 10t17 t2019 WA s?e.72 514.84 7.00 Public Notes s Show/Hide Existins Notes No note exists 514.84 27.2509t2112019WA526.874666Jacaway, Jacob 191931 09t12t201963500 s14.84 8.0010t09t2019WA526.873s004666Stewart, Joshua 191344 10t09120196 514.84 56.2508t30t2019WAs29.7235004666Woods, Everett 202493 08t25/20196 10t3012020 about:blank State of Washington Department of Labor & lndustries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Affidavit of Wages Paid Project Detail - Project Dashboard Document Received Date: 10t9/2020 Affidavit ld:971209 Status: Approved on 10t15/2020 lntent ld: 1065601 Company Details Name Address WA UBI no. Contractor Registration no. lndustrial lnsurance Account ld OMWBE Certifications as of 6/1612020 EmaiI Address Fited By Prime Contractor Prime contractor name Prime contractor registration no Prime contractor Phone Number Project lnformation Awarding agency: Awarding agency contact: Awarding agency contact phone number: Contract no. APPLY.A.LINE LLC 175 ROY ROAD SW PAClFlC,WA,98047 600553941 APPLYLLS34OJ 87998700 No active certifications existed when lntent was submitted sandy@applyaline.com Sabtan, Sandra APPLY.A-LINE LLC APPLYLLS34OJ 2s3-299-1200 BOTHELL, CITY OF 18415 101st Ave NE BOTHELL, WA ' 9801 1 JamalMahmoud 425-318-9020 2076 1t3 10t3012020 about:blank Project name Project Description Dollar amount of your contract: Bid due date Contract award date Job site address/directions: Payment Details Check Number: Transaction ld: Project Details County where work was performed City where work was performed Prime contractor lntent form ld# for this project lntent fited date Job start date:llM-DD-YYYY Date work com pleted : AllM- DD-YYYY Project Completion Did your company hire any subcontractors? Did your company have employees perform work on this project? Did you use apprentice emptoyees on this project? Company Owner lnformation How many owner/operators performed work on the project that own 30% or more of the company? No company owner added. Affidavit Subcontractor(s) iNo subcontractor is selected for this affidavit. Journeylevel Wages 2020 Citywide Pavement Markings Instattation of traffic pavement markings. 5 94,849.40 5t15t2020 6/15/2020 Various 107702403 King Bothett 1065601 6/16t2020 6/18t2020 7 t30t2020 Fringes # Hours 5.50 52.00 8.00 No Yes Yes 0 Cou King tyn Trade Traffic Control Stripers Traffic Control Stripers Traffic Control Stripers Journey Levet Journey Level Journey Level Occupation Wages 34.21 35.90 32.82 # Workers King King 14.82 17.13 16.21 2t3 10t30t2020 Traffic Control Stripers Journey Level Journey Level Journey Level about:blank 34.21 Program/Occupation Name Traffic Control Painter 07 t16/2020 s16.31 07 t30/2020 WA 526.78 514.e2 Apprentice Wages Trade Name Traffic Control Stripers County Name King 07 t30/2020 Name Hours Public Notes e Show/Hide Existing Notes No note exists King 14.82 ,l 38.50 King Traffic Control Stri pers Journey Level 35.1 5 13.88 1 3 8.50 King Traffic Control Stripers Journey Level 34.75 17.13 53.50 King Traffic Control Stripers Journey Level Journey Level 37.75 34.75 17.13 3 4 42.00 King Traffic Control Stripers Traffic Control Stripers 17.23 s2.00 32.s0King37.75 41.00 17.23 13.98 3 King Traffic Control Stripers 1 3.50 Step#Begin Hour End Hour Reg td Begin Hours End Hours State WageS FringeS 5 2334 3499 LINDERS, JONATHAN 199170 06/18/2020 06/'t9/2020 06/18/2020 WA WA s23.93 s23.93 514.82 5't4.82 5.50 8.00523343499CAMERON, AMIE 1 98554 06t19/2020 4 4 4 1167 2333 NELSON, SEAN 204258 06t22/2020 06t26t2020 WA 520.74 513.88 30.00 1't67 1167 2333 2333 5833 LINDERS, JASON LINDERS, JASON 204204 06t28t2020 06t29t2020 07 t06t2020 WA s23.se s13.88 513.e8 21.50 5.0020420407 t06t2020 WA WA 523.s9 7 5 4667 2334 JACAWAY JACOB HAYES, BENJAMIN 191931 07 t15/2020 $31.s6 14.50 4.003499197551 3/3 j City of Kent - 2021 Plastic Markings#21-3011.2 Statutory Requirements '1.6 - Valid Business License (3 Years) OITACFi BFf:iil.lE PO9 Ilf,](; ffiLiseruffiss ["EtHru$H S'IAI'F OF !,1A!ttii\j{,; tOi.l Limited Liability Company lssue Date: Dec 11 ,2020 Unified Business lD #: 600553941 Business lD #: 001 Location: 0001 Expires: Oct31,2021 t, ::i APPLY-A-LINE, LLC 175 ROY RD SW STE C PACIFIC, WA 98047-2150 UNEMPLOYMENT INSURANCE - ACTIVE TAX REGISTRATION - ACTIVE INDUSTRIAL INSURANCE - ACTIVE CITY ENDORSEMENTS: FIFE GENERAL BUSINESS - NON-RESIDENT - ACTIVE KELSO GENERAL BUSINESS - NON-RESIDENT (EXPIRES 113112021) - ACTIVE MOUNT VERNON GENERAL BUSINESS - NON-RESIDENT - ACTIVE BATTLE GROUND GENERAL BUSINESS - NON-RESIDENT - ACTIVE ELLENSBURG GENERAL BUSINESS - NON-RESIDENT #8833 - ACTIVE MUKILTEO GENERAL BUSINESS - NON-RESIDENT - ACTIVE PUYALLUP GENERAL BUSINESS - NON-RESIDENT #9BO2B1- ACTIVE LAKEWOOD GENERAL BUSINESS - NON-RESIDENT #BLO2-00166 - ACTIVE BAINBRIDGE ISLAND GENERAL BUSINESS - NON-RESIDENT #12389 - ACTIVE CHEHALIS GENERAL BUSINESS - NON-RESIDENT #16-0169 - ACTIVE YELM GENERAL BUSINESS - NON-RESIDENT #10401- ACTIVE SHELTON GENERAL BUSINESS #0025540 - ACTIVE KIRKLAND GENERAL BUSINESS - NON-RESIDENT #OBL-0002796 - ACTIVE ANACORTES GENERAL BUSINESS - NON-RESIDENT - ACTIVE BELLINGHAM GEN ERAL BUSINESS #022861 - ACTIVE BONNEY LAKE GENERAL BUSINESS - NON-RESIDENT - ACTIVE BUCKLEY GENERAL BUSINESS - NON-RESIDENT - ACTIVE EATONVILLE GENERAL BUSINESS - NON.RESIDENT - ACTIVE GIG HARBOR GENERAL BUSINESS - NON-RESIDENT - ACTIVE ISSAQUAH GENERAL BUSINESS - NON-RESIDENT #BUSO3-00415 - ACTIVE tlr;s {i{rr(t!'!jr,,i!l !il1 llirt r'...gistralir:ri:-c, errrirrlcrrlertl:r, aitri lii--crtg+:; atriltlri-izcsl for thr: !rttsirttlss rn-,*g rcii-:pl*i;.,. lirrr,.. .rirrl ar-rrrr.lie io ihe tresl of liis eir litll iitrttv!edge, anel tl+;ri l;ll5irrerr rviil be ,a1!i{i{!{-iir{i irr r*:npli;liri:e r..ifll all;rpFlic.rirle l{aslii;igtctr:rl;rle, {{-iltnti, antl cili-'reijlrl:lli{iilt.I)irc{ !r}r lifl).t1n1L'il1 oi lii'rlr:tt<' STATE OF WASHINGTON UBI:600553941 001 0001 APPLY-A-LINE, LLC 175 ROY RD SW STE C PAC|FtC, WA 98047-2150 UNEMPLOYMENT INSURANCE - ACTIVE INDUSTRIAL INSURANCE - ACTIVE TAX REGISTRATION - ACTIVE FIFE GENERAL BUSINESS - NON-RESIDENT - ACTIVE KELSO GENERAL BUSINESS - NON-RESTDENT (EXPIRES I 131 1202',1) Expires: Oct31,2021 i;r:,.!ri :tt !-ii: rr r-;i]..: iral:i i ii':i; il,* { i 5 ii lu.i f. j';i'l 1.. q ii-. ii : f t :'; r: !, {.4 ! !: {}i iii:\i,i.iil.,i. i i t ii'l Limited Liability Company lssue Date: Jul 05, 2019 Unified Business lD #: 600553941 Business lD #: 001 Location: 0001 Expires: Oct 31 ,2019APPLY-A-LINE, LLC 175 ROY RD SW STE C PAC|FIC, WA 98047-2150 UNEMPLOYMENT INSURANCE - ACTIVE TAX REGISTRATION . ACTIVE INDUSTRIAL INSURANCE - ACTIVE CITY ENDORSEMENTS: FIFE GENERAL BUSINESS - NON-RESIDENT. ACTIVE BATTLE GROUND GENERAL BUSINESS - NON-RESIDENT - ACTIVE ELLENSBURG GENERAL BUSINESS - NON-RESIDENT #8B33 - ACTIVE MUKILTEO GENERAL BUSINESS - NON-RESIDENT - ACTIVE PUYALLUP GENERAL BUSINESS - NON-RESIDENT #9BO2B1 - ACTIVE LAKEWOOD GENERAL BUSINESS - NON-RESIDENT #BLO2-00166 - ACTIVE BAINBRIDGE ISLAND GENERAL BUSINESS - NON-RESIDENT #12389 - ACTIVE CENTRALIA GENERAL BUSINESS - NON-RESIDENT #6210 - ACTIVE CHEHALIS GENERAL BUSINESS - NON-RESIDENT #16-0169 - ACTIVE YELM GENERAL BUSINESS - NON-RESIDENT #10401. ACTIVE SHELTON GENERAL BUSINESS #0025540 - ACTIVE KIRKLAND GENERAL BUSINESS - NON-RESIDENT #OBL.OOO2796 - ACTIVE ANACORTES GENERAL BUSINESS - NON-RESIDENT. ACTIVE BELLINGHAM GENERAL BUSINESS #022861 - ACTIVE BONNEY LAKE GENERAL BUSINESS - NON-RESIDENT - ACTIVE BUCKLEY GENERAL BUSINESS - NON-RESIDENT. ACTIVE EATONVILLE GENERAL BUSINESS - NON-RESIDENT - ACTIVE GIG HARBOR GENERAL BUSINESS - NON-RESIDENT. ACTIVE ISSAQUAH GENERAL BUSINESS - NON-RESIDENT #BUSO3-00415 - ACTIVE LACEY GENERAL BUSINESS. NON-RESIDENT #4949 - ACTIVE { ii;t:r l.r, i }ri;;tilt::: irl r,i lii'l ;'r,i;. li-ll\l t: fJ i: V{l\$ l-i I N aiT{il'l UBI:600553941 001 0001 APPLY.A-LINE, LLC 175 ROY RD SW STE C PAC|F|C, WA 98047-2150 UNEMPLOYMENT INSURANCE - ACTIVE INDUSTRIAL INSURANCE - ACTIVE TAX REGISTRATION - ACTIVE FIFE GENERAL BUSINESS - NON-RESIDENT - ACTIVE BATTLE GROUND GENERAL BUSINESS - NON-RESIDENT - Expires: Oct 3'1 ,2019 ffi 1331-1 APPLY-A.LINE, LLC 175 ROY RD SW STE C PAC|F|C WA 98047-2150 DETACH BEFoRE POqMG.. . BUSINESS LICENSE STATE OF WASHINGTON Limited Liability Company APPLY-A-LINE, LLC 175 ROY RD SW STE C PACTFIC, WA 98047-2150 UNEMPLOYMENT INSURANCE - ACTIVE TAX REGISTRATION - ACTIVE INDUSTRIAL INSURANCE - ACTIVE CITY ENDORSEMENTS: SAMMAMISH GENERAL BUSINESS (EXPIRES 10131120191- ACTIVE SULTAN GENERAL BUSINESS (EXPIRES 713112019) - ACTIVE ctc HARBOR GENERAL BUSINESS (EXPIRES 10131120191- ACTIVE tssAQUAH GENERAL BUSINESS #BUS03-00415 (EXPIRES 10/31/2019) - ACTIVE TUMWATER GENERAL BUSINESS #r-0O4BB4 (EXPIRES 1013112019) - ACTIVE MARYSVILLE GENERAL BUSINESS #3232CON501 (EXPIRES 10131l20',lg) - ACTIVE SHoRELTNE GENERAL BUSINESS (EXPIRES 10t3112019) - ACTIVE ANACORTES GENERAL BUSINESS (EXPIRES 513112019) - ACTIVE BONNEY LAKE GENERAL BUSINESS (EXPIRES 10/31i2019) - ACTIVE LAKE STEVENS GENERAL BUSINESS (EXPIRES 10/31/2019) - ACTIVE STANWOOD GENERAL BUSINESS (EXPIRES 1013't12019) - ACTIVE LONGVIEW GENERAL BUSINESS #2737s (EXPIRES 1013112019) - ACTIVE EATONVILLE GENERAL BUSINESS (EXPIRES 10t3112O19) - ACTIVE poRT oRCHARD GENERAL BUSINESS #8000673 (EXPIRES 1013112019) - ACTIVE BUCKLEY GENERAL BUSINESS (EXPIRES 1013112019) - ACTIVE oLYMPIA GENERAL BUSINESS #8326 (EXPIRES 1013'1120191- AcTlvE UNIVERSITY PLACE GENERAL BUSINESS (EXPIRES 813112019) - ACTIVE VANCOUVER GENEML BUSINESS (EXPIRES 10131t2019) - AGTIVE WASHOUGAL GENERAL BUSINESS (EXPIRES 8/31/2019) - ACTIVE SEDRO WOOLLEY GENERAL BUSINESS (EXPIRES 9/30/2019) - ACTIVE pouLSBO GENERAL BUSINESS #704 (EXPIRES 10/31/2019) - ACTIVE Unified Business lD #: 600553941 Business lD #: 001 Location:0001 Expires: Dec 31 ,2018 Director, Department of Revenue This document lists the registrations, endorsements, and licenses authorized for the business named above. By accepting"this document, the licensee certifies the information on the application was complete, true, aird alcurate to the best of his or her knowledge, and that business will be conducted in compliance with all applicable Washington state, county, and city regulations. STATE OF WASHINGTON Apply-A-llne, ttcClly ol Kenl - 2021 Plostlc Mcrkings - Project No. 21 -301 1.24. EXPERIENCE4.1 Colegories of workTroffic Povement Morkings on City, Counly, Siole ond Federol Highwoys, Airports ond Commerciol Porking Areos:Specificolly instolloiion of :Extruded concrete, ospholl, block ond precost curbLone morkers, Plostic bullons ond Rumble borsHighwoy / Airport point stripingRemovol of Point ond Plqsiics {including shot blosting, grinding ond High Pressure woJer removol)Applicotion of hol, cold ond inloid thermoplqsticsDurostripeRumble stripsSignoge4.4 Mojor Projeck - *CunenlJul-21Sep-21Oct-21Lynnwood Link Extension 1300l-5, SRs10 l/C Reconshuciion #9297Povement Morkings Jefferson County$239,304.s0$552,269.00$402,330.00Sound Tronsil (Skonsko Constructors-Prime) Robin ClorkeWSDOT {Scorsello Bros.-Prime) Tom KressJetferson Counly Dole SewordADDRESS1995 Aguo Monso RdPO Box 68697623 Sheridon StRiverside CA 92509Seotile WA 98158PtTownsend WA 98368{95l) 684-s360 90%l2s3l 872-7173 90%{360) 38s-9r60 65%*Apply-A-Line hos numerous contrqcts in vorious sloges ot compleieion wiih vorious public works entitites.4.5 ^ oJor Prolects - CompleleYEAR ..NTRACT 7o owNCOMPLETE PROJECT AMOUNT OWNER CONTACT ADDRESS -PHONE FOBQES2Ot8 20iSSheetSlripinS $21,234.00 Cilyof Bonneyloke SteveWillodson POBox7380 Bonneyloke WA 98391 l25l1 e62-8602 100%2Ol8 20isFridoyHoricoiRoodSlripe g7,5l8.OO Cityof FridoyHorlcor DoveSmiih POBox2l9 FridoyHorborWA93250 (360) 378-3192 1OV.2018 DNROlytS-t32018HMls+riping 922,109.58 WADeptNoturol Resources PomSuslick 4ll TillicumLn Forks WA 98331 (360) 3742831 100%2018 2018 City of tssoquoh nooa stripe 927,880.00 City of lssoquoh Mork Pitzen PO Box 1307 lssoquoh W A 98027 (4251 837-3449 100%2Ol8 2Ot8 Mutitpte Moieriols Project - Povement Morking $55,357.23 Asotin Counly G|enn Schornhorst PO Box 160 Asotin WA 99402 1509lr 243-2074 lO0%2Ol8 2018 Rood Resiriping $94,218.88 Ciiy of Morysville Joke Wetzel 80 Columio Ave Morysville W A 98270 (360) 363-8260 100%2Ot8 20tsJeffersonCounlyRoodStripe 9306,/63.89 JeffersonCounty DoleSeword 623SheridonSl PortTownsend WA 98368 {360)385-9353 100%2019 26lgStreetPqvemeniMorkingProgrom 9181,811,00 Cityof Mill Creek LorryCelustko 15728MoinSt Mill Creek WA 98012 (425)551-7254 100%2O1g 20tgAnnuol City-WideSi1pingMointenonce 940,325.00 CiiyofMountlokeTenoce MorcSeferion 610020l9thStSW MountlokeTenoceWA980a(425) 74+6265 lOO%ZOlg povement Morking lnsiolloiion 2019 g38,SlO.OO City of Mercer lslond Brion Hortvigson 961I SE 361h Sl Mercer lslond WA 98040 (2061 275-7809 1007"2019 2Ol 9 tssoquoh nooa Stripe $28,O8O.OO City of lssoquoh Mork Pilzen PO Box I 307 lssoquoh W A 98027 1425l. 837-3449 100%2O1g 26lgcityof BuckteyRoodStripe 916,979€0 Cityof Buckley JohnDonsby POBox 1960 Buckley WA 98321 '253l' 261-9826 100%2O1g 2019 Fridoy Horbor Rood Slripe $Z,88Z.SO Ciiy of Fridoy Horbor Dove Smilh PO Box 219 Fridoy Horbor WA 98250 (360) 378-3192 \ffi%2O2O 2019 Striping Conlroct 9584,206.52 City ot Tocomo Michoel Slode 742 Morket Sl Room 522 Tocomo WA 98402 (253) 591-2004 80%2OZO Greenwoy Fovement Morkings Phose 1 9107,930.00 Ciiy of Federal Woy Noveen Chondro 33325 8lh Ave 5 Federol Woy WA 98003 (2531 835-2729 100%ZOZO 2020 Annuot Striping Progrom 9326,803.00 Klickitol County Don Bellomy 228 W Moin ST MS-CH '19 Goldendole WA 98520 (509177X2371 100%2o2o 2g2gpovemeniMo;king 9102.995.55 Ciiyof Everett MikeKongqs 3200CedorSt Everett WA 98201 (425)2574840 100%ZO2O 2020 Citpvide Povement Morkings 967,800.00 City of Bothell Jomol Mohmoud 18415 l0lsi Ave NE Bothell WA 9801I (425) 318-9020 100%ZO2O 2O2OCny of portOrchordThermoplostic 939,734.00 Cityof PortOrchord TonyLong 216ProspectSt PortOrchord WA 98366 (3601 535-2490 100%2O2O 2020 povemenl Morkings 930.366.00 City ot Federol Woy Noveen Chondro 33325 8ih Ave S Federol Woy WA 98003 .253lr 835-2729 100%2OZO 2020Annuol City-Wideahiping g32,562.20 Cilyof MounllokeTerroce Morcseferion 61002l9thStSWSte200 MounilokeTenWA98043 (4251 77G1161 100%2OZO Cityof tssoquohRoodslriping 925,280.00 Cityof lssoquoh MorkPifzen POBoxl3O7 lssoquqh WA 98027 1425)837-3449 100%2OZO 2g2gcityoiBonneyLokeRoodstripe 924,853.50 CityofBonneyLqke TrissWeber POBox7380 Bonneyloke WA 98391 12531447-4320 100%2OZO 2020 City of Pocific Rood Stripe 912,775.00 City of Pocific Jomes Schunke 100 3rd Ave SE Pocific WA 98047 12531 929-1116 100%2O2O 2020 City of Aberdeen Rood Shipe 910,303.20 City of Aberdeen Sheilo Pellegrino 200 E Morkel Aberdeen WA 98520 {350) 537-3237 IOO%ZOZO 2020 Fridoy Horlcor Rood Stripe g7,887.80 City of Fridoy Horbor Dove Smilh PO Box 219 Fridoy Horbor WA 98250 {360) 378-3192 lOO% !Apply-A-Line, [[CCity of Kenl - 2021 Pldstic Jllqrkings - Projecl No. 2l -301 1.24. EXPERIENCE4.6 Conslruclion ExperlenceApply-A-Line hos been o Speciolty Conlroctor in Trqffic Pqvement Morkings for 37 yeors, bockedwiih o veleron stoff odepi in odminisirotive qnd field experience, estimoting, scheduling ond operoiions monogemenlApply-A-Line hos built o solid reputotion with Ciiy, Counly, Siole ond Federol Highwoy Agencies, US Militory qnd Airporl:wilh our knowledge, experience, estimoting, scheduling ond operotions monogemenl.We oltribute our success to the experience of our personnel qnd their dedicotion to providing quolity workmqnship ond timeliness in compleling eoch projectAdditionolly, we moinioin opproximotely 35 union iroined {Closed Union Shop) ioumeymen ond oppreniices yeqr round. Our employees ore required to ottoirWe volue our obility to deliver quoliiy service with stote of lhe ort technology ond equipmeni ond ore commitled to the highesl siondords 01professionol workmonship ond cuslomer service.Michoel LiliesiromRon ReillyMike SusnerRuss StelsonDove BennettJon WellsJeff DeonJomes SusnerLeo Vega-MortinezPresidentAssisloni Vice PresidenlEslimolorBtimotorOperotions MonogerJourneymon PointerJoumeymon PointerJourneymon PointerJoumeymon Pqinter43 Yeors39 Yeors43 Yeors32 Yeors26 Yeors18 Yeors18 Yeors3l Yeors20 YeorsAdministrotion, building ond operolion of highwoy striper. estimoting, mointenonce, supervision, dispotch ond schedulingOperoiions Monogemenl, esiimoling, supervision of personnel, field experience ond operotionsField operotions experience, estimoting, scheduling, supervision of personnel, dispotching crewsField experience, estimoiing, project monogetField operolions ond experience, scheduling, supervision ot personnel.dispolching crewsField operotionsField operotionsField operoiionsField operolions 1 Apply-A-tine, ILC Cfi of Kent - 2021 Plqstic Morklngs - Projecl No. 2l -301 1.2 4-EXPERIENCE 4.7 - Mqjor Equipmenl FTEET # DESCRI . VEHICTES FTEEI # DESCRIPTION . 450 455 465 510 550 575 595 625 670 7lo 730 745 765 7?O 800 805 810 850 865 890 900 920 925 930 ?40 r010 r 015 r 060 r 070 I 095 I 100 il10 il15 I 120 1 r25 li60 lt65 I 170 \175 1l85 1275 r 280 I 285 1290 r 320 1330 r335 t 340 I 350 I 365 1 370 I 375 r390 I 395 r 400 1405 t4r0 1445 I 455 1460 1465 r490 1495 r530 1535 1565 I 520 I 605 INTERNATIONAL FLATBED D INTERNATIONAL FLATBED D INT'L BOB TAIL TRACTOR D FORD F25O PICKUP U INTERNATIONAL FLATBED D INTERNAlIONAL FLATBED D INTL FLATBED D FORD RANGER U INTERNATIONAL 5 DUMP TRUCK D FORD F25O PICKUP D Ford Super Crew F I 50 U INTERNATIONAL Flotbed MMA Supply Truck D INTERNATIONAL Flotbed MMA Supply Truck D INTERNATIONAL 5 YARD DUMP D FORD F25O D Ford F250 D Ford F250 D lnternotionol Thermo S/F D Ford F250 D GMC T75OO SINGLE AXLE, WLIFI AXLE (STRIPER) D INTERNATIONAL THERMO S/F D FORD F 250 PICKUP D FORD F35O PICKUP D TANDEM AXLE, DAY CAB ond CHASSIS HAUL TRUCK FREIGHTLINER SINGLE AXLE, WLIFI AXLE (STRIPER) D FREIGHTLINER SINGLE AXLE, WLIFI AXIE ISTRIPER} D FORD F35O FLATBED D FORD RANGER U FORD RANGER U FORD F150 PICKUP U FORD FI50 PICKUP U FREIGHTLINER D Pulls Lowboy TRL 160 D FREIGHTLINER SINGLE AXLE, W/LIFI AXLE (SIRIPER) D FORD RANGER PICKUP U GMC W-4500 STRIPER D FORD TYMCO 600 FHD SWEEPER D OOS FORD FI50 PICKUP U ISUZU NPR'l2ft Flqlbed D INTERNATIONAL 8600 TANDEM AXLE FLATBED D INTERNATIONAL 8600 TANDEM AXLE TRUCK UHP Truck D ELGIN BROOM BEAR D ISUZU NPR-HD Lone Morker U ISUZU NPR FTATBED D FREIGHTLINER FLATBED D CHEVROLEI 25OO SILVERADO U CHEVROLET 25OO SILVERADO U INTERNATIONAL 8600 MMA STRIPER D FREIGHTLINER STRIPE REMOVAL SYSTEM-UHP D DODGE RAM ISOO SUPER CAB U DODGE RAM I 5OO SUPER CAB U ISUZU NPR U INTERNATIoNAL 8600 MMA Striper D CHEVROLET 25OO SILVERADO U CHEVROLET 25OO SILVERADO U INIERNATIONAL 8600 SINGLE AXLE, WLIFI AXLE (STRIPER) D CHEVROLEI COLORADO U CHEVROLET COLORADO U CHEVROLET COLORADO U CHEVROLET 25OO SILVERADO U CHEVROLEI COLORADO U CHEVROLET C35OO U CHEVROLET 35OO U CHEVROLET 35OO U CHEVROLET 25OO SILVERADO U CHEVROLEI 25OO SILVERADO U INTERNATIONAL 8600 ISUZU NPR U RAM 35OO U RAM 35OO U CHEVROLEI SILVERADO 48 105 r55 160 205 220 230 250 255 265 270 300 315 330 335 370 390 400 4t0 42s 435 470 s00 s05 530 540 560 570 600 605 610 615 620 625 630 640 650 675 680 685 785 800 810 820 830 835 845 855 865 820 900 9r5 920 945 955 965 ?70 975 990 1025 I 040 't065 1 085 |t00 MISC ROSCO RB48 SWEEPER HOFFMAN PROFILE MACHINE TMT 75D DURA.STRIPE PROFILE RIG JD855 #l Gdnder LINE LAZER Homemode mochine / Corey Groy THERMO APPLICATOR JD 855 #3 Grinder HYSTER FORKLIFT LINE LAZER LINE TAZER THERMO APPLICATOR Voxcovotor Model VT 800 DHD 800 Gol lrlr mid JD 855 #6 Fronl Loqder M-60D 5/ HP DieselselFpropelled sow M-60D 57 HP Diesel self-propelled sow HYSTER FORKLIFT DICKSON ROAD PRO 6IZO Welder JD 4720 TRACTOR Welder MILLER EXTRUDED CURB MACHINE 2OOO LB THERMO PRE METTER Wirtgen W500 Rumble Culter Generolion 2 Jet Dryer DELTA LTL-X RE]ROMETER WGPS JD 855 Grinder #8 Wirtgen W60 Rumble Culler LINE LAZER THERMO APPLICATOR NLB Woter Blosler Mounled on Truck # I I Z0 MMA Slruclured Line Applicotor RADIANT HEATER MODEL KM4-20 Airmork WIRTGEN W35DC LINE LAZER LINE LAZER RUMBLE STRIP CUT]ER HEAD 300 Gol point tonk w/ogitoior {2) LINE LAZER LINE LAZER l0'Slroroge Unit HEA]ER, SR28 VT3000 Vocuum System (6) MMA Meiers LINE LAZER HEATER, SR2B HEATER, SR2B JD 855 Front Looder Hond Grinders-Edco, Von Arx, Smilh 25D, MMA sproy rig 25D. MMA sproy rig Thermomork Foslmell 650 THERMO APPLICATOR THERMO APPLICATOR LINE DRIVER HD LINE LAZER LINE DRIVER HD LINE DRIVER HD LINE DRIVER HD CRAFCO SS125 otloched to lruck 1350 Supershoi 60 Diesel Skid Mount Bilum. Meller Hydroulic Truck Conveyor Messoge boord, lruck mounled Truck 810 John Deere 2032 R MINI MAC 4OO lhermomork 250 Hondliner '':( Apply-A-tine, LLC ; City of Kent - 2021 Plostlc Morkings - Project No. 21'3011.2 4-EXPERIENCE 4.7 - Mojor Equlpmenl NUMBER DESCRIPIION - TRAIIER5 HOFFMAN TRAILER TFB9MOOI TRAILMAX TILTBED TRL WIRTGEN TRAILER TOWMASTER T.I2.T 7XI8 BULLDOG TILT-BED (PWR MAC TRLR) Tow Mosler T-12-T 2002 Towmosler T-l 2-T lilt Trlr l8' 2002 Towmoster T-l 2-T lilt Trlr 16' DICKSON INDUSTRIES (BIG TURBO TRLR) lnierstole while corgo trlr MMATRAILER Bulldog till Troiler Bulldog till Troiler Voclron 800 gol voc-troiler (vt pmd800sdt)s/n 8DHD05l I 0l 35P 38' Low Boy Troilking TK7OHT HOMEMADE UTILITY TRAILER INTERSTATE CARGO Model ISFC I 0228TAZ AIRMARK TRLR PACE 4171697A3 CARGO TRAILER CURB TRAILER TRAILER,2OO3 GREAT LAKES PUP I6' Block Poinl/Airport Troiler Bulldog 20' enclosed koiler TRAILMOBILE 7K HD TILT 0r0 025 035 040 045 060 065 'I 15 120 125 r30 150 160 173 r95 200 4aa 245 250 698 310 BIDDER RESPONSIBILITY CRITERIA Statement that Bidder Has Not Been Disqualified This statement is required by state law (RCW 39.04.350(1)(d)) to be submitted to the City before the contract can be awarded' The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (February 23, 202L), the bidder has not been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). Applv-A-Line, LLC Bidder's Business Na , Signature of Authorized Officialx Ron Reilly Printed Name Assistant Vice President Title Washingtono2123/2O2L Date Pacific City * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. 2021 Plastic Markings/Araucto Project Number: 2I-3OLL.2 State 16 February 8,202L BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (February 23, 202I), the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Applv-A-Line, LLC Bidder's Business Name Signature of Authorized Officia Ron Reillv Printed Name Assistant ce President Title 0 o2r Date Pacific Washington StateCity x If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner' 2021 Plastic Ma rkings/Araucto Project Number: 2L-30LL2 T7 February 8,2O2I PROPOSAL SIGNATURE PAGE The undersigned bidder hereby proposes and agrees to start construction work on the Contract, if awarded to him/her, on or before ten (10) calendar days from the date of the Notice to Proceed, and agrees to complete the Contract within twenty-five (25) working days after issuance of the City's Notice to Proceed. The undersigned bidder hereby agrees to submit all insurance documents, performance bonds and signed contracts within ten (10) calendar days after City awards the Contract. The City anticipates issuance of the Notice to Proceed on the day of the preconstruction meeting. No bidder may withdraw his/her bid for a period of sixty (60) calendar days after the day of bid opening, The required bid security consisting of a bid bond, cashier's check or cash in an amount equal to 5olo of the total amount is hereto attached. Notice of acceptance of this bid or request for additional information shall be addressed to the undersigned at the address stated below. Receipt of Addendum No.'s [ , -, -, to the plans and/or specifications is hereby acknowledged. Failure to acknowledge receipt of the addenda may be considered an irregularity in this proposal' By signing this Proposal Signature Page, the undersigned bidder agrees to accept all contract forms and documents included within the bid packet and to be bound by all terms, requirements and representations listed in the bid documents whether set forth by the City or by the Bidder. DATE:02/23/202r Aoolv-A-Line. LLC NAME Signature of Authorized Re ntative Ron Reilly, Assistant Vice President (Print Name and Title) 175 Rov Rd SW Bld o c Address Pacific WA 98047 2021 Plastic Ma rkings/Araucto Project Number: 2l-3OtL.2 18 February 8,202L KENT PUBLIC WORKS DEPARTMENT Mark Howlett, P.E. Interlm Deputy Director/City Engineer 400 West Gowe Kent, WA 98032 Fax: 253-856-6500 PllONEr 253-856-5500WagHtNGToN FROM: TOr CITY OF KENT KING COUNru WASHTNGTON 2O2t Plastic Markings Project Number: 21-3OIL.2 ADDENDUM No. 1 February 1.6,2O2t' The Office of the City Engineer' Kent Washington All Plan Holders of the Project specifications and Plans This addendum forms a part of the Gontract documents and modifies the Proiect proposat and Specifications and Contract Drawings in accordance with the followingl ALL CHANGES ARE REFLECTED IN RED I - KEI{T SPECIAL PROVISIONS Page 8-1 - Section 8'22'2 - Materials REVISE Type A as follows: Type A (Liquid Hot Applied Thermoplastic) plastic material shall be used when applying the following Pavement markings.r Plastic Crosswalk Lineso Plastic StoP Linesr Plastic Yield Line SYmbol r Plastic Railroad Crossing makings o Intersection Turn Extension Line END OF ADDENDUM NO. 1 6- Mark Howlett, P.E.Date 1 Interim Deputy Dlrector/City Engineer S-*Lrs*i**ffik CASHIER'S CIIECK 34-827 11231 DATE CIMCK NUMBER Feb 22, zozt 1391556 $ ******5,500.00 PAY TO THE ORDER OF *Void if over $6,500.00 Purchaser RONALD REILLY ,F{<{.CITY OF KENT*** r! I ?5 tOB d? ?tl tt'.9OOOOOOO l{tt' The condition of this obligation is such that if the Obligee shall make any award to the Principal for 2O2L Plastic Markings/Project Number: 21-3011.2 According to the terms of the proposal or bid made by the Principal thereof, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the invitation to bid, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the amount of this bond. SIGNED, SEALED AND DATED THIS DAY OF 2027. PRINCIPAL SURETY n. l l q l 5 5 Ett' SIX THCIUSAND FJVH HUNDRED AND NO/ 3"0 CI nOLLARS* * * * * * * * * * * * * * * * * * * * * * * * * * * * 20 Received return of deposit in the sum of $ 2021 Plastic Markings/Araucto Project Number: 27-3OII.2 19 February B,2027 CITY OF KENT COMBINED DECLARATION FORM: NON-COLLUSTON, MTNTMUM WAGE NON.COLLUSION DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement' participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. AND MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having duly sworn, deposed, say and certify that in connection with the peformance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work not less than the prevailing rate of wage or not less than the minimum rate of wage as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. 2OZI Plastic Markings Project Number: 2L-3Ot L.2 NAME OF PROJECT Apply-A-Line, LLC NAME OF BIDDER'S FIRM SIGNATURE OF AUTHORIZED RESENTATIVE OF BIDDER Ron Reilly, Assistan President 2021 Plastic Markings/Araucto Project Number: 2t-3}t1-2 20 February B,2O2I This change order form is for example purposes only. By submitting a bid, the bidder agrees to be bound by the terms of this change order form for any change orders. CHANGE ORDER NO' [Enter # Lt 2, 3, etc.] NAME OF CONTRACTOR:llnsert Companv Namel ("Contractor") CONTRACT NAME & PROJECT NUMBER:[Insert Name of Orioinal Contract & Proiect #. if apolicable] ORIGINAL CONTRACT DATE :llnsert Date Original Contract was Siqnedl This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1, Section 1 of the Contract is hereby modified to revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessarY to: [Insert detailed description of additional materials, services, etc., that are needed which necessitate this change order - Be as detailed as possible. You may also refer to an attached exhibit, but clearly identify the exhibit by title and datel 2. The contract amount and time for performance provisions of Section 1 of the Contract are also modified as follows: Original Contract Sum, (including applicable alternates and WSST) $ Net Change by Previous Change Orders (incl. applicable WSST) $ Current Contract Amount (incl. Previous Change Orders) $ Current Change Order $ Applicable WSST Tax on this Change Order $ Revised Contract Sum $ 2021 Plastic Markings/Araucto Project Number: 2I-30It.2 2L February 8,2O2L Original Time for ComPletion (insert date) Revised Time for Completion under prior Change Orders (insert date) Days Required (+) for this Change Order working days Revised Time for Completion (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent Special Provisions and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below, Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind oi nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract, 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above' IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. 2021 Plastic Markings/Araucto Project Number: ZL-3OIL.2 CONTRACTOR: By (signature) Print Name I fc (title) DATE: CITY OF KENT: By (signature) Print Name: Chad Bieren. P.E. Its Interim Public Wor (titte) DATE: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department 22 February B,2O2I BIDDER'S CHECKLIST The following checklist is a guideline to help the Contractor make sure all forms are complete. The bidder's attention is especially called to the following forms. Failure to execute these forms as required may result in rejection of any bid. Bidder's Package should include the following: Bid Document Cover Sheet filled out with Bidder's Name .'....tr Order of Contents........... .............. tr Invitation to Bid Contractor Compliance Statement...... Date Have/ have not pa rticipated acknowledgment........... Signature and address ....'... Declaration - City of Kent Equal Employment Oppoftunity Policy Date and signature '...'..Administrative Policy Proposal First line of proposal - filled in .......... Minimum bid prices are correct... Unit prices are correct SUbCOntraCtOr LiSt (contracts over $1M - HVAC, Plumbing, & Electrical)............ Subcontractors listed ProPerlY Signature Subcontractor List (contracts over $1M - Structural Steel & Rebar Installation).. Subcontractors listed proPerly Date and signature ....... Contractor's Qualification Statement ............ Complete and notarized Statement that Bidder Has Not Been Disqualified ......... Certification of Compliance with Wage Payment Statutes Proposal Signature Page All Addenda acknowledged Date, signature and address ........ Bid Bond Form Signature, sealed and dated Power of Attorney.......... (Amount of bid bond shall equal 5o/o of the total bid amount) Combined Declaration Form Signature Change Order Form Bidder's Checklist The following forms are to be executed after the Contract is awarded: A) CONTRACT This agreement is to be executed by the successful bidder. B) PAYMENT AND PERFORMANCE BOND To be executed by the successful bidder and its surety company. The following form is to be executed afterthe Contract is completed: A) CITY OF KENT EOUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT To be executed by the successful bidder AFTER COMPLETION of this contract. 2021 Plastic Ma rkings/Ara ucto Project Number: 2L-30LL.2 tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr tr 23 February 8,202t KENT PAYMENT AND PERFORMANCE BOND TO CITY OF KENT Bond No. ES00007362 KNOW ALL MEN BY THESE PRESENTS That we, the undersigned,App LLC as Principal, and Everest Reinsur.qnce Gg4pany . . *. * a Corporation organized and existing under the laws of the State of Washington, as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of 5 tZs,SsZ.Oo.. , together with any aQjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal repreSentatives, as the CaSe may be. --Ione HundredrwentyFiveThousandrhreeHundrcdFiftvsevenand00/1001 This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT' Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of 2O2l Plastic Markings/Project Number:21-3O11.2 (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the C ITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect' tN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority of its governing body. 2O21 Plastic Markings/Araucto Project Number: 21 -3011.2 24 February 16,2021 TWO WITNESSES Jennifer Hoxig --PRINT NAME DATE: 03/LL/202L TITLE A SS1 .stant Vic Apply-A-Line, LLC PRINCIPAL (enter above) BY Ron Rei11y Pres'i dent DArE. 03/LL/202L <.-Bvr CORPORATE SEAL Sandra Sablan PRINT NAME DATE: 03/LL/202L Everest Reinsurance ComPanY SURETY CORPORATE SEAL a DATE. March 4,2021 TITLE:Aaron P. Clark, Attorney-ln-Fact ADDRESS P.O. Box 830 Liberty Corner, NJ 07938 - 0830 CERTIFICATE AS TO GORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within Bond; that Who signed the said bond on behalf of the Principal of the said Corporation; that I know his signature thereto is genuine, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. SECRETARY OR ASSISTANT SECRETARY BY 202 1 Plastic Markings/Araucto Project Number: 21 -3O1 1,2 25 February 16,2021 J* .c'IEREE\POWEROF ATTORNEY EVEREST REINSURANCE COMPANY DELAWARE KNOW ALL PERSONS By THESE pRESENTS: That Everest Reinsurance company, a corporation_^of ^the. state of Delaware (,,Compan/) having its principai-omce tocaGa at 477 Martinsville Road, Liberty coiner, New Jersey 07938, do hereby nominate, constitute, and appoint: Florcnce Mc}Iettan, Kristin Dartlng, Aaron p. Ctark, Autumn Stocklon, Robert F. Bobo, Timothy F' Kelly its true and lawful Attorney(s)-in-fuct to make, execute, aftest, seal and deliver for and on its behalf, as surety, and as its act and deed' where required, any and all Oonds and undertakings in the naiure thereol for the penal sum of no one ofwhich is in any event to exceed UNLIMITED, reserving for itself the full power of substitution and revocation' Such bonds and undertakings, when duly executed by the aforesaid Aftorney(stin-fact shall be binding upon the Company as fully and to the same extent as if such bonds and indertakings were signed by the President and Secretary of he Company and sealed with its corporate seal. This power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board of Directors of Company ("Board") on the 28th day of July 201 6: RESOLVED, that the president, any Executive vice President, and any senior vice President and Anthony Romano are hereby appointed by the Board as authorized to make, execute, seal and deliver for and on behatf of the Company, any and all bonds' undertakings, contracts or obligations in surety or co-surety with others and that the Secretary ot any Assr:stant se cretary of the Company be and that each of them heieby is authoriied fo affesf to the execution of any such bonds, undertakingg contracts or obligations in surety or co-surety and aftach thereto the coryorate seal of the Company' RESOLVED, FURTHER, that the Prcsident, any Executive Vice President, and any Senior Vice President and Anthony Romano are hereby authorized to execute powers of attorney quatifying the attorney named in the given power of attomey to execute' on behalf of the Company, bonds and underlakings in surely or co-surety with others, and that the Secrctaty or any Ass':sfanf Secretary of the Company be, and that each of them is hereby auhorized to attest the execution of any such power of aftorney, and to aftach thereto the corporate seal ofthe comqanv' RESOLVED, FURTHER, that the signature of such officets named in the preceding resolutions and the corporate seal of the Company may be atrixed to such powers of afromey or to any certificate relating thereto by facsimile, and any such power of attorney or certificate beaing such facsimite signatures or facsimile seat shalt he thereafter valid and binding upon the Company with respect to any bond, undertaking, contact ot obligation in surety or co'surety with others to which it is attached' lN WITNESS WHEREOF, Everest Reinsurance Company has caused their corporate seals to be affixed hereto, and these presents to be signed by their duly auttlorized officers 0ris 28th day of July 201 6' l,MJn'rL Everest Reinsurance GomPanY ds On this 2gth day of July 2016, before me personally came Anthony Romano, known to me, who, being duly sworn, did execute the above instrument; that he knows the seal of said Company; that the seal affixed to the aforesaid instrument is such corporate seal and was affixed thereto; and that he executed said instrument by like order. Pu- Attest: Nicole Chase, Assistant Secretary By: Anthony Romano, Vice President LINDA ROBINS Notary Public, State of New York No 01R06239736 Qualified in Quosns County Term Expires Aptil 25, 2023 Linda Robins, Notary Public lN WITNESS WHEREOF, I have hereunto set my hand a'nd affixed the seal of said Company, at the Liberty 6s1ns1, 16;5 4th 66y of March ES 00 01 04 16 2021 CONTRACT THIS AGREEMENT, is entered into between the CITY OF KENT, a Washington municipal corporation ("City"), and Applv-A -Line. LLC organized under the laws of the State of Washington located and doing business at L75 Rd SW. Blde C.Pacific l,{A 98047 ("Contractor"). WITN ESS: In consideration of the terms and conditions contained in this Agreement and in the project documents, plans, and specifications all of which are a part of this Agreement, the parties agree as follows: 1. The Contractor shall do all work and furnish all tools, materials, and equipment for 2O2L Plastic Markings/Project Number: 21-3O11.2 in accordance with and as described in the Contract and shall perform any alterations in or additions to the work provided under the Contract and every part thereof. The Contract shall include all project specifications, provisions, and plans; the City's general and special conditions; the 2O2t Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations, if applicable ("standard Specifications"); the City's bid documents; and the Contractor's response to the City's bid. The Contractor is responsible to obtain copies of the 2O2L WSDOT Standard Specifications including the latest amendments issued by WSDOT as of the date of bid opening. Unless otherwise directed by the City, work shall start within ten (10) days after the City issues its Notice to Proceed and work shall be physically completed within twenty-five (25) working days. The term of this Contract shalI continue until all work has been completed, Final Acceptance has occurred, and all Contractor obligations have been fulfilled. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing all the work provided for in the Contract, except where the specifications allocate that responsibility to the City. The total contract amount for all Work performed under this Contract, including Washington State Sales Tax, is $L25,357. The City hereby promises and agrees with the Contractor to employ, and does employ, the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract and the terms and conditions herein contained and hereby contracts to pay for the same according to the Contract and the schedule of unit or itemized prices provided by Contractor in its response to the City's bid, at the time and in the manner and upon the conditions provided for in the Contract. The Contractor for itself, and for its heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all covenants herein contained upon the part of the Contractor. 2 3 2021 Plastic Markings/Araucto Project Number: 2I-3OIL.2 26 February 23,2O2I 4 5 It is further provided that no liability shall attach to the City by reason of entering into this contract, except as expressly provided herein. Contractor shall defend, indemnify, and hold the City, its officers, officials, employees, agents, volunteers and assigns harmless from any and all claims, irjuries, damages, losses or suits, including all legal costs and attorney fees, aiising out of or in connection with the performance of this contract, except for ifluries and damages caused by the sole negligence of the City. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competentjurisdiction determine that this contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily iqjury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, ag-ents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this contract. Contractor agrees, upon the City's written demand, to make all books and records available to the City for inspection, review, photocopying, and audit in the event of a contract related dispute, claim, modification, or other contract related action at reasonable times (not to exceed three (3) business days) and at places designated by the CitY. The Contractor shall procure and maintain, during the term of construction and throughout the specified term of maintenance, insurance of the types and in the amouhts described in Exhibit A attached and incorporated by this reference. Contractor is responsible for locating any underground utilities affected by the work and is deemed to be an excavator for purposes of RCW Ch. 19'122, as amended. Contractor shall be responsible for compliance with RCW Ch. 19'122, including utilization of the "one call" locator service before commencing any excavation activities. 6 7 I 2021 Plaslic Markings/Araucto Project Number: 21 -3011 .2 27 February 16,2021 CITY OF KENT BY: DANA RALPH, MAYOR DATE: ATTEST KTMBERLEY A. KOMOTO, CITY CLERK APPROVED AS TO FORM: KENT LAW DEPARTMENT CONTRACTOR BY PRINT NAME; Ron Rei11Y TITLE DATE:a3/Lt/202L Assistant Vice President 2021 Plastic Markings/Araucto Project Number: 21-3O1'l .2 28 February 16, 2021 03/18/2021 EXHIBIT A r NSURANCE REQU I REMENTS FOR CONSTRUCTION PROJEGTS I nsurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for irjuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors, A. Minimum Scope of lnsurance Contractor shall obtain insurance of the types described below: 1. Gommercial General Liability insurance shall be written on ISO occurrence form CG OO 01 or its equivalent, with minimum limits of $3,OO0,OOO per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,OOO,OOO p-er occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 0311 85. The Gity shall be named as an Additional lnsured under the Gontactor's Gommercial General Liability insurance policy with respect to the work performed for the Gity. A[ endorsements adding Additional Insureds shall be issued on form CG 2() 1O 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Covelage shall be written on lnsurance Services Office (lSO) form CA OO O1 or a substitute form providing equivalent liability coverage. lf necessary, the policy shall be endorsed to provide contractual liability coverage. 3, Workers'Gompensation coverage as required by the lndustrial lnsurance laws of the State of Washington. B. Minimum Amounts of I nsurance Contractor shall maintain the following insurance limits: 1. Gommercial General Liability insurance shall be written with minimum limits of $3,0OO,OOO per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,OOO,OOO per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. 2O21 Plastic Markings/Araucto Pro-ject Number: 21 -3O1 1 .2 29 February 16,2021 EXHIBIT A (Gontinued) 2. Automobile Liability insurance with a minimum combined single limit for bodily trULlry and property damage of $1,OOO,OOO per accident' C. Other lnsurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained -by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certiiied mail, ret"urn rec'eipt requested, has been given to the City. The City of Kent shall be named as an additional insured on all policies (excepi Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of lnsurance. The City reserves the right to receive a certified copy of all required insurance policies' The Contrictor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liabilitY. D. Gontractor's I nsurance for Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, contractor's employee owned tools, machinery, equipment, or motor vehicles"owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to-any temporary structures, scaffolding and protective fences, E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the lnsurance Requirements Sectjon of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise' 202'l Plastic Markings/Araucto Project Number: 21 -3O11.2 3 30 February 16,2021 EXHIBIT A (Gontinued) F. Acceptability of lnsurers lnsurance is to be placed with insurers with a current A.M. Best rating of not less than A:Vl l. G. Verification of Goverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, inc-luding but not necessallly limite^d to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contradtor before commencement of the work. H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the Same insurance requirements as Stated herein for the Contractor. 2021 Plastic Markings/Araucto Project Number: 21 -3011.2 31 February 16,2021 --A,CORD'CERTIFICATE OF LIABILITY INSURANCE 1/112022 DATE (MMODTYYYY) 31412021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, ANO THE CERTIFICATE HOLDER. IMPORTANT; lf the certlficate holder is an AODITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. lf suBRoGATloN ls wAlvED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to ihe certificate holder in lieu of such endorsement(s). PRoDUCER LOCKTON COMPANIES 3657 BRIARPARK DRIVE, SUITE 7OO HOUSTON TX77042 866-260-3538 PHONElAlC llo Extl: INSIIRERTSI AFFORDNG COVERAGE N^n f tNsURER A ' ZUriCh American lnsurance company t 653.5 INSURED r 485069 Frontline Road Safety Holdings, LLC Apply-A-Line, LLC 175 Roy Road SW, Bldg C Pacific WA 98047 rNrlrRFR Fr, Arnerican Guarantee attd Liab. ltls. Co.)o4'l INSURER C : rNcr roEp n INSIIRFR F : INSIIRFR F . NOTWITHSTANDING MAY PERIODtcYTHEINSUREDTHEFORNAMEDABOVEBELOWLISTEDBEENHAVEISSUEDIJTHISCERTIFYTOTTHAPOLICIESTHEOF RESPECTWITH WHTO CH IDTHNTcoORRACTDOCUMENTOTHERANYENTREMORTERMOFCONDITIONANYTEINDICADREQUI TOBJECI THEALL TERMS,BY POLICIESTHE IBEDDESCR INHERE SUISRoYMAPERTTHcINSURANAFFORDEDERTICETEFICAISSUEDAIN,BE HAVEMAY REDUCEDBEEN PAIBY CLAIMSDCONDITIONSANDSUCHOFPOLILIIES.SHMITS o\lSIONSEXCLU LIMITSTYPE OF INSURANCE I[, PERSONAL & $ 1/1/2022YGLO 3002387 00 t /1t2021ACOMMERCAL GENERAL LABILITY crerus-unoelTl occun ro,crlTl !fft I ioc OTHER: Y I $xBODILY INJURY (Per person) BODILY INJURY (PCT $ $ $ XXXXXXX 1il t2021 1/1/2022YYBAP 3088737 00AAUTOMOBILE LIABILITY ANY AUTO OWNEDAI]TOS ONLY HIRED AUTOS ONLY SCHEDULED AUTOS NON-OWNED AUTOS ONLY $OCCI-RRENCEXR EGATE $ UMBRELLA LIAB EXCESS UAB $5 t/112021 1/1/2022YYAUC 3109785 00B DED EACH ACCIDENT I DISEASE. EA I vt/2021 1tl12022 /A Y wc 3002388 00 ANY PROPRIETOR/PARTNEFUEXECUTIVE OFFICER/MEMBER EXCLUDED? (Manddory in NHI N lfyes, describe DESCRIPTION under OF OPERATIONS below DESCRPTTON OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, RE: PROJECT: A.AL#145A6254 - 2021 PLASTIC MARKINGS Additional Remarks Schedule, may be attached if more space is required) PROJECT NO. 21-30t1.2. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATDN DATE THEREOF, NOTICE WLL BE DELMERED IN ACCORDAI'lCE WTH THE POLICY PROVFIONS' REPRESENIATIVE17400549 CITY OF KENT 4OO W GOWE KENT WA 98032 CERTI CANCEL o1988-2015 ACORDACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD All rights reserved All policies include a blanket notice of cancellation to certificate holders endorsement, providing fbr 30 davs'. advance notice if the policy is cancelled by the company other than for nonpayment of premium,-10 days'notice if the policy is cancelled for nonpayment of premium.-Notice is sent to certificate holders with mailing addresses on file withihe agent or the company. The endorsement does not provide for notice of cancellation if the named insured requests cancellation. CONNNUATION DESCRPTTON OF OpERATTONSTLOCATTONS/VEHtCLeSteXCIUS|OHS AODED BY ENDORSEMENT/SPECIAL PROVISIONS (Use only if more space is required) ACORD 25 (2016/03)Certilicate Holder ID: 17400549 Attachment Code : D581632 Mastel ID: 1485069, Certificate lD 17400549 All policies (except Workers'Compensation/El) include a blanket automatic additional insured [provision] that confers additional insured status to the certificate holder only if there is a written contract between the named insured and the ceftificate holder that requires the named insured to name the ceftificate holder as an additional insured. In the absence of such a contractual obligation on the paft of the named insured, the certificate holder is not an additional insured under the policy. All policies include a blanket automatic waiver of subrogation endorsement fprovision] that provides this feature only when there is a written contract between the named insured and the certificate holder that requires it. In the absence of such a contractual obligation on the paft of the named insured, the waiver of subrogation feature does not apply. Attachment Code : D5 85637 Master I D: I 485069, Certificate I D: 1 7400549 A. B. o t Additional Insured - Automatic - Ownerso Lessees Or Contractors ZURICH THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFI.JLLY. Named Insured: Frontline Road Safety Holdings, LLC; Stripe-A-Zone,lnc.; Apply-A-Line, LLC; Griffin Pavement Services Address (including ZIP Gode): 9 Greenway Plaza, Suite 2400, Houston,TX77046 This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part Section ll - Who ls An lnsured is amended to include as an additional insured any person or organization whom you are required to add as an additional insured on this policy under a written contract or written agreement' Such person or organization is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf, in the performance of your ongoing operations or "your work" as included in the "products-completed operations hazard", which is the subject of the written contract or written agreement. However, the insurance afforded to such additional insured: 1. Only applies to the extent permitted by law; and 2. Will not be broader than that which you are required by the written contract or written agreement to provide for such additional insured. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not aPPIY to: "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services including: a. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys' field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural orengineering activities' This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury,, or ;property damage", oithe offense which caused the "personal and advertis;ing injury", involved the renUeiing of or the faiiure to render any professional architectural, engineering or surveying services u-GL-1 175-F CW (04/13) Page 1 of2 Policy No.Eff. Date of Pol Exp. Date of Pol.Eff. Dale of End Producer No Add'|. Prem Return Prem. G1O3002387 00 1t1t2021 1t1t2022 1t1t2021 lncludes copyrighted material of lnsurance services office, lnc., with its permission. Attachment Code : D585637 Master ID: 1485069, Certificate ID:17400549 G. The following is added to Paragraph 2. Duties ln The Event Of Occurrence, Offense, Claim Or Suit of Section lV - Commercial General Liability Conditions : The additional insured must see to it that: 1. We are notified as soon as practicable of an "occurrence" or offense that may result in a claim; 2. We receive written notice of a claim or "suit" as soon as practicable; and 3. A request for defense and indemnity of the claim or "suit" will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacrty. This provision does not apply to insurance on which the additional insured is a Named lnsured if the written contract or written agreement requires that this coverage be primary and non-contributory. D. For the purposes of the coverage provided by this endorsement: 1. The following is added to the Other lnsurance Condition of Section lV - Commencial General Liability Gonditions: Primary and Noncontributory insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured provided that: a. The additional insured is a Named lnsured under such other insurance; and b. You are required by written contract or written agreement that this insurance be primary and not seek contribution from any other insurance available to the additional insured. 2. The following paragraph is added to Paragraph 4.b. of the Other lnsurance Condition of Section lV - Gommercial General Liability Conditions: This insurance is excess over: Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same "occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named lnsured on such other policy and where our policy is required by a written contract or written agreement to provide coverage to the additional insured on a primary and non-contributory basis. E. This endorsement does not apply to an additional insured which has been added to this policy by an endorsement showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to that identifi ed additional insured. F. With respect to the insurance afforded to the additional insureds under this endorsement, tlre following is added to Section lll - Limits Of lnsurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the written contract or written agreement referenced in Paragraph A. of this endorsement; or 2. Available under the applicable Limits of lnsurance shown in the Declarations, whichever is less. This endorsement shall not increase the applicable Limits of lnsurance shown in the Declarations. All other terms and conditions of this policy remain unchanged u-GL-1 175-F CW (04/13) Page 2 of 2 lncludes copyrighted material of lnsurance Services Office, lnc., with its permission Attachment Code : D5 85638 Mastet I D: I 485069, Certificate lD 17 400549 Limited Operations Coverage - Work Excluded Under A Consolidated (Wrap-Up) Insurance Program @ ZURICH Poliry No.Exp. Date of Pol.Efl. Date of End.Agency No.Addl. Prem Retum Prem. GLO 3002387 00 U!2022 1t112021 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFIJLLY. Named tnsured: Frontline Road Safety Holdings, LLC; Stripe-A-Zone,lnc.;Apply-A-Line, LLC; Griffin Pavement Services Address (including ZIP Code): 9 Greenway Plaza, Suite 2400, Houston,TX77046 This endorsement modifies insurance provided under the Commercial General Liability Coverage Part SCHEDULE Description and Location of Operation(s): (lf no entrv appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsemeqQ A. The following exclusion is added to paragraph 2., Exclusions of Goverage A - Bodily lnjury and Property Damage Liabllity (Section I - Coverages): This insurance does not apply to "bodily injury" or "property damage" arising out of either your ongoing operations or operations inctuOeO within tne 'products-completed operations hazard" at the location described in the SGHEDULE of this endorsement, as a consolidated (wrap-up) insurance program has been provided by the prime contractor/project manager or owner of the construction project in which you are involved. This exclusion applies whether or not the consolidated (wrap-up) insurance program 1. Provides coverage identical to that provided by this Coverage Part; 2. Has limits adequate to cover all claims; or 3. Remains in effect. B. The exclusion in A. above shall not apply to your ongoing operations at the location shown in the SCHEDULE - for your service, maintenance, correction, repair or replacement of the original work performed and insured under the consolidated wrap-up insurance program. u-GL-1294-A CW (l0/06) Page I of2 Attachment Code : D585638 Master ID: 1485069, Certificate IDl.17400549 However, this extension of coverage does not apply to damages because of "bodily injury" or "property damage" due to any service, maintenance, correction, repair or replacement work: 1. as respects the "products-completed operations hazard"; or 2. for which coverage is afforded under the consolidated (wrap-up) insurance program. C. For the application of the coverage provided by this endorsement in paragraph B. above, SECTION lV - COMMERCTAL GENERAL LIABILITY CONDITIONS paragraph 4 Other lnsurance is replaced by the following: This insurance is excess over any other insurance, whether primary, excess, contingent or on any other basis. lf any other insurance responds or can respond to this loss, we shall have the right but not the duty to defend any "suit". When this insurance is excess over other insurance, we will pay only our share of the amount of the loss, if any, that exceeds the sum of: L The total amount that all such other insurance would pay for the loss in the absence of this insurance; and 2. The total of all deductible and self-insured amounts under all that other insurance. We will share the remaining loss, if any, with any other insurance that may apply and that was not bought specifically to apply in excess of the Limits of lnsurance shown in the Declarations of this Coverage Part. Countersigned Authorized Representative U-GL-1294-A CW (10/06) PageZ of2 Attachment Code : D585639 Master ID: 1485069, Certificate lD:.17400549 WORKERS' GOMPENSATION AND EMPLOYERS' LIABILITY INSURANCE POLICY wc 04 03 06 (Ed.4-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS EN DORSEM ENT_CALI FORN IA This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on at12:01A.M. standard time, forms a part of Policy No. WC 3002388 00 of the issued to Premium (if any) $ 11112021 Endorsement No Zurich American lnsurace ComPanY Authorized Representative We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our righl against the person or organization named in the Schedule. (This agreement applies only to the extent that you pertorm work under a written contract that requires you to obtain this agreement from us') you must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be o/o of the California workers' compensation pre- mium othenrvise due on such remuneration. Schedule person or organization Job Description ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN CONTRI\CT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY FOR WORK PERFORMED BY YOU FOR THAT PERSON AND/OR ORGANIZATION. wc 252 (4-84) wc 04 03 06 (Ed. 4-84)Page 1 of 1 Attachment Code : D585640 Master ID: 1485069, Certificate ID: 17400549 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY wc4203048 (Ed. 6-14) TEXAS WAIVER OF OUR RIGHT TO REGOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in ltem 3.A. of the lnformation Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right againJt the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury-arisiig out of the operationi described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Scherdule. The premium for this endorsement is shown in the Schedule' Schedule 1. ( )SpecificWaiver Name of person or organization ( X )Blanket Waiver Any person or organization for whom the Named lnsured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium: The premium charge for this endorsement shall be 2o/o percent of the premium developed on payroll in connection with fuork performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated' (The information below is required only when this endorsement is issued subsequent to prepar'ation of the policy') Endorsement Effective 111t2021 Policy No WC 3002388 OO Endorsement N'r' lnsured Frontline Road Safety Holdings, LLC; Stripe-A-Zone, lnc.; Apply-A-Line, LLC; Griffin Pavement Services Premium lnsurance Company Countersigned by - wc420304B (Ed.06-14) @ Copyright 2014 National Council on Compensation lnsurance, lnc. All Rights Reserved Page 1 Of 1 Wolters Kluwer Financial Services I Uniform FormsTM Attachment Code : D585641 Master ID: 1485069, Celtificate lD:17400549 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY wc 00 03 13 (Ed. 04-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by thisr polic1. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perfbrm work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY FOR WORK PERFORMED BY YOU FOR THAT PERSON AND/OR ORGAN IZATION. This endorsement changes the policy to which it is attached and is effective on the date issued unless otheruvise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy') Endorsement Effective Policy No. WC 3002388 00 Endorsement No' lnsured Frontline Road Safety Holdings, LLC; Stripe-A-Zone,lnc.;Apply-A-Line, Premium $ LLC; Griffin Pavement Services lnsurance Company Zurich American lnsurance Company Countersigned by wc124 (4-841 wc 00 03 13 Page I of 1 Uniform FormsTMCopyright 1983 National Council on Compensation lnsurance, lnc. Attachment Code : D585642 Master ID: 1485069, Certificate ID 17400549 Coverage Extension Endorsement fr,.J ZURICH- Policy No.Eff. Date of Pol.Exp. Date of Pol.Eff. Date of End.Producer No Add'|. Prem Return Prem BAP 3088737 00 1tlt2021 1t1t2022 1t112022 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFI,JLLY. This endorsement modifies insurance provided under the Business Auto Goverage Form Motor Garrier Goverage Form A. Amended Who ls An lnsured 1. The following is added to the Who ls An lnsured Provision in Section ll - Govered Autos Liability Goverage: The following are also "insureds": a. Any "employee" of yours is an "insured" while using a covered "auto" you don't own, hire or borrow for acts performed within the scope of employment by you. Any "employee" of yours is also an "insured" while operating an "auto" hired or rented under a contract or agreement in an "employee's" name, with your permission, while performing duties related to the conduct of your business. b. Anyone volunteering services to you is an "insured" while using a covered "auto" you don't own, hire or borrow to transport your clients or other persons in activities necessary to your business. c. Anyone else who furnishes an "auto" referenced in Paragraphs A.1.a. and A.1.b. in this endorsement. d. Where and to the extent permitted by law, any person(s) or organization(s) where required by written contract or written agreement with you executed prior to any "accident", including those person(s) or organization(s) directing your work pursuant to such written contract or written agreement with you, provided the "accident" arises out of operations governed by such contract or agreement and only up to the limits required in the written contract or written agreement, or the Limits of lnsurance shown in the Declarations, whichever is less. Z. The following is added to the Other lnsurance Condition in the Business Auto Coverage Form and the Other lnsurance - Primary and Excess lnsurance Provisions Condition in the Motor Carrier Coverage Form: Coverage for any person(s) or organization(s), where required by written contract or written agreement with you executed prior to any "accident", will apply on a primary and non-contributory basis and any insurance maintained by the additional "insured" will apply on an excess basis. However, in no event will this c;overage extend beyond the terms and conditions of the Coverage Form. B. Amendment - Supplementary Payments paragraphs a.(2) and a.(4) of the Coverage Extensions Provision in Section ll - Govered Autos Liability Coverage are replaced by the following: (2) Up to $5,000 for the cost of bail bonds (including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" at our request, including actual loss of earnings up to $500 a day because of time off from work. u-cA-424-F CW (04/14) Page 1 of 6 Includes copyrighted material of lnsurance Services Office, lnc., with its permission Attachment Code : D585642Master ID: 1485069, Certificate lD:17400549 C. Fellow Employee Goverage The Fellow Employee Exclusion contained in Section ll- Govered Autos Liability Coverage does not apply. D. Driver Safety Program Liability and Physical Damage Coverage 1. The following is added to the Rabing Exclusion in Section ll- Covered Autos Liability Goverage: This exclusion does not apply to covered "autos" participating in a driver safety program event, such as, but not limited to, auto or truck rodeos and other auto or truck agility demonstrations. 2. The following is added to Paragraph 2. in the Exclusions of Section lll - Physical Damage Coverage of the Business Auto Coverage Form and Paragraph 2.b. in the Exclusions of Section lV - Physical Damage Coverage of the Motor Carrier Coverage Form: This exclusion does not apply to covered "autos" participating in a driver safety program event, such as, but not limited to, auto or truck rodeos and other auto or truck agility demonstrations. E. Lease or Loan Gap Goverage The following is added to the Coverage Provision of the Physical Damage Goverage Section: Lease Or Loan Gap Coverage ln the event of a total "loss" to a covered "auto", we will pay any unpaid amount due on the lease or loan for a covered "auto", less: a, Any amount paid under the Physical Damage Goverage Section of the Coverage Form; and b. Any: (1) Overdue lease or loan payments at the time of the "loss"; (2) Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; (3) Security deposits not returned by the lessor; (4) Costs for extended warranties, credit life insurance, health, accident or disability insurance purchased with the loan or lease; and (5) Carry-over balances from previous leases or loans. F. Towing and Labor Paragraph A.2. of the Physical Damage Coverage Section is replaced by the following: We will pay up to $75 for towing and labor costs incurred each time a covered "auto" of the private passenger type is disabled. However, the labor must be performed at the place of disablement, G. Extended Glass Goverage The following is added to Paragraph A.3.a. of the Physical Damage Goverage Section: lf glass must be replaced, the deductible shown in the Declarations will apply. However, if gliass can be repaired and is actually repaired rather than replaced, the deductible will be waived. You have the option of having the glass repaired rather than replaced. H. Hired Auto Physical Damage - lncreased Loss of Use Expenses The Coverage Extenslon for Loss Of Use Expenses in the Physical Damage Coverage Section is replaced by the following: Loss Of Use Expenses For Hired Auto Physical Damage, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a vehicle rented or hired without a driver under a written rental contract or written rental agreement. We will pay for loss of use expenses if caused by: u-cA-424-F CW (04/14) Page 2 of 6 lncludes copyrighted material of lnsurance Services Office, lnc., with its permission. Attachment Code : D585642 Master ID: 1485069, Certificate lD:17400549 (1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for any covered "auto"; (2) Specified Causes Of Loss only if the Declarations indicate that Specified Causes Of Loss Coverage is provided for any covered "auto"; or (3) Collision only if the Declarations indicate that Collision Coverage is provided for any covered "auto". However, the most we will pay for any expenses for loss of use is $100 per day, to a maximum of $3000. l. Personal Effects Coverage The following is added to the Coverage Provision of the Physical Damage Goverage Section: Personal Effects Coverage a. We will pay up to $750 for "loss" to personal effects which are: (1) Personal property owned by an "insured"; and (2) ln or on a covered "auto". b. Subject to Paragraph a. above, the amount to be paid for "loss" to personal effects will be based on the lesser of: (1) The reasonable cost to replace; or (2) The actual cash value. c. The coverage provided in Paragraphs a. and b. above, only applies in the event of a total theft of a covered "auto". No deductible applies to this coverage. However, we will not pay for "loss" to personal effects of any of the following: (1) Accounts, bills, currency, deeds, evidence of debt, money, notes, securities, or commercial paper or other documents of value. (2) Bullion, gold, silver, platinum, or other precious alloys or metals; furs or fur garrnents; jewelry, watches, precious or semi-precious stones. (3) Paintings, statuary and other works of art. (4) Contraband or property in the course of illegal transportation or trade. (5) Tapes, records, discs or other similar devices used with audio, visual or data electronic equipment. Any coverage provided by this Provision is excess over any other insurance coverage available for the same "loss". J. Tapes, Records and Discs Coverage 1. The Exclusion in Paragraph 8.4.a. of Section lll - Physical Damage Goverage in the Business Auto Coverage Form and the Exclusion in Paragraph 8.2.c. of Section lV - Physical Damage Goverage in the Motor Carrier Coverage Form does not aPPlY. 2. The following is added to Paragraph 1.a. Gomprehensive Goverage under the Goverage Provision of the Physical Damage Coverage Section: We will pay for "loss" to tapes, records, discs or other similar devices used with audio, 'visual or data electronic equipment- We will pay only if the tapes, records, discs or other similar audio, visual or data electronic devices: (a) Are the property of an "insured"; and (b) Are in a covered "auto" at the time of "loss". The most we will pay for such "loss" to tapes, records, discs or other similar devices is $500. The Physical Damage Coverage Deductible Provision does not apply to such "loss"' u-cA-424-F CW (04/14) Page 3 of 6 lncludes copyrighted material of lnsurance services office, lnc., with its permission. Attachment Code : D5 85642 Master I D: I 485069, Certificate lD: 17 400549 K. Airbag Coverage The Exclusion in Paragraph B.3.a. of Section lll - Physical Damage Goverage in the Business Auto Coverage Form and the Exclusion in Paragraph B.4.a. of Section lV - Physical Damage Goverage in the Motor Carrier Coverage Form does not apply to the accidental discharge of an airbag. L. Two or More Deductibles The following is added to the Deductible Provision of the Physical Damage Coverage Section: lf an accident is covered both by this policy or Coverage Form and by another policy or Coverage Form issued to you by us, the following applies for each covered "auto" on a per vehicle basis: 1. lf the deductible on this policy or Coverage Form is the smaller (or smallest) deductible, it will be waived; or 2. lf the deductible on this policy or Coverage Form is not the smaller (or smallest) deductible, it will be reduced by the amount of the smaller (or smallest) deductible. M. Physical Damage - Gomprehensive Coverage - Deductible The following is added to the Deductible Provision of the Physical Damage Coverage Section: Regardless of the number of covered "autos" damaged or stolen, the maximum deductible that will be applied to Comprehensive Coverage for all "loss" from any one cause is $5,000 or the deductible shown in the Declarations, whichever is greater. N. Temporary Substitute Autos - Physical Damage 1. The following is added to Section l- Govered Autos: Temporary Substitute Autos - Physical Damage lf Physical Damage Coverage is provided by this Coverage Form on your owned covered "autos", the following types of vehicles are also covered "autos" for Physical Damage Coverage: Any "auto" you do not own when used with the permission of its owner as a temporary substitute for a covered "auto" you do own but is out of service because of its: 1. Breakdown; 2. Repair; 3. Servicing; 4. "Loss"; or 5. Destruction. 2. The following is added to the Paragraph A. Coverage Provision of the Physical Damage Coverage Section: Temporary Substitute Autos - Physical Damage We will pay the owner for "loss" to the temporary substitute "auto" unless the "loss" results from fraudulent acts or omissions on your part. lf we make any payment to the owner, we will obtain the owner's rights against any other party. The deductible for the temporary substitute "auto" will be the same as the deductible for the covered "auto" it replaces. O. Amended Duties ln The Event Of Accident, Claimn Suit Or Loss paragraph a. of the Duties ln The Event Of Accident, Glaim, Suit Or Loss Condition is replaced by the following: a. ln the event of "accident", claim, "suit" or "loss", you must give us or our authorized representative prompt notice of the "accident", claim, "suit" or "loss". However, these duties only apply when the "accident", claim, "suit" or "loss" is known to you (if you are an individual), a partner (if you are a partnership), a member (if you are a limited liability company) or an executive officer or insurance manager (if you are a corporaticln). The failure of any u-cA-424-F CW (04/14) Page 4 of 6 lncludes copyrighted material of lnsurance services office, lnc., with its permission. Attachment Code : D585642 Master ID: 1485069, Certificate lD:17400549 agent, servant or employee of the "insured" to notify us of any "accident", claim, "suit" or "loss" shall not invalidate the insurance afforded by this policy. lnclude, as soon as practicable: (1) How, when and where the "accident" or "loss" occurred and if a claim is made or "suit" is brought, written notice of the claim or "suit" including, but not limited to, the date and details of such claim or "suit"; (2) The "insured's" name and address; and (3) To the extent possible, the names and addresses of any injured persons and witnesses. lf you report an "accident", claim, "suit" or "loss" to another insurer when you should hetve reported to us, your failure to report to us will not be seen as a violation of these amended duties provided you give us notice as soon as practicable after the fact of the delay becomes known to you. P. Waiver of Transfer Of Rights Of Recovery Against Others To Us The following is added to the Transfer Of Rights Of Recovery Against Others To Us Condition: This Condition does not apply to the extent required of you by a written contract, executed prior to any "accident" or "loss", provided that the "accident" or "loss" arises out of operations contemplated by such contract. This waiver only applies to the person or organization designated in the contract. O. Employee Hired Autos - Physical Damage Paragraph b. of the Other lnsurance Condition in the Business Auto Coverage Form and Paragraph f. of the Other lnsurance - P6mary and Excess Insurance Provisions Condition in'the Motor Carrier Coverage Form are replaced by the following: For Hired Auto Physical Damage Coverage, the following are deemed to be covered "autos" you own: (1) Any covered "auto" you lease, hire, rent or borrow; and (2) Any covered "auto" hired or rented under a written contract or written agreement entered into by an "employee" or elected or appointed official with your permission while being operated within the course and scope of that "employee's" employment by you or that elected or appointed official's duties as respect their obligations to you. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto". R. Unintentional Failure to Disclose Hazards The following is added to the Concealment, Misrepresentation Or Fraud Condition: However, we will not deny coverage under this Coverage.Form if you unintentionally: (1) Fail to disclose any hazards existing at the inception date of this Coverage Form; or (2) Make an error, omission, improper description of "autos" or other misstatement of information. you must notify us as soon as possible after the discovery of any hazards or any other information that was not provided to us prior to the acceptance of this policy. S. Hired Auto - World Wide Coverage Paragraph 7a.(5) of the Policy Period, Goverage Territory Condition is replaced by the following: (5) Anywhere in the world if a covered "auto" is leased, hired, rented or borrowed for a period of 60 days or less, T. Bodily lnjury Redefined The definition of "bodily injury" in the Definitions Section is replaced by the following: "Bodily injury" means bodily injury, sickness or disease, sustained by a person including death or mental anguish, resulting from any of these at any time. Mental anguish means any type of mental or emotional illness or disease' u-cA-424-F CW (04/14) Page 5 of 6 lncludes copyrighted material of lnsurance Services Office, lnc., with its permission Attachment Code : D585642 Master ID: 1485069, Certificate ID:.17400549 U. Expected Or lntended lnjury The Expected Or lntended lnjury Exclusion in Paragraph B. Exclusions under Section ll - Covered Auto Liability Coverage is replaced by the following: Expected Or Intended lnjury "Bodily injury" or "property damage" expected or intended from the standpoint of the "insured". This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. V. Physical Damage - Additional Temporary Transportation Expense Coverage Paragraph A.4.a. of Section lll - Physical Damage Coverage is replaced by the following: 4. Coverage Extensions a. Transportation Expenses We will pay up to $50 per day to a maximum of $1,000 for temporary transportation expense incurred by you because of the total theft of a covered "auto" of the private passenger type. We will pay only for those covered "autos" for which you carry either Comprehensive or Specified Causes of Loss Coverage. We will pay for temporary transportation expenses incurred during the period beginning 48 hours after the theft and ending, regardless of the policy's expiration, when the covered "auto" is returned to use or we pay for its "loss". W. Replacement of a Private Passenger Auto with a Hybrid or Alternative Fuel Source Auto The following is added to Paragraph A. Goverage of the Physical Damage Coverage Section: ln the event of a total "loss" to a covered "auto" of the private passenger type that is replaced with a hybrid "auto" or "auto" powered by an alternative fuel source of the private passenger type, we will pay an additional 10o/o ol the cost of the replacement "auto", excluding tax, title, license, other fees and any aftermarket vehicle upgrades, up to a maximum of $2500. The covered "auto" must be replaced by a hybrid "auto" or an "auto" powered by an alternative fuel source within 60 calendar days of the payment of the "loss" and evidenced by a bill of sale or new vehicle lease agreement. To qualify as a hybrid "auto", the "auto" must be powered by a conventional gasoline engine and another source of propulsion power. The other source of propulsion power must be electric, hydrogen, propane, solar or natural gas, either compressed or liquefied. To qualify as an "auto" powered by an alternative fuel source, the "auto" must be powered by a source of propulsion power other than a conventional gasoline engine. An "auto" solely propelled by biofuel, gasoline or diesel fuel or any blend thereof is not an "auto" powered by an alternative fuel source. X. Return of Stolen Automobile The following is added to the Coverage Extension Provision of the Physical Damage Coverage Section: lf a covered "auto" is stolen and recovered, we will pay the cost of transport to return the "auto" to you. We will pay only for those covered "autos" for which you carry either Comprehensive or Specified Causes of Loss Coverage. All other terms, conditions, provisions and exclusions of this policy remain the same. u-cA-424-F CW(04/14) Page 6 of 6 lncludes copyrighted material of lnsurance Services Office, lnc , with its permission Attachment Code : D585643 Master ID: 1485069, Certificate lD 17400549 Waiver Of Subrogation (Blanket) Endorsement o ZURICH THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part The following is added to the Transfer Of Rights Of Recovery Against Others To Us Condition: If you are required by a written contract or agreement, which is executed before a loss, to waive your rights of recovery from others, we agree to waive our rights of recovery. This waiver of rights shall not be construed to be a waiver with respect to any other operations in which the insured has no conttactual interest. u-GL-e25-B CW (12l01) Page I of I Poficy No.Eff. Date of Pol.Exp. Date of Pol.Eff. Date of End.Producer Add'1. Prern Retum Prem. cl-o 3002387 00 Uv202l t/t/2022 1/1/2021 Lockton Cornpanies $$ Attachment Code : D585644 Master ID: 1485069. Cerlificate ID:17400549 a sNotification to Others of Cancellation ZURICH THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFIJLLY This endorsement modifies insurance provided under the: Commercial Automobile Goverage Part A. lf we cancel this Coverage Part by written notice to the first Named lnsured for any reason other than nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation: 1. To the name and address corresponding to each person or organization shown in the Schedule below; and 2. Atleastl0dayspriortotheeffectivedateofthecancellation,asadvisedinournoticetothefirstNamedlnsured, or the longer number of days notice if indicated in the Schedule below. B. lf we cancel this Coverage Part by written notice to the first Named lnsured for nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation to the name and address corresporrding to each person or organization shown in the Schedule below at least '1 0 days prior to the effective date of such cancellation' C. lf notice as described in Paragraphs A. or B. of this endorsement is mailed, proof of mailing will be sufficient proof of such notice. SCHEDULE Name and Address of Other Person(s) / Orqanization(s):Number of Days l{otice To Be Determined, as required by written contract.30 All other terms and conditions of this policy remain unchanged u-cA-812-A CW (05/10) Page 1 of 1 Policy No.Eff. Date of Pol.Exp. Date of Pol.Eff. Date of End.Producer No.Add'1. frrem Return Prem. BAP 3088737 00 01t01t2021 01t0112022 01to1t2021 lncludes copyrighted material of lnsurance services office, lnc., with its permission. Attachment Code : D585645 Master ID: 1485069. Certificate lD:17400549 a Notification to Others of Gancellation ZURICH THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY This endorsement modifies insurance provided under the: Commercial General Liability Goverage Part Liquor Liability Goverage Part Products/Gompleted Operations Liability Coverage Part A. lf we cancel this Coverage Part(s) by written notice to the first Named lnsured for any reason other than nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation: 1. To the name and address corresponding to each person or organization shown in the Schedule below, and 2. At least 10 days prior to the effective date of the cancellation, as advised in our notice to the first Named lnsured, or the longer number of days notice if indicated in the Schedule below. B. lf we cancel this Coverage Part(s) by written notice to the first Named lnsured for nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation to the name and address corresponding to each person or organization shown in the Schedule below at least 10 days prior to the effective date of such cancellation. C. lf notice as described in Paragraphs A. or B. of this endorsement is mailed, proof of mailing will be sufficient proof of such notice. All other terms and conditions of this policy remain unchanged. u-GL-1446-4 CW (05/10) Page 1 of 1 Policy No Eff. Date of Pol.Exp. Date of Pol.Eff. Date of End.Producer No.Add'1. Prem Return Prem. cLo 3002387 0C 01t01t2021 01t01t2022 01t01t2021 SCHEDULE Name and Address of Other Person(s) / Orqanization(s):Number of Days Notice: To Be Determined, as required by written contract.30 days lncludes copyrighted material of lnsurance Services Office, lnc., with its permission. 2021 Plastic Markings/Araucto February 16, 2021 Project Number: 21-3011.2 KENT SPECIAL PROVISIONS TABLE OF CONTENTS PAGE DIVISION 1 GENERAL REQUIREMENTS ...................................... 1-1 1-01 Definitions and Terms ....................................................... 1-1 1-02 Bid Procedures and Conditions ........................................... 1-2 1-03 Award and Execution of Contract........................................ 1-5 1-04 Scope of the Work ........................................................... 1-5 1-05 Control of Work ............................................................... 1-7 1-06 Control of Material ........................................................... 1-10 1-07 Legal Relations and Responsibilities to the Public .................. 1-13 1-08 Prosecution and Progress .................................................. 1-19 1-09 Measurement and Payment ............................................... 1-22 1-10 Temporary Traffic Control ................................................. 1-24 DIVISION 8 MISCELLANEOUS CONSTRUCTION .......................... 8-1 8-22 Pavement Marking ........................................................... 8-1 KENT STANDARD PLANS .................................................................. A-1 WSDOT STANDARD PLANS ............................................................... A-2 APPENDIX ....................................................................................... A-3 TRAFFIC CONTROL PLANS ............................................................... A-4 PREVAILING WAGE RATES ............................................................... A-5 2021 Plastic Markings/Araucto 1 - 1 February 16, 2021 Project Number: 21-3011.2 KENT SPECIAL PROVISIONS The Kent Special Provisions (“Kent Special Provisions” or “KSP”) modify and supersede any conflicting provisions of the 2021 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations (“WSDOT Standard Specifications”). Otherwise all provisions of the WSDOT Standard Specifications shall apply. All references in the WSDOT Standard Specifications to the State of Washington, its various departments or directors, or to the contracting agency, shall be revised to include the City and/or City Engineer, except for references to State statutes or regulations. Finally, all of these documents are a part of this contract. DIVISION 1 – GENERAL REQUIREMENTS 1-01 DEFINITIONS AND TERMS SECTION 1-01.1 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-01.1 General When these Kent Special Provisions make reference to a “Section,” for example, “in accordance with Section 1-01,” the reference is to the WSDOT Standard Specifications as modified by these Kent Special Provisions. SECTION 1-01.2(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-01.2(2) Items of Work and Units of Measurement EA Each Eq. Adj. Equitable Adjustment FA Force Account HR Hour M GAL Thousand gallons NIC Not In Contract SF Square Feet SECTION 1-01.3, “CONTRACT” DEFINITION, IS DELETED AND REPLACED WITH THE FOLLOWING: 1-01.3 Definitions Contract The written agreement between the Contracting Agency and the Contractor. It describes, among other things: 1. What work will be done, and by when; 2. Who provides labor and materials; and 2021 Plastic Markings/Araucto 1 - 2 February 16, 2021 Project Number: 21-3011.2 3. How Contractors will be paid. The Contract includes the Contract (agreement) Form, Bidder’s completed Proposal Form, Kent Special Provisions, Contract Provisions, Contract Plans, WSDOT Standard Specifications (also including amendments to the Standard Specifications issued by WSDOT as of the later date of bid advertisement or any subsequent addenda), Kent Standard Plans, Addenda, various certifications and affidavits, supplemental agreements, change orders, and subsurface boring logs (if any). Also incorporated in the Contract by reference are: 1. Standard Plans (M21-01) for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and the American Public Works Association, current edition; 2. Manual on Uniform Traffic Control Devices for Streets and Highways, current edition, and; 3. American Water Works Association Standards, current edition; 4. The current edition of the “National Electrical Code.” Responsibility for obtaining these publications rests with the Contractor. SECTION 1-01.3, “DEFINITIONS” IS SUPPLEMENTED BY ADDING THE FOLLOWING DEFINITION: Incidental Work The terms “incidental to the project,” “incidental to the involved bid item(s),” etc., as used in the Contract shall mean that the Contractor is required to complete the specified work and the cost of such work shall be included in the unit contract prices of other bid items as specified in Section 1-04.1 (Intent of the Contract). No additional payment will be made. 1-02 BID PROCEDURES AND CONDITIONS SECTION 1-02.1 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.1 Qualification of Bidders Bidders shall be qualified by ability, experience, financing, equipment, and organization to do the work called for in the Contract. The City reserves the right to take any action it deems necessary to ascertain the ability of the Bidder to perform the work satisfactorily. This action includes the City’s review of the qualification information in the bid documents. The City will use this qualification data in its decision to determine whether the lowest responsive bidder is also responsible and able to perform the contract work. If the City determines that the lowest bidder is not the lowest responsive and responsible bidder, the City reserves its unqualified right to reject that bid and award the 2021 Plastic Markings/Araucto 1 - 3 February 16, 2021 Project Number: 21-3011.2 contract to the next lowest bidder that the City, in its sole judgment, determines is also responsible and able to perform the contract work (the “lowest responsive and responsible bidder”). SECTION 1-02.2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.2 Plans and Specifications Upon awarding the Contract, the City shall supply to the Contractor, for its own use, up to ten (10) copies of the plans and specifications. If the Contractor requests more than ten (10) copies, the City may require the Contractor to purchase the additional sets. SECTION 1-02.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.5 Proposal Forms Prospective bidders may obtain Bid Documents including a “Bid Proposal” for the advertised project by downloading at no charge at KentWA.gov/doing-business/bids-procurement; however, a prospective bidder remains responsible to obtain Bid Documents, even if unable to download all or any part of the documents, whether or not inability to access is caused by the bidder’s or the City’s technology. SECTION 1-02.6 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-02.6 Preparation of Proposal It is the Bidder’s sole responsibility to obtain and incorporate all issued addenda into the bid. In the space provided on the Proposal Signature Page, the Bidder shall confirm that all Addenda have been received. All blanks in the proposal forms must be appropriately filled in. SECTION 1-02.6 IS SUPPLEMENTED BY ADDING THE FOLLOWING TO THE LAST PARAGRAPH: Proposals must contain original signature pages. FACSIMILES OR OTHER FORMS OF ELECTRONIC DELIVERY ARE NOT ACCEPTABLE AND ARE CONSIDERED NON-RESPONSIVE SUBMITTALS. SECTION 1-02.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.7 Bid Deposit A deposit of at least 5 percent of the total Bid shall accompany each Bid. This deposit may be cash, cashier’s check, or a proposal bond (Surety bond). Any proposal bond shall be on the City’s bond form and shall be signed by the Bidder and the Surety. A proposal bond shall not be conditioned in any way to modify the minimum 5-percent required. The Surety shall: (1) be registered with the Washington State Insurance Commissioner, and (2) appear on the current Authorized 2021 Plastic Markings/Araucto 1 - 4 February 16, 2021 Project Number: 21-3011.2 Insurance List in the State of Washington published by the Office of the Insurance Commissioner. The failure to furnish a Bid deposit of a minimum of 5 percent with the Bid shall make the Bid nonresponsive and shall cause the Bid to be rejected by the Contracting Agency. SECTION 1-02.9 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.9 Delivery of Proposal All bids must be sealed and delivered in accordance with the “Invitation to Bid.” Bids must be received at the City Clerk’s office by the stated time, regardless of delivery method, including U.S. Mail. SECTION 1-02.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.10 Withdrawing, Revising, or Supplementing Proposal After submitting a Bid Proposal to the Contracting Agency, the Bidder may withdraw or revise it if: 1. The Bidder submits a written request signed by an authorized person, and 2. The Contracting Agency receives the request before the time for opening Bids. The original Bid Proposal may be revised and resubmitted as the official Bids Proposal if the Contracting Agency receives it before the time for opening Bids. SECTION 1-02.11 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.11 Combination and Multiple Proposals No person, firm or corporation shall be allowed to make, file, or be interested in more than one bid for the same work unless alternate bids are specifically called for; however, a person, firm, or corporation that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder is not disqualified from submitting a subproposal or quoting prices to other bidders or from making a prime proposal. SECTION 1-02.13 IS REVISED BY DELETING ITEM 1(a) AND REPLACING ITEM 1(a) WITH THE FOLLOWING: 1-02.13 Irregular Proposals a. The bidder is not prequalified when so required. 2021 Plastic Markings/Araucto 1 - 5 February 16, 2021 Project Number: 21-3011.2 SECTION 1-02.14 IS REVISED BY DELETING ITEM 3 AND REPLACING WITH THE FOLLOWING: 1-02.14 Disqualification of Bidders 3. The bidder is not qualified for the work or to the full extent of the bid. 1-03 AWARD AND EXECUTION OF CONTRACT SECTION 1-03.1 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SECOND PARAGRAPH IN THAT SECTION: 1-03.1 Consideration of Bids The City also reserves the right to include or omit any or all schedules or alternates of the Proposal and will award the Contract to the lowest responsive, responsible bidder based on the total bid amount, including schedules or alternates selected by the City. SECTION 1-03.2 IS REVISED BY REPLACING “45 CALENDAR DAYS” WITH “60 CALENDAR DAYS” RELATING TO CONTRACT AWARD OR BID REJECTION. 1-03.2 Award of Contract SECTION 1-03.3 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.3 Execution of Contract No claim for delay shall be granted to the Contractor due to its failure to submit the required documents to the City in accordance with the schedule provided in these Kent Special Provisions. SECTION 1-03.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.7 Judicial Review Any decision made by the City regarding the award and execution of the contract or bid rejection shall be conclusive subject to the scope of judicial review permitted under Washington State Law. Such review, if any, shall be timely filed in the King County Superior Court, located in Kent, Washington. 1-04 SCOPE OF THE WORK SECTION 1-04.1(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.1(2) Bid Items Not Included in the Proposal The Contractor shall include all costs of doing the work within the bid item prices. If the contract plans, contract provisions, addenda, or any other part of the contract require work that has no bid item price in the 2021 Plastic Markings/Araucto 1 - 6 February 16, 2021 Project Number: 21-3011.2 proposal form, the entire cost of labor and materials required to perform that work shall be incidental and included with the bid item prices in the contract. SECTION 1-04.2 IS SUPPLEMENTED BY ADDING THE WORDS, “KENT SPECIAL PROVISIONS, KENT STANDARD PLANS” FOLLOWING THE WORDS, “CONTRACT PROVISIONS” IN THE FIRST SENTENCE OF THE FIRST PARAGRAPH. SECTION 1-04.2 IS REVISED BY DELETING ITEMS 1 THROUGH 7 IN THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING 8 ITEMS: 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1. Approved Change Orders 2. The Contract Agreement 3. Kent Special Provisions 4. Contract Plans 5. Amendments to WSDOT Standard Specifications 6. WSDOT Standard Specifications 7. Kent Standard Plans 8. WSDOT Standard Plans SECTION 1-04.4 IS REVISED BY DELETING THE THIRD PARAGRAPH (INCLUDING SUBPARAGRAPHS A AND B). SECTION 1-04.4 IS REVISED BY DELETING THE FIFTH PARAGRAPH AND REPLACING IT WITH THE FOLLOWING: 1-04.4 Changes For Item 2, increases or decreases in quantity for any bid item shall be paid at the appropriate bid item contract price, including any bid item increase or decrease by more than 25 percent from the original planned quantity. SECTION 1-04.4 IS REVISED BY DELETING THE EIGHTH PARAGRAPH (NEXT TO THE LAST PARAGRAPH) AND REPLACING WITH THE FOLLOWING: Within 14 calendar days of delivery of the change order the Contractor shall endorse and return the change order, request an extension of time for endorsement or respond in accordance with Section 1-04.5. The Contracting Agency may unilaterally process the change order if the Contractor fails to comply with these requirements. Changes normally noted on field stakes or variations from estimated quantities, will not require a written change order. These changes shall be made at the unit prices that apply. The Contractor shall respond immediately to changes shown on field stakes without waiting for further notice. 2021 Plastic Markings/Araucto 1 - 7 February 16, 2021 Project Number: 21-3011.2 SECTION 1-04.6 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.6 Variation in Estimated Quantities Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. SECTION 1-04.11 ITEM 2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.11 Final Cleanup 2. Remove from the project all unapproved and/or unneeded material left from grading, surfacing, paving, or temporary erosion control measures. 1-05 CONTROL OF WORK SECTION 1-05.4 IS REVISED BY DELETING THE LAST FOUR PARAGRAPHS. SECTION 1-05.4 IS REVISED BY ADDING A PARAGRAPH AFTER PARAGRAPH 7 1-05.4 Conformity With and Deviations From Plans and Stakes To the extent a conflict exists between the requirements of WSDOT Section 1-05.4 and Kent Special Provision Section 1-05.8, the requirements of KSP Section 1-05.8 will prevail. SECTION 1-05.7 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.7 Removal of Defective and Unauthorized Work If the Contractor fails to remedy defective or unauthorized work within the time specified by the Engineer, or fails to perform any part of the work required by the contract, the Engineer may provide the Contractor written notice establishing a date after which the City will correct and remedy that work by any means that the Engineer may deem necessary, including the use of City forces or other contractors. If the Engineer determines that the Contractor’s failure to promptly correct any defective or any unauthorized work creates a situation that could be potentially unsafe or might cause serious risk of loss or damage to the public, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work removed and replaced, or have the work the Contractor refuses to perform completed by using City or other forces. Direct and indirect costs incurred by the City attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment may be deducted by the Engineer from monies due, or to become due, the Contractor. Direct and indirect costs shall include, without limitation, compensation for additional professional services required, 2021 Plastic Markings/Araucto 1 - 8 February 16, 2021 Project Number: 21-3011.2 compensation and engineering and inspection services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor’s unauthorized work. No increase in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the City’s rights provided by this section nor shall the exercise of this right diminish the City’s right to pursue any other remedy available under law with respect to the Contractor’s failure to perform the work as required. SECTION 1-05.9 IS SUPPLEMENTED WITH THE FOLLOWING NEW SUBSECTION: 1-05.9 Equipment 1-05.9(1) Operational Testing It is the intent of the City to have at the Physical Completion Date a complete and operable system. Therefore when the work involves the installation of machinery or other mechanical equipment, street lighting, electrical distribution of signal systems, building or other similar work, it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the Physical Completion Date. Whenever items of work are listed in the contract provisions for operational testing they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. In the event the contract does not specify testing time periods, the default testing time period shall be twenty-one (21) calendar days. During and following the test period, the Contractor shall correct any items of workmanship, materials, or equipment that prove faulty or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing shall be included in the various contract bid item prices unless specifically set forth otherwise in the contract. Operational and test periods, when required by the Engineer, shall not affect a manufacturer’s guaranties or warranties furnished under the terms of the Contract. 2021 Plastic Markings/Araucto 1 - 9 February 16, 2021 Project Number: 21-3011.2 SECTION 1-05.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-05.10 Guarantees In addition to any other warranty or guarantee provided for at law or in the parties’ contract, the Contractor shall furnish to the Contracting Agency any guarantee or warranty furnished as a customary trade practice in connection with the purchase of any equipment, materials, or items incorporated into the project. Upon receipt of written notice of any required corrective work, the Contractor shall pursue vigorously, diligently, and without disrupting city facilities, the work necessary to correct the items listed in the notice. Approximately sixty (60) calendar days prior to the one year anniversary of final acceptance, the Contractor shall be available to tour the project, with the Engineer, in support of the Engineer’s effort to establish a list of corrective work then known and discovered. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE FIRST PARAGRAPH: 1-05.13 Superintendents, Labor, and Equipment of Contractor Within ten (10) days of contract award, the Contractor shall designate the Contractor's project manager and superintendent for the contract work. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE THIRD PARAGRAPH (AS PRINTED IN THE 2021 WSDOT STANDARD SPECIFICATIONS): If at any time during the contract work, the Contractor elects to replace the contract manager or superintendent, the Contractor shall only do so after obtaining the Engineer's prior written approval. THE LAST PARAGRAPH OF 1-05.13 IS DELETED AND REPLACED WITH THE FOLLOWING: Whenever the City evaluates the Contractor’s qualifications or prequalifications pursuant to Section 1-02.1 or RCW 47.28.070, the City may take these or other Contractor performance reports into account. SECTION 1-05.14 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.14 Cooperation With Other Contractors Other Contracts or Other Work It is anticipated that the following work adjacent to or within the limits of this project will be performed by others during the course of this project and will require coordination of the work: 2021 Plastic Markings/Araucto 1 - 10 February 16, 2021 Project Number: 21-3011.2 2021 Paint Line Striping and RPM Replacement Project 2021 Crack Sealing Project 2021 City of Kent Crew Paving Operations: Work listed in the Appendices requires installation of markings after the completion of City paving operations. The City anticipates completion of all paving operations later in the year and will issue a separate notice to proceed in accordance with the Contract. SECTION 1-05 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-05.16 Water and Power The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the Contract includes power or water as bid items, or unless otherwise provided for in other bid items. 1-05.17 Oral Agreements No oral agreement or conversation with any officer, agent, or employee of the City, either before or after execution of the contract, shall affect or modify the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered unofficial information and in no way binding upon the City, unless subsequently recorded and/or put in writing and signed by an authorized agent of the City. 1-06 CONTROL OF MATERIAL SECTION 1-06.2(2) IS DELETED IN ITS ENTIRETY. 1-06.2(2) Statistical Evaluation of Materials for Acceptance SECTION 1-06 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-06.7 Submittals 1-06.7(1) Submittal Procedures All information submitted by the Contractor shall be clear, sharp, high contrast copies. Contractor shall accompany each submittal with a letter of transmittal containing the following information: 1. Contractor’s name and the name of Subcontractor or supplier who prepared the submittal. 2. The project name and identifying number. 3. Each new submittal shall be sequentially numbered (1, 2, 3, etc.). Each resubmittal shall include the original number with a sequential alpha letter added (1A, 1B, 1C, etc.). 2021 Plastic Markings/Araucto 1 - 11 February 16, 2021 Project Number: 21-3011.2 4. Description of the submittal and reference to the Contract requirement or technical specification section and paragraph number being addressed. 5. Bid item(s) where product will be used. 1-06.7(2) Schedule of Submittals The Contractor shall create and submit three (3) copies of a schedule of submittals showing the date by which each submittal required for product review or product information will be made. The schedule can be modified, deducted, or added to by the City. The schedule shall be available at the preconstruction conference (see 1-08.0 of the Kent Special Provisions). The schedule of submittals must be accepted prior to the City making the first progress payment. The schedule shall identify the items that will be included in each submittal by listing the item or group of items and the Specification Section and paragraph number and bid item under which they are specified. The schedule shall indicate whether the submittal is required for product review of proposed equivalents, shop drawings, product data or samples or required for product information only. The Contractor shall allow a minimum of 21 days for the Engineer’s review of each submittal or resubmittal. All submittals shall be in accordance with the approved schedule of submittals. Submittals shall be made early enough to allow adequate time for manufacturing, delivery, labor issues, additional review due to inadequate or incomplete submittals, and any other reasonably foreseeable delay. 1-06.7(3) Shop Drawings, Product Data, and Samples The Contractor shall submit the following for the Engineer’s review: 1. Shop Drawings: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 2. Product Data: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 3. Samples: Submit three labeled samples or three sets of samples of manufacturer’s full range of colors and finishes unless otherwise directed. One approved sample will be returned to the Contractor. Content of submittals: 1. Each submittal shall include all of the items required for a complete assembly or system. 2. Submittals shall contain all of the physical, technical and performance data required to demonstrate conclusively that the items comply with the requirements of the Contract. 2021 Plastic Markings/Araucto 1 - 12 February 16, 2021 Project Number: 21-3011.2 3. Each submittal shall verify that the physical characteristics of items submitted, including size, configurations, clearances, mounting points, utility connection points and service access points, are suitable for the space provided and are compatible with other interrelated items. 4. The Contractor shall label each Product Data submittal, Shop Drawing or Sample with the bid item number and, if a lump sum bid item, provide a reference to the applicable KSP paragraph. The Contractor shall highlight or mark every page of every copy of all Product Data submittals to show the specific items being submitted and all options included or choices offered. The City encourages a creative approach to complete a timely, economical, and quality project. Submittals that contain deviations from the requirements of the Contract shall be accompanied by a separate letter explaining the deviations. The Contractor’s letter shall: 1. Cite the specific Contract requirement including the Specification Section bid item number and paragraph number for which approval of a deviation is sought. 2. Describe the proposed alternate material, item or construction, explain its advantages, and explain how the proposed alternate meets or exceeds the Contract requirements. 3. State the reduction in Contract Price, if any, which is offered to the City. The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed deviation with or without cause. The Engineer will stamp and mark each submittal prior to returning it to the Contractor. The stamps will indicate one of the following: 1. “APPROVED AS SUBMITTED” – Accepted subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. 2. “APPROVED AS NOTED” – Accepted subject to minor corrections that shall be made by the Contractor and subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. No resubmission is required. 3. “AMEND AND RESUBMIT” – Rejected because of major inconsistencies, errors or insufficient information that shall be resolved or corrected by the Contractor prior to subsequent re- submittal. An amended resubmission is required. Re-submittals that contain changes that were not requested by the Engineer on the previous submittal shall note all changes and be accompanied by a letter explaining the changes. 2021 Plastic Markings/Araucto 1 - 13 February 16, 2021 Project Number: 21-3011.2 1-06.7(4) Proposed Equivalents The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed equivalent with or without cause. 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.2 State Taxes 1-07.2(1) State Sales Tax: WAC 458-20-171—Use Tax SECTION 1-07.2(1) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor’s obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to use tax under Section 1-07.2(1) in the proposal bid items. 1-07.2(2) State Sales Tax: WAC 458-20-170—Retail Sales Tax SECTION 1-07.2(2) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor’s obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to retail sales tax under Section 1-07.2(2) in the proposal bid items. SECTION 1-07.4(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.4(2) COVID-19 Job Site Requirements Before commencing any work on the Project site, the Contractor shall develop and post at each job site a comprehensive COVID-19 exposure control, mitigation, and recovery plan that complies with the Phase 1 Construction Restart COVID-19 Job Site Requirements issued by the Governor, or subsequent modifications or phase amendments as the Governor may issue. Contractor must further meet and maintain all requirements of the plan, including providing materials, schedules, and equipment required to comply with those job site requirements or any future adjustments that may be made to job site requirements by the Governor or any applicable federal or state agency during the COVID- 19 emergency. A copy of the COVID-19 job site safety plan, along with the identification and contact information for the COVID-19 Supervisor, shall be provided to the Engineer. SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.6 Permits and Licenses 2021 Plastic Markings/Araucto 1 - 14 February 16, 2021 Project Number: 21-3011.2 The City has obtained the following permits: None SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPHS AFTER THE LAST PARAGRAPH: A copy of each permit and/or license obtained by the Contractor shall be furnished to the City. Approved permits shall be furnished to the City upon completion of the project and prior to final acceptance. The Contractor shall promptly notify the City in writing of any variance in the contract work arising from the issuance of any permit. 1-07.9 Wages SECTION 1-07.9(1) IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SIXTH PARAGRAPH: 1-07.9(1) General To the extent allowed by law, the wage rates that will be in effect during the entire contract work period are those in effect on the day of bid opening, unless the City does not award the Contract within six months of the bid opening. SECTION 1-07.9(3) IS DELETED AND REPLACED WITH THE FOLLOWING: FOLLOWING: 1-07.9(3) Apprentices All contracts with an estimated construction cost greater than $1,000,000 (one million dollars) shall require that no less than 15 percent of the labor hours performed by workers subject to prevailing wages employed by the contractor or its subcontractors be performed by apprentices enrolled in a state-approved apprenticeship program. Definitions For the purposes of this specification, the following definitions apply: 1. Apprentice Utilization Requirement is expressed as a percentage of the project Labor Hours performed by Apprentices. 2. Labor Hours are the total hours performed by all workers receiving an hourly wage who are directly employed on the project site including hours performed by workers employed by the prime Contractor and all Subcontractors. Labor Hours do not include hours performed by foremen, superintendents, owners, and workers who are not subject to prevailing wage requirements. 3. Apprentice is a person enrolled in a State-approved Apprenticeship Training Program. 4. State-approved Apprenticeship Training Program is an apprenticeship training program approved by the Washington State Apprenticeship Council. 2021 Plastic Markings/Araucto 1 - 15 February 16, 2021 Project Number: 21-3011.2 5. Good Faith Effort is a demonstration that the Contractor has strived to meet the Apprenticeship Utilization Requirement including but not necessarily limited to the specific steps as described elsewhere in this specification. Plan The Contractor shall submit an “Apprentice Utilization Plan” within 30 calendar days of Notice of Award, demonstrating how they intend to achieve the Apprentice Utilization Requirement. The plan shall be updated and resubmitted as appropriate as the Work progresses. The intent is to provide the City with enough information to track progress in meeting the utilization requirements. Reporting The Contractor shall submit a “Monthly Apprentice Reporting Form” on a monthly basis. The report shall be submitted to the City by the last working day of the subsequent month, until the Physical Completion Date. The date reported shall be cumulative to date and consolidated to include the Contractor and all Subcontractors. At the Contractor’s request, the Engineer may suspend this reporting requirement during periods of minimal or no applicable work activities on the project. The Contractor shall submit documentation of their Good Faith Effort if: (1) they are unable to provide a plan demonstrating how they intend to meet the Apprentice Utilization Requirement; or (2) the project has been completed without meeting the Apprentice Utilization Requirement. Contacts The Contractor may obtain information on State-approved Apprenticeship Training Programs by contacting the Department of Labor and Industries at: Specialty Compliance Services Division, Apprenticeship Section, P.O. Box 44530, Olympia, WA 98504-4530 or by phone at (360) 902-5320. Compliance In the event that the Contractor is unable to accomplish the Apprentice Utilization Requirement, the Contractor shall demonstrate that a Good Faith Effort has been made as described within this specification. Failure to comply with the requirements as specified is subject to penalties for noncompliance as set forth in KCC 6.01.030(E). Good Faith Efforts In fulfilling the Good Faith Effort, the Contractor shall perform and, when appropriate, require its Subcontractors to perform the following steps: 1. Solicit Apprentice(s) from State-approved Apprenticeship Training Program(s). 2. Document the solicitation and, in the event Apprentice(s) are not available, obtain supporting documentation from the solicited program(s). 2021 Plastic Markings/Araucto 1 - 16 February 16, 2021 Project Number: 21-3011.2 3. Demonstrate that the plan was updated as required within this specification. 4. Provide documentation demonstrating what efforts the Contractor has taken to require Subcontractors to solicit and employ Apprentice(s). In the event that the preceding steps have been followed, the Contractor may also supplement the Good Faith Efforts documentation with the following documentation: 5. Submit documentation demonstrating successful Apprentice utilization on previous contracts. 6. Submit documentation indicating company-wide Apprentice utilization efforts and percentages of attainment. Payment Compensation for all costs involved with complying with the conditions of this specification is included in payment for the associated Contract items of work. 1-07.13 Contractor’s Responsibility for Work SECTION 1-07.13(4) IS REVISED BY DELETING THE SECOND SENTENCE OF THE FIRST PARAGRAPH AND DELETING THE LAST PARAGRAPH. 1-07.13(4) 1-07.13(4) Repair of Damage SECTION 1-07.14 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE BEGINNING OF THAT SECTION: 1-07.14 Responsibility for Damage To the extent a conflict exists between the terms of this Section 1- 07.14 and Section 5 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.15(1) IS REVISED BY ADDING THE FOLLOWING PARAGRAPH AFTER THE LAST PARAGRAPH: 1-07.15 Temporary Water Pollution Prevention 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan When the proposal form includes multiple bid schedules and the “SPCC Plan” bid item is present in only one bid schedule, the lump sum payment item for the “SPCC Plan” in that one schedule will apply to all bid schedules for all costs associated with creating and updating the accepted SPCC Plan, and all costs associated with the setup of prevention measures and for implementing the current SPCC Plan as required by this Specifications. 2021 Plastic Markings/Araucto 1 - 17 February 16, 2021 Project Number: 21-3011.2 SECTION 1-07.17 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE END OF THE SECOND PARAGRAPH: 1-07.17 Utilities and Similar Facilities If a utility is known to have or suspected of having underground facilities within the area of the proposed excavation and that utility is not a subscriber to the utilities underground location center, the Contractor shall give individual notice to that utility within the same time frame prescribed in RCW 19.122.030 for subscriber utilities. SECTION 1-07.17 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-07.17(3) Utility Markings Once underground utilities are marked by the utility owner or its agent, and/or once new underground facilities have been installed by the Contractor, the Contractor/excavator is responsible to determine the precise location of underground facilities that may conflict with other underground construction. The Contractor shall maintain the marks or a record of the location of buried facilities for the duration of time needed to avoid future damage until installation of all planned improvements at that location is complete. 1-07.17(4) Payment All costs to comply with subsection 1-07.17(3) and for the protection and repair of all identified or suspected underground utilities specified in RCW 19.122 are incidental to the contract and are the responsibility of the Contractor/excavator. The Contractor shall include all related costs in the unit bid prices of the contract. No additional time or monetary compensation shall be made for delays caused by utility re- marking or repair of damaged utilities due to the Contractor’s failure to maintain marks or to locate utilities in accordance with this section. 1-07.17(5) Notification of Excavation Within ten business days but not less than two business days prior to the commencement of excavation, the Contractor shall provide written notice (or other form of notice acceptable to the Engineer) to all owners of underground facilities, whether public or private, that excavation will occur, and when excavation will occur. 1-07.17(6) Site Inspection Contractor warrants and represents that it has personally, or through its employees, agents and/or subcontractors, examined all property affected by this project and that it is knowledgeable of specific locations for water, gas, telephone, electric power and combined sewerage utilities within those areas. 2021 Plastic Markings/Araucto 1 - 18 February 16, 2021 Project Number: 21-3011.2 The following list of contacts is provided only as a convenience to the Contractor. It may not be accurate and may not constitute a complete list of all affected utilities. CenturyLink Gabrielle Skorupa 206-305-4395 Comcast Aaron Cantrel 206-510-4222 (cell) Aaron_Cantrel@comcast.com Puget Sound Energy Gas Glenn Helton 253-395-6926 425-559-4647 (cell) Puget Sound Energy Power Hong Nguyen 425-449-6609 (cell) Hong.Nguyen@pse.com Verizon Scott Christenson 425-636-6046 425-471-1079 (cell) SECTION 1-07.18 IS REVISED BY ADDING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.18 Public Liability and Property Damage Insurance To the extent a conflict exists between the terms of this Section 1- 07.18 and the insurance requirements in Section 7 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.24 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.24 Rights of Way Street right of way lines, limits of easements and limits of construction are indicated or defined on the plans. The Contractor's construction activities shall be confined within these limits, unless arrangements for use of private property are made. It is anticipated that the City will have obtained all right of way, easements or right of entry agreements prior to the start of construction. Locations where these rights have not been obtained will be brought to the Contractor's attention prior to start of construction. The Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. 2021 Plastic Markings/Araucto 1 - 19 February 16, 2021 Project Number: 21-3011.2 SECTION 1-07.26 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.26 Personal Liability of Public Officers Neither the City, the Engineer, nor any other official, officer or employee of the City shall be personally liable for any acts or failure to act in connection with the contract, it being understood that, in these matters, they are acting solely as agents of the City. 1-08 PROSECUTION AND PROGRESS SECTION 1-08 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 1-08.0 Preconstruction and Preconstruction Conference The Engineer will furnish the Contractor with up to ten (10) copies of the plans and specifications. Additional documents may be purchased from the City at the price specified by the City or in the Invitation to Bid. Prior to undertaking each part of the work, the Contractor shall carefully study and compare the Contract and check and verify all pertinent figures shown and all applicable field measurements. The Contractor shall promptly report in writing to the Engineer any conflict, error or discrepancy that the Contractor discovers. After the Contract has been executed, but prior to the Contractor beginning the work, a preconstruction conference will be held with the Contractor, the Engineer and any other interested parties that the City determines to invite. The purpose of the preconstruction conference will be: 1. To review the initial progress schedule. 2. To establish a working understanding among the various parties associated or affected by the work. 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc. 4. To verify normal working hours for the work. 5. To review safety standards and traffic control. 6. To discuss any other related items that may be pertinent to the work. The Contractor shall prepare and submit for approval, at or prior to the preconstruction conference the following: 1. A price breakdown of all lump sum items. 2. A preliminary construction schedule. 3. A list of material sources for approval, if applicable. 4. Schedule of submittals. (See 1-06.6(2)) 5. Temporary Erosion/Sedimentation Control Plan (TESCP) for approval. 6. Traffic Control Plan (TCP) for approval. 2021 Plastic Markings/Araucto 1 - 20 February 16, 2021 Project Number: 21-3011.2 7. Request to sublet, for approval by the Engineer, of all subcontractors. SECTION 1-08.4 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-08.4 Notice to Proceed, Prosecution and Hours of Work Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of required insurance have been approved by and filed with the City. Unless otherwise approved in writing by the Engineer, the Contractor shall not commence the work until the Notice to Proceed has been given by the Engineer. The Contractor shall commence construction activities on the Project Site within ten working days of the Notice to Proceed Date. The Work thereafter shall be prosecuted diligently, vigorously, and without unauthorized interruption until physical completion of the work. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the Contract. Except in the case of emergency or unless otherwise approved by the Engineer, the normal straight time working hours for the Contractor shall be any consecutive 8 hour period between 7:00 a.m. and 6:00 p.m. Monday through Friday, unless otherwise specified in the Kent Special Provisions, with a 5-day work week, plus allowing a maximum one-hour lunch break in each working day. The normal straight time 8-hour working period for the contract shall be established at the preconstruction conference or prior to the Contractor commencing work. If a Contractor desires to perform work on holidays, Saturdays, Sundays, or before 7:00 a.m. or after 6:00 p.m. on any day, the Contractor shall apply in writing to the Engineer for permission to work those times. The Contractor shall notify the Engineer at least 48 hours in advance (72 hours in advance for weekend work) so that the Inspector's time may be scheduled. Permission to work longer than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. Permission to work between the hours of 10:00 p.m. and 7:00 a.m. during weekdays and between the hours of 10:00 p.m. and 9:00 a.m. on weekends or holidays may also be subject to noise control requirements. Approval to continue work during these hours may be revoked at any time the Contractor exceeds the City’s noise control regulations or the city receives complaints from the public or adjoining property owners regarding noise from the Contractor’s operations. The Contractor shall have no claim for damages or delays should this permission be revoked for these reasons. The Engineer may grant permission to work Saturdays, Sundays, holidays or other than the agreed upon normal straight time working hours, but may be subject to other conditions established by the City or Engineer. These conditions may include, but are not limited to the 2021 Plastic Markings/Araucto 1 - 21 February 16, 2021 Project Number: 21-3011.2 following: hours worked by City employees; impacts to the construction schedule; or accommodations to adjoining properties affected by the contract work. 1-08.4(A) Reimbursement for Overtime Work of City Employees Following is a non-exclusive list of work that may require Contractor reimbursement for overtime of City employees. The City will bill the Contractor at the OVERTIME RATE in order for locate crews to complete other work. If the locate request is for nights, weekend, holidays or at other times when locate crews are not normally working, all locate work and expenses, including travel, minimum call out times, and/or Holiday premiums will be borne by the Contractor. 1. Locate work required to re-establish marks for City-owned underground facilities that were not maintained or recorded by the Contractor in accordance with RCW 19.122.030. 2. Work required by City personnel or independent testing laboratories to re-test project materials, utility pressure or vacuum tests, camera surveys or water purity tests as the result of initial test failure on the part of the Contractor. 1-08.4(B) General The City allocates its resources to a contract based on the total time allowed in the contract. The City will accept a progress schedule indicating an early physical completion date but cannot guarantee the City resources will be available to meet the accelerated schedule. No additional compensation will be allowed if the Contractor is not able to meet its accelerated schedule due to the unavailability of City resources or for other reasons beyond the City's control. Unless previously approved by the Engineer, the original and all supplemental progress schedules shall not conflict with any time and order-of-work requirements in the contract. If the Engineer deems that the original or any necessary supplemental progress schedule does not provide adequate information, the City may withhold progress payments until a schedule containing needed information has been submitted by the Contractor and approved by the Engineer. The Engineer's acceptance of any schedule shall not transfer any of the Contractor's responsibilities to the City. The Contractor alone shall remain responsible for adjusting forces, equipment, and work schedules to ensure completion of the work within the times specified in the contract. SECTION 1-08.5 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-08.5 Time for Completion 2021 Plastic Markings/Araucto 1 - 22 February 16, 2021 Project Number: 21-3011.2 Contract time shall begin on the day of the Notice to Proceed. The Contract Provisions may specify another starting date for Contract time, in which case, time will begin on the starting date specified. SECTION 1-08.6 IS REVISED BY DELETING THE FIFTH, SIXTH, AND SEVENTH PARAGRAPHS AND REPLACING WITH THE FOLLOWING: 1-08.6 Suspension of Work If the performance of all or any part of the Work is suspended for an unreasonable period of time by an act of the Contracting Agency in the administration of the Contract, or by failure to act within the time specified in the Contract (or if no time is specified, within a reasonable time), the Engineer will make an adjustment for any increase in the cost or time for the performance of the Contract (excluding profit) necessarily caused by the suspension. However, no adjustment will be made for any suspension if (1) the performance would have been suspended by any other cause, including the fault or negligence of the Contractor, or (2) an equitable adjustment is provided for or excluded under any other provision of the Contract. If the Contactor believes that the performance of the Work is suspended for an unreasonable period of time and such suspension is the responsibility of the Contracting Agency, the Contractor shall immediately submit a written notice of protest to the Engineer as provided in Section 1-04.5. No adjustment shall be allowed for any costs incurred more than 10 calendar days before the date the Engineer receives the Contractor’s written notice to protest. In any event, no protest will be allowed later than the date of the Contractor’s signature on the Final Pay Estimate. The Contractor shall keep full and complete records of the costs and additional time of such suspension, and shall permit the Engineer to have access to those records and any other records as may be deemed necessary by the Engineer to assist in evaluating the protest. The Engineer will determine if an equitable adjustment in cost or time is due as provided in this Section. The equitable adjustment for increase in costs, if due, shall be subject to the limitations provide in Section 1- 09.4, provided that no profit of any kind will be allowed on any increase in cost necessarily caused by the suspension. SECTION 1-08.7 MAINTENANCE DURING SUSPENSION IS REVISED BY DELETING THE FOURTH AND SIXTH PARAGRAPHS. 1-09 MEASUREMENT AND PAYMENT SECTION 1-09.9 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 1-09.9(2) City’s Right to Withhold Certain Amounts 2021 Plastic Markings/Araucto 1 - 23 February 16, 2021 Project Number: 21-3011.2 In addition to the amount that the City may otherwise retain under the Contract, the City may withhold a sufficient amount of any payments otherwise due to the Contractor, including nullifying the whole or part of any previous payment, because of subsequently discovered evidence or subsequent inspections that, in the City's judgment, may be necessary to cover the following: 1. The cost of defective work not remedied. 2. Fees incurred for material inspection, and overtime engineering and inspection for which the Contractor is obligated under this Contract. 3. Fees and charges of public authorities or municipalities. 4. Liquidated damages. 5. Engineering and inspection fees beyond Completion Date. 6. Cost of City personnel to re-establish locate marks for City-owned facilities that were not maintained by the Contractor in accordance with RCW 19.122.030 (3). 7. Additional inspection, testing and lab fees for re-doing failed, water, other utility tests. SECTION 1-09.11(3) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.11(3) Time Limitations and Jurisdiction This contract shall be construed and interpreted in accordance with the laws of the State of Washington. The venue of any claims or causes of action arising from this contract shall be exclusively in the Superior Court of King County, located in Kent, Washington. For convenience of the parties to this contract, it is mutually agreed that any claims or causes of action which the Contractor has against the City arising from this contract shall be brought within 180 days from the date of Final Acceptance of the contract by the City. The parties understand and agree that the Contractor’s failure to bring suit within the time period provided shall be a complete bar to any such claims or causes of action. It is further mutually agreed by the parties that when any claims or causes of action that a Contractor asserts against the City arising from this contract are filed with the City or initiated in court, the Contractor shall permit the City to have timely access to any records deemed necessary by the City to assist in evaluating the claims or actions. SECTION 1-09.13 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.13 Final Decision and Appeal All disputes arising under this contract shall proceed pursuant to Section 1-04.5 and 1-09.11 of the WSDOT Standard Specifications and any Kent Special Provisions provided for in the contract for claims and resolution of disputes. The provisions of these sections and the Kent Special Provisions must be complied with as a condition precedent to 2021 Plastic Markings/Araucto 1 - 24 February 16, 2021 Project Number: 21-3011.2 the Contractor’s right to seek an appeal of the City’s decision. The City’s decision under Section 1-09.11 will be final and conclusive. Thereafter, the exclusive means of Contractor’s right to appeal shall only be by filing suit exclusively under the venue, rules and jurisdiction of the Superior Court of King County, located in Kent, Washington, unless the parties agree in writing to an alternative dispute resolution process. 1-10 TEMPORARY TRAFFIC CONTROL SECTION 1-10.2(1) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-10.2(1) General The TCS shall be certified as a work site traffic control supervisor by one of the following: Evergreen Safety Council 401 Pontius Avenue North Seattle, WA 98109 1-800-521-0778 or 206-382-4090 The Northwest Laborers-Employers Training Trust 27055 Ohio Avenue Kingston, WA 98346 360-297-3035 The American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 Training Dept. Toll Free (877) 642-4637 or (540) 368-1701 1-10.3(3) Traffic Control Devices SECTION 1-10.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 1-10.3(3)L Temporary Traffic Control Devices When the bid proposal includes an item for “Temporary Traffic Control Devices,” the work required for this item shall be furnishing barricades, flashers, cones, traffic safety drums, and other temporary traffic control devices, unless the contract provides for furnishing a specific temporary traffic control device under another item. The item “Temporary Traffic Control Devices” includes: 1. Initial delivery to the project site (or temporary storage) in good repair and in clean usable condition, 2. Repair or replacement when they are damaged and they are still needed on the project, and 3. Removal from the project site when they are no longer on the project. 2021 Plastic Markings/Araucto 1 - 25 February 16, 2021 Project Number: 21-3011.2 SECTION 1-10.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-10.5 Payment Payment will be made in accordance with Section 1-04.1, for the following bid items when they are included in the Proposal: The unit contract price for “Traffic Control Labor” per hour shall be full pay for all costs for the labor provided for performing those construction operations described in Section 1-10.2(1)B, and Section 1-10.3(1) of the WSDOT Standard Specifications, and as authorized by the Engineer. The hours eligible for “Traffic Control Labor” shall be limited to the hours the worker is actually performing the work as documented by traffic control forms provided by the Contractor’s TCM, and verified by the City Inspector’s records, and the Contractor’s Certified Payroll Records submitted to the City Inspector on a weekly basis. The unit contract price for “Traffic Control Supervisor” per hour shall be full pay for each hour a person performs the Traffic Control Supervisor duties described in Section 1-10.2(1)B of the WSDOT Standard Specifications. Payment for traffic control labor performed by the Traffic Control Supervisor will be paid under the item for “Traffic Control Labor”. The unit bid price per hour for “Uniformed Off-Duty Police Officer” will be complete compensation for the utilization of uniformed off-duty Police Officer(s) for traffic control purposes. This bid item includes all the equipment, and vehicle needed for the police officer to perform his duties. Cost is per hour for each hour an Officer is on the project with a minimum call-out time of three hours. The Contracting Agency (City of Kent) has set the unit price for “Uniformed Off-Duty Police Officer” at eighty dollars ($80.00) per hour minimum. Should the Contractor determine that the cost for this work is greater than the minimum price shown in the bid form, the Contractor may bid a higher price. Should the Contractor write in a unit price less than the minimum price shown in the bid form, the minimum unit price shown in the bid form shall govern and become part of the bid. No adjustment will be made for overtime hours or holidays. The lump sum contract price for “Temporary Traffic Control Devices” shall be full pay for providing the work described in Section 1-10.3(3)L of the Kent Special Provisions. Progress payment for the lump sum item “Temporary Traffic Control Devices” will be made as follows: 1. When the initial temporary traffic control devices are set up, 50 percent of the amount bid for the item will be paid. 2. Payment for the remaining 50 percent of the amount bid for the item will be paid on a prorated basis in accordance with the total job progress as determined by progress payments. 2021 Plastic Markings/Araucto 1 - 26 February 16, 2021 Project Number: 21-3011.2 The unit contract price for “Portable Changeable Message Sign (PCMS)” per day shall be full pay for all costs for furnishing, transporting, initial installation within the project limits, maintaining and removing the PCMS, and associated work described in Section 1-10.3(3)C of the WSDOT Standard Specifications. Relocation of the PCMS within the project limits will be paid under the item “Traffic Control Labor.” The unit contract price for “Sequential Arrow Sign (SAS)” per day shall be full pay for all costs for providing, maintaining and removing the SAS, and associated work and maintenance described in Section 1-10.3(3)B of the WSDOT Standard Specifications. The operator of this device will be paid under the item “Traffic Control Labor.” When the proposal does not include a bid item for a specific bid item listed in the WSDOT Standard Specifications and/or the Kent Special Provisions, all costs for the work described for those traffic control bid items shall be included by the Contractor in the unit contract prices for the various other bid items contained within the proposal. The Contractor shall estimate these costs based on the Contractor’s contemplated work procedures. When traffic control bid items are included in the bid proposal, payment is limited to the following work areas: 1. The entire construction area under contract and for a distance to include the initial warning signs for the beginning of the project and the END OF CONSTRUCTION sign. Any warning signs for side streets on the approved TCP are also included. If the project consists of two or more sections, the limits will apply to each section individually. 2. A detour provided in the plans or approved by the City’s Traffic Control Supervisor for by-passing all or any portion of the construction, irrespective of whether or not the termini of the detour are within the limits of the Contract. No payment will be made to the Contractor for traffic control items required in connection with the movement of equipment or the hauling of materials outside of the limits of 1 and 2 above, or for temporary road closures subject to the provisions of Section 1-07.23(1) of the WSDOT Standard Specifications. 2021 Plastic Markings/Araucto 8 - 1 February 16, 2021 Project Number: 21-3011.2 DIVISION 8 – MISCELLANEOUS CONSTRUCTION 8-22 PAVEMENT MARKING REVISE THE LAST SENTENCE OF THE SECOND PARAGRAPH AS FOLLOWS: 8-22.1 Description Except for “LOAD ZONE” and “R” in the railroad crossing symbol, traffic pavement marking letters and numerals shall be 8-feet high per WSDOT Standard Plan M-80.10-01 and M-80.20-00 for high-speed application (regardless of the posted speed limit of the street). The “R” in the railroad crossing symbol shall be as shown on Kent Standard Plan 6-78M. The “LOAD ZONE” letters shall be 12 inch in height. Layout of ONLY and arrows in the left turn pockets shall be as shown in the Kent Standard Plan 6-81. Plastic Pedestrian Pavement Marking pedestrian symbol shall be per Kent Standard Plan 6-79. SECTION 8-22.2 IS SUPPLEMENTED WITH THE FOLLOWING: 8-22.2 Materials Type A (Liquid Hot Applied Thermoplastic) plastic material shall be used when applying the following pavement markings.  Plastic Crosswalk Lines  Plastic Stop Lines  Plastic Yield Line Symbol  Plastic Railroad Crossing makings  Intersection Turn Extension Line Type B (Pre-Formed Fused Thermoplastic) plastic material shall be used when applying the following pavement markings.  Plastic Bike Lane symbols  Plastic Speed Bump markings  Plastic Pedestrian Plastic marking symbol Type D (Liquid Cold Applied Methyl Methacrylate) plastic material shall be used when applying the following pavement markings.  Plastic Traffic Arrows  Plastic Traffic Letters  LOAD ZONE Plastic Traffic Letters  Profiled Plastic lane lines  Plastic flat long lines  Plastic wide lane lines  Plastic Bike Lane Lines  Profiled Plastic Double Yellow Centerlines  Profiled Plastic Two-Way Left Turn Lane Lines Type A plastic material shall be BC2000 series or approved equal meeting the requirements of Section 9-34 and the following requirements. Type A plastic materials shall be capable of being 2021 Plastic Markings/Araucto 8 - 2 February 16, 2021 Project Number: 21-3011.2 applied at a temperature between 375 °F to 450 °F (190 °C to 230 °C) and to the required thickness without excessive overspray, running or deformation of the edges. Type A plastic materials shall be capable of bearing traffic within 5 minutes after application, 10 minutes when pavement surface temperature is at or above 130 °F(54°C), and show no deformation or flaking at temperatures between –10 °F to 140 °F (– 23 °C to 60 °C). The marking compound shall contain glass beads and shall have top dressing of glass beads applied. Type B plastic material shall have glass beads homogeneously blended throughout the material with a securely bonded protruding exposed layer of beads that provide immediate and required retroreflectivity. No additional glass beads shall be needed to be dropped on the material during application to obtain the required retroreflectivity. The top surface of Type B material shall have regularly spaced indents. The closing of these indents during application shall act as a visual cue that the material has reached a molten state allowing for satisfactory adhesion and proper bead embedment and as a post-application visual cue that the application procedures have been followed. Type D plastic material shall meet the requirements of Section 9-34. Glass beads shall be as recommended by the material manufacturer. Raised Pavement Markers shall meet the requirements of Section 8- 09.2. All materials shall be selected from material listed in the Washington State Department of Transportation qualified product list (QPL). SECTION 8-22.3(3)E IS SUPPLEMENTED WITH THE FOLLOWING: 8-22.3(3)E Installation Type B material shall be applied using the propane torch method as recommended by the manufacturer of the Type B material. SECTION 8-22.3(3)F IS SUPPLEMENTED WITH THE FOLLOWING: 8-22.3(3)F Application Thickness All markings shall meet the thickness requirements for flat/transverse & symbol for the various type of plastic material. 8-22.3(4) Tolerances for Lines SECTION 8-22.3(4) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(4)A Tolerances For Traffic Letters and Symbols Traffic Letters - The letter’s width of field of a marking shall be not be less than specified in the WSDOT Standard plans specified in the Contract or greater than specified plus ¼ inch. Edges shall be crisp and 2021 Plastic Markings/Araucto 8 - 3 February 16, 2021 Project Number: 21-3011.2 sharp with no more than ¼ inch variation in width. Seam and overlap of plastic marking material are not allowed in field of a marking that are less than 12 inches wide. Overlap of plastic material will be limited to 3 in field of a marking that are 12 inches or greater. Gap between passes of plastic material to form traffic letters will not be allowed. Symbols – The dimension of the symbols shall be not less than specified in the in the Contract or greater than specified dimensions plus ¼ inch. Edges shall be crisp and sharp with no more than ¼ inch width variation. Seam and overlap of plastic marking material is not allowed in field of a marking that are less than 12 inches wide. Overlap of plastic material will be limited to 3 in field of a marking that have width 12 inches or greater. Gap between passes of plastic material to form symbols will not be allowed. SECTION 8-22.3(5) IS SUPPLEMENTED WITH THE FOLLOWING: 8-22.3(5) Installation Instructions All markings required to be installed at each intersection shall be completed prior to mobilizing to the next intersection. Both the pavement surface and the air temperature at the time of application shall not be less than 50°F (as measured by a temperature gun) and shall be rising. The road surface shall be absolutely dry. When the type of stop line replacement is identified as “Fill-in” in Appendix A and B, only the worn out portion of the stop line is required to be refreshed, otherwise, the entire length of stop line will be refreshed. When the type of crosswalk replacement is identified as “Partial” in Appendix A and B, only the worn out portion of the crosswalk is required to be refreshed, otherwise, the entire crosswalk will be refreshed. SECTION 8-22.3(6) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(6) Removal of Pavement Markings All existing markings to be covered by the new markings shall be sufficiently removed for proper installation of new markings. Visible remnants of replaced markings shall be sufficiently removed. Under no circumstance shall paint, plastic material, sediment, and debris from the removal of pavement markings will be allowed to enter the stormwater system. Removal of pavement markings shall be performed on the same work shift and under the same traffic control set-up as the installation of the pavement markings. 2021 Plastic Markings/Araucto 8 - 4 February 16, 2021 Project Number: 21-3011.2 SECTION 8-22.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 8-22.3(7) Reporting On a daily basis, the Contractor shall provide a report to the Engineer with the following information: a. Project location. b. Crew Superintendent. c. Date, pavement surface temperature (°F), air temperature (°F), rain free forecast or rain forecast checked via what source, AM and PM actual weather. d. Bid items, quantity and location installed. e. Traffic control used, including number of hours. f. Start and stop time of shift. g. Product temperature within the hopper prior to application. At a minimum, Contractor shall check product temperature within the hopper every 30 minutes of work shift and provide documented results for Engineer. h. Product temperature at wand where product comes in contact with the road surface. Contractor shall provide results at each marking location (i.e. at each leg of an intersection) Contractor shall sign each day’s report certifying that material was installed per contractor provided instructions to Engineer. SECTION 8-22.4 IS REVISED BY DELETING THE LAST 2 PARAGRAPHS AND REPLACED WITH THE FOLLOWING: 8-22.4 Measurement Removal of stop line and crosswalk necessary to relocate such marking, removal of crosswalk markings not covered by new plastic marking material, and removal of “ONLY” traffic letters, as identified in the Appendices will be measured per square foot of removed plastic traffic marking. Any other removal will be considered incidental to the unit cost of installed pavement markings. No measurement will be made for the lump sum contract items “N Lincoln Street / W Meeker Street RPM Removal and Curb Painting.” The measurement for “8 inch Wide Plastic Intersection Turn Extension Lane (White)” and “8 inch Wide Plastic Intersection Turn Extension Lane (Yellow)” will be based on the total length of each 8 inch wide plastic line installed. No deduction will be made for the unmarked area for these dotted extension lines. SECTION 8-22.5 IS REVISED ACCORDING TO THE FOLLOWING: 8-22.5 Payment All items referencing removal of plastic lines or markings are deleted. 2021 Plastic Markings/Araucto 8 - 5 February 16, 2021 Project Number: 21-3011.2 “Additional Plastic Traffic Marking Removal,” per square foot. “8 inch Wide Plastic Intersection Turn Extension Lane (White),” and “8 inch Wide Plastic Intersection Turn Extension Lane (Yellow),” per linear foot. “N Lincoln Street / W Meeker Street RPM Removal and Curb Painting,” per lump sum. 2021 Plastic Markings/Araucto A - 1 February 16, 2021 Project Number: 21-3011.2 KENT STANDARD PLANS The following Kent Standard Plans supplement all other plans, which have been prepared for this project and are considered to be a part of the project plans. STREET 6-74M Typical Lane Markings 6-75M Plastic Crosswalk Markings 6-76M Plastic Arrows, Stop Bars & Only Legend 6-77M Fire Lane Marking 6-78M Railroad Grade Crossing Pavement Markings 6-79 Typical Pavement Markings 6-80M Symmetrical Left Turn Pocket Layout 6-81M Left Turn Pocket at End of Two Way Left Turn Lane Layout 110' 30' TRAFFIC DIRECTION 4" GAP VARIES (300' MAX.) 5' 2.5' TWO WAY LEFT TURN LANE TRAFFIC DIRECTION TWO WAY LEFT TURN LINES TRAFFIC DIRECTION TRAFFIC DIRECTION 20' 8" WHITE LINE ° ° TYPE 2W RPM ^ TYPE 2YY RPM ❑ ❑ Y� 20' 4" GAP 4" GAP 4" YELLOW LINE TRAFFIC DIRECTION TRAFFIC DIRECTION DOUBLE YELLOW CENTER LINE WIDE LINE TRAFFIC DIRECTION TRAFFIC DIRECTION 11' 30' 30' ❑ ❑ o TYPE 2W RPM ❑ �o 4" WHITE LINE TYPE 2Y RPM 4" YELLOW LINE TRAFFIC DIRECTION TRAFFIC DIRECTION LANE LINE SKIP CENTER LINE 6' 8' 01 ❑ 0 ❑ TYPE 2W RPM 4" WHITE LINE 4" GAP 8" WHITE LINE EDGE LINE DOTTED WIDE LINE TRAFFIC DIRECTION T 9' 21'(TYP) 18" YELLOW BARRIER LINE 1" 1" BD .WHITE LINE18"-TYPE T 2Y RPM'S EQUALLY SPACED 2W RPM TRAFFIC DIRECTION DROP LANE LINE S� BARRIER LINE ����� OF� $1���� NOTES: 4� �� 1. RAISED PAVEMENT MARKERS (RPM's)� = CITY OF KENT ENGINEERING DEPARTMENT SHALL BE INSTALLED PER WSDOT STANDARD SPECIFICATIONS 8-09, KENT TYPICAL LANE MARKINGS 9-02.1(8), 9-26.2 AND 9-21 38296 �0 IST- �SSIONAL ESPS DESIGNED FS STANDARD PLAN SCALE NONE DRAWN-- CHECKED DATE 02-2003 CITY ENGINEER 6-74M APPROVED } o w 24" WHITE EQUALLY z 0 J CROSSWALK BAR Lu SPACED J z �' z z z a g g (TYP) g c� 24" w Lu > H o 8 o L o of 4'(TYP) V —0——o— 0 o —0——o \— 12"-24" WHITE STOP LINE. TIRE TRACKS (TYP.) WIDTH AS SPECIFIED IN THE CONTRACT TYPICAL 4 LANE ROADWAY CONFIGURATION IS SHOWN * GENERAL NOTES: 1. FOR ROADWAYS WITH MORE OR LESS LANES, THE SAME CONFIGURATION APPLIES, CENTER CROSSWALK BARS ON THE LANE LINES, AND IN THE CENTER OF THE TRAVELED PORTION OF THE LANE TO MINIMIZE TIRE WEAR ON THE CROSSWALK BARS. 2. THE CENTERLINE OF THE CROSSWALK SHALL GO FROM THE CENTERLINE OF THE CURB RAMP ON ONE SIDE OF THE STREET TO THE CENTERLINE OF THE CURB RAMP ON THE OTHER SIDE OF THE STREET UNLESS OTHERWISE SHOWN ON THE PLANS. 3. ALL MARKINGS SHALL BE WHITE PLASTIC MATERIAL AS SPECIFIED IN THE CONTRACT AND IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-34. 4. GLASS BEADS (PER WSDOT STANDARD SPECS. SECTION 9-34) SHALL BE ADDED TO ALL PLASTIC CROSSWALKS AND STOP BARS. NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE �y V RE�- ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT o OF WAS�r THE CITY OF KENT. A COPY MAY BE OBTAINED UPON REQUEST. CITY OF KENT ENGINEERING DEPARTMENT KENT PLASTIC CROSSWALK MARKINGS 38296 4 WAS-1-1 ISTERF� ��'� DESIGNED DWH SCALE NONE STANDARD PLAN DRAWN- �SSIONAL ECHECKED 88 DATE ENGINEER 6 - 7 5 M APPROVED LENGTH VARIABLE STOP BAR DETAIL 5'-9" O N TYPE 2SR (RIGHT) IS MIRROR IMAGE OF TYPE 2SL 12"-24" AS SPECIFIED IN THE CONTRACT NOTE: 1. LETTER LAYOUT SHALL BE PER WSDOT STANDARD PLAN M-80.20-00 3'-7" W TYPE 3! IS MIRI OF TYPI 11 0 0 N TYPE 2SL(LEFT) TYPE 3SL(LEFT) NOTES: 1. ALL MARKINGS SHALL BE WHITE PLASTIC MATERIAL AS SPECIFIED IN THE CONTRACT AND IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-34. 2. GLASS BEADS (PER WSDOT STANDARD SPECS. SECTION 9-34) SHALL BE ADDED TO ALL PLASTIC MATERIAL. F REY �� OF WAShr1 &Q 'Z C� 38296 6" 6" RED STRIPE WHITE LETTERING NO PARKING 8" MINIMUM NO PARKING - FIRE LANE - FIRE 6" NOTES: TYPE 1: 1 LANE 1 18" MINIMUM NO PARKING - FIRE LANE INV] 321Id - JNI)i'dVd ON 18" MINIMUM f WHITE LETTERING NO PARKING FIRE LANE R8-31 TYPE 3: NO PARKING FIRE LANE R8-31L 1. DIAGONAL RED STRIPING ACROSS THE WIDTH OF THE FIRE LANE SHALL BE USED WHEN REQUIRED BY THE FIRE CODE OFFICIAL. IT SHALL BE USED IN CONJUNCTION WITH A 6 INCH RED STRIPE SIMILAR TO TYPE 1. THE STRIPES SHALL RUN AT A 30 TO 60 DEGREE ANGLE AND SHALL BE PARALLEL WITH EACH OTHER. THE STRIPE SHALL BE A MINIMUM 6 INCHES IN WIDTH AND A MINIMUM OF 24 INCHES APART. LETTERING TO OCCUR AS WITH TYPE 1 MARKING. TREY WA G'0 38296 wQ I ST� �SSIONAL 1. CURBS SHALL BE IDENTIFIED BY A 6 INCH RED PAINT STRIPE ON THE TOP AND SIDE. 2. ROLLED CURBS SHALL BE IDENTIFIED BY A 6 INCH RED PAINT STRIPE ON THE UPPER MOST PORTION OF THE CURB. 3. ROADS WITH NO CURBS SHALL BE IDENTIFIED BY A 6 INCH RED STRIPE. 4. THE WORDS "NO PARKING - FIRE LANE" SHALL BE 18 INCHES HIGH WHITE LETTERING WITH 3 INCH STROKE AND PLACED 8 INCHES AS MEASURED PERPENDICULAR TO THE RED STRIPE. IN MOST CASES, BOTH SIDES SHALL BE MARKED. WHERE LONG ROADS EXIST THE MARKING MAY ALTERNATE SIDES. MARKINGS WILL NOT EXCEED 50' APART. TYPE 2: 1. IN ADDITION TO TYPE 1, HIGHWAY GRADE METAL (ALUMINUM) SIGNS SHALL BE LOCATED AT INTERVALS OR LOCATIONS AS DETERMINED BY THE FIRE CODE OFFICIAL. SIGNS SHALL BE 12" X 18" 3M WHITE HIP PRISMATIC WITH RED 3M ELECTROCUT FILM LETTERS. POSTS SHALL BE PER 6-82 AND 6-83. THE BOTTOM OF THE SIGN SHALL BE A MINIMUM OF 7 FEET ABOVE THE CURB. SIGNS SHALL BE INSTALLED NOMINALLY PARALLEL TO THE ROAD, FACING THE DIRECTION OF TRAVEL. SIGNS WILL NOT EXCEED 150' APART. 2. WHERE SIGNS ARE ADJACENT TO BUILDINGS, THE FIRE CODE OFFICIAL MAY ALLOW THEM TO BE PLACED ON THE BUILDING OR STRUCTURE. 3. SEE STANDARD PLAN 6-83 FOR SIGN MOUNTING. NO PARKING FIRE LANE :Ll --_ �-- i R8-31D NO PARKING FIRE LANE R8-31R -ANE LINE OR ENTERLINE u J m w w o cn 0 0 N 1 AVAIIT EDGE LINE bo �0�u- 0 0 w Y � * 0<0Lu ~ W H IY Q w g a Lu QY � � < U- LU 24" WHITE STOP LINE LAN E D* MPH (Ft.) 25 50 30 100 35 150 40 225 45 300 50 375 * DIMENSIONS SHOWN ARE APPROXIMATE 1 1_4'(1 VP� GRID IS 1" SQUARE 'In-- 11CTA71 KEY: lO WHITE RR CROSSING SYMBOL PAY LIMIT INCLUDES X SYMBOL, LETTERS, AND TWO TRANSVERSE LINES 3 SYMBOL DETAILS O 24" WHITE TRANSVERSE LINES 3O W10-1 ADVANCE WARNING SIGN NOTES: SEE "R" DETAIL FOR LETTER LAYOUT 1. ALL MARKINGS SHALL BE WHITE PLASTIC MATERIAL AS SPECIFIED IN THE CONTRACT AND IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-34. 2. GLASS BEADS (PER WSDOT STANDARD SPECS. SECTION 9-34) SHALL BE ADDED TO ALL PLASTIC MATERIAL. o NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT M AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE ��FREY ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT OF WAS6) 1/1� THE CITY OF KENT. A COPY MAY BE OBTAINED UPON REQUEST. CITY OF KENT co G ENGINEERING DEPARTMENT RAILROAD GRADE CROSSING KENT PAVEMENT MARKINGS d 38296 Wes HINGTON �0 ��GI STEg�'� ��'� DESIGNED DWH ISCALE NONE STANDARD PLAN �SSjONAL CHECKED 66 DATE 6 - 7 8 M ENGINEER APPROVED NOTES: 1.PER BIKE RIDER SYMBOL DETAIL. 2.PER ARROW DETAIL ON THIS PLAN. 3.BIKE PAVEMENT MARKINGS SHALL BE PLACED IMMEDIATELY AFTER EVERY INTERSECTION AND AT PERIODIC INTERVALS WITH A MAXIMUM SPACING OF 600 FEET, CENTERED IN LANE. 4.SEE ROADWAY CROSS SECTION STANDARD PLANS 6-2 TO 6-13. 5.ALL MARKINGS SHALL BE WHITE PLASTIC MATERIAL AS SPECIFIED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-34, TYPE D (MMA). CORUNDUM SHALL ALSO BE ADDED. 6.SIGNING SHALL BE PER THE MUTCD. NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT THE CITY OF KENT. A COPY MAY BE OBTAINED UPON REQUEST. BIKE LANE LAYOUT ARROW DETAIL FACE OF CURB LINE OR EDGE OF PARKING SEE NOTE 3 SEE NOTE 1 3'-0" 6" SEE NOTE 2 BIKE RIDER SYMBOL DETAIL PEDESTRIAN SYMBOL DETAIL H W 6'-0" 3'-4" 30MPH OR LESS SPEED 35MPH OR GREATER 4'-0" 6'-0" 2'-1" 3'-2" H W 2'-8" 6'-0" 3" 1'-0" EDGE OF 8" SOLID WHITE LANE LINE TRAFFIC DIRECTION6'-0" 5' M �� � Q In � Z M � O ZQ � O a H � X O X ..i H U W /� O = J W � .--I z ti O z O w J � p w o_ � N (/) W � W W � m O U a � ~ � 0 � w w U) � �� Z Z W O � X X 7j H U` W Z VI � LOfI .--i N .--i WX J W add O � � +F J Ui H ~ F J J O J U) d � � O J CL J LL Lu > Z_ M O C7Lu O of z ILL a w ao O ~r O I ce Z� 0 J p J Z w 0 Q z z LL �� w � � z p z m w O x w �LLJ ¢ Q O T K J Q W W w .--. I I * U) J Y z LU D O � O m d Q Q I ++ �I I H If 2 H HLu CD 0 w _ W 2 H Lu z W LU = W LWwL F v 2 z W v a ILLw H w Z z m I I w W v QJLU J W Z J w Z O wQ I O Ln in CD z w a? w O Z W U O w U-j O C7 H Z H O O O= W w aZ z 0_ Q0 c~i) �_ W O H W oC il- u u u u u u u u ~ I J vi J a o � J W J O J 3 U) J m Lu Z W ~ o I NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT J o tT AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE FRE) ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT OF kI� THE CITY OF KENT. A COPY MAY BE OBTAINED UPON REQUEST. CITY OF KENT � . ENGINEERING DEPARTMENT • SYMMETRICAL LEFT Y W KENT TURN POCKET LAYOUT m w ¢ A� 38296 w� w.sr No,oN OJ 0+��, �GI ST�� .��DESIGNED DWH SCALE NONE STANDARD PLAN `U) U SSIONAL G DRAWN ee O U CHECKED DATE - 6— H O M APPROVED ENGINEER W �2 H U) z � o o o ^ � O Z ¢ w � o � W J CD W U � O O W U U) H O V O U1 lf'f I� � Q = 0' W C7 V) O z W W Z z o _ 0 0 z O ^ w� � N � �J Y U � a W O J J� H ON N N Ul � � J � o Q Z Z � F o _ _ _ _O '� F � � Y N N N 0 U a � J � vi p� o 0 0 � w o u� o � J 0 0 in W z � z Q J W Z g W Ctf z z J W g o N 0 ONLY NOTE: o SEE STANDARD PLAN 6-73 OR 6-74 FOR LANE MARKING DETAILS. J Lou Z rJ W p[ J W ED � O W ov 0 0 W z J z Lu H Lu J r N NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE WAsi' ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT OF �I� THE CITY OF KENT. A COPY MAY BE OBTAINED UPON REQUEST. �0 CITY OF KENT cl) ENGINEERING DEPARTMENT oLEFT TURN POCKET AT END KENT OF TWO WAY d 38296 w� WA5XINGT " LEFT TURN LANE LAYOUT �0 ISTER� � DESIGNED DWH � DRAWN BB SCALE NONE STANDARD PLAN sIONAL E� CHECKED DATE APPROVED - ENGINEER 6 - 81 M 2021 Plastic Markings/Araucto A - 2 February 16, 2021 Project Number: 21-3011.2 WSDOT STANDARD PLANS ROADWAY DELINEATION M-24.20-02 Symbol Markings ~ Traffic Arrows for High-Speed Roadways (3 sheets) (reference for Type 6L Traffic Arrow Only) M-24.60-04 Symbol Markings Miscellaneous (2 sheets) (reference for Chevron Crosshatch marking and Yield Line Symbol only) M-80.10-01 Traffic Letter and Numeral Applications (2 sheets) M-80.20-00 Traffic Letters and Numerals (High Speed Roadways) DRAWN BY: COLBY FLETCHERTRAFFIC ARROW TYPE 2L (LEFT) STANDARD PLAN M-24.20-02 SHEET 1 OF 3 SHEETS7’ - 4"8’ - 8"6" 1’ - 10" 1’ - 0" 2’ - 0" 1’ - 0" 1’ - 8"12’ - 0"4’ - 4"4’ - 8"1’ - 8"1’ - 4"1’ - 8" 1’ - 4" ~ ELLIPSE "B" AXIS TRAFFIC ARROW TYPE 2R (RIGHT) ‘ & LANE SYMBOL TYPE 1 TRAFFIC ARROW12’ - 0"NOTE TYPE 2L TRAFFIC ARROW MIRROR IMAGE OF ELLIPSE "A" ELLIPSE "B" 17.93 SQ.FT. MARKING AREA 17.44 SQ.FT. MARKING AREA 17.93 SQ.FT. MARKING AREA ‘ & LANE SYMBOL GRID IS 4" (IN) SQUARE OF ELLIPSES CENTER POINT 5’ - 8"ELLIPSE "A" AXIS2’ - 8"ELLIPSE "B" AXIS3’ - 4"2’ - 4" ELLIPSE "A" AXIS16’ - 0"TYPE 5 TRAFFIC ARROW 8" 8" 2’ - 0"4" 23.14 SQ.FT. MARKING AREA ‘ & LANE SYMBOL 9’ - 8"23’ - 4"HIGH-SPEED ROADWAYS TRAFFIC ARROWS FOR SYMBOL MARKINGS ~ APPROVED FOR PUBLICATION Washington State Department of Transportation STATE DESIGN ENGINEER and on all on-ramps and off-ramps. with a posted speed limit of 45 mph or higher type of Traffic Arrow being placed on roadways Use the dimensions shown on this plan for each 36103 HSLAW .J NAIRB STA TEOFWASHINGT O NR EGISTEREDPROFE S SIONAL ENGINEER SHEET 2 OF 3 SHEETS TRAFFIC ARROW TYPE 3R (RIGHT) STANDARD PLAN M-24.20-02 TYPE 3L TRAFFIC ARROW MIRROR IMAGE OF TRAFFIC ARROW TYPE 3L (LEFT)20’ - 0"3’ - 0"6’ - 0"1’ - 4" ~ ELLIPSE "B" AXIS 7’ - 0"2’ - 0" 1’ - 0" 1’ - 8"12’ - 0"4’ - 4"4’ - 8"1’ - 8"1’ - 4"3’ - 4"1’ - 8" 1’ - 0" ~ ELLIPSE "B" AXIS 1’ - 2" ELLIPSE "B" TYPE 4 TRAFFIC ARROW 3’ - 2" 8" 28.40 SQ.FT. MARKING AREA 33.82 SQ.FT. MARKING AREA33.82 SQ.FT. MARKING AREADRAWN BY: COLBY FLETCHEROF ELLIPSES CENTER POINT GRID IS 4" (IN) SQUARE 2’ - 6"1’ - 0"1’ - 6" ‘ & LANE SYMBOL ELLIPSE "B" ELLIPSE "A"2’ - 8"ELLIPSE "B" AXIS5’ - 8"ELLIPSE "A" AXIS3’ - 4"4’ - 4"1’ - 4"1’ - 8"4’ - 8"2’ - 0" 1’ - 8" 1’ - 8" 1’ - 0"1’ - 0" 2’ - 4" ELLIPSE "A" AXIS GRID IS 4" (IN) SQUARE OF ELLIPSES CENTER POINT ‘SYMMETRICAL ABOUT 2’ - 0" ~ ELLIPSE "A" AXIS 5’ - 8"ELLIPSE "A" AXIS2’ - 8"ELLIPSE "B" AXIS‘ & LANE SYMBOL ELLIPSE "A" HIGH-SPEED ROADWAYS TRAFFIC ARROWS FOR SYMBOL MARKINGS ~ APPROVED FOR PUBLICATION Washington State Department of Transportation STATE DESIGN ENGINEER 36103 HSLAW .J NAIRB STA TEOFWASHINGT O NR EGISTEREDPROFE S SIONAL ENGINEER STANDARD PLAN M-24.20-02 3’ - 0" 1’ - 0" 1 8 ’ - 0 " 9 ’ - 0 " 3 ’ - 0 " 6 ’ - 0 " ( 3.08’)~~ ~~3’ - 1" »¿ TRAFFIC ARROW TYPE 6L (LEFT) 1’ - 0" 1’ - 8"20’ - 0"3’ - 0"6’ - 0"1’ - 4" ~ ELLIPSE "B" AXIS7’ - 0"1’ - 0" TYPE 7 TRAFFIC ARROW 2’ - 4" ~ ELLIPSE "A" AXIS TRAFFIC ARROW TYPE 6R (RIGHT) (SHOWN AT REDUCED SCALE) (MIRRORED ABOUT LANE CENTERLINE) MIRROR IMAGE OF TYPE 6L 35.88 SQ.FT. MARKING AREA 35.88 SQ.FT. MARKING AREA45.17 SQ.FT. MARKING AREA SHEET 3 OF 3 SHEETSDRAWN BY: COLBY FLETCHER7’ - 0" 3’ - 6"1’ - 6" OF ELLIPSES CENTER POINT ELLIPSE "A" 2’ - 0" 1’ - 8"1’ - 8"4’ - 8"1’ - 4"4’ - 4"‘SYMMETRICAL ABOUT GRID IS 4" (IN) SQUARE 3’ - 4"2’ - 8"ELLIPSE "B" AXIS5’ - 8"ELLIPSE "A" AXIS‘ ‘ LANE SYMBOL 3’ - 0" »¿ ‘ & LANE SYMBOL ELLIPSE "B" HIGH-SPEED ROADWAYS TRAFFIC ARROWS FOR SYMBOL MARKINGS ~ APPROVED FOR PUBLICATION Washington State Department of Transportation STATE DESIGN ENGINEER 36103 HSLAW .J NAIRB STA TEOFWASHINGT O NR EGISTEREDPROFE S SIONAL ENGINEER 0 0::: 0 LL. >-() <( en ::::i > ID ~ 0 I enl-wU ii: ~ ~ !z :cO 1-U C>w z w ~en 1- () ~ 1-z 0 () w w en I en w ii: ~ ::c 1- (!) z w ....1 11'-6"-UNLESS NOTED "oTHERWISE IN CONTRACT STOP LINE WHITE OR YELLOW-SEE CONTRACT CHEVRON OR DIAGONAL CROSSHATCH MARKING W = 8" (IN) FOR POSTED SPEED LIMIT OF 40 MPH OR LOWER W = 12" (IN) FOR POSTED SPEED LIMIT OF 45 MPH OR HIGHER PAVED 7 SHOULDER LEDGE LINE MARKING AREA= 11.73 SQ.FT. HALF-MILE MARKER ~I LEDGE LINE \ MARKING AREA = 6.00 SQ. FT. FULL MILE MARKER ~PAVED SHOULDER AERIAL SURVEILLANCE MARKERS NOTE CENTERLINE OF JUNCTION BOX, ~ PULL BOX, OR CABLE VAULT 1. If Rumble Strips are present, install marking outside of the Rumble Strip. PAVED SHOULDER JUNCTION BOX, PULL BOX, OR CABLE VAULT MARKING AREA= 0.56 SQ. FT. JUNCTION BOX, PULL BOX, OR CABLE VAULT MARKINGS CENTERLINE OF '·,/ CROSS CULVERT -=--' _'_,_,_'____,_,:--___ .L_[_ __ EDGE LINE -(~.'¥ l_ YYi,,, PAVED__} ' SHOULDER ', MARKING AREA= 0.56 SQ. FT. CROSS CULVERT DRAINAGE MARKING ANGLE OF CROSS CULVERT EDGE LINE PAVED SHOULDER I· 2'-0" ·I 1m MARKING AREA = 1.06 SQ. FT. DRAINAGE STRUCTURE INLET DRAINAGE MARKING SYMBOL MARKINGS MISCELLANEOUS STANDARD PLAN M-24.60-04 SHEET 1 OF 2 SHEETS APPROVED FOR PUBLICATION STATE DESIGN ENGINEER ..... ... Washington State Department of Transportation I. 2'-0" .I GRID IS 4" (IN) SQUARE MARKING AREA= 1.41 SQ.FT. ACCESS PARKING SPACE SYMBOL (MINIMUM) I I,/ \ 1\ 1/1 \ I I / \ \ Lo ' 1/ \ C<l 4" \ \ ...:....._ I- 1\ v ~j ~ \ "'-...... ./ iYr ................. ...... v -- I. 3'-0" .I GRID IS 4" (IN) SQUARE MARKING AREA = 3.09 SQ.FT. 4" ACCESS PARKING SPACE SYMBOL (STANDARD) 1'-2" 3'-0" 1'-2" 5'-4" TOTAL MARKING AREA= 28.44 SQ.FT. WHITE= 9.76 SQ.FT. BLUE = 18.69 SQ.FT. ~ ~ ~ ~ ~ ~ ACCESS PARKING SPACE SYMBOL (STANDARD) WITH BLUE BACKGROUND AND WHITE BORDER (REQUIRED FOR CEMENT CONCRETE SURFACES) b ' Co LL. 0 z 0 i= (..) w a: Ci c.,~ t 3" - 10" SYMBOL & LANE ct 6'-0" 3'-0" MARKING AREA= 12.08 SQ.FT. SPEED BUMP SYMBOL Cxl ~ a, ' ' C\1 C<l Cxl 2'-0" 10" 3'-8" TOTAL MARKING AREA= 13.44 SQ.FT. WHITE = 4.82 SQ.FT. BLUE = 8.62 SQ.FT. ACCESS PARKING SPACE SYMBOL (MINIMUM) WITH BLUE BACKGROUND AND WHITE BORDER (REQUIRED FOR CEMENT CONCRETE SURFACES) SYMBOL MARKING YIELD AHEAD SYMBOL YIELD LINE SYMBOL LL. 0 z ....1 0 w i= ~ ~ I- ll: Ci A SYMBOL & LANE ct YIELD AHEAD SYMBOL TYPE1 TYPE2 TYPE1 TYPE2 TYPE2 A B c 6'-0" 2'-6" 13'-0" 6'-0" 3'-0" 20'-0" 1'-0" 6" 1'-6" 2'-0" 1'-0" 3'-0" 2'-0" 1'-0" 3'-0" B c D N/A N/A 6" 1'-0" 1'-0" USE LESS THAN 45 MPH 45 MPH OR GREATER LESS THAN 45 MPH 45 MPH OR GREATER ROUNDABOUTENTRY * * MINIMUM OF 4 IN LANE LL. 0 z ....1 § ~ w I- ll: Ci MARKING AREA 25.90 SQ.FT. 36.54 SQ.FT. 0.75 SQ.FT. 3.00 SQ.FT. 3.00 SQ.FT. YIELD LINE SYMBOL (MULTIPLE SYMBOLS REQUIRED FOR TRANSVERSE YIELD LINE - SEE CONTRACT) SYMBOL MARKINGS MISCELLANEOUS STANDARD PLAN M-24.60-04 SHEET 2 OF 2 SHEETS APPROVED FOR PUBLICATION STATE DESIGN ENGINEER ..... ... Washington State Department of Transportation TRAFFIC LANE VEHICLE WHEEL PATH MIN. MIN. LANE i i D 3'-3"' 3'-3" MIN. MIN. HIGH-SPEED APPLICATION TRAFFIC LANE VEHICLE WHEEL PATH 3'-3" 3'-3" MIN. MIN. LANE D 3'-3", 3'-3" MIN. MIN. LOW -SPEED APPLICATION w O z III w 2 � =k 0 J ' - EDGE LINE 2 w O r O z w III _w a EDGE LINE TRAFFIC LANE VEHICLE WHEEL PATH I X X LANE HIGH-SPEED APPLICATION 2 � O J bo EDGE LINE TRAFFIC LANE VEHICLE WHEEL PATH 3'-3" 3'-3" MIN. -MIN.- LANE H O z w w IJ n GOo� z V-10" MAX. HIGH-SPEED APPLICATION TRAFFIC LANE VEHICLE WHEEL PATH I 3'-3"; 3'-3" MIN. MIN LANE CE N 1' - 10" MAX. LOW -SPEED APPLICATION EDGE LINE O z w III to EDGE LINE NOTE 1. Typically, four times the letter or numeral height - minimum, up to ten times - maximum, or according to Plans. TRAFFIC LANE VEHICLE WHEEL PATH I LANE I MIN. I -MIN.- LOW-SPEED APPLICATION ■ =w O � W w O z w w 2 2 O o Q OD LI EDGNE ®� of WA,Sgj�c���'� Q � ®� 4� 291is SS' ONA 3dm�o zwuaZ W�oo� N m hSao !R � ffl' S WIZZ Q rWr R 2 m F TRAFFIC LETTER AND NUMERAL APPLICATIONS STANDARD PLAN M-80.10-01 SHEET 1 OF 2 SHEETS APPROVED FOR PUBLICATION Pasco Bakotich 111 06-03-11 STATE DESIGN ENGINEER DATE MAP Washington State Department of Transportation TRAFFIC TRAFFIC TRAFFIC TRAFFIC LANE LANE LANE LANE VEHICLE VEHICLE WHEEL PATH WHEEL PATH VEHICLE VEHICLE WHEEL PATH WHEEL PATH y p� TRAFFIC LANE VEHICLE cD _ 0: WHEEL PATH � � o � � � a k Lu Lu W J J O co Co O J � CdJ LANE D � w H i H O o W z LANE z 3'-3" 3'-3" 3'-3" 3'-3" z , o� MIN. MIN. MIN. MIN. �O 00 J W aj 3'-3" 3'-3" MIN. MIN. LAN LANE E E r/I EDGE l��Il LINE D EDGE cLu b k LINE -' J -' J a7 w LANE EDGE LINE EDGE LINE LINE HIGH-SPEED APPLICATION HIGH-SPEED APPLICATION TRAFFIC LANE TRAFFIC VEHICLE LANE WHEEL PATH TRAFFIC VEHICLE LANE WHEEL PATH VEHICLE WHEEL PATH = ' O Lu x k 0 w `a Co o of WA,Sgj� y , a o LANE E F- ' J `'• ZwooL3 S, 3'-3" 111 Lu MIN. MIN. F- ® 29115 O °z z LANE 3 -3 3 -3 W MIN. MIN. H cl S TES W 3 Q w z o �I®NAL t LANE W IS Q W Q W w J zm O a m Z D g TRAFFIC LETTER AND k D 0: (aNUMERAL APPLICATIONS 2 W a STANDARD PLAN M-80.10-01 `D w w SHEET 2 OF 2 SHEETS >_ W 3' - 3" ' 3' - S' 3' - 3" 3' - 3" w APPROVED FOR PUBLICATION MMIN. MIN. EDGE IN. MIN. EDGE + LINE Pasco Bakotich 111 06-03-11 LINE 'w w v EDGE STATE DESIGN ENGINEER DATE LINE Washington State Department of Transportation HIGH-SPEED APPLICATION LOW -SPEED APPLICATION HIGH-SPEED APPLICATION MA �y YN ®� ®V WASL N w a J®� Pp 25335 z Alli _ �� ��� CISTE� ��I®NAL ryUO' rcQ o io z awQ` °z EXPIRES AUGUST 9, 2009 m TRAFFIC LETTERS AND NUMERALS (HIGH SPEED ROADWAYS) STANDARD PLAN M-80.20-00 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION EIGHT FOOT HIGH LETTERS AND NUMERALS Pasco Bakotich 111 06-10-08 ARE SHOWN ON A FOUR -INCH SQUARE GRID STATE DESIGN ENGINEER DATE Washington Slate Department of Transportation FOR USE ON ROADWAYS WITH A POSTED SPEED OF 45 MPH OR MORE MAP 2021 Plastic Markings/Araucto A - 3 February 16, 2021 Project Number: 21-3011.2 APPENDIX The following documents, which have been prepared for this project and are considered to be a part of the project plans. List and Maps Appendix A: 2021 Intersection Markings List 2021 Plastic Marking Refresh Index and Mapbook Plans Sheet 1 of 1 N Lincoln Street and W Meeker Street Channelization Plan APPENDIX A 2021 INTERSECTION MARKINGS Map Key Intersection Description Map Pages Intersection LegStop Line Width (inches)Est. Stop Line Length (LF)Transverse Yield LineYield Line Symbol, Type 2 (LF)per WSDOT Standard Plan M-24.60-048 inch wide Intersection Turn Extension Line(Length) (LF)Intersection Turn Extension Line(Color)Dotted Edge Line (LF)8 inch wide traffic island edge (LF)"ONLY" LegendCrosswalk Replacement (Full/Partial)Est. Area of Crosswalk to Replace(SF)12" Wide Lane Line (White)(LF)Left Arrow (each)Type 2SLRight Arrow (each)Type 2SRNotes INT-2887 68 Av S / S 212 St 2 E 24 60 Full 288 INT-2887 68 Av S / S 212 St 2 N 24 70 130 White Full 320 INT-2887 68 Av S / S 212 St 2 S 24 70 150 White Full 320 INT-2887 68 Av S / S 212 St 2 W 24 60 Full 288 INT-1796 38 Av S / S 250 St 5 E Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-1796 38 Av S / S 250 St 5 W Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3046 Lincoln Av N / W Meeker St 7 W 200 0 See attached Lincoln Ave N / W Meeker Street Channelization Plan, work include curb painting and RPM removal. INT-3189 4 Av S / W Crow St 7 N 12 18 0 INT-3195 4 Av S / W Gowe St 7 E 24 18 Full 100 2 - 12 inch wide Parallel Line Style Crosswalk INT-3195 4 Av S / W Gowe St 7 N 24 20 Full 100 2 - 12 inch wide Parallel Line Style Crosswalk INT-3195 4 Av S / W Gowe St 7 S 24 20 Full 100 2 - 12 inch wide Parallel Line Style Crosswalk INT-3195 4 Av S / W Gowe St 7 W Full 100 2 - 12 inch wide Parallel Line Style Crosswalk INT-3203 4 Av N / W James St 7 E 24 42 Partial 160 Remove remnant of old crosswalk markings not covered by new crosswalk markings INT-3203 4 Av N / W James St 7 N 24 50 Partial 80 INT-3203 4 Av N / W James St 7 S 24 52 110 Yellow Full 300 Remove remnant of old crosswalk markings not covered by new crosswalk markings INT-3203 4 Av N / W James St 7 W 24 60 Partial 200 INT-3220 77 Av S / S 206 St 2 W 24 26 0 Move stop line back behind crosswalk/curb ramp INT-3223 3 Av S / W Crow St 7 E 12 16 0 INT-3223 3 Av S / W Crow St 7 W 12 14 0 INT-3227 3 Av S / 78 Av S / S 259 St 13 E 24 25 0 P:\Public\PROJECTS\_In Design\21-3011.2 2021 Plastic Marking Refresh\60 Design\60.8 Estimating\2021 Plastic Markings Estimate.xlsx Page 1 of 5 APPENDIX A 2021 INTERSECTION MARKINGS Map Key Intersection Description Map Pages Intersection LegStop Line Width (inches)Est. Stop Line Length (LF)Transverse Yield LineYield Line Symbol, Type 2 (LF)per WSDOT Standard Plan M-24.60-048 inch wide Intersection Turn Extension Line(Length) (LF)Intersection Turn Extension Line(Color)Dotted Edge Line (LF)8 inch wide traffic island edge (LF)"ONLY" LegendCrosswalk Replacement (Full/Partial)Est. Area of Crosswalk to Replace(SF)12" Wide Lane Line (White)(LF)Left Arrow (each)Type 2SLRight Arrow (each)Type 2SRNotes INT-3227 3 Av S / 78 Av S / S 259 St 13 N 24 11 0 INT-3266 2 Av S / W Gowe St 7 E 24 19 Full 140 INT-3266 2 Av S / W Gowe St 7 N 24 20 Full 140 INT-3264 2 Av S / W Crow St 7 E Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3264 2 Av S / W Crow St 7 W Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3266 2 Av S / W Gowe St 7 S 24 18 Full 140 INT-3266 2 Av S / W Gowe St 7 W 24 16 Full 140 INT-3275 2 Av N / W Cloudy St 7 E Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3275 2 Av N / W Cloudy St 7 W Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3332 E Gowe St / BNSF 7 E 24 20 0 INT-3332 E Gowe St / BNSF 7 W 24 20 0 INT-3357 E James St / Railroad Av N 7 S Partial 112 Refresh West section of the crosswalk markings INT-3408 Central Av N / E James St 7 N 24 52 120 White Full 272 4 Remove remnant of old crosswalk markings not covered by new crosswalk markings INT-3408 Central Av N / E James St 7 S 24 52 Full 272 2 2 Remove remnant of old crosswalk markings not covered by new crosswalk markings INT-3408 Central Av N / E James St 7 W 24 56 Full 256 2 INT-3442 Central Pl S / S 266 St 13 S 12 20 0 New Stop Line, Traffic Engineer to mark stop line location INT-3449 E Meeker St / State Av N / State Av S 7 E 24 18 Full 140 Remove remnant of old crosswalk markings not covered by new crosswalk markings INT-3449 E Meeker St / State Av N / State Av S 7 N 24 20 Full 160 Remove remnant of old crosswalk markings not covered by new crosswalk markings INT-3449 E Meeker St / State Av N / State Av S 7 S 24 18 Full 140 Remove remnant of old crosswalk markings not covered by new crosswalk markings INT-3449 E Meeker St / State Av N / State Av S 7 W 24 20 Full 160 Remove remnant of old crosswalk markings not covered by new crosswalk markings P:\Public\PROJECTS\_In Design\21-3011.2 2021 Plastic Marking Refresh\60 Design\60.8 Estimating\2021 Plastic Markings Estimate.xlsx Page 2 of 5 APPENDIX A 2021 INTERSECTION MARKINGS Map Key Intersection Description Map Pages Intersection LegStop Line Width (inches)Est. Stop Line Length (LF)Transverse Yield LineYield Line Symbol, Type 2 (LF)per WSDOT Standard Plan M-24.60-048 inch wide Intersection Turn Extension Line(Length) (LF)Intersection Turn Extension Line(Color)Dotted Edge Line (LF)8 inch wide traffic island edge (LF)"ONLY" LegendCrosswalk Replacement (Full/Partial)Est. Area of Crosswalk to Replace(SF)12" Wide Lane Line (White)(LF)Left Arrow (each)Type 2SLRight Arrow (each)Type 2SRNotes INT-3455 E Smith St / State Av N 7 E 24 36 Full 220 INT-3455 E Smith St / State Av N 7 N 24 12 Full 180 INT-3455 E Smith St / State Av N 7 W 24 36 Full 220 INT-3455 E Smith St / State Av N 7 S 24 12 Full 120 INT-3478 E George St / Woodford Av N 7 W 12 20 0 INT-3587 84 Av S / S 192 St 2 W 2 0 80 1 1 Place a new arrow and ONLY legend on each lane and add wide lane line INT-3605 E Titus St / Reiten Rd S 7 E 24 24 Full 144 1 1 INT-3605 E Titus St / Reiten Rd S 7 N 24 26 Full 128 1 INT-3605 E Titus St / Reiten Rd S 7 S 24 22 0 INT-3628 E Temperance St / Jason Av N 7 E Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3628 E Temperance St / Jason Av N 7 W Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3629 Cedar St / Jason Av N 7 E Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3629 Cedar St / Jason Av N 7 W Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-3668 E Guiberson St / Van De Vanter Av S 7 E 12 15 0 New Stop Line, Traffic Engineer to mark stop line location INT-3668 E Guiberson St / Van De Vanter Av S 7 W 12 15 0 New Stop Line, Traffic Engineer to mark stop line location INT-3712 E Temperance St / Hazel Av N 7 E 12 20 0 New Stop Line, Traffic Engineer to mark stop line location INT-3712 E Temperance St / Hazel Av N 7 W 12 20 0 New Stop Line, Traffic Engineer to mark stop line location INT-4096 98 Av S / S 241 St 8 W 12 15 0 INT-4177 100 Av SE / SE 244 St 8 W 12 26 0 New Stop Line, Traffic Engineer to mark stop line location INT-4177 100 Av SE / SE 244 St 8 E 12 26 0 New Stop Line, Traffic Engineer to mark stop line location P:\Public\PROJECTS\_In Design\21-3011.2 2021 Plastic Marking Refresh\60 Design\60.8 Estimating\2021 Plastic Markings Estimate.xlsx Page 3 of 5 APPENDIX A 2021 INTERSECTION MARKINGS Map Key Intersection Description Map Pages Intersection LegStop Line Width (inches)Est. Stop Line Length (LF)Transverse Yield LineYield Line Symbol, Type 2 (LF)per WSDOT Standard Plan M-24.60-048 inch wide Intersection Turn Extension Line(Length) (LF)Intersection Turn Extension Line(Color)Dotted Edge Line (LF)8 inch wide traffic island edge (LF)"ONLY" LegendCrosswalk Replacement (Full/Partial)Est. Area of Crosswalk to Replace(SF)12" Wide Lane Line (White)(LF)Left Arrow (each)Type 2SLRight Arrow (each)Type 2SRNotes INT-4376 104 Av SE / SE 264 St 14 S Full 192 INT-4614 108 Av SE / SE 224 St 8 E 24 34 0 Remove existing stop line and install new stop line behind curb ramp INT-4881 110 Av SE / SE 220 Pl 8 N 12 20 New Stop Line, Traffic Engineer to mark stop line location INT-4881 110 Av SE / SE 220 Pl 8 E 12 20 New Stop Line, Traffic Engineer to mark stop line location INT-4881 110 Av SE / SE 220 Pl 8 S 12 20 New Stop Line, Traffic Engineer to mark stop line location INT-4881 110 Av SE / SE 220 Pl 8 W 12 20 New Stop Line, Traffic Engineer to mark stop line location INT-5247 116 Av SE / SE Kent Kangley Rd 15 E 24 48 82 White Full 192 INT-5247 116 Av SE / SE Kent Kangley Rd 15 N 24 44 Y 7 Full 192 INT-5247 116 Av SE / SE Kent Kangley Rd 15 S 24 36 Full 192 INT-5247 116 Av SE / SE Kent Kangley Rd 15 W 24 36 Full 192 INT-5543 120 Av SE / SE 248 St 9 E 24 13 0 INT-5543 120 Av SE / SE 248 St 9 N 24 18 0 INT-5543 120 Av SE / SE 248 St 9 W 24 12 0 INT-5557 120 Av SE / SE 240 St 9 E 24 38 Full 176 INT-5557 120 Av SE / SE 240 St 9 N 24 28 Full 128 INT-5557 120 Av SE / SE 240 St 9 S 24 24 Full 144 INT-5557 120 Av SE / SE 240 St 9 W 24 36 Full 176 INT-5899 124 Av SE / SE 192 St 4 S 24 18 Full 120 INT-6112 128 Pl SE / SE 231 Wy 9 N Y 6 0 New Yield Line, Traffic Engineer to mark yield line location INT-6112 128 Pl SE / SE 231 Wy 9 S Y 6 0 New Yield Line, Traffic Engineer to mark yield line location P:\Public\PROJECTS\_In Design\21-3011.2 2021 Plastic Marking Refresh\60 Design\60.8 Estimating\2021 Plastic Markings Estimate.xlsx Page 4 of 5 APPENDIX A 2021 INTERSECTION MARKINGS Map Key Intersection Description Map Pages Intersection LegStop Line Width (inches)Est. Stop Line Length (LF)Transverse Yield LineYield Line Symbol, Type 2 (LF)per WSDOT Standard Plan M-24.60-048 inch wide Intersection Turn Extension Line(Length) (LF)Intersection Turn Extension Line(Color)Dotted Edge Line (LF)8 inch wide traffic island edge (LF)"ONLY" LegendCrosswalk Replacement (Full/Partial)Est. Area of Crosswalk to Replace(SF)12" Wide Lane Line (White)(LF)Left Arrow (each)Type 2SLRight Arrow (each)Type 2SRNotes INT-9052 S 262 St / Trail 13 W Full 100 Remove remnant of old crosswalk markings not covered by new crosswalk markings P:\Public\PROJECTS\_In Design\21-3011.2 2021 Plastic Marking Refresh\60 Design\60.8 Estimating\2021 Plastic Markings Estimate.xlsx Page 5 of 5 11 12 13 14 15 16 5 6 7 8 9 10 1 2 3 4 DOWNTOWN19 BRIDGES17 CLARKSPRINGS 18 5 5 5 99 181 515 516 99 18 169 516 516 99 516 167 515 Produced by Pavement Manager: Joseph Araucto U:\MXD\MAPBOOK_INDEX_MAP_8X11.mxd Printed: March 2018 2019 Plastic Pavement Marking Refresh INDEX MAP012Miles n  n n n n ÷ S 2 11 St 32PlSS 202 St S 190 St S 176 St 32 Av SS 180 St S 184 St31AvSS 181 StS 181 PlS182St 36PlSS 182 Pl S 176 St S 177 St S177 St S 178 St S 179 St S 181 StS 181 St S 182 St S 184 Pl S 186 StS186St S 187 St S 186 St 33 Av S34 Av S36 Av S49 Av S47 Av S46 Av S50 Ct S39AvS46 Av S47AvS37 Av S51AvS48AvS5 0 A v S S 194 St S 189 StS 188 Pl S 189 Pl 37 Pl S41 Av S35AvS33 Av SS 203 St 35 Ln SS 198 St SegaleParkBDrAndoverParkWAndover Park WSegale Park D Dr S Glacier S tAndoverParkE S 182 St S 188 St S 190 St 72AvSS 204 St S 216 StS216St FragerRd 3 5 AvS34AvS33AvSS 204 St SR181S 220 St S 212 StChristensenRd72 Av SWValleyRd64 Av SRussellRdS 194 St 62AvS64AvSS 204 St Sout hcent er PkyS 180 St S 1 7 8 St Bow Lake Dr180Pl 45 Av S38 Av S48AvS46 Av S179S t S 188 St MilitaryRdSOrillia R d 34 Pl S189 St 32AvS35Av33Av35 Av35 Pl36Pl41AvS38A v 193 St 184 StMilitaryRdS43 Av42 Av183 St 184 St 185 St36 Av50 Pl S 208 St 211 St 209 St SR5SR533Av200 St 32 AvMilitaryRdSS 212 S t32Av201 St West Valley Hwy68AvSSegale Park C Dr 3 7 Pl S35 Av SSaxon Dr Midland Dr Triland Dr Olympic Av SS 190 St 66 Av S5 8 Pl SS178St S 192 St S 1 9 4 St 35AvS 212 St S 200 St S 196 StCascadeAvSRiversideDr ToddBlvd 181 S t 71 Av179 St 181 Pl180 Pl34Av183 St 191 St 34AvS39 Av S192 St 40 Pl S40 Av S39 Pl S39 Av S38 Pl S201 St 34 Av186 St S 199 Pl62AvS 59PlS40AvS40PlS42 Av SSouthcenter Pky192 Pl 191 Pl 193 Pl S 193 St 70 Av S70AvSS 200 S t 42PlS2 1 7 S t 217 Pl 218 Pl 216 Pl 43Pl40PlS220Pl41Pl2 1 9 St 220 Pl S221 St 66AvSS 217 St S 219 St S 220 S t 67Av218 St 209 St 42AvSRussellRdSS194StS 208 St 217St 218 St 216 Pl 45 Pl45 Ct44 Pl46 Pl S220 St220 Pl 221 St 219 Pl S 216 St RiverviewBlvdS46AvS215Pl 47 Av214 Pl S215 St S 215 Pl 47Ct48Pl48Ct214 St S214Wy50 Av214 Pl215St 51 Av S213 St 52WyS5 3 PlRive r v ie w BlvdSS 212 P lS 209 Pl 40 Pl S39 Wy S4 0 Pl S S 211 P l210Pl 41 PlOrilliaRdS209 St 210 St 211 St 211 Pl38 Pl S37 Pl S20 9 Pl §¨¦5 INT-2887 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings Refresh PAGE 2 RIGHT PAGE 6 DOWN 1 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details)  ÷ n S 45 PlDavisAvS S 51 Ct S1 98 S tSegaleParkBDrAndoverParkWAndover Park WSegale Park D Dr S Glacier S tAndoverParkESW 41 St S208St92AvS 95AvS205 CtS 206 St S 208 St S 218 St 98AvS213 St 96AvS97 CtS 37St SW 41 St SW 39 St S38Ct 88AvS80AvSS 1 82 St S 188 St S 188 St S 190 St S 190 St S 192 St S 194 St 72AvS77AvS80AvS81 Av SS 200 St S 202 St S 206 St S 202 St S 204 St S 216 St S 216 StS216StSR181 S 194 StTalbotRdSEast Valley HwyLindAvSWEast Valley Hwy204 Pl 20 5 P l206 Pl S 220 St S 212 St 84AvS80PlSSW 43 StChristensenRd 72 Av SWValleyRd64 Av SS 194 St 62AvS64AvSSout hcent er PkyS 180 St West Valley Hwy68AvSSegale Park C Dr SR 167S 55 St 97Av S204 Ct93 Av S212 St 76 Av SSaxon Dr Midland Dr Triland Dr Olympic Av SS 190 St 66 Av SS 196 St S 196 StCascadeAvSRiversideDr ToddBlvd 181 S t 71 AvS 199 Pl62AvS 59PlS96Pl S 208 St96 Av S97 Pl S214 Av 98 Av STalbot Rd SS 192 St S 202 St 2 0 3 Pl 96WyS 207 Pl 219 Pl 92 Av S220 Av 95Pl96Av95Pl95 CtS 213 St 216 St 205 Pl94Av198St78 Av192Pl 191 Pl 193 Pl S 193 St 70 Av SS 182 S tS184StS 186 Pl77 Pl S75PlS80 Ct S187St 185 Pl S 184 St S 187 St S 190 St S 192 St70AvSS 200 S t S 198 St S 202 St85 Av S87 Av S89AvS93Pl96Av97 Pl66AvSS 217 St S 219 St S 220 S t 67Av218 St 209 St S 210 St 80AvS209 St S 207 Ct 84PlSS 218 St85Av S 213 Pl 86PlS88AvS88PlSS216 St 88 Pl S86AvS220 Ln 2 14 Pl 94PlS96AvS97 AvRussellRdS94PlS216 Pl 94Ct95Pl91PlSS208St 97Pl98AvS90PlS91PlS204 Pl 209 St 210 St 211 St 211 Pl INT-2887 INT-3220 INT-3587 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 1 LEFTPAGE 3 RIGHT PAGE 7 DOWN 2 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n  n nn n 118 Av SESE 175 L n SE 188 St SE 180 St 120AvSESE 186 St 121 Ct SE121 Av SESE 210 Pl SE 216 St119 Av107AvSE104AvSE105 Av SESE 199 St106 Av SESE181 StS 45 PlDavisAvS S 51 Ct SE 188 St SE 190 St S 50 St 190 Pl S1 98 S tSE 186 StSE185Pl SE 190 St SE 190 Pl 201 St186 Pl1 8 7 C t1 1 5 Pl S E SE 196 St 104 Pl SE103 Pl SE102PlSE102AvSE101AvSESE 189 Ct 103PlSESE 217 St SE 218 St SE 212 St 211 P lSE212St SE 213 St SE 219 Pl106PlSESE 216 St 114 PlSW 41 St S208St 98PlS92AvS95AvS205 CtS 206 St S 208 St S 218 St 98AvS213 St 99AvSSE 212 St 96AvS97 CtS 203 St 103AvSE9 8 Av SS 37 St SW 41 St SW 39 St S38Ct 88AvSS 192 St S 194 St 81 Av SS 200 St S 216 St 2 1 6 C t209 St 210 Pl 1 9 8 C t 199 Ct118AvSE116 Av SESE 178 Pl SE 192 St105PlSE110 Av SE111 Av SE112AvSE114 Av102 Pl187 S t 1 88 Pl SE 176 St 180 St 113Wy104Av108 Av SESR 515SE 200 St 112Pl101Av99 Pl S11 4 Av11 5 A v 102PlNE216 C t107Av108AvSES 194 St98 PlSTalbotRdSEast Valley HwyLindAvSWS E 1 79 St East Valley Hwy204 Pl 20 5 P l206 Pl 84AvS80PlSSE 176 St SE 186 Pl 103 Ct112 Av SESE 186 St SE 182 St 1 8 0 Pl 115LnSE180Pl104PlSE106AvSESR 167S 55 St SE 203 St 122 Av SE2 1 2Pl1 1 7Pl116 Av SE1 0 9 A v S E103Av97AvS204 Ct93 Av S213 Pl 212 St 118AvS E SE 218 P l 113PlSE119 Ct2 1 8 P l206 St 1 8 2 St 1 8 2 P l 183 P l111AvSE 185 Pl SE 184 Ln 188 St 187 Pl 2 04S tSE 212 Pl 214 St120 Pl SESE 210 St 120 Av211 Pl SE 204 St 216 Ln111 Ct118 Pl 213 C t205 St 205 Pl 206 St 204 Pl 113Av96Pl S 208 St96 Av S97 Pl SS 210 Pl 214 Av 98 Av STalbot Rd SS 192 St 116 Av SE197 Pl120 Av SE204 St 117 Av1 0 6 PlS E SE174 St 109AvSE113 Pl SE179 Pl SE 179 St 114 Av184 Pl 110 PlSE 183 Pl 109Av1 8 9 C t104 Pl SE103 Pl102 AvS 202 St 2 0 3 Pl 96WyS 207 Pl 101 Ct102 AvSE 207 St 104 Av105 Pl106 PlS E 2 06 Pl 104 Pl194 St SE 196 St 119 A v205 St 121 Pl SE215 St 121 Pl SE119 Av SE219 Ct119 LnSE 217 St 110Av107PlSE 215 St114 Pl115 Pl113 Pl113 Av2 11Pl109Pl1 14PlSE110 Av110 Av209 Pl SE 211 St 1 03Ct 213 Ct100Pl1 0 4Pl104 Av210 Pl 213 St 102AvSE 213 Pl100AvSE 103 Pl SE219 Pl S 220 Pl92 Av S220 Av 95Pl96Av95Pl95 CtS 213 St 216 St 205 Pl94Av 207 St 106 Pl106 AvSE218Pl 219 Pl100 Pl2 0 2 S t 102 Av114PlSE177 Pl S E 180 Pl 113 Av108AvSE183 St109 Av108PlSE107 Ct186 Pl 111AvSE80 Ct SS 184 St S 187 St S 190 St S 192 StS 198 St S 202 St85 Av S87 Av S89AvS93Pl96Av97 Pl209 St 84PlSS 218 St85Av S 213 Pl 86PlS88AvS88PlSS216 St 88 Pl S86AvS220 Ln 2 14 Pl 94PlS96AvS97 Av94PlS216 Pl 94Ct95Pl S E 1 8 1 S t 180 St 110 Av183 C t110th189 St 198 Pl SE 200 St 212 C t101 Pl91PlS106 Av97Pl189 Pl 117 Ln SESE 189 Pl SE 189 Ln SE 190 Ln SE 191 St 117PlSESE189 Pl S E 193 Ter 114PlSE115PlSESE 194 St113PlSE113AvSE193Pl SE 193 P l117PlSE114AvSE112 Pl SESE 188 St 194 Pl SE 198 St SE 200 St 117PlSE118 Av119 AvS E 1 91CtPrivate Rd113WySE190 Ct 110PlSE112 Av SEUnk Private 114AvSE191 P l 190 Pl 190 Pl SE 195 P l SE 199 St 194 St 194 Pl 104 AvSE 196 St 101AvSESE195 St SE 19 4Pl 106AvSEUnnamed110AvSE111WySE111WySESE 201 St 202 L n201Pl 110PlSE110TerSESE2 0 2 C t SE 203 Pl 113Pl111AvSE110AvSE112AvSESE 207 St 207 Pl 207 C tUnnamed 109 AvUnnamedUnnamed109LnSE209 Ln SE 206 St106AvSE105PlSE204Pl105Ct105AvSESE202Pl205St SE 206 St SE 204 St Unnamed11 0 A v 112 Av SESE 209 Pl 119 PlSE 2 1 3 S tSE 217 St 120AvSE120AvSESE 218 Pl SE 217 Pl SE 219 Pl SE 214 C t SE 214 St SE 216 St 216 St105AvSE209Pl103 Av SESE21 2St 104Av98AvS99AvS102PlSE105PlSE104PlSESE 218 S tSE 219 St 107AvSE220 Pl S E 218Pl Private Rd220 StSE220St105 AvSE 214 Pl105Pl 108Pl214 Pl 213 S t110 Ln113PlSE 205 St SE 211 Ln SE211 LnSE 214 StUnnamed110AvSEUnnamed 120 Av SE120AvSE121WySE119Av112 CtUnnamedUnnamed 101 Ct99PlSE 220 St90PlS91PlS204 Pl SE 206 St INT-3587 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 2 LEFTPAGE 4 RIGHT PAGE 8 DOWN 3 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n n n n n n n n ÷ SE 182 St SE 187 St SE 186 P l 139WySE 180 St 139PlSESE 184 St SE 184 Pl 135PlSESE189PlSE 143 Ct 132 Pl133AvSE133 Pl134AvSE135AvSE136 Pl SE133 Av SESE 198 St SE 200 St SE 201 St S E 2 0 2 C t 142 Av SE1 4 4 A v S E135 Av S E144 Av SE142AvSESE188St 189 CtSE 181 St SE 184 St118 Av SESE175 L n SE 188 St SE 180 St 124AvSE120AvSESE 186 St SE 204 Pl130 Av122 Ct SE121 Ct SE123 Pl122PlSESE206St121 Av SE122PlSESE 198 Pl SE 213 St 129AvSE 206 Pl 127PlSESE 210 Pl SE 216 St SE 219 Pl119 Av107AvSESE 199 St106 Av SESE181 StSE 186 St SE 190 St SE 190 Pl 201 St 1 1 5 Pl S E SE 196 St SE 189 Ct SE 217 St SE 218 St SE 212 St 211 P lSE212St SE 213 St SE 219 Pl106PlSESE 216 St 114 Pl213 S t131Pl138A v 19 6 St132Pl 1 9 9Pl138AvSE 204 W y134Ct198 St 202Pl133PlSE 202 St SE 192 St 143Av180 Pl 177 St 133 Av132 Pl SE1 8 5 Pl185St 186St 131Av142 Av140 Ct1 8 9 P l 139Wy138 Av132 Av SE131Pl207 St 207 Pl 212 Pl 212 Pl 215 St125Av 123 Av217 St122 Pl211 Pl 210 Pl 124Av217 Pl 2 1 6 C t209 St 121Pl210 Pl 211 Ct 218 Pl210 Ct 210 Ct 128Pl123 C t1 9 8 C t 199 Ct 197 Pl 198 St 190 Pl 189 Pl 130Av1 8 9 S t188 Pl184 Pl 118AvSE116 Av SESE 178 Pl SE 192 St105PlSE110 Av SE111 Av SE112AvSE114 Av18 7 S t 1 8 8 Pl SE 176 St 180 St 113Wy108 Av SESR 515112Pl11 4 Av11 5 A v 216 C t107Av108AvSESE 176 St 140 Av SESE 186 Pl112 Av SESE 186 St SE 182 St 180 Pl 115LnSE180Pl106AvSE143AvSE1 8 2StSE 182 Pl SE 183 St 143AvSE130AvSE SE 1 8 4 PlSE 203 St 122 Av SE124 Av SE2 1 2Pl209 Ct 1 1 7Pl 124AvSE116 Av SE210 St 1 0 9 A v S E 204 S t 143 Pl SESE 19 1StSE 182St118AvS E SE 218 P l 113PlSE194 St 1 4 1 Av 142Av123Av119 Ct217 Ct 218 Ct2 1 4Pl2 1 8 P l 206 St 206 Pl128Av130Pl126 Pl182 St 1 8 2 P l 18 3 P l111AvSE 185 Pl SE 184 Ln 135Av185 Pl 2 0 8 Pl 131 PlSE 2 04S t212Pl 2 1 3 S tSE 212 Pl SE 208 St121 Pl220 St SE 216 St 207 Pl 134Pl214 St120 Pl SESE 210 St 120 Av211 Pl 125 AvSE 204 St 216 Ln111 Ct118 Pl 213 C t205 St 205 Pl 206 St 204 Pl 113AvSE 211 S t 209 St 132 Pl116 Av SE197 Pl 122 Pl124 Av SE120 Av SESE 201 St 204 St 117 Av1 0 6 PlS E SE174 St 109AvSE113 Pl SE179 Pl SE 179 St 114 Av184 Pl 110 PlSE 183 Pl 109Av1 8 9 C tSE 179 Pl 123 Pl SE123 Ct191 Pl SE 188 Pl 186Pl SE 186 St 185Ct136 Pl134AvSE186 Pl 134AvSE133Pl1 9 0 P l 1 8 9 P lSE 188 Wy 105 Pl106 PlS E 206 Pl 194 St SE 196 St 119 A v205 St SE201 P lSE 203 Pl 130 Av125 Pl127 Pl 132 Av SESE 195 St129 Pl SE195 Ct193 St 1 4 4 C t 196 Ct142PlSESE 194 St140 Pl141Av195 Pl144 Pl143Pl142 Av201 St 209 S tSE 21 2 P l SE 212 St 121 Pl SE215 St 121 Pl SE214 Pl 216St 2 1 5 P l119 Av SE219 Ct119 LnSE 218 Pl129 Ct130Av218 Pl SE 216 St 217 St 218 Ct 123 PlSE 217 St 110Av107PlSE 215 St114 Pl115 Pl113 Pl113 Av2 11Pl109Pl1 14PlSE110 Av110 Av209 Pl SE 211 St 213 Ct 213 St 106 Pl106 Av137AvSE2 0 1 C t134PlSE193St137Ct SE 188St 187 Pl 186 St SE 1 7 9Pl114PlSE177 Pl S E 180 Pl 113 Av108AvSE183 St109 Av108PlSE107 Ct186 Pl 111AvSES E 1 8 1 S t 180 St 110 Av183 C t110th189 St 188 Pl 198 Pl SE 200 St 212 Ct212 C t131 Pl 106 Av189 Pl 117 Ln SESE 189 Pl SE 189 Ln SE 190 Ln SE 191 St 117PlSESE189 Pl S E 193 Ter 114PlSE115PlSESE 194S t113PlSE113AvSE193Pl SE 193 P l117PlSE114AvSE112 Pl SESE 188 St 121 Pl SE194 Pl SE 198 St SE 200 St 117PlSE118 Av119 AvS E 1 91CtPrivate Rd113WySE190 Ct 110PlSE112 Av SEUnk Private 114AvSE191 P l 190 Pl 190 Pl SE 195 P lSE 199 St SE 196 St SE195 St SE 19 4Pl 106AvSEUnnamed110AvSE111WySE111WySESE 201 St 202 L n201Pl 110PlSE110TerSESE2 0 2 C t SE 203 Pl 113Pl111AvSE110AvSE112AvSESE 207 St 207 Pl 207 C tUnnamed 109 AvUnnamedUnnamed109LnSE209 Ln SE 206 St106AvSE105PlSE204Pl SE 20 2 P lSE 204 St Unnamed11 0 A v 112 Av SESE 209 Pl 119 Pl214 StSE213St SE 217 St 120AvSE120AvSESE 218 Pl SE 217 Pl SE 219 Pl SE 214 C t SE 214 St SE 216 St 216 St SE 209 Ct 130 Pl SE1 31Pl131Pl210 Pl131Av 1 3 1 Ct S E2 11 StSE126Av SE 210 St 213 St 216 P lSE 217 PlSE127Pl 125AvSESE 217 P l125Pl214 St 129 PlSE130AvS E 214 Wy SE 204 St 130 Av SESE 203 Pl SE201St SE 202 Pl 127Ln105PlSE107AvSE220 Pl S E 218Pl Private Rd220 StSE220St SE 214 Pl105Pl 108Pl214 Pl 213 S t110 Ln113PlSE 205 St SE 211 Ln SE211 LnSE 214 StUnnamed110AvSEUnnamed SE122PlSE199 St 120 Av SE120AvSE121WySE119Av112 CtUnnamedUnnamed SE 206 St INT-5899 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 3 LEFT PAGE 9 DOWN 4 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n ÷  n n n n   n   S 253St 22AvSS254Pl S 257 St 20 Av S19 Av S14PlSS 245 Pl S 243 St 15 Av S17 Av S21AvS21AvS23AvS25AvS26 Av S24 Av SS 236 St S 245 Pl 19PlSS 242 St S 244 St S 234 St S 234 St S 232 St S 220 St S 226 St S227 Pl S 229 St S 234 St15AvS 26AvS26 Av S18AvSS 223 St S 226 St 19AvSS 220 St18 Pl S18 Av S15 Av S21 Av SS 212 St S 213 Pl S 214 St 29 Av SS212St32PlSFragerRd 3 5 AvS34AvSS 228 St33AvS31AvS 41AvS35AvS35PlS39AvSS239S t33AvS34AvS35PlS42AvS43AvSLakeFenwickRdS 248 St S 249 St 45PlSS 253St S 243 St S 24 8 St 35PlS20 Av S27PlS30AvSS 248 St S 251 St S 252 St 30Av25AvSS 246 S t SR 5SR 5SR99RussellRdS 212 S t32Av31A vMilit a r y Rd S 238St38AvS 239P l 241 St 242 St 35 Pl 239 St 42 Pl S243 Pl 36 Av S252 St 42Pl36PlS45 AvS 256 St S 224 St S 223 St 24 Av SSR99S 216 St S 221 St29 Av S30 Av S20 Av SKent-DesMoinesRd 18 Pl S1 8PlS19AvS20AvS27 Av26PlS28 Av S255 Pl 18 Av S23PlS2 5 1 P l 1 5AvS253 St S 251 St S 244 Pl 21Av 21PlS16 Av SS 240 St 257 Pl 2 58St45 Pl S R 5 1 6 3 7 P l S35 Av SS 2 5 7 S t43PlS38AvSS 255 St 35 Pl S32PlS25 9 Ct29 Av SS 256 St27 Av SS 242 St S 244 St S 244 St S 250 St 21 Av S20 Av S28 Av S22 Pl SS 246 Pl S251Pl S 249 St 15 Av S16AvS239 Pl S 244 St 34 AvS41AvS 35 Av SS23 6 St23PlS25AvSThunderbir d Dr S30AvSPacificHwyS28 AvS 212 St 19 Av16 Av S19 Pl SS 222 St22 Av SS 219 StS 219 St S 220 St 36PlS255 Pl 39Pl251 St 252 St 254 Pl253St 252 Pl29 Ct29 Av30 Av30 Pl249 Pl 23 Av17 Av 2 54 St 44 Av22 Av S249 Pl249 Pl257 S t35Pl 40AvS40PlS42 Av S2 3 2 S t233 St 232 St 2 3 2 Pl230 St 231 St 30 Av S227 Pl 24 Av43Av245 Ct 37Pl252 Pl 25 6 Ct 38Pl32 Pl31Av254 St 33Pl34Pl2 4 7 C t 2 4 7 S t 246 Ct 250 St 250 Pl 251 Pl 256 Pl 253 Pl254St 253 Pl ReithRdS 254 St 45 Av42PlS217St 217 Pl 218 Pl 216 Pl 43Pl39PlS40PlS220Pl41AvS41Pl2 2 1 P l 2 1 9 St S222P l41Pl223St4 2Av221Pl 43AvS220 Pl S221 St 221 Pl 45AvS222 S t 46AvS224Pl 4 3 AvS41Pl226St 225Pl42 Av42Pl35 P l S222 Pl 23 2 PlS 240 St 50 Av233Pl 5 1 A v5 1 AvS 225 Pl 51AvS51CtL a k e F e n wic k R d S45PlS4 5 Av S2 4 8 P l 4 6 AvS45AvS45PlS251 Pl KentDesMoinesRd249Pl248 PlS 250 Pl S 251 StS 251 Pl S 252 PlS 252 Pl 27 Av S32 Av256 Pl 257 Pl 258 St 258 Pl S 256 St 27PlS25 Ln S42AvS4 1AvFragerRd24 Pl S 250 St 250Pl 257 St 36PlEmmettLnRussell Rd 217St 218 St 216 Pl 45 Pl45 Ct44 Pl46 Pl S220 St220 Pl 221 St 219 Pl S 216 St RiverviewBlvdS46AvS215Pl 47 Av214 Pl S 215 St S 215 Pl 47Ct48Pl48Ct50 AvRive r v ie w B lvdSRiverviewBlvdSV e t e r a n s D r 252 Pl 251Ct &( &( &( §¨¦5 INT-1796 99 516 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings Refresh PAGE 6 RIGHT PAGE 11 DOWN 5 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n    n      n n    32PlS72AvSS 216 St 70AvSS 234 St S 226 St H a w l e yRdWNadenAvSMadisonAvN74AvSS 216 St S 236 StFragerRd 3 5 AvS34AvSS 228 St33AvS 41AvS35AvS35PlS39AvSS239S t33AvS34AvS35PlS42AvS43AvSLakeFenwickRdS 248 St S 249 St 45PlSS 253St S 243 St S 248 St 35PlSSR 5James St W Meek er St 6th Av NW Sam St 6th AvS 220 St S 212 St W M eeker S t64 Av SS 2 2 8 S tS 224 StRussellRd 54 Av SS 212 S t32Av Milit a r y Rd S 238St38AvS 239P l 241 St 242 St 35 Pl 239 St 42 Pl S243 Pl 36 Av S252 St 42Pl36PlS45 AvS 256 St 68AvS68AvS45 Pl S R 5 1 6 3 7 P l S35 Av SSR167Washington Av NLincolnAvNThompson Av NS 228 St 6th Av NFrager R dSRu s s e ll Rd S 2 5 7 S t43PlS38AvSS 255 St 35 Pl S32PlS239 Pl S 244 St 34 AvS41AvS 35 Av SS23 6 St S 212 St 36PlS255 Pl 39Pl251 St 252 St 254 Pl253St 252 Pl 2 54 St 44 Av249 Pl257 S t35Pl 40AvS40PlS42 Av S43Av71Pl227 Pl Rachael Pl 245 Ct 37Pl252 Pl 256 Ct 38Pl33Pl34Pl2 4 7 C t 2 4 7 S t 246 Ct 250 St 250 Pl 251 Pl 256 Pl W Saar St S 231 St 66 Av S253 Pl ReithRdWaterman St S 254 St 45 Av Adams5thAvS42PlS2 1 7 S t 217 Pl 218 Pl 216 Pl 43Pl39PlS40PlS220Pl41AvS41Pl2 2 1 P l 2 1 9 St S222P l41Pl223St4 2Av221Pl 43AvS220 Pl S221 St 221 Pl 45AvS222 S t 46AvS224Pl 4 3 AvS41Pl226St 225Pl42 Av42Pl35 P l S222 Pl 66AvSS 217 St S 219 St S 220 S t 67Av218 St S 224 St S 226 Pl66AvS 23 2PlS 2 3 2 S t50 Av50Pl233Pl 5 1 A v23 4St2 3 4 P l53Av53PlS51Av52Av52Pl53Av53Pl54 Av 5 1 AvS 225 Pl 2 37Pl51AvS51Ct S237Pl54Pl 55Pl51 Pl54Av234 Pl 2 3 3 St S 234 Pl 54Av235 2 31 Pl 5 6 Av232 P l 2 32 S t 5 7 Av2 3 6 P lSt 5 2 Pl 55 Av S5 7 A v S56 AvS 2 3 4 S t55Av Lakeside Blvd W S237 St57 Ct S58 CtS 2 3 8 CtS 238Pl S 239 St 63Av63AvS238 St 237 St62 Av S61AvSLakesideBlvdE 233Pl 234 Pl 5 9 PlS 60AvS5 8 A v S 2 3 5 S t 58 AvS2 3 1 S t233 St 60 Pl62AvS 233 St62 Pl63Pl60 Ct66AvS67PlSS 238 PlS 239 St S 239 Pl58 Pl SW Smith St 6th AvWJamesLnRidgeview DrW James LnJamesCt James Pl James PlJames Ln63 Wy S240 Ct 242Pl S 248 Pl S 2 4 9 S t S 2 4 9 P lS R 5 1663 Pl S62 Pl S62 Av SS 251 S t 62 Av SS 251 Pl S 253 St S 253 Pl S 255 St L a k e F e n wic k R d S45PlS4 5 Av S2 4 8 P l4 6 AvS45AvS45PlS251 Pl KentDesMoinesRd249Pl248 PlS 250 Pl S 251 StS 251 Pl S 252 Pl32 Av62 WyNaden Av42AvS4 1AvFragerRd6 2 Pl232Pl232 C t59PlS238 S tWMortonSt59Ct W Willis St 257 St 236 St 56 Ct56Pl61 PlS 232 St 36PlRussell Rd 217St 218 St 216 Pl 45 Pl45 Ct44 Pl46 Pl S220 St220 Pl 221 St 219 Pl S 216 St RiverviewBlvdS46AvS215Pl 47 Av214 Pl S215 St S 215 Pl 47Ct48Pl48Ct214 St S214Wy50 Av214 Pl215St 51 Av S213 St 52WyS5 3 PlRive r v ie w BlvdSRiverviewBlvdSV e t e r a n s D r 6 4 A v SS 236 Pl 65 Av64 Pl238 Pl 252 Pl 251Ct &( &( §¨¦ INT-1796 INT-2887 INT-3046 181 516 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 5 LEFTPAGE 7 RIGHTPAGE 1 UP PAGE 12 DOWN 6 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details)        n    nn   n  ÷      CrestAvSLenoraAvReitenRd95 Pl STil d enAvHilltopAv96 Av S98AvSS 241 St S 242 St 242 Ct S 246 Pl Reite n R d E Laurel St S 252 St88AvSHazelAvN96AvS96PlSS222 St S 228 St S 218 St S 222St 98AvS213St 96AvS72AvSS 216 St S 216 St 70AvS5thAvN3rdAvN1stAvN2ndAvNS 234 St StateW Cole St S 226 St H a w l e yRdWNadenAvSMadisonAvN74AvS5th Av S5thAvS3rdAvS2ndAvS1stAvSRailroadAvSW Gowe St S 216 St S 236 St E Temperance St Valley Pl 96P lNovak Ln SummitAvNWoodford Av NRailroadAvNCanyonDr MaplewoodAvSE Chicago St WynwoodDrMaple St WardSt E Guiberson St K e nsingtonAvGoweSt Bridges Av SCentralAvS4th Av SJames St W Meek er St 6th Av NW Harrison St W Meeker St W Sam St 6th Av4thAvNS 220 St S 212 St 84AvS64 Av SS 2 2 8 S tS 224 St68AvS S 222 St 68AvSETitusSt85 Pl SSR167ValleyFwyS R51693 Av S212 St CentralAvNProspect Av NS 243 St E Seattle St E Smith St 2nd Av NWashington Av NLincolnAvNThompson Av NS 228 St 83 Av S6th Av N22 4 St 2nd Av N76 Av SFrager R dS1st Av SStateAvNKennebeckAvMcmillan St Clark Av NPioneer St Hillcrest AvKensington AvStoneburnerLnGarfieldAvSOly mpicWy Cherry Hill E Filbert East LnWalnut E Hemlock St E Walnut St E Dean Jason Av NAlexanderGl e n wo o d L n Dean St George St 86AvAlpineW y 97 Pl S214 Av 219 Pl 96 Pl221 Pl92 Av S220 Av 95Pl96Av95Pl95 CtS 213 St 216 St 71Pl227 Pl W Cloudy St Cedar St AlvordAvN92 PlWestview CtS 239 Pl S 244 Pl 230 Pl S 232 St 94Ct S 95 Ct96AvS96Av97 AvS 245 Pl Weiland St Tacoma St E Maclyn St ScenicWy Ke n n e bec k AvE TitusStMarion St Ellis PlViewPlS 240 St Willis St W Titus St Rachael Pl W Crow St CrestPlStetson Av Seattle St Carter St S c e n ic Wy Chicago StMorton St W Saar St S 231 St 66 Av S96PlOverlook St Waterman StAdams 5thAvS220 Pl66AvSS217St S 219 St S 220 S t 67Av218 St S 224 St S 226 Pl66AvS 84PlSS 218 St85Av S 213 Pl 86PlS88AvS88PlSS216 St 88 Pl S86AvS220 Ln 2 14 Pl 94PlS58 CtS 2 3 8 CtS 238Pl S 239 St 63Av63AvS238 St 237 St62 Av S61AvSLakesideBlvdE 233Pl 234 Pl 5 9 PlS 60AvSS23 1 S t233 St 60 Pl62AvS 233 St62 Pl63Pl60 Ct66AvS67PlSS 238 PlS 239 St S 239 Pl 84 Pl S236 Pl 91 Av SS 235 Pl S 239 S t89 Pl90 Wy S92AvS91WyS94AvSS 223 Pl S 225 Pl 94 Pl S228 St95 Av SS 240 P l 239 Pl S 247 Ct Wo o dla n d Wy Carter PlKirkwoodAv 87AvSW Smith St 6th AvRussell StWJamesLnRidgeview DrW James LnJamesCt James Pl James PlJames Ln63 Wy S240 Ct 242Pl S 248 Pl S 2 4 9 S t S 2 4 9 P lS R 51663 Pl S62 Pl S62 Av SS 251 S t 62 Av SS 251 Pl S 253 St S 253 Pl S 255 St S 94AvS244 St62 WyNaden Av258 KimberlyAv6 2 Pl Scenic Wy232P l232 C t59PlS238 StWMortonSt59Ct E Smith St VanDeVanterAvSW Willis St 233 P l S234 Pl61 PlS 232 St StConcord 94PlS216 Pl 94Ct95Pl C le a rview 91PlSS 237 P l236 Pl S 235 Pl 97 Av SRamsayW y W Kent Sta St 1st Av N2nd Pl N235 Pl 3nd Pl N97AvS98 Pl S6 4 A v SS 236 Pl 65 Av64 Pl238 Pl 98AvSS 2 24 St94 Ct S95 Ct SS 223Ct &( &( INT-2887 INT-3046 INT-3189 INT-3195 INT-3203 INT-3223 INT-3264 INT-3266 INT-3275 INT-3332 INT-3357 INT-3408 INT-3449 INT-3455 INT-3478 INT-3605 INT-3628 INT-3629 INT-3668 INT-3712 INT-4096 181 516 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 6 LEFTPAGE 8 RIGHTPAGE 2 UP PAGE 13 DOWN 7 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n   n ÷ n n  nn nn      SE 216 St 117Av118AvSE103PlSE104PlSESE 217 St SE 218 St SE 212 St 211 P lSE212St SE 213 St SE 224 St SE 225Pl SE 219 Pl SE 222 St SE 223 St SE 225 St106PlSE SE 227 Pl SE 216 St 114 Pl106PlSE2 2 9 S t SE 232 Pl SE235 S t 229Pl SE 228 St SE 232 St SE 237 St 114PlSE100AvSE99AvS105 Pl SE111AvSE113AvSE100 Pl SE100AvSE109 PlCrestAvSLenoraAvReitenRd95 Pl STil d enAvHilltopAv96 Av S98AvSS 241 St S 242 St 242 Ct S 246 Pl Reite n R d E Laurel St S 252 St88AvSHazelAvN96AvS96PlSS222 St S 228 St S 218 St S 222St 98AvS213St 99AvSSE 212 St 96AvSS 216 St State252 Pl 255S t121Pl114Av115Av254 St115Pl 222 Pl SE 236 St SE 234 St S E 231Pl 2 1 6 C t105Av10 6 Pl 216 C tSE 2 2 6 S t 2 2 6 St107Av108AvSEBensonRd 233 Pl 228 St 110Av2 3 2St112Pl108Av236 Pl 238 St 113 PlSE 237 St SE 248 St E Temperance St Valley Pl 96P lNovak Ln 98P lSummitAvNWoodford Av NCanyonDr MaplewoodAvSE Chicago St WynwoodDrMaple St WardSt E Guiberson St K e nsingtonAvGoweSt 84AvSSE 256 St S 222 St 119 PlETitusSt85 Pl SValleyFwy2 1 2Pl1 1 7 Pl SE 2 21St116 Av SE253 St S R516 10 7 Av109 Av SESE236 St105Av228St105AvSE 234P l 11 4 W y231 St 112AvSE1 0 9 A v S E 93 Av S213 Pl 212 St CentralAvNProspect Av NS 243 St E Seattle St E Smith St83 Av S22 4 St 119 Pl SE220 Pl SE 218 P l 113PlSE253 St 247 Pl 117 Av228 Pl 119 Ct2 1 8 P l111Av111 Ct111 Pl1 0 6 Av StateAvNKennebeckAvMcmillan St Clark Av NPioneer St Hillcrest AvKensington AvStoneburnerLnGarfieldAvSOly mpicWy Cherry Hill E Filbert East LnWalnut E Hemlock St E Walnut St E Dean Jason Av N229Pl117Av119Pl109PlAlexanderGl e n wo o d L n Dean St George St 244 Ct 245 Pl 246 Pl SE 212 Pl 112 Av240 Pl 102 Pl102 Av101 Pl102 Pl242 PlS 242 Pl SE 236 St 119 Av245 Pl86Av227St AlpineW y 214 St120 Pl SE120 Av211 Pl 216 Ln111 Ct112 Pl113 Ct223 Ln SE 222 Pl 109 Pl110 Av107 Pl SE105 Av 233 Pl 1 09 Pl 118 Pl 220 Ct 220 Pl 120Av118 Av213 C t230 Pl111 Ct120 Av SE97 Pl S214 Av S 236 S 238 St S 237 St 117 Av98 Pl121 Pl SE215 St 121 Pl SE119 Av SE219 Ct 120 Pl119 LnSE223Dr SE 217 St 110Av115 Pl114 Pl113 Pl113 AvSE 220 Pl SE 221Pl107PlSE 215 St114 Pl115 Pl113 Pl113 Av2 11Pl1 14PlSE1 03Ct 213 Ct100Pl1 0 4Pl104 Av213 St 102AvSE 213 Pl100AvSE 103 Pl SE219 Pl 96 Pl221 Pl S 220 Pl92 Av S220 Av 95Pl96Av95Pl95 CtS 213 St 216 St Cedar St AlvordAvN92 PlWestview CtS 239 Pl S 244 Pl SE 239 St 230 Pl S 232 St 94 Ct S 95 Ct232 St S 231 St SE 231 St 226 Pl 103 Av230 Pl 108 Av SE105 AvSE 226 St 230 St 1 0 9 Av 235PlSE 236 Pl106Av 110 Pl110 Av235 St 235Pl 234 Pl229Pl SE 229 Pl SE 227 Pl SE 2 28 P l 120 Av SESE 2 30 Pl 228 Pl106 Av110 Ct112 Av SE114 Av115Pl115 Av11 3 Pl SE 225St SE 244 St 121 Pl SE2 51Pl252 P l255 Pl117PlSE 254 Pl 115 Av252 Pl 120 Av SE114 Pl100 Pl SE102 Pl96AvS96Av97 AvS 245 Pl Weiland St Tacoma St E Maclyn St ScenicWy Ke n n e bec k AvE TitusStMarion St Ellis PlViewPlS 240 St 256 Pl 257StCrestPlStetson Av Seattle St Carter St S c e n ic Wy Chicago St 104 Av SESE218Pl 219 Pl100 Pl106 Av224 Pl 117 Pl96Pl2 33Pl220 Pl84PlSS218St85AvS213Pl86PlS88AvS88PlSS216St88 Pl S86AvS220 Ln 2 14 Pl 94PlS84 Pl S236 Pl 91 Av SS 235 Pl S 239 S t89 Pl90 Wy S92AvS91WyS94AvSS 223 Pl S 225 Pl 94 Pl S228 St95 Av SS 230 St S 226 St S 240 P l 239 Pl 233 St 2 3 5 S t 101 Av102 Av235Pl SE 234 Pl 102AvSE 238 Pl101 Av SE101 Pl SE238 St 108P l 108 Av SE2 3 8 S t109AvSE110AvSE111PlSE238 Pl 2 39St SE 234 St SE 241 Pl 109 Pl108 Pl240 Pl 110 Pl SE111 Pl233St115Av231 Pl113Av226 St 119Av 118 Av SE249 Pl 250P l S E 2 4 8 C t110 PlSE 243 St SE 244 St 111AvSE115 Pl SE105 Pl SES 247 Ct 101 Pl SE248 Ct101 Pl100PlSE2 4 9S t99PlS248 Pl 100 Av249 Pl 253 Pl 114AvSE112 Av SE111 Av SE248 Pl 251 Pl 251 Ct110 Ct253 Pl 249 Ct110 Pl110AvSE109Pl2 5 0 Ct SE 250 St 108AvSESE 250 Pl 106 Av SE252 St 105 Pl SE108 Pl SESE 254 Pl 106AvSE109AvSE252 Pl 253 Pl 109 Ct254 Pl 110 Av110 Av255 Pl 10 9CtPl109 110 Pl SE109Pl256 Pl 257 St S E 257 St 256 Pl 114 Av102PlWo o dla n d Wy Carter PlKirkwoodAv 87AvSRussell St S 94AvS244 St 258 KimberlyAvScenic WySE 240 St SR515E Smith St VanDeVanterAvSSE 256 St 233 P l S234 Pl 251St2 5 0 S t251 P l94PlS216 Pl 94Ct95Pl 212 C t226Pl 110Pl120PlSE254St103AvSE101 Pl220 Pl C le a rview 91PlS102 Pl118 PlS 237 P l236 Pl S 235 Pl 97 Av S119 Ct119Pl117 Pl232 Pl SE 232 St S 235235 Pl 114Pl114 Av113 Pl117Av116 Pl118 Pl119 Pl240 Pl102 Ct102 Pl237 St 120 Av SE1 1 9 P l 239 Pl 1 1 8 P l118Av 236Pl 117Pl238 St116 PlPl239St 238 117Av228 Ct97AvS 98 Pl SS 228 P l 233 Ct 110 AvSE 249St SE 251 St118 Av SE117Ct118 Ct250 Pl 250 Ct112 Av112 Pl106 Av1 1 9Av227St 227 St 117 AvSE 236 St 119 Av SE117 Pl234 Pl109 AvUnnamedUnnamedUnnamed11 0 A v 112 Av SE119 PlSE 2 1 3 S tSE 217 St 122Av S E120AvSE120AvSESE 222 Ct 120 Av SE116 Pl22 5Ct226 St 1 1 3 Pl SE 224 Pl SE 223 Pl SE 225 St 111 AvSE 218 Pl SE 217 Pl SE 219 Pl SE 214 C t SE 214 St SE 216 St 216 St103 Av SESE21 2St 104Av98AvS99AvS102PlSE105PlSE104PlSESE 218 S tSE 219 St 107AvSE220 Pl S E 218Pl Private Rd220 StSE220St105 AvSE 214 Pl105Pl 108Pl214 Pl 213 S tSE 211 Ln SE211 LnSE 214 St 112 CtUnnamedUnnamed 115 Ct22 9 St114 Pl104 Av225 St 102 Pl101 Pl103Av1 0 1 P l 103 Pl2 2 5 St 2 2 5 Pl 2 2 4 Pl101 Ct99PlSE 222 St SE 220 St Unna m ed 236 Pl 233 Pl 233 P l112Pl112 Pl SE237 Ct237 Pl 117 Av242 Pl 242 St S 224 St94 Ct S95 Ct SS 223Ct 114 Pl SESE 253 Pl &(&( INT-3449 INT-3455 INT-3478 INT-3605 INT-3628 INT-3629 INT-3668 INT-3712 INT-4096 INT-4177 INT-4614 INT-4881 INT-5543 INT-5557 516 515 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 7 LEFTPAGE 9 RIGHTPAGE 3 UP PAGE 14 DOWN 8 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n n  ÷ n n n ÷ n  n n 144 Av SE144 Av SE142AvSE1 4 0AvSES E 231 St SE 235 St 135 Pl SESE 236 Pl SE 213 St 129AvSE 216 St SE 219 Pl 126Pl117Av SE 233 St 128PlSE126 Pl SESE237 P l 129AvSE129PlSE128PlSE118AvSE128PlSE127 Av S E SE 217 St SE 218 St SE 212 St 211 P lSE212St SE 213 St SE 219 Pl SE 222 St SE 223 St SE 225 St106PlSE SE 227 Pl SE 216 St 114 Pl106PlSE2 29 St SE 232 Pl SE235 S t 229Pl SE 232 St SE 237 St 114PlSE105 Pl SE111AvSE113AvSE109 Pl140 Av138Av2 43Pl 131Pl1 4 5AvSE2 52 P l137Av SE 240 St 254 St134Av135Av138Av 144Av S E 213 S t 252 Pl 255S t121Pl114Av115Av254 St 2 2 3 Dr 2 2 3 P l125 Ct127 Av130Pl128Pl 122Av 115Pl222 Pl 127AvSESE 234 St SE 236 St 126AvSESE 224 St SE 234 St S E 231Pl 132 Av SE212 Pl 212 Pl 215 St125Av 123 Av217 St122 Pl211 Pl 124Av217 Pl 2 1 6 C t121Pl211 Ct 218 Pl128Pl129Pl10 6 Pl 216 C tSE 2 2 6 S t 2 2 6 St107Av108AvSEBensonRd 233 Pl 228 St 110Av2 3 2St112Pl108Av236 Pl 238 St 113 PlSE 237 St SE 248 St SE 256 St 144AvSE136 A v S E SE251StSE251Pl 140AvSESE 241 St 142AvSESE237Pl 119 Pl1 2 6 Av SE134 CtSE253 Pl 1 4 2 A v S E 144AvSE136PlSE143AvSE2 1 2Pl1 1 7 Pl 1 2 6 PlSE 221St S E 2 2 1 S t 129AvSE124AvSE116 Av SE232S tSE 235 St 130Av 253 St 124 Av SE132 Av SE2 5 3 C t SE 252 Pl 10 7 Av109 Av SESE236 St 234P l 11 4 W y231 St 112AvSE1 0 9 A v S E SE 2 5 0 S t119 Pl SE220 Pl SE 218 P l 113PlSE253 St 139Av144 Pl133 Av241 Pl127Ct128Av129Av 130Av13 0 Av129Pl254 Pl117 Av125Av228 Pl 123Av119 Ct217 Ct 218 Ct2 1 4Pl2 1 8 P l111Av 111 Ct111 Pl1 0 6 Av 23 9 S t212Pl 2 1 3 S t129Ct131 Av117Av119Pl109Pl144Pl138 Pl246St 256 Pl 130Av SE 224 St SE 212 Pl 220 St SE 216 St 112 Av240 Pl 119 Av245 Pl 214 St120 Pl SE120 Av211 Pl 216 Ln111 Ct112 Pl113 Ct223 Ln SE 222 Pl 109 Pl110 Av107 Pl SE233 Pl 1 09 Pl 118 Pl 220 Ct 220 Pl 120Av118 Av225 Pl213 C t126 A v SE126 Pl SE SE231 Wy SE232Pl 232 Ct131 AvS E 2 3 3 S t 133 Ct132 PlSE 231 St SE 211 S t 230 Pl111 Ct120 Av SE117 AvSE 21 2 P l SE 212 St 121 Pl SE215 St 121 Pl SE214 Pl 216St 2 1 5 P l119 Av SE219 Ct 120 Pl1 23Av119 LnSE223Dr S E 22 1 Pl 22 3 Ct222Pl124 Av127 Ct123 PlSE 218 Pl129 Ct130Av218 Pl SE 216 St 217 St 126 Ct 218 Ct 123 Pl228 Ct 229 C t227 Ct 1 2 5 Pl 1 2 6 Av225 Ct 226 St SE 217 St 110Av115 Pl114 Pl113 Pl113 AvSE 220 Pl SE 221Pl107PlSE 215 St114 Pl115 Pl113 Pl113 Av2 11Pl1 14PlSE213 Ct 213 St 108 Av SESE 226 St 230 St 1 0 9 Av 235PlSE 236 Pl 110 Pl110 Av235 St 235Pl 234 Pl229Pl SE 229Pl SE 227 Pl SE 2 28 P l 120 Av SESE 2 30 Pl 228 Pl106 Av110 Ct112 Av SE114 Av115Pl115 Av11 3 Pl SE 225St 227 St SE 232 S t125 A v 231 Ct 134 Ln134 Ct131Av123 Av238 Pl 236 P l125 Av127 Av127Pl SE124 Av SE234 St 130 Ct 237 Ct SE230 St 232 Pl 137Av139 Av 141AvSESE 228 St 137Pl132Pl133 Ct248 Pl249St 2 4 9St 243 Pl 135 Av SESE 243 St138AvSE242 St 133 Av138 Ct144 Pl 2 5 1 Pl 255 Pl129PlSE252St 128 Av SE25 4C t 2 5 4 P l SE 247 Pl129Av243 St 241St 242 C t 130AvSE24 6 Pl SE 244 St 121 Pl SE2 51Pl252 P l122 Pl 255 Pl117PlSE 254 Pl 115 Av252 Pl 120 Av SE114 Pl256 Pl 257St 135Av256 Pl SE 237 Pl 139Pl238 Pl 245St 145Pl SE231 St231St224 Pl 117 Pl122Pl2 33Pl234 St 108P l 108 Av SE2 3 8 S t109AvSE110AvSE111PlSE238 Pl 2 39St SE 234 St SE 241 Pl 109 Pl108 Pl240 Pl 110 Pl SE111 Pl233St115Av231 Pl113Av226 St SE 236 Pl SE 237 St 14 1 L n S E 139Av141 Pl242 Pl 140Ln238 Ln 143 Av SE246 St137 Av SE137 Ct SE246 C t133AvSE 247 St 245 S t132 Pl132 Ct249 Pl250 Ct 139 Pl SE253 St 252 Pl 257 St119Av118 Av SE249 Pl 250P l S E 2 4 8 C t 244 St 130 Pl255 St 123 PlSE 251 Pl 255 Pl 126PlSE258St110 PlSE 243 St SE 244 St 111AvSE115 Pl SE114AvSE112 Av SE111 Av SE248 Pl 251 Pl 251 Ct110 Ct253 Pl 249 Ct110 Pl110AvSE109Pl2 5 0 Ct SE 250 St 108AvSE106 Av SE252 St 108 Pl SESE 254 Pl 109AvSE252 Pl 253 Pl 109 Ct254 Pl 110 Av110 Av255 Pl 10 9CtPl109 110 Pl SE109Pl256 Pl 257 St S E 257 St 256 Pl 114 AvSE 240 St 253 St251St250St251Pl212 Ct212 C t226Pl 125 Av23 0 S tSE 230 St 110Pl120PlSE254St 2 5 6 Pl118 Pl119 Ct119Pl117 Pl232 Pl 1 3 3 A v SE 232 St 124Av114Pl114 Av113 Pl117Av116 Pl118 Pl119 Pl240 Pl 131Av120 Av SE1 1 9 P l 239 Pl 1 1 8 P l118Av 236Pl 117Pl238 St116 PlPl239St 238 117Av133Pl132 Pl137 AvSE 241 St SE 240 Pl 134 Ct SE233 Ct 124 Av SE123Pl137 Av255 Pl 137 Wy254 Pl110 AvSE 249St SE 251 St118 Av SE117Ct118 Ct250 Pl 250 Ct 134 Pl SE112 Av112 Pl106 Av1 1 9AvSE 255 St117 AvSE 236 St 239 St119 Av SE117 PlSE 252 St 136AvSE135 AV SE234 Pl109 AvUnnamedUnnamedUnnamed11 0 A v 112 Av SE119 Pl214 StSE213St SE 217 St 122Av S E120AvSE120AvSESE 222 Ct SE 2 25C tSE 22 6 C t1 28Pl1 2 9 PlSE 129 Av SE 2 2 8 Pl128AvSE 227 St 1 3 4 Pl S E225 Pl SE 226 St SE 227 St SE 227 Pl129PlSE 135AvSE134Av2 3 2 S t120 Av SE116 Pl22 5Ct226 St 1 1 3 Pl SE 224 Pl SE 223 Pl SE 225 St 111 AvSE 218 Pl SE 217 Pl SE 219 Pl SE 214 C t SE 214 St SE 216 St 216 St 1 31Pl131Pl210 Pl 1 3 1 Ct 213 St 216 P lSE 217 PlSE127Pl 125AvSESE 217 P l125Pl214 St 222 Pl 131PlSE13 1Av 131 Av SESE224StSE224 P l132PlSE132 P l S E 133PlSE 226 Pl 134PlSESE 235Pl128Ct126AvSE129 PlSE130AvS E 214 Wy 105PlSE107AvSE220 Pl S E 218Pl Private Rd220 StSE220St SE 214 Pl105Pl 108Pl214 Pl 213 S tSE 211 Ln SE211 LnSE 214 St 112 CtUnnamedUnnamed 115 Ct22 9 St114 Pl2 2 5 St 2 2 5 Pl 2 2 4 Pl 236 Pl 233 Pl 233 P l112Pl112 Pl SE237 Ct237 Pl 117 Av242 Pl 242 St 114 Pl SESE 253 Pl INT-4614 INT-4881 INT-5543 INT-5557 INT-6112 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 8 LEFTPAGE 10 RIGHTPAGE 4 UP PAGE 15 DOWN 9 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n ÷ n n 168 Av SE166AvSE167 Pl SE159AvSE160AvSESE229Pl SE 229 Pl SE 232 Pl 152AvSE153 Pl SE156AvSESE 251 St SE 236 St SE 218 St SE 235 St SE 236 St SE 234 St SE 251 St SE 214 St SE 216 St 144 Av SE144 Av SE142AvSESE 220 St 1 4 0AvSES E 231 St SE 235 St 135 Pl SESE 236 Pl 253Pl 167 Av168 Av168Pl1 6 8 Pl 167 Av251 Pl167AvSESE 235 St SE 231 S t 153 Av SE162 PlSE 256 St 164AvSESE 224 St148 Av SE140 Av138Av2 43Pl 14 5 Ln146AvSE131Pl145AvSE 2 52 Pl137Av SE 240 St 254 St 147 Av134Av135Av138 Av144Av S E 213 S t 2 2 3 P l130PlSE 224 St 132 Av SE129Pl144AvSE136 A v S E SE251StSE251Pl 140AvSESE 241 St 142AvSE188 Av SE166 AvSE237Pl SE240Wy148 Av SE147AvSE134 CtSE253 Pl SE 2 4 7 St1 4 2 A v S E 144AvSE136PlSE143AvSE129AvSE232S t130Av 132 Av SE146AvSE145PlSE250St 163Pl139Av144 Pl133 Av241 Pl 130Av13 0 Av129Pl2 39 S t131 Av144Pl138 Pl246St 256 Pl 130Av SE 224 St 220 St SE 216 St SE231 Wy SE232Pl 232 Ct131 AvS E 2 3 3 S t 133 Ct132 PlSE 231 St SE 21 2 P l SE 212 St 214 Pl 216St 22 3 CtSE 218 Pl130Av 134 Ln134 Ct131Av130 Ct 237 Ct SE230 St 232 Pl 137Av139 Av 141AvSESE 228 St SE 232 St 234 St 234St150 AvSE 234 Pl147 Av152 Av SE153 Av234 Pl 151 Pl SE245 Ct 244St145 Pl137Pl132Pl133 Ct248 Pl249St 2 4 9St 243 Pl 135 Av SESE 243 St138AvSE242 St 133 Av138 Ct144 Pl 2 5 1 Pl 255 Pl 150PlSE255 Pl129PlSE252St SE 247 Pl 243 St 130AvSE135Av256 Pl139Pl238 Pl 252 Pl 161 Pl254 St 245St 145Pl SE146 Pl246 Pl 148AvSESE 232 S t 164AvSESE 227 S tSE 224 St 222 St147 Av156 Av SE2 32 St 234 St SE 236 Pl SE 237 St 14 1 L n S E 139Av141 Pl242 Pl 140Ln238 Ln 143 Av SE246 St137 Av SE137 Ct SE148LnSE246 C t133AvSE 247 St 245 S t132 Pl132 Ct249 Pl250 Ct 139 Pl SE253 St 252 Pl 257 St 244 St 130 P l253 St 146 Av146PlSE2 5 6 Pl 1 3 3 A v 131Av133Pl132 Pl137 AvSE 241 St SE 240 Pl 134 Ct SE137 Av255 Pl 137 Wy254 Pl134 Pl SE159AvSE 255 St 239 St SE 252 St 136AvSE135 AV SESE 225C tSE 226 C t1 28Pl1 2 9 PlSE 129 Av SE 2 2 8 PlSE 227 St 1 3 4 Pl S E225 Pl SE 226 St SE 227 St SE 227 Pl129PlSE 135AvSE134Av2 3 2 S t1 31Pl131Pl210 Pl 1 3 1 Ct 216 P lSE 217 Pl 222 Pl 131PlSE13 1 Av 131 Av SESE224StSE224 P l132PlSE132 P l S E 133PlSE 226 Pl 134PlSESE 235Pl129 PlSE130AvS E 214 Wy Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 9 LEFT PAGE 16 DOWN 10 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details)  n  n n  n ÷ n S 273 Pl S 274 Pl S 284 Pl 51PlSS 288 PlS275Pl32AvSS280St S 277 Pl 38Pl S S 280 St S 282 St 48AvSS 284 Pl S 2 7 9Pl S 287 St S 290 St S 282 St32PlS36AvS 42 Av S43 Pl S46 Av S41 Av S34 Av S33 Pl S4 6 A vSS 285 Pl 47 Pl S34 Av S37 Av S39AvS41AvS43 PlS 288 Pl S 289 Pl S 290 PlS 290 StS 290 St S 2 91 St S 291 St S 289 Pl S 2 9 1 St 46 Pl S42 Av SS 276 St S 273 St S 281Pl S 290 St16AvS 15PlS2 6 Av SS 276 St25DrS 18 Av SS 276 St S 253St 22AvSS254Pl S 257 St S 261 Pl S 263Pl S 2 6 4 Pl 15 Av S18PlS20 Av S19 Av S14PlSS 268 StWoodmontBeachDrSS 266 Pl19PlS 33AvS34AvS35PlS42AvS43AvSLakeFenwickRdS 249 St 45PlSS 260 St S 253St 31AvS41AvSS 261 Pl S 262 St S 263 St Kent Ct S 270 St S 270 St 268 Pl 37AvS42AvS35PlSS 268 St20 Av S27PlS30AvSS 251 St S 252 St 30Av25AvSSR 5SR99291 Pl 292 St 289 Pl S 291StSR5260 St 252 St 42PlMilitaryRdS33AvS33 Av40AvSSo merset Ln36PlS Carn a byWy DoverCt34A v 269 St 35 Av40AvS45 AvS 256 St 289 Pl 51 Av S255 Pl 18 Av S23PlS2 5 1 P l 253 St S 251 St 21Av 21PlSS 260 St S 272 St16 Av S273 Pl SStarLakeRdPacificHwyS257 Pl 2 58StMilitary Rd SS 288 St 20 AvS 289 St 2 1Av40 Av S45 Pl 50AvSS Star Lake Rd43AvS S 2 8 6 S t49 AvS S tar Lake Rd 37 Av SS 288 Pl 27AvS 285 Pl S 282Pl 283 St 41 Pl S39PlSS 2 63StS 2 5 7 S t43PlS38AvSS 255 St 35 Pl S32PlS25 9 Ct29 Av SS 256 St S 262 Pl 20 Av SS 2 7 3 P lS 250 St 21 Av SS251Pl15 Av S34 AvS35 Av SS 2 6 1StS 261 St 36PlS255 Pl 39Pl251 St 252 St 254 Pl253St 252 Pl 270St BristolCtCardiff Av SCa m bridgePlManchesterAv35PlCtPrincetonAvCanterburyMan c hesterWa yH a m pton Wy SomersetCt19 Av17 Ct18 Av17 Av Crestwood Rd 282 Pl 36Av36LnS t r a tfordCt YaleCtHighlandAv2 54 St 44 Av36Pl36 Ct22 Av S249 Pl249 Pl257 S t35Pl37 Pl252 Pl 25 6 Ct 38Pl44 Pl43Pl 43Av46AvCambridge Ct Stanford CtSaxonCtAvonCt271 S t 32 Pl SS 2 7 3 P l46 Ct SF e n w ic k C t 49AvS50 Pl S48 Av S45 Av S28 1 S t 50PlS279Pl S 282 St S 287 S t 30 Av S2 8PlS23 Pl S23AvS26 Av S27 Av S28 Av S22AvS28 Pl SS 285 PlS280Pl 20 Av SS 284 Pl 26 Pl S25 Pl S282 St S 285 St 29 Av SS 286 St 21AvS 286 St Cam e lotDr S 279Pl29AvS27 Pl284 St 282 St 280 Wy 283 St S 274 St 276 Pl17 Pl S17 Av S17 Av259 St 259 Ln32 Pl31Av254 St 265 St 33Pl34Pl250 St 250 Pl 251 Pl 256 Pl 253 Pl254St 253 Pl ReithRdS 272 St S 254 St 45 Av 258 Pl 2 4 8 P l 4 6 AvS45AvS45PlS251 Pl KentDesMoinesRd249Pl248 PlS 250 PlS 251 StS 251 Pl S 252 Pl EtonCtPl271 4 8Pl SArden Ct46AvS44PlS47AvS47 Pl S47 Pl SS 272 St 45 Pl SS 252 Pl 26 Pl S256 Pl 257 Pl 258 St 258 Pl 2 5 9 S t S 256 St 27PlS25 Ln S2 7PlS 260 LnS259P lAv 2920PlS26AvSS 2 7 0 St S 268 Pl28 Av S26 9St PlHampton Wy CarnabyWy24 Pl S 250 St 38AvS36 Av36Pl250Pl 257 St 284 PlS 284 St S 279 St27 Av2735Ln269 St36Pl 42 Pl 43 Ct S252 Pl 251Ct 35 Pl S&( &( §¨¦ FederalWay 5 INT-1796 99 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings Refresh PAGE 12 RIGHTPAGE 5 UP 11 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details)   n n n n n ÷ S 285 StS285St 3 7 S t N W72AvSS287St S 273 Pl S 274 Pl S 284 Pl 51PlSS 288 Pl S 292 St 59AvS51 PlS S27 5 P lS 280 St S 277 Pl 38Pl S S 280 St S 282 St 48AvSS 284 Pl S 2 7 9Pl S 287 St S 290 St S 282 St36AvS 42 Av S43 Pl S46 Av S41 Av S34 Av S33 Pl S4 6 A vSS 285 Pl 47 Pl S34 Av S37 Av S39AvS41AvS43 PlS 288 Pl S 289 Pl S 290 PlS 290 StS 290 St S 2 91 St S 291 St S 289 Pl S 2 91 St 46 Pl S42 Av SH a w l e y RdWNadenAvS74AvSS 262 StS262St33AvS34AvS35PlS42AvS43AvSLakeFenwickRdS249St45PlSS260St S 253St 41AvSS 261 Pl S 262 St S 263 St Kent Ct S 270 St S 270 St37AvS 42AvS35PlSS 268 St SR 181S 277 St 6th Av55AvSS 288 StS272Wy WestValleyHwy52PlS291 Pl 292 St 5 2 A v 52AVS289 Pl S 291StS 276 Pl 260 St 252 St 42PlMilitaryRdS33AvS33 Av40AvSSo merset Ln36PlS Carna byWy DoverCt34A v 269 St 35 Av40AvS45 AvS 256 St 289 Pl 52 Av51 Av S40 Av S45 Pl 72AvSSR 167Frager R dS50AvSS Star Lake Rd43AvS S 2 8 6 S t49 AvS Star Lake Rd 37 Av S41 Pl S39PlSS 2 63StS 2 5 7 S t43PlS38AvSS 255 St 35 Pl S32PlS34 AvS35 Av SS 2 6 1StS 261 St 36PlS255 Pl 39Pl251 St 252 St 254 Pl253St 252 Pl 270St BristolCtCardiff Av SCa m bridgePlManchesterAv35PlCtPrincetonAvCanterburyMan c hesterWa yH a m pton Wy Some rsetCt 36Av36LnS t r a tfordCt YaleCtHighlandAv2 54 St 44 Av36Pl36 Ct249 Pl257 S t35Pl Rachael Pl 37Pl252 Pl 256 Ct 38Pl44 Pl43Pl 43Av46AvCambridge Ct Stanford CtSaxonCtAvonCt271 S t S 2 7 3 P l46 Ct SF e n w ic k C t 49AvS50 Pl S48 Av S45 Av S281 S t 59 Pl50Pl259 Ln 33Pl34Pl250 St 250 Pl 251 Pl 256 Pl W Saar St 253 Pl ReithRdS 272 St Waterman St S 254 St 45 Av 2 58 Pl 5thAvS6th AvS 272 St S 248 Pl S 2 4 9 S t S 2 4 9 P lS R 5 1663 Pl S62 Pl S62 Av SS 251 S t 62 Av SS 251 Pl S 253 St S 253 Pl S 255 St S 261 St S 269 St 52 Ln S2 4 8 P l4 6 AvS45AvS45PlS251 Pl KentDesMoinesRd249Pl248 PlS 250 PlS 251 StS 251 Pl S 252 Pl EtonCtPl271 4 8Pl SArden Ct46AvS44PlS47AvS47 Pl S47 Pl SS 272 St 45 Pl SNaden Av6 2 Pl W Willis St Hampton Wy CarnabyWy38AvS36 Av36Pl257 St S 279 St35Ln269St36Pl42 Pl 43 Ct SSR 167252 Pl 251Ct 35 Pl S&( §¨¦ INT-1796 INT-9052 167 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 11 LEFTPAGE 13 RIGHTPAGE 6 UP 12 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details)   n ÷ n 86AvSGStNE85AvS45StN E 40 St NE I St NES 2 8 0 S t37 St NE 94PlSB Pl NWDStNWS 285 StS285St 3 7 St N W72AvSS287St59AvS CrestAvSReitenRdTil d enAvW o odlandWyE Laurel St S259St S 252 StH a w l e y RdWNadenAvS74AvS5thAvS3rdAvS2ndAvS1stAvSRailroadAvSS 259 St S 262 StS262St S 266 St C entral PlSR 181CanyonDr MaplewoodAvSE Chicago St WynwoodDrMaple St E Guiberson St Bridges Av SCentralAvSAuburnWyNGreenRiver R d S 277 St 4th Av S6th AvWestValleyHwy79AvS261S t 80AvS72AvSS R 516 E Seattle St SR 167Frager R dSE Valley RdS 277 St1st Av SHillcrest AvKensington AvStoneburnerLnGarfieldAvSE Filbert East LnWalnut E Hemlock St E Walnut StAlexanderGl e n wo o d L n 265 Pl 263 Pl S 262 PlAlpineWy96AvEMaclynStScenicWy K e n n e bec k AvMarion St Ellis PlViewPlWillis St Rachael Pl W Crow St 97 AvSeattle St Carter St S c e n ic Wy Chicago StMorton St W Saar St Overlook St Waterman St 5thAvSWo o dla n d Wy Carter PlKirkwoodAv 87AvS6th AvRussell St S 272 St S 248 Pl S 2 4 9 S t S 2 4 9 P lS R 51663 Pl S62 Pl S62 Av SS 251 S t 62 Av SS 251 Pl S 253 St S 253 Pl S 255 St S 261 St S 269 St Naden Av258Pl 88AvKimberlyAv6 2 Pl Scenic Wy97 Pl97 Av SIvesAvSAlder Ln Maple Ln SVanDeVanterAvSW Willis St C le a rview SR 167&( &( INT-3189 INT-3223 INT-3227 INT-3264 INT-3442 INT-3668 INT-9052 516 167 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 12 LEFTPAGE 14 RIGHTPAGE 7 UP 13 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n n  n n  n  n n 118AvSESE 272 Pl 274 St 275 St 117AvSE118AvSESE 284 St SE 277 P l105AvSESE 284 St 283 St SE 290 Pl109AvSE86AvSGStNE85AvS45StNE 40 St NE I St NES 2 8 0 S t37 St NE 94PlSSE 264 Pl SE 260 St 1 0 0 P l S E 111AvSE113AvSE100 Pl SE104AvSE106AvSE1 10AvSE112AvSE109 Ct111Ct111AvSESE270 St 1 1 5 A v S E 9 7 P l SCrestAvSReitenRdTil d enAvW o odlandWyE Laurel St S259St S 252 St C entral Pl 121Av122Av123Av118Pl122 Av121 Av269 St120Pl 272 St 116Pl121Pl118Av121 P l 274 St118Pl264St119Ct120Av264Pl122Ct263St252Pl255St121Pl259Pl 268 St114Av115Av254St116 Av SESE 248 St 108 Av SE269St111 Pl 110AvSE 281 St CanyonDr MaplewoodAvSE Chicago St WynwoodDrMaple St E Guiberson St AuburnWyNGreenRiver R d SE 256 St 119PlSESE 289 StSE 290 St101 Av SESE 286 St SE 270 St SE 286 St SE 271 St 253 St S E 2 9 1 S t108AvSE 287 St S R 516 10 7 Av109 Av SEE Seattle St S E 2 7 4 W y S 277 St 119 Pl SE253 St 1 2 1 Pl115PlHillcrest AvKensington AvStoneburnerLnGarfieldAvSE Filbert East LnWalnut E Hemlock St E Walnut St 110AvSE2 6 1 C t119Pl111Ct110CtAlexanderGl e n wo o d L n 265 Pl 263 Pl 259 Pl 119DrS 262 Pl 2 7 0 S t115 Av111 PlAlpineW y 264 S t113 Pl121 Pl SE2 51Pl252 P l255 Pl117Pl 258 St SE 254 Pl 115 Av252 Pl96AvEMaclynStScenicWy K e n n e bec k AvMarion St Ellis PlViewPl97 AvSE 267 St99 Pl S102AvSE268 St 107 AvSE 264 St SE 266 St114 Pl265 Pl 115 Av268 St 270 CtSE 272 Pl 268 St 267 Pl 266 Pl118Pl263 C t261Pl256 Pl 260S t 262 C tSE 260 Pl 118Pl117Pl257St 122Av122 Pl281Ct121 AvSE 282 St SE 280 St 120 Av SESE 276Pl 123AvSE 276 St SE 288 St 107 Av108 Av112AvSE111 Av 122PlSeattle St Carter St S c e n ic Wy Chicago St 111Pl110 Pl 116Pl116Pl117PlS E 2 7 7 S t275 St 115 Pl265 Pl 112Pl277 St 249 Pl 250P l S E 2 4 8 C t 119 Av1 2 1 Av 262 Pl120PlSE 122 Pl119 Av116 Av SE248 Ct101 Pl100PlSE2 4 9S t99PlS248 Pl 100 Av249 Pl 253 Pl 114AvSE112 Av SE111 Av SE248 Pl 251 Pl 251 Ct110 Ct253 Pl 249 Ct110 Pl110AvSE109Pl2 5 0 Ct SE 250 St 108AvSESE 250 Pl 106 Av SE252 St 105 Pl SE108 Pl SESE 254 Pl 106AvSE109AvSE252 Pl 253 Pl 109 Ct254 Pl 110 Av110 Av255 Pl 10 9C t Pl109110 Pl SE259109Pl256 Pl 257 St S E 257 St 256 Pl 257 Pl 115 Av258 St 259 St114 AvSE 264 St 258 Pl 112 AvAvSE113260 St 260 Pl106 Pl2 6 1 S t262St 106 Pl SE107 Av SEAv103SE 270 Pl102Pl258 Pl Pl 114PlSE 277 St 114AvSE106 Av SESE 279 St Gr e e n RiverRdSWo o dla n d Wy Carter PlKirkwoodAv 87AvSRussell St 258Pl 88AvKimberlyAvScenic Wy97 Pl97 Av S114 Av SE114AvSE265 St114 Ln SEAlder Ln Maple Ln SVanDeVanterAvSSE 256 St 251St2 5 0 S t251 P l110Pl120PlSE254St103AvSE 266 Pl266 St C le a rview 119 Ct119Pl266 Pl 268 St 106Pl272 Pl SE 273 Pl103 PlSE 290 Pl SE 295 St 121 Pl SE269 Pl SE 249St SE 251 St118 Av SE117Ct118 Ct250 Pl 250 Ct 105PlSE 272 St105 Av106 Av105 Pl271 St 271 Pl 274 Ct105 AvSt 273 107 Pl266 Ct 109 A vSE 269 St 122 Av122 W y 12 3 W y 121 W y 120Wy288 Pl SE292WySE292S t120 Av SE121 Av SESE 253 Pl &(&( INT-3442 INT-3668 INT-4376 INT-5247 INT-5543 516 515 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 13 LEFTPAGE 15 RIGHTPAGE 8 UP 14 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n n n n n ÷ n   n n 146A v140AvSESE261St144AvSESE263St 264 St SE 268 St SE264St SE270Pl SE 278 St 141AvSE129AvSE129PlSE128PlSE118AvSE12 7 Av S E SE 264 St SE 272 Pl 274 St 275 St SE270St 117AvSE118AvSESE 284 St SE 288 Pl SE 285 St SE 282 St SE 276 Pl SE 277 P lSE 284 St 283 St SE 290 Pl109AvSESE 264 Pl SE 260 St 111AvSE113AvSE1 10AvSE112AvSE109 Ct111Ct111AvSESE270 St 1 1 5 A v S E 276 St 2 6 3 P l 134Av261 St132Pl 136PlSE132 Av SE144 Av SE2 52 P l 254 St 121Av122Av123Av118Pl122 Av121 Av269 St120Pl 2 7 7 Pl 278 Ct 279 Ct 272 St 116Pl121Pl118Av121 P l 282Wy 274 St 277 Ct118Pl264St124Pl119Ct120Av264Pl122Ct263St252Pl255St121Pl259Pl 268 St114Av 126Av131Pl263 Pl115Av254St 259 Pl 116 Av SESE 248 St 108 Av SE269St111 Pl 110AvSE 281 St SE 256 St 144AvSE136 A v S E SE251StSE251Pl 1 2 6 Av SE119PlSE128 Pl1 3 1Pl262 Pl 262 Pl SE 273 Pl 126 PlSE 289 StSE 290 St 134 CtSE253 Pl SE 286 St SE 270 St SE 286 St SE 271 St 128 Av SE127 Av SE129 A v 1 4 2 A v S E 253 St 124 Av SE132 Av SE2 5 3 C t SE 252 Pl S E 2 9 1 S t108AvSE 287 St 10 7 Av109 Av SESE 2 7 4 W y 274 StSE250StSE 261 St119 Pl SE124 Av SE253 St 139Pl145Av146Av145Av130Av 145Ct139Av144 Pl 143Av27 5 Pl274St 1 2 1 Pl127Av130 Av129 Ct278St115Pl280 St 277 P l129Pl1 2 7 Av254 Pl2 73 St 139Pl126Ct110AvSE2 6 1 C t125Av258 St119Pl 111Ct110Ct259 Pl 144Pl138 Pl258 Pl SE 258 St 256 Pl 130Av257 St 263 St SE266St SE 264 259 Pl 119Dr2 7 0 S t115 Av111 Pl264 S t113 Pl261 Pl 280 Pl 281 St 281 Pl 140 Av137Pl132Pl133 Ct248 Pl249St 2 4 9St 144 Pl 2 5 1 Pl 255 Pl129PlSE252St 128 Av SE25 4C t 2 5 4 P l SE 247 Pl 121 Pl SE2 51Pl252 P l122 Pl 255 Pl117Pl 258 St SE 254 Pl 115 Av252 Pl 107 AvSE 266 St114 Pl265 Pl 115 Av268 St 270 CtSE 272 Pl 268 St 267 Pl 266 Pl118Pl263 C t261Pl256 Pl 260S t 26 2 C tSE 260 Pl 118Pl117Pl257St 122Av125Pl 126Pl265 Pl126 Av259 St 129Av258 St 130 Pl261 St 264 Pl 135 Av136 Av267 Pl 138Av270 St135Av 142AvSE141AvSE143AvSE258 Pl136AvSESE 257 Pl 256 Pl 275 Pl 276 Pl 2 7 4St275St140AvSE276 St SE 283Pl126Av124Pl276 Pl 125Av131Av2 8 0 S t1 3 1 Ct 123 Pl122 Pl281Ct121 Av123PlSE 282 St SE 280 St 120 Av SESE 276Pl 123AvSE 276 St SE 288 St 107 Av108 Av112AvSE111 Av 122PlSE 282 St 143 St143 Pl142 Pl SE1 3 7 Av139 Ct 275 Pl111Pl110 Pl 116Pl116Pl117Pl122Pl259 St 125 Pl276WySE278St 143Pl266 St 126 Ln275 St 115 Pl265 Pl 112Pl135 Pl265 St 136 Av1 3 7 A v 1 3 8 P l137 Av1137 Pl271 St 1 3 5 A v 277 St 132 Pl132 Ct249 Pl250 Ct 139 Pl SE253St 252 Pl 135Pl257 St 138AvSE258Pl 259 Pl SE 257 Ct SE 258 St SE 258 Ct 259 St 132 Pl SE 1 3 4 A v S E SE 260 Ln 142AvSE145Pl268 St 270 St 266 Pl 266 St 131 Pl SESE 271 P l1 4 0 A v 140LnSE273 Ct 274 Pl 274Ct140 Ct146 AvSE 282 Pl SE 284 St SE 288 St136 Av SE137 Av SE138 Pl SE141AvSE249 Pl 250P l S E 2 4 8 C t 255 St 123 PlSE 251 Pl 119 Av1 2 1 Av 262 Pl120PlSE 255 Pl 258 St 126PlSE258StSE 265 St122 Pl119 Av12 8 Pl 272 St 130 Av SE273 St2 7 2 Pl 273 CtPl 274Ct 2 7 3 Pl 1 2 9 SE 274 St 116 Av SESE 280 St 1 2 8 Ct 282St SE 286 Pl114AvSE112 Av SE111 Av SE248 Pl 251 Pl 251 Ct110 Ct253 Pl 249 Ct110 Pl110AvSE109Pl2 5 0 Ct SE 250 St 108AvSE106 Av SE252 St 108 Pl SESE 254 Pl 109AvSE252 Pl 253 Pl 109 Ct254 Pl 110 Av110 Av255 Pl 10 9C t Pl109110 Pl SE259109Pl256 Pl 257 St S E 257 St 256 Pl 257 P l 115 Av258 St 259 St114 AvSE 264 St 258 Pl 112 AvAvSE113260 St 260 Pl 2 6 1 S t262St 107 Av SEPl 114PlSE 277 St 114AvSESE 279 St SE 275 St 131 Av134 Pl SESE 282 St 274 Pl114 Av SE114AvSE265 St114 Ln SE262 St145Av 253 St 143 Ct251St250St251Pl110Pl120PlSE254St 266 Pl266 St 2 7 4 P l 2 7 3 C t135AvSE257 Ct 2 5 6 Pl 14 3 AvSE 260 St 144Av259 P l119 Ct119Pl136 Av SESE 280 Ct 137 Av SE136 Pl281 Pl 266 Pl SE 279 Pl SE 280 St 145 AvSE 278 St 145 PlSE 290 Pl SE 290 Pl SE 295 StSE 295 St SE 285 Pl 142PlSESE 286 Ct SE2 87 St121 Pl SE269 Pl 123Av262 Ct 133Pl132 PlSE 278 Pl SE 277 Pl 126Av126Pl124 Pl277St128 Pl SE129 Pl280 P l279Pl 268St S R 5 16 261 St 260 St 137 Av255 Pl 137 Wy254 Pl SE 249St SE 251 St118 Av SE117Ct118 Ct250 Pl 250 Ct SE 272 St 106 Av265 Ct 274 Ct St 273 107 Pl138PlSE 262 St 134 Av266 Ct 109 A vSE 269 St SE 255 St SE 273 St SE 274 St SE 252 St 136AvSE135 AV SE2 5 9 Pl259 Pl 122 Av122 W y 12 3 W y 121 W y 120Wy288 Pl SE292WySE292S t120 Av SE121 Av SESE 253 Pl &( INT-5247 INT-5543 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 14 LEFTPAGE 16 RIGHTPAGE 9 UP PAGE 17 DOWN 15 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n n n  ÷ ÷  n n 146A v 168AvSE164PlSE168PlSE168PlSE156AvSE160AvSE156AvSESE 261 St SE 251 StSE251St SE 287 St SE 2 92 St SE 280 St SE 291 Pl140AvSESE261St144AvSESE263St 2 64 St SE 268 St SE264St SE270Pl SE 278 St 141AvSESE 285 St SE279 Pl167 Pl278Pl168AvSE258 St253Pl167 Av168 Av168Pl1 6 8 Pl 167 Av251 Pl SE 264 S t153 Av SESE 275 Pl 152 W y SESE 264 St SE 263 St 2 6 5 S t SE 264 Pl SE 264 St 271 Pl 159Av260 S t2 5 8 S t160Av162 Pl161Av288 S t156 Av290 St 290St276 Pl 279 P l148Wy 1 6 2 A v 276 St 2 6 3 P l 134Av261 St132Pl SE26 7 St 136PlSESE 256 St Kent-Black Diamond Rd132 Av SE144 Av SE14 5 Ln146AvSE 2 52 Pl 254 St 282Wy 131Pl263 Pl 259 Pl Kent Kangley Rd144AvSE136 A v S E SE251StSE251Pl 188 Av SE166 Av1 3 1Pl273 St Co v i n g t o n Wy SESE 278 St 167 Pl165 Pl SE166PlSE168 Av SE150Pl134 CtSE253 Pl SE 2 4 7 St1 4 2 A v S E132 Av SE274 St146 AvSE145Pl SE 2 5 0 S t163 Ct163AvSE1 4 7 Pl S E SE 266 St 163Pl147Av158 PlPl 139Pl145Av146Av145Av130Av 145Ct147 Av139Av144 Pl 147Av143Av278St277 Pl166 Av166Av2 6 6 S t S E 262PlSE 2 6 7 Pl2 73 St 139Pl258 St 259 Pl 144Pl138 Pl256 Pl 130Av257 St SE266St SE 264 153 Av261 Pl 280 Pl 281 St 281 Pl 140 Av151 Pl SE145 Pl137Pl132Pl133 Ct248 Pl249St 2 4 9St 144 Pl 2 5 1 Pl 255 Pl 150PlSE255 Pl129PlSE252St SE 247 Pl 258 St 130 Pl261 St 264 Pl 135 Av136 Av267 Pl 138Av270 St135Av 142AvSE141AvSE143AvSE258 Pl136AvSESE 257 Pl 256 Pl 149 Av148 Av154Av274Ct267 C t269 St161 Pl265 Ct S E 262 Pl SE 263 Pl 158 Ct158Av157AvSE159Pl261 Ct261 Pl SE 283 Pl149 Pl275 Pl 278 Pl SE 276 Pl276Pl 2 7 4St275St140AvSE276 St SE 283Pl131Av1 3 1 Ct SE 282 St 143 St143 Pl142 Pl SE1 3 7 Av139 Ct 275 Pl 147 Pl252 Pl 161 Pl254 St 150P l 151 Pl150 Pl279 Pl 270 Pl270 StSE278St 143PlPl147 281 St148AvSE135 Pl265 St 136 Av1 3 7 A v 1 3 8 P l137 Av1137 Pl271 St 1 3 5 A v132 Pl132 Ct249 Pl250 Ct 139 Pl SE253St 252 Pl 135Pl257 St 138AvSE258Pl 259 Pl SE 257 Ct SE 258 St SE 258 Ct 259 St 132 Pl SE 1 3 4 A v S E SE 260 Ln 142AvSE145Pl146 Av SE268 St 270 St 266 Pl 266 St 131 Pl SESE 271 P l1 4 0 A v 140LnSE273 Ct 274 Pl 274Ct 147Av140 Ct146 Av152AvSESE 260 St 148 Av SE267 St SE 274 St SE 274Pl 151Pl148PlSE149 Av SE149 Pl SE150AvSESE 275 Pl 274 Ln SE 275 Wy SE 278 Pl 152 Av SE277 Pl SE 278 St SE 273 Pl 150 Ln153PlSESE 288 St 152AvSESE 282 Pl SE 282 Pl 149 Av SESE 284 St 146PlSESE 288 St136 Av SE137 Av SE138 Pl SE141AvSE272 St 130 Av SE274Ct SE 274 St 282St SE 275 St 131 Av134 Pl SESE 282 St 262 St145Av 253 St 143 Ct 2 7 4 P l2 7 3 C t135AvSE257 Ct 2 5 6 Pl 14 3 AvSE 260 St 144Av259 P l136 Av SESE 280 Ct 137 Av SE136 Pl281 Pl SE 279 Pl SE 280 St 276 Pl145 AvSE 278 St 145 Pl2 7 7Ct SE 285 Pl 142PlSESE 286 Ct SE2 87 St133Pl132 Pl28 0 P l279Pl 137 Av255 Pl 137 Wy254 Pl 138PlSE 262 St 134 AvSE 255 St SE 273 St SE 274 St SE 252 St 136AvSE135 AV SE&(516 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings RefreshPAGE 15 LEFT PAGE 10 UP 16 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) n n n  SE 268 St SE 278 St SE 272 Pl 274 St 275 St SE270St 117AvSE118AvSESE 284 St SE 288 Pl SE 285 St SE 282 St SE 276 Pl SE 277 P l105AvSESE 284 St 283 St SE 290 Pl109AvSE104AvSE106AvSE110AvSE112AvSE109 Ct111CtSE270 St 1 1 5 A v S E 276 St134Av136PlSE 132 Av SE121Av122Av123Av118Pl122 Av121 Av26 9 St120Pl 2 7 7 Pl 278 Ct 279 Ct 272 St 116Pl121Pl118Av121 P l 282Wy 274 St 277 Ct120Av268St108 Av SE269St111 Pl 110AvSE 281 St SE 273 Pl 126 PlSE 289 StSE 290 St SE 286 St SE 270 St SE 286 St SE 271 St 128 Av SE127 Av SES E 2 9 1 S t108AvSE 287 St SE 2 7 4 W y 124 Av SE139Pl130Av 2 7 5 Pl274St 1 2 1 Pl127Av130 Av129 Ct278St115Pl280 St 277 Pl2 7 3 St 139Pl126Ct110AvSE125Av111Ct110Ct2 7 0 S t115 Av111 Pl113 Pl280 Pl 281 St 281 Pl 140 AvSE 267 St 102AvSE268 St SE 266 St114 Pl265 Pl 115 Av268 St 270 CtSE 272 Pl 268 St 267 Pl 266 Pl 126Pl265 Pl 135 Av136 Av267 Pl 138Av270 St 2 7 4 St275St140AvSE276 St126Av124Pl276 Pl 125Av131Av2 8 0 S t1 3 1 Ct 123 Pl122 Pl281Ct121 Av 123PlSE 282 St SE 280 St 120 Av SESE 276Pl 123AvSE 276 St SE 288 St 107 Av108 Av112AvSE111 Av 122PlSE 282 St 1 3 7 Av139 Ct 275 Pl111Pl116Pl116Pl117PlSE 2 7 7 S t276Wy266 St 126 Ln275 St 115 Pl112Pl135 Pl1 3 7 A v 1 3 8 P l137 Av1137 Pl271 St 277 St 268 St 270 St 266 Pl 266 St 131 Pl SE1 4 0 A v 140LnSE140 CtSE 288 St136 Av SE137 Av SE138 Pl SE141AvSE122 Pl119 Av128 Pl 272 St 130 Av SE273 St2 7 2 Pl 273 CtPl 274Ct 2 7 3 Pl 1 2 9 SE 274 St 116 Av SESE 280 St 1 2 8 Ct 282St SE 286 P l SE 2 70 Pl SE 277 St 114AvSE106 Av SESE 279 St Gr e e n RiverRdSSE 275 St 131 Av134 Pl SESE 282 St 274 Pl114 Av SE114AvSE266 Pl266 St 2 7 4 P l2 7 3 C t135AvSE136 Av SESE 280 Ct 137 Av SE136 Pl281 Pl 266 Pl 268 St 106PlSE 279 Pl SE 280 St 272 Pl SE 273 Pl103 PlSE 290 Pl SE 290 Pl SE 295 St 127Wy125AvSE124Pl126AvSE 296 Wy SE 298 Pl SE 299 Pl SE 300 Wy 127PlSE126Ct128Ct297 Ct 129PlSE130WySE297 Pl SE 299 St SE 299St124Av125Pl128 Pl 125Ct126CtSE 302 St SE 301 St128Ct 302 Pl129AvSE 129PlSE130AvSESE 301 Pl 127PlSE132 Av SE120Av121PlSE303 Ct112AvSE SE 304 St SE 304 St SE 298 St SE 295 St 111AvSE118AvSE124 Av SE116AvSE121 Pl SE269 Pl SE 278 Pl SE 277 Pl 126Av126Pl124 Pl277St128 Pl SE129 Pl28 0 P l279Pl 268St S R 5 16105Pl SE 272 St105 Av106 Av105 Pl271 St 271 Pl 274 Ct105 AvSt 273 107 Pl138Pl266 Ct 109 A vSE 269 St SE 273 St SE 274 St 122 Av122 W y 12 3 W y 121 W y 120Wy288 Pl SE292W ySE292S t120 Av SE121 Av SESE 296 Pl Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings Refresh PAGE 15 UP BRIDGES - 17 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) SE 264 St 267 StSE 265 St 267Pl 269 St 235 Av2 71 Pl MAPLEVALLEYBLACKDIAMONDRDSE 264 St S E KENT-KANGLEYRDSUMMIT-LANDSBURGRD234 Av235 Av233 Av236Av234234 CtSE266St 233264 Pl 234 Av267Pl 235AvSEKENT-KAN G L E Y RD 235 Ct233 AvSE 276 St 234 Av235 Av236 Av SESE 286 St S E 2 8 5 St 234 Ct 241Av S E 262 Av SE268AvSE233 Pl SEMaple Valley Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings Refresh CLARK SPRINGS - 18 OF 19F 0 500 1,000 1,500 2,000Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details)        n    n   n  ÷     CrestAvSLenoraAvReitenRdHilltopAvReite n R d E Laurel St S259St88AvSHazelAvNS228St5thAvN3rdAvN1stAvN2ndAvNS234StStateW Cole St H a w l e y RdWNadenAvSMadisonAvN74AvS5th Av S5thAvS3rdAvS2ndAvS1stAvSRailroadAvSW Gowe St S 259 St S 262 StS262St S 236 St E Temperance St Valley Pl Novak Ln SummitAvNWoodford Av NRailroadAvNCanyonDr E Chicago St WynwoodDrWardSt E Guiberson St K e nsingtonAvGoweSt Bridges Av SCentralAvS4th Av SJames St W Meek er St 6th Av NW Harrison St W Meeker St W Sam St 6th Av4thAvN68AvSETitusSt85 Pl S79AvS261S t 80AvSSR167CentralAvNProspect Av NE Seattle St E S mith St 2nd Av NWashington Av NLincolnAvNThompson Av NS 228 St 6th Av N2nd Av NFrager R dS1st Av SStateAvNKennebeckAvMcmillan St Clark Av NPioneer St Hillcrest AvKensington AvStoneburnerLnGarfieldAvSOly mpicWy Cherry Hill E Filbert East LnE Hemlock St E Walnut St E Dean Jason Av NAlexanderGl e n wo o d L n Dean St George St 86AvAlpineW y71PlWCloudySt Cedar St AlvordAvNWeiland St Tacoma St E Maclyn St ScenicW y Ke n n ebec k AvE TitusStMarion S t Ellis PlViewPlWillis St W Titus St Rachael Pl W Crow St CrestPlStetson Av Se attle St Carter St S c e n ic W y Chicago StMorton St W Saar St S 231 St 66 Av SOverlook St Waterman StAdams 5thAvSS 238Pl S 239 St 63Av63AvS238 St 237 St62 Av S62AvS 233 St62 Pl63Pl66AvS67PlSS 238 PlS 239 St S 239 Pl 84 Pl S236 Pl 91 Av SS 235 Pl 89 Pl90 Wy S91WySCarter PlKirkwoodAv 87AvSW Smith St 6th AvRussell StWJamesLnRidgeview DrW James LnJamesCt James Pl James PlJames Ln63 Wy S240 Ct 242Pl S 248 Pl S 2 4 9 S t S 2 4 9 P lS R 51663 Pl S62 Pl S62 Av SS 251 S t 62 Av SS 251 Pl S 253 St S 253 Pl S 255 St S 261 St S62 WyNaden Av258Pl 88Av6 2 Pl Scenic WyS238 StWMortonSt Alder Ln E Smith St VanDeVanterAvSW Willis St S 232 St StConcord C le a rvi ew RamsayW y W Kent Sta St 1st Av N2nd Pl N3nd Pl NSR 1676 4 A v SS 236 Pl 65 Av64 Pl238 Pl &( INT-3046 INT-3189 INT-3195 INT-3203 INT-3223 INT-3227 INT-3264 INT-3266 INT-3275 INT-3332 INT-3357 INT-3408 INT-3449 INT-3455 INT-3478 INT-3605 INT-3628 INT-3629 INT-3668 INT-3712 INT-9052 181 Produced by Joseph Araucto \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Plastic Marking Refresh Mapbook.mxd Printed: January 2021 2021 Plastic Pavement Markings Refresh DOWNTOWN - 19 OF 19F 0 500 1,000 1,500Ft Intersection Marking Legend INT-123 Map Key (see Appendix A for details) 2021 Plastic Markings/Araucto A - 4 February 16, 2021 Project Number: 21-3011.2 TRAFFIC CONTROL PLANS 2019 2019 2019 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 25 ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 E GOWE ST ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.41 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SPOLICESTOP CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b . . # , ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION NO PARK BARRICADE STOP SPEED LIMIT 25 DISPLAYED 72 HRS IN ADVANCE OF CLOSURE 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH W MEEKER ST 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 25 ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 E GOWE ST ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.42 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SPOLICE STOP CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b . . # , ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION NO PARK BARRICADE STOP SPEED LIMIT 25 DISPLAYED 72 HRS IN ADVANCE OF CLOSURE 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH W MEEKER ST 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 W20-7a E GOWE ST SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.43 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 SPEED LIMIT 25 28” REFL. CONE W MEEKER ST RIGHT LANE CLOSED AHEAD W20-5R W4-2L STOP LEFT LANE CLOSED AHEAD W20-5L ROAD WORK AHEAD W20-1 W4-2R W20-7a BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE . . # , FLAGGING CHARTS SPEED LIMIT 25 SPEED LIMIT 25 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION SEQUENTIAL ARROWBOARD STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC KEEP RIGHT R4-7 18” x 24” R3-5L MODIFIED OK 18” x 24” CONE TAPER = L CONE TAPER = L 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 W20-7a E GOWE ST SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.44 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 SPEED LIMIT 25 28” REFL. CONE W MEEKER ST STOP ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE . . # , FLAGGING CHARTS SPEED LIMIT 25 SPEED LIMIT 25 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION SEQUENTIAL ARROWBOARD STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC RIGHT LANE CLOSED AHEAD W20-5R W4-2L KEEP LEFT R4-7 18” x 24” RIGHT LANE CLOSED AHEAD W20-5R W4-2L CONE TAPER = L CONE TAPER = L 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 25 ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 E GOWE ST ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.45 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SPOLICE STOP CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b . . # , ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION NO PARK BARRICADE STOP SPEED LIMIT 25 DISPLAYED 72 HRS IN ADVANCE OF CLOSURE 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH W MEEKER ST SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 25 ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 E GOWE ST ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.46 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SPOLICE STOP CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b . . # , ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION NO PARK BARRICADE STOP SPEED LIMIT 25 DISPLAYED 72 HRS IN ADVANCE OF CLOSURE 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH W MEEKER ST SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 W20-7a E GOWE ST SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.47 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 SPEED LIMIT 25 28” REFL. CONE W MEEKER ST RIGHT LANE CLOSED AHEAD W20-5R W4-2L LEFT LANE CLOSED AHEAD W20-5L ROAD WORK AHEAD W20-1 W4-2R W20-7a BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE . . # , FLAGGING CHARTS SPEED LIMIT 25 SPEED LIMIT 25 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION SEQUENTIAL ARROWBOARD STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC R3-5L MODIFIED OK 18” x 24” STOP KEEP LEFT R4-7 18” x 24” CONE TAPER = L CONE TAPER = L 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 W20-7a E GOWE ST SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.48 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-14194 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 SPEED LIMIT 25 28” REFL. CONE W MEEKER ST ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE . . # , FLAGGING CHARTS SPEED LIMIT 25 SPEED LIMIT 25 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION SEQUENTIAL ARROWBOARD STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC STOP RIGHT LANE CLOSED AHEAD W20-5R W4-2L KEEP RIGHT R4-7 18” x 24” LEFT LANE CLOSED AHEAD W20-5L W4-2R R3-5R MODIFIED OK 18” x 24” CONE TAPER = L CONE TAPER = L XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYW4-2L W4-2L RIGHT LANE CLOSED AHEAD W20-5R ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.13 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 35 POSTED SPEED LIMIT POLICE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD KENT STATION DRIVEWAYROAD WORK AHEAD W20-1 BIKES MERGE WITH TRAFFIC W4-1B BIKE LANE MAINTAINED CONE TAPER = L SPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED METRO STOP SHALL BE RELOCATEDSHOWARE DRIVEWAYW20-7a CROSSWALK CLOSED 36” x 24” R9-3XC R3-5R MODIFIED OK 18” x 24” W20-7a W JAMES ST CONE TAPER = L 3 AVE N4 AVE N5 AVE NRKC/KENT CMNS TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE RIGHT LANE CLOSED AHEAD W20-5R 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYW4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 35 POSTED SPEED LIMIT POLICE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD ROAD WORK AHEAD W20-1 SPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED SHOWARE DRIVEWAYCROSSWALK CLOSED 36” x 24” R9-3XC R3-5L MODIFIED OK 18” x 24” METRO STOP UNAFFECTED W20-7a W4-2L RIGHT LANE CLOSED AHEAD W20-5R ROAD WORK AHEAD W20-1 BIKE LANE MAINTAINED CONE TAPER = L W20-7a ROAD WORK AHEAD W20-1 W2-401 W2-401 KEEP RIGHT R4-7 18” x 24” W20-7a RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 W20-7a R3-5L MODIFIED OK 18” x 24” R3-5R MODIFIED OK 18” x 24” SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.13 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 W JAMES ST 4 AVE NW JAMES ST CONE TAPER = L RIGHT LANE CLOSED AHEAD W20-5R KENT STATION DRIVEWAYRKC/KENT CMNS3 AVE N5 AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAY 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.15 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT POLICE CONE TAPER = L SPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7bW20-7a XXXX76 GASSTATION KENTSTATIONAPTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE STRAILROAD AVE N1 AVE NRAMSEY WAY 1 AVE N2 AVE NSTOPSTOP3 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5RROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 KEEP RIGHT R4-7 18” x 24” W1-4 W20-7a R3-5R MODIFIED OK 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC4 AVE NW JAMES ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD W20-7a SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. CONE TAPER = L 4 AVE N5 AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAY 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.16 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT POLICE CONE TAPER = LSPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7bW20-7a XXXX76 GASSTATION KENTSTATIONAPTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE STRAILROAD AVE N1 AVE NRAMSEY WAY 1 AVE N2 AVE NSTOPSTOP3 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC4 AVE NW JAMES ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD W20-7a R3-5L MODIFIED OK 18” x 24” KEEP RIGHT R4-7 18” x 24” LEFT LANE CLOSED AHEAD W20-5L W4-2R SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION.4 AVE N5 AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.17 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED W JAMES ST RIGHT TURN LANE CLOSED AHEAD R3-5R MODIFIED OK 18” x 24” BIKES MERGE WITH TRAFFIC W4-1B RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 R3-5R MODIFIED OK 18” x 24” LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 3 AVE N4 AVE N5 AVE NRKC/KENT CMNSSHOWARE DRIVEWAYROAD WORK AHEAD W20-1W20-7aCONE TAPER = L RIGHT LANE CLOSED AHEAD W20-5RW4-2L CROSSWALK CLOSED 36” x 24” R9-3XC 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.18 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED W JAMES ST CROSSWALK CLOSED 36” x 24” R9-3XC R3-5R MODIFIED OK 18” x 24” ROAD WORK AHEAD W20-1 METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W20-7a LEFT LANE CLOSED AHEAD W20-5L W4-2R SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. R3-5L MODIFIED OK 18” x 24” ROAD WORK AHEAD W20-1 LEFT LANE CLOSED AHEAD W20-5LW4-2R W20-7a ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE CONE TAPER = L 3 AVE N4 AVE N5 AVE NSHOWARE DRIVEWAYRKC/KENT CMNS POLICE 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAY 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.19 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 SPEED LIMIT 35 POSTED SPEED LIMIT CONE TAPER = L SPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC4 AVE NW JAMES ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD RIGHT LANE CLOSED AHEAD W20-5R W4-2L ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.4 AVE N5 AVE NCONE TAPER = L 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAY 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.20 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 SPEED LIMIT 35 POSTED SPEED LIMIT CONE TAPER = L SPEED LIMIT 30 POSTED SPEED LIMIT METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC4 AVE NW JAMES ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE LEFT LANE CLOSED AHEAD W20-5L W4-2R R3-5L MODIFIED OK 18” x 24” BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7bW20-7a W20-7a W20-7a5 AVE NCONE TAPER = L 28” REFL. CONE SE 240 ST 120 AVE SERIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 BIKES MERGE WITH TRAFFIC W4-1B 120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.57 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 40 POSTED SPEED LIMIT CONE TAPER = L LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD R3-5R MODIFIED OK 18” x 24” SPEED LIMIT 35 POSTED SPEED LIMIT ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a W1-4 SE 240 ST 120 AV E SE28” REFL. CONE W4-2L RIGHT LANE CLOSED AHEAD W20-5R ROAD WORK AHEAD W20-1 CONE TAPER = L W20-7a BIKES MERGE WITH TRAFFIC W4-1B SE 240 ST 120 AVE SERIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 BIKES MERGE WITH TRAFFIC W4-1B 120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.58 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 40 POSTED SPEED LIMIT CONE TAPER = L LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD SPEED LIMIT 35 POSTED SPEED LIMIT ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a W2-401 R3-5L MODIFIED OK 18” x 24” KEEP RIGHT R4-7 18” x 24”120 AV E SESE 240 ST 28” REFL. CONE W4-2L RIGHT LANE CLOSED AHEAD W20-5R ROAD WORK AHEAD W20-1 CONE TAPER = L W20-7a BIKES MERGE WITH TRAFFIC W4-1B SE 240 ST 120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.59 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 W20-7a ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b POLICE STOP CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT S 240 ST120 AV E SESE 240 ST SE 240 ST 120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.60 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 W20-7a ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b POLICE STOP CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT S 240 ST120 AVE SE120 AV E SESE 240 ST SE 240 ST 120 AVE SE120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.61 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 40 POSTED SPEED LIMIT LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD SPEED LIMIT 35 POSTED SPEED LIMIT ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC W4-2L RIGHT LANE CLOSED AHEAD W20-5R ROAD WORK AHEAD W20-1W20-7a SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. CONE TAPER = L W1-4R3-5R MODIFIED OK 18” x 24” CONE TAPER = L W4-2L ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W20-7a BIKES MERGE WITH TRAFFIC W4-1B 120 AV E SESE 240 ST 28” REFL. CONE BIKES MERGE WITH TRAFFIC W4-1B SE 240 ST 120 AVE SE120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.62 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 40 POSTED SPEED LIMIT LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b CROSSWALK CLOSED 36” x 24” R9-3XC CONE TAPER = L W4-2L ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W20-7a BIKES MERGE WITH TRAFFIC W4-1B CROSSWALK CLOSED 36” x 24” R9-3XC W4-2L RIGHT LANE CLOSED AHEAD W20-5R ROAD WORK AHEAD W20-1W20-7a SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. CONE TAPER = L W2-401 W2-401 R3-5L MODIFIED OK 18” x 24” KEEP RIGHT R4-7 18” x 24” SPEED LIMIT 35 POSTED SPEED LIMIT 120 AV E SESE 240 ST 28” REFL. CONE BIKES MERGE WITH TRAFFIC W4-1B SE 240 ST 120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.63 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ROAD WORK AHEAD W20-1W20-7a BE PREPARED TO STOP W20-7b POLICE STOP W20-7a ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH S 240 ST SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.120 AV E SESE 240 ST SE 240 ST 120 AVE SETRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.64 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ROAD WORK AHEAD W20-1W20-7a BE PREPARED TO STOP W20-7b POLICE STOP W20-7a ROAD WORK AHEAD W20-1 W20-7a ONE LANE ROAD AHEAD W20-4 CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH S 240 ST SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.120 AV E SESE 240 ST 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 40 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.33 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. STOP W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b METRO STOP UNAFFECTED SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC S 200 ST108 AVE SELEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 40 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.34 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. STOP W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b METRO STOP UNAFFECTED SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC S 200 ST108 AVE SELEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.35 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 POLICE METRO STOP UNAFFECTED RIGHT LANE CLOSED AHEAD W20-5R W4-2L W1-4 RIGHT LANE CLOSED AHEAD W20-5R BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC R3-5R MODIFIED OK 18” x 24” BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 W20-7a S 200 ST 28” REFL. CONE 108 AVE SECONE TAPER = L SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. CONE TAPER = L 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.36 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 POLICE METRO STOP UNAFFECTED RIGHT LANE CLOSED AHEAD W20-5R W4-2L W1-4 RIGHT LANE CLOSED AHEAD W20-5R BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 W20-7a S 200 ST 28” REFL. CONE 108 AVE SECONE TAPER = L SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. W2-401 KEEP RIGHT R4-7 18” x 24” R3-5L MODIFIED OK 18” x 24” CONE TAPER = L 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 40 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.37 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. STOP W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b METRO STOP UNAFFECTED SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC S 200 ST 108 AVE SELEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 40 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.38 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b METRO STOP UNAFFECTED SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC S 200 ST 108 AVE SELEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. STOP 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.39 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 POLICE METRO STOP SHALL BE RELOCATED RIGHT LANE CLOSED AHEAD W20-5R W4-2L RIGHT LANE CLOSED AHEAD W20-5R BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 W20-7a S 200 ST 28” REFL. CONE 108 AVE SECONE TAPER = L SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. CONE TAPER = L R3-5R MODIFIED OK 18” x 24” W1-4 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.40 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 POLICE METRO STOP UNAFFECTED RIGHT LANE CLOSED AHEAD W20-5R W4-2L RIGHT LANE CLOSED AHEAD W20-5R BE PREPARED TO STOP W20-7b W20-7a ROAD WORK AHEAD W20-1 W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 S 200 ST 28” REFL. CONE 108 AVE SECONE TAPER = L SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. R3-5L MODIFIED OK 18” x 24” CONE TAPER = L W1-4 W2-401 W20-7a KEEP RIGHT R4-7 18” x 24” XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a RIGHT LANE CLOSED AHEAD W20-5RW4-2L W20-7a KEEP LEFT R4-7 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 28” REFL. CONE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED METRO STOP UNAFFECTED LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE MATCH KPM 2021.2ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.1 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W2-401 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L THIS CLOSURE SHALL ONLY BE IMPLEMENTED FOR CROSSWALK WORK. WHEN COMPLETED, ROAD SHALL BE OPENED TO IT’S FULL WIDTH. CONTACT METRO PRIOR TO WORK. W JAMES ST3 AVE N2 AVE N1 AVE NRAILROAD AVE N1 AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a RIGHT LANE CLOSED AHEAD W20-5RW4-2L W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.2 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED MATCH KPM 2021.1SPEED LIMIT 35 POSTED SPEED LIMIT POLICE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L CROSSWALK CLOSED 36” x 24” R9-3XCR3-5R MODIFIED OK 18” x 24”CENTRAL AVE NN STATE STWOODFORD AVE NE JAMES ST 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a W20-7a KEEP LEFT R4-7 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED METRO STOP UNAFFECTED LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE MATCH KPM 2021.4ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.3 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W JAMES ST3 AVE N2 AVE N1 AVE NRAILROAD AVE N1 AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a RIGHT LANE CLOSED AHEAD W20-5RW4-2L W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.4 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED MATCH KPM 2021.3SPEED LIMIT 35 POSTED SPEED LIMIT POLICE KEEP RIGHT R4-7 18” x 24” W2-401 RIGHT LANE CLOSED AHEAD W20-5R W4-2L W20-7a KEEP RIGHT R4-7 18” x 24” R3-5L MODIFIED OK 18” x 24” LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L R3-5L MODIFIED OK 18” x 24” E JAMES STN STATE STWOODFORD AVE NCENTRAL AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYSUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.5 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L W20-7a W20-7a RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED W1-4 KEEP LEFT R4-7 18” x 24” POLICE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L R3-5R MODIFIED OK 18” x 24” E JAMES STCENTRAL AVE NRAILROAD AVE NE GEORGE ST CONE TAPER = L 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYSUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.6 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L W20-7a W20-7a RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED KEEP RIGHT R4-7 18” x 24” W1-4 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L R3-5L MODIFIED OK 18” x 24” E JAMES STCENTRAL AVE NRAILROAD AVE NE GEORGE ST 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a RIGHT LANE CLOSED AHEAD W20-5RW4-2L W20-7a KEEP LEFT R4-7 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 28” REFL. CONE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED METRO STOP UNAFFECTED LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE MATCH KPM 2021.8ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.7 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W JAMES ST3 AVE N2 AVE N1 AVE NRAILROAD AVE N1 AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.8 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED MATCH KPM 2021.7SPEED LIMIT 35 POSTED SPEED LIMIT POLICE 76 GAS STATION CROSSWALK CLOSED 36” x 24” R9-3XC R3-5R MODIFIED OK 18” x 24” LEFT LANE CLOSED AHEAD W20-5L W4-2R LEFT LANE CLOSED AHEAD W20-5LW4-2R KEEP RIGHT R4-7 18” x 24” R3-5L MODIFIED OK 18” x 24” LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L R3-5L MODIFIED OK 18” x 24” E JAMES STCENTRAL AVE NN STATE STWOODFORD AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST 1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a RIGHT LANE CLOSED AHEAD W20-5RW4-2L W20-7a KEEP LEFT R4-7 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 28” REFL. CONE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED METRO STOP UNAFFECTED LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE MATCH KPM 2021.10ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.9 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W JAMES ST3 AVE N2 AVE N1 AVE N1 AVE NRAILROAD AVE N1 AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYRIGHT LANE CLOSED AHEAD W20-5R W4-2L BIKES MERGE WITH TRAFFIC W4-1B ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 BNSFW20-7a ROAD WORK AHEAD W20-1 W20-7a W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.10 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED MATCH KPM 2021.9SPEED LIMIT 35 POSTED SPEED LIMIT POLICE 76 GAS STATION CROSSWALK CLOSED 36” x 24” R9-3XC R3-5R MODIFIED OK 18” x 24” W1-4 KEEP LEFT R4-7 18” x 24” LEFT LANE CLOSED AHEAD W20-5L W4-2R LEFT LANE CLOSED AHEAD W20-5LW4-2R KEEP RIGHT R4-7 18” x 24” R3-5L MODIFIED OK 18” x 24” R3-5L MODIFIED OK 18” x 24” R3-5R MODIFIED OK 18” x 24” LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L E JAMES STN STATE STWOODFORD AVE NCENTRAL AVE N28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYSUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.11 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L W20-7a W20-7a RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED POLICE W1-4 76 GAS STATION KEEP LEFT R4-7 18” x 24” R3-5R MODIFIED OK 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC W2-401R3-5R MODIFIED OK 18” x 24” LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = LCENTRAL AVE NW JAMES ST RAILROAD AVE NCONE TAPER = L E GEORGE ST 28” REFL. CONE XXXX76 GAS STATION KENT STATION APTS E JAMES STN STATE STWOODFORD AVE NPROSPECT AVE NJASON AVE NCLARK AVE NCENTRAL AVE NE GEORGE ST RAILROAD AVE N1 AVE NW JAMES ST1 AVE N2 AVE NSTOPSTOP3 AVE N4 AVE NRKC/KENT CMNS5 AVE NKENT STATION DRIVEWAYSUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.12 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L W20-7a W20-7a ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7bW20-7a ROAD WORK AHEAD W20-1 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOP UNAFFECTED LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD POLICE 76 GAS STATIONCROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b KEEP RIGHT R4-7 18” x 24” W2-401 R3-5L MODIFIED OK 18” x 24” CONE TAPER = L E JAMES STCENTRAL AVE NRAILROAD AVE NE GEORGE ST 28” REFL. CONE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 35 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.65 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC E PIONEER ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.CENTRAL AVE NE PIONEER ST RAILROAD AVE NSTOP ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b 28” REFL. CONE POLICE ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 35 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.66 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC E PIONEER ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.CENTRAL AVE NE PIONEER ST RAILROAD AVE NSTOP ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b 28” REFL. CONE POLICE ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.67 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L W20-7a W20-7a RIGHT LANE CLOSED AHEAD W20-5R W4-2L BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7bW20-7a TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 25 POLICE W1-4 R3-5R MODIFIED OK 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L CONE TAPER = L E PIONEER ST CENTRAL AVE N28” REFL. CONE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.68 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L W20-7a W20-7a RIGHT LANE CLOSED AHEAD W20-5R W4-2L BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7bW20-7a TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L CONE TAPER = L E PIONEER ST CENTRAL AVE NW1-4 R3-5L MODIFIED OK 18” x 24” POLICE KEEP RIGHT R4-7 18” x 24” 28” REFL. CONE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 35 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.69 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC E PIONEER ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.CENTRAL AVE NE PIONEER ST RAILROAD AVE NSTOP ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b POLICE 28” REFL. CONE ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 35 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.70 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1W20-7a ONE LANE ROAD AHEAD W20-4 . . # , SPEED LIMIT 25 CROSSWALK CLOSED 36” x 24” R9-3XC E PIONEER ST LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.CENTRAL AVE NE PIONEER ST RAILROAD AVE NSTOP ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b POLICE 28” REFL. CONE ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 45 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 116 AVE SEMETRO STOP UNAFFECTED CONE TAPER = L W20-7a POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L W1-4 R3-5R MODIFIED OK 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7b CONE TAPER = L W20-7a METRO STOP SHALL BE RELOCATED ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.75 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SPEED LIMIT 45 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 116 AVE SEMETRO STOP UNAFFECTED CONE TAPER = L W20-7a POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L W1-4 CROSSWALK CLOSED 36” x 24” R9-3XC RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7b CONE TAPER = L W20-7a METRO STOP SHALL BE RELOCATED ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.76 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W2-401 R3-5L MODIFIED OK 18” x 24” KEEP RIGHT R4-7 18” x 24” 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.77 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE METRO STOP UNAFFECTED SPEED LIMIT 45 POSTED SPEED LIMIT 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W20-7a W1-4 R3-5R MODIFIED OK 18” x 24” W20-7a BE PREPARED TO STOP W20-7b BE PREPARED TO STOP W20-7b W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BIKES MERGE WITH TRAFFIC W4-1B CONE TAPER = L 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.78 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE METRO STOP UNAFFECTED SPEED LIMIT 45 POSTED SPEED LIMIT 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W20-7a W20-7a BE PREPARED TO STOP W20-7b BE PREPARED TO STOP W20-7b W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BIKES MERGE WITH TRAFFIC W4-1B CONE TAPER = L W2-401 R3-5L MODIFIED OK 18” x 24” KEEP RIGHT R4-7 18” x 24” 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 116 AVE SEMETRO STOP UNAFFECTED CONE TAPER = L W20-7a POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L R3-5R MODIFIED OK 18” x 24” CROSSWALK CLOSED 36” x 24” R9-3XC RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b W20-7a BE PREPARED TO STOP W20-7b CONE TAPER = L W20-7a METRO STOP SHALL BE RELOCATED ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.79 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 45 POSTED SPEED LIMIT W1-4 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 28” REFL. CONE SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 116 AVE SEMETRO STOP UNAFFECTED CONE TAPER = L W20-7a POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L CROSSWALK CLOSED 36” x 24” R9-3XC RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a W20-7a BE PREPARED TO STOP W20-7b CONE TAPER = L W20-7a METRO STOP SHALL BE RELOCATED ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.80 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT SPEED LIMIT 45 POSTED SPEED LIMIT W1-4 W2-401 KEEP RIGHT R4-7 18” x 24” R3-5L MODIFIED OK 18” x 24” BE PREPARED TO STOP W20-7b 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.81 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 28” REFL. CONE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 114 AVE SEADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOPUNAFFECTED ROAD WORK AHEAD W20-1 METRO STOPUNAFFECTEDSPEEDLIMIT45POSTEDSPEEDLIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS.UPO SHALL COUNTERMAND SIGNAL.(REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER)UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION.CONE TAPER = L POLICECROSSWALKCLOSED36” x 24”R9-3XC KENT-KANGLEY RDRIGHT LANECLOSEDAHEAD W20-5RW4-2L ROADWORKAHEAD W20-1114 AVE SEROADWORKAHEAD W20-1ROADWORKAHEADW20-1ADVANCE WARNING SIGNSSPACED @ (X) OR AS PER SITE CONDITIONS.REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W20-7aW1-4 W20-7a BEPREPAREDTOSTOPW20-7bBEPREPAREDTOSTOPW20-7b W20-7a CROSSWALKCLOSED36” x 24”R9-3XCBIKESMERGE WITHTRAFFICW4-1B CONE TAPER = L RIGHT LANE CLOSED AHEAD W20-5R W4-2L R3-5RMODIFIEDOK18” x 24” W1-4 W20-7a W2-401 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE MATCH KPM 2021.82 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 28” REFL. CONE 114 AVE SEMETRO STOP UNAFFECTED METRO STOP UNAFFECTED SPEED LIMIT 45 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. CONE TAPER = L POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W20-7a W1-4 W20-7a BE PREPARED TO STOP W20-7b BE PREPARED TO STOP W20-7b W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BIKES MERGE WITH TRAFFIC W4-1B CONE TAPER = L RIGHT LANE CLOSED AHEAD W20-5R W4-2L R3-5R MODIFIED OK 18” x 24” W1-4 W20-7a W2-401 MATCH KPM 2021.81 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.82 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.83 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 28” REFL. CONE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 114 AVE SEADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT METRO STOPUNAFFECTED ROAD WORK AHEAD W20-1 METRO STOPUNAFFECTEDSPEEDLIMIT45POSTEDSPEEDLIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS.UPO SHALL COUNTERMAND SIGNAL.(REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER)UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION.CONE TAPER = L POLICECROSSWALKCLOSED36” x 24”R9-3XC KENT-KANGLEY RDRIGHT LANECLOSEDAHEAD W20-5RW4-2L ROADWORKAHEAD W20-1114 AVE SEROADWORKAHEAD W20-1ROADWORKAHEADW20-1ADVANCE WARNING SIGNSSPACED @ (X) OR AS PER SITE CONDITIONS.REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W20-7aW1-4 W20-7a BEPREPAREDTOSTOPW20-7bBEPREPAREDTOSTOPW20-7b W20-7a CROSSWALKCLOSED36” x 24”R9-3XCBIKESMERGE WITHTRAFFICW4-1B CONE TAPER = L RIGHT LANE CLOSED AHEAD W20-5R W4-2L R3-5RMODIFIEDOK18” x 24” W1-4 W20-7a W2-401 TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE MATCH KPM 2021.84 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD 28” REFL. CONE 114 AVE SEMETRO STOP UNAFFECTED METRO STOP SHALL BE RELOCATED SPEED LIMIT 45 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. CONE TAPER = L POLICE CROSSWALK CLOSED 36” x 24” R9-3XC KE N T -KA N G L E Y R D RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1114 AVE SEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 35 POSTED SPEED LIMIT W20-7a W1-4 W20-7a BE PREPARED TO STOP W20-7b W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC BIKES MERGE WITH TRAFFIC W4-1B CONE TAPER = L RIGHT LANE CLOSED AHEAD W20-5R W4-2L W1-4 W20-7a W2-401 MATCH KPM 2021.83 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@trafficcontrolplan.net KPM 2021.84 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD W2-401 W4-2L RIGHT LANE CLOSED AHEAD W20-5R R3-5L MODIFIED OK 18” x 24” KEEP RIGHT R4-7 18” x 24” CONE TAPER = L 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.85 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.N LINCOLN AVEROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W MEEKER ST STOP LEGEND WORK AREA SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP W MEEKER ST SPEED LIMIT 30 POSTED SPEED LIMIT SPEED LIMIT 30 POSTED SPEED LIMIT 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE CROSSWALK CLOSED 36” x 24” R9-3XC W SMITH ST RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 W4-2LSTATE AVE NCENTRAL AVE NRIGHT LANE CLOSED AHEAD W20-5R W2-401 TRAFFIC REVISION AHEAD W20-901 KEEP LEFT R4-7 18” x 24” W1-4 W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.49 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 30 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT CONE TAPER = L CONE TAPER = L CONE TAPER = L LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD R3-5R MODIFIED OK 18” x 24”N KENNEBECK AVESPEED LIMIT 25 W SMITH STSTATE AVE NCENTRAL AVE N28” REFL. CONE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE CROSSWALK CLOSED 36” x 24” R9-3XC RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 W4-2LSTATE AVE NCENTRAL AVE NRIGHT LANE CLOSED AHEAD W20-5R W2-401 TRAFFIC REVISION AHEAD W20-901 KEEP LEFT R4-7 18” x 24” W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.50 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 30 POSTED SPEED LIMIT SPEED LIMIT 35 POSTED SPEED LIMIT CONE TAPER = L CONE TAPER = L CONE TAPER = L LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD W2-401 R3-5L MODIFIED OK 18” x 24” KEEP RIGHT R4-7 18” x 24”N KENNEBECK AVESPEED LIMIT 25 W SMITH ST CENTRAL AVE NW SMITH STSTATE AVE N28” REFL. CONE TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE POLICE STOP W20-7a ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ONE LANE ROAD AHEAD W20-4 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.51 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.STATE AVE NROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH SPEED LIMIT 25 W SMITH STW SMITH STSTATE AVE N TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE POLICE STOP W20-7a ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ONE LANE ROAD AHEAD W20-4 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.52 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.STATE AVE NROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH SPEED LIMIT 25 W SMITH STW SMITH STSTATE AVE N TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE CROSSWALK CLOSED 36” x 24” R9-3XC W4-2LSTATE AVE NRIGHT LANE CLOSED AHEAD W20-5R W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 30 POSTED SPEED LIMIT CONE TAPER = L CONE TAPER = L LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARDN KENNEBECK AVECENTRAL AVE N 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 W1-4R3-5R MODIFIED OK 18” x 24” SPEED LIMIT 25 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.53 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 W SMITH ST CENTRAL AVE NW SMITH STSTATE AVE N28” REFL. CONE TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE CROSSWALK CLOSED 36” x 24” R9-3XC W4-2LSTATE AVE NRIGHT LANE CLOSED AHEAD W20-5R W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. POLICE ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. SPEED LIMIT 30 POSTED SPEED LIMIT CONE TAPER = L CONE TAPER = L LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARDN KENNEBECK AVECENTRAL AVE N 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W20-5R W4-2L ROAD WORK AHEAD W20-1 SPEED LIMIT 25 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.54 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 W2-401 KEEP RIGHT R4-7 18” x 24”W2-401 R3-5L MODIFIED OK 18” x 24” W SMITH ST CENTRAL AVE NW SMITH STSTATE AVE N28” REFL. CONE TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE POLICE STOP W20-7a ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ONE LANE ROAD AHEAD W20-4 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.55 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.STATE AVE NROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH SPEED LIMIT 25 W SMITH STSTATE AVE NW SMITH ST TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE POLICE STOP W20-7a ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 W20-7a BE PREPARED TO STOP W20-7b ONE LANE ROAD AHEAD W20-4 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: . . # , SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.56 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1W20-7a CROSSWALK CLOSED 36” x 24” R9-3XC LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART.STATE AVE NROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b BE PREPARED TO STOP W20-7b 28” REFL. CONE. OFFSET CONES TO MAINTAIN 11’ MIN. TRAVEL LANE WIDTH SPEED LIMIT 25 W SMITH STW SMITH STSTATE AVE N TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE . . # , LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.71 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 25 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ONE LANE ROAD AHEAD W20-4 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. STOP ROAD WORK AHEAD W20-1 POLICE 28” REFL. CONE BE PREPARED TO STOP W20-7bE TITUS STRE I T E N R D W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 Mill Creek Canyon Ear thworks Park CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE . . # , LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.72 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 25 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ONE LANE ROAD AHEAD W20-4 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. STOP ROAD WORK AHEAD W20-1 POLICE 28” REFL. CONE BE PREPARED TO STOP W20-7bE TITUS STRE I T E N R D W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 Mill Creek Canyon Ear thworks Park CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE . . # , LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.73 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 25 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. STOP ROAD WORK AHEAD W20-1 POLICE 28” REFL. CONE BE PREPARED TO STOP W20-7b E TITUS STRE I T E N R D W20-7a ONE LANE ROAD AHEAD W20-4 ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 Mill Creek Canyon Ear thworks Park CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT BE PREPARED TO STOP W20-7b TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE . . # , LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW FLAGGING STATION STOP 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.74 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 25 POSTED SPEED LIMIT SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. STOP ROAD WORK AHEAD W20-1 POLICE 28” REFL. CONE BE PREPARED TO STOP W20-7b E TITUS STRE I T E N R D W20-7a ROAD WORK AHEAD W20-1 W20-7a ROAD WORK AHEAD W20-1 Mill Creek Canyon Ear thworks Park CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 30 POSTED SPEED LIMIT BE PREPARED TO STOP W20-7b ONE LANE ROAD AHEAD W20-4 2019 2019 2019 S 212 ST ROAD WORK AHEAD W20-1 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED CONE TAPER = L TRAFFIC REVISION AHEAD W20-901 W20-7a ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501 W4-2L W1-4 W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT TWO LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a R3-5R MODIFIED OK 18” x 24” SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE CROSSWALK CLOSED 36” x 24” R9-3XC SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.21 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 28” REFL. CONE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD66 AVE SMATCH KPM 2021.22KEEP LEFT R4-7 18” x 24” S 212 ST ROAD WORK AHEAD W20-1 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED CONE TAPER = L TRAFFIC REVISION AHEAD W20-901 W20-7a ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L W1-4 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT TWO LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a R3-5R MODIFIED OK 18” x 24” SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.22 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 28” REFL. CONE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD66 AVE S68 AVE SCONE TAPER = L 28” REFL. CONEMATCH KPM 2021.21SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a POLICE S 212 ST ROAD WORK AHEAD W20-1 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED CONE TAPER = L TRAFFIC REVISION AHEAD W20-901 W20-7a ROAD WORK AHEAD W20-1 W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT TWO LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE CROSSWALK CLOSED 36” x 24” R9-3XC SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.23 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 28” REFL. CONE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD66 AVE SR3-5L MODIFIED OK 18” x 24” LEFT LANE CLOSED AHEAD W20-5L W4-2R MATCH KPM 2021.24KEEP RIGHT R4-7 18” x 24” S 212 ST ROAD WORK AHEAD W20-1 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED CONE TAPER = L TRAFFIC REVISION AHEAD W20-901 W20-7a ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L W1-4 W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT TWO LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a R3-5R MODIFIED OK 18” x 24” SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.24 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 28” REFL. CONE 66 AVE S68 AVE SCONE TAPER = L 28” REFL. CONEMATCH KPM 2021.23SIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. W20-7a LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD S 212 ST 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED CONE TAPER = L POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 50 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.25 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 28” REFL. CONE 68 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. RIGHT LANE CLOSED AHEAD W20-5R ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 W4-2L RIGHT TWO LANES CLOSED AHEAD W20-501 CROSSWALK CLOSED 36” x 24” R9-3XC METRO STOP UNAFFECTED ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 R3-5R MODIFIED OK 18” x 24” W20-7a W4-2L W1-4 SPEED LIMIT 40 POSTED SPEED LIMIT ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W20-7a S 212 ST 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 50 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 28” REFL. CONE 68 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC METRO STOP UNAFFECTED BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W20-7a BE PREPARED TO STOP W20-7b W4-2R LEFT TWO LANES CLOSED AHEAD W20-501 R3-5L MODIFIED OK 18” x 24” ROAD WORK AHEAD W20-1 W4-2R SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.26 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 KEEP RIGHT R4-7 18” x 24” LEFT TURN LANE CLOSED AHEAD 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD S 212 ST ROAD WORK AHEAD W20-1 METRO STOP UNAFFECTED CONE TAPER = L W20-7a W4-2L W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED 28” REFL. CONE 66 AVE SCROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b W1-4 SPEED LIMIT 40 POSTED SPEED LIMIT R3-5R MODIFIED OK 18” x 24”MATCH KPM 2021.28ROAD WORK AHEAD W20-1 RIGHT TWO LANES CLOSED AHEAD W20-501 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.27 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. CONE TAPER = L S 212 ST ROAD WORK AHEAD W20-1 METRO STOP UNAFFECTED CONE TAPER = L W20-7a ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 28” REFL. CONE 66 AVE SCROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b W1-4 KEEP LEFT R4-7 18” x 24” 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.28 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARDMATCH KPM 2021.27CONE TAPER = L SPEED LIMIT 40 POSTED SPEED LIMIT R3-5R MODIFIED OK 18” x 24” 28” REFL. CONE 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD S 212 ST ROAD WORK AHEAD W20-1 METRO STOP UNAFFECTED CONE TAPER = L W20-7a W4-2L W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED 28” REFL. CONE 66 AVE SCROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b W1-4 SPEED LIMIT 40 POSTED SPEED LIMIT R3-5R MODIFIED OK 18” x 24”MATCH KPM 2021.30ROAD WORK AHEAD W20-1 RIGHT TWO LANES CLOSED AHEAD W20-501 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.29 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. R3-5R MODIFIED OK 18” x 24” R3-5L MODIFIED OK 18” x 24” CONE TAPER = L S 212 ST ROAD WORK AHEAD W20-1 METRO STOP UNAFFECTED CONE TAPER = L W20-7a ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 RIGHT THREE LANES CLOSED AHEAD W20-501W4-2L ROAD WORK AHEAD W20-1 W4-2L ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT SPEED LIMIT 50 POSTED SPEED LIMIT METRO STOP UNAFFECTED ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. 28” REFL. CONE 66 AVE SCROSSWALK CLOSED 36” x 24” R9-3XC BE PREPARED TO STOP W20-7b 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.30 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARDMATCH KPM 2021.29CONE TAPER = LSPEED LIMIT 40 POSTED SPEED LIMIT 28” REFL. CONE KEEP RIGHT R4-7 18” x 24” W2-401 W1-4 S 212 ST 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 50 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 28” REFL. CONE 68 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC METRO STOP UNAFFECTED BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W20-7a ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.31 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 RIGHT LANE CLOSED AHEAD W20-5R W4-2L RIGHT THREE LANES CLOSED AHEAD W20-501 W4-2L W4-2L W1-4 KEEP LEFT R4-7 18” x 24” R3-5R MODIFIED OK 18” x 24” CONE TAPER = L S 212 ST 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES ().MANDATORY 3. ALERT KING COUNTY METRO CONSTRUCTION 5 DAYS IN ADVANCE OF CLOSURE: 206-477-1140 4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 5. ALL SIGNS MIN. 48” x 48” UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28” REFL. CONES (see TABLE (1) for spacing distances). 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT-GRADE INTERSECTIONS AND/OR DRIVEWAYS. GENERAL NOTES: METRO STOP UNAFFECTED POLICE POLICE CROSSWALK CLOSED 36” x 24” R9-3XC SPEED LIMIT 50 POSTED SPEED LIMIT TRAFFIC CONTROL PLAN KENT, WA NOT TO SCALE 28” REFL. CONE 68 AVE SSIGNAL SHALL FLASH RED-ALL DIRECTIONS. UPO SHALL COUNTERMAND SIGNAL. (REQUIRES OFF-DUTY LAW ENFORCEMENT OFFICER) UPO SHALL CONTROL ALL TRAFFIC MOVEMENTS WITHIN INTERSECTION. ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 CROSSWALK CLOSED 36” x 24” R9-3XC METRO STOP UNAFFECTED BE PREPARED TO STOP W20-7b W20-7a W20-7a BE PREPARED TO STOP W20-7b ROAD WORK AHEAD W20-1 W20-7a SPEED LIMIT 40 POSTED SPEED LIMIT ADVANCE WARNING SIGNS SPACED @ (X) OR AS PER SITE CONDITIONS. REFER TO SIGN SPACING CHART. LEGEND WORK AREA 28” REFL. CONE SIGN LOCATION EXISTING TRAFFIC FLOW SEQUENTIAL ARROWBOARD CONE TAPER = L W20-7a ROAD WORK AHEAD W20-1 SUPERVISOR PHONE NUMBER (office) 1/16/20 CONTRACTOR Kent, WA PROJECT LOCATION PHONE NUMBER (fax)SHEET NUMBER DATE PREPARED BY Chris Grose E-MAIL chris@traf ficcontrolplan.net KPM 2021.32 JOB NAME Traffic of WA ControlPlan Co. PHONE# 253-258-1419 W4-2L KEEP RIGHT R4-7 18” x 24” R3-5L MODIFIED OK 18” x 24” BE PREPARED TO STOP W20-7b RIGHT TWO LANES CLOSED AHEAD W20-501 W4-2L W1-4 2021 Plastic Markings/Araucto A - 5 February 16, 2021 Project Number: 21-3011.2 PREVAILING WAGE RATES State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 02/23/2021 County King King King King King King King King King King King King King King King King King Trade Asbestos Abatement Workers Boilermakers Brick Mason Brick Mason Building Service Employees Building Service Employees Building Service Employees Building Service Employees Cabinet Makers (In Shop). Carpenters Carpenters Carpenters Carpenters Carpenters Carpenters Carpenters Cement Masons King Cement Masons King Cement Masons King Cement Masons King King King King King King King Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Job Classification Journey Level Journey Level Journey Level Pointer -Caulker -Cleaner Janitor Traveling Waxer/Shampooer Window Cleaner (Non -Scaffold) Window Cleaner (Scaffold) Journey Level Acoustical Worker Carpenter Carpenters on Stationary Tools Creosoted Material Floor Finisher Floor Layer Scaffold Erector Application of all Composition Mastic Application of all Epoxy Material Application of all Plastic Material Application of Sealing Compound Application of Underlayment Building General Composition or Kalman Floors Concrete Paving Curb Et Gutter Machine Curb Et Gutter, Sidewalks Curing Concrete Wage Holiday Overtime Note $52.39 $69.29 $60.57 $60.57 $26.28 $26.63 $29.33 $30.33 $22.74 $64.94 $64.94 $65.07 $65.07 $64.94 $64.94 $64.94 $64.84 5D 5N 7E 7E 5S 5S 5S 5S 7A 7A 7A 7A 7A 7A 7A 7A $64.34 7A $64.84 7A $64.34 7A 1H 1C 1N 1N 2F 2F 2F 2F 1 4C 4C 4C 4C 4C 4C 4C 4U *Risk Class View View View View View View View View View View View View View View View View View 4U View 4U View 4U View $64.84 7A 41J View 1 $64.34 7A 41J View $64.84 7A 41J View $64.34 7A 41J View $64.84 7A 41J View $64.34 7A 41J View $64.34 7A 41J View King King King King King King King King King King King King King Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons Cement Masons King Cement Masons King Cement Masons King Cement Masons King Cement Masons King King King King King King King King King King King King King King King King King King King King King King King Cement Masons Divers Et Tenders Divers Et Tenders Divers Et Tenders Divers Et Tenders Divers Et Tenders Divers Et Tenders Divers Et Tenders Divers Et Tenders Divers Et Tenders Dredge Workers Dredge Workers Dredge Workers Dredge Workers Dredge Workers Dredge Workers Dredge Workers Drywall Applicator Drywall Tapers Electrical Fixture Maintenance Workers Electricians - Inside Electricians - Inside Electricians - Inside Finish Colored Concrete Floor Grinding Floor Grinding/Polisher Green Concrete Saw, self - powered Grouting of all Plates Grouting of all Tilt -up Panels Gunite Nozzleman Hand Powered Grinder Journey Level Patching Concrete Pneumatic Power Tools Power Chipping Et Brushing Sand Blasting Architectural Finish Screed Et Rodding Machine Spackling or Skim Coat Concrete Troweling Machine Operator Troweling Machine Operator on Colored Slabs Tunnel Workers Bell/Vehicle or Submersible Operator (Not Under Pressure) Dive Supervisor/Master Diver Diver On Standby Diver Tender Manifold Operator Manifold Operator Mixed Gas Remote Operated Vehicle Operator/Technician Remote Operated Vehicle Tender Assistant Engineer Assistant Mate (Deckhand) Boatmen Engineer Welder Leverman, Hydraulic Mates Oiler Journey Level Journey Level Journey Level $64.84 7A 4U View $64.84 7A 4U View $64.34 7A 4U View $64.84 7A 4U View $64.34 7A 4U View $64.34 7A 4U View $64.84 7A 4U View $64.84 7A 4U View $64.34 7A 4U View $64.34 7A 4U View $64.84 7A 4U View $64.84 7A 4U View $64.84 7A 4U View $64.84 7A 4U View $64.34 7A 4U View $64.84 7A 4U View $64.84 7A 4U View $64.84 7A 4U View $118.80 7A 4C View $81.98 7A 4C View $118.80 7A 4C 8V View $76.98 7A 4C View $69.91 7A 4C View $69.91 7A 4C View $74.91 7A 4C View $69.91 7A 4C View $65.19 7A 4C View $70.62 5D 3F View $70.07 5D 3F View $70.62 5D 3F View $71.97 5D 3F View $73.41 5D 3F View $70.62 5D 3F View $70.07 5D 3F View $64.94 5D 1 H View $65.31 5P 1 E View $31.99 5L 1 E View Cable Splicer $89.11 7C 4E View Cable Splicer (tunnel) $95.77 7C 4E View Certified Welder $86.08 7C 4E View King Electricians - Inside Certified Welder (tunnel) $92.44 7C 4E View King Electricians - Inside Construction Stock Person $43.18 7C 4E View King Electricians - Inside Journey Level $83.05 7C 4E View King Electricians - Inside Journey Level (tunnel) $89.11 7C 4E View King Electricians - Motor Shop Journey Level $47.53 5A 1 B View King Electricians - Powerline Cable Splicer $82.39 5A 4D View Construction King Electricians - Powerline Certified Line Welder $75.64 5A 4D View Construction King Electricians - Powerline Groundperson $49.17 5A 4D View Construction King Electricians - Powerline Heavy Line Equipment $75.64 5A 4D View Construction Operator King Electricians - Powerline Journey Level Lineperson $75.64 5A 4D View Construction King Electricians - Powerline Line Equipment Operator $64.54 5A 4D View Construction King Electricians - Powerline Meter Installer $49.17 5A 4D 8W View Construction King Electricians - Powerline Pole Sprayer $75.64 5A 4D View Construction King Electricians - Powerline Powderperson $56.49 5A 4D View Construction King Electronic Technicians Journey Level $53.57 7E 1 E View King Elevator Constructors Mechanic $97.31 7D 4A View King Elevator Constructors Mechanic In Charge $105.06 7D 4A View King Fabricated Precast Concrete All Classifications - In -Factory $18.25 5B 1 R View Products Work Only King Fence Erectors Fence Erector $44.40 7A 4V 8Y View King Fence Erectors Fence Laborer $44.40 7A 4V 8Y View King Flaggers Journey Level $44.40 7A 4V 8Y View King Glaziers Journey Level $69.26 7L 1Y View King Heat Et Frost Insulators And Journeyman $79.43 5J 4H View Asbestos Workers King Heating Equipment Mechanics Journey Level $89.61 7F 1 E View King Hod Carriers Et Mason Tenders Journey Level $54.01 7A 4V 8Y View King Industrial Power Vacuum Journey Level $13.69 1 View Cleaner King Inland Boatmen Boat Operator $61.41 5B 1 K View King Inland Boatmen Cook $56.48 5B 1 K View King Inland Boatmen Deckhand $57.48 5B 1 K View King Inland Boatmen Deckhand Engineer $58.81 5B 1 K View King Inland Boatmen Launch Operator $58.89 5B 1 K View King Inland Boatmen Mate $57.31 5B 1 K View King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 View Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $13.69 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 View Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $64.94 7A 4C T View King Ironworkers Journeyman $75.23 7N 10 View King Laborers Air, Gas Or Electric Vibrating $52.39 7A 4V 8Y View Screed King Laborers Airtrac Drill Operator $54.01 7A 4V 8Y View King Laborers Ballast Regular Machine $52.39 7A 4V 8Y View King Laborers Batch Weighman $44.40 7A 4V 8Y View King Laborers Brick Pavers $52.39 7A 4V 8Y View King Laborers Brush Cutter $52.39 7A 4V 8Y View King Laborers Brush Hog Feeder $52.39 7A 4V 8Y View King Laborers Burner $52.39 7A 4V 8Y View King Laborers Caisson Worker $54.01 7A 4V 8Y View King Laborers Carpenter Tender $52.39 7A 4V 8Y View King Laborers Cement Dumper -paving $53.35 7A 4V 8Y View King Laborers Cement Finisher Tender $52.39 7A 4V 8Y View King Laborers Change House Or Dry Shack $52.39 7A 4V 8Y View King Laborers Chipping Gun (30 Lbs. And $53.35 7A 4V 8Y View Over) King Laborers Chipping Gun (Under 30 Lbs.) $52.39 7A 4V 8Y View King Laborers Choker Setter $52.39 7A 4V 8Y View King Laborers Chuck Tender $52.39 7A 4V 8Y View King Laborers Clary Power Spreader $53.35 7A 4V 8Y View King Laborers Clean-up Laborer $52.39 7A 4V 8Y View King Laborers Concrete Dumper/Chute $53.35 7A 4V 8Y View Operator King Laborers Concrete Form Stripper $52.39 7A 4V 8Y View King Laborers Concrete Placement Crew $53.35 7A 4V 8Y View King Laborers Concrete Saw Operator/Core $53.35 7A 4V 8Y View Driller King Laborers Crusher Feeder $44.40 7A 4V 8Y View King Laborers Curing Laborer $52.39 7A 4V 8Y View King Laborers Demolition: Wrecking Et Moving $52.39 7A 4V 8Y View (Incl. Charred Material) King Laborers Ditch Digger $52.39 7A 4V 8Y View King Laborers Diver $54.01 7A 4V 8Y View King Laborers Drill Operator (Hydraulic, $53.35 7A 4V 8Y View Diamond) King Laborers Dry Stack Walls $52.39 7A 4V 8Y View King Laborers Dump Person $52.39 7A 4V 8Y View King Laborers Epoxy Technician $52.39 7A 4V 8Y View King Laborers Erosion Control Worker $52.39 7A 4V 8Y View King Laborers Faller Et Bucker Chain Saw $53.35 7A 4V 8Y View King Laborers Fine Graders $52.39 7A 4V 8Y View King Laborers Firewatch $44.40 7A 4V 8Y View King Laborers Form Setter $52.39 7A 4V 8Y View King Laborers Gabian Basket Builders $52.39 7A 4V 8Y View King Laborers General Laborer $52.39 7A 4V 8Y View King Laborers Grade Checker Et Transit Person $54.01 7A 4V 8Y View King Laborers Grinders $52.39 7A 4V 8Y View King Laborers Grout Machine Tender $52.39 7A 4V 8Y View King Laborers Groutmen (Pressure) Including $53.35 7A 4V 8Y View Post Tension Beams King Laborers Guardrail Erector $52.39 7A 4V 8Y View King Laborers Hazardous Waste Worker (Level $54.01 7A 4V 8Y View A) King Laborers Hazardous Waste Worker (Level $53.35 7A 4V 8Y View B) King Laborers Hazardous Waste Worker (Level $52.39 7A 4V 8Y View C) King Laborers High Scaler $54.01 7A 4V 8Y View King Laborers Jackhammer $53.35 7A 4V 8Y View King Laborers Laserbeam Operator $53.35 7A 4V 8Y View King Laborers Maintenance Person $52.39 7A 4V 8Y View King Laborers Manhole Builder-Mudman $53.35 7A 4V 8Y View King Laborers Material Yard Person $52.39 7A 4V 8Y View King Laborers Motorman -Dinky Locomotive $53.35 7A 4V 8Y View King Laborers Nozzleman (Concrete Pump, $53.35 7A 4V 8Y View Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Blaster, Vacuum Blaster) King Laborers Pavement Breaker $53.35 7A 4V 8Y View King Laborers Pilot Car $44.40 7A 4V 8Y View King Laborers Pipe Layer Lead $54.01 7A 4V 8Y View King Laborers Pipe Layer/Tailor $53.35 7A 4V 8Y View King Laborers Pipe Pot Tender $53.35 7A 4V 8Y View King Laborers Pipe Reliner $53.35 7A 4V 8Y View King Laborers Pipe Wrapper $53.35 7A 4V 8Y View King Laborers Pot Tender $52.39 7A 4V 8Y View King Laborers Powderman $54.01 7A 4V 8Y View King Laborers Powderman's Helper $52.39 7A 4V 8Y View King Laborers Power Jacks $53.35 7A 4V 8Y View King Laborers Railroad Spike Puller - Power $53.35 7A 4V 8Y View King Laborers Raker - Asphalt $54.01 7A 4V 8Y View King Laborers Re-timberman $54.01 7A 4V 8Y View King Laborers Remote Equipment Operator $53.35 7A 4V 8Y View King Laborers Rigger/Signal Person $53.35 7A 4V 8Y View King Laborers Rip Rap Person $52.39 7A 4V 8Y View King Laborers Rivet Buster $53.35 7A 4V 8Y View King Laborers Rodder $53.35 7A 4V 8Y View King Laborers Scaffold Erector $52.39 7A 4V 8Y View King Laborers Scale Person $52.39 7A 4V 8Y View King Laborers Sloper (Over 20") $53.35 7A 4V 8Y View King Laborers Sloper Sprayer $52.39 7A 4V 8Y View King Laborers Spreader (Concrete) $53.35 7A 4V 8Y View King Laborers Stake Hopper $52.39 7A 4V 8Y View King Laborers Stock Piler $52.39 7A 4V 8Y View King Laborers Swinging Stage/Boatswain $44.40 7A 4V 8Y View Chair King Laborers Tamper Et Similar Electric, Air $53.35 7A 4V 8Y View Et Gas Operated Tools King Laborers Tamper (Multiple Et Self- $53.35 7A 4V 8Y View propelled) King Laborers Timber Person - Sewer (Lagger, $53.35 7A 4V 8Y View Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $52.39 7A 4V 8Y View King Laborers Topper $52.39 7A 4V 8Y View King Laborers Track Laborer $52.39 7A 4V 8Y View King Laborers Track Liner (Power) $53.35 7A 4V 8Y View King Laborers Traffic Control Laborer $47.48 7A 4V 9C View King Laborers Traffic Control Supervisor $50.31 7A 4V 9C View King Laborers Truck Spotter $52.39 7A 4V 8Y View King Laborers Tugger Operator $53.35 7A 4V 8Y View King Laborers Tunnel Work -Compressed Air $129.67 7A 4V 9B View Worker 0-30 psi King Laborers Tunnel Work -Compressed Air $134.70 7A 4V 9B View Worker 30.01-44.00 psi King Laborers Tunnel Work -Compressed Air $138.38 7A 4V 9B View Worker 44.01-54.00 psi King Laborers Tunnel Work -Compressed Air $144.08 7A 4V 9B View Worker 54.01-60.00 psi King Laborers Tunnel Work -Compressed Air $146.20 7A 4V 9B View Worker 60.01-64.00 psi King Laborers Tunnel Work -Compressed Air $151.30 7A 4V 9B View Worker 64.01-68.00 psi King Laborers Tunnel Work -Compressed Air $153.20 7A 4V 9B View Worker 68.01-70.00 psi King Laborers Tunnel Work -Compressed Air $155.20 7A 4V 9B View Worker 70.01-72.00 psi King Laborers Tunnel Work -Compressed Air $157.20 7A 4V 9B View Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $54.11 7A 4V 8Y View Tender King Laborers Tunnel Work -Miner $54.11 7A 4V 8Y View King Laborers Vibrator $53.35 7A 4V 8Y View King Laborers Vinyl Seamer $52.39 7A 4V 8Y View King Laborers Watchman $40.36 7A 4V 8Y View King Laborers Welder $53.35 7A 4V 8Y View King Laborers Well Point Laborer $53.35 7A 4V 8Y View King Laborers Window Washer/Cleaner $40.36 7A 4V 8Y View King Laborers - Underground Sewer General Laborer Et Topman $52.39 7A 4V 8Y View Et Water King Laborers - Underground Sewer Pipe Layer $53.35 7A 4V 8Y View Et Water King Landscape Construction Landscape $40.36 7A 4V 8Y View Construction/Landscaping Or Planting Laborers King Landscape Construction Landscape Operator $72.28 7A 3K 8X View King Landscape Maintenance Groundskeeper $17.87 1 View King Lathers Journey Level $64.94 5D 1 H View King Marble Setters Journey Level $60.57 7E 1 N View King Metal Fabrication (In Shop). Journey Level $40.08 1 View King Millwright Journey Level $66.44 7A 4C View King Modular Buildings Cabinet Assembly $13.69 1 View King Modular Buildings Electrician $13.69 1 View King Modular Buildings Equipment Maintenance $13.69 1 View King Modular Buildings Plumber $13.69 1 View King Modular Buildings Production Worker $13.69 1 View King Modular Buildings Tool Maintenance $13.69 1 View King Modular Buildings Utility Person $13.69 1 View King Modular Buildings Welder $13.69 1 View King Painters Journey Level $45.40 6Z 2B View King Pile Driver Crew Tender $69.91 7A 4C View King Pile Driver Crew Tender/Technician $69.91 7A 4C View King Pile Driver Hyperbaric Worker - $80.76 7A 4C View Compressed Air Worker 0-30.00 PSI King Pile Driver Hyperbaric Worker - $85.76 7A 4C View Compressed Air Worker 30.01 44.00 PSI King Pile Driver Hyperbaric Worker - $89.76 7A 4C View Compressed Air Worker 44.01 - 54.00 PSI King Pile Driver Hyperbaric Worker - $94.76 7A 4C View Compressed Air Worker 54.01 60.00 PSI King Pile Driver Hyperbaric Worker - $97.26 7A 4C View Compressed Air Worker 60.01 - 64.00 PSI King Pile Driver Hyperbaric Worker - $102.26 7A 4C View Compressed Air Worker 64.01 68.00 PSI King Pile Driver Hyperbaric Worker - $104.26 7A 4C View Compressed Air Worker 68.01 70.00 PSI King Pile Driver Hyperbaric Worker - $106.26 7A 4C View Compressed Air Worker 70.01 - 72.00 PSI King Pile Driver Hyperbaric Worker - $108.26 7A 4C View Compressed Air Worker 72.01 74.00 PSI King Pile Driver Journey Level $65.19 7A 4C View King Plasterers Journey Level $61.67 M 1 R View King Playground It Park Equipment Journey Level $13.69 1 View Installers King Plumbers & Pipefitters Journey Level $90.69 6Z 1G View King Power Equipment Operators Asphalt Plant Operators $73.49 7A 3K 8X View King Power Equipment Operators Assistant Engineer $69.12 7A 3K 8X View King Power Equipment Operators Barrier Machine (zipper) $72.84 7A 3K 8X View King Power Equipment Operators Batch Plant Operator: concrete $72.84 7A 3K 8X View King Power Equipment Operators Bobcat $69.12 7A 3K 8X View King Power Equipment Operators Brokk - Remote Demolition $69.12 7A 3K 8X View Equipment King Power Equipment Operators Brooms $69.12 7A 3K 8X View King Power Equipment Operators Bump Cutter $72.84 7A 3K 8X View King Power Equipment Operators Cableways $73.49 7A 3K 8X View King Power Equipment Operators Chipper $72.84 7A 3K 8X View King Power Equipment Operators Compressor $69.12 7A 3K 8X View King Power Equipment Operators Concrete Finish Machine - $69.12 7A 3K 8X View Laser Screed King Power Equipment Operators Concrete Pump - Mounted Or $72.28 7A 3K 8X View Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators Concrete Pump: Truck Mount $73.49 7A 3K 8X View With Boom Attachment Over 42 M King Power Equipment Operators Concrete Pump: Truck Mount $72.84 7A 3K 8X View With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $72.28 7A 3K 8X View King Power Equipment Operators Cranes friction: 200 tons and $75.72 7A 3K 8X View over King Power Equipment Operators Cranes: 100 tons through 199 $74.22 7A 3K 8X View tons, or 150' of boom (including jib with attachments) King Power Equipment Operators Cranes: 20 Tons Through 44 $72.84 7A 3K 8X View Tons With Attachments King Power Equipment Operators Cranes: 200 tons- 299 tons, or $74.99 7A 3K 8X View 250' of boom including jib with attachments King Power Equipment Operators Cranes: 300 tons and over or $75.72 7A 3K 8X View 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 Tons Through 99 $73.49 7A 3K 8X View Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A -frame - 10 Tons And $69.12 7A 3K 8X View Under King Power Equipment Operators Cranes: Friction cranes through $74.99 7A 3K 8X View 199 tons King Power Equipment Operators Cranes: through 19 tons with $72.28 7A 3K 8X View attachments, A -frame over 10 tons King Power Equipment Operators Crusher $72.84 7A 3K 8X View King Power Equipment Operators Deck Engineer/Deck Winches $72.84 7A 3K 8X View (power) King Power Equipment Operators Derricks, On Building Work $73.49 7A 3K 8X View King Power Equipment Operators Dozers D-9 Ft Under $72.28 7A 3K 8X View King Power Equipment Operators Drill Oilers: Auger Type, Truck $72.28 7A 3K 8X View Or Crane Mount King Power Equipment Operators Drilling Machine $74.22 7A 3K 8X View King Power Equipment Operators Elevator And Man -lift: $69.12 7A 3K 8X View Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $72.84 7A 3K 8X View Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $72.28 7A 3K 8X View With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $69.12 7A 3K 8X View Attachments King Power Equipment Operators Grade Engineer: Using Blue $72.84 7A 3K 8X View Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/Stakeman $69.12 7A 3K 8X View King Power Equipment Operators Guardrail Punch $72.84 7A 3K 8X View King Power Equipment Operators Hard Tail End Dump $73.49 7A 3K 8X View Articulating Off- Road Equipment 45 Yards. &t Over King Power Equipment Operators Hard Tail End Dump $72.84 7A 3K 8X View Articulating Off -road Equipment Under 45 Yards King Power Equipment Operators Horizontal/Directional Drill $72.28 7A 3K 8X View Locator King Power Equipment Operators Horizontal/Directional Drill $72.84 7A 3K 8X View Operator King Power Equipment Operators Hydralifts/Boom Trucks Over $72.28 7A 3K 8X View 10 Tons King Power Equipment Operators Hydralifts/Boom Trucks, 10 $69.12 7A 3K 8X View Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Ft $74.22 7A 3K 8X View Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $73.49 7A 3K 8X View Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $72.84 7A 3K 8X View Yards King Power Equipment Operators Loaders, Plant Feed $72.84 7A 3K 8X View King Power Equipment Operators Loaders: Elevating Type Belt $72.28 7A 3K 8X View King Power Equipment Operators Locomotives, All $72.84 7A 3K 8X View King Power Equipment Operators Material Transfer Device $72.84 7A 3K 8X View King Power Equipment Operators Mechanics, All (leadmen - $74.22 7A 3K 8X View $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Graders $73.49 7A 3K 8X View King Power Equipment Operators Mucking Machine, Mole, Tunnel $73.49 7A 3K 8X View Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $69.12 7A 3K 8X View Distribution E. Mulch Seeding Operator King Power Equipment Operators Outside Hoists (Elevators And $72.28 7A 3K 8X View Manlifts), Air Tuggers, Strato King Power Equipment Operators Overhead, Bridge Type Crane: $72.84 7A 3K 8X View 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $74.22 7A 3K 8X View Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 Tons $73.49 7A 3K 8X View Through 99 Tons King Power Equipment Operators Pavement Breaker $69.12 7A 3K 8X View King Power Equipment Operators Pile Driver (other Than Crane $72.84 7A 3K 8X View Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $72.28 7A 3K 8X View King Power Equipment Operators Posthole Digger, Mechanical $69.12 7A 3K 8X View King Power Equipment Operators Power Plant $69.12 7A 3K 8X View King Power Equipment Operators Pumps - Water $69.12 7A 3K 8X View King Power Equipment Operators Quad 9, Hd 41, D10 And Over $73.49 7A 3K 8X View King Power Equipment Operators Quick Tower - No Cab, Under $69.12 7A 3K 8X View 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $73.49 7A 3K 8X View Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger and Bellman $69.12 7A 3K 8X View King Power Equipment Operators Rigger/Signal Person, Bellman $72.28 7A 3K 8X View (Certified) King Power Equipment Operators Rollagon $73.49 7A 3K 8X View King Power Equipment Operators Roller, Other Than Plant Mix $69.12 7A 3K 8X View King Power Equipment Operators Roller, Plant Mix Or Multi -lift $72.28 7A 3K 8X View Materials King Power Equipment Operators Roto-mill, Roto-grinder $72.84 7A 3K 8X View King Power Equipment Operators Saws - Concrete $72.28 7A 3K 8X View King Power Equipment Operators Scraper, Self Propelled Under $72.84 7A 3K 8X View 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $72.28 7A 3K 8X View King Power Equipment Operators Scrapers, Self-propelled: 45 $73.49 7A 3K 8X View Yards And Over King Power Equipment Operators Service Engineers - Equipment $72.28 7A 3K 8X View King Power Equipment Operators Shotcrete/Gunite Equipment $69.12 7A 3K 8X View King Power Equipment Operators Shovel, Excavator, Backhoe, $72.28 7A 3K 8X View Tractors Under 15 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoe: $73.49 7A 3K 8X View Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $72.84 7A 3K 8X View Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $74.22 7A 3K 8X View Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $74.99 7A 3K 8X View Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $73.49 7A 3K 8X View King Power Equipment Operators Spreader, Topsider Et $73.49 7A 3K 8X View Screedman King Power Equipment Operators Subgrader Trimmer $72.84 7A 3K 8X View King Power Equipment Operators Tower Bucket Elevators $72.28 7A 3K 8X View King Power Equipment Operators Tower Crane Up To 175' In $74.22 7A 3K 8X View Height Base To Boom King Power Equipment Operators Tower Crane: over 175' $74.99 7A 3K 8X View through 250' in height, base to boom King Power Equipment Operators Tower Cranes: over 250' in $75.72 7A 3K 8X View height from base to boom King Power Equipment Operators Transporters, All Track Or Truck $73.49 7A 3K 8X View Type King Power Equipment Operators Trenching Machines $72.28 7A 3K 8X View King Power Equipment Operators Truck Crane Oiler/driver - 100 $72.84 7A 3K 8X View Tons And Over King Power Equipment Operators Truck Crane Oiler/Driver Under $72.28 7A 3K 8X View 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $72.84 7A 3K 8X View King Power Equipment Operators Welder $73.49 7A 3K 8X View King Power Equipment Operators Wheel Tractors, Farman Type $69.12 7A 3K 8X View King Power Equipment Operators Yo Yo Pay Dozer $72.84 7A 3K 8X View King Power Equipment Operators- Asphalt Plant Operators $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Bobcat $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $69.12 7A 3K 8X View Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Bump Cutter $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Cableways $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Chipper $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Compressor $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine - $69.12 7A 3K 8X View Underground Sewer Et Water Laser Screed King Power Equipment Operators- Concrete Pump - Mounted Or $72.28 7A 3K 8X View Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators- Concrete Pump: Truck Mount $73.49 7A 3K 8X View Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Pump: Truck Mount $72.84 7A 3K 8X View Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes friction: 200 tons and $75.72 7A 3K 8X View Underground Sewer Et Water over King Power Equipment Operators- Cranes: 100 tons through 199 $74.22 7A 3K 8X View Underground Sewer Et Water tons, or 150' of boom (including jib with attachments) King Power Equipment Operators- Cranes: 20 Tons Through 44 $72.84 7A 3K 8X View Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $74.99 7A 3K 8X View Underground Sewer Et Water 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $75.72 7A 3K 8X View Underground Sewer Et Water 300' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 Tons Through 99 $73.49 7A 3K 8X View Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A -frame - 10 Tons And $69.12 7A 3K 8X View Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction cranes through $74.99 7A 3K 8X View Underground Sewer Et Water 199 tons King Power Equipment Operators- Cranes: through 19 tons with $72.28 7A 3K 8X View Underground Sewer Et Water attachments, A -frame over 10 tons King Power Equipment Operators- Crusher $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/Deck Winches $72.84 7A 3K 8X View Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 Et Under $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $72.28 7A 3K 8X View Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $74.22 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Elevator And Man -lift: $69.12 7A 3K 8X View Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $72.84 7A 3K 8X View Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $72.28 7A 3K 8X View Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $69.12 7A 3K 8X View Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $72.84 7A 3K 8X View Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/Stakeman $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $73.49 7A 3K 8X View Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $72.84 7A 3K 8X View Underground Sewer Et Water Articulating Off -road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/Directional Drill $72.28 7A 3K 8X I View Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/Directional Drill $72.84 7A 3K 8X View Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/Boom Trucks Over $72.28 7A 3K 8X View Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/Boom Trucks, 10 $69.12 7A 3K 8X View Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $74.22 7A 3K 8X View Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $73.49 7A 3K 8X View Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $72.84 7A 3K 8X View Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $74.22 7A 3K 8X View Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Graders $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $73.49 7A 3K 8X View Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $69.12 7A 3K 8X View Underground Sewer Et Water Distribution Et Mulch Seeding I Operator King Power Equipment Operators- Outside Hoists (Elevators And $72.28 7A 3K 8X View Underground Sewer Et Water Manlifts), Air Tuggers, Strato King Power Equipment Operators- Overhead, Bridge Type Crane: $72.84 7A 3K 8X View Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $74.22 7A 3K 8X View Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 Tons $73.49 7A 3K 8X View Underground Sewer Et Water Through 99 Tons King Power Equipment Operators- Pavement Breaker $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $72.84 7A 3K 8X View Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Power Plant $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $69.12 7A 3K 8X View Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $73.49 7A 3K 8X View Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger and Bellman $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, Bellman $72.28 7A 3K 8X View Underground Sewer Et Water (Certified) King Power Equipment Operators- Rollagon $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi -lift $72.28 7A 3K 8X View Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $72.84 7A 3K 8X View Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $73.49 7A 3K 8X View Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Shotcrete/Gunite Equipment $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe, $72.28 7A 3K 8X View Underground Sewer Et Water Tractors Under 15 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoe: $73.49 7A 3K 8X View Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $72.84 7A 3K 8X View Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $74.22 7A 3K 8X View Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $74.99 7A 3K 8X View Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $73.49 7A 3K 8X View Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In $74.22 7A 3K 8X View Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Tower Crane: over 175' $74.99 7A 3K 8X View Underground Sewer Et Water through 250' in height, base to boom King Power Equipment Operators- Tower Cranes: over 250' in $75.72 7A 3K 8X View Underground Sewer Et Water height from base to boom King Power Equipment Operators- Transporters, All Track Or Truck $73.49 7A 3K 8X View Underground Sewer Et Water Type King Power Equipment Operators- Trenching Machines $72.28 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $72.84 7A 3K 8X View Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/Driver Under $72.28 7A 3K 8X View Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $72.84 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Welder $73.49 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmall Type $69.12 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $72.84 7A 3K 8X View Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $53.10 5A 4A View Trimmers King Power Line Clearance Tree Spray Person $50.40 5A 4A View Trimmers King Power Line Clearance Tree Tree Equipment Operator $53.10 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer $47.48 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $36.10 5A 4A View Trimmers King Refrigeration Et Air Journey Level $85.51 6Z 1G View Conditioning Mechanics King Residential Brick Mason Journey Level $60.57 7E 1 N View King Residential Carpenters Journey Level $36.44 1 View King Residential Cement Masons Journey Level $46.64 1 View King Residential Drywall Applicators Journey Level $64.94 7A 4C View King Residential Drywall Tapers Journey Level $35.95 1 View King Residential Electricians Journey Level $83.05 7C 4E View King Residential Glaziers Journey Level $27.62 1 View King Residential Insulation Journey Level $24.43 1 View Applicators King Residential Laborers Journey Level $29.73 1 View King Residential Marble Setters Journey Level $15.12 1 View King Residential Painters Journey Level $23.37 1 View King Residential Plumbers Et Journey Level $90.69 6Z 1G View Pipefitters King Residential Refrigeration Et Air Journey Level $85.51 6Z 1G View Conditioning Mechanics King Residential Sheet Metal Journey Level $89.61 7F 1 E View Workers King Residential Soft Floor Layers Journey Level $15.12 1 View King Residential Sprinkler Fitters Journey Level $40.70 1 View _(Fire Protection). King Residential Stone Masons Journey Level $15.12 1 View King Residential Terrazzo Workers Journey Level $55.71 7E 1 N View King Residential Terrazzo/Tile Journey Level $24.39 1 View Finishers King Residential Tile Setters Journey Level $21.04 1 View King Roofers Journey Level $55.55 5A 3H View King Roofers Using Irritable Bituminous $58.55 5A 3H View Materials King Sheet Metal Workers Journey Level (Field or Shop) $89.61 7F 1 E View King Shipbuilding Et Ship Repair New Construction Boilermaker $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Carpenter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Crane $36.36 7V 1 View Operator King Shipbuilding Et Ship Repair New Construction Electrician $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Heat Et Frost $79.43 5J 4H View Insulator King Shipbuilding Et Ship Repair New Construction Laborer $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Machinist $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Operating $36.36 7V 1 View Engineer King Shipbuilding Et Ship Repair New Construction Painter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Pipefitter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Rigger $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Sheet Metal $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Shipfitter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction $36.36 7V 1 View Warehouse/Teamster King Shipbuilding Et Ship Repair New Construction Welder / $36.36 7V 1 View Burner King Shipbuilding Et Ship Repair Ship Repair Boilermaker $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Carpenter $44.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Crane Operator $45.06 7Y 4K View King Shipbuilding Et Ship Repair Ship Repair Electrician $47.42 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Heat Et Frost $79.43 5J 4H I I View Insulator King Shipbuilding Et Ship Repair Ship Repair Laborer $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Machinist $46.15 7X 4.1 View King Shipbuilding Et Ship Repair Ship Repair Operating Engineer $45.06 7Y 4K View King Shipbuilding Et Ship Repair Ship Repair Painter $46.15 7X 4.1 View King Shipbuilding Et Ship Repair Ship Repair Pipefitter $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Rigger $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Sheet Metal $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Shipwright $44.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Warehouse / $45.06 7Y 4K View Teamster King Sign Makers Et Installers Journey Level $49.44 0 1 View .(Electrical). King Sign Makers Et Installers (Non- Journey Level $31.96 0 1 View Electrical). King Soft Floor Layers Journey Level $51.07 5A 3. View King Solar Controls For Windows Journey Level $13.69 1 View King Sprinkler Fitters (Fire Journey Level $84.39 5C 1X View Protection) King Stage Rigging Mechanics (Non Journey Level $13.69 1 View Structural) King Stone Masons Journey Level $60.57 7E 1 N View King Street And Parking Lot Sweeper Journey Level $19.09 1 View Workers King Surveyors Assistant Construction Site $72.28 7A 3K 8X View Surveyor King Surveyors Chainman $69.12 7A 3K 8X View King Surveyors Construction Site Surveyor $73.49 7A 3K 8X View King Telecommunication Technicians Journey Level $53.57 7E 1 E View King Telephone Line Construction - Cable Splicer $41.81 5A 2B View Outside King Telephone Line Construction - Hole Digger/Ground Person $23.53 5A 2B View Outside King Telephone Line Construction - Installer (Repairer) $40.09 5A 2B View Outside King Telephone Line Construction - Special Aparatus Installer 1 $41.81 5A 2B View Outside King Telephone Line Construction - Special Apparatus Installer II $40.99 5A 2B View Outside King Telephone Line Construction - Telephone Equipment Operator $41.81 5A 2B View Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $38.92 5A 2B View Outside (Light) King Telephone Line Construction - Telephone Lineperson $38.92 5A 2B View Outside King Telephone Line Construction - Television Groundperson $22.32 5A 2B View Outside King Telephone Line Construction - Television Lineperson/Installer $29.60 5A 2B View Outside King Telephone Line Construction - Television System Technician $35.20 5A 2B I View Outside King Telephone Line Construction - Television Technician Outside King Telephone Line Construction - Tree Trimmer Outside King Terrazzo Workers Journey Level King Tile Setters Journey Level King Tile, Marble Et Terrazzo Finisher Finishers King Traffic Control Stripers Journey Level King Truck Drivers Asphalt Mix Over 16 Yards King Truck Drivers Asphalt Mix To 16 Yards King Truck Drivers Dump Truck King Truck Drivers Dump Truck Et Trailer King Truck Drivers Other Trucks King Truck Drivers - Ready Mix Transit Mix King Well Drillers Et Irrigation Pump Irrigation Pump Installer Installers King Well Drillers Et Irrigation Pump Oiler Installers King Well Drillers Et Irrigation Pump Well Driller Installers $31.67 5A 2B View $38.92 5A 2B View $55.71 7E 1 N View $55.71 7E 1 N View $46.54 7E 1 N View $49.13 7A 1 K View $64.55 5D 4Y 8L View $63.71 5D 4Y 8L View $63.71 5D 4Y 8L View $64.55 5D 4Y 8L View $64.55 5D 4Y 8L View $64.55 5D 4Y 8L View $17.71 1 View $13.69 1 View $18.00 1 View Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two (2) hours before or after a five -eight (8) hour workweek day or a four -ten (10) hour workweek day and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four - ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Continued O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays, holidays and after twelve (12) hours, Monday through Friday and after ten (10) hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays (except makeup days if circumstances warrant) and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee) and all hours worked in excess of eight (8) hours per day (10 hours per day for a 4 x 10 workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight -time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Continued 2. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four -day, ten- hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The first eight (8) hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays shall be paid at double the hourly rate of wage. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. C. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Continued E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week, once 40 hours of straight time work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half (1-1/2) times the regular rate of pay. All hours worked between the hours of 10:00 pm and 5:00 am, Monday through Friday, and all hours worked on Saturdays shall be paid at a one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. K. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal 5 am to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in excess of twelve (12) hours in a single shift shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. When an employee returns to work without at least eight (8) hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the eight (8) hours rest period. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve (12) hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay, unless a four (4) day ten (10) hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, the first two (2) hours of overtime after ten (10) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay. On Saturday, the first twelve (12) hours of work shall be paid at one and one half (1-1/2) times the straight time rate of pay, except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12) hours in a day and all hours worked on Sunday and Holidays shall be paid at two (2) times the straight time rate of pay. 4 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Continued 4. D. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturday, Sundays and holidays shall be paid at double the hourly rate of pay. Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines, switching stations, regulating, capacitor stations, generating plants, industrial plants, associated installations and substations, except those substations whose primary function is to feed a distribution system, will be paid overtime under the following rates: The first two (2) hours after eight (8) regular hours Monday through Friday of overtime on a regular workday, shall be paid at one and one-half times the hourly rate of wage. All hours in excess of ten (10) hours will be at two (2) times the hourly rate of wage. The first eight (8) hours worked on Saturday will be paid at one and one-half (1-1/2) times the hourly rate of wage. All hours worked in excess of eight (8) hours on Saturday, and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the hourly rate of wage. E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four -day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The Monday or Friday not utilized in the normal four - day, ten hour work week, and Saturday shall be paid at one and one half (1'/2) times the regular shift rate for the first eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium rate of 20% over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, and all hours on Sunday shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. I. The First eight (8) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight (8) per day on Saturdays shall be paid at double the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. The first eight (8) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight (8) hours on a Saturday shall be paid at double the hourly rate of wage. All hours worked over twelve (12) in a day, and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. K. All hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is the sixth consecutive day worked. All hours worked over twelve (12) in a day Monday through Saturday, and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Continued 4. L. The first twelve (12) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on a Saturday in excess of twelve (12) hours shall be paid at double the hourly rate of pay. All hours worked over twelve (12) in a day Monday through Friday, and all hours worked on Sundays shall be paid at double the hourly rate of wage. All hours worked on a holiday shall be paid at one and one-half times the hourly rate of wage, except that all hours worked on Labor Day shall be paid at double the hourly rate of pay. M. All hours worked on Sunday and Holidays shall be paid at double the hourly rate. Any employee reporting to work less than nine (9) hours from their previous quitting time shall be paid for such time at time and one-half times the hourly rate. N. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays, and all work performed between the hours of midnight (12:00 AM) and eight AM (8:00 AM) every day shall be paid at double the hourly rate of wage. O. All hours worked between midnight Friday to midnight Sunday shall be paid at one and one-half the hourly rate of wage. After an employee has worked in excess of eight (8) continuous hours in any one or more calendar days, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of six (6) hours or more. All hours worked on Holidays shall be paid at double the hourly rate of wage. P. All hours worked on Holidays shall be paid at one and one-half times the hourly rate of wage. Q. The first four (4) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday shall be paid at double the hourly rate. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. R. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is the sixth consecutive day worked. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. S. All hours worked on Saturdays and Holidays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays shall be paid at double the hourly rate of wage. T. The first two (2) hours of overtime for hours worked Monday -Friday shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day shall be paid at double the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. For work on Saturday which is scheduled prior to the end of shift on Friday, the first six (6) hours work shall be paid at one and one-half times the hourly rate of wage, and all hours over (6) shall be paid double the hourly rate of wage. For work on Saturday which was assigned following the close of shift on Friday, all work shall be paid at double the hourly rate of wage. U. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. (Except on makeup days if work is lost due to inclement weather, then the first eight (8) hours on Saturday may be paid the regular rate.) All hours worked over twelve (12) hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Continued 4. V. Work performed in excess of ten (10) hours of straight time per day when four ten (10) hour shifts are established or outside the normal shift (5 am to 6pm), and all work on Saturdays, except for make-up days shall be paid at time and one-half (1 ''/z) the straight time rate. In the event the job is down due to weather conditions, then Saturday may, be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All work performed on Sundays and holidays and work in excess of twelve (12) hours per day shall be paid at double (2x) the straight time rate of pay. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. When an employee returns to work without a break of eight (8) hours since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. W. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. When an employee returns to work without at least eight (8) hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. X. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. Work performed outside the normal shift of 6 am to 6pm shall be paid at one and one-half the straight time rate, (except for special shifts or three shift operations). All work performed on Sundays and holidays shall be paid at double the hourly rate of wage. Shifts may be established when considered necessary by the Employer. The Employer may establish shifts consisting of eight (8) or ten (10) hours of work (subject to WAC 296-127-022), that shall constitute a normal forty (40) hour work week. The Employer can change from a 5-eight to a 4-ten hour schedule or back to the other. All hours of work on these shifts shall be paid for at the straight time hourly rate. Work performed in excess of eight hours (or ten hours per day (subject to WAC 296-127-022) shall be paid at one and one- half the straight time rate. When due to conditions beyond the control of the Employer, or when contract specifications require that work can only be performed outside the regular day shift, then by mutual agreement a special shift may be worked at the straight time rate, eight (8) hours work for eight (8) hours pay. The starting time shall be arranged to fit such conditions of work. When an employee returns to work without at a break of eight (8) hours since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Overtime Codes Continued 4. Y. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. All work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. ZOvertime Calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium rate of 20% over the hourly rate of wage. Work performed on Sundays may be paid at double time. All hours worked on holidays shall be paid at double the hourly rate of wage. Holidav Codes A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, and Christmas Day (7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, the day before Christmas, and Christmas Day (8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). H. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Day after Thanksgiving Day, And Christmas (6). I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day, And Christmas Day (7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (9). 8 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Holiday Codes Continued P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, One -Half Day Before Christmas Day, And Christmas Day. (7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, And Christmas Day (7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and a Half - Day On Christmas Eve Day. (9 1/2). G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Christmas Eve Day (11). H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (10). I. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, And Christmas Day (7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. 9 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Holiday Codes Continued B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 10 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Holiday Codes Continued M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, And the Day after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. When Christmas falls on a Saturday, the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day after or before Christmas Day (10). If any of the listed holidays fall on Saturday, the preceding Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Day, the Day after Christmas, and A Floating Holiday (9). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. T. Paid Holidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and The Day after or before Christmas Day. (10). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. V. Holidays: New Year's Day, President's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, the day before or after Christmas, and the day before or after New Year's Day. If any of the above listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. W. Holidays: New Year's Day, Day After New Year's, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Eve Day, Christmas Day, the day after Christmas, the day before New Year's Day, and a Floating Holiday. X. Holidays: New Year's Day, Day before or after New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day before or after Christmas day. If a holiday falls on a Saturday or on a Friday that is the normal day off, then the holiday will be taken on the last normal workday. If the holiday falls on a Monday that is the normal day off or on a Sunday, then the holiday will be taken on the next normal workday. Y. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day. (8) If the holiday falls on a Sunday, then the day observed by the federal government shall be considered a holiday and compensated accordingly. 11 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Holiday Codes Continued Z. Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 15. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the day before Christmas Day and Christmas Day. (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. B. Holidays: New Year's Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day. (9) C. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the day before Christmas Day and Christmas Day. (8) D. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Day, and the day after Christmas. E. Holidays: the day before New Years's Day, New Year's Day, Martin Luther King, Jr. Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving Day, the day before Christmas, and Christmas Day. (12) Note Codes 8. D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And Level C: $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level C: $0.50, And Level D: $0.25. P. Workers on hazmat projects receive additional hourly premiums as follows -Class A Suit: $2.00, Class B Suit: $1.50, Class C Suit: $1.00, And Class D Suit $0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. S. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. 12 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Note Codes Continued 8. T. Effective August 31, 2012 — A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. U. Workers on hazmat projects receive additional hourly premiums as follows — Class A Suit: $2.00, Class B Suit: $1.50, And Class C Suit: $1.00. Workers performing underground work receive an additional $0.40 per hour for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive an additional $0.50 per hour. The premium for work suspended shall be paid for the entire shift worked. Workers who do "pioneer" work (break open a cut, build road, etc.) more than one hundred fifty (150) feet above grade elevation receive an additional $0.50 per hour. V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more. Over 50' to 100' - $2.00 per foot for each foot over 50 feet. Over 10l' to 150' - $3.00 per foot for each foot over 101 feet. Over 151' to 220' - $4.00 per foot for each foot over 220 feet. Over 221' - $5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent and is measured by the distance travelled from the entrance. 25' to 300' - $1.00 per foot from entrance. 300' to 600' - $1.50 per foot beginning at 300'. Over 600' - $2.00 per foot beginning at 600'. W. Meter Installers work on single phase 120/240V self-contained residential meters. The Lineman/Groundmen rates would apply to meters not fitting this description. X. Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit: $1.50, Class C Suit: $1.00, and Class D Suit: $0.50. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a government agency or the contract specifications requires that work can only be performed outside the normal 5 am to 6pm shift, then the special shift premium will be applied to the basic hourly rate. When an employee works on a special shift, they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Y. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging state or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. 13 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Note Codes Continued 8. Z. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as a contractor), a government agency or the contract specifications require that more than (4) hours of a special shift can only be performed outside the normal 6 am to 6pm shift, then the special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a special shift, they will be paid a special shift premium for each hour worked unless they are in overtime or double- time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) A. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a government agency or the contract specifications require that more than four (4) hours of a special shift can only be performed outside the normal 6 am to 6pm shift, then the special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a special shift, they shall be paid a special shift premium for each hour worked unless they are in overtime or double- time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Certified Crane Operator Premium: Crane operators requiring certifications shall be paid $0.50 per hour above their classification rate. Boom Pay Premium: All cranes including tower shall be paid as follows based on boom length: (A) — 130' to 199' — $0.50 per hour over their classification rate. (B) — 200' to 299' — $0.80 per hour over their classification rate. (C) — 300' and over — $1.00 per hour over their classification rate. B. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. C. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012. 14 Benefit Code Key — Effective 9/2/2020 thru 3/2/2021 Note Codes Continued D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, towers, dams, bridges, power generation facilities and manufacturing facilities such as chemical plants, etc., or anywhere abrasive blasting is necessary to prepare surfaces, or hazardous materials encapsulation is required. E. Heavy Construction includes construction, repair, alteration or additions to the production, fabrication or manufacturing portions of industrial or manufacturing plants, hydroelectric or nuclear power plants and atomic reactor construction. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level C: $0.50, And Level D: $0.25. F. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, towers, dams, power generation facilities and manufacturing facilities such as chemical plants, etc., or anywhere abrasive blasting is necessary to prepare surfaces, or hazardous materials encapsulation is required. 15