HomeMy WebLinkAboutCAG2021-113 - Original - Specialized Pavement Marking - 2021 Paint Line Striping & RPM Replacement - 03/09/2021ApprovalOriginator:Department:
Date Sent:Date Required:
Authorized to Sign:
Director or Designee Mayor
Date of Council Approval:
Grant? Yes No
Type:Review/Signatures/RoutingDate Received by City Attorney:
Comments:
Date Routed to the Mayor’s Office:
Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category:
Vendor Number:Sub-Category:
Project Name:
Project Details:
Agreement Amount:
Start Date:
Basis for Selection of Contractor:
Termination Date:
Local Business? Yes No*
Business License Verification: Yes In-Process Exempt (KCC 5.01.045)
If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace.
Notice required prior to disclosure?
Yes No
Contract Number:
Agreement Routing Form
For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)
Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20
Budget Account Number:
Budget? Yes No
Dir Asst:
Sup/Mgr:
Dir/Dep:
rev. 200821
FOR CITY OF KENT OFFICIAL USE ONLY
(Optional)
* Memo to Mayor must be attached
CAG2021-113
DATE: February 16, 2021
TO: Kent City Council
SUBJECT: 2021 Paint Line Striping and Raised Pavement Marking
Replacement Bid - Award
MOTION: Award the 2021 Paint Line Striping and Raised Pavement Marking
Replacement Project to Specialized Pavement Marking, Inc. in the amount
of $255,780 and authorize the Mayor to sign all necessary documents,
subject to final terms and conditions acceptable to the City Attorney and
Public Works Director.
SUMMARY: This project includes repainting painted lane line markings and
installing replacement raised pavement markers on select City streets.
The bid opening for the 2021 Paint Line Striping and Raised Pavement Marking
Replacement Project was held on February 9, 2021 with three bids received. The
lowest responsible and responsive bid was submitted by Specialized Pavement
Marking, Inc. in the amount of $255,780.
Bid Tab Summary
01. Specialized Pavement Marking, Inc. $255,780
02. Stripe Rite, Inc. $261,480
03. Apply-A-Line LLC $271,120
Engineer's Estimate $307,030
BUDGET IMPACT: The project will be paid for using budgeted B&O Funds.
SUPPORTS STRATEGIC PLAN GOAL:
Evolving Infrastructure - Connecting people and places through strategic investments in physical
and technological infrastructure.
ATTACHMENTS:
1. Paint Line Striping & RPM Repl Bid Tab (PDF)
CITY OF KENT
KING COUNTY, WASHINGTON
KENT SPECIAL PROVISIONS FOR
2021 Paint Line Striping and
RPM Replacement
Project Number: 21-3011.1
BIDS ACCEPTED UNTIL
February 9, 2021
11:00 A.M.
BID OPENING IMMEDIATELY FOLLOWING
DELIVER TO
CITY OF KENT, CITY HALL
220 4th Avenue S., Kent, WA 98032-5895
CHAD BIEREN, P.E.
INTERIM PUBLIC WORKS DIRECTOR
INDEX
Section 1 Bidder’s Package
Section 2 Payment and Performance Bond
and Contract
Section 3 Table of Contents
Section 4 Kent Special Provisions
Section 5 Kent Standard Plans
Section 6 Maps and Appendices
Section 7 Traffic Control Plans
Section 8 Prevailing Wage Rates
ORDER OF CONTENTS
Invitation to Bid
Contractor Compliance Statement
Declaration – City of Kent Equal Employment Opportunity Policy
Administrative Policy 1.2 – Minority and Women Contractors
City of Kent Equal Employment Opportunity Compliance Statement
Proposal
Subcontractor List (over $1 million) – HVAC, Plumbing, and Electrical
Subcontractor List (over $1 million) – Structural Steel Installation and Rebar
Installation
Contractor’s Qualification Statement
Statement that Bidder Has Not Been Disqualified
Certification of Compliance with Wage Payment Statutes
Proposal Signature Page
Bid Bond Form
Combined Declaration Form
Non-Collusion, Minimum Wage
Change Order
Bidder’s Checklist
Payment and Performance Bond
Contract
Table of Contents
Kent Special Provisions
Kent Standard Plans
Maps and Appendices
Traffic Control Plans
Prevailing Wage Rates
INVITATION TO BID
Notice is hereby given that the City of Kent, Washington, will receive sealed bids at the City
Clerk's office through February 9t 2O2L up to 11:OO a.m. as shown on the clock on the east
wall of the City Clerk's Office on the first floor of City Hall, 220 4th Avenue South, Kent,
Washington, All bids must be properly marked and sealed in accordance with this "Invitation to
Bid." Bids must be delivered and received at the City Clerk's office by the above-stated time,
regardless of delivery method, including U,S, Mail. All bids will be opened and read publicly aloud
immediately following 11:OO a.m, for the City of Kent project named as follows:
2O2L Paint Line Striping and RPM Replacement
Project Number: 21-3Ol 1,1
The City of Kent will conduct the bid opening at the time and date as scheduled,
however, due to the coronavirus disease 2OLg (COVID-l9) and its impacts the bid
opening process will take place as follows:
Bidders shall call the City Clerk at (253) 856-5725 to drop off bids. The City Clerk will
read the bids out loud from the Clerk's office. Individuals can stand in the lobby
outside the Clerk's office during the bid opening to hear the bid results, but must
stand 6 feet or more apart.
The project consists of installing paint striping over existing lane markings, and installing
replacement raised pavement markings on various City of Kent Streets, all in accordance with
Kent Special Provisions, and the WSDOT Standard Specifications,
The City of Kent has determined the project is essential pursuant to the Governor
Inslee issued Proclamation 2O-25. Should a contract be executed and this
Proclamation or a similar proclamation be in place, specialized plans and protocols
must be established and implemented to meet the social distancing and sanitation
measures set forth by the United States Department of Labor or the Washington State
Department of Health. It is the contractor's responsibility to implement these
measures.
The Engineer's estimated range for this project is approximately $291,000 to 9313,000. Bid
documents may be obtained by contacting City of Kent Engineering Department, Nancy
Yoshitake at 253-856-5508. For technical questions, please call Joseph Araucto at 253-856-
5664.
Bids must be clearly marked *Bid" with the name of the project on the outside of the envelope,
addressed to the City Clerk, 220 4th Avenue South, Kent, WA 98032-5895. Only sealed bids will
be accepted, No facsimiles or electronic submittals will be considered,
Each bid shall be in accordance with the plans and specifications and other contract documents
now on file in the office of the City Engineer, City of Kent, Washington. Plans and
specifications can also be downloaded at no charge at KentWA.oov/doinq-
business/bids-procurement. Copies of the WSDOT Standard Specifications are available for
perusal only.
Apprentice Utilization Requirements are mandatory for all public works estimated to cost one
million dollars or more, in which case no less than 15% of the labor hours must be performed by
apprentices. KCC 6.01.030.
A cashier's check, cash or surety bond in the amount of 5olo of the bid must be included with the
bid.
The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates
or to waive any informalities in the bidding and shall determine which bid or bidders is the most
responsive, satisfactory and responsible bidder and shall be the sole judge thereof. Note: The
award of the contract will not occur until the City of Kent has reviewed all bids for
responsiveness and responsibility determinations and the Kent City Council has formally
awarded the contract.
No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit
or as a defense to any action based upon the neglect or refusal to execute a contract,
Bidders must submit with their initial bid a signed statement as to whether they have previously
performed work subject to the President's Executive Order No, 1L246.
No bidder may withdraw his/her bid for a period of sixty (60) days after the day of bid opening,
Dated this 25th day of January, 2O2I
BY
Kimberley oto,e rk
Published in Daily Journal of Commerce on January 26 and February 2, 202t
CONTRACTOR COM PLIANCE STATEM ENT
(President's Executive Order # Lt246)
,"r" L- 9- L'JLI
This statement relates to a proposed contract with the City of Kent named
2O2L Paint Line Striping and RPM Replacement
Project Number: 2O-3O11.1
I am the undersigned bidder or prospective contractor. I represent that -
1. IY have not, participated in a previous contract or
subcontract subject to the President's Executive Order #LL246 (regarding equal
employment oppoftunity) or a preceding similar Executive Order.
(ea6\iuÅ Vav emovtr l.¡l an b.rr
NAME OF BIDDER
Presidúht
have,
3,
tnc
BY
SIG ú\r lr-(r()v1
\\ùÉ'rS E\J\} lndu styl/tl t/V
"Tür\\rrtr'rn,
Û R ql\bL
ADDRESS
(Note to Bidders: The information required in this Compliance Statement is
informational only)
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
1 January 25, 2027
DECLARATION
CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY
The City of Kent is committed to conform to Federal and State laws regarding equal
opportunity, As such, all contractors, subcontractors and suppliers who perform work
with relation to this contract shall comply with the regulations of the City's equal
employment opportunity policies.
The following questions specifically identify the requirements the City deems
necessary for any contractor, subcontractor or supplier on this specific contract to
adhere to, An affirmative response is required on all of the following questions for this
contract to be valid and binding. If any contractor, subcontractor or supplier willfully
misrepresents themselves with regard to the directives outlined, it will be considered a
breach of contract and it will be at the City's sole determination regarding suspension
or termination for all or part of the contract;
The questions are as follows:
1, I have read the attached City of Kent administrative policy number 1.2.
2. During the time of this contract I will not discriminate in employment on the basis
of sex, race, color, national origin, age/ or the presence of all sensory, mental or
physical disability.
3. During the time of this contract the prime contractor will provide a written
statement to all new employees and subcontractors indicating commitment as an
equal opportunity employer.
4. During the time of the contract I, the prime contractor, will actively consider hiring
and promotion of women and minorities,
5. Before acceptance of this contract, an adherence statement will be signed by me,
the Prime Contractor, that the Prime Contractor complied with the requirements as
set forth above.
By signing below, I ag fulfill the five requirements referenced above.
By:
For:
Title:
Date
s
flesidant
\rzrd Fftrle lìl\ü/lt tvlarF.tvr , lylc"
L-V LÐ}À
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
2 January 25,202L
CITY OF KENT
ADMINISTRATIVE POLICY
NUMBER: L.2 EFFECTIVE DATE: January 1, 1998
SUBJECT:MINORITY AND WOMEN
CONTRACTORS
SUPERSEDES: April I, 1996
APPROVED BY Jim White, Mayor
POLICY:
Equal employment opportunity requirements for the City of Kent will conform to
federal and state laws. All contractors, subcontractors, consultants and suppliers of
the City must guarantee equal employment opportunity within their organization and,
if holding contracts with the City amounting to $10,000 or more within any given
year, must take the following affirmative steps:
1, Provide a written statement to all new employees and subcontractors indicating
commitment as an equal opportunity employer,
2. Actively consider for promotion and advancement available minorities and women
Any contractor, subcontractor, consultant or supplier who willfully disregards the City's
nondiscrimination and equal opportunity requirements shall be considered in breach of
contract and subject to suspension or termination for all or part of the contract,
Contract Compliance Officers will be appointed by the Directors of Planning, Parks,
and Public Works Departments to assume the following duties for their respective
departments.
1, Ensuring that contractors, subcontractors, consultants, and suppliers subject to
these regulations are familiar with the regulations and the City's equal employment
opportunity policy.
2. Monitoring to assure adherence to federal, state and local laws, policies and
guidelines.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
3 January 25,202I
CITY OF KENT
EQUAL EMPLOYMENT OPPORTUNITY
COMPLIANCE STATEMENT
This form shall be filled out AFTER COMPLETION of this project by the Contractor
awarded the contract.
I, the undersigned, a duly represented agent of
Company, hereby acknowledge and declare that the before-
mentioned company was the prime contractor for the contract known as 2O21 Paint
Line Striping and RPM Replacement/Project Number: 21-3011.1 that was
entered into on the
the City of Kent.
between the firm I represent and
I declare that I complied fully with all of the requirements and obligations as outlined
in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal
Employment Opportunity Policy that was part of the before-mentioned contract.
By
For
Title:
Date:
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
4 January 25,202L
PROPOSAL
To the City Clerk
City Hall
Kent, Washington 98032
The undersigned hereby certifies that (;\\MYowuwìt NïovrK{ir r ll'1c-
has examined the job site and construction details of the work as outlined on the
plans and described in the specifications for the project named 2O2L Paint Line
Striping and RPM Replacement/Project Number: 21-3O11,1 for the City of Kent,
Washington, and has read and thoroughly understands the plans and specifications
and contract governing the work embraced in this improvement and the method by
which payment will be made for that work and hereby proposes to undertake and
complete the work embraced in this improvement in accordance with the bid and
contract, and at the following schedule of rates and prices:
NOTE TO BIDDERS:
1) All bid items are described in the Kent Special Provisions (KSP) or the Standard
Specifications (WSDOT). Reference the Section No. listed in this proposal, where
the bid item is described.
2) Proposal items are numbered in sequence but are non-continuous.
3) Unit prices for all items, all extensions, and total amount of bid must be shown,
4) Should bid items with identically worded bid item descriptions, marked with
asterisk (x), appear in more than one schedule of the proposal, the bidder must
bid the same unit price on corresponding items for each schedule. If the
Contractor enters different unit prices on these items, the City will unilaterally
revise the bid amounts to the lowest unit price on each corresponding item and
recalculate the Contractor's total bid amount, The corrected total bid amount will
be used by the City for award purposes and fix the amount of the contract bond.
EXAMPLE
SCHEDULE I - STREET
ITEM SECTION
NO, NO.
APPROX.
QUANTIW
ITEM UNIT
PRICE
TOTAL
AMOUNT
1006 2-03,5
WSDOT
100
CU YDS
Roadway Excavation,
Including Haul
$14.00
Per CY
$1,400.00
Any bids not filled out properly may be considered non-responsive.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
5 January 25, 202L
ITEM
NO.
SECTION
NO.
APPROX.UNIT
PRICE
TOTAL
AMOUNT
ITEM
1000 r-09.7
WSDOT
TY
1
LUMP SUM
Mobilization $ 8,&É ç ö,7ooe
Per LS
1005 B-22.5
KSP
405,000
LN FT
Painted Double Solid Line $oH $ g"lrÊ
Per LF
1010 B-22.5
KSP
634,000
LN FT
&gÐ-
Per LF
Painted Single Solid Line $I
5;ot-l?o
ob
1015 B-22.5
KSP
140,000
LN FT
Painted Skip Lane Line +OY $
Per LF 8,
.þ
1@
1020 B-22.5
KSP
20,000
LN FT
Painted Dotted Line çob
Per LF
(¿ô- z,orÐ-
ro25 B-22.5
KSP
140,000
LN FT
ço9
Per LF
$ePainted TWLTL Line lb,æ
1030 8-22.5
WSDOT
32,000
LN FÏ
Painted Wide Lane Line
tâl$o>
Per LF
$I
b,tcþ
1035 8-22.5
KSP
128,000
LN FT
Painted Bike Lane Line
tb$o-
Per LF
$e-79,1Þ
1040 B-09.5
WSDOT
80
HUNDRED
Raised Pavement Marker
Type 1
ç 7)Ç* ç éoL7-,tøPer HUND
1045 B-09.5
WSDOT
BO
HUNDRED
Raised Pavement Marker
Type 2
to-
$ 3eo $
Per HUND L6rtæ
January 25,2O2I
*
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
6
ITEM
NO,
SECTION
NO.
UNIT
PRICE
TOTAL
AMOUNT
APPROX.
OUANTITY
ITEM
1050 1-10.4(1)
KSP
1
LUMP SUM
Project Tem pora ry Traffic
Control
a9-#þæ $
Per LS þ,øn *
1055 1-07.1s(1)
WSDOT
1
LUMP SUM
SPCC Plan $ ge## çr*.4
Per LS
1060 1
CALC
L-04.4(r)
WSDOT
Minor Changes
xCommon orice to all bidders
$5,000,00x 95,000.00
Per CALC
Total Z
¿to -?þ--
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
7 January 25,202I
N,ISUBCONTRACTOR LIST
(Contracts over 1 million dollars)
HVAC, PLUMBING AND ELECTRICAL
Name of Bidder:
Project Name:2O2a Paint Line Strinino and RPM Reolacement
Project Number:21-3fl11_1
Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with
whom the Bidder, if awarded the contract, will subcontract for performance of the
work of heating, ventilation, and air conditioning; plumbing; and electrical, or name
itself for the work.
Failure of the Bidder to submit, within one hour after the published bid submittal time,
the names of such subcontractors or to name itself to perform such work or the
naming of two or more subcontractors to perform the same work shall render the
Bidder's Bid non-responsive and, therefore, void.
Heating, Ventilation, and Air Conditioning Subcontractor Name:
Plumbing Subcontractor Name :
Electrica I Subcontractor Name
Signature of Bidder
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
Date
8 January 25,2027
SUBCONTRACTOR LIST
(Contracts over 1 million dollars)
N k
STRUCTURAL STEEL INSTALLATION AND REBAR INSTALLATION
Name of Bidder:
Project Name:2O2L Paint Line Strinino and RPM Renlacement
Project Number:21-3011.1
Pursuant to RCW 39.30,060, Bidder shall list the names of the subcontractors with
whom the Bidder, if awarded the contract, will subcontract for performance of the
work of structural steel installation and rebar installation.
Failure of the Bidder to submit, within 48 hours after the published bid submittal time,
the names of such subcontractors or to name itself to perform such work or the
naming of two or more subcon2l-3O11,ltractors to perform the same work shall
render the Bidder's Bid non-responsive and, therefore, void.
Structural Steel Installation Subcontractor Name
Rebar Installation Subcontractor Name
Signature of Bidder
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
Date
9 January 25,202I
CoNTRACTOR'S QUALIFICATION STATEM ENT
(RCW 39.O4.35O)
THE CTTY WTLL REVTEW THE CONTRACTOR'S RESPO'VSES TO THTS FORM TO
DETERMTNE WHETHER THE BTDDING CONTRACTOR TS RESPONSIBLE TO
PERFORM THE CONTRACT WORK. THTS FORM TNCLUDES CRITERTA
ESTABLISHED BY STATE LAW THAT MUST BE MET TO BE CONSTDERED A
RESPONSIBLE BIDDER AND QUALTFTED TO BE AWARDED THIS PIIBLTC
WORKS PROJECT AS WELL AS SUPPLEMENTAL CRTTERTA ESTABLTSHED BY
THE CTTY THAT ARE APPLTCABLE TO THTS PUBLIC WORKS PROJECT.
THE BTDDER SHOULD READ AND RESPOND TO THTS FORM CAREFULLY.
Indicia of contractor's responsibility inherently involve subjective determinations as to
the contractor's ability to perform and complete the contract work responsibly and to
the owner city's satisfaction. The city has an obligation and a duty to its citizens and
its taxpayers to administer its budgets and complete its projects in a businesslike
manner, Accordingly, it has a duty to exercise the type of inquiry and discretion a
business would conduct when selecting a contractor who will be responsible to
perform the contract work,
The city's supplemental criteria are based, in large part, on the qualification statement
form used by the American Institute of Architects, The city provides these criteria so
as to provide the most objective framework possible within which the city will make its
decision regarding the bidder's ability to be responsible to perform the contract work.
These criteria, taken together, will form the basis for the city's decision that a bidder
is or is not responsible to perform the contract work.
Any bidder may make a formal written request to the city to modify the criteria set
forth in this qualification statement, but that request may only be made within 48
hours of the date and time that the bidder first obtains the bid documents or three (3)
business days prior to the scheduled bid opening date, whichever occurs first. If the
city receives a modification request, it will consider any information submitted in the
request and will respond before the bid submittal deadline. If the city's evaluation
results in changed criteria, the city will issue an addendum establishing the new or
modified criteria.
If the city determines that, based on the criteria established in this statement, a
bidder is not responsible to perform the contract work, the city will provide written
notice of its determination that will include the city's reason for its decision. The
bidder has 24 hours from the time the city delivers written notice to the bidder that
the bidder is not responsible to perform the contract work to appeal the city's
determination: No appeals will be received after the expiration of this 24 hour appeal
period. The city may deliver this notice by hand delivery, email, facsimile, or regular
mail. In the event the city uses regular mail, the delivery will be deemed complete
three days after being placed in the U.S. Mail. The bidder's right to appeal is limited
to the single remedy of providing the city with additional information to be considered
before the city issues a final determination. Bidder acknowledges and understands
that, as provided by RCW 39.04.350, no other appeal is allowed and no other remedy
of any kind or nature is available to the bidding contractor if the City determines that
the bidder is not responsible to perform the contract work.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
10 January 25,2O2L
If the bidder fails to request a modification within the time allowed, or fails to appeal a
determination that the bidder is not responsible within the time allowed, the city will
make its determination of bidder responsibility based on the information submitted.
COMPLETE AND S'GAI THIS FORM AS PART OF YOUR BTD. FAILURE TO
PROPERLY COMPLETE THIS FORM MAY ALSO RESULT TN A DETERMTNATION
THAT YOUR BTD TS
'VON-RESPONSIVE
AND THEREFORE VOTD,
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION
WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION
OR MODIFICATION.
The undersigned certifies under oat at the in
sufficiently complete so as to isleadi
formation provided herein is true and
ve YnceSUBMITTED BY:
NAME:
ADDRESS:
PRINCIPAL OFFICE:
ADDRESS:
PHONE:
FAX:
"[\,tn,tann, ùR qlobL
,SPeaatt Pft\j rÌ fu'lútt'Krt14. [,rc-
\\Öøts çw tnduefn4\ Y\Irt J
Sfth/t,L a L fl^¿ov€/
9a'ßS " oLt2o
sbå- Ç82- 9v?A
1
STATUTORY REQUIREMENTS - Per state law a bidder must meet the
following responsibility criteria
Required Responsibility Criteria
1.1 Provide a copy of your Department of Labor and Industries certificate.of
registration in compliance with chapter L8.27 RCW. Sgg 4''KqUhCd
1..2 Provide your current state unified business identifier number. t 02-Ù01- 0Ù å
1,3 Provide proof of applicable industrial insurance coverage for your
employees working in Washington as required in Title 51 RCW, together
with an employment security department number as required in Title 50
RCW, and a state excise tax registration number as required in Title 82
RCW. Providing a copy of a state of Washington "Master License Service
Registration and Licenses" form is typically suffiçient,evidence of the
requirements of this subsection, S€.€, frtT4ClhCd
1.,4 Provide a statement, signed by a person with authority to act and speak
for your company, that your company, including any subsidiary
companies or affiliated companies under majority ownership or under
2021 Paint Line Striping & RPM/Araucto 11 January 25,202I
Project Number: 21-3011. 1
2
control by the owners of the bidder's company, are not and have not
been in the past three (3) years, disqualified from bidding on any public
works contract under RcW 3e.06.010 or 3e.12.06s (3), Ëü fltlq(/V\Ld,
1.5 Provide a signed statement, signed under penalty of perjury by a person
with authority to act and speak for your company, that within the three-
year period immediately preceding the bid solicitation date, your
company is not a "willful" violator as defined in RCW 49.48.082, of any
provisions of chapters 49.46, 49.48, or 49.52 RCW, as determined by a
final and binding citation and notice of assessment issued by the
Department of Labor and Industries or through a civil judgment entered
bv a courr of timired or generat jurisdicrion, stû a:KnuÃetÅ
1.6 Provide proof that a designated person or persons with your company
has either received training from the department of Iabor and industries
or an approved training provider on the requirements related to public
works and prevailing wages under chapter 39.04 RCW and 39.L2 RCW or
provide proof that your company has completed three or more public
works projects and have had a valid business license in Washington for
three or more years and are exempt from this training requirement.grr"i/rtr
^(/nrr)SUPPLEMENTAL CRITERIA - Established by the City to determine bidder
responsibility
ORGANIZATION
2.L How many years has your organization been in business as a Contractor?
2.2 How many years has your organization been in business under its
present business name?
2.2.L Under what other or former names has your organization
operated?
2.3 If your organization is a corporation, answer the following:
2.3.L Date of incorporation:
2.3.2 State of incorporation:
2.3.3 President's name :
2.3.4 Vice-president's na me(s) :
2,3,5 Secretary's name:
2.3.6 Treasurer's name :
2.4 If your organization is a partnership, answer the following:
2,4.L Date of organization:
2.4.2 Type of partnership (if applicable)
2.4.3 Name(s) of general partner(s):
2.5 If your organization is individually owned, answer the following
2.5.L Date of organization
2.5.2 Name of owner:
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
L2 January 25,202L
2.6 If the form of your organization is other than those listed above, describe
it and name the principals:
3. LICENSING
3.1 List jurisdictions and trade categories in which your organization is legally
qualified to do business, and indicate license numbers, if applicable.
3.2 List jurisdictions in which your organization's partnership or trade name
is filed.
4. EXPERIENCE
4.L List the categories of work that your organization normally performs wlth
its own forces.
4.2 Claims and Suits, (If the answer to any of the questions below is yes,
please attach details,)
4.2.L Has your organization ever failed to complete any work awarded to
it?
4.2.2 Are there any judgments, claims, arbitration proceedings or suits
pending or outstanding against your organization or its officers?
4.2.3 Has your organization filed any law suits or requested arbitration
with regard to construction contracts within the last five years?
4.3 Within the last five years, has any officer or principal of your organization
ever been an officer or principal of another organization when it failed to
complete a construction contract? (If the answer is yes, please attach
details.)
4.4 On a separate sheet, list major construction projects your organization
has in progress, giving the name of project, owner, architect or design
engineer, contract amount, percent complete and scheduled completion
date,
4.4.L State total worth of work in progress and under contract:
4.5 On a separate sheet, list the major projects your organization has
completed in the past five years, giving the name of project, owner,
architect or design engineer, contract amount, date of completion and
percentage of the cost of the work performed with your own forces.
4,5.L State average annual amount of construction work performed
during the past five years:
4.6 On a separate sheet, list the construction experience and present
commitments of the key individuals of your organization.
4,7 On a separate sheet, list your major equipment,
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
13 January 25,202L
5. REFERENCES
5.1
5.2
5,3
Trade References:
Bank References:
Surety:
5.3.1 Name of bonding company:
5,3.2 Name and address of agent:
6. FINANCING
6.1 Financial Statement.
After bid opening, the City may require the following financial information
from any of the three apparent low bidders. If so required, the selected
bidder(s) must respond with this financial information within 24 hours of
the City's request for that information. The City's request for this
information shall not be construed as an award or as an intent to award
the contract. A bidder's failure or refusal to provide this information may
result in rejection of that bidder's bid,
6.1.1 Attach a financial statement, preferably audited, including your
organization's latest balance sheet and income statement showing
the following items:
Current Assets (e.9., cash, joint venture accounts, accounts
receivable, notes receivable, accrued income, deposits, materials
inventory and prepaid expenses);
Net Fixed Assets;
Other Assets;
Current Liabilities (e.9., accounts payable, notes payable, accrued
expenses, provision for income taxes, advances, accrued salaries
and accrued payroll taxes); Other Liabilities (e.9., capital, capital
stock, authorized and outstanding shares par values, earned
surplus and retained earnings).
6,L,2 Name and address of firm preparing attached financial statement,
and date thereof:
6.1,3 Is the attached financial statement for the identical organization
named on page one?
6.L.4 If not, explain the relationship and financial responsibility of the
organization whose financial statement is provided (e.9,, parent-
subsidia ry),
6.2 Will the organization whose financial statement is attached act as
guarantor of the contract for construction?
2021 Paint L¡ne Striping & RPM/Araucto
Project Number: 21-3011.1
L4 January 25,202L
7. SIGNATURE
7.1, Dated at this
rfhÞ day of f{øvttøvy
nization: S h\\lrd,Name of O rga
N\AVtan lf\c"
,2027
By:
Title:?w
7.2
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
N\nrþ VYrcrz being duly sworn, deposes and says that the
information provided herein is true and sufficiently complete so as not to
be misleading.
Subscribed and sworn before me this ,t day of ?"üouwu,,'l ,202L.
)
Notary Public:
My Commission Expires:
@
OFFICIAL STAMP
LESLEYANN RYBURN
NOTARY PUBLIC - OREGON
coMMtsstoN No.998400
¡iIY COMMISSION EXPIRES MARCH 26, 2024
15 January 25,202I
I
t
Depaftment of Labor and Industries
PO Box 44450
bfy*Plu, WA 98504-4450
Ìîr,?*,"ffi ,i$ÆHity"--iä
ffitffå^oRe'o62
SPECIAI-IZED PAVEMENT MRKG INC
Ree: CC $PE'CIPMOOOBQ
uBlI: 602-o01'oo3
R'si*,.Ë**mäJÍ'3"b,,tolåü,"'
(cc01) - GSNERAL
Ëtrf;lå[:3fi'*å-iilfiîi,,,
ffi SPECIALIZED PAVEMENT MARKING, INC
1 1095 SW INDUSTRIAL WAY STE A
TUALATIN OR 97062-9685
UBI:602001003 001 0001
163-1
DETACH EEFORE POSÎING
SPECIALIZED PAVEMENf
MARKING, INC
SPECIALIZED PAVEMENT
MARKING, INC.
1 1095 SW INDUSTRIAL WAY STE A
TUALAT|N, OR 97062-9685
UNEMPLOYMENT INSURANCE .
ACTIVE
INÐUSTRIAL INSURANCE . ACTIVE
TAX REGISTRATION . ACTIVE
. BATTLE GROUND GENERAL
BUSINESS . NON-RESIDENT.
, ACTIVE
' MUKILTEO GENERALBUSINESS -
NON-RESf DENT - ACTIVE
LAKEWOOD GENERAL BUSINESS .
, NON-RES|DENT (EXP|RES 6/30/2021 )
. ACTIVE
CHEHALIS GENERAL BUSINESS.
NON-RESTDENT (EXPIRES 6/30/2021 )
- ACTIVE. KIRKLAND GENERAL BUSINESS.
NON-RESIDENT #OBL.OOO4978 -
']fu'é- /"-4t
Expires: Feb28,2021
S TAifEJF WASHINGTON
BUSINESS LICENSE
STATE OF
TYASHINGTON
Profit Corporation
lssue Date: Nov 20, 2020
Unified Business lD #: 602001003
Business lD #: 001
Location: 0001
Expires: Feb28,2O21SPECIALIZED PAVEMENT MARKING, INC
SPECIALIZED PAVEMENT MARKING, INC.
11095 SW INDUSTRIAL WAY STE A
TUALATIN, OR 97062.9685
UNEMPLOYMENT INSURANCE - ACTIVE
TAX REGISTRATION - ACTIVE
INDUSTRIAL INSURANCE - ACTIVE
CITY ENDORSEMENTS:
BATTLE GROUND GENERAL BUSINESS . NON-RESIDENÏ. ACTIVE
MUKILTEO GENERAL BUSINESS . NON-RESIDENT - ACTIVE
LAKEWOOD GENÊRAL BUSTNESS - NON-REStDENT (EXPtRES 6t30t2121) - ACTTVE
cHEHALTS GENERAL BUSTNESS - NON-RESTDENT (EXPTRES 6t3012021) - ACTTVE
KIRKTAND GENERAL BUSINESS - NON-RESIDENT#OBL.OOO4g7B - ACTIVE
ISSAQUAH GENERAL BUSINESS - NON.RESIDENT . ACTIVE
LAKE STEVENS GENERAL BUSINESS - NON-RESIDENT (EXPIRES 613012021I. ACTIVE
MARYSVILLE GENERAL BUSINESS . NON-RESIDENT #O42OCON913 - ACTIVE
OLYMPIA GENERAL BUSINESS . NON-RESIDENT #28013 . ACTIVE
TUMWATER GENERAL BUSINESS . NON.RESIDENT #R-015029 - ACTIVE
VANCOUVER GENERAL BUSINESS - NON-RESIDENT - ACTIVE
EDMONDS GENERAL BUSTNESS - NON-RESTDENT (EXPTRES 6t30120211- ACTIVE
FEDERAL WAY GENERAL BUSINESS - NON-RESIDENT #16-104772.00-8L - ACTIVE
OAMAS GENERAL BUSTNESS - NO¡,¡-RESTDENT (EXPTRES 6130t2021) - ACTIVE
YAKTMA GENERAL BUSTNESS - NON-RESTDENT #81078135 (EXPIRES 12131t2020) - ACTIVE
LICENSING RESTRICTIONS:
Not licensed to hire minors without a M¡nor Work Perm¡t.
This document l¡sts the reg¡strat¡ons, endorsements, and licenses authorized forthe business
namèd above. 8y accept¡ng this document, the l¡censee certi6es the ¡nformation on the appl¡cat¡on
was complete, true, and accurate to the best of his or her knowledge, and that business will be
conducted ¡n compl¡ance w¡th all ¿pplicableWashlngton state, county, and c¡ty regulations.DlrKtor, Departm€nt of Revenue
gâL0û02
DETACH THIS SECTION FOR YOUR WALLET Dircctor, Departme¡t of R€venue
Htr
163-2
SPECIALIZED PAVEMENT MARKING, INC
11095 SW INDUSTRIAL WAY STE A
TUALATIN OR 97062.9685
UBI:602001003 001 0001
SPECIALIZED PAVEMENT
MARKING, INC
SPECIALIZED PAVEMENT
MARKING, INC.
11095 SW INDUSTRIAL WAY STE A
TUALATIN, OR 97062.9685
3, uNct'¡plovtr¡ENT rNsuRANcE -
"'AcTlvE
INDUSTRIAL INSURANCE - ACTIVE
TAX REGISTRATION.ACTIVE
BATTLE GROUND GENERAL
BUSINESS . NON.RESIDENT -
ACTIVE
MUKILTEO GENERAL BUSINESS.
NON-RESIDENT. ACTIVE
LAKEWOOD GENERAL BUSINESS.
NON-RES|DENT (EXPTRES 6/30/2021 ). ACTIVE
CHEHALIS GENERAL BUSINESS -
NON-REStDENT (ÉXPTRES 6/30/2021 )
- ACTIVE
KIRKLAND GENERAL BUSINESS .
NON-RËSIDENT #OBL.OOO4978 .
OETACH BEFORE POSTING
SÎAIE OF
Pr
WASHINGÍON
I
I
I
I
I
I
t
i
I
I
I
I
I
] Expires: Feb28,2021
I
I
I
I
I
I
!
I
I
I
I
I
I
i
I
]fr,é" á,"a"
I
@ BUSINESS LICENSE
STATE OF
WASHINGTON
Profit Corporation
lssue Date: Nov 20, 2020
Unified Business lD #: 602001003
Business lD #: 001
Location: 0001
Expires: Feb28,2021SPECIALIZED PAVEMENT MARKING, INC
SPECIALIZED PAVEMENT MARKING, INC.
11095 SW INDUSTRIAL WAY STE A
TUALAT|N, OR 97062-9685
REGISTERED TRADE NAMES:
SPECIALIZED PAVEMENT MARKING, INC.
This document lists the reglstÍôtions, endorsements, and licens€s authorized for the buslness
named above. 8y accepting this dGument, the llcensee certifies the information on the appllcation
was complete, true, and accurâte to the best ofhis or her knowledge and that business w¡ll be
conducted ln compllance with all âppl¡cableWashington statg county, and city regulâtlons.
Zfu¿"-tu
D¡rector, Depırtment of Revenue
q310002
I
DETACH THIS SECTIQN FOR YOUR WALLET Oirector, Department ol Revenue
Corporate Offïce:
11095 SW lndustrial Way, Suite A
Tualatin, Oregon 97062
Phone: 503-885-0420; Fax 503-582-8629
Oregon CCB License: 138591
Washinqton Office:
14330 32nd Street East
Sumner, WA 98390
WA Contractor License: SPECIPMOOBQ
S PECIALTZED PAVEMENT MARKING, INC.
Power Sweeping . Striping . Related Services
2021 Paint Line Striping and RPM Replacement
CITY OF KENT. PROJECT #21.3011.1
Statutory Requí rements:
L.4
1.5
Mark Price, President
Specialized Pavement Marking, lnc. has not been in the past three (3)
years, disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065 (3).
Specialized Pavement Marking, lnc. is not a "willful" violator as defined in
RCW 49.48.082, of any provisions of chapters 49.46, 49.48 or 49.52 RCW,
as determined by a final and binding citation and notice of assessment
issued by the Department of Labor and lndustries or through a civil
judgment entered by a court of limited or general jurisdiction, within the
three-year period immediately preceding the bid solicitation date.
7-4-z(
Date
SPECIALIZED PAVEMENT MRKG INC Page 1. of 2
L&l regional offices are closed to public visits until further notice. Offices can still help you by phone from 8 a.m. to 5 p.m. weekdays
(except state holidays). l.Jse the phone number for your clqsest regional office fHt0$14llm.sov/âs-encv/conlâc or you can
callthe Office of lnformation and Assistance at 360-902'5800.
Aw¡or.wru\.1 tabd¡ a rnttirsr ri.r..[httns"71-hilJyag0y)
SPECIALIZED PAVEMENT MRKG ¡NC
9w. n9f 9 !:.lrgd.e..ç P.e-r:9n
Principals
PRICE, MARK ALAN, PRESIDENT
EVERTON, ROBERT K, SECRETARY
DAHILL, HOWARD, VICE PRESIDENT
(End:02113t20'14)
Do¡ng business as
SPECIALIZED PAVEMENT MRKG INC
WA UBI No.
602 001 003
IIO95 SW INDUSTRIAL WAY
SUITE A
TUALATIN, OR 97062
503-885-0420
Business lype
Corporâtlon
Governing persons
MARK
A
PRICE
HOWARD DAHILL;
License
Veriry the contractor's active reglstration / l¡cense / certif¡calion (depending on trade) and any past violations.
.ç.._o..ng.t.rJ9!!.-o.n,ç9[-t|f.çfpl Acflve
Meêt6 current r€qulrements,
License specialties
GENERAL
License no.
SPECIPMOOOBQ
Effective - exp¡ralion
01 I 1 I I 2000- 03 I 1 8 I 2022
PsnC.
FIDELITY & DEPOSIT CO OF MD
Bond account no.
088671 94
$12,000.00
Received by L&l Effêctive date
oznEt2008
Expiration date
Unt¡l Cancêled
0310712008
https://secure.lni.wa.govlveriîy/Detail.aspx?UBI:602001003&LIC:SPECIPM000BQ&SAV/:913t2020
SPECIALIZED PAVEMENT MRKG INC
lnlslS.t-gs
Phoenlx lnsurance Company, The
Policy no.
co-8K289175
Rece¡ved by L&l
04t10t2020
Page2 of 2
$2,000,000.00
Effective date
o4t15t2018
Expiration date
0411512021
lnsurânöe h¡story
-s,gvirg9-No Cãviñgs accounts dur¡ng the previous 6 year period,
.Lqyv..ç.sils.nsêi.n9!.!he.,þInC.II.9î.Yins-s-
Ño tàwsuits against the bond or savings accounts dur¡ng the previous 6 year period'
L&l Tax debts
Ñô'lai iäiääbts are recorded for this contractor l¡cense during the previous 6 year period, but some debts
may be recorded by other agencles.
Llcense Vlolatlons
ñö'äöðäêö îiôläiiöns curins the previous 6 yêar per¡od.
Certifications & Endorsements
OMWBE Certificat¡ons
ñö äði¡Vö"öäääiöäiiöiiä äxlst for tn¡s buslness.
¡ pp rsn!! -". S,T¡e!n !¡S. å9 _"..t!
Régiéiered training agent. Check theii eligible progrants âlld occupatìons.
Workers'Comp
Do you know if the business has employees? lf so, verify the buslness is up-to-date on workers' comp premiums.
L&l Account lD Account is current.
992'9:!-{:9:1.
Doing business as
SPECIALIZED PAVEMENT MARKING
Eslimated workers reported
Quarter 2 of Year 2020 "2{ to 30 Workers"
L&l account contact
T3 / KEITH CURTISS (360)902-6641 - Email: CURQ235@lni.wa'gov
Public Works Requirements
Verify the contractor is eligible to perform work on public works projects.
.Be-q.qlfrg.Ir?.in!rs;.Flfgç!!v..e.{slv.1, ?-0-1,q
Exempt from this requlrement.
contractor Strikes
Ñö ;Ïiliö liäTä b-äen lssued aga¡nst this contractor.
Contractors not allowed to bid
ñö ¡äääiiñäätë liaïö iiöää i3êued asainst this contractor.
Workplace Safety & Health
Check for any past safely and health vlolât¡ons found on jobsites this business was ¡esponslble for
No inspections durlng lhe prevlous 6 year period.
https;//secure,lni.wa.gov/verifylDetail.aspx?UBI:602001003&LIC:SPECIPMOO0BQ&SAW=91312020
Corporate Office:
11095 SW lndustrial Way, Suite A
Tualatin, Oregon 97062
2.L
2.2
2,3
2.4
2.5
Washington Office:
3102 NW B Street
Auburn, WA 98001
2.6
S PECIALTZED PAVEMENT MARKING, INC.
Power Sweeping . Striping . Related Services
2021 Paint Line Striping and RPM Replacement
CITY OF KENT - PROJECT #21.3011.1
Specialized Pavement Marking, lnc. has been in business as a Contractor Since L995.
Specialized Pavement Marking, lnc. has been under its present business name since 1997
2.2.1Former Business Name: Asphalt Services of Oregon - 1995-L997.
Our business is a Corporation:
2.3.L Date of lncorporation: September L997
2.3.2 State of lncorporation: Oregon
2.3.3 President's Name: Mark Price
2.3.4 Vice President's Name: Mark Price
2.3.5 Secretary's Name: Bob Everton
2.3.6 Treasurer's Name: Bob Everton
N/A
N/a
N/A
Licensing - See Attached List.
Experience:
4.1 Categories of Work: Pavement Marking/Striping and associated tasks, Stripe Removal,
Rumble Strips, Curbing, and Traffic Control.
4.2.L Ever failed to complete any work awarded to it? No.
4.2.2 Any Judgments, claims, arbitration proceedings or suits pending or outstanding? No.
3
4
Page L of2
Corporate Offlce:
11095 SW lndustrial Way, Suite A
Tualatin, Oregon 97062
Washinston Off¡ce:
3102 NW B Street
Auburn, WA 98001
SPECIALTZED PAVEMENT MARKING, INC.
Power Sweeping . Striping . Related Services
4.2.3 Has your organization filed any law suits or requested arbitration with regard to
construction contracts within the last five years? No.
4.3 Within the last five years has any officer or principal of your organization ever been an officer or
principal of another organization when it failed to complete a construct¡on contract? No.
4.4 See Attached Sheet.
4.5 See Attached Sheet.
4.6 See Attached Sheet.
4.7 See Attached Sheet.
5 References:
5.1 See Attached Sheet
5.2 See Attached Sheet
5.3.L Name of Surety: Fidelity & Deposit Company of Maryland
5.3.2 Name/Address of Agent: Rick Kowalski, L26L SW 12th Ave, Suite 500, Portland, OR 97205
6 Financing
6.L- 6.2 Will be provided after bid opening upon request.
/u,fu z-1^?
Mark Price, President Date
PageZ ofZ
S PECIALIZED PAVEMENT MARKING, INC.
Power Sweeping . Striping . Related Services
4.4 Maior Construction Proiects in Process (over S250K)
Job #Job Name Cllent Owner Contract %
4.4.1Total Worth of Work ln Progress and Under Contract:
. Approx¡mately $15 Million
Amount
24282-E320 South Bellevue Sound Transit Parkins Structure Lvd¡s Construct¡on. lnc.Sound Transit s259,634.00 84%
24040-E340 Bel-Red Sound Transit Max J, Kunev Comoanv Sound Transit s26t.707.93 43%
15049-FBO ReÞair Maintenance Ramo - Kinsslev Field ANGB - Klâmâth Kiew¡t lnfrâstructure West Co.Oregon A¡r National Guard s290.000.00 0%
44925-INU Mendenhall Loop Road Caoacity lmprovements Secon AKDOT s292.575.00 so/.
24170-E335 Downtown Bellevue to SDrins Distr¡ct-Sound Transit Stad and w¡tbeck/AtkinsÕn Sound transit s297.789.62 42Yo
2494t-SR 522 -FR I.5 TO 615T AVE NE PAVING WSDOT # 9501 Titan Earthwork WSDOT 53s7.444.oo o%
44675-JNU Esan Drive lmprovements Ma¡n St, - loth St.Secon AKDOT s36s,667.00 3%
24120-8360 SR520 to Overlake Transit Center-sound Transit Kiewit-Hoffman / East Link Sound Transit S424.803.73 4A%
14629-l-5. Roberts Creek Rd. - South UmDoua River Section Kerr Contractórs. lnc.ODOT s459.655.50 0%
14734-l-5 Californ¡a State L¡ne - Ashland Proiect Carter & Comoanv ODOT 346s.437.s0 25%
35039-Steese Hwv & Chena Hot Sor¡nqs Rd Ramo Teimini Roundabouts Exclus¡vê Pâvins AKDOT s561,568.25 5%
24818-WATERFRONT SEATTLE ATASKAN WAY SDOT Garv Merlino Const Co lnc SDOT Ss73.987.85 13%
15132-ODOT Rumble Str¡Ds Proiect - Various Counties OR Deot. of TransDÕrtâtion ODOT ss9s.030.00 0%
2493r-DELRIDGE WAY SW. RAPID RIDE H IINE Jansen lnc,SDOT s607.171.85 o%
23773-Seattle-Traff¡c Chãnnelizat¡on Services Citv of Seâttle SDOT s616,842.0s 87%
25rO7-K¡ng County lnternat¡onal Airport Pa¡nt¡ns 2020 -Kine Countv - Airoort D¡v¡s¡on Kins Co.S6ss.ooo.oo o%
15069-Div¡sion Trans¡t Proiect - Raimore Construct¡on Râimore Construction LLC Tri-Met s69s.373.00 0%
2449L L-200 - Northsate Stat¡on to NE 200th St. B¡d PackaRe #25 Jânsen lnc.Sound Transit s703.343.00 2%
34904-HSIP Seward Hwv Passins Lanes MP 37-52 Preservât¡on MP 3648 OAP Genêrâl Contrãctors AKDOT s723.533.40 0%
14462-0R212, UPRR - US26 Sec.Kerr Contractors, Inc.ODOT S7ss.8ss.5o 49%
24782-I-90 EASTGATE TO SR 9OO WSDOT # 9429 Atkinson Construct¡ôn WSDOT s8s1,s45.50 29%
24750-SR 520 MONTTAKE TO TK WASHINGTON INTERCHANGE BRIDGES Graham Contract¡ns Ltd WSDOT s1-100.433.7s 20%
24604-I.5 PORTLAND AVE TO PORT OF TACOMA RD SB HOV Atk¡nson Construction WSDOT L,!24,142.84 35%
24579-l-5 Steilacoom-Dupont Rd to Thorne Ln-Corridor lmprovements Atkinson Construction WSDOT s1.360.079.4s 45/"
11095 SV/ Industrial Way, Suite A . Tualatin, OF.97062. Ph. (503) 885-0420 . Fax: (503) 582-8629. CCB#138591
SPECIALTZED PAVEMENT MARKING, INC
Power Sweeping . Striping . Related Services
4.5 Maior Proiects Completed in the past five vears (proiects over S250Kl
Date
Job# Job Name Client Owner Contract Amount
24032-Olympic Reqion Rumble WSDOT - Olympia WSDOÏ $2s2,840.36 818/2017
22786-NE 134th St Interchanoe Max J. Kunev Company WSDOT 92s3,704.34 4lt6l201s
14502-03-0G9504 - Replace Polyester C0ncrete Peterson Chase CALTRANS $2s6,22s.00 6126/2018
$261.791.5913934-2016-17 Road Fund Overlays Baker Rock Resources MUNI t0/30120t7
13421 I-90 Mullan-Montana St Ln Acme Concrete Paving ITD $262,388.03 10ltl20t6
14657-¡-90, wA 5T LN to Bike and Ped tsE, Post Falls
Td:hn Poe Asphalt Pavlng Inc.ITD $266,588.54 9/ßl20te
I-84 Encina - Pleasant Val Oreqon Mainline Pavinq, LLC ODOT i276,358.7r tu31201814094-
23881-SR4 Et al Pavement Rehab Gran¡te Construction Company WSDOT $277,389.45 8/11/2017
14662-PDX Taxiway K Rehabil¡tat¡on Tapani Underqround Port of Portland $294,800.00 t011612019
MUNI $307.899.4523989-Pacific Hwy South HOV Lan Graham Contracting Ltd tLlt612018
23835-2016 Annual Str¡oinq Kirkl City of Kirkland, WA MUNI $31s,599.00 12/1412016
24624-NCR CENTERLINE RUMBLE STRIPS 2019 WSDOT - North Central Reqion WSDOT $316,,108.50 412612019
13916-US97 UPRR O' Xins-Mil¡tary Oregon Mainline Paving, LLC ODOT $321,s83.00 612912017
14485-I-84: Poverw Flats - Meacham (ODOT)Oreqon Mainline Paving, LLC ODOT $332,100.00 t0127120t8
OAP General Contractors AKDOT $340,s08.3s st261201633595-Ingra to Gambell Phase 1
Roy L Houck Construction ODOT $341,374.s0 t0/24/201814444-FFO-US97I Sunriver Interchange - OR31 Sec.
tôDclTl
Jansen Inc.City of Seattle $342,08s,75 slt4/201924446-2018 ARTERIAL ASPHALT & CONCRETE PKG
#) ()ñ17-Oqq\
WSDOT $345,844.7s e/28120t824437-SR 522 SR 9 VIC TO SNOHOMISH RIVER -
061 8n1 4 Lakeside Industries
23783-I-90 WB Mercer Slouqh Lakeside Industr¡es WSDOT *347,794.0L thol20L6
44516-JNU Runway Safety Area, Phase 2C (lNU)Secon cBl $347,891.00 6/2012019
14098-vancouver Joint city-county Preservatlon
a^ntrâ.t Intermounta¡n Slurry Seal City of Vancouver $3s4,179.00 1o12312017
24215-Road Safety-H¡gh Fr¡ction SuÉace Treatment ierce County Planning & Public Worl Pierce County $360,110.00 tolru2017
t4452-Reg 3 Plural Comp - 834926 AL, Bl,Cl, CZ,
N1 Ff F? F1 F'OR Dept. of Transportat¡on ODOT $362,8s8.02 612312019
1399s-US26 Cornelius Pass Rd-NW Kerr Contractors, Inc.ODOT $363,030.03 |tl5l20L8
33971-Cold Bay AirDort ImDrove Knik Construction AKDOT $368,ss7.6s 91812017
s371.747.0012875-OR8 Minter Br¡dse Road -Moore Excavation, Inc.ODOT 9l23l20Ls
14483-I-84 N Hunt¡ngton Inch-N Fork Jacobson Gulch
IÔDOTì ODOT - Ontario ODOT $382,830.00 5/1412019
23388-SRs20 Montlake-Everqreen Flatiron Constructors, Inc,WSDOT $389,870.33 912612018
Idaho TransDortation DeDt, D6 ITD $393,061.49 LLt28t20t8t3173-FY14 D6 Durable Pvmt Mkgs
14035-2016 so Central chip Seal Harney Rock & Paving Co.ODOT $396¡r5.oo 9/1112017
33764-Fl13 Mat-Su Pvmt Mkqs 20 Alaska DOT & PF AKDOT $397,769.80 6/2212016
24r40-2017 Annual Stripinq - CiW of Kirkland City of Kirkland, WA C¡ty of Kirkland $398,175.48 7lt9/20r7
13140-FFO-I-5 Fern Vallev Int Hamilton Construct¡on Co ODOT $404,613.66 313U2017
14071-CalTrans 03-0G3404 Q&DConstruction,Inc.CALTRANS $40s,s48.00 101912017
24053-l-405 Hard Shoulder Runni Graham Contract¡nq Ltd WSDOT $416,680.00 9l13l20t7
t4775-2017-18 Road Fund Maintenance Overlay-
\^rÀarì Eagle Elsner, Inc.WACO i420,732.60 tol20l2ot8
14106-I-5 Durable Striping ODOT Salem ODOT $426,876.80 4il2017
24482 2018 ANNUAL STRIPING PRO]ECT CITY OF
¡(ÎPt(l ÂNn City of Kirkland, WA City of Kirkland $432,089.80 812912018
14066-CalTrans 03-0G5704 S¡erra Nevada Construction CALTRANS $440,0s3.00 912212017
13443-West Eugene EMX Extension W¡ldish Bu¡ld¡ng Co.MUNI $452,732.64 9ls/2017
13862-Us3oMcNamee Rd-NW Bridqe Kerr Contractors, Inc.ODOT $4s4,094.58 sl23lzoL7
11095 SW Industrial V/ay, Suite A . Tualatin, OR 97062 . Ph. (503) 885-0420 . Fax: (503) 582-8629. CCB#I38591
14975 Repair Work - CalTrans 09-376804 - Lone P¡ne Ennis Flint CALTRANS $4s6,000.00 s/|s/2020
23427-I-5 Portland Ave - Port ofTacoma Hamllton Construction Co WSDOT $457,667.73 12/14120ß
14L44-2017 Countywide Pavement Striping Poect-
a^'^,liÞ r^, 'nh,
Cowl¡E County Dept of Public Work CowliÞ County $460,893.81 8/26/2017
74087-2017 Spring Road Fund Maintenance Overlay
1t^rÂaô\Oregon Mainline Paving, LLC MUNI í474,496.28 t2/712017
24054-StriÞing Program 20u Grant County Publ¡c Works WSDOT $491,329,06 1011012017
t4374-I-5: North ïigard Interchange - East Portland
FrePWâv I/a Oregon Ma¡nline Paving, LLC ODOT $492,s62.s8 Ll29/7019
24123-I-5 Ebey Slouqh Bridqe To SR 531 I/C dman Materials, Inc. (formerly Cemr WSDOT $s02,899.00 6/212019
13883-Reo 4&5 Plural ComD PA-44 ODOT - District 13 ODOT ss09,70s.77 8t7t2016
13582-Reqion 1 Rumble Strlp Ins ODOT Troutdale ODOT $51 1,045.00 713U20t7
24636-2018 Arterial Asphalt Package 3 City of Seattle KC Equipment LLC City of Seattle $s28,738.85 9110/2019
14443-Reg 4 & 5 17119 Region 5 MFD - 833616-412 ODOT - D¡strict 13 ODOT $s33,s83.72 514/2019
14138-I-5 Willamette River Bridge - Woodburn Sec Knife River Corporation NW ODOT $540,513.45 to/1812017
33847-Sterlino Hwv MP 114-135 Pruhs Corporat¡on AKDOT $s69,s2s.00 6129/2017
33708-Fairbanks & North Pole Intersection strlping -
qiâ^Â ff Alaska DOT AKDOT çs71,470.00 8112/2016
24460-Str¡ping Program 2018 Grant County Grant County Public Worla MUNI $s78,636.1s 10129/2018
14189-I-205 Pacific Highway - Abernethy Bridge Sec.Oregon Mainline Pav¡ng, LLC ODOT $s83,490.21 9/26/2017
13151-CalTrans 03-249204 Road & Highway Builders LLC CALI-RANS $608,26s.00 8/1012017
74453-u59/: SnaniKo - Trout CreeK tsr¡oge sec.
fônôTt High Deseft Aggregate & Paving ODOT $618,463.00 7122/2019
13834-I-84 lordan Rd-Multnomah Kerr Contractors. Inc.ODOT $622,770.96 81812017
13252-FFO-US26 MP49.2-57.45 K &. E Excavating, Inc,ODOT $623,72t,07 r0112/2016
22592-I-90 Snowshed to Keechelus Dam Atkinson Constructlon WSDOT $627,926.14 70115/2019
44090-various Primary Airports - surlace Preservat¡on Alaska DOT & FP Juneau AKDOT $643,490.00 7122/2017
13189-I-5 Martin Creek Oregon Mainline Pav¡ng, LLC ODOT 9645,362.75 7/U2015
12907-I-84 Kamela Interchanqe -Oreqon Mainline Pav¡ng, LLC ODOT $706,168.74 Lt/tt12016
44742-var¡ous Pr¡mary/Non-Primary tAs Airpoft
Þâ\rìnñ Mârk¡nôa Alaska DOT & FP Juneau CBJ $735,450.00 to/t3/2019
34256-I udor Road, M¡nnesota to h. Sbth Pavement
Þrêcêruãt¡ôn QAP General Contractors AKDOT $781,299.3s 912012018
3424t Sterl¡ng llwy MP 58-/9 & 6[ì-19 Renaþ, &
Kêñâ¡ N\^.lP \/ic¡l^r Granite Construction Company AKDOT $86s,87s.40 s12812020
13528-I-84 Cascade Locks-Hood R Oreqon Malnline Pavinq, LLC ODOT $891,127.0s 8/17/20t8
23344-I-5 M St to Portland Ave Max J. Kuney Company WSDOT $901,178.42 r/22/2019
34685-Parks Hwy MP 356-362 Resurfacing/Automated
\/Þh¡.1ê alâ<çifìa HC Contractors, Inc.AKDOT $987,300.2s 9/2712019
24074-2014 County Safety Select¡on-King County CA Carey Corp King County $1,050,000.00 111612017
44431-FFY1E 5R A¡rport Pvmt. MrKs. & Hwy. Strip¡ng
ÂknôT Alaska DOT & FP Juneau AKDOT $1,369,409.49 913120t8
23857-USz Eastern Reoion Inters WSDOT-Eastern Req¡on WSDOT $1,s26,969.5s sl1U20L7
23s04-I-90 2-Way Transit & HOV IMCO General Construction WSDOT $1,681,301.10 9/1412017
14409-CalTrans 10-1H8804 - Stockton CalTrans D10 CALTRANS {3,996,791.46 6/2912018
22778-I-405, NE 6rh Sr to I-5 Wi Flat¡ron Constructors, Inc.WSDOT $4.848.978.88 812212016
14445-CalTrans 03-1G1904 - Truckee CalTrans D3 CALTRANS $L0,946,260.76 L0/r112018
4.5.1Average Annual Amount of Construction Work Performed during the past 5 vears:
Average $30 million.
S PECIALIZED PAVEMENT MARKING, INC.
Power Sweeping . Striping . Related Services
4.6 Construction Exoerience of Kev ln dividuals at Snecialized Pavement Markins. lnc.
lndividual's Name Present Position Years Experience
Mark Price President 26
Henry Robinson Project Manager/Scheduling 19
Bob Everton cFo 25
Tyler Pierce General Manager, WA 26
Troy Benedict Field Superintendent 23
Rob Busse Field Superintendent 22
11095 SV/ Industrial Way, Suite A . Tualatin, OP.97062. Ph. (503) 885-0420 . Fax: (503) 582-8629. CCB#I38591
S PECIALIZED PAVEMENT MARKING, INC.
Power Sweeping . Striping . Related Services
4.7 Maior Equipment
Quantity Equipment Description
L 1999 - Paint Striping Truck
t 2000 - Paint Striping Truck
L 2004 - Paint Striping Truck
L 2005 - Paint Striping Truck
1,200L - Thermoplastic Striping Truck
L 2006 - Thermoplastic Striping Truck
L 2003 - MMA Striping Truck
t 2006 - MMA Striping Truck
1 20L9 - MMA Striping Truck
t ZOOL - Epoxy Striping Truck
L 1999 - Turboblast Shot Blaster
L 2006 - Concord Hydroblaster
L 2002 - Vac Trac Grinder
L 2003 - lnlaid Milling Truck
L 2006 - Wirtgen Milling Machine
L 2015 - StripeHog Hydroblaster
L L997 - Freightliner Blastrac Shot Blaster/Abrasion Truck
21 Support Trucks (1.O) / 7 Tons (L1)
4 Sweepers
11095 SV/ Industrial Way, Suite A. Tualatin, OF.9'7062. Ph. (503) 885-0420 . Fax: (503) 582-8629. CCB#I38591
CORPORATE HEADOUARTERS
11095 SW Industrial Wa¡ Suite A
Tualatin, Oregon 97062
PH. (503) 885-M20
Fax: (503) 582-8629
ccB# 138591
WASHINGTON DIVISION
14329 32nd Street East
Sumner, Washington 98390
PH. (253) 32r-3r93
Fax: (253) 321-3250
ccB# SPECIPMOO0BQ
SPECIALIZED PAVEMENT MARKING, INC
CREDIT INFORMATION
Oregon CCB License:
WA Contractor's License:
UBI:
T¡x ID:
Business Start Date:
Date of Incorporation:
Principles:
Bank References:
Credít References:
138591
sPECrPM000BQ
602-00r-003
91-1854057
1995
September 1997
Mark Price - President
Bob Everton - Secretary
Northwest Bank
4900 Meadows Road, Suite 410
Lake Oswego, OR 97035
Phone: (503)905-3212
Fax: (503) 906-3938
Account: 1010006748
Contact: Tom Lee
Ennis-Flint, Inc.
Ennis Paint Division
P.O, Box 603518
Charlotte, NC 27410
Phone: (336) 477-8398 or (503) 569-0332
Fax: (336) 475-2340
Email : j ohns@ennisfl int,com
Jubiø Corporation
P.O. Box ll25l
Portland, OR 97211
Phone: (503) 283-1 137
Fax: (503)-240-5852
Email : marina.avalvuk@jubitz.com
Les Schwab Tire Center
15905 SW Tualatin-Sherwood Hwy
Sherwood, OR 97140
Phone: (503) 925-0570
Fax: (503) 625-9332
BIDDER RESPONSIBILITY CRITERIA
Statement that Bidder Has Not Been Disqualified
This statement is required by state law (RCW 39.04.350(1)(d)) to be submitted to
the City before the contract can be awarded.
The bidder hereby certifies that, within the three-year period immediately preceding
the bid solicitation date (February 9, ZOZL), the bidder has not been disqualified from
bidding on any public works contract under RCW 39.06.010 or 39,12,065(3).
(n\tz¿d Ue{yr0nf N'ìo¡Y g¡¡, \Ytc"
Bidder's B
sig nature o Au
\\r\w P nce
ame
zed Officialx
Printed Name
YwÉio\(rnt
Title
2'Ç- Ivzt Ítdt\rttl'!'l ÙR
Date City State
x If a corporationt proposal must be executed in the corporate name by the president
or vice-president (or any other corporate officer accompanied by evidence of
authority to sign). If a co-partnership, proposal must be executed by a partner.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011. 1
16 January 25,202L
BIDDER RESPONSIBILITY CRITERIA
Certification of Compliance with Wage Payment Statutes
This certification is required by state law (RCW 39.04.350(2)) to be submitted to
the City before the contract can be awarded.
The bidder hereby certifies that, within the three-year period immediately preceding
the bid solicitation date (February 9, 202L), the bidder is not a "willful" violator, as
defined in RCW 49.48.082, of any provision of chapters 49.46,49.48, or 49.52 RCW,
as determined by a final and binding citation and notice of assessment issued by the
Department of Labor and Industries or through a civil judgment entered by a court of
limited or general jurisdiction.
I certify under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
,s r,t\ tæút PsüiilnøH N4r¡rtil n , \hc"
Bidder's Bu ness e
S ignature o uthorized Officialxf
\ftrÂYK ?wce
Printed Name
Yrectdt¡nt
Titleyç1.oZ't iln\fr"n'rì TR
Date City State
x If a corporationt proposal must be executed in the corporate name by the president
or vice-president (or any other corporate officer accompanied by evidence of
authority to sign). If a co-partnership, proposal must be executed by a partner.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011,1
77 January 25,2O2I
PROPOSAL SIGNATURE PAGE
The City will issue multiple Notice to Proceed letters. A limited Notice to
Proceed will be issued for the installation of raised pavement markers and
the paint line striping of Group A Streets on the day of the preconstruction
meeting. The City anticipates issuance of a separate Notice to Proceed for
the peformance of the remaining work on July 6t 2O2L.
The undersigned bidder, if awarded to him/her, hereby proposes and agrees
to start construction work on the Contract to complete all paint line striping
on Group A Streets on or before ten (1O) working days from the date of the
Limited Notice to Proceed. Liquidated Damages may be assessed if the work
is not completed within ten (1O) working days. RPM installation may be
completed by the end of the full Notice to Proceed time period.
The Contractor also proposes and agrees to complete the Contract within
forty (4O) working days after issuance of the City's final Notice to Proceed.
The undersigned bidder hereby agrees to submit all insurance documents,
performance bonds and signed contracts within ten (10) calendar days after City
awards the Contract,
No bidder may withdraw his/her bid for a period of sixty (60) calendar days after the
day of bid opening.
The required bid security consisting of a bid bond, cashier's check or cash in an
amount equal to 5olo of the total amount is hereto attached.
Notice of acceptance of this bid or request for additional information shall be
addressed to the undersigned at the address stated below,
Receipt of Addendum No.'s _t to the plans and/or
specifications is hereby acknowledged. Failure to acknowledge receipt of the addenda
may be considered an irregularity in this proposal.
By signing this Proposal Signature Page, the undersigned bidder agrees to accept all
contract forms and documents included within the bid packet and to be bound by all
terms, requirements and representations listed in the bid documents whether set forth
by the City or by the Bidder,
DATE, 7',Y'1^)-\tÃo\\iL(Å, P,,tvt,ttrteeìT Tt/ì øn Kr nJ tvlc,
NAME OF D
Sign
\l\ft\rËfvice
re of Authorized Rep
rîÉer
resentative
dtfnr
Print Name and Titl(
0qS eW Mú\
e)
Ue tnq I t\l
Address
ruqtrr"n'n, DR q1ûb2
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
1B January 25,2027
BID BOND FORM
KNOW ALL MEN BYTHESE PRESENTS:
That we,Specialized Pavement Marking, lnc.as Principal,
and Fidelity and Deposit Company of Maryland as Surety, are held and firmly
bound unto the CITY OF KENT, as Obligee, in the penal sum of FivePercentof TotalAmount
Bid (5%)
Dollars, for the payment of which the Principal and the Surety bond'thémselves, their
heirs, executors, administrators, successors and assigns, jointly and severally, by
these presents.
The condition of this obligation is such that if the Obligee shall make any award to the
Principal for 2O2l Paint Line Striping and RPM Replacement/ Project Number:
21-3011.1
According to the terms of the proposal or bid made by the Principal thereof, and the
Principal shall duly make and enter into a contract with the Obligee in accordance with
the terms of said proposal or bid and award and shall give bond for the faithful
performance thereof, with Surety or Sureties approved by the Obligee; or if the
Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal
amount of the deposit specified in the invitation to bid, then this obligation shall be
null and void; otherwise it shall be and remain in full force and effect and the Surety
shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the
amount of this bond.
SIGNED, SEALED AND DATED THIS gth DAY OF February 202t
Specialized Marking, lnc.
By:
PRINCIPAL
Fidelity and Deposit Company of MarylandNlùd"\Nw
SURETY Vicki Mather, Attorney-in-Fact
20
Received return of deposit in the sum of $
2021 Pa¡nt Line Striping & RPM/Araucto
Project Number: 21-3011. 1
19 January 25,202I
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICÄN CASUÄLTY AND SURETYCOMPANY
FIDELITY AND DEPOSIT COMPANY OFMARYLAND
POWER OFATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of
New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of lllinois, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert
D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By-Laws of said Companies, which are set forth
on the reverse side hereofand are hereby certified to be in full force and effect on the date hereof do hereby nominate, constitute, and appoint
J. Patrick DOONEY, Vicki MATIIER' Richard W. KOWALSKI, Joel DIETZMAN, Brent OLSON, Gail
PRICE and Gloria BRUNING, of Portlando Oregon, EACH, its true and lawful agent and Attomey-in-Fact, to make, execute, seal
and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of
such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and
purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZUzuCH AMERICAN INSURANCE
COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND
SURETY COMPANY at its ofnice in Owings Mills, Maryland, and the regularly elected officers of the FIDELITY AND DEPOSIT
COMPANY OF MARYLAND at its ofnice in Owings Mills, Maryland, in their own proper persons.
The said Vice President does hereby certif,i that the extract set forth on the reverse side hereofis a true copy ofArticle V, Section 8, ofthe
By-Laws of said Companies and is now in force.
IN WITNESS V/HEREOF, the said Vice-President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUÄLTY AND SURETY COMPANY, and
FIDELITYÄND DEPOSIT COMPANY OF MARYLAND, this lOth day of June, A.D.2020.
ATTEST:
ZURICH AMERICAN INSURANCtr COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OFMARYLAND
By: Robert D. Murray
Vice President
S)*o.u ÃWwr'*
By: Dawn E. Brown
Secretary
State of Maryland
County of Baltimore
On this lOth day of June A.D.2020, before the subscriber, aNotary Public of the State of Maryland, duly commissioned and qualified, RobertD.
Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and offìcers described in and
who executed the preceding instrument, and acknowledged the execution ofsame, and being by me duly sworn, deposeth and saith, that he/she is the said
ofücer ofthe Company aforesaid, and that the seals afüxed to the preceding instrument are the Corporate Seals ofsaid Companies, and that the said Corporate
Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction ofthe said Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affìxed my Offrcial Seal the day and year first above written.
G-"ñ-"- A.å,r,rü4*/
Constance A. Dunn, Notary Public
My Commission Expires: July 9,2023
1fir
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section 8, Attorneys-in-Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested cor?orate seal, appoint attorneys-in-fact with authority to execute bonds, policies,
recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
attorney-in-fact to affix the corporate seal thereto; and may with or without cause modif, of revoke any such appointment or authority at any
time."
CERTIFICATE
I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMEzuCAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certifu that
the foregoing Power of Attorney is still in full fo¡ce and effect on the date of this certificate; and I do fufiher certif that Article V, Section 8,
of the By- Laws of the Companies is still inforce.
This Power of Attorney and Certiltcate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at ameeting duly called and held on the l5th day ofDecember 1998.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affrxed by facsimile on any Power of Attorney...Any such Power or any certifìcate thereof bearing such
facsimile signature and seal shall be valid and binding on theCompany."
This Power of Attomey and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the lOth day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of
any Vice-President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
day \\.
'ßwnltl'if*-
By:Brian M. Hodges
Vice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETEDESCRIPTION
OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOURCONTACT
INF'ORMATIONTO:
Zurich Surety Claims
1299 ZurichWay
Schaumburg, IL 60 196-1056
www.reportsfclaims@zurichna.com
800-626-4s77
lCoB
CITY OF KENT
COMBINED DECLARATION FORM :
NON-COLLUSTON, MTNTMUM WAGE
NON.COLLUSION DECLARATION
I, by signing the proposal, hereby declare, under penalty of perjury under the
laws of the United States that the following statements are true and correct:
That the undersigned person(s), firm, association or corporation has
(have) not, either directly or indirectly, entered into any agreement,
participated in any collusion, or otherwise taken any action in
restraint of free competitive bidding in connection with the project
for which this proposal is submitted,
2. That by signing the signature page of this proposal, f am deemed to
have signed and to have agreed to the provisions of this declaration.
AND
MINIMUM WAGE AFFIDAVIT FORM
I, the undersigned, having duly sworn, deposed, say and certify that in connection
with the performance of the work of this project, I will pay each classification of
laborer, workman, or mechanic employed in the performance of such work not less
than the prevailing rate of wage or not less than the minimum rate of wage as
specified in the principal contract; that I have read the above and foregoing statement
and certificate, know the contents thereof and the substance as set forth therein is
true to my knowledge and belief.
2O2L Paint Line Striping and RPM Replacement
Project Number: 21-3011.1
1
NAME OF PROJECT
STwor\ize{ lowüylûr-f VlotrrKin$ r \nc "
NAME OF BIDDER'S FIRM
SIGNATURE OF AUTHO D REPRESENTATIVE OF BIDDER
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3011.1
20 January 25,202L
NOTICE
Your contract agreement is not yet fully executed.
As such, we are unable to date either the bond or power of
attorney as these documents must not pre-date the contract.
Please insert the correct date on all documents once the contract
agreement is fully executed.
Thank you.
fuichor Insurance & Surety, Inc.
L20I SW 12th Ave., Suite 500, Portland, OR 97205
(503) 224-2soo
Bond # 9353822
PAYMENT AND PERFORMANCE BOND
�N-- TO CITY OF KENT
W A 3 111 N O T ON
KNOW ALL MEN BY THESE PRESENTS:
That we, the undersigned, Specialized Pavement Marking, Inc.
as Principal, and Fidelity and Deposit Company of Maryland 111iULJ Q
a Corporation organized and existing under the laws of the State of WRSWXKJ0Wr as a
Surety Corporation, and qualified under the laws of the State of Washington to
become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are
jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of
$ 255,780400 # * , together with any adjustments, up or down, in the total contract
price because of changes in the contract work, for the payment of which sum on
demand we bind ourselves and our successors, heirs, administrators or personal
representatives, as the case may be,
* Two Hundred Fifty -Five Thousand Seven Hundred Eighty and No/100 ***
This obligation is entered into in pursuance of the statutes of the State of
Washington, and the Codes and Ordinances of the CITY OF KENT.
Nevertheless, the conditions of the above obligation are such that:
WHEREAS, under and pursuant to a motion, duly made, seconded and passed
by the City Council of the City of Kent, King County, Washington, the Mayor of the
City of Kent has let or is about to let to the above bounden Principal, a certain
contract, the said contract providing for construction of 2021 Paint Line Striping
and RPM Replacement/Project Number: 21=3011.1 (which contract is referred to
herein and is made a part hereof as though attached hereto), and
WHEREAS, the Principa! has accepted, or is about to accept, the contract, and
undertake to perform the work therein provided for in the manner and within the time
set forth.
NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully
perform all the provisions of said contract in the manner and within the time herein
set forth, or within such extensions of time as may be granted under the said
contract, and shall pay all laborers, mechanics, subcontractors and material men, and
all persons who shall supply the Principal or subcontractors with provisions and
supplies for the carrying on of said work and shall indemnify and hold the CITY OF
KENT harmless from any damage or expense by reason of failure of performance as
specified in said contract or from defects appearing or developing in the material or
workmanship provided or performed under said contract, then and in that event this
obligation shall be void; but otherwise it shall be and remain in full force and effect.
IN
WITNESS WHEREOF, the above bounden parties have executed this
instrument under their separate seals. The name and corporate seal {if required by
law) of each corporate party is hereto affixed and duly signed by its undersigned
representatives pursuant to authority of its governing body.
2021 Paint Line Striping &RPM/Araucto 24 January 25, 2021
Project Number; 21-301 1,1
nd i r Q (�;r U P,rVI I"
DATE ; v2 oL" c L Qc�`
PR I IVT NAME
DATE : � •' -��� �'�-/
CORPORATE SEAL:
Specialized Pavement Marking, Inc.
PR I IVC I PAL (enter principal's name above)
BY ;
DATE :
CORPORATE SEAL:
Fidelity and Deposit Com
SURETY
BY:
DATE:
TITLE;
Attorney -in -Fact
ADDRESS:
of Maryland
12Q1 SW 12th Ave., Suite 500
Portland, OR 97205
CERTIFICATE AS TO CORPORATE SEAL
I hereby certify that I am the (Assistant) Secretary of the Corporation named as ore
Principal in the within Bond; that
Who signed the said bond on behalf of the Principal
of the said Corporation; that I know his signature the
Bond was duly signed, sealed, and attested for and i
authority of its governing body. I
reto is genuine, and that said
n behalf of said Corporation by
SECRETARY OR ASS I STA
SECRETARY
2021 Paint Line Striping &RPM/Araucto
Project Number: 21-3011.1
25
January 25, 2021
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of
New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert
D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth
on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint
J. Patrick DOONEY, Vicki MATHER, Richard W. KOWALSKI, Joel DIETZMAN, Brent OLSON, Gail
PRICE and Gloria BRUNING, of Portland, Oregon, EACH, its true and lawful agent and Attorney -in -Fact, to make, execute, seal
and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of
such bonds or undertakings in pursuance of these presents, shall be its binding upon said Companies, as fully and amply, to all intents and
purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCEI
COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUAL Y AND
SURETY COMPANY at its office in Owings Mills, Maryland, and the regularly elected officers of the FIDELITY AND DEPOSIT
COMPANY OF MARYLAND at its office in Owings Mills, Maryland, in their own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the
By -Laws of said Companies and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/hex names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this IOth day of June, A.D. 2020.
tttoe
ATTEST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
By: Robetvt 7-).1Vurray
Yice President
�;��q�thG � ,(EGG>��-•
By: Dawn E. Brown
Secretary
State of Maryland
County of Baltimore
On this lt7tlr day ofJwie A.1), 2t)2b, before the subscriber, a Notary Pttblie of ttte Sttttc. of ytttrylaud, duly commissioned arad qualified, Robcrtl3.
Alurray, Vice President and llflyvn L'. tiro�rn, Secretary° of the Cnrnpt►nies, id me persanully krtown to tie the individuals �ntd offjccrs elcscribcd in and
rvho executed the preceding it strunrent, and acknowledged the execuuon of same, and being by me duly s�torn, deposeth and saitlr, that ltclsi�e is tltt $did
officer of the Company aforesaid, and that the seals affixed to tilt preceding instrument are the Corporate Seals of said Companies, and that the said Corporate
Seals and the signature as such officer Nvere duly affixed and subscribed to tie said instrument by the authority and direction of the said Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
Constance A, Dunn, Notary Public
My Commission Expires: July 4,2023
EXTRACT FROM BY-L.AWS OF THE COMPANIES
"Article V. Section 8, Attomeys4n-Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attorneys4n-fact with authority to execute bonds, policies,
recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
nttorncy-in-fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any
time."
CERTIFICATE
1, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that
the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8,
of the By- Laws of the Companies is still in force.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney...Any such Power or any certificate thereof bearing such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the I Oth day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal ofthe company and facsimile or mechanically reproduced signature of
any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
TM
TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this day of ,
61
i
13y: Brian M. Hodges
Vice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION
OF 'THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT
INFORMATION TO:
Zurich Surety Claims
1299 Zurich Way
Schaumburg, IL 60196-1056
iv NvNv.reportsfclaitns1 zurichnaxom
800-6264577
THIS AGREEMENT,
municipal corporation ("City"), and
CONTRACT
is entered into between th CITY OF KENT, a Washington
organized u
business at o Str 4 L)
Lr/k-A<-
loc
"Cont
d and doing
ractor"),
nder the laws of the State (
WITNESS:
In consideration of the terms and conditions contained in this Agreement and in
the project documents, plans, and specifications all of which are a part of this
Agreement, the parties agree as follows:
1. The Contractor shall do all work and furnish all tools, materials, and equipment
for: 2O2L Paint Line Striping and RPM Replacement/Project Number:
21-3011.1 in accordance with and as described in the Contract and shall
perform any alterations in or additions to the work provided under the Contract
and every part thereof. The Contract shall include all project specifications,
provisions, and plans; the City's general and special conditions; the 2021
Standard Specifications for Road, Bridge, and Municipal Construction, as
prepared by the Washington State Department of Transportation and the
Washington State Chapter of the American Public Works Association, including
all published amendments issued by those organizations, if applicable
("standard Specifications"); the City's bid documents; and the Contractor's
response to the City's bid, The Contractor is responsible to obtain copies of the
2O2I WSDOT Standard Specifications including the latest amendments issued
by WSDOT as of the date of bid opening. Unless otherwise directed by the City,
work shall start within ten (10) days afterthe City issues its Notice to Proceed
and work shall be physically completed within forty (4O) working days. The
term of this Contract shall continue until all work has been completed, Final
Acceptance has occurred, and all Contractor obligations have been fulfilled.
2.
The City will issue multiple Notice to Proceed letters. A limited Notice
to Proceed will be issued for the installation of raised pavement
markers and paint line striping of Group A Streets on the day of the
preconstruction meeting. The City anticipates issuance of a separate
Notice to Proceed for the performance of the remaining Work on July 6,
202L.
The Contractor agrees to complete all paint line striping on Group A
Streets within ten (1O) working days after issuance of Limited Notice to
Proceed. Liquidated Damages may be assessed if the work is not
completed within ten (1O) working days, RPM installation may be
completed by the end of the full Notice to Proceed time period. The
Contractor also agrees to complete the Contract within forty (4O)
working days after issuance of the full City's Notice to Proceed.
The Contractor shall provide and bear all expense of all equipment, work, and
labor of any sort whatsoever that may be required for the transfer of materials
and for constructing and completing all the work provided for in the Contract,
except where the specifications allocate that responsibility to the City, The total
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-301 1. 1
26 February tO,2027
2
contract amount for all Work performed under this Contract, including
Washington State Sales Tax, is $255,780.
The City hereby promises and agrees with the Contractor to employ, and does
employ, the Contractor to provide the materials and to do and cause to be done
the above described work and to complete and finish the same according to the
Contract and the terms and conditions herein contained and hereby contracts to
pay for the same according to the Contract and the schedule of unit or itemized
prices provided by Contractor in its response to the City's bid, at the time and
in the manner and upon the conditions provided for in the Contract'
The Contractor for itself, and for its heirs, executors, administrators,
successors, and assigns, does hereby agree to the full performance of all
covenants herein contained upon the part of the Contractor.
It is further provided that no liability shall attach to the City by reason of
entering into this contract, except as expressly provided herein,
Contractor shall defend, indemnify, and hold the City, its officers, officials,
employees, agents, volunteers and assigns harmless from any and all claims,
injuries, damages, losses or suits, including all legal costs and attorney fees,
arising out of or in connection with the performance of this contract, except for
injuries and damages caused by the sole negligence of the City.
The City's inspection or acceptance of any of Contractor's work when completed
shall not be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this contract is subject
to RCW 4.24.115, then, in the event of liability for damages arising out of bodily
injury to persons or damages to property caused by or resulting from the
concurrent negligence of the Contractor and the City, its officers, officials,
employees, agents and volunteers, the Contractor's liability hereunder shall be
only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S
WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW,
SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES
FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS
WAIVER,
The provisions of this section shall survive the expiration or termination of this
contract.
Contractor agrees, upon the City's written demand, to make all books and
records available to the City for inspection, review, photocopying, and audit in
the event of a contract related dispute, claim, modification, or other contract
related action at reasonable times (not to exceed three (3) business days) and
at places designated by the City,
3
4
5
6
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-301 1. 1
27 February LO,2O2t
7
B
The Contractor shall procure and maintain, during the term of construction and
throughout the specified term of maintenance, insurance of the types and in the
amounts described in Exhibit A attached and incorporated by this reference,
Contractor is responsible for locating any underground utilities affected by the
work and is deemed to be an excavator for purposes of RCW Ch. 19.122, as
amended. Contractor shall be responsible for compliance with RCW Ch. 19.122,
including utilization of the "one call" locator service before commencing any
excavation activities.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21-3O1'l .1
2a January 25,2021
CITY OF KENT
BY
DANA RALPH, MAYOR
DATE
ATTEST
KIMBERLEY A. KOMOTO, CITY CLERK
APPROVED AS TO FORM
KENT LAW DEPARTMENT
CONTRACTOR
BY
PRINT NAME:7(al{ fr lc <-
Pr,, i o/, -fTITLE:
DATE:t./q.J/
2021 Painl Line Striping & RPM/Araucto
Project Number: 21 -3O11.1
29 January 25, 2O2'l
03/09/2021
EXHIBIT A
I NSURANGE REQU I REMENTS FOR
CONSTRUCTION PROJECTS
lnsurance
The Contractor shall procure and maintain for the duration of the Agreement,
insurance against claims for irjuries to persons or damage to property which may
arise from or in connection with the performance bf the work hereunder by the
Contractor, their agents, representatives, employees or subcontractors.
A. Minimum Scope of lnsurance
Contractor shall obtain insurance of the types described below:
1. Gommercial General Liability insurance shall be written on ISO
occurrence forrn CG OO 01 or its equivalent, with minimum limits of
$3,OOO,OOO per occurrence and in the aggregatefor each 1 year policy
period, This coverage may be any combingllon of primary, umbrella or
bxcess liability covelage affording total liability limits of not less than
$3,OOO,OOO p-er occurrence and ih ttre aggregate. Products and Com.pleted
Operations coverage shall be provided for a period.oj^3 years following
Substantial Compl6tion of the work. The Commercial General.Liability
insurance shall be endorsed to provide the Aggregate per Project
Endorsement ISO form CG 25 03 11 85. The Gity shall be named as an
Additional lnsured under the Gontactor's Gommercial General
Liability insurance policy with respe-ct to the wo+ performed for the
Gity. Ali endorsements iOalng Additional lnsureds shall be issued on
for-m CG 20 1O 11 85 or a form deemed equivalent, providing the
Additional Insureds with all policies and endorsements set forth in
this section.
2, Automobile Liability insurance covering all owned, non-owned, hired and
leased vehicles. Coverage shall be written on lnsurance Services Office
(tSO) form CA OO O1 or a substitute form providing equivalent liability
coverage. lf necessary, the policy shall be endorsed to provide contractual
liability coverage.
3. Workers'Gompensation coverage as required by the lndustrial lnsurance
laws of the State of Washington.
B. Minimum Amounts of lnsurance
Contractor shall maintain the following insurance limits
Gommercial General Liability insurance shall be written with minimum
limits of $3,OOO,OOO per occurrence and in the aggregate for each 1 year
policy period. This coverage may be any combination of primary, umbrella or
excess liability coverage affording total liability limits of not less than
$3,OOO,OOO per occurrence and in the aggregate. Products and Completed
Operations coverage shall be provided for a period of 3 years following
Substantial Completion of the work.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21 -3O1 1 .1
1
30 January 25,2021
EXHIBIT A (Gontinued)
2. Automobile Liability insurance with a minimum combined single limit for
bodily irjury and property damage of $1,OOO,OOO per accident.
C. Other I nsurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following
provisions for Automobile Liability and Commercial General Liability:
1. The Contractor's insurance coverage shall be primary insurance as respect
the City. Any insurance, self-insurance, or insurance pool coverage
mainta-ined by the City shall be excess of the Contractor's insurance and
shall not contribute with it.
2. The Contractor's insurance shall be endorsed to state that coverage shall not
be cancelled by either party, except after thirty (30) days prior written
notice by certified mail, return receipt requested, has been given to the City.
3. The City of Kent shall be named as an additional insured on all policies
(except Professional Liability) as respects work performed by or on behalf of
the contractor and a copy of the endorsement naming the City as additional
insured shall be attached to the Certificate of lnsurance. The City reserves
the right to receive a certified copy of all required insurance policies. The
Contractor's Commercial General Liability insurance shall also contain a
clause stating that coverage shall apply separately to each insured against
whom claim is made or suit is brought, except with respects to the limits of
the insurer's liabilitY,
D. Gontractor's I nsurance for Other Losses
The Contractor shall assume full responsibility for all loss or damage from any cause
whatsoever to any tools, contractor's employee owned tools, machinery, equipment,
or motor vehicles-owned or rented by the Contractor, or the Contractor's agents,
suppliers or contractors as well as to any temporary structures, scaffolding and
protective fences.
E. Waiver of Subrogation
The Contractor and the City waive all rights against each other any of their
Subcontractors, Sub-subcontractors, agents and employees, each of the other, for
damages caused by fire or other perils to the extend covered by Builders Risk
insurance or other property insurance obtained pursuant to the lnsurance
Requirements Section of this Contract or other property insurance applicable to the
work. The policies shall provide such waivers by endorsement or otherwise.
2021 Paint Line Striping & RPM/Araucto
Project Number: 21 -3O1 1 .1
31 January 25, 2021
EXHIBIT A (Continued)
F. Acceptability of lnsurers
lnsurance is to be placed with insurers with a current A.M. Best rating of not less than
A:Vll,
G. Verification of Goverage
Contractor shall furnish the City with original certificates and a copy of the
amendatory endorsements, inc-luding but not necelsaljly limited to the additional
insured endorsement, evidencing the Automobile Liability and Commercial General
Liability insurance of the Contradtor before commencement of the work,
H. Subcontractors
Contractor shall include all subcontractors as insureds under its policies or shall
furnish separate certificates and endorsements for each subcontractor, All coverages
for subcontractors shall be subject to all of the same insurance requirements as stated
herein for the Contractor.
2021 Painl Line Striping & RPM/Araucto
Project Number: 21 -3O11 .1
32 January 25,2021
--^A,CORD-CERTIFICATE OF LIABILIry INSURANCE DATE (MM/DD/YYYY)
2t2512021
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERT|FIGATE DOES NOT AFF|RMAT|VELY OR NEGATTVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
DDlTIoNALlNsURED,thepolicy(ies)musthaveADDlTloNALlNsUREDprovisionsorbeendorsed.
lf SUBROGATION lS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
thls certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Anchor lnsurance and Surety, lnc
1201 SW 12th Ave. Ste. 500
Portland OR 97205
NTACT..MF. LlSa liteele
filPNS^'-r 503-224-2500 503-224-9830
ilf#Lrss. certificates@anchorias.com
INSURERIS} AFFORDING COVERAGE NAIC #
tNsuRER a : Phoenix lnsurance companv 25623
INSURED
Specialized Pavement Marking, lnc.
11095 SW lndustrial Way, Ste A
Tualatin OR 97062
SPECPAV-o1 tNsuRER B: Travelers Prooertv casualtv co. of America 25674
rNsuRER c : SAIF Corooration 361S6
tNsuRER D: Naviqators lnsurance co.42307
rNsuRER E: Great American E & S lnsurance 37532
rNsupFp F . Charter Oak Fire lns, Co.2561 5
GERTIFICATE N REVISION
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
THE POLICY PERIOD
POLICY EXP LIMITSSU BX
POLICY NUMBERINSRITRTYPE OF INSURANCE
EACH OCCURRENCE $ 2,000.000
DAMAGE IQRENIEU
PRFMISFS rF, n.."rran..e\$ 500,000
MED EXP (Anv one oerson)$ 1 0.000
PERSONAL & ADV INJURY $ 2.000.000
GENERAL AGGREGATE $ 4.000.000
PRODUCTS - COI\,4P/OP AGG $ 4.000.000
4t15t2020 4t15t2021
WA STOP GAP $ 1,000,000
COMMERCIAL GENERAL LIABILITY
X
LTD JOBSITE POLL
X
LIMIT
PRO-
JECT
APPLIESE
X
X
OCCUR
POLICY
GEN'L
Work within 50'
CLAIMS-MADE
PER:
LOC
co-8K289175
$ '1,000,000
BODILY INJURY (P€r pe6on)$
BODILY INJURY (P€r accident)$
$
$ 1,000,000
81 0-0N242040 4t15t2020 4115t2021
Pollution
AUTOMOBILE LIABILITY
ANYAUTO
OWNED
AUTOS ONLY
HIRED
AUTOS ONLY AUTOS ONLY
SCHEDULED
AUTOS
NON-OWNEDX
X
X
EACH OCCURRENCE $ 5,000,000XX
AGGREGATE $ 5,000,000
UMBRELLA LIAB
EXCESS LIAB
OCCUR
CLAIMS-MADE
nFn X RFTFNTIONgi^^^^
cuP-8K31 6495 4t15t2020 4l'1512021B
PERqTATI ITF o tH-FP ORX
E.L. EACH ACCIDENT $ 1.000.000
$ 1.000.000E.L. DISEASE. EA EMPLOYEE
10t1t2021
E-1. DISEASE - POLICY LIMIT $ 1.000.000
c WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
ANYPROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBEREXCLUDED?
(Mandatory in NH)
lf ye6, describ6 undor
nFSCRIPTION OF OPFRATIONS hcldw
N/A
91 8006 10t1t2020
1 0,000,000
2,000,000
300,000
sE20EXC841844tC
PCM1827610-06
660-8K538424
4t15t2020
4t15t2020
4t15t2020
4t1512021
4t15t2021
411512021
EA OCCiAGGREGATE
EA OCC $1M /AGG
Ded: 1,000
E
F
EXCESS LIABILITY
Prof.& Pollution
lnstallation/BR
DESCRTPTTON OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Addltlonal R€marks Schodulo, may bo atlached lf moro space ls roqulrsd)
Certificate holder and all other entities are additional insureds when specified by written contract. Coverage is primary & non-contributory
subrogation when required by written contract. All subject to the terms, conditions and exclusions of the policies. Endorsements attached:
cGD211 01 /04, CGD31 6 02/1 I, CG Tl 00 021 I, CAT499 02i 1 6, CAT353 0211 5, WC00031 3.
Excess extends over Umbrella, which extends over General Liability, Auto Liability, and Employers Liability/Stop Gap.
25203 2021 Paint Line Striping and RPM ReplacemenUProject Number: 21-3011.1
and includes waiver of
cGD246 04119,
CERTIF TE
@ 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of AGORD
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS,
City of Kent
400 West Gowe
Kent WA 98032 W"F't"\f--*'
ACORD 25 (2016/03)
4. Odrer lnsurance
lf valid and cdlectide other insurance is available to
the insured for a loss we co\,er under Cor,reragasA
or B of this Cowrage Part, our obligaticns are
limited c described in Paagraphs a. and b. bdoar.
As used anywhee in this Coverage Part, other
insurance means insurance, or the funding of
lGses, that is prouided by, through or m behalf cf:
(i) Another insurance corrpany
(ii) Us or anycf o.rr affiliated insurance companies,
e>cept when the Non cumulatim of Each
Occurrence Limit provision of Paragraph 5. of
Section lll - Limits Of lnsurance or the Non
cumulation of Perscnal and Advertising lnjury
Limit proVsion of Paragraph 4. of Section lll -
Limits of lnsurarce applies because the
Amendmsrt Non Cumulation Of Each
Occurrence Limit Of Liability And Non
Cumulatim Of PersonalAnd Advertising lnjury
Limit endorsernent is included in this policy
(iii) Any risk rdention group; or
(iv)Any self-insurance mdrod or program, in
which case the insured will be deerned to be
the prwider of other insurarce.
Other insurance does not include umhella
insurance, or e:<cess insurancg that was bo,tght
specifically to apply in e><cess of the Limits of
lnsurance shorun in the Declarations of this
Coverage Part.
As used anywhee in this Coverage Part, other
insurer means a proMder of other insurance. As
used in Par4raph c. bdo,v, insurer m@ns a
proMder cf insurance.
a. Primary lnsurance
This insurance is primary except when
Paragraph b. bdory applies. lf this insurarce is
primary, orr obligations are not affected unless
any of the other insurance is also primary.
Then, we will share with all that other insurance
by the mdhod described in Paragraph c. bdoru,
ocept when Paragraph d. bdoar 4plies.
b. Excess Insurance
(1) This insurance is o<cess cnrer:
(a) Any of the other insurance, whether
primary, ercess, cmtingent or on any
other basis:
(i) That is Fire, Extended Cover4e,
Buildefs RisK lnstallation Risk or
similar coverage for "your work";
@ 2017 the Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Offlce, lnc. with its permission
COMMERCIAL GEN ERAL LIABILITY
(ii) That is insurance for "prernises
damage';
(iii) lf the loss arisas out of the
maintenance or use of aircraft,
or watercraft to the odent
not subject to any exclusion in this
Cowrage Part that aPPlies to
aircraft, "aLItG" or watercraft;
(iv) That is insurance availdle to a
premises owner, manager or
lessor that qualifies as an insured
under Paragraph 4. of Section ll -
Who ls An lnsured, ercePt when
Paragraph d. bdoru applies; or
(v) That is insurance available to an
equipment lessor that qualifies as
an insured under Paragraph 5, of
Section ll - Who ls An lnsured,
e)Gept when Panagraph d. bdoru
applies.
(b) Any of the other insurance, whether
primary, elcess, contingent or on any
other basis, that is awildle to the
insured when the insured is an
additimal insured, or is any other
insured that does not qualify as a
named insured, under such other
insurance-
(2) When this insurance is o<cess, we will
harre no duty under Correrages A or B to
ddend the insured against any "suit" if ffty
other insurer has a duty to ddend the
insured against that "suit'. lf no other
insurer defends, we will undertake to do so,
but we will be entifled to the insured's r(7hts
against all tlrcse otl'rer insurers.
(3) When this insurance is ocess owr other
insurance, we will pay only olr share of the
amount of the loss, if any, that oceeds the
sum of:
(a) The total amornt that all such other
insuranoe would payfor the loss in the
absenceof this insurance; and
(b) The total of all deductible and self-
insured amcunts under all that other
insurance.
(a) We will share the remaining les, if any,
with any other insurance that is not
described in this Excess lnsurance
provision and wa not bolght spedficallyto
apply in e:cess of the Limits of lnsurance
shorvn in the Declarations of this Coverage
Part.
cG Tl 00 02 19 Prye15 d 21
COMMERCIAL GENERAL LIABILITY
c. Method Of Sharing
lf all of the other insurance permits cmtributim
by equal shares, ue will folloru this method also.
Under this approach eah insurer cmtributes
equal amcunts until it has paid its applicable
limit of insurance or nme of the loss remains,
whichever comes first.
lf any of the other insurance does not permit
contributiqr by equal shaes, we will contrihlte
by limits. Under this mdhod, erch insure/s
shae is based m the ratio of its appicable limit
of insurance to the total applicable limits of
insurance of all insurers.
d. Primary And Non-Contributory lnsurance lf
Required By Written Gontract
lf you specifically agree in a written contract or
agreernent that the insurarrce afforded to an
insured under this Correrage Part must apply on
a primay beis, or a PrimaY and norF
contributoqy basis, this insurance is primaryto
other insurance that is arailable to such insured
whicfr cor,ers such irsured re a narned insured,
ard we will not share with that other insurarrce,
provided that:
(1) The "bodily injury'' or "property damage" for
which cor,er4e is sottght occurs; and
(2) The "persmd and achrertising injury'' for
which cover4e is sottght is caused by an
offense that is csnmitted ;
subsequent to the signing of that cmtract or
agreernent by yctt.
5. Premium Audit
a. We will canptrte dl prerniums fathis Co,erage
Part in rccordance with olr rules and rates.
b. Prernium shorvn in this Coverage Part as
ad\ance premium is a depcit prernium only. At
the close of erch audit period we will compute
the eaned premium for that period and send
nctrice to the first Named lnsured, The due date
for audit and retrospectir,ne prerniums is the date
shoryn as the due date on the bill. lf the sum of
the adrance and ar.rdit premiums paid for the
pdiry period is greater than the eaned
premium, we will return the e>cess to the first
Named lnsured.
c, The first Named lnsured must keep records of
the infsnratim we need for premium
computdlcn, and send us copies at such times
as we mq/ request.
6. Reprcsentations
By accepting this @icy, yrrJ agree:
a. The staternents in the Declarations are
accurate md corndde;
b. Those staternents are bced upon
representatbns you madeto us; and
c. We have issued this pdiqy in relimce upon
1or.r r representations.
The unintentional ornission of, or unintentiond enor
in, any infomatbn proVded by lou which we relied
upon in issuing this poliqy will nct prejudice ycur
rights under this insurance. However, this provision
des nct affect our right to cdlect additional
premium or to etercise crur rights of cancdlatior or
nmrenerard in *cordance with applicable insurance
laws s regulatims.
7. Separation Of lnsureds
Except with respect to the Limits of lnsurance, and
any rights or duties specifically assigned in this
Coverage Part to the first Named lnsured, this
insurance applies:
a. As if each Named lnsured were the mly
Named lrsured; and
b. Sepaatdyto each insured against whqn claim
is made ff "suit' is bro.lghl
8. Transfer Of Rights Of Recovery Against Others
To Us
lf the insured has rigl'rts to recorrcr all c part of any
pa4ent we hare mde under this Coverage Part,
thce rights are transfened to us. The insured must
do nothing after lcs to impair thern. At our request,
the insured will bring "suif' or transfer those rights
to us and hdp us enforce thern.
9. When We Do Not Renew
lf we decide not to rensru this Co,erage Part, wewill
mail or deliver to the first Named lnsured shown in
the Declaratims wriften nctice of the nmrensrual
nct less than 30 dqn befcethe opiratim date.
lf notice is mailed, proof of mailirg will be sufficient
proof of notice.
SECTION V- DEFINITIONS
1. "Advertisement" means a ncfrice that is broadca$ or
published to the general public or specific maket
segments about your goods, products or seMces
for the purpce of attracting customers or
supporters. For the purpces of this definition:
a. Notices that are published include material
plrced on the lnternet or on similar electronic
means of csnmunicatim; and
b. Regprding wehsibs, only that part of a website
that is about ylrcur gmds, products or services
for the purpces of attr*ting customers or
supporters is corsidered m ach,ertisernent.
@ 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission.
P4e16of 21 cG T1 00 02 19
Caffief : Phoonix lnsurance Company
policy Number. co-8K28e17s COMMERCIAL GENERAL LIABILITY
lnSUfgd: Spocialized Pavement Marking, lnc.
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
BLANKET ADDITIONAL INSURED
(lncludes Products-Gompleted Operations lf Required By Contract)
This endorsement modifies insurance provided underthe following
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PROVISIONS
The following is added to SEGTION ll - WHO lS AN
INSURED:
Any person or organization that you agree in a
written contract or agreement to include as an
additional insured on this Coverage Part is an
insured, but only:
a. With respect to liability for "bodily injury" or
"property damage" that occurs, or for "personal
injury" caused by an offense that is committed,
subsequent to the signing of that contract or
agreement and while that part of the contract or
agreement is in effect; and
b. lf, and only to the extent that, such injury or
damage is caused by acts or omissions of you or
your subcontractor in the performance of "your
worK' to which the written contract or agreement
applies. Such person or organization does not
qualify as an additional insured with respect to
the independent acts or omissions of such
person or organization.
The insurance provided to such additional insured is
subject to the following provisions:
a. lf the Limits of lnsurance of this Coverage Part
shown in the Declarations exceed the minimum
limits required by the written contract or
agreement, the insurance provided to the
additional insured will be limited to such
minimum required limits. For the purposes of
determining whether this limitation applies, the
minimum limits required by the written contract or
agreement will be considered to include the
minimum limits of any Umbrella or Excess
liability coverage required for the additional
insured by that written contract or agreement.
This provision will not increase the limits of
insurance described in Section lll - Limits Of
I nsurance.
b. The insurance provided to such additional
insured does not apply to:
(1) Any "bodily injury", "property damage" or
"personal injury" arising out of the providing,
or failure to provide, any professional
architectural, engineering or surveying
services, including:
(a) The preparing, approving, or failing to
prepare or approve, maPS, shoP
drawings, opinions, reports, surveys,
field orders or change orders, or the
preparing, approving, or failing to
prepare or approve, drawings and
specifications; and
(b) Supervisory, inspection, architectural or
engineering activities.
(2) Any "bodily injury" or "property damage"
caused by "your work" and included in the
"products-completed operations hazard"
unless the written contract or agreement
specifically requires you to provide such
coverage for that additional insured during
the policy period.
c. The additional insured must comply with the
following duties:
(1) Give us written notice as soon as practicable
of an "occurrence" or an offense which may
result in a claim. To the extent possible, such
notice should include:
(a) How, when and where the "occurrence"
or offense took place;
(b) The names and addresses of any injured
persons and witnesses; and
(c) The nature and location of any injury or
damage arising out of the "occurrence"
or offense.
(2) lf a claim is made or "suit" is brought against
the additional insured:
cG D2 46 04 19 O 2018 The Travelers lndemnity Company. All rights reserved Page 1 of 2
COMMERCIAL GENERAL LIABI LITY
(a) lmmediately record the specifics of the
claim or"suit" and the date received; and
(b) Notify us as soon as practicable and see
to it that we receive written notice of the
claim or"suit" as soon as practicable.
(3) lmmediately send us copies of all legal
papers received in connection with the claim
or "suit", cooperate with us in the
investigation or settlement of the claim or
defense against the "suif', and otherwise
comply with all policy conditions.
(4) Tender the defense and indemnity of any
claim or "suit" to any provider of other
insurance which would cover such additional
insured for a loss we cover. However, this
condition does not affect whether the
insurance provided to such additional
insured is primary to other insurance
available to such additional insured which
covers that person or organization as a
named insured as described in Paragraph 4.,
Other lnsurance, of Section lV - Commercial
General Liability Conditions.
Page 2 o'f 2 @ 2018 The Travelers lndemnity Company. All rights reserved.cG D2 46 04 19
COMMERCIAL GENERAL LIABILITY
ISSUE DATE:
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY
DESTGNATED PROJECT(S)
GEN ERAL AGGREGATE LIMIT
This endorsement modffies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Designated Project
General Aggregate(s)
$4,000,000
Designated Project(s):
EJA,CH ''PRO''ECT'' FOR WHICH YOU HAVE AGREED IN A
WRITTEN CONTRACT TITAT IS IN EFFECT DURING
THIS POLICY PERIOD, TO PROVIDE A SEPAR]ATE
GENERAI. AGGREGATE LIMIT, PROVIDED THAT THE
CONTRACT IS SIGNED BY YOU BEFORE THE ''BODILY
TNJURY'' OR ''PROPERTY DAMAGE'' OCCURS.
A. For all sums which the insured becomes legally
obligated to pay as damages caused by "occur-
rences" under GOVERAGE A. (SECTION l), and
for all medical expenses caused by accidents un-
der COVERAGE C (SECTION l), which can be
attributed only to operations at a single desig-
nated "project" shown in the Schedule above:
1. A separate Designated Project General Ag-
gregate Limit applies to each designated "pro-
ject", and that limit is equal to the amount of
the General Aggregate Limit shown in the
Declarations, unless separate Designated
Project General Aggregate(s) are sched-
uled above.
2. The Designated Project General Aggregate
Limit is the most we will pay for the sum of all
damages under COVERAGE A., except
damages because of "bodily injury" or "prop-
erty damage" included in the "products-
completed operations hazard", and for medi-
cal expenses under COVERAGE C, regard-
less of the number of:
a, lnsureds;
b. Claims made or "suits" brought; or
c. Persons or organizations making claims
or bringing "suits".
3. Any payments made under COVERAGE A'
for damages or under COVERAGE G. for
medical expenses shall reduce the Desig-
nated Project General Aggregate Limit for
that designated "project". Such payments
shall not reduce the General Aggregate Limit
shown in the Declarations nor shall they re-
duce any other Designated Prcject General
Aggregate Limit for any other designated
"project" shown in the Schedule above.
4. The limits shown in the Declarations for Each
Occurrence, Damage To Premises Rented
To You and Medical Expense continue to
apply. Howwer, instead of being subject to
the General Aggregate Limit shown in the
Declarations, such limits will be subject to the
applicable Designated Project General Ag-
gregate Limit.
B. For all sums which the insured becomes legally
obligated to pay as damages caused by "occur-
rences" under GOVERAGE A. (SECTION l), and
for all medical expenses caused by accidents un-
der COVERAGE C. (SECTION l), which cannot
be attributed only to operations at a single desig-
nated "projecf'shown in the Schedule above:
cG D2 11 01 04 Copyright, The Travelers lndemnity Company, 2004 Page 1 of 2
COMMERCIAL GENERAL LIABILITY
1. Any payments made under COVERAGE A.
for damages or under COVERAGE G. for
medical expenses shall reduce the amount
available under the General Aggregate Limit
or the Products-Completed Operations Ag-
gregate Limit whichever is applicable; and
2. Such payments shall not reduce any Desig-
nated Project General Aggregate Limit.
C. Part2. of SECTION lll-LlMlTS OF INSURANCE
is deleted and replaced by the following:
2. The General Aggregate Limit is the most we
will pay for the sum of:
a. Damages underCoverage B; and
b. Damages from "occurrences" under
COVERAGE A (SECTION l) and for all
medical expenses caused by accidents
under COVERAGE C (SECTION l) which
cannot be attributed only to operations at
a single designated "project" shown in the
SCHEDULE above.
D. When coverage for liability arising out of the
"products-completed operations hazard" is pro-
vided, any payments for damages because of
"bodily injury" or "property damage" included in
the "products-completed operations hazard" will
reduce the Products-Completed Operations Ag-
gregate Limit, and not reduce the General Aggre-
gate Limit nor the Designated Project General
Aggregate Limit.
E. For the purposes of this endorsement the Defini-
tions Section is amended by the addition of the
following definition:
"Project" means an area away from premises
owned by or rented to you at which you are per-
forming operations pursuant to a contract or
agreement. For the purposes of determining the
applicable aggregate limit of insurance, each
"project" that includes premises involving the
same or connecting lots, or premises whose con-
nection is interrupted only by a street, roadway,
waterway or right-of-way of a railroad shall be
considered a single "project".
F. The provisions of SEGTION lll - LIMITS OF
INSURANCE not otherwise modified by this en-
dorsement shall continue to apply as stipulated.
Page 2 of 2 Copyright, The Travelers lndemnity Company, 2004 cG D2 11 01 04
CARRI ER: Phoenix lnsuranc€ Company
POLICY NUMBER: co-8K28e17s
INSURED: Specialized Pavement Marking, lnc.
COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY
XTEND ENDORSEMENT FOR CONTRACTORS
This endorsement modifies insurance provided underthe following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
GENERAL DESGRIPTION OF COVERAGE - This endorsement broadens coverage. However, coverage for any
injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or
timiteO by another endorsement to this Coverage Part, and these coverage broadening provisions do not apply to
the extent that coverage is excluded or limited by such an endorsement. The following listing is a general
coverage description only. Read all the provisions of this endorsement and the rest of your policy carefully to
determine rights, duties, and what is and is not covered.
A. Who ls An lnsured - Unnamed Subsidiaries
B. Blanket Additional lnsured Governmental
Entities - Permits Or Authorizations Relating To
Operations
PROVISIONS
A. WHO IS AN INSURED UNNAMED
SUBSIDIARIES
The following is added to SEGTION ll - WHO lS
AN INSURED:
Any of your subsidiaries, other than a partnership,
joint venture or limited liability company, that is
not shown as a Named lnsured in the
Declarations is a Named lnsured if:
a. You are the sole owner of, or maintain an
ownership interest of more than 50% in, such
subsidiary on the first day of the policy period;
and
b. Such subsidiary is not an insured under
similar other insurance.
No such subsidiary is an insured for "bodily injury"
or "property damage" that occurred, or "personal
and advertising injury" caused by an offense
committed:
a. Before you maintained an ownership interest
of more than 50% in such subsidiary; or
b. After the date, if any, during the policy period
that you no longer maintain an ownership
interest of more than 50% in such subsidiary.
For purposes of Paragraph 1, of Section ll - Who
ls An lnsured, each such subsidiary will be
deemed to be designated in the Declarations as:
C. lncidental Medical Malpractice
D. Blanket Waiver Of Subrogation
E. Contractual Liability - Railroads
F. Damage To Premises Rented To You
a. An organization other than a partnership, joint
venture or limited liability company;or
b. A trust;
as indicated in its name or the documents that
govern its structure.
B. BLANKET ADDITIONAL INSURED
GOVERNMENTAL ENTITIES - PERMITS OR
AUTHORIZATIONS RELATING TO OPERATIONS
The following is added to SEGTION ll - WHO lS
AN INSURED:
Any governmental entity that has issued a permit
or authorization with respect to operations
performed by you or on your behalf and that you
are required by any ordinance, law, building code
or written contract or agreement to include as an
additional insured on this Coverage Part is an
insured, but only with respect to liability for "bodily
injury", "property damage" or "personal and
advertising injury" arising out of such operations.
The insurance provided to such governmental
entity does not apply to:
a. Any "bodily injury", "property damage" or
"personal and advertising injury" arising out of
operations performed for the governmental
entity; or
b. Any "bodily injury" or "property damage"
included in the "products-completed
operations hazard".
O 2017 The Travelers lndemnity Company. All rights reseryed.
lncludes copyrighted material of lnsurance Services Office, lnc., with its permission
cc D3 16 02 19 Page 1 of 3
COMMERCIAL GENERAL LIABILITY
C. INCIDENTAL MEDICAL MALPRACTICE
1. The following replaces Paragraph b. of the
definition of "occurrence" in the
DEFINITIONS Section:
b. An act or omission committed in providing
or failing to provide "incidental medical
services", first aid or "Good Samaritan
services" to a person, unless you are in
the business or occupation of providing
professional health care services.
2. The following replaces the last paragraph of
Paragraph 2.a.(11 of SEGTION ll - WHO lS
AN INSURED:
Unless you are in the business or occupation
of providing professional health care services,
Paragraphs (1)(a), (b), (c) and (d) above do
not apply to "bodily injury" arising out of
providing or failing to provide:
(a) "lncidental medical services" by any of
your "employees" who is a nurse, nurse
assistant, emergency medical technician
or paramedic; or
(b) First aid or "Good Samaritan services" by
any of your "employees" or "volunteer
workers", other than an employed or
volunteer doctor. Any such "employees"
or "volunteer workers" providing or failing
to provide first aid or "Good Samaritan
services" during their work hours for you
will be deemed to be acting within the
scope of their employment bY You or
performing duties related to the conduct
of your business.
3. The following replaces the last sentence of
Paragraph 5. of SECTION lll - LIMITS OF
INSURANCE:
For the purposes of determining the
applicable Each Occurrence Limit, all related
acts or omissions committed in providing or
failing to provide "incidental medical
services", first aid or "Good Samaritan
services" to any one person will be deemed to
be one "occurrence".
4. The following exclusion is added to
Paragraph 2., Exclusions, of SECTION I -
COVERAGES - COVERAGE A - BODILY
INJURY AND PROPERW DAMAGE
LIABILITY:
Sale Of Pharmaceuticals
"Bodily injury" or "property damage" arising
out of the violation of a penal statute or
ordinance relating to the sale of
pharmaceuticals committed by, or with the
knowledge or consent of, the insured.
5. The following is added to the DEFINITIONS
Section:
"lncidental medical services" means:
a. Medical, surgical, dental, laboratory, x-ray
or nurcing service or treatment, advice or
instruction, or the related furnishing of
food or beverages; or
b. The furnishing or dispensing of drugs or
medical, dental, or surgical supplies or
appliances.
6, The following is added to Paragraph 4.b.,
Excess lnsurance, of SECTION lV
COMMERCIAL GENERAL LIABILITY
CONDITIONS:
This insurance is excess over any valid and
collectible other insurance, whether primary,
excess, contingent or on any other basis, that
is available to any of your "employees" for
"bodily injury" that arises out of providing or
failing to provide "incidental medical services"
to any person to the extent not subject to
Paragraph 2.a.(11 of Section ll - Who ls An
lnsured.
D. BLANKET WAIVER OF SUBROGATION
The following is added to Paragraph 8., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION lV - COMMERCIAL GENERAL
LIABILITY CONDITIONS:
lf the insured has agreed in a contract or
agreement to waive that insured's right of
recovery against any person or organization, we
waive our right of recovery against such person or
organization, but only for payments we make
because of:
a. "Bodily injury" or "property damage" that
occurs; or
b. "Personal and advertising injury" caused by
an offense that is committed;
subsequent to the execution of the contract or
agreement.
E. CONTRACTUAL LIABILIry - RAILROADS
1. The following replaces Paragraph c. of the
definition of "insured contract" in the
DEFINITIONS Section:
c. Any easement or license agreement;
@ 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Offlce, lnc., with its permission
Page 2 of 3 cG D3 16 02 19
2. Paragraph f.(1) of the definition of "insured
contract" in the DEFINITIONS Section is
deleted.
F. DAMAGE TO PREMISES RENTED TO YOU
The following replaces the definition of "premises
damage" in the DEFINITIONS Section:
"Premises damage" means "property damage" to:
COMMERCIAL GEN ERAL LIABI LITY
a. Any premises while rented to you or
temporarily occupied by you with permission
of the owner; or
b. The contents of any premises while such
premises is rented to you, if you rent such
premises for a period of seven or fewer
consecutive days.
O 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc., with its permission-
cG D3 16 02 19 Page 3 of 3
Caffigf: Phoenix lnsurance Company
poricy Number. co-8K28e17s coMMERcIAL GENERAL LlABlLlrY
lnSUfed: Specialized Pavem€nt Marking, lnc.
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
AMENDMENT - POLLUTION EXCLUSION - INCLUDING
LIMITED COVERAGE FOR POLLUTION COSTS -
CONTRACTORS
This endorsement modifies insurance provided underthe following
COMMERCIAL GENERAL LIABILITY COVERAGE PART
respect to your ongoing operations
performed for that additional insured
at that premises, site or location and
such premises, site or location is not
and never was owned, occuPied or
managed by, or rented or loaned to,
any insured, other than that additional
insured; or
(iii) "Bodily injury" or "property damage"
arising out of heat, smoke or fumes
from a "hostile fire";
(b) At or from any premises, site or location
which is or was at any time used by or for
any insured or others for the handling,
storage, disposal, Processing or
treatment of waste;
(c) lf such "pollutants" are or were at any
time transported, handled, stored,
treated, disposed of, or processed as
waste by or for:
(i) Any insured; or
(ii) Any person or organization for whom
you may be legally resPonsible;
(d) At or from any premises, site or location
on which any insured or any contractors
or subcontractors working directly or
indirectly on any insured's behalf are or
were at any time performing operations to
test for, monitor, clean up, remove,
contain, treat, detoxify or neutralize, or in
any way respond to, or assess the effects
of, "pollutants"; or
(e) lf any of such discharge, dispersal,
seepage, migration, release or escape of
"pollutants" resulted in "bodily injury" or
"property damage" that occurred, in
whole or in part, prior to the policy period.
Any continuation, change or resumptionof such "bodily injury" or "property
damage" during or after the policy period
will be deemed to have occurred prior to
@ 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission
PROVISIONS
1. The following replaces Paragraph 1 .a.(2) of
SECTION I - COVERAGES - COVERAGE A -
BODILY INJURY AND PROPERW DAMAGE
LIABILITY and of SECTION I - COVERAGES -
COVERAGE B PERSONAL AND
ADVERTISING INJ URY LIABILITY:
(2) Our right and duty to defend end when we
have used up the applicable limit of insurance
in the payment of judgments or settlements
under Coverages A or B, medical expenses
under Coverage C or "limited covered
pollution costs" under Coverage D.
2. The following replaces Paragraph (1) of Exclusion
f., Pollution, in Paragraph 2. of SECTION I -
COVERAGES COVERAGE A BODILY
INJURY AND PROPERTY DAMAGE LIABILITY:
(1) "Bodily injury" or "property damage" arising
out of the actual, alleged or threatened
discharge, dispersal, seepage, migration,
release or escape of "pollutants":
(a) At or from any premises, site or location
which is or was at any time owned,
occupied or managed by, or rented or
loaned to, any insured. However, this
subparagraph does not aPPly to:
(i) "Bodily injury" if sustained within a
building and caused by smoke,
fumes, vapor or soot Produced bY or
originating from equipment that is
used to heat, cool or dehumidify the
building, or produced by or originating
from equipment that is used to heat
water for personal use by the
building's occupants or their guests;
(ii) "Bodily injury" or "property damage"
for which you may be held liable, if
you are a contractor and the owner or
lessee of such premises, site or
location has been added to your
policy as an additional insured with
cG Dl 730219 Page 1 of 5
COMMERCIAL GENERAL LIABILITY
the policy period. However, this
subparagraph does not apply to "bodily
injury" or "property damage" included in
the "products-completed operations
hazard".
Paragraphs (l Xa), (b) and (c) of this
exclusion do not apply to "bodily injury" or
"property damage" arising only out of the
discharge, release or escape of any
"pollutant" if such discharge, release or
escape:
(1) ls either:
(a) At or from any Premises, site or
location (other than at or from an
"underground tank") which is owned,
occupied or managed by, or rented or
loaned to, you during the PolicY
period; or
(b) From a pipe containing sewage;
(2) Commences abruptly during the policy
period and after the effective date of the
Amendment Pollution Exclusion
lncluding Limited Coverage For Pollution
Costs - Contractors endorsement;
(3) Ends within seven consecutive days after
its abrupt commencement;
(4) Becomes known to an insured listed
under Paragraph 1. of Section ll - Who ls
An lnsured, or to an "employee"
authorized by you to give or receive
notice of any "occurrence" or claim, and
is reported to us, within 30 days after its
abrupt commencement; and
(5) Does not arise out of any intentional
violation of any governmental law,
regulation or rule by you or anyone acling
on your behalf.
All "bodily injury" or "property damage"
described in this exception will be deemed to
occur at the time such discharge, release or
escape abruptly commences.
3. The following replaces Paragraph (2) of Exclusion
f., Pollution, in Paragraph 2. of SECTION I -COVERAGES COVERAGE A BODILY
INJURY AND PROPERW DAMAGE LIABILITY:
(2) "Pollution costs".
4. The following replaces Exclusion n., Pollution-
Related, in Paragraph 2. of SECTION | -
COVERAGES - COVERAGE B - PERSONAL
AND ADVERTISING INJURY LIABILITY:
n. Pollution Costs
"Pollution costs".
5. The following is added to SECTION I -
GOVERAGES:
COVERAGE D - LIMITED COVERAGE FOR
POLLUTION COSTS
1. lnsuring Agreement
a. We will pay those sums that you become
legally obligated to pay as "limited
covered pollution costs" to which this
insurance applies. We will have the right
and duty to defend you against any "suit"
seeking those "limited covered pollution
costs". However, we will have no duty to
defend you against any "suit" seeking
"limited covered pollution costs" to which
this insurance does not apply. We may at
our discretion investigate any discharge,
release or escape of "pollutants" and
settle any claim or "suit" that may result.
But:
(1) The amount we will pay for "limited
covered pollution costs" will be
included within, and not in addition to,
the limits of insurance that apply to
Coverage A; and
(2) Our right and duty to defend end
when we have used up the aPPlicable
limit of insurance in the payment of
judgments or settlements under
Coverages A or B, medical expenses
under Coverage C or "limited covered
pollution costs" under Coverage D.
No other obligation or liability to pay sums
or perform acts or services is covered
unless explicitly provided for under
Supplementary Payments.
b, This insurance applies to "limited covered
pollution costs" only if the "pollutants" for
which the "limited covered pollution costs"
are incurred also cause "bodily injury" or
"property damage" covered under
Coverage A that:
(1) Arises out of a dispersal, seepage,
migration, release or escape of
"pollutants" at or from any premises,
site or location on which any insured
or any contractors or subcontractors
working directly or indirectly on any
insured's behalf are performing
operations if the "pollutants" are
brought on or to the premises, site or
@ 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission
Page 2 of 5 cG Dl 730219
location in connection with such
operations by such insured,
contractor or subcontractor; or
(2) ls within the exception to exclusion f.
of Coverage A that requires the
discharge, release or escape of
"pollutants" to:
(a) Be either:
(i) At or from any Premises, site
or location (other than at or
from an "underground tank")
which is owned, occuPied or
managed by, or rented or
loaned to, you during the
policy period; or
(ii) From a pipe containing
sewage;
(b) Commence abruptly during the
policy period and after the
effective date of the Amendment
- Pollution Exclusion - lncluding
Limited Coverage For Pollution
Costs Contractors
endorsement;
(c) End within seven consecutive
days after its abruPt
commencement;
(d) Become known to an insured
listed under ParagraPh 1. of
Section ll-Who ls An lnsured, or
to an "employee" authorized by
you to give or receive notice of
any "occurrence" or claim, and be
reported to us, within 30 days
after its abrupt commencement;
and
(e) Not arise out of any intentional
violation of any governmental
law, regulation or rule by you or
anyone acting on your behalf.
2. Exclusion
This insurance does not apply to "limited
covered pollution costs" which you are
obligated to pay by reason of the assumption
of liability in a contract or agreement. This
exclusion does nol apply to liability that you
would have to pay "limited covered pollution
costs" in the absence of the contract or
agreement.
COMMERCIAL GENERAL LIABILITY
6. The following is added to SECTION ll - WHO lS
AN INSURED:
Paragraph 3. is the only part of this section that
applies to Section | - Coverage D. For the
purposes of Coverage D, similar coverage as
used in Paragraph 3. of this section includes any
pollution liability coverage.
7. The following is added to SECTION lll - LIMITS
OF INSURANGE:
For the purposes of any aggregate limit and the
Each Occurrence Limit, "limited covered pollution
costs" under Coverage D will be deemed to be
damages because of "property damage" under
Coverage A.
8. The following is added to Paragraph 3., Legal
Action Against Us, of SECTION lV
COMMERCIAL GENERAL LIABILITY
CONDITIONS:
With respect to "limited covered pollution costs",
no person or organization has a right under this
Coverage Part:
a. To join us as a party or otheruvise bring us
into a "suit" asking for "limited covered
pollution costs" from you; or
b. To sue us on this Coverage Parl unless all of
its terms have been fully complied with.
With respect to "limited covered pollution costs", a
person or organization may sue us to recover on
an agreed seltlement or on a final judgment
against you, but we will not be liable for "limited
covered pollution costs" that are not payable
under the terms of this Coverage Part or that are
in excess of the applicable limit of insurance. As
used in this provision, an agreed settlement
means a settlement and release of liability signed
by us, by you and by the claimant or the
claimant's legal representative.
9. The following is added to Paragraph 4., Other
Insurance, of SEGTION lV - COMMERCIAL
GENERAL LIABILITY CONDITIONS :
lf valid and collectible other insurance is available
to you for a loss we cover under Coverage D of
this Coverage Part, this insurance is excess over
any of the other insurance, whether primary,
excess, contingent or on any other basis.
We will have no duty under Coverage D to defend
you against any "suit" if any other insurer has a
duty to defend you against that "suit". lf no other
insurer defends, we will undertake to do so, but
we will be entitled to your rights against all those
other insurers.
@ 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, Inc. with its permission
GG Dl 730219 Page 3 of 5
COMMERCIAL GENERAL LIABI LITY
We will pay only our share of the amount of the
loss, if any, that exceeds the sum of:
(1) The total amount that all such other insurance
would pay for the loss in the absence of this
insurance; and
(2) The total of all deductible and self-insured
amounts under all such other insurance.
10. The following is added to Paragraph 8., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION lV - COMMERCIAL GENERAL
LIABILITY GONDITIONS:
With respect to "limited covered pollution costs", if
you have agreed in a contract or agreement to
waive your rights of recovery against any person
or organization, we waive our right of recovery
against such person or organization, but only for
payments we make because of "limited covered
pollution costs" incurred for a discharge, release
or escape of "pollutants" that commences
abruptly after the execution of the contract or
agreement.
11. The following replaces the definition of "suit" in
the DEFINITIONS Section:
"Suit" means a civil proceeding in which damages
because of "bodily injury", "property damage",
"personal injury" or "advertising injury" to which
this insurance applies, or in which "limited
covered pollution costs" to which this insurance
applies, are alleged. "Suit" includes:
a. An arbitration proceeding in which such
damages are claimed and to which the
insured must submit or does submit with our
consent;
b. Any other alternative dispute resolution
proceeding in which such damages are
claimed and to which the insured submits with
our consent;
c. An arbitration proceeding in which such
"limited covered pollution costs" are claimed
and to which you must submit or do submit
with our consent; and
d. Any other alternative dispute resolution
proceeding in which such "limited covered
pollution costs" are claimed and to which you
submit with our consent.
12. The following is added to the DEFINITIONS
Section:
"Limited covered pollution costs":
a. Means any cost or expense to test for,
monitor, clean up, remove, contain, treat,
detoxify or neutralize, or assess the effects of,
"pollutants".
b. Does not include:
(1) Any punitive or exemplary damages or
the portion of any multiplied damage
award that exceeds the amount
multiplied;
(2) Any statutory or administrative fine or
penalty;
(3) Any salary of, or benefit for, any of your
"employees", any of your partners or
members (if you are a partnership or joint
venture), any of your managers (if you
are a limited liability company), any of
your trustees (if you are a trust), or any of
your "executive officers" or directors (if
you are an organization other than a
partnership, joint venture, limited liability
company or trust);
(4) Any cost or expense for:
(a) The repair, rePlacement,
enhancement, restoration or
maintenance of any premises, site or
location which is or was at anY time
owned, occupied or managed bY, or
rented or loaned to, You; or
(b) The prevention of injury to a person
or damage to another's Property;
(5) Any cost or expense to test for, monitor,
clean up, remove, contain, treat, detoxify
or neutralize, or assess the effects of,
"pollutants", if such work or operations
began while such "pollutants" are or
were:
(a) At any premises, site or location
which is or was at any time owned,
occupied or managed by, or rented or
loaned to, you; or
(b) On or in personal property in your
care, custody or control; or
(c) At that particular part of any property
that must be restored, repaired or
replaced because "your work" was
incorrectly performed on it; or
(6) Any cost or expense to test for, monitor,
clean up, remove, contain, treat, detoxify
or neutralize, or assess the effects of,
"pollutants" on or in any of your
"employees", after the actual, alleged or
threatened absorption, ingestion or
inhalation of such "pollutants" by any of
O 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission.
Page 4 of 5 cG Dl 730219
your "employees" arising out of and in the
course of:
(a) Employment by you; or
(b) Performing duties related to the
conduct of your business.
"Pollution costs" means any loss, cost or expense
arising out of any:
a. Request, demand, order or statutory or
regulatory requirement that any insured or
others test for, monitor, clean up, remove,
contain, treat, detoxify or neutralize, or in any
way respond to or assess the effects of,
"pollutants"; or
b. Claim or suit by or on behalf of any
governmental authority or any other person or
organization because of testing for,
monitoring, cleaning uP, removing,
containing, treating, detoxifying or
neutralizing, or in any way responding to, or
assessing the effects of, "pollutants".
COMMERCIAL GENERAL LIABILITY
"Underground tank" means any one or
combination of tanks (including any connected
pipe or pump), the volume of which (including the
volume of all connected underground pipes or
pumps) is 10% or more:
a. Beneath the surface of the ground outside of
a building or structure;
b. Beneath the lowest basement floor of a
building or structure;
c. Othenrvise covered with earthen materials; or
d- Beneath the surface of the water.
Underground pipes or pumps means all
underground piping or pumps, including valves,
elbows, joints, flanges and flexible connectors
attached to any one or a combination of tanks.
However, "underground tank" does not include
the part of any tank (including the part of any
connected pipe or pump) containing sewage.
@ 2017 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission.
cG Dl 730219 Page 5 of 5
COMMERCIAL AUTO
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
BLANKET ADDITIONAL INSURED - PRIMARY AND
NON.CONTRIBUTORY WITH OTHER INSURANCE -
CONTRAGTORS
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
PROVISIONS
1. The following is added to Paragraph c. in A.1.,
Who ls An lnsured, of SECTION ll - COVERED
AUTOS LIABILITY COVERAGE:
This includes any person or organization who you
are required under a written contract or
agreement, that is signed by you before the
"bodily injury" or "property damage" occurs and
that is in effect during the policy period, to name
as an additional insured for Covered Autos
Liability Coverage, but only for damages to which
this insurance applies and only to the extent of
that person's or organization's liability for the
conduct of another "insured".
2. The following is added to Paragraph 8.5., Other
lnsurance of SECTION lV - BUSINESS AUTO
CONDITIONS:
Regardless of the provisions of paragraph a. and
paragraph d. of this part 5. Other lnsurance, this
insurance is primary to and non-contributory with
applicable other insurance under which an
additional insured person or organization is a
named insured when a written contract or
agreement with you, that is signed by you before
the "bodily injury" or "property damage" occurs
and that is in effect during the policy period,
requires this insurance to be primary and non-
contributory.
@ 2016 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission
cA T4 99 02 16 Page 1 of 1
CARRIER: Pho€nix lnsuranco Company
POLICY NUMBER: 810-0N242040
INSURED: Specialized Pavemont Marklng, lnc.
COMMERCIAL AUTO
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
BUSINESS AUTO EXTENSION ENDORSEMENT
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
GENERAL DESCRIPTION OF COVERAGE - This endorsement broadens coverage. However, coverage for any
injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or
firiritia by anlther endorsement to the Coverage Part, and these coverage broadening provisions do not apply to
the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover-
age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en-
dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered.
A. BROAD FORM NAMED TNSURED H. HIRED AUTO PHYSICAL DAMAGE - LOSS OF
B. BLANKET ADDITIONAL INSURED USE - INCREASED LIMIT
C, EMPLOYEE HIRED AUTO I. PHYSICAL DAMAGE TRANSPORTATION
EXPENSES - INCREASED LIMIT
D. EMPLOYEESASINSURED J. PERSONALPROPERW
E. SUPPLEMENTARY PAYMENTS - INCREASED K. AIRBAGSLlMlrs L. NolcE AND KNowLEDGE oF AccTDENT oR
F. HIRED AUTO - LIMITED WORLDWIDE COV- LOSS
ERAGE - INDEMN|TY BASIS M. BLANKET WATVER OF SUBROGATTON
G. WAIVER OF DEDUCTIBLE - GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS
PROVISIONS
A. BROAD FORM NAMED INSURED
The following is added to Paragraph A.1., Who ls
An lnsured, of SECTION ll - COVERED AUTOS
LIABILITY COVERAGE:
Any organization you newly acquire or form dur-
ing the policy period over which you maintain
50% or more ownership interest and that is not
separately insured for Business Auto Coverage.
Coverage under this provision is afforded only un-
til the 1B0th day after you acquire or form the or-
ganization or the end of the policy perlod, which-
ever is earlier.
B. BLANKET ADDITIONAL INSURED
The following is added to Paragraph c. in A.1.,
Who ls An lnsured, of SECTION ll- COVERED
AUTOS LIABILITY COVERAGE:
Any person or organization who is required under
a written contract or agreement between you and
that person or organization, that is signed and
executed by you before the "bodily injury" or
"property damage" occurs and that ts in effect
during the policy period, to be named as an addi-
tional insured is an "insured" for Covered Autos
Liability Coverage, but only for damages to which
this insurance applies and only to the extent that
person or organization qualifies as an "insured"
under the Who ls An lnsured provision contained
in Section ll.
C. EMPLOYEE HIRED AUTO
1. The following is added to Paragraph A.1.,
Who ls An lnsured, of SECTION ll - COV-
ERED AUTOS LIABILITY COVERAGE:
An "employee" of yours is an "insured" while
operating an "auto" hired or rented under a
contract or agreement in an "employee's"
name, with your permission, while performing
duties related to the conduct of your busi-
ness.
2. The following replaces Paragraph b. in 8.5.,
Other lnsurance, of SECTION lV - BUSI-
NESS AUTO CONDITIONS:
b. For Hired Auto Physical Damage Cover-
age, the following are deemed to be cov-
ered "autos" you own:
(1) Any covered "auto" you lease, hire,
rent or borrow; and
(2) Any covered "auto" hired or rented by
your "employee" under a contract in
an "employee's" name, with Your
@ 2015 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission.
cA T3 53 02 15 Page 1 of4
COMMERCIAL AUTO
permission, while performing duties
related to the conduct of your busi-
ness.
However, any "auto" that is leased, hired,
rented or borrowed with a driver is not a
covered "auto".
D. EMPLOYEES AS INSURED
The following is added to Paragraph A.1., Who ls
An lnsured, of SECTION ll - COVERED AUTOS
LIABILITY COVERAGE:
Any "employee" of yours is an "insured" while us-
ing a covered "auto" you don't own, hire or borrow
in your business or your personal affairs.
E. SUPPLEMENTARY PAYMENTS - INCREASED
LIMITS
1. The following replaces Paragraph A.2.a.(21,
of SECTION II - COVERED AUTOS LIABIL.
ITY COVERAGE:
(2) Up to $3,000 for cost of bail bonds (in-
cluding bonds for related traffic law viola-
tions) required because of an "accident"
we cover. We do not have to furnish
these bonds.
2. The following replaces Paragraph A.2.a.(4),
of SECTION ll - COVERED AUTOS LIABIL-
ITY COVERAGE:
(4) All reasonable expenses incurred by the
"insured" at our request, including actual
loss of earnings up to $500 a day be-
cause of time off from work.
F, HIRED AUTO _ LIMITED WORLDWIDE COV.
ERAGE - INDEMNITY BASIS
The following replaces Subparagraph (5) in Para-
graph 8.7., Policy Period, Coverage Territory,
of SECTION lV - BUSINESS AUTO CONDI-
TIONS:
(5) Anywhere in the world, except any country or
jurisdiction while any trade sanction, em-
bargo, or similar regulation imposed by the
United States of America applies to and pro-
hibits the transaction of business with or
within such country or jurisdiction, for Cov-
ered Autos Liability Coverage for any covered
"auto" that you lease, hire, rent or borrow
without a driver for a period of 30 days or less
and that is not an "auto" you lease, hire, rent
or borrow from any of your "employees",
partners (if you are a partnership), members
(if you are a limited liability company) or
members of their households.
(a) With respect to any claim made or "suit"
brought outside the United States of
America, the territories and possessions
of the United States of America, Puerto
Rico and Canada:
(i) You must arrange to defend the "in-
sured" against, and investigate or set-
tle any such claim or "suit" and keep
us advised of all proceedings and ac-
tions.
(ii) Neither you nor any other involved
"insured" will make any settlement
without our consent.
(iii) We may, at our discretion, participate
in defending the "insured" against, or
in the settlement of, anY claim or
" suit".
(iv) We will reimburse the "insured" for
sums that the "insured" legally must
pay as damages because of "bodilY
injury" or "property damage" to which
this insurance applies, that the "in-
sLlred" pays with our consent, but
only up to the limit described in Para-
graph C., Limits Of lnsurance, of
SECTION II - COVERED AUTOS
LIABILITY COVERAGE.
(v) We will reimburse the "insured" for
the reasonable expenses incurred
with our consent for your investiga-
tion of such claims and your defense
of the "insured" against any such
"suit", but only up to and included
within the limit described in Para-
graph C., Limits Of lnsurance, of
SECTION II * COVERED AUTOS
LlABlLlry COVERAGE, and not in
addition to such limit. Our duty to
make such payments ends when we
have used up the applicable limit of
insurance in payments for damages,
settlements or defense expenses.
(b) This insurance is excess over any valid
and collectible other insurance available
to the "insured" whether primary, excess,
contingent or on any other basis.
(c) This insurance is not a substitute for re-
quired or compulsory insurance in any
country outside the United States, its ter-
ritories and possessions, Puerto Rico and
Canada.
@ 2015 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission.
Page 2 of 4 cA T3 53 02 15
G
You agree to maintain all required or
compulsory insurance in any such coun-
try up to the minimum limits required by
local law. Your failure to comply with
compulsory insurance requirements will
not invalidate the coverage afforded by
this policy, but we will only be liable to the
same extent we would have been liable
had you complied with the compulsory in-
surance requirements.
(d) lt is understood that we are not an admit-
ted or authorized insurer outside the
United States of America, its territories
and possessions, Puerto Rico and Can-
ada. We assume no responsibility for the
furnishing of certificates of insurance, or
for compliance in any way with the laws
of other countries relating to insurance.
WAIVER OF DEDUCTIBLE - GLASS
The following is added to Paragraph D., Deducti'
ble, of SECTION lll - PHYSICAL DAMAGE
COVERAGE:
No deductible for a covered "auto" will apply to
glass damage if the glass is repaired rather than
replaced.
HIRED AUTO PHYSICAL DAMAGE - LOSS OF
USE - INCREASED LIMIT
The following replaces the last sentence of Para-
graph A.4.b., Loss Of Use Expenses, of SEC-
TION III_ PHYSICAL DAMAGE COVERAGE:
However, the most we will pay for any expenses
for loss of use is $65 per day, to a maximum of
$750 for any one "accident".
PHYSICAL DAMAGE TRANSPORTATION
EXPENSES - INCREASED LIMIT
The following replaces the first sentence in Para-
graph A.4.a., Transportation Expenses, of
SECTION III _ PHYSICAL DAMAGE COVER.
AGE:
We will pay up to $50 per day to a maximum of
$1,500 for temporary transportation expense in-
curred by you because of the total theft of a cov-
ered "auto" of the private passenger type.
PERSONAL PROPERTY
The following is added to Paragraph A.4., Cover-
age Extensions, of SECTION lll - PHYSICAL
DAMAGE COVERAGE:
Personal Propefty
We will pay up to $400 for "loss" to wearing ap-
parel and other personal property which is:
(1) Owned by an "insured"; and
COMMERCIAL AUTO
(2) ln or on your covered "auto".
This coverage applies only in the event of a total
theft ofyour covered "auto".
No deductibles apply to this Personal Property
coverage.
K. AIRBAGS
The following is added to Paragraph 8.3., Exclu-
sions, of SECTION lll - PHYSICAL DAMAGE
COVERAGE:
Exclusion 3.a. does not apply to "loss" to one or
more airbags in a covered "auto" you own that in-
flate due to a cause other than a cause of "loss"
set forth in Paragraphs A.1.b. and A.1.c., but
only:
a. lf that "auto" is a covered "auto" for Compre-
hensive Coverage under this policy;
b. The airbags are not covered under any war-
ranty; and
c. The airbags were not intentionally inflated.
We will pay up to a maximum of $1,000 for any
one "loss".
L. NOTICE AND KNOWLEDGE OF ACCIDENT OR
LOSS
The following is added to Paragraph A.Z.a., of
SECTION IV - BUSINESS AUTO CONDITIONS:
Your duty to give us or our authorized representa-
tive prompt notice of the "accident" or "loss" ap-
plies only when the "accident" or "loss" is known
to:
(a) You (if you are an individual);
(b) A partner (if you are a partnership);
(c) A member (if you are a limited liability com-
pany);
(d) An executive officer, director or insurance
manager (if you are a corporation or other or-
ganization); or
(e) Any "employee" authorized by you to give no-
tice of the "accident" or "loss".
M. BLANKET WAIVER OF SUBROGATION
The following replaces Paragraph A.5., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION lV - BUSINESS AUTO CONDI-
TIONS:
5. Transfer Of Rights Of Recovery Against
Others To Us
We waive any right of recovery we may have
against any person or organization to the ex-
tent required of you by a written contract
signed and executed prior to any "accident"
or "loss", provided that the "accident" or "loss"
arises out of operations contemplated by
H
J
@ 2015 The Travelers lndemnity Company. All rights reserved.
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission.
cA T3 53 02 15 Page 3 of 4
COMMERCIAL AUTO
such contract. The waiver applies only to the
person or organization designated in such
contract.
N. UNINTENTIONAL ERRORS OR OMISSIONS
The following is added to Paragraph 8.2., Con-
cealment, Misrepresentation, Or Fraud, of
SECTION IV - BUSINESS AUTO CONDITIONS:
The unintentional omission of, or unintentional
error in, any information given by you shall not
prejudice your rights under this insurance. How-
ever this provision does not affect our right to col-
lect additional premium or exercise our right of
cancellation or non-renewal.
@ 2015 The Travelers lndemnity Compa ny. All rights reserved .
lncludes copyrighted material of lnsurance Services Office, lnc. with its permission
Page 4 of 4 cA T3 53 02 15
www.saif.com
Carrier no: 20001
SAIF policy: 918006 Specialized Pavement Marking Inc
Endorsement no: WC000313
saifffi:.
Waiver of Our Right to Recover from Others Endorsement
We have the right to recover our payments from anyone liable for an injury covered by this policy. We
will not enforce our right against the person or organization named in the Schedule.
This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule.
Schedule
Description:
Contractor name
ALL OPERATIONS
Persons and/or organizations with whom the insured-employer is required by
written contract to waive subrogation rights.
This endorsement does not alter the rights of an injured worker to pursue recovery from another party
or SAIF to receive a statutory share of recoveries by an injured worker, even from the party listed in the
schedule.
The premium charge for this endorsement is based on one (1) percent of your manual premium.
Effective date: October 01, 2020
This endorsement changes the policy to which it is attached and is effective on the date issued unless
otherwise stated.
Countersigned September 30, 202O at Salem, Oregon/Lgs-
)
Kerry Barnett
President and Chief Executive Officer
400 High Street SE
Satem, 0R 97312
P: 800.285.8525
F: 503.373.8020
Pot_PC1_E4308
2021 Paint Line Striping & RPM/Araucto January 25, 2021
Project Number: 21-3011.1
KENT SPECIAL PROVISIONS
TABLE OF CONTENTS
PAGE
DIVISION 1 GENERAL REQUIREMENTS ...................................... 1-1
Description of Work .......................................................... 1-1
1-01 Definitions and Terms ....................................................... 1-1
1-02 Bid Procedures and Conditions ........................................... 1-2
1-03 Award and Execution of Contract........................................ 1-5
1-04 Scope of the Work ........................................................... 1-6
1-05 Control of Work ............................................................... 1-7
1-06 Control of Material ........................................................... 1-10
1-07 Legal Relations and Responsibilities to the Public .................. 1-13
1-08 Prosecution and Progress .................................................. 1-19
1-09 Measurement and Payment ............................................... 1-23
1-10 Temporary Traffic Control ................................................. 1-24
DIVISION 8 MISCELLANEOUS CONSTRUCTION .......................... 8-1
8-09 Raised Pavement Markers ................................................. 8-1
8-22 Pavement Marking ........................................................... 8-2
KENT STANDARD PLANS .................................................................. A-1
MAPS AND APPENDICES .................................................................. A-2
TRAFFIC CONTROL PLANS ............................................................... A-3
PREVAILING WAGE RATES ............................................................... A-4
2021 Paint Line Striping & RPM/Araucto 1 - 1 January 25, 2021
Project Number: 21-3011.1
KENT SPECIAL PROVISIONS
The Kent Special Provisions (“Kent Special Provisions” or “KSP”) modify and supersede
any conflicting provisions of the 2021 Standard Specifications for Road, Bridge, and
Municipal Construction, as prepared by the Washington State Department of
Transportation and the Washington State Chapter of the American Public Works
Association, including all published amendments issued by those organizations
(“WSDOT Standard Specifications”). Otherwise all provisions of the WSDOT Standard
Specifications shall apply. All references in the WSDOT Standard Specifications to the
State of Washington, its various departments or directors, or to the contracting
agency, shall be revised to include the City and/or City Engineer, except for references
to State statutes or regulations. Finally, all of these documents are a part of this
contract.
DIVISION 1 – GENERAL REQUIREMENTS
DIVISION 1 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
DESCRIPTION OF WORK
This Contract provides for the installation of paint striping over existing lane markings,
and installing replacement raised pavement markings on various City of Kent Streets,
all in accordance with these Kent Special Provisions, and the WSDOT Standard
Specifications.
Appendix A includes the following:
1. Location Maps and Appendix A of 2021 RPM Replacement Project Location
2. Location Map and List of 2021 Paint Line Striping Group A Streets
3. Location Maps and Appendix B of 2021 Paint Line Striping – Citywide
1-01 DEFINITIONS AND TERMS
SECTION 1-01.1 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
1-01.1 General
When these Kent Special Provisions make reference to a “Section,” for
example, “in accordance with Section 1-01,” the reference is to the
WSDOT Standard Specifications as modified by these Kent Special
Provisions.
SECTION 1-01.2(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
1-01.2(2) Items of Work and Units of Measurement
EA Each
Eq. Adj. Equitable Adjustment
FA Force Account
HR Hour
M GAL Thousand gallons
NIC Not In Contract
2021 Paint Line Striping & RPM/Araucto 1 - 2 January 25, 2021
Project Number: 21-3011.1
SF Square Feet
SECTION 1-01.3, “CONTRACT” DEFINITION, IS DELETED AND REPLACED
WITH THE FOLLOWING:
1-01.3 Definitions
Contract
The written agreement between the Contracting Agency and the
Contractor. It describes, among other things:
1. What work will be done, and by when;
2. Who provides labor and materials; and
3. How Contractors will be paid.
The Contract includes the Contract (agreement) Form, Bidder’s
completed Proposal Form, Kent Special Provisions, Contract Provisions,
Contract Plans, WSDOT Standard Specifications (also including
amendments to the Standard Specifications issued by WSDOT as of the
later date of bid advertisement or any subsequent addenda), Kent
Standard Plans, Addenda, various certifications and affidavits,
supplemental agreements, change orders, and subsurface boring logs
(if any).
Also incorporated in the Contract by reference are:
1. Standard Plans (M21-01) for Road, Bridge and Municipal
Construction as prepared by the Washington State Department of
Transportation and the American Public Works Association, current
edition;
2. Manual on Uniform Traffic Control Devices for Streets and
Highways, current edition, and;
3. American Water Works Association Standards, current edition;
4. The current edition of the “National Electrical Code.”
Responsibility for obtaining these publications rests with the Contractor.
SECTION 1-01.3, “DEFINITIONS” IS SUPPLEMENTED BY ADDING THE
FOLLOWING DEFINITION:
Incidental Work
The terms “incidental to the project,” “incidental to the involved bid
item(s),” etc., as used in the Contract shall mean that the Contractor is
required to complete the specified work and the cost of such work shall
be included in the unit contract prices of other bid items as specified in
Section 1-04.1 (Intent of the Contract). No additional payment will be
made.
1-02 BID PROCEDURES AND CONDITIONS
SECTION 1-02.1 IS DELETED AND REPLACED WITH THE FOLLOWING:
2021 Paint Line Striping & RPM/Araucto 1 - 3 January 25, 2021
Project Number: 21-3011.1
1-02.1 Qualification of Bidders
Bidders shall be qualified by ability, experience, financing, equipment,
and organization to do the work called for in the Contract. The City
reserves the right to take any action it deems necessary to ascertain
the ability of the Bidder to perform the work satisfactorily. This action
includes the City’s review of the qualification information in the bid
documents. The City will use this qualification data in its decision to
determine whether the lowest responsive bidder is also responsible and
able to perform the contract work. If the City determines that the
lowest bidder is not the lowest responsive and responsible bidder, the
City reserves its unqualified right to reject that bid and award the
contract to the next lowest bidder that the City, in its sole judgment,
determines is also responsible and able to perform the contract work
(the “lowest responsive and responsible bidder”).
SECTION 1-02.2 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-02.2 Plans and Specifications
Upon awarding the Contract, the City shall supply to the Contractor, for
its own use, up to ten (10) copies of the plans and specifications. If
the Contractor requests more than ten (10) copies, the City may
require the Contractor to purchase the additional sets.
SECTION 1-02.5 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-02.5 Proposal Forms
Prospective bidders may obtain Bid Documents including a “Bid
Proposal” for the advertised project by downloading at no charge at
KentWA.gov/doing-business/bids-procurement; however, a prospective
bidder remains responsible to obtain Bid Documents, even if unable to
download all or any part of the documents, whether or not inability to
access is caused by the bidder’s or the City’s technology.
SECTION 1-02.6 IS REVISED BY DELETING THE THIRD PARAGRAPH AND
REPLACING WITH THE FOLLOWING:
1-02.6 Preparation of Proposal
It is the Bidder’s sole responsibility to obtain and incorporate all issued
addenda into the bid. In the space provided on the Proposal Signature
Page, the Bidder shall confirm that all Addenda have been received. All
blanks in the proposal forms must be appropriately filled in.
SECTION 1-02.6 IS SUPPLEMENTED BY ADDING THE FOLLOWING TO THE
LAST PARAGRAPH:
Proposals must contain original signature pages. FACSIMILES OR
OTHER FORMS OF ELECTRONIC DELIVERY ARE NOT ACCEPTABLE
AND ARE CONSIDERED NON-RESPONSIVE SUBMITTALS.
2021 Paint Line Striping & RPM/Araucto 1 - 4 January 25, 2021
Project Number: 21-3011.1
SECTION 1-02.7 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-02.7 Bid Deposit
A deposit of at least 5 percent of the total Bid shall accompany each
Bid. This deposit may be cash, cashier’s check, or a proposal bond
(Surety bond). Any proposal bond shall be on the City’s bond form and
shall be signed by the Bidder and the Surety. A proposal bond shall not
be conditioned in any way to modify the minimum 5-percent required.
The Surety shall: (1) be registered with the Washington State
Insurance Commissioner, and (2) appear on the current Authorized
Insurance List in the State of Washington published by the Office of the
Insurance Commissioner.
The failure to furnish a Bid deposit of a minimum of 5 percent with the
Bid shall make the Bid nonresponsive and shall cause the Bid to be
rejected by the Contracting Agency.
SECTION 1-02.9 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-02.9 Delivery of Proposal
All bids must be sealed and delivered in accordance with the “Invitation
to Bid.” Bids must be received at the City Clerk’s office by the stated
time, regardless of delivery method, including U.S. Mail.
SECTION 1-02.10 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-02.10 Withdrawing, Revising, or Supplementing Proposal
After submitting a Bid Proposal to the Contracting Agency, the Bidder
may withdraw or revise it if:
1. The Bidder submits a written request signed by an authorized
person, and
2. The Contracting Agency receives the request before the time for
opening Bids.
The original Bid Proposal may be revised and resubmitted as the official
Bids Proposal if the Contracting Agency receives it before the time for
opening Bids.
SECTION 1-02.11 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-02.11 Combination and Multiple Proposals
No person, firm or corporation shall be allowed to make, file, or be
interested in more than one bid for the same work unless alternate bids
are specifically called for; however, a person, firm, or corporation that
has submitted a subproposal to a bidder, or that has quoted prices of
2021 Paint Line Striping & RPM/Araucto 1 - 5 January 25, 2021
Project Number: 21-3011.1
materials to a bidder is not disqualified from submitting a subproposal
or quoting prices to other bidders or from making a prime proposal.
SECTION 1-02.13 IS REVISED BY DELETING ITEM 1(a) AND REPLACING ITEM
1(a) WITH THE FOLLOWING:
1-02.13 Irregular Proposals
a. The bidder is not prequalified when so required.
SECTION 1-02.14 IS REVISED BY DELETING ITEM 3 AND REPLACING WITH
THE FOLLOWING:
1-02.14 Disqualification of Bidders
3. The bidder is not qualified for the work or to the full extent of the
bid.
1-03 AWARD AND EXECUTION OF CONTRACT
SECTION 1-03.1 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH
AFTER THE SECOND PARAGRAPH IN THAT SECTION:
1-03.1 Consideration of Bids
The City also reserves the right to include or omit any or all schedules
or alternates of the Proposal and will award the Contract to the lowest
responsive, responsible bidder based on the total bid amount, including
schedules or alternates selected by the City.
SECTION 1-03.2 IS REVISED BY REPLACING “45 CALENDAR DAYS” WITH “60
CALENDAR DAYS” RELATING TO CONTRACT AWARD OR BID REJECTION.
1-03.2 Award of Contract
SECTION 1-03.3 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-03.3 Execution of Contract
No claim for delay shall be granted to the Contractor due to its failure
to submit the required documents to the City in accordance with the
schedule provided in these Kent Special Provisions.
SECTION 1-03.7 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-03.7 Judicial Review
Any decision made by the City regarding the award and execution of
the contract or bid rejection shall be conclusive subject to the scope of
judicial review permitted under Washington State Law. Such review, if
any, shall be timely filed in the King County Superior Court, located in
Kent, Washington.
2021 Paint Line Striping & RPM/Araucto 1 - 6 January 25, 2021
Project Number: 21-3011.1
1-04 SCOPE OF THE WORK
SECTION 1-04.1(2) IS DELETED AND REPLACED WITH THE FOLLOWING:
1-04.1(2) Bid Items Not Included in the Proposal
The Contractor shall include all costs of doing the work within the bid
item prices. If the contract plans, contract provisions, addenda, or any
other part of the contract require work that has no bid item price in the
proposal form, the entire cost of labor and materials required to
perform that work shall be incidental and included with the bid item
prices in the contract.
SECTION 1-04.2 IS SUPPLEMENTED BY ADDING THE WORDS, “KENT SPECIAL
PROVISIONS, KENT STANDARD PLANS” FOLLOWING THE WORDS,
“CONTRACT PROVISIONS” IN THE FIRST SENTENCE OF THE FIRST
PARAGRAPH.
SECTION 1-04.2 IS REVISED BY DELETING ITEMS 1 THROUGH 7 IN THE
SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING 8 ITEMS:
1-04.2 Coordination of Contract Documents, Plans, Special Provisions,
Specifications, and Addenda
1. Approved Change Orders
2. The Contract Agreement
3. Kent Special Provisions
4. Contract Plans
5. Amendments to WSDOT Standard Specifications
6. WSDOT Standard Specifications
7. Kent Standard Plans
8. WSDOT Standard Plans
SECTION 1-04.4 IS REVISED BY DELETING THE THIRD PARAGRAPH
(INCLUDING SUBPARAGRAPHS A AND B).
SECTION 1-04.4 IS REVISED BY DELETING THE FIFTH PARAGRAPH AND
REPLACING IT WITH THE FOLLOWING:
1-04.4 Changes
For Item 2, increases or decreases in quantity for any bid item shall be
paid at the appropriate bid item contract price, including any bid item
increase or decrease by more than 25 percent from the original planned
quantity.
SECTION 1-04.4 IS REVISED BY DELETING THE EIGHTH PARAGRAPH (NEXT
TO THE LAST PARAGRAPH) AND REPLACING WITH THE FOLLOWING:
Within 14 calendar days of delivery of the change order the Contractor
shall endorse and return the change order, request an extension of time
2021 Paint Line Striping & RPM/Araucto 1 - 7 January 25, 2021
Project Number: 21-3011.1
for endorsement or respond in accordance with Section 1-04.5. The
Contracting Agency may unilaterally process the change order if the
Contractor fails to comply with these requirements. Changes normally
noted on field stakes or variations from estimated quantities, will not
require a written change order. These changes shall be made at the
unit prices that apply. The Contractor shall respond immediately to
changes shown on field stakes without waiting for further notice.
SECTION 1-04.6 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-04.6 Variation in Estimated Quantities
Payment to the Contractor will be made only for the actual quantities of
Work performed and accepted in conformance with the Contract.
SECTION 1-04.11 ITEM 2 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-04.11 Final Cleanup
3. Remove from the project all unapproved and/or unneeded material
left from grading, surfacing, paving, or temporary erosion control
measures.
1-05 CONTROL OF WORK
SECTION 1-05.4 IS REVISED BY DELETING THE LAST FOUR PARAGRAPHS.
SECTION 1-05.4 IS REVISED BY ADDING A PARAGRAPH AFTER PARAGRAPH 7
1-05.4 Conformity With and Deviations From Plans and Stakes
To the extent a conflict exists between the requirements of WSDOT
Section 1-05.4 and Kent Special Provision Section 1-05.8, the
requirements of KSP Section 1-05.8 will prevail.
SECTION 1-05.7 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
1-05.7 Removal of Defective and Unauthorized Work
If the Contractor fails to remedy defective or unauthorized work within
the time specified by the Engineer, or fails to perform any part of the
work required by the contract, the Engineer may provide the Contractor
written notice establishing a date after which the City will correct and
remedy that work by any means that the Engineer may deem
necessary, including the use of City forces or other contractors.
If the Engineer determines that the Contractor’s failure to promptly
correct any defective or any unauthorized work creates a situation that
could be potentially unsafe or might cause serious risk of loss or
damage to the public, the Engineer may have the defective and
unauthorized work corrected immediately, have the rejected work
2021 Paint Line Striping & RPM/Araucto 1 - 8 January 25, 2021
Project Number: 21-3011.1
removed and replaced, or have the work the Contractor refuses to
perform completed by using City or other forces.
Direct and indirect costs incurred by the City attributable to correcting
and remedying defective or unauthorized work, or work the Contractor
failed or refused to perform, shall be paid by the Contractor. Payment
may be deducted by the Engineer from monies due, or to become due,
the Contractor. Direct and indirect costs shall include, without
limitation, compensation for additional professional services required,
compensation and engineering and inspection services required, and
costs for repair and replacement of work of others destroyed or
damaged by correction, removal, or replacement of the Contractor’s
unauthorized work.
No increase in contract time or compensation will be allowed because of
the delay in the performance of the work attributable to the exercise of
the City’s rights provided by this section nor shall the exercise of this
right diminish the City’s right to pursue any other remedy available
under law with respect to the Contractor’s failure to perform the work
as required.
SECTION 1-05.9 IS SUPPLEMENTED WITH THE FOLLOWING NEW
SUBSECTION:
1-05.9 Equipment
1-05.9(1) Operational Testing
It is the intent of the City to have at the Physical Completion Date a
complete and operable system. Therefore when the work involves the
installation of machinery or other mechanical equipment, street
lighting, electrical distribution of signal systems, building or other
similar work, it may be desirable for the Engineer to have the
Contractor operate and test the work for a period of time after final
inspection but prior to the Physical Completion Date.
Whenever items of work are listed in the contract provisions for
operational testing they shall be fully tested under operating conditions
for the time period specified to ensure their acceptability prior to the
Physical Completion Date. In the event the contract does not specify
testing time periods, the default testing time period shall be twenty-one
(21) calendar days.
During and following the test period, the Contractor shall correct any
items of workmanship, materials, or equipment that prove faulty or that
are not in first class operating condition. Equipment, electrical controls,
meters, or other devices and equipment to be tested during this period
shall be tested under the observation of the Engineer, so that the
Engineer may determine their suitability for the purpose for which they
were installed. The Physical Completion Date cannot be established
until testing and corrections have been completed to the satisfaction of
the Engineer.
2021 Paint Line Striping & RPM/Araucto 1 - 9 January 25, 2021
Project Number: 21-3011.1
The costs for power, gas, labor, material, supplies, and everything else
needed to successfully complete operational testing shall be included in
the various contract bid item prices unless specifically set forth
otherwise in the contract.
Operational and test periods, when required by the Engineer, shall not
affect a manufacturer’s guaranties or warranties furnished under the
terms of the Contract.
SECTION 1-05.10 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-05.10 Guarantees
In addition to any other warranty or guarantee provided for at law or in
the parties’ contract, the Contractor shall furnish to the Contracting
Agency any guarantee or warranty furnished as a customary trade
practice in connection with the purchase of any equipment, materials,
or items incorporated into the project.
Upon receipt of written notice of any required corrective work, the
Contractor shall pursue vigorously, diligently, and without disrupting
city facilities, the work necessary to correct the items listed in the
notice. Approximately sixty (60) calendar days prior to the one year
anniversary of final acceptance, the Contractor shall be available to tour
the project, with the Engineer, in support of the Engineer’s effort to
establish a list of corrective work then known and discovered.
SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH
AFTER THE FIRST PARAGRAPH:
1-05.13 Superintendents, Labor, and Equipment of Contractor
Within ten (10) days of contract award, the Contractor shall designate
the Contractor's project manager and superintendent for the contract
work.
SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH
AFTER THE THIRD PARAGRAPH (AS PRINTED IN THE 2021 WSDOT
STANDARD SPECIFICATIONS):
If at any time during the contract work, the Contractor elects to replace
the contract manager or superintendent, the Contractor shall only do so
after obtaining the Engineer's prior written approval.
THE LAST PARAGRAPH OF 1-05.13 IS DELETED AND REPLACED WITH THE
FOLLOWING:
Whenever the City evaluates the Contractor’s qualifications or
prequalifications pursuant to Section 1-02.1 or RCW 47.28.070, the City
may take these or other Contractor performance reports into account.
2021 Paint Line Striping & RPM/Araucto 1 - 10 January 25, 2021
Project Number: 21-3011.1
SECTION 1-05.14 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
1-05.14 Cooperation With Other Contractors
Other Contracts Or Other Work
It is anticipated that the following work adjacent to or within the limits
of this project will be performed by others during the course of this
project and will require coordination of the work: None
SECTION 1-05 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTIONS:
1-05.16 Water and Power
The Contractor shall make necessary arrangements, and shall bear the
costs for power and water necessary for the performance of the work,
unless the Contract includes power or water as bid items, or unless
otherwise provided for in other bid items.
1-05.17 Oral Agreements
No oral agreement or conversation with any officer, agent, or employee
of the City, either before or after execution of the contract, shall affect
or modify the terms or obligations contained in any of the documents
comprising the contract. Such oral agreement or conversation shall be
considered unofficial information and in no way binding upon the City,
unless subsequently recorded and/or put in writing and signed by an
authorized agent of the City.
1-06 CONTROL OF MATERIAL
SECTION 1-06.2(2) IS DELETED IN ITS ENTIRETY.
1-06.2(2) Statistical Evaluation of Materials for Acceptance
SECTION 1-06 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTIONS:
1-06.7 Submittals
1-06.7(1) Submittal Procedures
All information submitted by the Contractor shall be clear, sharp, high
contrast copies. Contractor shall accompany each submittal with a
letter of transmittal containing the following information:
1. Contractor’s name and the name of Subcontractor or supplier who
prepared the submittal.
2. The project name and identifying number.
3. Each new submittal shall be sequentially numbered (1, 2, 3, etc.).
Each resubmittal shall include the original number with a
sequential alpha letter added (1A, 1B, 1C, etc.).
2021 Paint Line Striping & RPM/Araucto 1 - 11 January 25, 2021
Project Number: 21-3011.1
4. Description of the submittal and reference to the Contract
requirement or technical specification section and paragraph
number being addressed.
5. Bid item(s) where product will be used.
1-06.7(2) Schedule of Submittals
The Contractor shall create and submit three (3) copies of a schedule of
submittals showing the date by which each submittal required for
product review or product information will be made. The schedule can
be modified, deducted, or added to by the City. The schedule shall be
available at the preconstruction conference (see 1-08.0 of the Kent
Special Provisions). The schedule of submittals must be accepted prior
to the City making the first progress payment. The schedule shall
identify the items that will be included in each submittal by listing the
item or group of items and the Specification Section and paragraph
number and bid item under which they are specified. The schedule
shall indicate whether the submittal is required for product review of
proposed equivalents, shop drawings, product data or samples or
required for product information only.
The Contractor shall allow a minimum of 21 days for the Engineer’s
review of each submittal or resubmittal. All submittals shall be in
accordance with the approved schedule of submittals. Submittals shall
be made early enough to allow adequate time for manufacturing,
delivery, labor issues, additional review due to inadequate or
incomplete submittals, and any other reasonably foreseeable delay.
1-06.7(3) Shop Drawings, Product Data, and Samples
The Contractor shall submit the following for the Engineer’s review:
1. Shop Drawings: Submit an electronic copy or three paper copies.
Submittals will be marked, stamped and returned to the
Contractor. The Contractor shall make and distribute any required
copies for its superintendent, subcontractors and suppliers.
2. Product Data: Submit an electronic copy or three paper copies.
Submittals will be marked, stamped and returned to the
Contractor. The Contractor shall make and distribute any required
copies for its superintendent, subcontractors and suppliers.
3. Samples: Submit three labeled samples or three sets of samples of
manufacturer’s full range of colors and finishes unless otherwise
directed. One approved sample will be returned to the Contractor.
Content of submittals:
1. Each submittal shall include all of the items required for a
complete assembly or system.
2. Submittals shall contain all of the physical, technical and
performance data required to demonstrate conclusively that the
items comply with the requirements of the Contract.
2021 Paint Line Striping & RPM/Araucto 1 - 12 January 25, 2021
Project Number: 21-3011.1
3. Each submittal shall verify that the physical characteristics of items
submitted, including size, configurations, clearances, mounting
points, utility connection points and service access points, are
suitable for the space provided and are compatible with other
interrelated items.
4. The Contractor shall label each Product Data submittal, Shop
Drawing or Sample with the bid item number and, if a lump sum
bid item, provide a reference to the applicable KSP paragraph.
The Contractor shall highlight or mark every page of every copy of
all Product Data submittals to show the specific items being
submitted and all options included or choices offered.
The City encourages a creative approach to complete a timely,
economical, and quality project. Submittals that contain deviations
from the requirements of the Contract shall be accompanied by a
separate letter explaining the deviations. The Contractor’s letter shall:
1. Cite the specific Contract requirement including the Specification
Section bid item number and paragraph number for which approval
of a deviation is sought.
2. Describe the proposed alternate material, item or construction,
explain its advantages, and explain how the proposed alternate
meets or exceeds the Contract requirements.
3. State the reduction in Contract Price, if any, which is offered to the
City.
The Engineer retains the exclusive right, at his or her sole discretion, to
accept or reject any proposed deviation with or without cause.
The Engineer will stamp and mark each submittal prior to returning it to
the Contractor. The stamps will indicate one of the following:
1. “APPROVED AS SUBMITTED” – Accepted subject to its compatibility
with the work not covered in this submission. This response does
not constitute approval or deletion of specified or required items
not shown in the partial submission.
2. “APPROVED AS NOTED” – Accepted subject to minor corrections
that shall be made by the Contractor and subject to its
compatibility with the work not covered in this submission. This
response does not constitute approval or deletion of specified or
required items not shown in the partial submission. No
resubmission is required.
3. “AMEND AND RESUBMIT” – Rejected because of major
inconsistencies, errors or insufficient information that shall be
resolved or corrected by the Contractor prior to subsequent re-
submittal. An amended resubmission is required.
Re-submittals that contain changes that were not requested by the
Engineer on the previous submittal shall note all changes and be
accompanied by a letter explaining the changes.
2021 Paint Line Striping & RPM/Araucto 1 - 13 January 25, 2021
Project Number: 21-3011.1
1-06.7(4) Proposed Equivalents
The Engineer retains the exclusive right, at his or her sole discretion, to
accept or reject any proposed equivalent with or without cause.
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
1-07.2 State Taxes
1-07.2(1) State Sales Tax: WAC 458-20-171—Use Tax
SECTION 1-07.2(1) IS REVISED BY DELETING THE SECOND PARAGRAPH AND
REPLACING WITH THE FOLLOWING:
Without waiving the Contractor’s obligation to understand and apply
these tax rules correctly, the City has indicated those parts of the
project that are subject to use tax under Section 1-07.2(1) in the
proposal bid items.
1-07.2(2) State Sales Tax: WAC 458-20-170—Retail Sales Tax
SECTION 1-07.2(2) IS REVISED BY DELETING THE SECOND PARAGRAPH AND
REPLACING WITH THE FOLLOWING:
Without waiving the Contractor’s obligation to understand and apply
these tax rules correctly, the City has indicated those parts of the
project that are subject to retail sales tax under Section 1-07.2(2) in
the proposal bid items.
SECTION 1-07.4(2) IS DELETED AND REPLACED WITH THE FOLLOWING:
1-07.4(2) COVID-19 Job Site Requirements
Before commencing any work on the Project site, the Contractor shall
develop and post at each job site a comprehensive COVID-19 exposure
control, mitigation, and recovery plan that complies with the Phase 1
Construction Restart COVID-19 Job Site Requirements issued by the
Governor, or subsequent modifications or phase amendments as the
Governor may issue. Contractor must further meet and maintain all
requirements of the plan, including providing materials, schedules, and
equipment required to comply with those job site requirements or any
future adjustments that may be made to job site requirements by the
Governor or any applicable federal or state agency during the COVID-
19 emergency.
A copy of the COVID-19 job site safety plan, along with the
identification and contact information for the COVID-19 Supervisor,
shall be provided to the Engineer.
SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING
PARAGRAPH BEFORE THE FIRST PARAGRAPH:
1-07.6 Permits and Licenses
2021 Paint Line Striping & RPM/Araucto 1 - 14 January 25, 2021
Project Number: 21-3011.1
The City has obtained the following permits: None
SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING
PARAGRAPHS AFTER THE LAST PARAGRAPH:
A copy of each permit and/or license obtained by the Contractor shall
be furnished to the City. Approved permits shall be furnished to the
City upon completion of the project and prior to final acceptance.
The Contractor shall promptly notify the City in writing of any variance
in the contract work arising from the issuance of any permit.
1-07.9 Wages
SECTION 1-07.9(1) IS SUPPLEMENTED BY INSERTING THE FOLLOWING
PARAGRAPH AFTER THE SIXTH PARAGRAPH:
1-07.9(1) General
To the extent allowed by law, the wage rates that will be in effect
during the entire contract work period are those in effect on the day of
bid opening, unless the City does not award the Contract within six
months of the bid opening.
SECTION 1-07.9(3) IS DELETED AND REPLACED WITH THE FOLLOWING:
FOLLOWING:
1-07.9(3) Apprentices
All contracts with an estimated construction cost greater than
$1,000,000 (one million dollars) shall require that no less than 15
percent of the labor hours performed by workers subject to prevailing
wages employed by the contractor or its subcontractors be performed
by apprentices enrolled in a state-approved apprenticeship program.
Definitions
For the purposes of this specification, the following definitions apply:
1. Apprentice Utilization Requirement is expressed as a percentage of
the project Labor Hours performed by Apprentices.
2. Labor Hours are the total hours performed by all workers receiving
an hourly wage who are directly employed on the project site
including hours performed by workers employed by the prime
Contractor and all Subcontractors. Labor Hours do not include
hours performed by foremen, superintendents, owners, and
workers who are not subject to prevailing wage requirements.
3. Apprentice is a person enrolled in a State-approved Apprenticeship
Training Program.
4. State-approved Apprenticeship Training Program is an
apprenticeship training program approved by the Washington
State Apprenticeship Council.
2021 Paint Line Striping & RPM/Araucto 1 - 15 January 25, 2021
Project Number: 21-3011.1
5. Good Faith Effort is a demonstration that the Contractor has
strived to meet the Apprenticeship Utilization Requirement
including but not necessarily limited to the specific steps as
described elsewhere in this specification.
Plan
The Contractor shall submit an “Apprentice Utilization Plan” within 30
calendar days of Notice of Award, demonstrating how they intend to
achieve the Apprentice Utilization Requirement. The plan shall be
updated and resubmitted as appropriate as the Work progresses. The
intent is to provide the City with enough information to track progress
in meeting the utilization requirements.
Reporting
The Contractor shall submit a “Monthly Apprentice Reporting Form” on
a monthly basis. The report shall be submitted to the City by the last
working day of the subsequent month, until the Physical Completion
Date. The date reported shall be cumulative to date and consolidated to
include the Contractor and all Subcontractors. At the Contractor’s
request, the Engineer may suspend this reporting requirement during
periods of minimal or no applicable work activities on the project. The
Contractor shall submit documentation of their Good Faith Effort if: (1)
they are unable to provide a plan demonstrating how they intend to
meet the Apprentice Utilization Requirement; or (2) the project has
been completed without meeting the Apprentice Utilization
Requirement.
Contacts
The Contractor may obtain information on State-approved
Apprenticeship Training Programs by contacting the Department of
Labor and Industries at: Specialty Compliance Services Division,
Apprenticeship Section, P.O. Box 44530, Olympia, WA 98504-4530 or
by phone at (360) 902-5320.
Compliance
In the event that the Contractor is unable to accomplish the Apprentice
Utilization Requirement, the Contractor shall demonstrate that a Good
Faith Effort has been made as described within this specification. Failure
to comply with the requirements as specified is subject to penalties for
noncompliance as set forth in KCC 6.01.030(E).
Good Faith Efforts
In fulfilling the Good Faith Effort, the Contractor shall perform and,
when appropriate, require its Subcontractors to perform the following
steps:
1. Solicit Apprentice(s) from State-approved Apprenticeship Training
Program(s).
2. Document the solicitation and, in the event Apprentice(s) are not
available, obtain supporting documentation from the solicited
program(s).
2021 Paint Line Striping & RPM/Araucto 1 - 16 January 25, 2021
Project Number: 21-3011.1
3. Demonstrate that the plan was updated as required within this
specification.
4. Provide documentation demonstrating what efforts the Contractor
has taken to require Subcontractors to solicit and employ
Apprentice(s).
In the event that the preceding steps have been followed, the
Contractor may also supplement the Good Faith Efforts documentation
with the following documentation:
5. Submit documentation demonstrating successful Apprentice
utilization on previous contracts.
6. Submit documentation indicating company-wide Apprentice
utilization efforts and percentages of attainment.
Payment
Compensation for all costs involved with complying with the conditions
of this specification is included in payment for the associated Contract
items of work.
1-07.13 Contractor’s Responsibility for Work
SECTION 1-07.13(4) IS REVISED BY DELETING THE SECOND SENTENCE OF
THE FIRST PARAGRAPH AND DELETING THE LAST PARAGRAPH.
1-07.13(4) Repair of Damage
SECTION 1-07.14 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO
THE BEGINNING OF THAT SECTION:
1-07.14 Responsibility for Damage
To the extent a conflict exists between the terms of this Section 1-
07.14 and Section 5 of the Contract, the terms of the Contract will
control. Any reference to the State, Governor, Commission, Secretary,
or all officers and employees of the State also will include the City, its
officers and employees.
SECTION 1-07.15(1) IS REVISED BY ADDING THE FOLLOWING PARAGRAPH
AFTER THE LAST PARAGRAPH:
1-07.15 Temporary Water Pollution Prevention
1-07.15(1) Spill Prevention, Control, and Countermeasures Plan
When the proposal form includes multiple bid schedules and the “SPCC
Plan” bid item is present in only one bid schedule, the lump sum
payment item for the “SPCC Plan” in that one schedule will apply to all
bid schedules for all costs associated with creating and updating the
accepted SPCC Plan, and all costs associated with the setup of
prevention measures and for implementing the current SPCC Plan as
required by this Specifications.
2021 Paint Line Striping & RPM/Araucto 1 - 17 January 25, 2021
Project Number: 21-3011.1
SECTION 1-07.17 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO
THE END OF THE SECOND PARAGRAPH:
1-07.17 Utilities and Similar Facilities
If a utility is known to have or suspected of having underground
facilities within the area of the proposed excavation and that utility is
not a subscriber to the utilities underground location center, the
Contractor shall give individual notice to that utility within the same
time frame prescribed in RCW 19.122.030 for subscriber utilities.
SECTION 1-07.17 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTIONS:
1-07.17(3) Utility Markings
Once underground utilities are marked by the utility owner or its agent,
and/or once new underground facilities have been installed by the
Contractor, the Contractor/excavator is responsible to determine the
precise location of underground facilities that may conflict with other
underground construction. The Contractor shall maintain the marks or
a record of the location of buried facilities for the duration of time
needed to avoid future damage until installation of all planned
improvements at that location is complete.
1-07.17(4) Payment
All costs to comply with subsection 1-07.17(3) and for the protection
and repair of all identified or suspected underground utilities specified
in RCW 19.122 are incidental to the contract and are the responsibility
of the Contractor/excavator. The Contractor shall include all related
costs in the unit bid prices of the contract. No additional time or
monetary compensation shall be made for delays caused by utility re-
marking or repair of damaged utilities due to the Contractor’s failure to
maintain marks or to locate utilities in accordance with this section.
1-07.17(5) Notification of Excavation
Within ten business days but not less than two business days prior to
the commencement of excavation, the Contractor shall provide written
notice (or other form of notice acceptable to the Engineer) to all owners
of underground facilities, whether public or private, that excavation will
occur, and when excavation will occur.
1-07.17(6) Site Inspection
Contractor warrants and represents that it has personally, or through
its employees, agents and/or subcontractors, examined all property
affected by this project and that it is knowledgeable of specific locations
for water, gas, telephone, electric power and combined sewerage
utilities within those areas.
2021 Paint Line Striping & RPM/Araucto 1 - 18 January 25, 2021
Project Number: 21-3011.1
The following list of contacts is provided only as a convenience
to the Contractor. It may not be accurate and may not
constitute a complete list of all affected utilities.
CenturyLink
Gabrielle Skorupa
206-305-4395
Comcast
Aaron Cantrel
206-510-4222 (cell)
Aaron_Cantrel@comcast.com
Puget Sound Energy Gas
Glenn Helton
253-395-6926
425-559-4647 (cell)
Puget Sound Energy Power
Hong Nguyen (cell)
425-449-6609
Hong.Nguyen@pse.com
Verizon
Brad Landis
425-201-0901
425-766-1740 (cell)
SECTION 1-07.18 IS REVISED BY ADDING THE FOLLOWING PARAGRAPH
BEFORE THE FIRST PARAGRAPH:
1-07.18 Public Liability and Property Damage Insurance
To the extent a conflict exists between the terms of this Section 1-
07.18 and the insurance requirements in Section 7 of the Contract, the
terms of the Contract will control. Any reference to the State,
Governor, Commission, Secretary, or all officers and employees of the
State also will include the City, its officers and employees.
SECTION 1-07.24 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-07.24 Rights of Way
Street right of way lines, limits of easements and limits of construction
are indicated or defined on the plans. The Contractor's construction
activities shall be confined within these limits, unless arrangements for
use of private property are made.
It is anticipated that the City will have obtained all right of way,
easements or right of entry agreements prior to the start of
construction. Locations where these rights have not been obtained will
be brought to the Contractor's attention prior to start of construction.
The Contractor shall not proceed with any portion of the work in areas
where right of way, easements or rights of entry have not been
acquired until the Engineer certifies to the Contractor that the right of
way or easement is available or that the right of entry has been
received.
2021 Paint Line Striping & RPM/Araucto 1 - 19 January 25, 2021
Project Number: 21-3011.1
SECTION 1-07.26 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-07.26 Personal Liability of Public Officers
Neither the City, the Engineer, nor any other official, officer or
employee of the City shall be personally liable for any acts or failure to
act in connection with the contract, it being understood that, in these
matters, they are acting solely as agents of the City.
1-08 PROSECUTION AND PROGRESS
SECTION 1-08 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTION:
1-08.0 Preconstruction and Preconstruction Conference
The Engineer will furnish the Contractor with up to ten (10) copies of
the plans and specifications. Additional documents may be purchased
from the City at the price specified by the City or in the Invitation to
Bid. Prior to undertaking each part of the work, the Contractor shall
carefully study and compare the Contract and check and verify all
pertinent figures shown and all applicable field measurements. The
Contractor shall promptly report in writing to the Engineer any conflict,
error or discrepancy that the Contractor discovers.
After the Contract has been executed, but prior to the Contractor
beginning the work, a preconstruction conference will be held with the
Contractor, the Engineer and any other interested parties that the City
determines to invite. The purpose of the preconstruction conference
will be:
1. To review the initial progress schedule.
2. To establish a working understanding among the various parties
associated or affected by the work.
3. To establish and review procedures for progress payment,
notifications, approvals, submittals, etc.
4. To verify normal working hours for the work.
5. To review safety standards and traffic control.
6. To discuss any other related items that may be pertinent to the
work.
The Contractor shall prepare and submit for approval, at or prior to the
preconstruction conference the following:
1. A price breakdown of all lump sum items.
2. A preliminary construction schedule.
3. A list of material sources for approval, if applicable.
4. Schedule of submittals. (See 1-06.6(2))
5. Temporary Erosion/Sedimentation Control Plan (TESCP) for
approval.
6. Traffic Control Plan (TCP) for approval.
2021 Paint Line Striping & RPM/Araucto 1 - 20 January 25, 2021
Project Number: 21-3011.1
7. Request to sublet, for approval by the Engineer, of all
subcontractors.
SECTION 1-08.4 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-08.4 Notice to Proceed, Prosecution and Hours of Work
Notice to Proceed will be given after the contract has been executed
and the contract bond and evidence of required insurance have been
approved by and filed with the City. Unless otherwise approved in
writing by the Engineer, the Contractor shall not commence the work
until the Notice to Proceed has been given by the Engineer.
The City will issue multiple Notice to Proceed letters. A limited
Notice to Proceed will be issued for the installation of raised
pavement markers and paint line striping of Group A Streets on
the day of the preconstruction meeting. The City anticipates
issuance of a separate Notice to Proceed for the performance of
the remaining Work on July 6, 2021.
The Contractor shall commence construction activities on the Project
Site within ten working days of the Notice to Proceed Date. The Work
thereafter shall be prosecuted diligently, vigorously, and without
unauthorized interruption until physical completion of the work.
Voluntary shutdown or slowing of operations by the Contractor shall not
relieve the Contractor of the responsibility to complete the work within
the time(s) specified in the Contract.
Except in the case of emergency or unless otherwise approved by the
Engineer, the normal straight time working hours for the Contractor
shall be any consecutive 8 hour period between 7:00 a.m. and 6:00
p.m. Monday through Friday, unless otherwise specified in the Kent
Special Provisions, with a 5-day work week, plus allowing a maximum
one-hour lunch break in each working day. The normal straight time
8-hour working period for the contract shall be established at the
preconstruction conference or prior to the Contractor commencing
work.
If a Contractor desires to perform work on holidays, Saturdays,
Sundays, or before 7:00 a.m. or after 6:00 p.m. on any day, the
Contractor shall apply in writing to the Engineer for permission to work
those times. The Contractor shall notify the Engineer at least 48 hours
in advance (72 hours in advance for weekend work) so that the
Inspector's time may be scheduled. Permission to work longer than an
8-hour period between 7:00 a.m. and 6:00 p.m. is not required.
Permission to work between the hours of 10:00 p.m. and 7:00 a.m.
during weekdays and between the hours of 10:00 p.m. and 9:00 a.m.
on weekends or holidays may also be subject to noise control
requirements. Approval to continue work during these hours may be
revoked at any time the Contractor exceeds the City’s noise control
regulations or the city receives complaints from the public or adjoining
2021 Paint Line Striping & RPM/Araucto 1 - 21 January 25, 2021
Project Number: 21-3011.1
property owners regarding noise from the Contractor’s operations. The
Contractor shall have no claim for damages or delays should this
permission be revoked for these reasons.
The Engineer may grant permission to work Saturdays, Sundays,
holidays or other than the agreed upon normal straight time working
hours, but may be subject to other conditions established by the City or
Engineer. These conditions may include, but are not limited to the
following: hours worked by City employees; impacts to the construction
schedule; or accommodations to adjoining properties affected by the
contract work.
The Contractor shall coordinate its work around scheduled
events that will likely impact its Work. The Contractor shall
have no claim for damages or delays for work schedule conflicts.
The following are known events that could impact the work:
1. Kent Cornucopia Days: July 9-11, 2021 (Unconfirmed)
1-08.4(A) Reimbursement for Overtime Work of City Employees
Following is a non-exclusive list of work that may require Contractor
reimbursement for overtime of City employees. The City will bill the
Contractor at the OVERTIME RATE in order for locate crews to
complete other work. If the locate request is for nights, weekend,
holidays or at other times when locate crews are not normally working,
all locate work and expenses, including travel, minimum call out times,
and/or Holiday premiums will be borne by the Contractor.
1. Locate work required to re-establish marks for City-owned
underground facilities that were not maintained or recorded by the
Contractor in accordance with RCW 19.122.030.
2. Work required by City personnel or independent testing
laboratories to re-test project materials, utility pressure or vacuum
tests, camera surveys or water purity tests as the result of initial
test failure on the part of the Contractor.
1-08.4(B) General
The City allocates its resources to a contract based on the total time
allowed in the contract. The City will accept a progress schedule
indicating an early physical completion date but cannot guarantee the
City resources will be available to meet the accelerated schedule. No
additional compensation will be allowed if the Contractor is not able to
meet its accelerated schedule due to the unavailability of City resources
or for other reasons beyond the City's control.
Unless previously approved by the Engineer, the original and all
supplemental progress schedules shall not conflict with any time and
order-of-work requirements in the contract.
2021 Paint Line Striping & RPM/Araucto 1 - 22 January 25, 2021
Project Number: 21-3011.1
If the Engineer deems that the original or any necessary supplemental
progress schedule does not provide adequate information, the City may
withhold progress payments until a schedule containing needed
information has been submitted by the Contractor and approved by the
Engineer.
The Engineer's acceptance of any schedule shall not transfer any of the
Contractor's responsibilities to the City. The Contractor alone shall
remain responsible for adjusting forces, equipment, and work schedules
to ensure completion of the work within the times specified in the
contract.
SECTION 1-08.5 IS REVISED BY DELETING THE THIRD PARAGRAPH AND
REPLACING WITH THE FOLLOWING:
1-08.5 Time for Completion
Contract time shall begin on the day of the Notice to Proceed. The
Contract Provisions may specify another starting date for Contract time,
in which case, time will begin on the starting date specified.
SECTION 1-08.6 IS REVISED BY DELETING THE FIFTH, SIXTH, AND SEVENTH
PARAGRAPHS AND REPLACING WITH THE FOLLOWING:
1-08.6 Suspension of Work
If the performance of all or any part of the Work is suspended for an
unreasonable period of time by an act of the Contracting Agency in the
administration of the Contract, or by failure to act within the time
specified in the Contract (or if no time is specified, within a reasonable
time), the Engineer will make an adjustment for any increase in the
cost or time for the performance of the Contract (excluding profit)
necessarily caused by the suspension. However, no adjustment will be
made for any suspension if (1) the performance would have been
suspended by any other cause, including the fault or negligence of the
Contractor, or (2) an equitable adjustment is provided for or excluded
under any other provision of the Contract.
If the Contactor believes that the performance of the Work is
suspended for an unreasonable period of time and such suspension is
the responsibility of the Contracting Agency, the Contractor shall
immediately submit a written notice of protest to the Engineer as
provided in Section 1-04.5. No adjustment shall be allowed for any
costs incurred more than 10 calendar days before the date the Engineer
receives the Contractor’s written notice to protest. In any event, no
protest will be allowed later than the date of the Contractor’s signature
on the Final Pay Estimate. The Contractor shall keep full and complete
records of the costs and additional time of such suspension, and shall
permit the Engineer to have access to those records and any other
records as may be deemed necessary by the Engineer to assist in
evaluating the protest.
2021 Paint Line Striping & RPM/Araucto 1 - 23 January 25, 2021
Project Number: 21-3011.1
The Engineer will determine if an equitable adjustment in cost or time is
due as provided in this Section. The equitable adjustment for increase
in costs, if due, shall be subject to the limitations provide in Section 1-
09.4, provided that no profit of any kind will be allowed on any increase
in cost necessarily caused by the suspension.
SECTION 1-08.7 MAINTENANCE DURING SUSPENSION IS REVISED BY
DELETING THE FOURTH AND SIXTH PARAGRAPHS.
1-09 MEASUREMENT AND PAYMENT
SECTION 1-09.9 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTION:
1-09.9(2) City’s Right to Withhold Certain Amounts
In addition to the amount that the City may otherwise retain under the
Contract, the City may withhold a sufficient amount of any payments
otherwise due to the Contractor, including nullifying the whole or part
of any previous payment, because of subsequently discovered evidence
or subsequent inspections that, in the City's judgment, may be
necessary to cover the following:
1. The cost of defective work not remedied.
2. Fees incurred for material inspection, and overtime engineering
and inspection for which the Contractor is obligated under this
Contract.
3. Fees and charges of public authorities or municipalities.
4. Liquidated damages.
5. Engineering and inspection fees beyond Completion Date.
6. Cost of City personnel to re-establish locate marks for City-owned
facilities that were not maintained by the Contractor in accordance
with RCW 19.122.030 (3).
7. Additional inspection, testing and lab fees for re-doing failed,
water, other utility tests.
SECTION 1-09.11(3) IS DELETED AND REPLACED WITH THE FOLLOWING:
1-09.11(3) Time Limitations and Jurisdiction
This contract shall be construed and interpreted in accordance with the
laws of the State of Washington. The venue of any claims or causes of
action arising from this contract shall be exclusively in the Superior
Court of King County, located in Kent, Washington.
For convenience of the parties to this contract, it is mutually agreed
that any claims or causes of action which the Contractor has against the
City arising from this contract shall be brought within 180 days from
the date of Final Acceptance of the contract by the City. The parties
understand and agree that the Contractor’s failure to bring suit within
the time period provided shall be a complete bar to any such claims or
causes of action.
2021 Paint Line Striping & RPM/Araucto 1 - 24 January 25, 2021
Project Number: 21-3011.1
It is further mutually agreed by the parties that when any claims or
causes of action that a Contractor asserts against the City arising from
this contract are filed with the City or initiated in court, the Contractor
shall permit the City to have timely access to any records deemed
necessary by the City to assist in evaluating the claims or actions.
SECTION 1-09.13 IS DELETED AND REPLACED WITH THE FOLLOWING:
1-09.13 Final Decision and Appeal
All disputes arising under this contract shall proceed pursuant to
Section 1-04.5 and 1-09.11 of the WSDOT Standard Specifications and
any Kent Special Provisions provided for in the contract for claims and
resolution of disputes. The provisions of these sections and the Kent
Special Provisions must be complied with as a condition precedent to
the Contractor’s right to seek an appeal of the City’s decision. The
City’s decision under Section 1-09.11 will be final and conclusive.
Thereafter, the exclusive means of Contractor’s right to appeal shall
only be by filing suit exclusively under the venue, rules and jurisdiction
of the Superior Court of King County, located in Kent, Washington,
unless the parties agree in writing to an alternative dispute resolution
process.
1-10 TEMPORARY TRAFFIC CONTROL
SECTION 1-10.2(1) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
1-10.2(1) General
The TCS shall be certified as a work site traffic control supervisor by
one of the following:
Evergreen Safety Council
401 Pontius Avenue North
Seattle, WA 98109
1-800-521-0778 or 206-382-4090
The Northwest Laborers-Employers Training Trust
27055 Ohio Avenue
Kingston, WA 98346
360-297-3035
The American Traffic Safety Services Association
15 Riverside Parkway, Suite 100
Fredericksburg, VA 22406-1022
Training Dept. Toll Free (877) 642-4637 or (540) 368-1701
1-10.3(3) Traffic Control Devices
SECTION 1-10.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTION:
2021 Paint Line Striping & RPM/Araucto 1 - 25 January 25, 2021
Project Number: 21-3011.1
1-10.3(3)L Temporary Traffic Control Devices
When the bid proposal includes an item for “Temporary Traffic Control
Devices,” the work required for this item shall be furnishing barricades,
flashers, cones, traffic safety drums, and other temporary traffic control
devices, unless the contract provides for furnishing a specific temporary
traffic control device under another item. The item “Temporary Traffic
Control Devices” includes:
1. Initial delivery to the project site (or temporary storage) in good
repair and in clean usable condition,
2. Repair or replacement when they are damaged and they are still
needed on the project, and
3. Removal from the project site when they are no longer on the
project.
SECTION 1-10.4(1) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
1-10.4(1) Lump Sum Bid for Project (No Unit Items)
The proposal contains the item “Project Temporary Traffic Control,”
lump sum. The provisions of Section 1-10.4(1) shall apply.
2021 Paint Line Striping & RPM/Araucto 8 - 1 January 25, 2021
Project Number: 21-3011.1
DIVISION 8 – MISCELLANEOUS CONSTRUCTION
8-09 RAISED PAVEMENT MARKERS
SECTION 8-09.1 IS DELETED AND REPLACED WITH THE FOLLOWING:
8-09.1 Description
This work shall consist of furnishing, and installing new raised
pavement markers (RPM) to replace damaged and missing RPMs upon
the roadway surface in accordance with applicable Kent Standard Plans
and/or WSDOT Standard Plans at locations shown on 2021 RPM
Replacement Location Map or as directed by the Engineer.
The color of pavement markers shall conform to the color of the
marking for which they supplement, substitute for, or server as a
positioning guide for.
Unless otherwise noted, new raised pavement markers shall be installed
in strict conformance to Kent Standard Plans 6-73M and 6-74M.
The 2021 RPM Replacement Location Map and Appendix A show
more than what can be completed under this contract. It also indicates
the locations RPM installation must be coordinated with paving
activities. The Contractor shall approach this project as follows:
The Contractor shall reserve quantities of Type 1 and 2 RPM
for streets that are schedule to be re-paved. Installation of
these RPM will be completed following completion of paving
activities.
The Contractor shall complete the installation of new Type 2
RPM upon street(s) requiring Type 2YY and/or Type 2W, with
the smallest priority number first before proceeding with the
same activity upon street with the next lowest priority
number. The Contractor shall immediately cease installation
of Type 2 RPM when the total installed amount equal the
contract quantity for Type 2 RPM, or as directed by the
Engineer.
The Contractor shall complete replacement of all damaged
and missing Type 1 RPMs upon street(s) requiring Type 1Y
and/or Type 1W, with the smallest priority number first
before proceeding with the same activity upon street with the
next lowest priority number. The Contractor shall
immediately cease installation of Type 1 RPM when the total
installed amount equal the contract quantity for Type 1 RPM
or as directed by the Engineer.
SECTION 8-09.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTION:
8-09.3(8) Reporting
2021 Paint Line Striping & RPM/Araucto 8 - 2 January 25, 2021
Project Number: 21-3011.1
For each week that RPM Work is performed, the Contractor shall submit
a report summarizing the accomplished work. The report shall be in
adequate detail to determine the number of RPM, color and type,
installed on each location described on the location map. The report
shall be submitted to the Engineer by the end of the week following the
RPM Work or some other mutually agreed upon submittal time. The
Contractor shall sign each report certifying that material was installed
and the linear footage installed are based on actual measurements in
accordance with the specifications.
At the end of the Contract, the Contractor shall provide the total
amount of RPM installed for each type and color.
SECTION 8-09.3(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-09.3(2) Surface Preparation
In removing raised pavement markers and plastic traffic buttons, the
Contractor shall:
1. Haul broken-up pieces of raised pavement markers, plastic traffic
buttons and all waste material to an off-project site, unless
otherwise directed by the Engineer, or permitted by the Kent
Special Provisions.
2. Remove all sand, or other waste materials deposited on the
pavement, or within the City’s stormwater management system,
as a result of the removal process selected by the Contractor.
3. Install temporary lane markings at their sole expense, unless the
street is going to be remarked, or overlaid immediately after the
completed removal of raised pavement markers and/or plastic
traffic buttons.
4. Take suitable care so as not to damage the underlying pavement
surface more than necessary, clean all underlying pavement,
including the complete removal of all remaining adhesive, and fill
any surface voids caused by the removal work.
8-22 PAVEMENT MARKING
THE LAST SENTENCE OF THE SECOND PARAGRAPH OF SECTION 8-22.1 IS
REVISED AS FOLLOWS:
8-22.1 Description
Traffic letters used in word messages shall be 6-feet high with the
exception of the “R” in the railroad crossing symbol which shall be as
shown on the standard plans.
SECTION 8-22.1 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.1 Description
This Work also consists of furnishing, and installing traffic paint upon
existing traffic curbing.
2021 Paint Line Striping & RPM/Araucto 8 - 3 January 25, 2021
Project Number: 21-3011.1
SECTION 8-22.2 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.2 Materials
Painted striping and curbing paint shall be installed using Low VOC
Solvent Based Paint meeting the requirements of Section 9-34.
8-22.3(3) Marking Application
SECTION 8-22.3(3)B IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.3(3)B Line Patterns
Double Solid Yellow Center Line - Two solid yellow lines, each 4
inches wide, separated by a 4-inch space.
Single Solid Yellow Center Line - One solid yellow line, 4 inches
wide, to delineate adjacent curb, barrier, etc. at select locations.
Skip Center Line - A broken yellow line 4 inches wide. The broken
pattern shall be based on a 40-foot unit consisting of a 10-foot line and
a 30-foot gap. Skip center stripe may be used as centerline delineation
on select two way highways and streets.
Two Way Left Turn Line (TWLTL) - A solid yellow line, 4 inches
wide, with a broken yellow line 4 inches wide, separated by a 4-inch
space. The broken pattern shall be based on a 40-foot unit consisting
of a 10-foot line and a 30-foot gap. The solid line shall be installed to
the right of the broken line relative to the direction of travel and for
each direction of travel.
Skip Lane Line - A broken white line 4 inches wide to delineate
adjacent lanes traveling in the same direction. The broken pattern shall
be based on a 40-foot unit consisting of a 10-foot line and a 30-foot
gap.
Gore / Wide Line - A solid white line 8 inches wide used for
delineation at ramp connections, to separate left and right turning
movements from through movements, to separate high Occupancy
Vehicle (HOV) lanes from general purpose lanes, for traffic islands,
hash marks, chevrons, and other applications.
Wide Dotted Line - A broken white or yellow line, 8 inches wide,
matching color with its associated solid or broken line. The dotted
pattern shall be based on an 8-foot unit consisting of a 2-foot line and a
6-foot gap.
Dotted Line - A broken white or yellow line, 4 inches wide, matching
color with its associated solid or broken line, an extension of an edge
line, lane line, or centerline used at exit ramps, intersections, horizontal
curves, multiple turn lanes, and other locations where the direction of
2021 Paint Line Striping & RPM/Araucto 8 - 4 January 25, 2021
Project Number: 21-3011.1
travel for through traffic is unclear. The dotted pattern shall be based
on a 6-foot unit consisting of a 2-foot line and a 4-foot gap.
Edge Line / Solid Lane Line - A single solid white line 4 inches wide
used for road edge and lane delineation, bike lane delineation, adjacent
lanes traveling in the same direction or bus pull-outs.
Bike Lane Line - A solid white line 8 inches wide that is used to
delineate a bike lane adjacent general purpose lanes.
Dotted Bike Lane Line - A dotted white line 8 inches wide with the
dotted pattern based on an 8-foot unit consisting of a 2-foot line and a
6-foot gap. Bike Lane Dotted Line is used to discontinue a Bike Lane
Line in advance of right-turns at major intersections or corresponding
with transit stops.
Curbing Painting – Existing traffic curbing shall be painted with one
full coat of paint. The paint can be applied by brush or spray on all side
of curbing visible to vehicular traffic. The Contractor shall install glass
traffic paint beads sprinkled in the wet paint at the rate of 12 pounds
per 100 linear feet of curbing. The beads shall conform to the
requirements of Section 9-34.4.
8-22.3 Construction Requirements
8-22.3(1) Preliminary Spotting
THE FIRST SENTENCE OF SECTION 8-22.3(1) IS REVISED AS FOLLOWS:
The Engineer will provide necessary begin/end control points for work
sections where begin/end points cannot be readily discerned per
existing permanent markings and/or newly installed permanent
markings. A list of intersections where newly installed permanent
markings are likely to be encountered, and therefore excluded from this
Contract, can be provided before work commences.
THE THIRD SENTENCE IS REVISED AS FOLLOWS:
Approval by the Engineer is required before marking begins unless
other mutually agreed upon inspection and approval process is
proposed and approved.
SECTION 8-22.3(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.3(2) Preparation of Roadway Surfaces
Traffic curbing surfaces shall be dry, and within the proper temperature
range prior to painting.
2021 Paint Line Striping & RPM/Araucto 8 - 5 January 25, 2021
Project Number: 21-3011.1
SECTION 8-22.3(3) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.3(3) Marking Application
The Contractor is responsible for providing traffic control and traffic
control devices as necessary to direct vehicular traffic away from freshly
painted traffic stripes until such time as the marking paint has completely
dried. Failure to ensure reasonable protection for the undried paint
stripes will result in the Engineer’s decision to adjust the method of
payment for damaged paint stripes. The Engineer’s decision regarding
the means of payment adjustment for vehicle damaged paint stripes is
final in this matter.
THE FIRST SENTENCE OF THE FOURTH PARAGRAPH OF SECTION 8-22.3(3)E
IS REVISED AS FOLLOWS:
8-22.3(3)E Installation
One coat application of paint will be required to complete all paint
markings installed over existing paint markings. Two applications of
paint will be required to complete all paint markings installed on new
surface-treated roadways, on re-channelized street or when centerline
markings are revised to double yellow centerline, or as noted in the
Appendix A. Vehicle and pedestrian tracking of newly applied striping
shall be removed per section 8-22.3(6), and the affected portion of
marking reinstalled by the end of the next working day.
THE FIRST PARAGRAPH OF SECTION 8-22.3(3)F IS SUPPLEMENTED WITH
THE FOLLOWING:
8-22.3(3)F Application Thickness
Marking Material Application HMA PCC BST Groove Depth
Paint – one coat spray 15 15 15
SECTION 8-22.3(4) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.3(4) Tolerances for Lines
Length of Line: The longitudinal accumulative error within a 40-foot
length of dotted line shall not exceed plus or minus 1 inch. The dotted
line segment shall not be less than 2 feet.
The gap spacing specified for skip/broken and dotted lines in Section
8-22.3(B) of Kent Special Provisions are anticipated to be the shortest
gaps that exists. Regardless of the specified gap spacing, the
Contractor shall paint over skip/broken and dotted paint lines to
reasonably match the existing pattern.
SECTION 8-22.3(6) IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.3(6) Removal of Pavement Markings
Only hydroblasting equipment will be allowed for the removal of
pavement markings as called for in Appendix A. Vacuum shrouded
equipment, or other equally effective means, shall be used to contain
2021 Paint Line Striping & RPM/Araucto 8 - 6 January 25, 2021
Project Number: 21-3011.1
and collect all pavement marking debris and excess water. Collected
water and debris shall be disposed of off the project site in accordance
with Department of Ecology or other federal, state or local regulations.
The removal of raised pavement markers shall be incidental to the
removal of the associated marking.
SECTION 8-22.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW
SECTION:
8-22.3(7) Reporting
For each week that Work is performed, the Contractor shall submit a
report summarizing the accomplished work. The report shall be in the
same format and detail as Appendix A, for each street section painted,
showing the total installed linear footage for each line pattern and color.
The report shall be submitted to the Engineer by the end of the week
following the Work or some other mutually agreed upon submittal time.
The Contractor shall sign each report certifying that material was
installed and the linear footage installed are based on actual
measurements in accordance with the specifications.
At the end of the Contract, the Contractor shall provide the total
amount of paint in gallons used for each color and the total amount of
beads in pounds used to perform the Work.
SECTION 8-22.4 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.4 Measurement
“Painted Double Solid Line”
“Painted Single Solid Line”
“Painted Skip Lane Line”
“Painted Dotted Line”
“Painted TWLTL Line”
The measurement for the above items will be based on a marking
system capable of simultaneous application of three 4-inch lines with
two 4-inch spaces. No deduction will be made for the unmarked area
when the marking includes a broken line such as center line, dotted
extension line, center line with no-pass line, lane line, reversible lane
line, or two-way left-turn center line. No additional measurement will
be made when more than one line can be installed on a single pass
such as center line with no-pass line, double center line, double lane
line, reversible lane line, or two-way left-turn center line
“Painted Wide Lane Line”
“Painted Bike Lane Line”
The measurement for the above items will be based on the total length
of each painted line installed. No deduction will be made for the
unmarked area when the marking includes a broken line such as, wide
broken lane line, drop lane line, or wide dotted lane line. The
measurement for double wide lane line will be based on the total length
of each wide lane line installed.
2021 Paint Line Striping & RPM/Araucto 8 - 7 January 25, 2021
Project Number: 21-3011.1
The measurement for “Painting Traffic Curb” will be based on the total
length of painted curb. No additional measurement will be made for
curbing painted on both sides of the curbing.
No specific measurement will be made for placing preliminary spotting.
Cost for placing preliminary spotting shall be considered incidental to the
various items of the Contract.
SECTION 8-22.5 IS SUPPLEMENTED BY ADDING THE FOLLOWING:
8-22.5 Payment
“Painted Double Solid Line,” per linear foot
“Painted Single Solid Line,” per linear foot
“Painted Skip Lane Line,” per linear foot
“Painted Dotted Line,” per linear foot
“Painted TWLTL Line,” per linear foot
“Painted Bike Lane Line,” per linear foot
“Painting Traffic Curb,” per linear foot
2021 Paint Line Striping & RPM/Araucto A - 1 January 25, 2021
Project Number: 21-3011.1
KENT STANDARD PLANS
The following Kent Standard Plans supplement all other plans, which have been
prepared for this project and are considered to be a part of the project plans.
STREET
6-73M Typical RPM Lane Markings
6-74M Typical Lane Markings
42'
12' 30'
3'
000000000000000000000000000000000000000000-000000000000
0 0 0 0 0 a 0 0 0 0
a 0 0 0 0 0 0 0 0 0
VARIES
(300' MAX.)
5' TWO WAY LEFT TURN LANE
a 0 0 0 0 00000
a 0 0 0 00000
0 a 0 0 0 0 0 0 a 0 0 0 0
0 0 0 0 0 0 a 0 0 0 0 0 0 a 0 0 0 0 0 0 oo oa000000a000�4"
21'
TYPE 1Y
RPM GAP
TYPE 2YY RPM TRAFFIC DIRECTION
TWO WAY LEFT TURN LINES
TRAFFIC DIRECTION
TRAFFIC DIRECTION
21'
��4
TYPE 2W OR Y RPM
a o 0 0 0 0 o a o 0 0 0 0 o a
TYPE1W OR Y RPM
000000000 0
TYPE lY RPM 4" GAP
21'
TYPE 2YY RPM
8888888 8 88888888888--NOGAP
TRAFFIC DIRECTION
DOUBLE YELLOW CENTER LINE
WIDE LINE
TRAFFIC DIRECTION
TRAFFIC DIRECTION
42'
42'
12' 30'
12' 30'
0 0 0 0 00
cLo00 0000 0
TYPE 2W RPM TYPE 1W RPM
TYPE 1W RPM
TYPE 2W RPM
TRAFFIC DIRECTION
TRAFFIC DIRECTION
LANE LINE
SKIP CENTER LINE
TYPE 2Y RPM
21' TYPE RPM
6'
31
1 �f88
88 88 88 88 88
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a
a0000000000000co000000
00 00 00 00 00 o0 00 00 00 00 0o o0 00 00 00 00 0o
TYPE IW RPM
S 000 S S S
TYPE 2W RPM
18"-RPWS EQUALLY SPACED
TRAFFIC DIRECTION
BARRIER LINE
DOTTED WIDE LINE
12' 15' T
0
88 88
TYPE IWRPM
0000 00000000�0oo00a00000
TYPE 2WRPM
TYPE 2W RPMTYPE 1W RPM
DROP LANE LINE TRAFFIC DIRECTION
EDGE LINE S�
NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT
��� WY
OF
AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE
ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT
NOTES: cl �
THE CITY OF KENT. A COPY MAY BE OBTAINED UPON REQUEST.
1. RAISED PAVEMENT MARKERS
CITY OF KENT
(RPM's) SHALL BE INSTALLED PER
ENGINEERING DEPARTMENT
WSDOT STANDARD SPECIFICATIONS �� 38296 w�
• TYPICAL RPM LANE
8-09, 9-02.1(8), 9-26.2 AND 9-21 ISTEg� ��'
1
SSIONAI,
KENT
Wws„,„oro„ MARKINGS
��Cs
DESIGNED DWH STANDARD PLAN
SCALE NONE
DRAWN BE
CHECKED DATE 6 - 7 3 M
ENGINEER
APPROVED
110' 30'
TRAFFIC DIRECTION
4" GAP VARIES
(300' MAX.)
5'
2.5' TWO WAY LEFT TURN LANE
TRAFFIC DIRECTION
TWO WAY LEFT TURN LINES
TRAFFIC DIRECTION
TRAFFIC DIRECTION
20'
8" WHITE LINE
° °
TYPE 2W RPM
^ TYPE 2YY RPM ❑
❑
Y� 20'
4" GAP
4" GAP
4" YELLOW LINE
TRAFFIC DIRECTION
TRAFFIC DIRECTION
DOUBLE YELLOW CENTER LINE
WIDE LINE
TRAFFIC DIRECTION
TRAFFIC DIRECTION
11' 30'
30'
❑ ❑ o
TYPE 2W RPM
❑ �o
4" WHITE LINE
TYPE 2Y RPM
4" YELLOW LINE
TRAFFIC DIRECTION
TRAFFIC DIRECTION
LANE LINE
SKIP CENTER LINE
6' 8'
01 ❑
0
❑ TYPE 2W RPM
4" WHITE LINE
4" GAP 8" WHITE LINE
EDGE LINE
DOTTED WIDE LINE
TRAFFIC DIRECTION
T 9'
21'(TYP) 18" YELLOW BARRIER
LINE
1"
1"
BD
.WHITE LINE18"-TYPE
T
2Y RPM'S EQUALLY SPACED
2W RPM
TRAFFIC DIRECTION
DROP LANE LINE
S�
BARRIER LINE
�����
OF� $1����
NOTES: 4� ��
1. RAISED PAVEMENT MARKERS (RPM's)� =
CITY OF KENT
ENGINEERING DEPARTMENT
SHALL BE INSTALLED PER WSDOT
STANDARD SPECIFICATIONS 8-09,
KENT TYPICAL LANE MARKINGS
9-02.1(8), 9-26.2 AND 9-21 38296
�0
IST-
�SSIONAL ESPS
DESIGNED FS STANDARD PLAN
SCALE NONE
DRAWN--
CHECKED DATE 02-2003
CITY ENGINEER 6-74M
APPROVED
2021 Paint Line Striping & RPM/Araucto A - 2 January 25, 2021
Project Number: 21-3011.1
MAPS AND APPENDICES
This section includes the following which have been prepared for this project and are
considered to be a part of the project plans:
Location Maps and Appendix A of 2021 RPM Replacement Location Map
Location Map and List of 2021 Paint Line Striping Group A Streets
Location Maps and Appendix B of 2021 Paint Line Striping – Citywide
Kent
King County
Covington
KingCounty
Auburn
Renton
DesMoines
Tukwila
SeaTac
UP Railroad152 Ave SE108 Ave SE140 Ave SES 200 St
64 Ave SS 180 St
S 200 St
132 Ave SESE 208 St
SE 256 St
S 228 St 76 Ave SS 248 St
124 Ave SE144 Ave SESE 248 St
SE 281 St
S 188 St
S 196 St
SE 240 St
SE 192 St
International Airport
Seattle-Tacoma
S 208 St
Smith St
108 Ave SES 277 St
SR 18Valley FwyE Valley Rd68 Ave SRiv
erRiverBow Lake
LakeYoungs
LakeFenwick
Star Lake
Angle Lake
Hwy (SR) 9916AveSS 216 St
S 223 St
16 Ave S24 Ave SPacificHwySSR516PacificHwySKe ntDesMoinesRd SpringbrookRd124 Ave SEPanther Lake
Kent-KangleyRd
C
anyon
Dr94 Ave SSE 288 St116 Ave SES 288 St 55AveS4 Ave NJames St
BN RailroadWValleyHwyW M eeker St
E
Valle
y
RdMilitaryRdOrilliaRdRussellRd116 Ave SEW i llis St BN RailroadSE 224 St
LakeMeridian
Clark LakeW Valley HwyS 212 St
GreenAuburn-EchoLakeRdAuburn-EchoLakeRdS 272 St
Ve t e r a n s D r
&(
&(
&(
&(
&(
&(
&(
&(
&(
&(
&(§¨¦
§¨¦!!!!!!!!!!!!!!!!
!!
!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
18
516
516
(211)(215)(207)(203)(211)(213)(268)(216)(209)(262)(260)(208)(214)(204)(263)(202)(265)
(269)(207)(266)
(204)
(210)(201)(208)(2 6 7 )(2 7 0 )(206)(208 )(206)(205)
(2 0 9 )(212)(205)(264)(210)PA GE 3 OF 7
PAGE 2 OF 7
PAGE 5 OF 7
PAGE 7 OF 7
PA GE 1 OF 7 PAGE 6 OF 7
PAGE 4 OF 7(DOWNTOWN)5
5
509
99
181
99
516
99
167
515
µ
Legend
RPM_Projects_2021$ Events
RPM Types to Refresh
!!!!!!!!1Y, 1W, 2YY, 2W (Coord w/ Other Work)
!!!!!!!!2YY, 2W (Coord w/ Other Work)
!!!!!!!!2YY (Coord w/ Other Work)
1Y, 1W, 2YY, 2W
1Y, 2YY
2YY, 2W
2YY
CITY OF KENT2021 Raised Pavement Marker RefreshProject Locations Map Page Index
Document Path: P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021.mxd Date: 1/17/2021
(XXX) - PROJECT INDEX (SEE APPENDIX)
n
n
n
÷
S 2 11 St
32PlSS 202 St 33 Av S34 Av S39AvSS 194 St
37 Pl S41 Av S35AvS33 Av SS 203 St 35 Ln SS 198 St
S 204 St
72AvSS 216 St
70AvSS 226 St
S 216 St
FragerRd
3
5
AvS34AvSS 228 St33AvSS 204 St
31AvSS 220 St64 Av SS 2 2 8 S tS 224 StRussellRd
54 Av SS 194 St 62AvS64AvSS 204 StMilitaryRdS35Av193 St
208 St
211 St
209 St SR5SR5200 St
32 AvMilitaryRdSS 212 S t32Av31A
vMilit
a
r
y
Rd
S
201 St West Valley Hwy68AvS68AvS3
7
P
l
S35 Av S66 Av S5
8 Pl S
S 1 9 4 St
35AvS 212 St
S 20 0 St
S 196 St
192 St
40 Pl S40 Av S39 Pl S39 Av S38 Pl S201 St
34 AvS 199 Pl62AvS
59PlS40AvS40PlS42 Av S71Pl227 Pl
S 231 St
66 Av S192 Pl
191 Pl
193 Pl
S 193 St
70 Av S70AvSS 200 S t
42PlS2 1 7 S t
217 Pl
218 Pl
216 Pl
43Pl39PlS40PlS220Pl41AvS41Pl2 2 1 P l
2 1 9 St
S222Pl41Pl223St4 2Av221Pl
43AvS220
Pl
S221
St
221 Pl
45AvS222 S t 46AvS224Pl
4
3
AvS41Pl
226St
225Pl4 2Av42Pl35
P
l
S222 Pl 66AvSS 217 St
S 219 St
S 220 S t 67Av218 St
209 St
S 224 St
S 226 Pl66AvS
23 2 PlS 2 3 2 S t50 Av50Pl233Pl
5
1
A
v53Av51Av52Av52Pl53Av53Pl54
Av
5
1
Av
S
225 Pl
54Av234 Pl
2 3 3 St
2 31 Pl
5
6Av232 P l 232 S t
5
7
Av5
2
Pl
5
7
Av
S56 AvS 2 3 4 S t55Av LakesideBlvdE
233
5
9
PlS
58 AvS2 3 1 S t233 St
60 Pl62AvS 233 St62 Pl63Pl60 Ct58 Pl S42AvS4
1
Av232P l232 C t59Pl59CtRussellRdSS194St61 PlS 232 St
S 208 St
Russell
Rd
217St
218 St
216 Pl
45 Pl45 Ct44 Pl46 Pl S220 St220 Pl
221 St
219 Pl
S 216 St
RiverviewBlvdS46AvS215Pl 47 Av214 Pl
S 215 St
S 215 Pl
47Ct48Pl48Ct214 St S214Wy50 Av214 Pl215St
51 Av S213 St
52WyS53 PlRive r v ie w BlvdSRiverviewBlvdSV e t e r a n s D r
S 212 P lS 209 Pl
40 Pl S39 Wy S4
0
Pl SS 211 P l210Pl 41 PlOrilliaRdS209 St
210 St
211 St
211 Pl38 Pl S37 Pl S20 9 Pl
&(
§¨¦
!!!!!!!!!!!!
!!
!!
!!
!!
!!
!!!!!!!!!!!!!!!
5
(265)(212)(267)(206)(264)Produced by Joseph S. Araucto P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021 - Mapbook.mxd Printed: January 2021
F2021 Raised Pavement Marker RefreshProject Locations
0 500 1,000Feet PAGE 1 OF 7
Legend
RPM Types to Refresh
!!!!1Y, 1W, 2YY, 2W (Coord w/ Other Work)1Y, 1W, 2YY, 2W1Y, 2YY
(XXX) - PROJECT INDEX (SEE APPENDIX A)
n
n
n
n
n
n
÷
n
51
PlS
33 Pl SS 236 St
S 234 St
S 232 St
26AvSS 236 St
41AvS35AvS35PlS39AvSS239S t33AvS34AvS35PlS42AvS43AvSLakeFenwickRdS 248 St
S 249 St
45PlSS 260 St
S 253St
S 243 St
S 24 8 St
31AvS41AvSS 261 Pl S 262 St
S 263 St
Kent Ct
S 270 St S 270 St
268 Pl
37AvS42AvS35PlSS 268 St27PlS30AvSS248St
S 252 St
30AvS 246 St SR 5SR 5SR995
2 A
v
52AVSW M eeker S tS 2 2 8 S tMilit
a
r
y
Rd
S
238St38AvS
239P l
241 St
242 St
35 Pl
239 St 42 Pl S243 Pl
36 Av S260 St
252 St
42PlMilitaryRdS33AvS33 Av40AvSSo merset Ln36PlS
Carn a byWy DoverCt34A v
269 St
35 Av40AvS45 AvS 256 St26PlS253St
45 Pl
S
R
5
1
6
Frager R dSRu
s
s
ell Rd
41 Pl S39PlSS 2 63StS 2 5 7 S t43PlS38AvSS 255 St 35 Pl S32PlS25 9 Ct29 Av SS 256 St27 Av SS 242 St
S 244 St 28 Av S239
Pl
S 244 St
34
AvS41AvS
35 Av SS23 6 St30AvS
PacificHwySS 2 6 1StS 261 St 36PlS255 Pl 39Pl251 St
252 St
254 Pl253St
252 Pl
270St BristolCtCardiff Av SCa
mbridgePlManchesterAv35PlCtPrincetonAvCanterburyMan
c
hesterWa
yH a m pton Wy
Some rsetCt
36Av36LnS t r a tfordCt YaleCtHighlandAv2 54 St
44 Av36Pl36 Ct249 Pl249 Pl257 S t35Pl 43Av245 Ct
37Pl252 Pl
2 5 6 C t 38Pl44Pl43Pl
43Av46AvCambridge Ct
Stanford CtSaxonCtAvonCt271 S t
32 Pl SF e n w ic k
C t259 Ln32 Pl31Av254 St
265 St 33Pl34Pl2 4 7 C t
2 4 7 S t
246 Ct
250 St
250 Pl
251 Pl
256 P l
S 231 St
253 Pl
ReithRdS 272 St
S 254 St
45 Av
25 8 Pl
23 2 PlS 240 St
S 2 3 2 S t50 Av50Pl233Pl
5
1
A
v23 4St2 3 4 P l53Av53PlS51Av52Av52Pl53Av53Pl54
Av
5
1
AvS
2 37Pl51AvS51Ct
S237Pl54Pl 55Pl51 Pl54Av234 Pl
2 3 3 St
S 234 Pl
54Av235
2 31 Pl
5
6
Av232 P l 232 S t
5
7
Av2 3 6 P lSt
5
2
Pl
55 Av S5
7
Av
S56 AvS 2 3 4 S t55Av
Lakeside Blvd
W
S237
St57 Ct S58 CtS 2 3 8
CtS 238Pl
S 239 St 63Av63AvS238 St
237 St62 Av S61AvSLakesideBlvdE
233Pl
234 Pl
5
9
PlS
60AvS5
8 A
v
S
2 3 5 S t
58 AvS2 3 1 S t233 St
60 Pl62AvS 233 St62 Pl63Pl60 Ct66AvSJames PlJames Ln63 Wy S240 Ct
242Pl
S 248 Pl
S 2 4 9 S t
S 2 4 9 P lS R 51663 Pl
S62 Pl
S62 Av SS 251 S t
62 Av SS 251 Pl
S 253 St
S 253 Pl
S 255 St
S 261 St
S 269 St
52 Ln SL
a
k
e
F
e
n
wick
R
d
S45PlS4
5
Av
S2 4 8 P l4
6
AvS45AvS45PlS251 Pl KentDesMoinesRd249Pl248 PlS 250 Pl
S 251 StS 251 Pl
S 252 Pl
EtonCtPl271
4
8Pl
SArden Ct46AvS44PlS47AvS47 Pl S47 Pl SS 272 St
45 Pl S27 Av S32 Av26 Pl S256 Pl
257 Pl
258 St
258 Pl
2 5 9 S t
S 256 St
27PlS2 7PlS 260 LnS259P lAv
2926AvSS 2 7 0 St
S 268 Pl28 Av S26 9St Pl62 WyFragerRd6
2
Pl232Pl232 C t59Pl59CtHampton Wy CarnabyWy38AvS36 Av36Pl250Pl
257 St
236 St
56 Ct56Pl61 PlS 232 St
27 Av2735Ln269 St36Pl
42 Pl 43 Ct S6
4
A
v
SS 236 Pl
65 Av64 Pl238 Pl
252 Pl
251Ct
35 Pl S&(
§¨¦
!!!!!!!!!!
!!
!!
!!
!!
!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
5 (264)(215)
(207)(211)(209)(206)(208)(210)516
Produced by Joseph S. Araucto P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021 - Mapbook.mxd Printed: January 2021
F2021 Raised Pavement Marker RefreshProject Locations
0 500 1,000Feet PAGE 2 OF 7
Legend
RPM Types to Refresh
!!!!1Y, 1W, 2YY, 2W (Coord w/ Other Work)1Y, 1W, 2YY, 2W1Y, 2YY2YY, 2W2YY (XXX) - PROJECT INDEX (SEE APPENDIX A)
n
÷
n 107AvSE104AvSE105 Av SESE 199 St106 Av SESE181 StS 45 PlDavisAvS
S 51 Ct SE 188 St
SE 190 St
S 50 St
190 Pl
S1 98
S
t
SE 186 StSE185Pl
SE 190 St
SE 190 Pl
201 St186 Pl1 8 7 C t104 Pl SE103 Pl SE102PlSE102AvSE101AvSE103PlSESE 217 St
SE 218 St
211 P lSE212St
106PlSESE 216 St
S208St 98PlS92AvS95AvS205 CtS 206 St
S 208 St
S 218 St 98AvS213
St 99AvSSE 212 St
96AvS97 CtS 203 St88AvS80AvSS182St
S 188 St
S 190 St
S 192 St
S 194 St
77AvS80AvS81 Av SS 200 St
S 202 St
S 206 St
S 202 St
S 216 St
SE 192 St105PlSE102 Pl187 S t
180 St104
Av108 Av SESR 515SE 200 St
101Av99 Pl S102PlNE10
6
P
l 107Av108AvSES 194 St98 PlSTalbotRdSEast Valley HwyS E 1 7 9 St
East Valley Hwy204 Pl
20 5 P l206 Pl
S 212 St
84AvS80PlSSW 43 St
72 Av S103 Ct1 8 0 Pl180Pl
104PlSE106AvSEValleyFwySR 167S 55 St
1
0
9
A
v
S
E103Av97AvS204 Ct93 Av S213 Pl
212 St
76 Av SS 196 St
220 Pl
1 8 2 S t
1 8 2 P l
18 3 P lSE 184 Ln
188 St
187 Pl
SE 204 St
96P
l
S 208 St96 Av S97 Pl SS 210 Pl
214 Av 98 Av STalbot Rd SS 192 St
98 Pl179 Pl
109Av1 8 9 C t104 Pl
SE103 Pl102 AvS 202 St
2 0 3 Pl
96WyS 207 Pl 101 Ct102 AvSE 207 St 104 Av105 Pl106 PlS E 2 0 6 Pl
104 Pl194 St
SE 196 St
110Av107Pl109Pl110 Av110 AvSE 211 St
1
03Ct
213 Ct100Pl1
0
4Pl104 Av210 Pl
213 St
102AvSE 213 Pl100AvSE
103 Pl SE219 Pl
96 Pl221 Pl
S 220 Pl92 Av S220 Av 95Pl96Av95Pl95 CtS 213 St
216 St
205 Pl94Av
207 St 106 Pl106 AvSE218Pl
219 Pl100 Pl2 0 2 S t 102 Av109 Av108PlSE107 Ct198 St78 Av220 P l
S 182 S tS184StS 186 Pl77 Pl S75PlS80 Ct S187St
185 Pl
S 184 St
S 187 St
S 190 St
S 192 StS 198 St
S 202 St85 Av S87 Av S89AvS93Pl96Av97 PlS 210 St
80AvS209 St
S 207 Ct
84PlSS 218 St85Av S 213 Pl
86PlS88AvS88PlSS216 St
88 Pl S86AvS220 Ln
2 14 Pl
94PlS96AvS97
Av94PlS216 Pl 94Ct95Pl
183 C t101 Pl220 Pl91PlS
102 Pl106 Av97Pl194 St
194 Pl
104 AvSE 196 St
101AvSESE195 S t
SE 19
4Pl
106AvSEUnnamed110AvSE110AvSE109 AvUnnamedUnnamed109LnSESE 206 St106AvSE105PlSE204Pl105Ct105AvSESE202Pl205St
SE 206 St
SE 204 St
Unnamed105AvSE2 0 9 Pl
103 Av SESE 21
2St 104Av98AvS99AvS102PlSE105PlSE104PlSESE 218 S tSE 219 St
107AvSE220 Pl
S E 218Pl
Private Rd220 StSE220St105 AvSE 214 Pl105Pl
108Pl214 Pl
213 St110
AvSE
101 Ct99PlSE 220 St90PlS91PlS204 Pl
(213)(268)
(269)
(266)(206)(205)Produced by Joseph S. Araucto P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021 - Mapbook.mxd Printed: January 2021
F2021 Raised Pavement Marker RefreshProject Locations
0 500 1,000Feet PAGE 3 OF 7
Legend
RPM Types to Refresh1Y, 2YY2YY, 2W2YY
(XXX) - PROJECT INDEX (SEE APPENDIX A)
n
n
n
÷
72AvS70AvS5thAvN3rdAvN1stAvN2ndAvNS 234 St
StateW Cole St
S 226 St
H
a
w
l
e
yRdWNadenAvSMadisonAvN5th Av S5thAvS3rdAvS2ndAvS1stAvSRailroadAvSW Gowe St
S 236 St
Novak Ln
Woodford Av NRailroadAvNWardSt
K e nsingtonAvGoweSt
Bridges Av S4th Av SJames St
W Mee ker St 6th Av NW Harrison St
W Meeker St
W Sam St
6th Av4thAvNS 220 St 84AvSW M eeker S t64 Av SS 2 2 8 S tS 224 St
S 222 St
68AvSETitusStSR167CentralAvN2nd Av NWashington Av NLincolnAvNThompson Av NS 228 St 83 Av S6th Av N22 4 St
2nd Av N76 Av SRu
s
s
e
ll Rd
StateAvNKennebeckAvMcmillan St
Clark Av NPioneer St
Hillcrest AvE Dean
George St
AlpineW y71Pl227 Pl
W Cloudy St
ScenicW y
Ke
n
n
e
bec
k
AvE TitusStWillis St
W Titus St
Rachael Pl W Crow St
S
c
e
n
ic
Wy
W Saar St
S 231 St
66 Av SAdamsS 220 S t 67AvS 224 St
S 226 Pl66AvS
55Pl2 3 2 S t
5
7
Av5
7
Av
S56 AvS 2 3 4 S t
Lakeside Blvd
W
S237
St57 Ct S58 CtS 2 3 8
CtS 238Pl
S 239 St 63Av63AvS238 St
237 St62 Av S61AvSLakesideBlvdE
233Pl
234 Pl
5
9
PlS
60AvS5
8 A
v
S
2 3 5 S t
58 AvS2 3 1 S t233 St
60 Pl62AvS 233 St62 Pl63Pl60 Ct66AvS67PlSS 238 PlS 239 St
S 239 Pl58 Pl S84 Pl S236 Pl
KirkwoodAvW Smith St
6th AvRussell StWJamesLnRidgeview DrW James LnJamesCt
James Pl
James PlJames Ln63 Wy S240 Ct
242Pl
S 248 Pl
S 2 4 9 S t
S 2 4 9 P lS R 51663 Pl
S62 Pl
S62 Av SS 251 S t
S 251 Pl62 WyNaden Av6
2
Pl Scenic Wy232P l232 C t59PlS238 S tWMortonSt59Ct
E Smith St
W Willis St56 Ct56Pl61 PlS 232 St
StConcord
C le a rvi ew
RamsayW
y
W Kent Sta St
1st Av N2nd Pl N3nd Pl N6
4
A
v
SS 236 Pl
65 Av64 Pl238 Pl
&(
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!
!!
!!
!!
!!
!!
!!
!!
!!
!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!(207)(216)(208)(208)(263)(204)(270)(206)(205)(212)181
Produced by Joseph S. Araucto P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021 - Mapbook.mxd Printed: January 2021
F2021 Raised Pavement Marker RefreshProject Locations
0 500 1,000Feet PAGE 4 OF 7 (DOWNTOWN)
Legend
RPM Types to Refresh
!!!!1Y, 1W, 2YY, 2W (Coord w/ Other Work)
!!!!2YY, 2W (Coord w/ Other Work)1Y, 1W, 2YY, 2W1Y, 2YY2YY (XXX) - PROJECT INDEX (SEE APPENDIX A)
n
n
÷
n
n
n
n
n
n
n
126 Pl SE118AvSE127
Av
S
E
SE 264 St
SE 272 Pl
274 St
275 St
SE270St
117AvSE118AvSESE 276 Pl
SE 277 P l99AvS94PlSSE 264 Pl
SE 260 St
1
0
0
P
l
S
E 111AvSE113AvSE100 Pl SE104AvSE106AvSE1
10AvSE112AvSE109 Ct111Ct111AvSESE270 St
1
1
5
A
v
S
E100AvSE109 Pl9
7
P
l
SReitenRd95 Pl STil
d
enAvHilltopAv96 Av SW
o
odlandWy98AvSS 241 St
S 242 St
242 Ct
S 246 Pl
S 252 St
121Av122Av123Av118Pl122 Av121 Av269 St120Pl 2 7 7 Pl 278 Ct
279 Ct
272 St
116Pl121Pl121
P
l
274 St
277 Ct118Pl264St124Pl119Ct120Av264Pl122Ct263St252Pl255St121Pl259Pl
268 St114Av 126Av115Av254 St 126AvSE116 Av SE238 St SE 237 St
SE 248 St
108 Av SE269St111 PlSummitAvNCanyonDrMaplewoodAvSMapleStGreenRiv
er
R
d
SE 256 St119 Pl1
2
6
A
v
SE
119PlSE128 Pl262 Pl
SE 273 Pl
126 Pl101 Av SESE 270 St
SE 271 St 128 Av SE127 Av SE253 St 124 Av SE2 5 3 C t
SE 252 Pl
S
R
516
10
7
Av109 Av SES 243 St
S E 2 7 4 W y
S 277 St
SE 261 St119 Pl SE124 Av SE253 St
247 Pl
2 7 5 Pl274St
1
2
1
Pl127Av115Pl1
2
7
Av127Ct254 PlWalnutE Walnut St
126Ct110AvSE2 6 1 C t125Av119Pl111Ct110Ct258 Pl
244 Ct
245 Pl
246 Pl
263 St112 Av240 Pl
102 Pl102 Av101 Pl102 Pl242 PlS 242 Pl
265 Pl
263 Pl
259 Pl
119DrS 262 Pl 119 Av245 Pl
2 7 0 S t115 Av111 Pl264 S tS 238 St
113 Pl92 PlWestview CtS 239 Pl
S 244 Pl
SE 239 St 238 Pl
125 Av127Pl
SE128 Av SE254C t
2 5 4 P l
SE 244 St
121 Pl SE2 51Pl252 P l122 Pl
255 Pl117Pl
258 St
SE 254 Pl
115 Av252 Pl 120 Av SE114 Pl100 Pl SE102 Pl96AvS96Av97 AvS 245 Pl
Weiland St
Ellis PlViewPlS 240 St
97 AvSE 267 St99 Pl S102AvSE268 St 107 AvSE 264 St
SE 266 St114 Pl265 Pl
115 Av268 St
270 CtSE 272 Pl
268 St
267 Pl
266 Pl118Pl263 C t261Pl256 Pl
260S t
262 C tSE 260 Pl
118Pl117Pl257St
122Av125Pl
126Pl265 Pl126 Av126Av124Pl276 Pl
125Av123Pl120 Av SESE 276Pl
123AvSE 276 St111Av
122PlSE 237 Pl
111Pl110 Pl106 Av116Pl116Pl117Pl122Pl259 St
125 PlS E 2 7 7 S t276Wy266 St
126 Ln275 St 115 Pl265 Pl
112Pl277 St
S 239 S t
S 240 P l
239 Pl 102AvSE 238 Pl101 Av SE101 Pl SE238 St
108 Av SE2 3 8 S t109AvSE110AvSE111PlSE238 Pl
2 39St
SE 241 Pl 109 Pl108 Pl240 Pl
110 Pl SE111 Pl119Av
118 Av SE249 Pl
250P lS E 2 4 8 C t
255 St
123 PlSE 251 Pl
119 Av1
2
1
Av
262 Pl120PlSE 255 Pl
258 S t 126PlSE258St122 Pl119 Av128
Pl
2
7
3 Pl
116 Av SE110 PlSE 243 St
SE 244 St 111AvSE115 Pl SE105 Pl SES 247 Ct 101 Pl SE248 Ct101 Pl100PlSE2 4 9S t99PlS248 Pl
100 Av249 Pl
253 Pl 114AvSE112 Av SE111 Av SE248 Pl
251 Pl
251 Ct110 Ct253 Pl
249 Ct110 Pl110AvSE109Pl2 5 0 Ct
SE 250 St
108AvSESE 250 Pl
106 Av SE252 St
105 Pl SE108 Pl SESE 254 Pl
106AvSE109AvSE252 Pl
253 Pl
109 Ct254 Pl
110 Av110 Av255 Pl
10
9C
t Pl109110 Pl SE259109Pl256 Pl
257 St S E 257 St
256 Pl
257 P l 115 Av258 St
259 St114 AvSE 264 St
258 Pl
112 AvAvSE113260 St
260 Pl106 Pl2 6 1 S t262St
106 Pl SE107 Av SEAv103SE 2 70 Pl102Pl258 Pl
Pl 114PlSE 277 St
114AvSE106 Av SESE 279 StWo
o
dla
n
d
Wy
S 94AvS244 St
KimberlyAv274 Pl97 Pl97 Av S114 Av SE114AvSE265 St114 Ln SESE 240 St
SR515SE 256 St 251St2 5 0 S t251 P l110Pl120PlSE254St103AvSE
266 Pl266 St
S 237 P l119 Ct119Pl266 Pl
268 St 106Pl124Av272 Pl
SE 273 Pl103 Pl114Pl114 Av113 Pl117Av116 Pl118 Pl119 Pl240 Pl 120 Av SE1
1
9
Pl
239 Pl
1
1
8
P
l118Av117Pl238St116 PlPl239St
238
117Av121 Pl SE269 Pl 123Av262 Ct
SE 278 Pl
SE 277 Pl
126Av126Pl124 Pl268St
S
R
5
16
261 St
260 St 124 Av SE123Pl110 AvSE 249St
SE 251 St118 Av SE117Ct118 Ct250 Pl
250 Ct
105PlSE 272 St105 Av106 Av105 Pl271 St
271 Pl
265 Ct
274 Ct105 AvSt
273
107 Pl266 Ct112 Av112 Pl109
A
vSE 269 St
2 5 9 Pl259 Pl
237 Ct237 Pl
117 Av242 Pl 242 St
114 Pl SESE 253 Pl
&(&(
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!(203)(261)(
2
6
2
)
(2 6 0 )(202)(207)(201)(208)(2 0 9 )
516 515
Produced by Joseph S. Araucto P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021 - Mapbook.mxd Printed: January 2021
F2021 Raised Pavement Marker RefreshProject Locations
0 500 1,000Feet PAGE 5 OF 7
Legend
RPM Types to Refresh
!!!!1Y, 1W, 2YY, 2W (Coord w/ Other Work)
!!!!2YY, 2W (Coord w/ Other Work)
!!!!2YY (Coord w/ Other Work)1Y, 1W, 2YY, 2W2YY, 2W2YY (XXX) - PROJECT INDEX (SEE APPENDIX A)
n
n
n
÷ 133 Av SESE 198 St
SE 200 St
SE 201 St
S E 2 0 2 C t
135
Av
S
ESE 204 Pl130 Av122 Ct SE121 Ct SE123 Pl122PlSESE206St121 Av SE122PlSESE 198 Pl
SE 213 St
129AvSE 206 Pl
127PlSESE 216 St119 Av132Pl
1 9 9PlSE 204 W y134Ct133Pl132 Av SE131Pl207 St
207 Pl
212 Pl 212 Pl
215 St125Av
123 Av217 St122 Pl211 Pl
210 Pl
124Av217 Pl
209 St
121Pl210 P l
211 Ct
218 Pl210 Ct 210 Ct123 C t1 9 8 C t
199 Ct
197 Pl
198 St
122 Av SE124 Av SE2 1 2Pl209 Ct
124AvSE210 St
204 S t
119 Ct21 7 Ct
2 1 4Pl2
0
6 St
206 Pl128Av130Pl126 Pl2 0 8 P l
131 PlSE
2 04S t212Pl
2 1 3 S tSE 208 St
SE 216 St
207 Pl
134Pl2 1 4 S t120 Pl SESE 210 St
120 Av211 Pl 125 Av213 C tSE 211 S t
209 St
197 Pl
122 PlSE 201 St
205 St
SE201 P lSE 203 Pl 130 Av125 Pl127 Pl
132 Av SE209 S tSE 21 2 P l
SE 212 St
121 Pl SE215 St 121 Pl SE214 Pl
216St
2 1 5 P l119 Ln129 Ct130AvSE 216 St
217 St 137AvSE134Pl198 Pl
SE 200 St
212 Ct212 C t131 Pl119 AvSE 209 Pl
119 Pl2 1 4 S tSE213St
SE 217 St
120AvSESE 209 Ct
130 Pl SE1
31Pl131Pl210 Pl131Av
1
31 Ct
S E2 11 StSE126Av SE 210 St
213 St
216 P lSE 217 PlSE127Pl
125AvSESE 217 P l125Pl214 St
129 PlSE130AvS E 214 Wy
SE 204 St
130 Av SESE 203 Pl
SE201St
SE 202 Pl 127Ln199 St
120 Av SE120AvSE121WySE(214)(204)Produced by Joseph S. Araucto P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021 - Mapbook.mxd Printed: January 2021
F2021 Raised Pavement Marker RefreshProject Locations
0 500 1,000Feet PAGE 6 OF 7
Legend
RPM Types to Refresh2YY, 2W
(XXX) - PROJECT INDEX (SEE APPENDIX A)
152AvSESE 235 St
SE 236 St
SE 251 St
1
4
0AvSE135 Pl SESE 236 Pl
140 Av138Av2 4 3Pl
14
5
Ln146AvSE
1 4 5AvSE137Av
SE 240 St135Av138Av
144Av
S
E
144AvSE136
A
v
S
E
SE251StSE251Pl 140AvSESE 241
St
142AvSESE237Pl
SE240Wy148 Av SE147AvSESE 2 4 7 St144AvSE136PlSE145Pl
SE 2 5 0 S t241 Pl239 S tS E 2 3 3 S t
SE 231 St
137Av139 Av
SE 232 St
234 St 234St150 AvSE 234 Pl147 Av245 Ct 244St135 Av SESE 243 St138AvSE138 Ct144 Pl139Pl238 Pl
145Pl
SE146 Pl246 Pl
148AvSESE 232 S t
14 1 L n S E
139Av141 Pl242 Pl 140Ln23 8 Ln
143 Av SE246 St137 Av SE137 Ct SE148LnSE249 Pl146 Av146PlSE137 Av239
2 3 2 S t(211)
(210)
Produced by Joseph S. Araucto P:\Public\Operations\Streets\Pavement Marking Projects\Pavement Marking RPM Locations 2021 - Mapbook.mxd Printed: January 2021
F2021 Raised Pavement Marker RefreshProject Locations
0 500 1,000Feet PAGE 7 OF 7
Legend
RPM Types to Refresh2YY
(XXX) - PROJECT INDEX (SEE APPENDIX A)
2021 Raised Pavement Marker Refresh
Project Location - Appendix A
Index Group Street Name Location Legend
Coordinate
with Other
Work
Notes
202 1 108 Av SE SE 264 St to SE 260 St 2YY Yes Includes RPM replacement of
Painted Islands
203 1 124 Av SE SE Kent Kangley Rd to SE 264 St 2YY, 2W Yes
204 1 4 Av N SR 167 to 76 Av S / S 228 St (N)2YY, 2W Yes
205 1 W James Street Washington Av N to Central Av N 2YY, 2W Yes
206 1 S 228 St Lakeside Blvd E to 68 Av S 1Y, 1W, 2YY, 2W Yes
207 1 SE 260 St / 108 Av SE 104 Av SE to SE Kent Kangley Rd 1Y, 1W, 2YY, 2W Yes Includes RPM replacement of
Painted Islands
208 1 W James St Washington Av N to Lincoln Av N 2YY, 2W Yes
201 1 104 Av SE SE 248 St to SE 240 St 1Y, 1W, 2YY, 2W
204 1 132 Av SE / SE Lake Youngs
Wy SE 208 St to Kent City Limits 2YY, 2W
205 1 80 Av S S 196 St to S 180 St 2YY, 2W
206 1 80 Pl S 80 Av S to 84 Av S / East Valley Hwy / S 192 St
(SE)2YY, 2W
207 1 Lakeside Blvd E W James St to 600 ft North of W James St
208 1 W Meeker St Kent-Des Moines Road to Russel Road 1Y, 1W, 2YY, 2W
209 1 W Meeker St Reith Rd / S Kent-Des Moines Rd to 910 feet
East of Reith Rd / S Kent-Des Moines Rd 1Y, 1W, 2YY, 2W
210 1 Military Road S S 272nd St to Kent-Des Moines Road 2YY, 2W
211 1 Military Rd S S 239 St to S Kent-Des Moines Rd 1Y, 1W, 2YY, 2W
208 1 SE 277 St - EASTBOUND DON WICKSTROM BRIDGE to 111 Av SE 1Y, 1W, 2YY, 2W
209 1 SE 277 St - WESTBOUND DON WICKSTROM BRIDGE to 111 Av SE 1Y, 1W, 2YY, 2W
210 1 SE 240 St 142 Av SE to 148 Av SE 2YY
211 1 148 Av SE SE 240 St to SE 244 St 2YY
212 1 68 Ave S S 240th St to S 228th St 1Y, 1W, 2YY, 2W
213 2 100 Av SE S 208 St to S 210 Pl 2YY
214 2 124 Av SE SE 208 St to SE 204 St 2YY, 2W
215 2 42 Av S S 248 St to S 247 St 2YY
216 2 5th Ave S W Gowe St to W Saar St 2YY
Page 1 of 2
P:\Public\Operations\Streets\Pavement Marking Projects\RPM_List_2021.xls
1/17/2021 8:10 PM
2021 Raised Pavement Marker Refresh
Project Location - Appendix A
Index Group Street Name Location Legend
Coordinate
with Other
Work
Notes
260 2 94 Av S / S 248 St E Canyon Dr to 96 Av S 2YY, 2W
261 2 94 Av S S 248 St to 0.15 miles N of S 248th St 2YY, 2W
262 2 97 Pl S E Canyon Dr to 1000 ft S of E Canyon Drive 2YY
263 2 Lincoln Av N W Smith St to W James St 1Y, 2YY
264 2 Riverview Blvd S Veterans Drive EB Off Ramp to S 216 St 1Y, 2YY
265 2 S 208th St 68th Ave S to 59th Pl S 1Y, 1W, 2YY, 2W Behind Amazon Fulfilment
Center
266 2 S 208 St 84 Av S to EAST END OF BRIDGE OVER I-405 2YY
267 2 S 216 St / Riverview Blvd S 40 Pl S / 42 Av S to S 212 St 1Y, 1W, 2YY, 2W
268 2 SE 216 St 105 Pl SE to 108 Av SE €2YY, 2W
269 2 S 218 St 93 Av S to 98 Av S 1Y, 2YY
270 2 S 228th St / 83rd Ave S / S
224th St 4 Ave N / 76 Ave S to 84th Ave S 1Y, 1W, 2YY, 2W
Page 2 of 2
P:\Public\Operations\Streets\Pavement Marking Projects\RPM_List_2021.xls
1/17/2021 8:10 PM
Kent
King County
Covington
KingCounty
Auburn
Renton
DesMoines
Tukwila
SeaTac
UP Railroad152 Ave SE108 Ave SE140 Ave SES 200 St
64 Ave SS 180 St
S 200 St
132 Ave SESE 208 St
SE 256 St
S 228 St 76 Ave SS 248 St
124 Ave SE144 Ave SESE 248 St
SE 281 St
S 188 St
S 196 St
SE 240 St
SE 192 St
International Airport
Seattle-Tacoma
S 208 St
Smith St
108 Ave SES 277 St
SR 18Valley FwyE Valley Rd68 Ave SRiv
erRiverBow Lake
LakeYoungs
LakeFenwick
Star Lake
Angle Lake
Hwy (SR) 9916AveSS 216 St
S 223 St
16 Ave S24 Ave SPacificHwySSR516PacificHwySKe ntDesMoinesRd SpringbrookRd124 Ave SEPanther Lake
Kent-KangleyRd
C
anyon
Dr94 Ave S116 Ave SES 288 St 55AveS4 Ave NJames St
BN RailroadWValleyHwyW M eeker St
E
Valle
y
RdMilitaryRdOrilliaRdRussellRd116 Ave SEW ill is St BN RailroadSE 224 St
LakeMeridian
Clark LakeW Valley HwyS 212 St
GreenS 272 St
Ve t e r a n s D r
&(
&(
&(
&(
&(
&(
&(
&(
&(
&(§¨¦
§¨¦
516
516
5
5
99
181
99
516
99
167
515
City of Kent2021 Paint Line Striping Group A Streets
Legend
Project Location
µ
Document Path: P:\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Line Striping Group A Streets.mxd : Sunday, January 17, 2021
2 1
6
4
8
7
11
10
Location ID
6
Location ID Street Name Location Description Skip Yellow
Double Solid Yellow
TWLTL Yellow
Skip Lane Line White
Gore Line White
Bike Lane Line White
Wide Dotted Bike Lane Line White
Wide Dotted Lane Line White
Edge Line White
Dotted Edge Line White
1 SE 208th Street 84th Ave S to 96th Ave S 200 4000 8000 200
2 S 212th Street 68th Ave S to 72nd Ave S 435 620 2100 450 1990
3 Not Used
4 Military Road S S 272nd St to South City Limit 12460 2500 24925
5 (Not Used)
6 S 259th St / S 260th St / Reith Road Pacific Hwy S to Military Rd 2600 400
6 Reith Road 42 Ave S to S 253 St 3740
7 SE 248th St/94thAve S Canyon Dr to 104th Ave S 4805 1300 8000
8 Canyon Dr Titus St to 101St Ave S 5,100 1600
9 (Not Used)
10 S 240th St 140th Ave S to 148th Ave S 3600 7200 1100
11 SE 256th St 118th Pl S to 148th Ave S 550 4200 10550 1050 10550
Yellow Lane Lane Markings (ln-ft)White Lane Lane Markings (ln-ft)
515
' r I
I �
99
u"ila
r%r1IZ. King C unty \
169
f i �
ea a 2 3 1 4
II `ram•% \
I,1 e
99
T •+ nti
es 5, 64'.1 6 181 7 8 9 10
1516) DOWNTOWN �
n.• r rr
r j 516
19 � .•1, 515 -----
.— — 18
Coviigon — —�
J 4J
LARK
.1 �---- ._.1�12 ;13. 'ng j14 1.5 51a 6
. un — „ .r-516 SPRINGS 18
tal
Aubur �-' BRIDGES
0 1 2
Miles N
Produced by Pavement Manager: Joseph Araucto U:\MXD\MAPBOOK INDEX MAP SX11.mxd
INDEX MAP
,�
1-00 KENT
nn
n
÷
S 180 St
S 184 St
S 181 StS 181 PlS182St 36PlSS 182 Pl
S 179 St
S 181 StS 181 St
S 182 St
S 184 Pl
S 186 St
S 186St
S 187 St
S 186 St
36 Av S49 Av S47 Av S39AvS46 Av S47AvS37 Av S51AvS48AvS5
0
A
v
S
S 194 StS 189 StS 188 PlS 189 Pl
37 Pl S41 Av S35AvS35 Ln SS 198 St SegaleParkBDrAndoverParkWSegale Park D Dr
S Glacier S tS 188 St
S 190 St
S 204 St
S 216 StS216St3
5
AvSSR181ChristensenRdWValleyRdS 194 St 62AvS64AvSS 204 St
S 180 StBowLakeDr180Pl
45 Av S38 Av S48AvS46 Av SS 188 St
MilitaryRdSOrillia
R
d
189 St
35Av35 Av35 Pl36Pl38A v
193 St
184 StMilitaryRdS42 Av183 St
184 St
185 St36 Av208 St
211 St
209 St SR5MilitaryRdSS 212 S t West Valley Hwy68AvSSegale Park C Dr
3
7
Pl
S35 Av SOlympic Av SS 190 St
66 Av S5
8 Pl S
S 192 St
S 1 9 4 St
35AvS 20 0 St
S 196 StCascadeAvSRiversideDr
ToddBlvd181 Pl180 Pl39 Av S192 St
40 Pl S40 Av S39 Pl S39 Av S38 Pl S186 St
S 199 Pl62AvS
59PlS40PlS42 Av SSouthcenter Pky192 Pl
191 Pl
193 Pl
S 193 St
70 Av S70AvSS 200 S t
2 1 7 S t
216 Pl 66AvS209 StRussellRdSS194StS208St
217St
216 Pl
S 216 St
RiverviewBlvdS46AvS215Pl 47 Av214 Pl
S 215 St
S 215 Pl
47Ct48Pl48Ct214 St S214Wy50 Av214 Pl215St
51 Av S213 St
52WyS5 3 PlRive r v ie w BlvdSS 212 P lS 209 Pl
40 Pl S39 Wy S4
0
Pl SS 211 P l210Pl 41 PlOrilliaRdS209 St
210 St
211 St
211 Pl38 Pl S37 Pl S2 0 9 Pl
§¨¦5
2 8 8
298295 18
16
2 8 9
27214 20290 1929732802 9 2
6027317 16
291296
303293 152942281113
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000Feet PAGE 2 RIGHT
PAGE 6 DOWN
1 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
÷
S 45 PlDavisAvS
S1 98
S
tSegaleParkBDrAndoverParkWSegaleParkDDr
S Glacier S tS208St92AvS 95AvSS 206 St
S 208 St 88AvS80AvSS 1 82 St
S 188 St
S 188 St
S 190 St S 190 St
S 192 St
S 194 St
72AvS77AvS80AvS81 Av SS 200 St
S 202 St
S 206 St
S 202 St
S 204 St
S 216 St S 216 StS216StSR181 East Valley HwyEast Valley HwyS 212 St 80PlSSW 43 StChristensenRd
72 Av SWValleyRdS 194 St 62AvS64AvSS 180 St
West Valley Hwy68AvSSegale Park C Dr SR 167S 55 StOlympic Av SS 190 St
66 Av SS 196 St
S 196 StCascadeAvSRiversideDr
ToddBlvd
181 S t 71 AvS 199 Pl62AvS Talbot Rd SS 192 St
S 202 St
2 0 3 Pl
S 207 Pl
S 213 St
2 05 Pl94Av198St78 Av192 Pl
191 Pl
193 Pl
S 193 St
70 Av SS 182 S tS184StS 186 Pl77 Pl S75PlS80 Ct S187St
185 Pl
S 184 St
S 187 St
S 190 St
S 192 St70AvSS 200 S t
S 198 St
S 202 St85 Av S87 Av S89AvS93Pl66AvS209 St
S 210 St
80AvS209 St
S 207 Ct
84PlS85AvS 213 Pl
86PlS88AvS88PlS86AvS2 14 Pl
94PlS94Ct95Pl91PlSS208St90PlS91PlS204 Pl
209 St
210 St
211 St
211 Pl 4682761 452
45866330
18
46216
272454
14
455
327
6471329
486
466
3332019277
17 16
459
6046535453450457
2734612804 8 8 463467449322 65328
13464456
4 8 7
4 8 9
326
2782
333154460
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 1 LEFTPAGE 3 RIGHT
PAGE 7 DOWN
2 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
nn
n 118 Av SESE 180 St
SE 210 Pl
SE 216 St107AvSE104AvSE105 Av SESE 199 St106 Av SESE181 StS 45 PlDavisAvS
S 51 Ct SE 188 St
SE 190 St
S 50 St
190 Pl
S1 98
S
t
SE 186 StSE185Pl
SE 190 St
SE 190 Pl
201 St186 Pl1 8 7 C t1
1
5
Pl
S
E
SE 196 St
104 Pl SE103 Pl SE102PlSE102AvSE101AvSESE 189 Ct
103PlSESE 217 St
SE 212 St
211 P lSE212St
SE 213 St
SE 216 St
S208St 98PlS92AvS95AvS205 CtS 208 St
98AvS213
St 99AvSSE 212 St
96AvS97 CtS 203 St
9
8 Av
S88AvS118AvSE116 Av SESE 178 Pl
SE 192 St105PlSE110 Av SE111 Av SE112AvSE114 Av102 Pl187 S t
1 8 8 Pl
180 St
113Wy104Av108 Av SESR 515SE 200 St
112Pl101Av99 Pl S11
4
Av1
1
5
A
v
102PlNE216 C t108AvSES 194 St98 PlSTalbotRdSEast Valley HwyS E 1 7 9 St
204 Pl
20 5 P l206 Pl
103 Ct112 Av SESE 186 St
SE 182 St
1 8 0 P l
115LnSE180Pl104PlSE106AvSESR 167S 55 St
SE 203 St
116 Av SE1
0
9
A
v
S
E103Av97AvS204 Ct213 Pl
212 St
18 2 S t
1 8 2 P l
183 P lSE 185 Pl
SE 184 Ln
18 8 St
187 Pl
SE 212 Pl
SE 204 St
111 Ct205 St
205 Pl
206 St
204 Pl
113Av96P
l
S 208 St96 Av S97 Pl SS 210 Pl
214 Av 98 Av STalbot Rd SS 192 St
116 Av SE204 St
117 Av109AvSE113 Pl SE179 Pl SE 179 St
114 Av184 Pl
110 PlSE 183 Pl
109Av1 8 9 C t104 Pl
SE103 Pl102 AvS 202 St
2 0 3 Pl
96WyS 207 Pl 101 Ct102 AvSE 207 St 104 Av105 Pl106 PlS E 2 0 6 Pl
104 Pl194 St
SE 196 St
119 A v119 Av SESE 215 St114 Pl115 Pl113 Pl113 Av2 11Pl109Pl1
14PlSE110 Av110 Av209 Pl
SE 211 St
1
03Ct
213 Ct100Pl1
0
4Pl104 Av210 Pl
213 S t
102AvSE 213 Pl100AvSE
95Pl95 CtS 213 St
216 St
205 Pl94Av
207 St 106 Pl106 Av2 0 2 S t 102 AvS E 1 80 Pl
113 Av108AvSE183 St109 Av108PlSE107 Ct186 Pl
111AvSES 184 St
S 187 St
S 190 St
S 198 St
S 202 St85 Av S87 Av S89AvS93Pl96Av97 Pl209 St
84PlS85AvS 213 Pl
86PlS88AvS88PlS86AvS2 14 Pl 96AvS97
Av94PlS94Ct95Pl
S E 1 8 1 S t
180 St
110 Av183 C t110th189 St
91PlS106 Av97Pl189 Pl
117 Ln SESE 189 Pl
SE 189 Ln
SE 190 Ln
117PlSESE189 Pl
S E 193 Ter
114PlSE115PlSESE 194 S t113PlSE113AvSE193Pl
SE 193 P l117PlSE114AvSE112 Pl SESE 188 St
194 Pl
SE 198 St
SE 200 St
117PlSE118 AvS E 1 91CtPrivate Rd113WySE190 Ct
110PlSE112 Av SEUnk Private
114AvSE191 P l
190 Pl 190 Pl
SE 195 P lSE 199 St
194 St
194 Pl
104 AvSE 196 St
101AvSESE195 St
SE 19
4Pl
106AvSEUnnamed110AvSE111WySE111WySESE 201 St
20 2 L n201Pl
110PlSE110TerSESE2 0 2 C t
SE 203 Pl
113Pl111AvSE110AvSE112AvSESE 207 St 207 Pl
207 C tUnnamed
109 AvUnnamedUnnamed109LnSE209 Ln
SE 206 St106AvSE105PlSE204Pl105Ct105AvSESE202Pl205St
SE 206 St
SE 204 St
Unnamed11
0
A
v
112 Av SESE 214
C
t
SE 214 St
SE 216 St 216 St105AvSE209Pl103 Av SESE 21
2St 104Av98AvS99AvS102PlSE105PlSE104PlSESE 214 Pl105Pl 214 Pl
213 S t110 Ln113PlSE 205 St
SE 211 Ln
SE211 LnSE 214 StUnnamed110AvSEUnnamed
112 CtUnnamedUnnamed90PlS91PlS204 Pl
SE 206 St
107481 5633466434448047942477654333474471
476486
466
73473
472 475478465 46846331
6530
29
28469467470 535510827333
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 2 LEFTPAGE 4 RIGHT
PAGE 8 DOWN
3 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
n
n
n
n
÷
SE 182 St
SE 187 St
SE 186 P l
139WySE 180 St
SE 184 St
SE 184 Pl
135PlSESE189Pl132 Pl133AvSE133 Pl134AvSE135AvSE136 Pl SE133 Av SESE 198 St
SE 200 St
SE 201 St
S E 2 0 2 C t
135
Av
S
E142AvSESE188St
189 CtSE 181 St
SE 184 St118 Av SESE 188 St
SE 180 St
124AvSE120AvSESE 186 St
SE 204 Pl130 Av122 Ct SE121 Ct SE123 Pl122PlSESE206St121 Av SE122PlSESE 198 Pl
SE 213 St
129AvSE 206 Pl
127PlSESE 210 Pl
SE 216 St119 AvSE 190 St
SE 190 Pl
1
1
5
Pl
S
E
SE 196 St
SE 189 Ct
SE 217 St
SE 212 St
211 P l
SE 213 St 213 S t131Pl138A
v
1 96 St13
2Pl
1 9 9Pl138AvSE 204 W y134Ct198 St
202Pl133PlSE 202 St
SE 192 St133 Av132 Pl SE1 8 5 Pl185St
186St 131Av140 Ct1 8 9 P l 139Wy131Pl207 St
207 Pl
212 Pl 212 Pl
215 St125Av
123 Av122 Pl211 Pl
210 Pl
124Av209 St
121Pl210 Pl
211 Ct
210 Ct 210 Ct123 C t1 9 8 C t
199 Ct
197 Pl
198 St
190 Pl
189 Pl 130Av1 8 9 S t188 Pl184 Pl
118AvSE116 Av SESE 178 Pl
SE 192 St110 Av SE111 Av SE112AvSE114 Av1 8 8 Pl
113WySR 515112Pl11
4
Av1
1
5
A
v
216 C t140 Av SESE 186 Pl112 Av SESE 186 St
SE 182 St
18 0 Pl
115LnSESE 182 Pl
SE 183 St
130AvSE
SE 1 8 4 PlSE 203 St
122 Av SE124 Av SE2 1 2Pl209 Ct
124AvSE116 Av SE210 St
1
0
9
A
v
S
E
204 S t SE 1 9 1StSE 182St2 1 4Pl20
6 St
206 Pl128Av130Pl126 PlSE 185 Pl
135Av185 Pl
2 0 8 Pl
131 PlSE
2 04S t212Pl
2 1 3 S tSE 212 Pl
SE 208 St121 PlSE 216 St
207 Pl
134Pl21 4 St120 Pl SESE 210 St
120 Av211 Pl 125 AvSE 204 St
111 Ct213 C t205 St
205 Pl
206 St
204 Pl
113AvS E 211 S t
209 St 132 Pl116 Av SE197 Pl
122 Pl124 Av SE120 Av SESE 201 St
204 St
117 Av109AvSE113 Pl SE179 Pl SE 179 St
114 Av184 Pl
110 PlSE 183 Pl
109AvSE 179 Pl 123 Pl SE123 Ct191 Pl
SE 188 Pl
186Pl
SE 186 St 185Ct136 Pl134AvSE186 Pl
134AvSE133Pl1 9 0 P l
1 8 9 P lSE 188 Wy
119 A v205 St
SE201 P lSE 203 Pl 130 Av125 Pl127 Pl
132 Av SESE 195 St129 Pl SE195 Ct193 St
SE 194 St140 Pl141Av195 Pl201 St
209 S tSE 21 2 P l
SE 212 St
215 St 121 Pl SE214 Pl
216St
2 1 5 P l119 Av SESE 216 St
SE 215 St114 Pl115 Pl113 Pl113 Av2 11Pl109Pl1
14PlSE110 Av110 Av209 Pl 137AvSE2 0 1 C t134PlSE193St137Ct
SE 188St
187 Pl
186 St
S E 1 80 Pl
113 Av108AvSE183 St109 Av108PlSE186 Pl
111AvSES E 1 8 1 S t
180 St
110 Av183 C t110th189 St
188 Pl
198 Pl
SE 200 St
212 Ct212 C t131 Pl
189 Pl
117 Ln SESE 189 Pl
SE 189 Ln
SE 190 Ln
SE 191 St
117PlSESE189 Pl
S E 193 Ter
114PlSE115PlSESE 194 St113PlSE113AvSE193Pl
SE 193 P l117PlSE114AvSE112 Pl SESE 188 St
121 Pl SE194 Pl
SE 198 St
SE 200 St
117PlSE118 Av119 AvS E 1 91CtPrivate Rd113WySE190 Ct
110PlSE112 Av SEUnk Private
114AvSE191 P l
190 Pl 190 Pl
SE 195 P lSE 199 St
Unnamed110AvSE111WySE111WySESE 201 St
202 L n201Pl
110PlSE110TerSESE2 0 2 C t
SE 203 Pl
113Pl111AvSE110AvSE112AvSESE 207 St 207 Pl
207 C tUnnamed
109 AvUnnamedUnnamed109LnSE209 Ln
Unnamed11
0
A
v
112 Av SESE 209 Pl
119 Pl214 S tSE213St
SE 214
C
t
SE 214 St
SE 216 St 216 St
SE 209 Ct
130 Pl SE1
31Pl131Pl210 Pl131Av
1
3
1
Ct
S E2 11 StSE126Av SE 210 St
213 St
214 St
129 PlSE130AvS E 214 Wy
SE 204 St
130 Av SESE 203 Pl
SE201St
SE 202 Pl 127Ln214 Pl
21 3 St110 Ln113PlSE 205 St
SE 211 Ln
SE211 LnSE 214 StUnnamed110AvSEUnnamed SE122PlSE199 St
120 Av SE120AvSE121WySE119Av112 CtUnnamedUnnamed
SE 206 St
107
57
33420144545676 75203
202
2
0
5
204
59
5355108 747358
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 3 LEFT
PAGE 9 DOWN
4 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
÷
n n
n
n
n
S 253 St
22AvSS254Pl
S 245 Pl
S 243 St
15 Av S17 Av S21AvS21AvS23AvS25AvS26 Av S24 Av SS 236 St
S 245 Pl
19PlSS 242 St
S 244 St
S 234 St
S 234 St
S 232 St
S 220 St
S 226 St
S227 Pl
S 229 St
S 234 St15AvS
26AvS26 Av S18AvSS 223 St
S 226 St
19AvSS 220 St18 Pl S32PlS3
5
AvS34AvSS 228 St31AvS
41AvS35AvS35PlS39AvSS239S t35PlS42AvS43AvSS 248 St
S 249 St
45PlSS 253St
S 243 St
S 24 8 S t
20 Av SS 248 St
S 251 St
S 252 St
30Av25AvSS 246 S t SR 5SR 5SR99Milit
a
r
y
R
d
S
238St38AvS
239P l
241 St
242 St
35 Pl
239 St 42 Pl S243 Pl
36 Av S252 St
42Pl36PlSS 224 St
S 223 St 24 Av SS 216 St
S 221 St29 Av S30 Av SKent-DesMoinesRd
18 Pl S1
8PlS19AvS20AvS27 Av26PlS28 Av S23PlS2 5 1 P l
1
5AvS253 St
S 251 St
S 244 Pl
21Av
21PlS16 Av SS 240 St
S
R
5
1
643PlS38AvS35 Pl S32PlS29 Av S27 Av SS 242 St
S 244 St
S 244 St
S 250 St 21 Av S20 Av S28 Av S22 Pl SS 246 Pl
S251Pl
S 249 St
15 Av S16AvS239
Pl
S 244 St
34
AvS41AvS
35 Av SS23 6 St23PlS25AvSThunderbir
d
Dr
S30AvSPacificHwyS28 Av19 Av16 Av S19 Pl SS 222 St
S 219 StS 219 St
S 220 St
251 St
252 St
25 3 St
252 Pl29 Ct29 Av30 Av30 Pl249 Pl
23 Av22 Av S249 Pl249 Pl40AvS40PlS2 3 2 S t233 St
232 St 2 3 2 Pl230 St
2 31St 30 Av S227 Pl
24 Av43Av245 Ct
37Pl252 Pl
31Av254 St
2 4 7 C t
2 4 7 S t
246 Ct
250 St
250 Pl
251 Pl
253 Pl254St
253 Pl S 254 St
45 Av42PlS217St
217 Pl
218 Pl
216 Pl
43Pl39PlS40PlS220Pl41AvS41Pl2 2 1 P l
2 1 9 St
S222Pl41Pl223St4 2Av221Pl
43AvS220
Pl
S221
St
221 Pl
45AvS222 S t
224Pl
4
3
AvS41Pl226St
225Pl42 Av42Pl35
P
l
S222 Pl
23 2 PlS 240 St
225 Pl
L
a
k
e
F
e
n
wic
k
R
d
S45PlS4
5
Av
S2 4 8 P l
4
6
AvS45AvS45PlS251 Pl249Pl248 PlS 250 Pl
S 251 StS 251 Pl
S 252 PlS 252 Pl 27 Av S32 Av42AvS4
1
Av
24
Pl
S 250 St 250PlEmmettLn Russell
Rd
217St
218 St
216 Pl
45 Pl45 Ct44 Pl46 Pl S220 St220 Pl
221 St
219 Pl
RiverviewBlvdSPl 48Rive r v ie w B lvdSRiverviewBlvdSV e t e r a n s D r
&(
&(
§¨¦5563 2 9 6
301579282 303
283564295286
2 8 4
300
593302 291585
287
2 8 8
592589
590
2 8 5
591 31399
516
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000Feet PAGE 6 RIGHT
PAGE 11 DOWN
5 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
n
72AvSS 216 St
70AvSS 234 St
S 226 St
H
a
w
l
e
yRdWNadenAvSS 216 St
S 236 StFragerRd
3
5
AvSS 228 St
41AvS35PlS39AvSS239S t35PlS42AvS43AvSS 248 St
S 249 St
45PlSS 243 St
S 24 8 S t
W Meek er St
W Sam St
S 220 St
W M eeker S t64 Av SS 2 2 8 S tS 224 StRussellRd
54 Av SMilit
a
r
y
R
d
S
238St38AvS
239P l
241 St
242 St
35 Pl
239 St 42 Pl S24 3 Pl
36 Av S252 St
42Pl36PlS68AvSS
R
5
1
6Washington Av NLincolnAvNThompson Av NS 228 St
Ru
s
s
e
ll Rd
43PlS38AvS35 Pl S239
Pl
S 244 St
41AvSS236St
251 St
252 St
25 3 St
252 Pl249 Pl40AvS40PlS43Av71Pl227 Pl
245 Ct
37Pl2 4 7 C t
2 4 7 S t
246 Ct
250 St
S 231 St
66 Av S253 Pl S 254 St
45 Av Adams42PlS2 1 7 S t
217 Pl
218 Pl
216 Pl
43Pl39PlS40PlS220Pl41AvS41Pl2 2 1 P l
2 1 9 St
S222P l41Pl223St4 2Av221Pl
43AvS220
Pl
S221
St
221 Pl
45AvS222 S t 46AvS224Pl
4
3
AvS41Pl226St
225Pl4 2Av42Pl35
P
l
S222 Pl
S 217 St
S 219 St
S 220 S t 67Av218 St
S 224 St
S 226 Pl66AvS
S 2 3 2 S t50 Av50Pl233Pl
5
1
A
v2 3 4St2 3 4 P l53Av53PlS51Av52Av52Pl53Av53Pl54
Av
5
1
AvS
2 37Pl51AvS51Ct
S237Pl54Pl 55Pl51 Pl54Av234 Pl
2 3 3 St
S 234 Pl
54Av235
2 31 Pl
5
6
Av232 P l 2 3 2 S t
5
7
Av2 3 6 P lSt
5
2
Pl
55 Av S5
7
Av
S56 AvS 2 3 4 S t55Av
Lakeside Blvd
W
S237
St57 Ct S58 CtS 2 3 8
CtS 238Pl
S 239 St 63Av63AvS238 St
237 St62 Av S61AvSLakesideBlvdE
233Pl
234 Pl
5
9
PlS
60AvS5
8 A
v S
2 3 5 S t
58 AvS2 3 1 S t233 St
60 Pl62AvS 233 St62 Pl63Pl60 Ct66AvS67PlSS 238 PlS 239 St
S 239 Pl58 Pl SWJamesLnRidgeview DrW James LnJamesCt
James Pl
James PlJames Ln63 Wy S240 Ct
242Pl
S 248 Pl
S 2 4 9 S t
S 2 4 9 P lS R 51663 Pl
S62 Pl
S62 Av SS 251 S t
S 251 Pl
S 253 St
S 253 Pl
L
a
k
e
F
e
n
wic
k
R
d
S45PlS4
5
Av
S2 4 8 P l4
6
AvS45AvS45PlS251 Pl KentDesMoinesRd
S 250 Pl
S 251 StS 251 Pl
S 252 Pl 62 Wy42AvS4
1
Av
FragerRd6
2
Pl232Pl232 C t59PlS238 S tWMortonSt59Ct236 St
56 Ct56Pl61 PlS 232 StRussell
Rd
217St
218 St
216 Pl
45 Pl45 Ct44 Pl46 Pl S220 St220 Pl
221 St
219 Pl
S 216 St
RiverviewBlvdSPl 4848CtRive r v ie w BlvdSRiverviewBlvdSV e t e r a n s D r
6
4
A
v
SS 236 Pl
65 Av64 Pl238 Pl
252 Pl
251Ct
&(
&(
2 9 6
301 340301579256301
207
208306282 275257
283
2
1
1295286 2062092 8 4
307
300
2552722 6 3 274346308
302
341297307
2 7 1581317287298592268258585273261 2672913162 8 8
589 2702592602102142 6 2309
590 311304
3 2 1
2 8 5
591
269305313303
181
516
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 5 LEFTPAGE 7 RIGHTPAGE 1 UP
PAGE 12 DOWN
6 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
÷
CrestAvSLenoraAvReitenRd95 Pl SHilltopAvReite
n
R
d
E Laurel St88AvSHazelAvNS228St
S 218 St
S 222St
72AvSS 216 St S 216 St
70AvS5thAvN3rdAvN1stAvN2ndAvNS 234 St
StateW Cole St
S 226 St
H
a
w
l
e
yRdWNadenAvSMadisonAvN74AvS5th Av S5thAvS3rdAvS2ndAvS1stAvSRailroadAvSW Gowe St
S 216 St
S 236 St
E Temperance St
Valley Pl
Novak Ln
SummitAvNWoodford Av NRailroadAvNCanyonDr
MaplewoodAvSE Chicago St
WynwoodDrWardSt
E Guiberson St
K e nsingtonAvGoweSt
Bridges Av S4th Av SJames St
W Meeker St 6th Av NW Harrison St
W Meeker St
W Sam St
6th Av4thAvNS 220 St 84AvS64 Av SS 224 St
S 222 St
68AvSETitusSt85 Pl SSR167ValleyFwy93 Av SCentralAvNProspect Av NE Seattle St
E Smith St
2nd Av NWashington Av NLincolnAvNThompson Av NS 228 St 83 Av S6th Av N22 4 St
2nd Av N76 Av S1st Av SStateAvNKennebeckAvMcmillan St
Clark Av NPioneer St
Hillcrest AvKensington AvOly
mpicWy
Cherry HillEDeanJason Av NAlexanderGl
e
n
wo
o
d
L
n
Dean St
George St 86AvAlpineW y 92 Av S220 Av
71Pl227 Pl
W Cloudy St
Cedar St
AlvordAvN92 PlWestview CtS 232 St
94Ct S
95 Ct96AvWeiland St
Tacoma St
E Maclyn St
ScenicWy
Ke
n
n
ebec
k
AvE TitusStViewPlS 240 St
Willis St
W Titus St
Rachael Pl W Crow St CrestPlStetson Av
S eattle St
S
c
e
nic
Wy
Chicago StMorton St
W Saar St
S 231 St
66 Av SWaterman StAdams 220 Pl
S 217 St
S 219 St
S 220 S t 67Av218 St
S 224 St
S 226 Pl66AvS 84PlSS 218 St85Av 86PlS88AvS88PlSS216 St
88 Pl S86AvS220 Ln 94PlSS 238Pl
S 239 St 63Av63AvS238 St
237 St62 Av S62AvS 233 St62 Pl63Pl66AvS67PlSS 238 PlS 239 St
S 239 Pl 84 Pl S236 Pl 91 Av SS 235 Pl
S 239 S t89 Pl90 Wy S92AvS91WyS94AvSS 223 Pl
S 225 Pl
94 Pl S95 Av SS 240 P l
23 9 Pl
Wo
o
dla
n
d
WyKirkwoodAvW Smith St
6th AvRussell StWJamesLnRidgeview DrW James LnJamesCt
James Pl
James PlJames Ln63 Wy S240 Ct
242Pl
S 248 Pl
S 2 4 9 S t
S 2 4 9 P lS R 51663 Pl
S62 Pl
S62 Av SS 251 S t
S 251 Pl
S 253 St
S 253 Pl
S 94AvS244 St62 WyNaden Av6
2
Pl Scenic WyS238 S tWMortonSt
E Smith St
VanDeVanterAvSW Willis St
233
P
l S234 Pl
S 232 St
StConcord 94PlS216 Pl 94CtC le a rview
S 237 P lRamsayW
y
W Kent Sta St
1st Av N2nd Pl N3nd Pl N6
4
A
v
SS 236 Pl
65 Av64 Pl238 Pl
S 224 St94 Ct SS 223Ct
&(
&(
265
340
374 4 2 4
277
256482
383 373409 432365
389384 423441219
370
421
377
380
207
208
148
417
386
440
431 422
430
397405427418
399395
401402 420428407
400
396149
393410
160222426433
398403 387
257
372 388382
381378
364
371
3401
37 9
404
445
442
443
385
322
2065843
209444
161275429
366390255
411272406
392
147305
4083253 6 3
266
412375 230274415414
264
347260341
2 7 1 231317268258233324369
434
267276
484
316273146323232
4 2 5348259210214346446320321
485
181
516
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 6 LEFTPAGE 8 RIGHTPAGE 2 UP
PAGE 13 DOWN
7 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
÷
n
n
nn
SE 216 St
117Av118AvSE103PlSE104PlSESE 217 St
SE 218 St
SE 224 St
SE 225Pl
SE 219 Pl
SE 222 St
SE 223 St
SE 225 St106PlSE
SE 227 Pl
SE 216 St
114 Pl106PlSE2 2 9 S t
SE 232 Pl
SE235 S t
229Pl
SE 228 St
SE 232 St
SE 237 St 114PlSE100AvSE99AvS105 Pl SE100AvSE109 PlCrestAvSLenoraAvReitenRd95 Pl SHilltopAv96 Av S98AvSS 241 S t
S 242 St
242 Ct
S 246 Pl
Reite
n
R
d
E Laurel St
S 252 St88AvSHazelAvN96AvS96PlSS222 St
S 228 St
S 218 St
S 222St
252 Pl115Av115PlSE234St
S E 231Pl
2 1 6 C t105Av10
6
P
l 216 C tSE 2 2 6 S t 2 2 6 St107Av108AvSEBensonRd
233 Pl
228 St
110Av2 3 2St112Pl108Av236 Pl
238 St 113 PlSE 237 St
SE 248 St
E Temperance St
Valley Pl 96P
l98P
lSummitAvNCanyonDr
MaplewoodAvSE Chicago St
E Guiberson St
K e nsingtonAvS 222 St
ETitusSt85 Pl SValleyFwy1
1
7
Pl
S E 2 21St116 Av SE253 St
10
7AvSE236 St105Av228St105AvSE 234P l
1
1
4 Wy231 St
112AvSE93 Av SProspect Av NS 243 St
E Seattle St
E Smith St
220 Pl
SE 218 P l 113PlSE247 Pl 117 Av228 Pl111Av111 Ct111 Pl1
0
6
Av
Kensington AvOly
mpicWy
Cherry HillJason Av N229Pl117Av109PlAlexanderGl
e
n
wo
o
d
L
n
Dean St
244 Ct
245 Pl
246 Pl 112 Av240 Pl
102 Pl102 Av101 Pl102 Pl242 PlS 242 Pl
SE 236 St
119 Av245 Pl86Av227St
216 Ln111 Ct112 Pl113 Ct223 Ln
SE 222 Pl 109 Pl110 Av107 Pl SE105
Av 233 Pl
1
09
Pl 118 Pl
220 Ct
118 Av230 Pl111 CtS 236
S 238 St
S 237 St 117 Av98 PlSE 223Dr
SE 217 St
110Av115 Pl114 Pl113 Pl113 AvSE 220 Pl
SE 221Pl107PlSE 215 St114 Pl115 Pl113 Pl103 Pl SE219 Pl
96 Pl221 Pl
S 220 Pl92 Av S220 Av 95Pl96Av95Pl216 St
Cedar St
AlvordAvN92 PlWestview CtS 239 Pl
S 244 Pl
SE 239 St
230 Pl
S 232 St
94 Ct S
95 Ct232 St
S 231 St SE 231 St
226 Pl
103 Av230 Pl 108 Av SE105 AvSE 226 St
230 St
1
0
9
Av 235PlSE 236 Pl106Av 110 Pl110 Av235 St
235Pl
234 Pl229Pl SE 229Pl
SE 227 Pl
SE 2 2 8 P l
SE 2 30 Pl
228 Pl106 Av110 Ct112 Av SE114 Av115Pl115 Av1
1
3 Pl
SE 225St
SE 244 St
252 Pl114 Pl100 Pl SE102 Pl96AvS96Av97 AvS 245 Pl
Weiland St
Tacoma St
E Maclyn St
ViewPlS 240 StCrestPlStetson Av
Sea ttle St
Chicago St 104 Av SESE218Pl
219 Pl100 Pl106 Av224 Pl 117 Pl96Pl2 33Pl220 Pl84PlSS218St85Av86PlS88AvS88PlSS216St88 Pl S86AvS220 Ln 94PlS236 Pl 91 Av SS 235 Pl
S 239 S t89 Pl90 Wy S92AvS91WyS94AvSS 223 Pl
S 225 Pl
94 Pl S228 St95 Av SS 230 St
S 226 St
S 240 P l
23 9 P l
233 St
2 3 5 S t 101 Av102 Av235Pl
SE 234 Pl
102AvSE 238 Pl101 Av SE101 Pl SE238 St 108Pl
108 Av SE2 3 8 S t109AvSE110AvSE111PlSE238 Pl
2 39St
SE 234 St
SE 241 Pl 109 Pl108 Pl240 Pl
110 Pl SE111 Pl233St115Av231 Pl113Av226 St
119Av
118 Av SE110 PlSE 243 St
SE 244 St 111AvSE115 Pl SE105 Pl SES 247 Ct 101 Pl SE248 Ct101 Pl100PlSE2 4 9S t99PlS248 Pl
100 Av249 Pl
253 Pl 114AvSE112 Av SE111 Av SE248 Pl
251 Pl
251 Ct110 Ct253 Pl
249 Ct110 Pl110AvSE109Pl2 5 0 Ct
SE 250 St
108AvSESE 250 Pl
106 Av SE252 St
105 Pl SE108 Pl SE109AvSE252 Pl
110 AvPl109Wo
o
dla
n
d
Wy
S 94AvS244 St
SE 240 St
SR515VanDeVanterAvS233
P
l S234 Pl
251St2 5 0 S t251 P l94PlS216 Pl 94Ct226Pl
110Pl103AvSE101 Pl220 Pl
102 Pl118 PlS 237 P l236 Pl
S 235 Pl
97 Av S117 Pl232 Pl
SE 232 St
S 235235 Pl
114Pl114 Av113 Pl117Av116 Pl118 Pl119 Pl240 Pl102 Ct102 Pl237 St 1
1
9
P
l
239 Pl
1
1
8
P
l118Av117Pl238St116 PlPl239St
238
117Av228 Ct97AvS
98 Pl SS 228 P l
233 Ct
110 AvSE 249St
SE 251 St118 Av SE117Ct118 Ct250 Pl
250 Ct112 Av112 Pl1 1 9Av227St
227 St
117 AvSE 236 St 119 Av SE117 Pl234 Pl 112 Av SESE 222 Ct
116 Pl22 5Ct226 St
1
1
3
Pl
SE 224 Pl
SE 223 Pl
SE 225 St 111 AvSE 218 Pl
SE 217 Pl
SE 219 Pl
SE 214
C
t
SE 216 St 216 St98AvS99AvS
102PlSE105PlSE104PlSESE 218 S tSE 219 St
107AvSE220 Pl
S E 218Pl
Private Rd220 StSE220St105 AvSE 214 Pl
108Pl214 Pl
112 Ct115 Ct22 9 St114 Pl104 Av225 St
102 Pl101 Pl103Av1
0
1
P
l 103 Pl2 2 5 St
2 2 5 Pl
2 2 4 Pl101 Ct99PlSE 222 St
SE 220 St
Unna
m
ed
236 Pl
233 Pl 233 P l112Pl112 Pl SE237 Ct237 Pl
117 Av242 Pl 242 St
S 224 St94 Ct S95 Ct SS 223Ct
114 Pl SESE 253 Pl
&(&(
414
129
13339
119
137132
124
3337329836
97
114113
148
472
1013810635 334476
149 144
145
482
103
425160
122
3499
125
109
108
126
3401
100
140131445 481123
121
164169494136141
104
13495
104
27
5843
128
49
135130
116
10540
170479138477 102
5141 498127
96
162147
25
325142
143
434 163230159107
1394803242
4
23116522478323
484711026
52
161484
94
93
21
118
146
120
23223
233173 167446
50
485
516 515
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 7 LEFTPAGE 9 RIGHTPAGE 3 UP
PAGE 14 DOWN
8 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
÷
n
n
n
n
n
n
1
4
0AvSES E 231 St
SE 235 St
135 Pl SESE 236 Pl129AvSE 216 St
SE 219 Pl
126Pl117Av
SE 233 St 128PlSE126 Pl SESE237 P l
129PlSE128PlSE118AvSE128PlSESE 217 St
SE 218 St
SE 219 Pl
SE 222 St
SE 223 St
SE 225 St
SE 227 Pl 114 Pl114PlSE109 Pl140 Av138Av131Pl137Av
SE 240 St134Av135Av138Av
252 Pl115Av 2 2 3 Dr
2 2 3 P l125 Ct127 Av130Pl128Pl
122Av
115Pl222 Pl
127AvSESE 234 St
SE 236 St
126AvSESE 224 St
SE 234 St
S E 2 31Pl 132 Av SE215 St
123 Av217 St122 Pl124Av217 Pl
2 1 6 C t218 Pl128Pl129Pl216 C tSE 2 2 6 S t 2 2 6 St
228 St
110Av2 3 2St112Pl236 Pl 113 PlSE 237 St
SE 248 St 136
A
v
S
E
SE251StSE251Pl 140AvSESE 241
St
142AvSESE237Pl
119 Pl136PlSE1
1
7
Pl
1 2 6 PlS E 2 21St
S E 22 1 S t
129AvSE116 Av SE232S tSE 235 St
130 Av
253 St 124 Av SE132 Av SE2 5 3 C t
SE 252 Pl234Pl
1
1
4 Wy231 St
112AvSESE 2 5 0 S t119 Pl SE220 Pl
SE 218 P l 113PlSE253 St 133 Av127Ct128Av129Av130Av13
0
Av129Pl117 Av125Av228 Pl 123Av119 Ct217 Ct
218 Ct2 1 8 P l111Av111 Ct111 Pl239 S t129Ct131 Av117Av119Pl109Pl138 Pl246St
SE 224 St
220 St
SE 216 St
112 Av240 Pl
119 Av245 Pl 120 Av216 Ln111 Ct112 Pl113 Ct223 Ln
SE 222 Pl 109 Pl110 Av1
09
Pl 118 Pl
220 Ct
220 Pl
120Av118 Av225 Pl
126
A
v
SE126 Pl SE
SE231 Wy
SE232Pl 232 Ct131 AvS E 2 3 3 S t
133 Ct132 PlSE 231 St
230 Pl111 Ct120 Av SE117 Av121 Pl SE215 St 121 Pl SE216St
2 1 5 P l219 Ct
120 Pl1
23Av119 LnSE223Dr
S E 22 1 Pl
22 3 Ct222Pl124 Av127 Ct123 PlSE 218 Pl129 Ct130Av218 Pl
SE 216 St
217 St
126 Ct
218 Ct
123 Pl228 Ct
229 C t227 Ct
1
2
5
Pl
1
2
6
Av225 Ct
226 St
SE 217 St
110Av115 Pl114 Pl113 Pl113 AvSE 220 Pl
SE 221Pl
SE 215 St114 Pl115 Pl113 Pl230 St
1
0
9
Av 235Pl110 Pl110 Av235 St
235Pl
234 Pl229Pl SE 229 Pl
SE 227 Pl
SE 2 2 8 P l 120 Av SESE 230 Pl
228 Pl110 Ct112 Av SE114 Av115Pl115 Av1
1
3 Pl
SE 225St
227 St
SE 232 S t125
A
v
231 Ct
134 Ln134 Ct131Av123 Av238 Pl
236 P l125 Av127 Av127Pl
SE124 Av SE234 St
130
Ct
237 Ct
SE230 St
232 Pl
137Av139 Av 141AvSE132Pl133 Ct248 Pl249St
2
4
9St
243 Pl 135 Av SESE 243 St138AvSE242 St
133 Av138 Ct129PlSE 252 St
SE 247 Pl129Av243 St
241St
242C t 130AvSE24 6 P l
SE 244 St
121 Pl SE2 51Pl252 P l252 Pl 120 Av SE114 PlSE 237 Pl
139Pl238 Pl
245St
231 St231St224 Pl 117 Pl2 33Pl234 St
2 3 8 S t109AvSE110AvSE111PlSE238 Pl
SE 234 St
SE 241 Pl 109 Pl110 Pl SE111 Pl233St115Av231 Pl113Av226 St
SE 236 Pl
SE 237 St
14 1 L n S E
139Av141 Pl242 Pl 140Ln238 Ln
246 St137 Av SE137 Ct SE246 C t133AvSE 247 St
245 S t132 Pl132 Ct249 Pl250 Ct
139 Pl SE252 Pl119Av118 Av SE249 Pl
250P lS E 2 4 8 C t
244 St
130 PlSE 251 Pl110 PlSE 243 St
111AvSE115 Pl SE114AvSE112 Av SE111 Av SE248 Pl
251 Pl
251 Ct110 Ct253 Pl
249 Ct110 Pl110AvSE252 Pl
110 Av251St226Pl
125 Av23 0 S tSE 230 St
110Pl118 Pl117 Pl232 Pl
1
3
3
A
v
SE 232 St
124Av114Pl114 Av113 Pl117Av116 Pl118 Pl119 Pl240 Pl
131Av120 Av SE1
1
9
P
l
239 Pl
1
1
8
P
l118Av 236Pl
117Pl238 St116 PlPl239St
238
117Av132 Pl137 AvSE 241 St
SE 240 Pl
134 Ct SE233 Ct
124 Av SE123Pl110 AvSE 249St
SE 251 St118 Av SE117Ct118 Ct250 Pl
250 Ct 134 Pl SE112 Av112 Pl1 1 9Av117 AvSE 236 St
239
St119 Av SE117 PlSE 252 St
135 AV SE234 Pl 112 Av SESE 217 St
122Av
S
E120AvSE120AvSESE 222 Ct
SE 2 25C tSE 226 C t1
28Pl1
2
9
PlSE
129 Av SE 2 2 8 Pl128AvSE 227 St
1
3
4
Pl
S
E225 Pl
SE 226 St
SE 227 St
SE 227 Pl129PlSE
135AvSE134Av2 3 2 S t120 Av SE116 Pl22 5Ct226 St
1
1
3
Pl
SE 224 Pl
SE 223 Pl
SE 225 St 111 AvSE 218 Pl
SE 217 Pl
SE 219 Pl
SE 214
C
t
SE 216 St 216 St
1
3
1 Ct
216 P lSE 217 PlSE127Pl
125AvSESE 217 P l125Pl222 Pl 131PlSE13 1 Av
131 Av SESE224StSE224 P l132PlSE132
P
l
S
E 133PlSE 226 Pl
134PlSESE 235Pl128Ct126AvSE129 PlSE130AvS E 214 Wy214 Pl
112 Ct115 Ct22 9 St114 Pl236 Pl
233 Pl 233 P l112Pl112 Pl SE237 Ct237 Pl
117 Av242 Pl 242 St
114 Pl SESE 253 Pl
202
501136187137496191
98
97
40
101
106 334193
103
19541
19499
197
108
100
140201
192
169189
104
95
104
497494105
492
138
102
51 498493
96 77196
107
139170188
199
187
52
19049194
93
490
17119878
514
200
16750
500495499Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 8 LEFTPAGE 10 RIGHTPAGE 4 UP
PAGE 15 DOWN
9 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n 166AvSE159AvSE160AvSESE229Pl
S E 229 Pl
SE 232 Pl
152AvSE153 Pl SE156AvSESE 251 St
SE 236 St
SE 218 St
SE 235 St
SE 236 St
SE 234 St
SE 251 St
SE 216 St
144 Av SE144 Av SESE 220 St
1
4
0AvSES E 231 St
SE 235 St
135 Pl SESE 236 Pl
SE 235 St
SE 231 S t
164AvSE148 Av SE140 Av138Av2 43Pl
14
5
Ln146AvSE
1 4 5 AvSE2 5 2 P l137Av
SE 240 St 147 Av134Av135Av1
38
Av144Av
S
E132 Av SE144AvSE136
A
v
S
E
SE251StSE251Pl 140AvSESE 241
St
142AvSESE237Pl
SE240Wy148 Av SE147AvSESE 2 4 7 St144AvSE136PlSE145Pl
SE 2 5 0 S t133 Av241 Pl
2 3 9 S t138 PlSE 224 St
SE 216 St
S E 2 3 3 S t
133 Ct132 PlSE 231 St
216St
134 Ln134 CtSE230 St
232 Pl
137Av139 Av 141AvSESE 228 St
SE 232 St
234 St 234St150 AvSE 234 Pl147 Av152 Av SE153 Av234 Pl
245 Ct 244St133 Ct248 Pl249St
2
4
9St
243 Pl 135 Av SESE 243 St138AvSE242 St
133 Av138 Ct144 Pl
2 5 1 Pl139Pl238 Pl
252 Pl
161 Pl145Pl
SE146 Pl246 Pl
148AvSESE 232 S t
164AvSESE 227 S tSE 224 St
222 St147 Av156 Av SE2 32 St
234 St
SE 236 Pl
SE 237 St
14 1 L n S E
139Av141 Pl242 Pl 140Ln238 Ln
143 Av SE246 St137 Av SE137 Ct SE148LnSE246 C t133AvSE 247 St
245 S t132 Pl132 Ct249 Pl250 Ct
139 Pl SE252 Pl 146 Av146PlSE1
3
3
A
v
137 AvSE 241 St
SE 240 Pl
134 Ct SE134 Pl SE159Av239
St
SE 252 St
135 AV SE1
3
4
Pl
S
E225 Pl
SE 226 St
SE 227 St
SE 227 Pl
135AvSE134Av2 3 2 S tSE224StSE224 P l132PlSE132
P
l
S
E 133PlSE 226 Pl
134PlSE202
201
5 0 2
497 501200
504
503500
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 9 LEFT
PAGE 16 DOWN
10 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
n
÷
n
S27 5 P l32AvSS 280 St
S 277 Pl
38Pl S
S 280 St
S 282 St
48AvSS 284 Pl
S 2 7 9Pl
S 287 St
S 290 St
S 282 St32PlS36AvS 42 Av S43 Pl S46 Av S41 Av S34 Av S33 Pl S4 6 A vSS 285 Pl
47 Pl S34 Av S37 Av S39AvS41AvS43 PlS 288 Pl
S 289 Pl
S 290 PlS 290 StS 290 St
S 2 91 St
S 291 St
S 289 Pl
S 2 9 1 St 46 Pl S42 Av SS 276 St
S 273 St
S 281Pl
S 290 St16AvS
15PlS2
6
Av
SS 2
7
6 St25DrS
18 Av SS 276 St 22AvSS254Pl
S 257 St
S 261 Pl
S 263Pl
S 2 6 4 Pl
15 Av S18PlS20 Av S19 Av S14PlSS 268 StWoodmontBeachDrSS 266 Pl 33AvS34AvS45PlSS 260 St
S 253St
31AvS41AvSS 261 Pl S 262 St
S 263 St
Kent Ct
S 270 St S 270 St
268 Pl
37AvS42AvS35PlSS 268 St27PlS30AvSSR 5SR5260 St 42PlMilitaryRdS33AvS33 Av40AvSSo merset Ln36PlS
Carn a byWy DoverCt34A v
269 St
35 Av40AvS45 AvS 256 St
289 Pl
255 Pl
18 Av SS 260 St
S 272 St16 Av S273 Pl
SStarLakeRdPacificHwyS257 Pl
2 58StMilitary Rd SS 288 St
20 AvS 289 St
2
1Av40 Av S45 Pl
S S tar Lake
Rd43AvS
S 2 8 6 S tS S tar Lake Rd
37 Av SS 288 Pl 27AvS 285 Pl
S 282Pl
283 St 41 Pl S39PlSS 2 63StS 2 5 7 S t43PlS38AvSS 255 St 35 Pl S32PlS25 9 Ct29 Av SS 256 St
S 262 Pl
20 Av SS 2 7 3 P lS 2 6 1StS 261 St 36PlS255 Pl 39Pl254 Pl253St
252 Pl
270St BristolCtCardiff Av SCa
m
bridgePlManchesterAv35PlCtPrincetonAvCanterburyMan
c
hesterWa
yH a m pton Wy
S
ome rsetCt19 Av17 Ct18 Av17 Av
Crestwood Rd
282 Pl 36Av36LnS t r a t fordCt YaleCtHighlandAv2 54 St
44 Av36Pl36 Ct257 St35Pl37 Pl2 56 C t 38Pl44Pl43Pl
43Av46AvCambridge Ct
Stanford CtSaxonCtAvonCt271 S t
32 Pl SS 2 7 3 P l46 Ct SF e n w ic k
C t48 Av S45 Av S28 1 S t
S279 Pl
S 282 St
S 28 7 S t
30 Av S2
8PlS23 Pl S23AvS26 Av S27 Av S28 Av S22AvS28 Pl SS 285 PlS280Pl
20 Av SS 284 Pl
26 Pl S25 Pl S282 St
S 285 St 29 Av SS 286 St
21AvS 286 St
Cam
elotDr
S 279Pl29AvS27 Pl284 St
282 St
280 Wy
283 St
S 274 St
276 Pl17 Pl S17 Av S17 Av259 St
259 Ln32 Pl31Av254 St
265 St 33Pl34Pl2 56 P l
253 Pl254St
253 Pl
ReithRdS 272 St
S 254 St
2 5 8 P l
EtonCtPl271 Arden Ct46AvS44PlS47AvS47 Pl S45 Pl S26 Pl S256 Pl
257 Pl
258 St
258 Pl
2 5 9 S t
S 256 St
27PlS25 Ln S27PlS 260 LnS259P lAv
2920PlS26AvSS 2 7 0 St
S 268 Pl28 Av S26 9St PlHampton Wy CarnabyWy38AvS36 Av36Pl257 St
284 PlS 284 St27 Av2735Ln269 St36Pl
42 Pl 43 Ct S35 Pl S&(
§¨¦
FederalWay
5 302
5755735
7
2 576570577578571301587574
568586
589 579
582588
56799
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000Feet PAGE 12 RIGHTPAGE 5 UP
11 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
n
S 285 St 72AvSS 287 St
S 273 Pl
S 274 Pl
S 284 Pl
51PlSS 288 Pl
S 292 St 59AvS51
PlS
S27 5 P lS 277 Pl
38Pl S
S 280 St
S 282 St
48AvSS 284 Pl
S 2 7 9Pl
S 287 St 42 Av S43 Pl S46 Av S41 Av S4 6 A vSS 285 Pl
47 Pl S37 Av S39AvS41AvS43 PlS 288 Pl
S 289 Pl
S 290 PlS 290 StS 290 St
S 291 St
S 289 Pl
S 2 91 St 46 Pl S42 Av SH
a
w
l
e
y
RdWS 262 StLakeFenwickRd45PlSS260St
41AvSS 261 Pl S 262 St
S 263 St
Kent Ct
S 270 St37AvS 42AvS35PlSSR 181S 277 St
55AvSS 288 StS272Wy WestValleyHwy52PlS291 Pl
292 St
5
2 A
v
52AVS289 Pl
S 291StS 276 Pl
260 St 42Pl40AvSSo merset Ln36PlS
Carn a byWy DoverCt40AvS45 AvS 256 St
289 Pl 52 Av51 Av S40 Av S45 Pl
72AvSSR 167Frager R dS50AvSS Star Lake
Rd43AvS
S 2 8 6 S t49 Av37 Av S41 Pl S39PlSS 2 63StS 2 5 7 S t43PlS38AvS35 Pl SS 2 6 1StS 261 St 36PlS255 Pl 39Pl254 Pl253St
252 Pl
BristolCtCardiff Av SCa
m
bridgePl
Canterbur y Man
c
hesterWa
yH a m pton Wy
S
ome rsetCt
36LnS t r a tfordCt YaleCtHighlandAv2 54 St
44 Av36 Ct257 S t35Pl37 Pl2 5 6 Ct 38Pl44Pl43Pl
43Av46AvCambridge Ct
Stanford CtSaxonCtAvonCt271 S t
S 2 7 3 P l46 Ct SF e n w ic k
C t
49AvS50 Pl S48 Av S45 Av S2 8 1 S t
59 Pl50Pl2 5 6 P l
253 Pl
ReithRdS 272 St
S 254 St
258 Pl
S 272 St62 Av SS 253 St
S 253 Pl
S 255 St
S 261 St
S 269 St
52 Ln SPl271
4
8Pl
SArden Ct46AvS44PlS47AvS47 Pl S47 Pl SS 272 St
45 Pl SHampton Wy CarnabyWy38AvS36 Av36Pl257 St
S 279 St
269 St36Pl
42 Pl 43 Ct SSR 167252 Pl
35 Pl S&(
302 301576588
341271
577578582301267
589 579
340
594339
167
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 11 LEFTPAGE 13 RIGHTPAGE 6 UP
12 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
÷
n
86AvSGStNE85AvS45StN E
40 St NE
I St NES 2 8 0 S t94PlSB Pl NWDStNWS 285 StS285St72AvS
S 287 St CrestAvSReitenRdTil
d
enAvE Laurel St
S259St
H
a
w
l
e
y
RdW74AvS5thAvS3rdAvS2ndAvSRailroadAvSS 259 St
S 262 StS262St
S 266 St
C
e
ntral PlSR 181MaplewoodAvSWynwoodDrMaple StBridges Av SCentralAvSAuburnWyNGreenRiv
er
R
d
S 277 St
WestValleyHwy79AvS261 S t 80AvS72AvSSR 167Frager R dSE Valley RdS 277 St1st Av SHillcrest AvStoneburnerLnGarfieldAvSE Filbert
East LnWa ln u t
E Hemlock St
E Walnut St
Marion S t Ellis PlCarter St
Chicago StMorton St
Overlook St
Waterman St
5thAvSWo
o
dla
n
d
Wy
Carter Pl
87AvS6th AvS 272 St62 Av SS 253 St
S 253 Pl
S 255 St
S 261 St
258Pl
88AvKimberlyAvIvesAvSAlder Ln
Maple Ln SSR 167&(
341271
436368357435267
3
6
8
369375
439367
340
339
594
167
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 12 LEFTPAGE 14 RIGHTPAGE 7 UP
13 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
n
n
n 118AvSESE 272 Pl
274 St
275 St
117AvSE118AvSESE 277 P l105AvSESE 284 St
283 St
SE 290 Pl109AvSEGStNE45StNE
40 St NE
I St NE94PlSSE 264 Pl
SE 260 St
1
0
0
P
l
S
E 111AvSE113AvSE100 Pl SE104AvSE106AvSE1
10AvSE112AvSE109 Ct111Ct111AvSESE270 St
1
1
5
A
v
S
E
9
7
P
l
SCrestAvSReitenRdTil
d
enAvW
o
odlandWyE Laurel St
S259St
S 252 St
118Pl26 9 St116Pl118Av118Pl264 St 119Ct264Pl
252 Pl
255 S t259 Pl
268 St114Av254St116 Av SE108 Av SE269St111 Pl
110AvSE 281 StMaplewoodAvSMapleSt
AuburnWyNGreenRiv
er
R
d
SE 289 StSE 290 St101 Av SESE 286 StSE 286 St
SE 271 St
253 St
108AvSE 287 St
S
R
516
109 Av SES E 2 7 4 W y
S 277 St 115PlStoneburnerLnGarfieldAvSE Filbert
East LnWalnut
E Hemlock St
E Walnut St
110AvSE111Ct110Ct265 Pl
263 Pl 119DrS 262 Pl
2 7 0 S t115 Av111 Pl264 S t113 Pl255 Pl117Pl
258 St
SE 254 Pl
115 Av252 Pl
Marion St Ellis Pl97 AvSE 267 St99 Pl S102AvSE268 St 107 AvSE 264 St
SE 266 St114 Pl265 Pl
115 Av268 St
270 CtSE 272 Pl
268 St
267 Pl
266 Pl118Pl263 C t261Pl256 Pl
260S t
118Pl117Pl257St
SE 282 St
SE 280 St 120 Av SESE 276 St
SE 288 St
107 Av108 Av112AvSE111Av
Carter St
Chicago St
111Pl110 Pl
116Pl116Pl117PlS E 2 7 7 S t275 St 115 Pl265 Pl
112Pl277 St119 Av119 Av116 Av SE253 Pl
251 Pl
253 Pl
252 St
105 Pl SE108 Pl SESE 254 Pl
106AvSE109AvSE252 Pl
253 Pl
109 Ct254 Pl
110 Av110 Av255 Pl
10
9C
t Pl109110 Pl SE259109Pl256 Pl
257 St S E 257 St
256 Pl
257 P l 115 Av258 St
259 St114 AvSE 264 St
258 Pl
112 AvAvSE113260 St
260 Pl106 Pl2 6 1 S t262St
106 Pl SE107 Av SEAv103SE 27 0 Pl102Pl258 Pl
Pl 114PlSE 277 St
114AvSE106 Av SESE 279 St
Gr
e
e
n
RiverRdSWo
o
dla
n
d
Wy
Carter Pl
258
88AvKimberlyAv97 Pl97 Av S114 Av SE114AvSE265 St114 Ln SESE 256 St
266 Pl266 St 119 Ct119Pl266 Pl
268 St 106Pl272 Pl
SE 273 Pl103 PlSE 290 Pl117Ct 118 Ct105PlSE 272 St105 Av106 Av105 Pl271 St
271 Pl
274 Ct105 AvSt
273
107 Pl266 Ct
109
A
vSE 269 St
SE 253 Pl
159
595
80546
547
87595
848543955154288
5555521 7 3
548
82
522
8 6 554233550
553 549 545
80Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 13 LEFTPAGE 15 RIGHTPAGE 8 UP
14 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
n
÷
n
n140AvSE264St
SE 268 St
SE270Pl
SE 278 St 141AvSE129AvSE118AvSE1
2
7
Av
S
E
SE 264 St
SE 272 Pl
274 St
275 St
SE270St
117AvSE118AvSESE 284 St
SE 288 Pl
SE 285 St
SE 282 St
SE 276 Pl
SE 277 P lSE 284 St
283 St
SE 290 Pl
SE 264 Pl111AvSE113AvSE
1
10AvSE112AvSE111Ct111AvSESE270 St
1
1
5
A
v
S
E
276 St
2 6 3 P l
134Av261 St132Pl
136PlSE132 Av SE254 St
121Av122Av123Av118Pl122 Av121 Av26 9 St120Pl 2 7 7 Pl 278 Ct
279 Ct
272 St
116Pl121Pl118Av121
P
l
282Wy
274 St
277 Ct118Pl264St124Pl119Ct120Av264Pl122Ct263St252Pl255St121Pl259Pl
268 St114Av 126Av131Pl263 Pl
254 St
259 Pl
116 Av SE269St111 Pl
110AvSE 281 St
SE 256 St
S E 251Pl
1
2
6
Av
SE119PlSE128 Pl1
3
1Pl262 Pl
262 Pl
SE 273 Pl
126 PlSE 289 StSE 290 St 134 CtSE253 Pl
SE 286 St
SE 270 St
SE 286 St
SE 271 St 128 Av SE127 Av SE129
A
v
1
4
2 A
v S
E
253 St 124 Av SE132 Av SE2 5 3 C t
SE 252 Pl
S E 2 7 4 W y
SE 261 St
124 Av SE253 St
139Pl130Av 139Av2 7 5 Pl274St
1
2
1
Pl127Av130 Av129 Ct278St115Pl280 St 277 Pl129Pl1
2
7
Av254 Pl2 7 3 St
139Pl126Ct110AvSE2 6 1 C t125Av258 St119Pl
111Ct110Ct138 Pl258 Pl SE 258 St
256 Pl
130Av257 St
263 St
SE 264
259 Pl
119Dr2 7 0 S t115 Av111 Pl264 S t113 Pl261 Pl
280 Pl
281 St
281 Pl
140 Av137Pl255 Pl129PlSE252St
128 Av SE25 4C t
2 5 4 P l252 P l122 Pl
255 Pl117Pl
258 St
SE 254 Pl
115 Av252 Pl
SE 266 St114 Pl265 Pl
115 Av268 St
270 CtSE 272 Pl
268 St
267 Pl
266 Pl118Pl263 C t261Pl256 Pl
260S t
262 C tSE 260 Pl
118Pl117Pl257St
122Av125Pl
126Pl265 Pl126 Av259 St
129Av258 St
130 Pl261 St
264 Pl
135 Av136 Av267 Pl
138Av270 St135Av 142AvSE141AvSE143AvSE136AvSESE 257 Pl
2 7 4St275St140AvSE276 St
SE 283Pl126Av124Pl276 Pl
125Av131Av2 8 0 S t1
3
1
Ct
123 Pl122 Pl281Ct121 Av123PlSE 282 St
SE 280 St 120 Av SESE 276Pl
123AvSE 276 St
SE 288 St112AvSE111Av 122PlSE 282 St
143 St142 Pl SE1
3
7
Av13
9 Ct
275 Pl111Pl110 Pl
116Pl116Pl117Pl122Pl259 St
125 Pl276WySE278St
266 St
126 Ln115 Pl265 Pl
112Pl135 Pl265 St 136 Av1
3
7
Av
1
3
8
P
l137 Av1137 Pl271 St
1
3
5
A
v
277 St 139 Pl SE253
St
252 Pl
135Pl257 St
138AvSE258Pl
259 Pl
SE 257 Ct
SE 258 St
SE 258 Ct
259 St
132 Pl SE
1
3
4
A
v
S
E
SE 260 Ln 142AvSE268 St
270 St
266 Pl
266 St
131 Pl SESE 271 P l1
4
0
A
v 140LnSE140 CtSE 288 St136 Av SE137 Av SE138 Pl SE141AvSE255 St
123 Pl119 Av12
1
Av
262 Pl120PlSE 255 Pl
258 S t 126PlSE258StSE 265 St122 Pl119 Av128
Pl 272 St
130 Av SE273 St2 7 2 Pl
273 CtPl
274Ct
2
7
3 Pl
1
2
9 SE 274 St
116 Av SESE 280 St
1
2
8
Ct
282St
SE 286 Pl
251 Pl
253 Pl
252 Pl
253 Pl
110 Av110 Av255 Pl
110 Pl SE259
256 Pl
257 St S E 257 St
256 Pl
257 P l 115 Av258 St
259 S t114 AvSE 264 St
258 Pl
112 AvAvSE113260 St
Pl 114Pl114AvSESE 275 St 131 Av134 Pl SESE 282 St
274 Pl114 Av SE114AvSE265 St114 Ln SE253 St
143 Ct120PlSE254St
266 Pl266 St
2 7 4 P l2 7 3 C t135AvSE257 Ct
2 5 6 Pl
14
3
AvSE 260 St
259 P l119 Ct119Pl136 Av SESE 280 Ct
137 Av SE136 Pl281 Pl
SE 279 Pl
SE 280 St
SE 290 Pl
SE 285 Pl
142PlSESE 286 Ct
SE2 87 St121 Pl SE269 Pl 123Av262 Ct 133Pl132 PlSE 278 Pl
SE 277 Pl
126Av126Pl124 Pl277St128 Pl SE129 Pl28 0 P l279Pl
268St
S
R
5
16
261 St
260 St 137 Av255 Pl
137 Wy254 Pl117Ct118 Ct265 Ct
138PlSE 262 St
134 Av266 Ct
SE 255 St
SE 273 St
SE 274 St
SE 252 St
136AvSE135 AV SE2 5 9 Pl259 Pl
122 Av122
W
y
12
3
W
y
121
W
y
288 Pl
SE 253 Pl
244
511
512
509
336
80520
544
80176 177
506
337187
518
507
185
186
505
519
510
179
184
508
513
178
546
547
87
543180241182 243175239517
88
515
516
183
250521514
82
181240
174 251335
522242542533545
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 14 LEFTPAGE 16 RIGHTPAGE 9 UP
PAGE 17 DOWN
15 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
÷
÷
n
n 146Av
164PlSE160AvSE156AvSESE 261 St
SE 251 St
SE 287 St
SE 280 St140AvSESE261St144AvSESE263St
2 6 4 St
SE 268 St
SE264St
SE270Pl
SE 278 St 141AvSESE 264 S t153 Av SESE 275 Pl
152
W
y
SESE 264 St SE 263 St
2 6 5 S t
SE 264 Pl SE 264 St
271 Pl 159Av260 S t2 5 8 S t160Av162 Pl161Av28 8 S t156 Av290St276 Pl
279 P l148Wy 1
6
2
A
v
276 St
2 6 3 P l
134Av261 St132Pl
SE26
7
St
136PlSESE 256 St
Kent-Black Diamond Rd144 Av SE2 5 2 P l
254 St
Kent Kangley Rd
S E 251Pl
188 Av SE166 Av273 St
Co
v
i
n
g
t
o
n
Wy
SESE 278 St 165 Pl SE150Pl134 CtSE253 Pl
1
4
2 A
v S
E
274 St146 AvSE163 Ct163AvSE1
4
7
Pl
S
E
SE 266 St 163Pl147Av158 PlPl
139Pl145Av146Av145Av145Ct147 Av139Av144
Pl
147Av143Av166 Av2 6 6 S t
S E 262PlSE 2 6 7 Pl2 7 3 St
139Pl258 St
259 Pl 144Pl138 PlSE266St
SE 264
153 Av280 Pl
281 St
281 Pl
140 Av151 Pl SE145 Pl137Pl2 5 1 Pl
255 Pl
150PlSE255 Pl
135 Av136 Av267 Pl
138Av270 St135Av 142AvSE141AvSE143AvSE258 Pl136AvSESE 257 Pl
256 Pl
149 Av148 Av154Av274Ct267 C t269 St161 Pl265 Ct
S E 262 Pl
SE 263 Pl 158 Ct158Av157AvS
E159Pl261 Ct261 Pl
SE 283 Pl149 Pl275 Pl
278 Pl
SE 276 Pl276Pl
2 7 4St275St140AvSE276 St
SE 283Pl
SE 282 St
143 St143 Pl142 Pl SE1
3
7
Av13
9 Ct
275 Pl
147 Pl252 Pl
161 Pl254 St
150P l
151 Pl150 Pl279 Pl
270 Pl270 StSE278St 143PlPl147
281 St148AvSE135 Pl265 St 136 Av1
3
7
Av
1
3
8
P
l137 Av1137 Pl271 St
1
3
5
A
v 139 Pl SE253
St
252 Pl
135Pl257 St
138AvSE258Pl
259 Pl
SE 257 Ct
SE 258 St
SE 258 Ct
259 St
132 Pl SE
1
3
4
A
v
S
E
SE 260 Ln 142AvSE145Pl146 Av SE270 St
266 St
SE 271 P l1
4
0
A
v 140LnSE273 Ct
274 Pl
274Ct 147Av140 Ct146 Av152AvSESE 260 St
148 Av SE267 St
SE 274 St SE 274Pl
151Pl148PlSE149 Av SE149 Pl SE150AvSESE 275 Pl
274 Ln
SE 275 Wy
SE 278 Pl
152 Av SE277 Pl
SE 278 St
SE 273 Pl
150 Ln153PlSESE 288 St 152AvSESE 282 Pl
SE 282 Pl
149 Av SESE 284 St
146PlSESE 288 St136 Av SE137 Av SE138 Pl SE141AvSE134 Pl SESE 282 St
262 St145Av
253 St
143 Ct
2 7 4 P l
2 7 3 C t135AvSE257 Ct
2 5 6 Pl
14
3
AvSE 260 St 144Av259 P l136 Av SESE 280 Ct
137 Av SE136 Pl281 Pl
SE 279 Pl
SE 280 St 276 Pl145 AvSE 278 St
145
Pl2 7 7Ct
SE 285 Pl
142PlSESE 286 Ct
SE2 87 St133Pl137 Av255 Pl
137 Wy254 Pl
138PlSE 262 St
134 AvSE 255 St
SE 273 St
SE 274 St
SE 252 St
136AvSE135 AV SE&(338336
535
541
538
529
540
528
536
539
530
531
527337243
534250523
537
504
525
524 2442425262513 3 5
252253533532
516
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000FeetPAGE 15 LEFT PAGE 10 UP
16 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
n
SE 278 St
SE 272 Pl
274 St
275 St
SE270St
117AvSE118AvSESE 284 St
SE 288 Pl
SE 285 St
SE 282 St
SE 276 Pl
SE 277 P l105AvSESE 284 St
283 St
SE 290 Pl109AvSE109 CtSE270 St
1
1
5
A
v
S
E 136PlSE132 Av SE121Av122Av123Av118Pl122 Av121 Av26 9 St120Pl 2 7 7 Pl 278 Ct
279 Ct
272 St
116Pl121Pl118Av121
P
l
282Wy
274 St
277 Ct120Av269St111 Pl
110AvSE 281 St
SE 273 Pl
126 PlSE 289 StSE 290 St
SE 286 St
SE 270 St
SE 286 St
SE 271 St
S E 2 9 1 S t108AvSE 287 St
S E 2 7 4 W y 124 Av SE130Av
2 7 5 Pl274St
1
2
1
Pl127Av130 Av129 Ct278St115Pl280 St 277 Pl2 7 3 St
126Ct110AvSE125Av111Ct110Ct2 7 0 S t115 Av111 Pl113 Pl270 CtSE 272 Pl
270 St
276 St126Av124Pl276 Pl
125Av131Av2 8 0 S t1
3
1
Ct
123 Pl122 Pl281Ct121 Av123PlSE 282 St
SE 280 St 120 Av SESE 276Pl
123AvSE 276 St
SE 288 St
107 Av108 Av112AvSE111Av
122Pl1
3
7
Av116Pl116Pl117Pl
276Wy275 St
277 St
270 St
SE 288 St136 Av SE137 Av SE128Pl 272 St
130 Av SE273 St2 7 2 Pl
273 CtPl
274Ct
2
7
3 Pl
1
2
9 SE 274 St
116 Av SESE 280 St
1
2
8
Ct
282St
SE 286 P l
SE 277 St
114AvSE106 Av SESE 279 St
SE 275 St 131 Av134 Pl SESE 282 St
274 Pl114 Av SE2 7 4 P l
2 7 3 C t135AvSE136 Av SESE 280 Ct
137 Av SE136 Pl281 Pl
SE 279 Pl
SE 280 St
272 Pl
SE 273 Pl
SE 290 Pl
SE 290 Pl
SE 295 St
127Wy125AvSE124Pl126AvSE 296 Wy
SE 298 Pl
SE 299 Pl
SE 300 Wy 127PlSE126Ct128Ct297 Ct
129PlSE130WySE297 Pl
SE 299 St
S E 299St124Av125Pl128 Pl
125Ct126CtSE 302 St
SE 301 St128Ct
302 Pl129AvSE 129PlSE130AvSESE 301 Pl
127PlSE132 Av SE120Av121PlSE303 Ct112AvSE
SE 304 St
SE 304 St
SE 298 St
SE 295 St
111AvSE118AvSE124 Av SE116AvSE121 Pl SE269 Pl
SE 278 Pl
SE 277 Pl
126Av126Pl124 Pl277St128 Pl SE129 Pl28 0 P l279Pl
S
R
5
16
SE 272 St105 Av106 Av105 Pl271 St
271 Pl
274 Ct105 AvSt
273
107 Pl138PlSE 273 St
SE 274 St
122 Av122
W
y
12
3
W
y
121
W
y
120Wy288 Pl
SE292WySE292S t120 Av SE121 Av SESE 296 Pl
336
520
176 177
515
25151880519
179
178
180
549 181
84545
85175
517552516 25052182
174 53380522550 542Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000Feet PAGE 15 UP
BRIDGES - 17 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
MAPLEVALLEYBLACKDIAMONDRDSE 264 St
S E KENT-KANGLEY RDSUMMIT-LANDSBURGRD264 Pl
235AvSEKENT-KAN G L E Y RD
SE 276 St
SE 286 St 262 Av SE268AvSEMaple Valley 254Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000Feet
CLARK SPRINGS - 18 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
n
n
÷
CrestAvSLenoraAvReite
n
R
d
E Laurel St
S259StHazelAvN5thAvN3rdAvN1stAvNS234StStateW Cole St
H
a
w
l
e
yRdWNadenAvSMadisonAvN74AvS5th Av S5thAvS3rdAvS2ndAvS1stAvSRailroadAvSW Gowe St
S 259 St
E Temperance St
Valley Pl
Novak Ln
Woodford Av NRailroadAvNE Chicago St
WynwoodDrWardSt
E Guiberson St
K e nsingtonAvGoweSt
Bridges Av SCentralAvS4th Av SJames St
W Mee k er St 6th Av NW Harrison St
W Meeker St
W Sam St
6th Av4thAvN68AvSETitusSt80AvSSR167CentralAvNProspect Av NE Seattle St
E Sm ith St
2nd Av NWashington Av NLincolnAvNThompson Av N6th Av N2nd Av N1st Av SStateAvNKennebeckAvMcmillan St
Clark Av NPioneer St
Hillcrest AvKensington AvStoneburnerLnGarfieldAvSOly
mpicWy
C herry Hill
E Filbert
E Hemlock St
E Dean Jason Av NAlexanderGl
e
n
wo
o
d
L
n
Dean St
George St
AlpineW y71PlWCloudySt
Cedar St
Tacoma St
E Maclyn St
ScenicW y
Ke
n
n
e
bec
k
AvE TitusStMarion S t
Willis St
W Titus St
Rachael Pl W Crow St
Stetson Av
Sea ttle St
Carter St
S
c
e
n
ic
W
y
Chicago StMorton St
W Saar St
S 231 St
66 Av SOverlook St
Waterman StAdams
5thAvS66AvS67PlSS 238 PlS 239 St
S 239 Pl 84 Pl S236 Pl S 235 Pl
Carter PlKirkwoodAv
87AvSW Smith St
6th AvRussell StWJamesLnRidgeview DrW James LnJamesCt
James Pl
James PlJames Ln63 Wy S240 Ct
S R 51663 Pl
SS 251 S t Naden Av258Pl
88AvScenic WyS238 S tWMortonSt
E Smith St
VanDeVanterAvSW Willis St
StConcord
C le a rv i ew
RamsayW
y
W Kent Sta St
1st Av N2nd Pl N3nd Pl N6
4
A
v
SS 236 Pl
65 Av64 Pl238 Pl
&(
374
424260256383
373
409 432365389
264
384 423441219
370
421
377 380
207
208
417386 440431 422
430
397405427418399395401402420 428419407
400396393410
368 222426433
398403 387
257
372 388382
381378
364
371
379
445
404
442 443
231385206209 444
429
366390255411
406
436392
4083 6 3412 230415435414347
341
2 7 1268258 434
425348259210214346485
439340
267
375 369
265
181
Produced by Joseph Araucto: \\Client\P$\Public\Operations\Streets\Pavement Marking Projects\2021 Paint Striping Mapbook.mxd Printed: January 2021
F 2021 Paint Line Striping - Citywide
0 500 1,000Feet
DOWNTOWN - 19 OF 19
Legend Paint Coordinate work with Paving Activities 123 Map Key (see Appendix B)
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
1 59 Pl S S 212 St - 62 Ave S 1 0 0 0 710 7460 0 0 0 470 0 0 0 0 0 0 0 0
2 S 196 St 200th S Bridge - SR 181 / W
Valley Hwy 1, 2 0 0 0 1667 4920 0 8381 0 907 8202 0 107 0 0 0 0 0
3 S 196 St SR 181 / W Valley Hwy - 72nd
Ave S 2 0 0 0 0 0 0 2290 0 0 2220 0 0 0 0 0 0 0 Paint over Type 1 RPM lines.
4 S 196 St 72nd Ave S - 80th Ave S 2 0 3180 0 1360 0 0 5432 0 435 0 0 0 0 0 0 0 0 Paint over Type 1 RPM Lines
5 S 196 St 80th Ave S - E Valley Hwy 2 0 0 0 1305 300 0 2320 0 330 0 0 0 0 0 0 0 0
6 S 196 St E Valley Hwy - easterly to end of
existing line 2 0 0 0 190 0 0 0 0 0 0 0 0 0 0 0 0 0
13 58th Pl S / S 194 St S 196 St - 66th Ave S 1, 2 0 0 0 4660 0 0 0 0 60 0 0 0 0 0 0 0 0
14 62 Ave S S 196 St - S 194 St 1 0 0 0 545 0 0 0 0 235 0 0 0 0 0 0 0 0
15 62 Ave S / S 190th St S 194 St - 66th Ave S 1, 2 0 0 0 2620 0 0 0 0 0 0 0 0 0 0 0 0 0
16 66th Ave S S 196 St - S 190th St 2 0 0 0 1625 0 0 0 0 0 0 0 0 0 0 0 0 0
17 64th Ave S S 194 St - S 190th St 1 0 0 0 1115 0 0 0 0 0 0 0 0 0 0 0 0 0
18 S 190 St 66 Ave S - West Valley Hwy 2 0 0 0 0 0 0 0 0 75 0 0 0 0 0 0 0 0
19 S 190 St West Valley Hwy - 72 Ave S 2 0 0 0 1050 0 0 0 0 70 0 0 0 0 0 0 0 0 Includes wide lane line on the west
side of int @ West Valley Hwy
20 S 188 St West Valley Hwy - 72 Ave S 2 0 0 0 960 0 0 0 0 0 0 0 0 0 0 0 0 0
21 104 Ave SE SE 235 St - SE 232 St 8 0 0 0 0 2290 0 0 0 0 0 0 0 0 0 0 185 0 Paint starts 180 ft N of SE 235 St
22 104 Ave SE SE 232 St - SE 228 St 8 0 0 0 0 2100 0 0 0 0 0 0 0 0 0 0 355 0
23 104 Ave SE / Benson Rd SE 228 St - SE 224 St 8 0 0 0 0 3200 0 0 0 0 0 0 0 0 0 0 355 0
24 Benson Rd SE 224 St - SE 222 St 8 0 0 0 0 1780 0 0 0 0 0 0 0 0 0 0 0 0
25 SR 515 / 104 Ave SE / 108 Ave
SE / Benson Rd SE 222 St - SE 220 Pl 8 0 0 0 440 490 0 0 0 200 0 0 0 0 0 0 485 0
26 108 Ave SE SE 220 Pl - SE 217 St 8 0 0 0 310 1780 0 0 0 165 0 0 0 0 0 0 335 0
27 108 Ave SE SE 217 St - SE 208 St 8, 3 0 0 0 1225 3480 0 0 0 510 0 0 0 0 0 0 855 120
28 108 Ave SE SE 208 St - SE 204 St 3 0 0 0 1295 290 0 0 0 1070 0 0 0 0 0 0 530 0
29 108 Ave SE SE 204 St - SE 200 St 3 0 0 0 485 1540 0 0 0 230 0 0 0 0 0 0 350 0
30 108 Ave SE SE 200 St - SE 196 St 3 0 0 0 610 1380 0 0 0 210 0 0 0 0 0 0 355 0
31 108 Ave SE SE 196 St - SE 192 St 3 0 0 0 565 1050 105 0 0 325 0 0 0 0 0 0 0 0
32 SE 235 St 104 Ave SE - east end of lines 8 0 0 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0
33 SE 232 St 104 Ave SE - east end of lines 8 0 0 0 75 0 0 0 0 0 0 0 0 0 0 0 0 0
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 1 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
34 230 Pl 104 Ave SE - west end of lines 8 0 0 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0
35 SE 228 St 104 Ave SE - 103 Ave SE 8 0 0 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0
36 SE 228 St 104 Ave SE - 105 Ave SE 8 0 0 0 70 0 0 0 0 0 0 0 0 0 0 0 0 0
37 SE 226 St 104 Ave SE - 105 Ave SE 8 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0
38 SE 224 St 104 Ave SE - 108 Ave SE 8 0 0 0 110 0 0 0 0 0 0 0 0 0 0 0 0 0
39 SE 224 St 104 Ave SE - 105 Ave SE 8 0 0 0 90 0 0 0 0 0 0 0 0 0 0 0 0 0
40 SE 222 Pl 108 Ave SE - 110 Ave SE 8 0 0 0 110 0 0 0 0 0 0 0 0 0 0 0 0 0
41 SE 220 Pl 108 Ave SE - 110 Ave SE 8 0 0 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0
42 SE 212 St 108 Ave SE - 106 Ave SE 3 0 0 0 95 0 0 0 0 0 0 0 0 0 0 0 0 0
43 SE 204 St 108 Ave SE - 106 Pl SE 3 0 0 0 110 0 0 0 0 0 0 0 0 0 0 0 0 0
44 SE 204 St 108 Ave SE - 110 Ave SE 3 0 0 0 175 0 0 0 0 0 0 0 0 0 0 0 0 0
47 SE 236 PL 104 Ave SE - 108 Ave SE 8 0 0 0 1135 0 0 0 0 0 0 0 0 1175 0 0 0 0
48 108 Ave SE SE 240 St - SE 236 Pl 8 0 0 0 1130 0 0 0 0 95 0 0 0 0 0 0 0 0
49 108 Ave SE SE 240 St - SE 241 Pl 8 0 0 0 210 540 0 0 0 90 0 0 0 0 0 0 0 0
50 112 Ave SE SE 240 St - SE 232 St 8 0 0 0 0 0 0 0 0 0 0 0 0 4010 0 0 0 0
51 112 Ave SE SE 240 St - south end of lines 8 0 0 0 485 0 0 0 0 75 0 0 0 0 0 0 0 0
52 SE 227 Pl / 113 Ave SE 116 Ave SE - 228 Pl 8, 9 0 0 0 0 0 0 0 0 0 0 0 0 1940 0 0 0 0
53 SE 196 St 108 Ave SE - 116 Ave SE 3, 4 0 0 0 2105 385 0 0 0 80 0 0 0 4685 0 0 0 0
54 SE 196 St 116 Ave SE - 124 Ave SE 4 0 0 0 2380 0 0 0 0 100 723 0 0 3415 0 0 0 0
55 SE 192 St 108 Ave SE - 116 Ave SE 3, 4 0 0 0 3170 0 0 0 0 390 0 0 0 4220 0 0 0 0
56 SE 192 St 116 Ave SE - 124 Ave SE 4 0 0 0 2430 0 0 0 0 0 0 0 0 5000 0 0 0 0
57 124 Ave SE SE 208 St - SE 209 St 4 0 0 0 315 0 0 0 0 45 0 0 0 0 0 0 0 0 Paint over Type 1 RPM lines.
58 124 Ave SE SE 208 St - SE 196 St 4 0 0 0 3555 0 0 0 0 140 0 0 0 6930 0 0 0 0
59 124 Ave SE SE 196 St - SE 192 St 4 0 0 0 1250 0 0 0 0 0 0 0 0 2565 0 0 0 0
60 S 212 St 68 Ave S - 72 Ave S 2 0 0 0 595 1220 0 2245 225 370 0 1345 0 0 0 0 0 0 Paint over Type 1 RPM lines.
65 S 212 St 84 Ave S - 167 Ramps 2 0 0 0 630 1350 0 2700 110 290 880 1895 0 200 0 0 0 0
66 S 212 St 167 Ramps - 167 Ramp / 91 Pl
S 2, 3 0 0 0 685 0 0 1440 0 675 0 0 0 0 0 0 0 150
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 2 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
73 SE 208 St 116 Ave SE - 124 Ave SE 4 0 0 0 705 4010 0 0 0 225 2235 0 0 0 0 0 0 0
74 SE 208 St 124 Ave SE - 132 Ave SE 4 0 0 0 540 4040 0 5080 0 520 4611 0 0 0 0 0 0 0
75 SE 208 St 132 Ave SE - east City Limits
(Soos Creek Trail cross walk)4 0 0 0 1640 0 0 0 0 100 0 0 0 2960 0 0 0 0 Stop at City Limits
76 120 Pl SE SE 208 St - SE 210 Pl 4 0 0 0 415 0 0 0 0 0 0 0 0 0 0 0 0 0 Paint over Type 1 RPM lines.
77 SE 218 Pl 130 Ave SE - westerly to end of
lines 9 0 0 0 0 0 0 0 0 0 0 0 0 205 0 0 0 0
78 SE 224 St 132 Ave SE - 127 Ave SE 9 0 0 0 0 0 0 0 0 0 0 0 0 2545 0 0 0 0
80 S 277 St L St NE - 111 Pl SE 14, 17 0 9260 0 0 0 0 0 0 0 0 0 0 6680 0 0 0 0
82 SE 274 Way / 116 Ave SE 114 Ave SE - SE 270 St 14, 15, 17 0 1860 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
84 SE 277 St off Ramp SE 277 St - 108 Ave SE 14 0 520 0 0 0 0 0 0 0 0 0 0 1095 0 0 0 0
85 SE 277 St on Ramp 108 Ave SE - SE 277 St 14 0 530 0 0 0 0 0 0 0 0 0 0 940 0 0 0 0
86 Green River Rd S City Limits - City Limits 14 0 0 0 1775 0 0 0 0 0 0 0 0 3550 0 0 0 0
87 116 Ave SE SR 516 (Kent-Kangley Road) -
SE 259 Pl 15 0 0 0 0 0 0 0 0 0 1295 0 0 0 0 0 0 0
88 116 Ave SE SE 259 Pl - SE 256 St 15 0 0 0 0 0 0 0 0 0 2115 0 0 0 0 0 0 0
93 116 Ave SE SE 248 St - SE 244 St 9 0 0 0 1265 0 0 0 0 0 0 0 0 2610 0 0 0 0
94 116 Ave SE SE 244 St - SE 240 St 9 0 0 0 1630 0 0 0 0 100 0 0 0 1030 0 0 0 0
95 116 Ave SE SE 240 St - SE 238 St 9 0 0 0 730 0 0 0 0 220 405 0 0 435 0 0 0 0
96 116 Ave SE SE 238 St - SE 236 St 9 0 0 0 890 0 0 0 0 50 0 0 0 1315 0 0 0 0 Hatching @ 238 St not included
97 116 Ave SE SE 236 St - SE 234 Pl 9 0 0 0 570 0 0 0 0 0 0 0 0 1090 0 0 0 0
98 116 Ave SE SE 234 Pl - SE 234 St 9 0 0 0 175 0 0 0 0 0 0 0 0 380 0 0 0 0
99 116 Ave SE SE 234 St - SE 233 Pl 9 0 0 0 350 0 0 0 0 0 0 0 0 710 0 0 0 0
100 116 Ave SE SE 233 Pl - SE 231 Pl 9 0 0 0 415 0 0 0 0 0 0 0 0 780 0 0 0 0
101 116 Ave SE SE 231 Pl - SE 230 Pl 9 0 0 0 245 0 0 0 0 0 0 0 0 535 0 0 0 0
102 116 Ave SE SE 230 Pl - SE 228 Pl 9 0 0 0 550 0 0 0 0 0 0 0 0 1105 0 0 0 0
103 116 Ave SE SE 228 Pl - SE 227 Pl 9 0 0 0 305 0 0 0 0 0 0 0 0 605 0 0 0 0
104 116 Ave SE SE 227 Pl - SE 225 St 9 0 0 0 920 0 0 0 0 0 0 0 0 1785 0 0 0 0
105 116 Ave SE SE 225 St - SE 219 Pl 9 0 0 0 805 665 0 0 0 0 0 0 0 2895 0 0 0 0
106 116 Ave SE SE 219 Pl - SE 218 Pl 9 0 0 0 0 260 0 0 0 0 0 0 0 485 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 3 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
107 116 Ave SE SE 218 Pl - SE 216 Pl 9 0 0 0 475 475 0 0 0 0 0 0 0 1490 0 0 0 0
108 116 Ave SE SE 216 Pl - SE 208 St 9, 4 0 0 0 2645 0 0 0 0 285 0 0 0 4725 0 0 0 95
109 104 Ave SE SE 224 St - SE 225 Pl 8 0 0 0 0 0 0 0 0 0 0 0 0 725 0 0 0 0
110 SE 224 St 104 Ave SE - 100 Ave SE 8 0 0 0 0 0 0 0 0 0 0 0 0 2440 0 0 0 0
113 100 Ave SE SE 246 Pl - SE 245 Pl 8 0 0 0 0 0 0 0 0 0 0 0 0 215 0 0 0 0
114 100 Ave SE SE 245 Pl - SE 244 Ct 8 0 0 0 0 0 0 0 0 0 0 0 0 225 0 0 0 0
116 100 Ave SE SE 244 St - S 242 Pl 8 0 0 0 0 0 0 0 0 0 0 0 0 535 0 0 0 0 Hatching @ S 242 Pl not included
118 100 Ave SE SE 240 St - S 236 St 8 0 0 0 1275 0 0 0 0 0 0 0 0 2530 0 0 0 0
119 100 Ave SE S 236 St - S 235 Pl 8 0 0 0 145 0 0 0 0 0 0 0 0 300 0 0 0 0
120 100 Ave SE S 235 Pl - S 231 St 8 0 0 0 1435 0 0 0 0 0 0 0 0 2775 0 0 0 0
121 100 Ave SE S 231 St - SE 229 Pl 8 0 0 0 420 0 0 0 0 0 0 0 0 875 0 0 0 0
122 100 Ave SE SE 229 Pl - SE 228 Ct 8 0 0 0 325 0 0 0 0 0 0 0 0 680 0 0 0 0
123 100 Ave SE SE 228 Ct - SE 227 St 8 0 0 0 405 0 0 0 0 0 0 0 0 820 0 0 0 0
124 100 Ave SE SE 227 St - SE 226 Pl 8 0 0 0 130 0 0 0 0 0 0 0 0 175 0 0 0 0
125 100 Ave SE SE 226 Pl - SE 225 Pl 8 0 0 0 340 0 0 0 0 0 0 0 0 440 0 0 0 0
126 100 Ave SE SE 225 Pl - SE 224 St 8 0 0 0 395 0 0 0 0 0 0 0 0 800 0 0 0 0
127 100 Ave SE SE 224 St - SE 222 St 8 0 0 0 0 0 0 0 0 0 0 0 0 1280 0 0 0 0
128 100 Ave SE SE 222 St - S 220 Pl 8 0 0 0 475 0 0 0 0 0 0 0 0 785 0 0 0 0
129 100 Ave SE S 220 Pl - SE 220 St 8 0 0 0 65 0 0 0 0 0 0 0 0 95 0 0 0 0
130 100 Ave SE SE 220 St - SE 218 Pl 8 0 0 0 495 0 0 0 0 0 0 0 0 810 0 0 0 0
131 SE 244 St 100 Ave SE - 101 Pl SE 8 0 0 0 120 0 0 0 0 0 0 0 0 490 0 0 0 0
132 SE 244 St 101 Pl SE - 102 Ave SE 8 0 0 0 120 0 0 0 0 0 0 0 0 0 0 0 0 0
133 SE 244 St 102 Ave SE - 102 Pl SE 8 0 0 0 85 0 0 0 0 0 0 0 0 0 0 0 0 0
134 SE 244 St 102 Pl SE - 104 Ave SE 8 0 0 0 430 0 0 0 0 65 0 0 0 110 0 0 0 0
135 SE 244 St 104 Ave SE - 108 Ave SE 8 0 0 0 1230 0 0 0 0 0 0 0 0 2420 0 0 0 0
136 SE 244 St 108 Ave SE - 109 Pl SE 8 0 0 0 435 0 0 0 0 0 0 0 0 600 0 0 0 0
137 SE 244 St 109 Pl SE - 110 Ave SE 8 0 0 0 135 0 0 0 0 0 0 0 0 125 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 4 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
138 SE 244 St 110 Ave SE - 112 Ave SE 8 0 0 0 595 0 0 0 0 0 0 0 0 1055 0 0 0 0
139 SE 244 St 112 Ave SE - 114 Pl SE 8, 9 0 0 0 800 0 0 0 0 0 0 0 0 1530 0 0 0 0
140 SE 244 St 114 Pl SE - 116 Ave SE 9 0 0 0 350 0 0 0 0 0 0 0 0 580 0 0 0 0
141 98 Ave S SE 248 St - S 246 Pl 8 0 0 0 380 0 0 0 0 0 0 0 0 415 0 0 0 0
142 98 Ave S S 246 Pl - S 244 Pl 8 0 0 0 625 0 0 0 0 0 0 0 0 1290 0 0 0 0
143 98 Ave S S 244 Pl - S 242 St 8 0 0 0 700 0 0 0 0 0 0 0 0 275 0 0 0 0
144 98 Ave S S 242 St - S 241 St 8 0 0 0 290 0 0 0 0 0 0 0 0 0 0 0 0 0
145 98 Ave S S 241 St - S 240 St 8 0 0 0 275 0 0 0 0 0 0 0 0 0 0 0 0 0
146 94 Ave S SE 248 St - S 244 St 8 0 0 0 1280 0 0 0 0 0 0 0 0 2645 0 0 0 0
147 94 Ave S S 244 St - S 242 St 8 0 0 0 650 0 0 0 0 0 0 0 0 1320 0 0 0 0
148 94 Ave S S 242 St - S 241 St 8 0 0 0 260 0 0 0 0 0 0 0 0 395 0 0 0 0
149 94 Ave S S 241 St - SE 240 St 8 0 0 0 255 0 0 0 0 0 0 0 0 515 0 0 0 0
159 S 252 St SR 516 (Kent-Kangley Road) -
98 Pl S 8 0 0 0 210 0 0 0 0 0 0 0 0 0 0 0 0 0
160 94 Ave S SR 516 (Kent-Kangley Road) -
SE 248 St 8 0 0 0 325 0 0 0 0 210 0 0 0 610 0 75 0 0
161 SE 248 St 94 Ave S - 98 Ave S 8 0 0 0 1550 0 0 0 0 90 0 0 0 2235 0 0 0 0
162 SE 248 St 98 Ave S - 100 Ave SE 8 0 0 0 980 0 0 0 0 90 0 0 0 1145 0 0 0 0
163 SE 248 St 100 Ave SE - 102 Pl SE 8 0 0 0 960 0 0 0 0 0 0 0 0 605 0 0 0 0
164 SE 248 St 102 Pl SE - 104 Ave SE 8 0 0 0 310 330 0 0 0 0 0 0 0 630 0 0 0 0
165 SE 248 St 104 Ave SE - 109 Ave SE 8 0 0 0 150 0 0 0 0 0 0 0 0 760 0 0 0 0
167 SE 248 St 110 Ct SE - 116 Ave SE 8, 9 0 0 0 1850 0 0 0 0 0 0 0 0 3700 0 0 0 0
169 SE 248 St 116 Ave SE - 118 Ave SE 9 0 0 0 415 0 0 0 0 0 0 0 0 830 0 0 0 0
170 SE 248 St 118 Ave SE - 120 Ave SE 9 0 0 0 800 0 0 0 0 0 0 0 0 1610 0 0 0 0
171 SE 248 St 120 Ave SE - 124 Ave SE 9 0 0 0 1235 0 0 0 0 0 0 0 0 2610 0 0 0 0
173 109 Ave SE SE 256 St - SE 248 St 14, 8 0 0 0 2700 0 0 0 0 200 5400 0 0 0 0 0 0 0
174 132 Ave SE SE 288 St - SE 282 St 15, 17 0 0 0 1790 0 0 0 0 0 0 0 0 3580 0 0 0 0
175 132 Ave SE SE 282 St - SE 279 Pl 15, 17 0 0 0 975 0 0 0 0 140 0 0 0 2025 0 0 0 0
176 132 Ave SE SE 279 Pl - SE 278 Pl 15, 17 0 0 0 165 0 0 0 0 0 0 0 0 420 0 0 0 0 Y
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 5 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
177 132 Ave SE SE 278 Pl - SE 278 St 15, 17 0 0 0 185 0 0 0 0 0 0 0 0 400 0 0 0 0 Y
178 132 Ave SE SE 278 St - SE 276 St 15, 17 0 0 0 625 0 0 0 0 0 0 0 0 1255 0 0 0 0
179 132 Ave SE SE 276 St - SE 274 St 15, 17 0 0 0 0 0 0 0 0 0 510 130 0 0 0 110 0 0
180 132 Ave SE SE 274 St - SR 516 (Kent-
Kangley Road)15, 17 0 0 0 0 0 0 300 0 0 610 0 0 0 0 0 0 0
181 132 Ave SE SR 516 (Kent-Kangley Road) -
SE 266 St 15, 17 0 0 0 1270 1250 0 250 0 375 0 0 0 2250 0 0 0 0 Paint over Type 1 RPM lines.
182 132 Ave SE SE 266 St - SE 263 Pl 15 0 0 0 975 0 0 0 0 200 0 0 0 1205 0 0 0 0 Paint over Type 1 RPM lines.
183 132 Ave SE SE 263 Pl - SE 259 Pl 15 0 0 0 1125 0 0 0 0 0 0 0 0 2270 0 0 0 0
184 132 Ave SE SE 259 Pl - SE 256 St 15 0 0 0 1215 0 0 0 0 100 0 0 0 2310 0 0 0 0
185 132 Ave SE SE 256 St - SE 255 St 15 0 0 0 450 0 0 0 0 100 0 0 0 645 0 0 0 0 Hatching not included
186 132 Ave SE SE 255 St - SE 253 Pl 15 0 0 0 610 0 0 0 0 50 0 0 0 740 0 0 0 0 Hatching not included
187 132 Ave SE SE 253 Pl - SE 248 St 15, 9 0 0 0 135 0 0 0 0 0 0 0 0 3505 0 0 0 0
188 132 Ave SE SE 248 St - SE 245 St 9 0 0 0 0 0 0 0 0 0 0 0 0 895 0 0 0 0
189 132 Ave SE SE 245 St - SE 244 St 9 0 0 0 0 0 0 0 0 0 0 0 0 880 0 0 0 0
190 132 Ave SE SE 244 St - SE 240 St 9 0 0 0 980 350 0 0 0 145 0 0 0 2295 0 0 0 0
191 132 Ave SE SE 240 St - SE 236 Pl 9 0 0 0 1385 0 0 0 0 225 0 0 0 1600 0 0 0 0
192 132 Ave SE SE 236 Pl - SE 235 St 9 0 0 0 435 0 0 0 0 0 0 0 0 870 0 0 0 0
193 132 Ave SE SE 235 St - SE 234 St 9 0 0 0 260 0 0 0 0 0 0 0 0 520 0 0 0 0
194 132 Ave SE SE 234 St - SE 233 St 9 0 0 0 360 0 0 0 0 0 0 0 0 720 0 0 0 0
195 132 Ave SE SE 233 St - SE 231 Way 9 0 0 0 320 0 0 0 0 0 0 0 0 650 0 0 0 0
196 132 Ave SE SE 231 Way - SE 230 St 9 0 0 0 735 0 0 0 0 0 0 0 0 1470 0 0 0 0
197 132 Ave SE SE 230 St - SE 228 Pl 9 0 0 0 360 0 0 0 0 0 0 0 0 740 0 0 0 0
198 132 Ave SE SE 228 Pl - SE 224 St 9 0 0 0 470 2040 0 1730 0 780 0 0 0 2490 0 0 0 0 Inside painted chevron not included
199 132 Ave SE SE 224 St - SE 221 Pl 9 0 0 0 395 750 0 445 0 355 0 0 0 825 0 0 0 0
200 132 Ave SE SE 221 Pl - SE 216 St 9 0 0 0 120 830 0 0 0 340 0 0 0 2990 0 0 0 0
201 132 Ave SE SE 216 St - SE 214 Way 9, 4 0 0 0 230 190 0 0 0 0 0 0 0 890 0 0 0 0
202 132 Ave SE SE 214 Way - SE 210 St 4 0 0 0 460 2000 0 0 0 0 0 0 0 3060 0 0 0 0
203 132 Ave SE SE 210 St - SE 208 St 4 0 0 0 890 0 0 605 0 175 0 0 0 1125 0 0 0 110
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 6 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
204 132 Ave SE SE 208 St - SE Lake Youngs
Way 4 0 0 0 735 0 0 390 0 290 300 0 0 1050 0 0 0 0
205 SE Lake Youngs Way 132 Ave SE - East City Limits 4 0 0 0 655 0 0 0 0 0 0 0 0 1310 0 0 0 0
206 W Harrison St Washington Ave N - Thompson
Ave N 7, 19 0 0 0 450 0 0 0 0 0 0 0 0 0 0 0 0 0
207 Thompson Ave N W Meeker St - W Harrison St 7, 19 0 0 0 245 0 0 0 0 0 0 0 0 0 0 0 0 0
208 Thompson Ave N W Harrison St - W Smith St 7, 19 0 0 0 255 0 0 0 0 0 0 0 0 0 0 0 0 0
209 W Smith St Thompson Ave N - Washington
Ave N 7, 19 0 0 0 445 0 0 0 0 0 0 0 0 0 0 0 0 0
210 W Smith St 64 Ave N - Washington Ave N 6, 7, 19 0 0 0 1470 0 0 0 0 0 0 0 0 0 0 0 0 0
211 W Meeker St SR 516 (Kent-Des Moines
Road) - Frager Rd 6 0 0 0 175 0 0 0 0 50 0 0 0 810 0 0 0 0
214 W Meeker St 64 Ave S - Washington Ave N 6, 7, 19 0 0 0 0 0 0 0 0 0 2800 0 0 0 0 0 0 0
219 E Meeker St 1 Ave N - Railroad Ave N 7, 19 0 0 0 0 0 0 0 0 0 0 0 0 190 0 0 0 0
222 E Meeker St State Ave N - S Kennbeck Ave 7, 19 0 0 0 320 0 0 0 0 0 0 0 0 0 0 0 0 0
230 E Smith St Jason Ave N - E Canyon Dr 7, 19 0 0 0 0 0 0 0 0 0 0 0 0 730 0 0 0 0
231 E Canyon Dr E Smith St - Summit Ave N 7, 8, 19 0 0 0 0 0 0 0 0 0 0 0 0 930 0 0 0 0
232 E Canyon Dr Summit Ave N - 94 Ave S 8 0 0 0 0 0 0 0 0 0 0 0 0 1425 0 0 0 0
233 E Canyon Dr 94 Ave S - 101 Ave SE 14, 8 0 0 0 0 0 0 0 0 0 0 0 0 2140 0 0 0 0
239 SE 256 St 120 Pl SE - 124 Ave SE 15 0 0 0 0 0 0 0 0 105 2060 0 120 0 0 0 0 0
240 SE 256 St 124 Ave SE - 129 Ave SE 15 0 0 0 0 0 0 0 0 0 3330 0 0 0 0 0 0 0
241 SE 256 St 129 Ave SE - 132 Ave SE 15 0 0 0 0 0 0 0 0 105 1500 0 0 0 0 0 0 0
242 SE 256 St 132 Ave SE - 139 Ave SE 15, 16 0 0 0 0 0 0 0 0 375 360 0 120 4080 0 0 0 0 Bike Lane Line fronting sidewalk
only. Hatching not included
243 SE 256 St 139 Ave SE - 142 Ave SE 16 0 0 0 40 0 0 0 0 0 0 0 0 2000 0 0 0 0 Hatching not included
244 SE 256 St 142 Ave SE - 148 Ave SE 16 0 0 0 1750 0 0 0 0 0 0 0 0 3690 0 0 0 0
250 SR 516 (Kent-Kangley Road)132 Ave SE - 137 Ave SE 15, 17 0 0 0 225 2600 0 0 0 0 0 0 0 0 0 0 315 0
251 SE 272 St 137 Ave SE - 144 Ave SE 15, 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 165 0
252 SE 272 St 144 Ave SE - 152 Way SE 16 0 970 0 1380 2430 0 0 0 325 0 0 0 0 0 0 650 0
253 SE 272 St 152 Way SE - 156 Pl SE 16 0 0 0 190 4860 0 0 0 95 0 0 0 0 0 0 495 0
254 SR 516 (Kent-Kangley Road)Summit Landsburg Rd - 262 Ave
SE 18 0 0 0 5540 0 0 0 0 0 0 0 0 10760 0 0 0 0
255 W Morton St 68 Ave S - west end of lines 6, 7, 19 0 0 0 265 0 0 0 0 0 0 0 0 0 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 7 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
256 W Morton St 68 Ave S - east end of lines 7, 19 0 0 0 125 0 0 0 0 0 0 0 0 240 0 0 0 0
257 Washington Ave N (Spur)W Morton St - 68 Ave S 7, 19 0 0 0 170 0 0 0 0 0 0 0 0 435 0 0 0 0
258 S 234 St 68 Ave S - 71 Pl 7 0 0 0 970 0 0 0 0 0 0 0 0 0 0 0 0 0
259 W James Street Washington Ave N - 64 Ave S 6, 7, 19 0 0 0 0 0 0 0 0 0 2880 0 0 0 0 0 0 0
260 W James Street 64 Ave S - Lakeside Blvd 6 0 0 0 0 0 0 0 0 0 1545 0 0 0 0 0 0 0
261 W James Street Lakeside Blvd - Hogan Park
North Entrance 6 0 0 0 1175 0 0 0 0 0 0 0 0 1760 0 0 0 0 Do not paint plastic lane lines
262 Russel Rd S Hogan Park North Entrance - W
Meeker St 6 0 0 0 1565 0 0 0 0 0 1535 0 0 1640 0 0 0 0
263 Russel Rd S W Meeker St - Green River 6 0 0 0 515 0 0 0 0 0 0 0 0 0 0 0 0 0
264 6 Ave N S 228 St - south end of lines 7 0 0 0 1790 0 0 0 0 0 0 0 0 0 0 0 0 0
265 4 Ave N W James St - S 228 St 7, 19 0 0 0 2590 0 0 5930 0 0 0 0 0 0 0 0 0 0 Y
265 4 Ave N W James St - S 228 St 7, 19 0 0 0 0 0 0 200 0 100 0 0 0 0 0 0 0 0 Y
266 2 Ave N S 228 St - south end of lines 7 0 0 0 630 0 0 0 0 0 0 0 0 0 0 0 0 0
267 Hawley Rd W Washington Ave S - south end
of lines 13, 7, 19 0 0 0 250 0 0 0 0 0 0 0 0 1320 0 0 0 0
268 S 251 St Washington Ave S - west end of
lines 6, 7, 19 0 0 0 600 0 0 0 0 60 0 0 0 640 0 0 0 0 Paint over Type 1 RPM lines.
269 Frager Rd S W Meeker St - north end of lines 6 0 0 0 310 0 0 0 0 0 0 0 0 5520 0 0 0 0
270 Frager Rd S W Meeker St - south end of
lines 6 0 0 0 0 0 0 0 0 0 0 0 0 3060 0 0 0 0
271 Frager Rd S Washington Ave S - west end of
lines 13, 7, 19 0 0 0 880 0 0 0 0 0 0 0 0 1760 0 0 0 0
272 S 216 St 64 Ave S - 68 Ave S 1, 2 0 0 0 1150 0 0 0 0 0 0 0 0 0 0 0 0 0
273 S 216 St 68 Ave S - 72 Ave S 2 0 0 0 1210 0 0 0 0 0 0 0 0 0 0 0 0 0
274 S 220 St 68 Ave S - 70 Ave S 7 0 0 0 675 0 0 0 0 0 0 0 0 0 0 0 0 0
275 S 220 St 70 Ave S - 72 Ave S 7 0 0 0 480 0 0 960 0 0 0 0 0 0 0 0 0 0
276 72 Ave S S 220 St - S 216 St 7, 2 0 0 0 1285 0 0 2570 0 0 0 0 0 0 0 0 0 0
277 72 Ave S S 216 St - S 212 St 2 0 0 0 1235 0 0 2470 0 0 0 0 0 0 0 0 0 0
278 72 Ave S S 212 St - S 204 St 2 0 0 0 2445 0 0 4890 0 0 0 0 0 0 0 0 0 0
280 S 204 St 68 Ave S - 72 Ave S 2 0 0 0 0 0 0 2380 0 190 0 0 0 0 0 0 0 0
281 Frager Rd S S 212 St - S 204 St 1 0 0 0 2865 0 0 0 0 0 0 0 0 0 0 0 0 0
282 Riverview Blvd S (Off Ramp)Veterans Dr - Riverview Blvd S 5, 6 0 0 0 0 0 0 0 0 0 0 0 0 455 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 8 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
283 Riverview Blvd S (On Ramp)Riverview Blvd S - Veterans Dr 5 0 375 0 0 0 0 0 0 0 0 0 0 375 0 0 0 0
284 Riverview Blvd S (Off Ramp)Veterans Dr - Riverview Blvd S 5, 6 0 345 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
285 Riverview Blvd S Veterans Dr - 39 Pl S 5, 6 0 0 0 375 1200 0 0 0 180 2200 0 0 2130 0 0 0 0
286 Riverview Blvd S 39 Pl S - 41 Pl S 5 0 0 0 0 1130 0 0 0 0 0 0 0 1130 0 0 0 0
287 Riverview Blvd S 41 Pl S - S 219 St 5, 6 0 0 0 0 1600 0 0 0 0 0 0 0 2000 0 0 0 0
288 Riverview Blvd S S 219 St - S 216 St 6, 1 0 0 0 70 1930 0 0 0 0 0 0 0 2530 0 0 0 0
289 Riverview Blvd S S 212 St - S 214 St 1 0 555 0 0 0 0 0 0 0 1130 0 0 0 0 0 0 0
290 Riverview Blvd S S 214 St - S 216 St 1 0 810 0 0 0 0 0 0 0 1510 0 0 0 0 0 0 0
291 Riverview Blvd S S 216 St - 49 Ave S 1 0 770 0 0 0 0 0 0 0 1735 0 0 0 0 0 0 0
292 Orilla Rd S City Limits - 42 Ave S 1 0 0 0 0 0 0 1800 0 300 0 0 0 0 0 0 0 0 Hatching not included. Paint over
white skip Type 1 RPM
293 S 212 St 42 Ave S - Riverview Blvd S 1 0 0 0 0 0 0 9650 0 0 0 0 0 0 0 0 0 0 Paint over Type 1 RPM lines.
294 S 212 St Riverview Blvd S - 59 Pl S 1 0 0 0 0 0 0 5080 0 0 0 0 0 0 0 0 0 0 Paint over white Type 1 RPM lines.
295 S 216 St Riverview Blvd S - 42 Ave S 1 0 195 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
296 42 Ave S S 216 St - S 212 St 1 0 300 0 610 0 0 0 0 200 0 0 0 0 0 0 0 0 Hatching not included
297 S 216 St Riverview Blvd S - Frager Rd 1 0 0 0 875 0 0 0 0 0 0 0 0 875 0 0 0 0
298 Frager Rd S S 216 St - south end of lines 6, 1 0 0 0 710 0 0 0 0 0 0 0 0 1770 0 0 0 0
300 40 Ave S 40 Pl S - 39 Pl S 5 0 0 0 535 0 0 0 0 0 0 0 0 1120 0 0 0 0
301 S 254 St Reith Rd - Lake Fenwick Rd S 10, 11 0 0 0 1500 0 0 0 0 0 0 0 0 2630 0 0 0 0
302 S 253 St / 42 Ave S Reith Rd - 43 Ave S 12, 5, 6 0 0 0 1220 0 0 0 0 0 0 0 0 24440 0 0 0 0
302 S 253 St / 42 Ave S Reith Rd - 252 Pl 10 0 0 0 815 0 0 0 0 0 0 0 0 1630 0 0 0 0
302 S 253 St / 42 Ave S Reith Rd - 43 Ave S 12, 5, 6 0 0 0 900 0 0 0 0 0 0 0 0 1800 0 120 0 0
303 Russel Rd S S 228 St - S 212 St 6, 1 0 0 0 1110 0 0 0 0 0 0 0 0 15050 0 0 0 0
304 54 Ave S S 228 St - north end of lines 6 0 0 0 0 3840 0 0 0 0 0 0 0 0 0 0 0 0
305 S 226 St 54 Ave S - 64 Ave S 6 0 0 0 2745 0 0 0 0 0 0 0 0 0 0 0 0 0
306 Lakeside Blvd E S 228 St - S 232 Pl 6 0 0 0 0 0 0 0 0 105 0 0 0 395 120 0 0 0
307 S 232 Pl Lakeside Blvd E - S 234 Pl 6 0 0 0 0 0 0 0 0 0 0 0 0 1710 0 0 0 0
308 53 Pl S S 234 Pl - 54 Pl S 6 0 0 0 0 0 0 0 0 0 0 0 0 2940 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 9 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
309 Lakeside Blvd W 54 Pl S - Lakeside Blvd E 6 0 0 0 0 0 0 0 0 0 0 0 0 3630 0 0 0 0
311 Lakeside Blvd E S 236 St - S 232 Pl 6 0 0 0 0 0 0 0 0 0 0 0 0 3890 0 0 0 0
313 Veterans Dr Military Rd - 54 Ave S 5, 6 0 7090 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Single solid yellow line on each side
of barrier and planter.
316 S 228 St 64 Ave S - 68 Ave S 6, 7 0 0 0 315 0 0 2380 0 575 0 0 0 0 0 0 0 0 Y
317 S 228 St 68 Ave S - 72 Ave S 7 0 0 0 480 430 0 160 0 280 0 0 0 0 0 0 0 0 Y
320 S 228 St / 83 Ave S / S 224 St 2 Ave N - 84 Ave S 7 0 0 0 0 0 0 5600 0 140 0 0 0 0 0 0 0 0 Paint over white Type 1 RPM skip
lines.
321 72 Ave S / 70 Ave S S 228 St - S 220 St 7 0 0 0 820 0 0 5140 0 0 0 0 0 0 0 0 0 0 Paint over white Type 1 RPM lines.
322 76 Ave S S 228 St - S 212 St 7, 2 0 0 0 3000 6000 0 0 0 285 0 0 0 1835 0 0 0 0
322 76 Ave S S 228 St - S 212 St 7, 2 0 0 0 3000 6000 0 0 0 285 0 0 0 1835 0 0 0 0
322 76 Ave S S 228 St - S 212 St 7, 2 0 0 0 3000 6000 0 0 0 285 0 0 0 1835 0 0 0 0
322 76 Ave S S 228 St - S 212 St 7, 2 0 0 0 3000 6000 0 0 0 285 0 0 0 1835 0 0 0 0
322 76 Ave S S 228 St - S 212 St 7, 2 0 0 0 3000 6000 0 0 0 285 0 0 0 1835 0 0 0 0
323 S 218 St 84 Ave S - 88 Pl S 7 0 0 0 1285 0 0 0 0 0 0 0 0 0 0 0 0 0
324 S 228 St Central Ave N - 88 Ave S 7 0 0 0 1080 0 0 0 0 75 0 0 0 1760 0 0 0 0
325 S 228 St 88 Ave S - 90 Way S (to end of
lines)7 0 0 0 40 0 0 0 0 0 0 0 0 1340 0 0 0 0
326 72 Ave S S 196 St - S 190 St 2 0 0 0 280 3620 0 660 0 270 0 0 0 0 0 0 0 0 Y
327 72 Ave S S 190 St - S 188 St 2 0 0 0 0 1350 0 0 0 0 0 0 0 0 0 0 0 0 Y
328 72 Ave S S 188 St - S 182 St 2 0 0 0 300 2840 0 0 0 0 0 0 0 0 0 0 0 0 Y
329 72 Ave S S 182 St - S 180 St 2 0 0 0 735 0 0 1245 0 225 0 0 0 0 0 0 0 0
330 S 181 St / 71 Ave S W Valley Hwy - S 180 St 2 0 0 0 390 0 0 0 0 0 0 0 0 0 0 0 0 0
333 S 208 St 84 Ave S - 96 Ave S 2, 3 0 0 0 3940 0 0 0 0 160 0 0 0 7880 0 0 0 0
334 SE 216 St 116 Ave SE - 117 Ave SE 9 0 0 0 155 0 0 0 0 0 0 0 0 490 0 0 0 0
335 140 Ave SE / SE 260 St SE 256 St - 144 Ave SE 16 0 0 0 2500 0 0 0 0 0 0 0 0 5000 0 0 0 0
336 135 Ave SE SR 516 (Kent-Kangley Road) -
SE 272 St 15 0 0 0 95 0 0 0 0 0 0 0 0 0 0 0 0 0
337 SE 270 Pl SR 516 (Kent-Kangley Road) -
north end of lines 16 0 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0
338 150 Pl SE SR 516 (Kent-Kangley Road) -
SE 271 Pl 16 0 0 0 125 0 0 0 0 0 0 0 0 0 0 0 0 0
339 68 Ave S S 277 St - S 262 St 13 0 0 0 5060 0 0 0 0 0 0 0 0 9650 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 10 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
340 68 Ave S S 262 St - Frager Rd 13, 19 0 0 0 2765 0 0 0 0 0 0 0 0 5540 0 0 0 0
341 68 Ave S Frager Rd - S 251 St 13, 7, 19 0 0 0 940 0 0 0 0 0 0 0 0 2000 0 0 0 0
346 W James St Washington Ave N - RJC Kent
CMNS 7, 19 0 0 0 0 0 0 3695 0 290 1260 350 0 0 0 0 0 0 Paint over white Type 1 RPM skip
lines.Y
347 W James St RJC Kent CMNS - 4 Ave N 7, 19 0 0 0 0 0 0 730 0 105 720 280 0 0 0 0 0 0 Paint over Type 1 RPM skip lines Y
348 W James St 4 Ave N - Central Ave N 7, 19 0 0 0 0 0 0 2850 0 420 720 440 0 0 0 0 0 0 Paint over Type 1 RPM skip lines
357 Central Ave S Central Ave Bridge mid span - S
266 St 12 0 0 0 485 840 0 1450 0 0 0 0 0 0 0 0 0 0
363 Central Ave S E Willis St - E Titus St 7, 19 0 0 0 700 0 0 1280 0 0 0 0 0 0 0 0 0 0
364 Central Ave S E Titus St - E Gowe St 7, 19 0 0 0 140 390 0 680 0 80 0 0 0 0 0 0 0 0
365 Central Ave S E Gowe St - E Meeker St 7, 19 0 0 0 165 0 0 340 0 75 0 0 0 0 0 0 0 0
366 Central Ave N E Meeker St - E Smith St 7, 19 0 0 0 510 0 0 1030 0 215 0 0 0 0 0 0 0 0
367 S 266 St / Maple Ln / Alder Ln Central Ave S - Central Ave S 13 0 0 0 2640 0 0 0 0 0 0 0 0 165 0 0 0 0
368 79 Ave S / S 261 St / 80 Ave S 470' N of S 266th St - S 259 St 13 0 0 0 1500 0 0 0 0 0 0 0 0 4000 0 0 0 0
368 S 266 St Central Ave S -UPRR Overpass 13 0 0 0 700 0 0 0 0 0 0 0 0 1400 0 0 0 0
369 1 Ave S S 259 St - W Willis St 13, 7, 19 0 0 0 2750 0 0 0 0 0 0 0 0 265 0 0 0 0
370 1 Ave S W Willis St - W Saar St 7, 19 0 0 0 250 0 0 0 0 0 0 0 0 0 0 0 0 0
371 1 Ave S W Saar St - W Titus St 7, 19 0 0 0 365 0 0 0 0 0 0 0 0 0 0 0 0 0
372 1 Ave S W Titus St - W Gowe St 7, 19 0 0 0 355 0 0 0 0 0 0 0 0 0 0 0 0 0
373 1 Ave S W Gowe St - W Meeker St 7, 19 0 0 0 175 0 0 0 0 0 0 0 0 0 0 0 0 0
374 1 Ave N W Meeker St - north end of lines 7, 19 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0
375 3 Ave S S 259 St - W Crow St 13, 7, 19 0 0 0 2330 0 0 0 0 0 0 0 0 170 0 0 0 0
377 3 Ave S W Willis St - W Saar St 7, 19 0 0 0 210 0 0 0 0 0 0 0 0 0 0 0 0 0
378 3 Ave S W Saar St - E Titus St 7, 19 0 0 0 360 0 0 0 0 0 0 0 0 0 0 0 0 0
379 2 Ave S W Crow St - W Willis St 7, 19 0 0 0 375 0 0 0 0 0 0 0 0 0 0 0 0 0
380 2 Ave S W Willis St - W Saar St 7, 19 0 0 0 240 0 0 0 0 0 0 0 0 0 0 0 0 0
381 2 Ave S W Saar St - W Titus St 7, 19 0 0 0 370 0 0 0 0 0 0 0 0 0 0 0 0 0
382 2 Ave S W Titus St - W Gowe St 7, 19 0 0 0 355 0 0 0 0 0 0 0 0 0 0 0 0 0
383 2 Ave S W Gowe St - W Meeker St 7, 19 0 0 0 175 0 0 0 0 0 0 0 0 0 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 11 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
384 2 Ave N W Meeker St - W Harrison St 7, 19 0 0 0 180 0 0 0 0 0 0 0 0 0 0 0 0 0
385 Bridges Ave S E Russell St - E Willis St 7, 19 0 0 0 400 0 0 0 0 0 0 0 0 0 0 0 0 0
386 Railroad Ave S E Willis St - E Saar St 7, 19 0 0 0 255 0 0 0 0 0 0 0 0 0 0 0 0 0
387 Railroad Ave S E Saar St - E Titus St 7, 19 0 0 0 360 0 0 0 0 0 0 0 0 0 0 0 0 0
388 Railroad Ave S E Titus St - E Gowe St 7, 19 0 0 0 355 0 0 0 0 0 0 0 0 0 0 0 0 0
389 Railroad Ave S E Gowe St - E Meeker St 7, 19 0 0 0 170 0 0 0 0 0 0 0 0 0 0 0 0 0
390 Railroad Ave N E Meeker St - E Smith St 7, 19 0 0 0 520 0 0 0 0 0 0 0 0 0 0 0 0 0
392 Railroad Ave N Pioneer St - E James St 7, 19 0 0 0 345 0 0 0 0 0 0 0 0 0 0 0 0 0 Paint over white Type 1 RPM lines.
393 E Saar St Railroad Ave S - Central Ave S 7, 19 0 0 0 300 0 0 0 0 0 0 0 0 0 0 0 0 0
395 W Willis St 3 Ave S - 2 Ave S 7, 19 0 0 0 250 0 0 500 0 0 0 0 0 0 0 0 0 0
396 W Willis St 2 Ave S - 1 Ave S 7, 19 0 0 0 280 0 0 720 0 0 0 0 0 0 0 0 0 0
397 W Willis St 1 Ave S - Railroad Ave S 7, 19 0 0 0 50 0 0 520 0 0 0 0 0 0 0 0 0 0
398 W Willis St Railroad Ave S - Central Ave S 7, 19 0 0 0 310 0 0 845 0 0 0 0 0 0 0 0 0 105
399 W Saar St 1 Ave S - 2 Ave S 7, 19 0 0 0 260 0 0 0 0 0 0 0 0 0 0 0 0 0
400 W Saar St 2 Ave S - 3 Ave S 7, 19 0 0 0 250 0 0 0 0 0 0 0 0 0 0 0 0 0
401 W Saar St 3 Ave S - 4 Ave S 7, 19 0 0 0 250 0 0 0 0 0 0 0 0 0 0 0 0 0
402 W Saar St 4 Ave S - 5 Ave S 7, 19 0 0 0 240 0 0 0 0 0 0 0 0 0 0 0 0 0
403 5 Ave S W Saar St - W Titus St 7, 19 0 0 0 360 0 0 0 0 0 0 0 0 0 0 0 0 0
404 5 Ave S W Titus St - W Gowe St 7, 19 0 0 0 355 0 0 0 0 0 0 0 0 0 0 0 0 0
405 W Gowe St 1 Ave S - 2 Ave S 7, 19 0 0 0 280 0 0 0 0 0 0 0 0 0 0 0 0 0
406 W Gowe St 2 Ave S - 4 Ave S 7, 19 0 0 0 575 0 0 0 0 0 0 0 0 0 0 0 0 0
407 W Gowe St 4 Ave S - 5 Ave S 7, 19 0 0 0 260 0 0 0 0 0 0 0 0 0 0 0 0 0
408 W Gowe St / 6 Ave S 5 Ave S - W Meeker St 7, 19 0 0 0 630 0 0 0 0 0 0 0 0 0 0 0 0 0
409 6 Ave S W Meeker St - W Harrison St 7, 19 0 0 0 190 0 0 0 0 0 0 0 0 0 0 0 0 0
410 6 Ave S W Harrison St - W Smith St 7, 19 0 0 0 290 0 0 0 0 0 0 0 0 0 0 0 0 0
411 W Harrison St 2 Ave N - 4 Ave N 7, 19 0 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0
412 W Harrison St 4 Ave N - 6 Ave N 7, 19 0 0 0 535 0 0 0 0 0 0 0 0 0 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 12 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
414 E Titus St Reiten Rd S - Kennebeck Ave S 7, 19 0 0 0 0 0 0 0 0 0 0 0 0 450 0 0 0 0
415 E Titus St Kennebeck Ave S - Central Ave
S 7, 19 0 0 0 575 0 0 0 0 0 0 0 0 0 0 0 0 0
417 E Titus St Railroad Ave S - 1 Ave S 7, 19 0 0 0 30 0 0 0 0 0 0 0 0 100 0 0 0 0
418 W Titus St 1 Ave S - 2 Ave S 7, 19 0 0 0 250 0 0 0 0 0 0 0 0 0 0 0 0 0
419 W Titus St 2 Ave S - 3 Ave S 7, 19 0 0 0 255 0 0 0 0 0 0 0 0 0 0 0 0 0
420 W Titus St 3 Ave S - 4 Ave S 7, 19 0 0 0 255 0 0 0 0 0 0 0 0 0 0 0 0 0
421 Kennebeck Ave N E Smith St - E Ward St 7, 19 0 0 0 230 0 0 0 0 0 0 0 0 0 0 0 0 0
422 Kennebeck Ave N E Ward St - E Meeker St 7, 19 0 0 0 255 0 0 0 0 0 0 0 0 0 0 0 0 0
423 Kennebeck Ave S E Meeker St - E Gowe St 7, 19 0 0 0 180 0 0 0 0 0 0 0 0 0 0 0 0 0
424 Kennebeck Ave S E Gowe St - E Titus St 7, 19 0 0 0 125 0 0 0 0 0 0 0 0 0 0 0 0 0
425 Kennbeck Ave S / E Guiberson
St E Titus St - Van De Vanter Ave 7, 19 0 0 0 1450 0 0 0 0 0 0 0 0 0 0 0 0 0
426 E Ward St Kennebeck Ave N - State Ave N 7, 19 0 0 0 335 0 0 0 0 0 0 0 0 0 0 0 0 0
427 Pioneer St Railroad Ave N - Central Ave N 7, 19 0 0 0 220 0 0 0 0 60 0 0 0 0 0 0 0 0
428 Pioneer St Central Ave N - State Ave N 7, 19 0 0 0 250 0 0 0 0 0 0 0 0 0 0 0 0 0
429 State Ave N Pioneer St - E Smith St 7, 19 0 0 0 430 0 0 0 0 0 0 0 0 0 0 0 0 0
430 State Ave N E Smith St - E Ward St 7, 19 0 0 0 225 0 0 0 0 0 0 0 0 0 0 0 0 0
431 State Ave N E Ward St - E Meeker St 7, 19 0 0 0 235 0 0 0 0 0 0 0 0 0 0 0 0 0
432 State Ave N E Meeker St - E Gowe St 7, 19 0 0 0 165 0 0 0 0 0 0 0 0 0 0 0 0 0
433 State Ave N E Gowe St - E Titus St 7, 19 0 0 0 180 0 0 0 0 0 0 0 0 0 0 0 0 0 Paint over Type 1 RPM lines.
434 Kenosia Ave / Kensington Ave S
/ E Dean St E Titus St - Van De Vanter Ave 7, 19 0 0 0 1215 0 0 0 0 0 0 0 0 0 0 0 0 0
435 S 259 St Central Ave S - 1 Ave S 13 0 0 0 735 0 0 0 0 0 0 0 0 1450 0 0 0 0
436 S 259 St 1 Ave S - 3 Ave S 13 0 0 0 630 0 0 0 0 0 0 0 0 1040 0 0 0 0
439 S 259 St Central Ave S - east end of lines 13 0 0 0 2015 0 0 0 0 0 0 0 0 3625 0 0 0 0
440 E George St Central Ave N - State Ave N 7, 19 0 0 0 240 0 0 0 0 0 0 0 0 0 0 0 0 0
441 E George St State Ave N - Woodford Ave N 7, 19 0 0 0 220 0 0 0 0 0 0 0 0 0 0 0 0 0
442 State Ave N E James St - E George St 7, 19 0 0 0 375 0 0 0 0 0 0 0 0 0 0 0 0 0
443 Woodford Ave N E James St - E George St 7, 19 0 0 0 370 0 0 0 0 0 0 0 0 0 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 13 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
444 Woodford Ave N E George St - north end of lines 7, 19 0 0 0 270 0 0 0 0 0 0 0 0 0 0 0 0 0
445 E Smith St E Canyon Dr - Alvord Ave N 7, 19 0 0 0 335 0 0 0 0 0 0 0 0 680 0 0 0 0
446 E Smith St / Summit Ave N Alvord Ave N - S 240 St 7, 8 0 0 0 2065 0 0 0 0 0 0 0 0 4140 0 0 0 0
449 S 188 St 80 Ave S - west end of lines 2 0 0 0 1375 0 0 0 0 0 0 0 0 0 0 0 0 0
450 S 190 St 80 Ave S - west end of lines 2 0 0 0 2005 0 0 0 0 0 0 0 0 0 0 0 0 0
452 80 Ave S S 190 St - S 188 St 2 0 0 0 575 0 0 1150 0 0 0 0 0 0 0 0 0 0
453 80 Ave S S 188 St - S 184 St 2 0 0 0 865 1240 0 2530 0 0 0 0 0 0 0 0 0 0
454 80 Ave S S 184 St - S 182 St 2 0 0 0 1140 0 0 1280 0 0 0 0 0 0 0 0 0 0
455 80 Ave S S 182 St - S 180 St 2 0 0 0 670 0 0 930 0 420 0 0 0 0 0 0 0 0
456 80 Ave S S 200 St - S 206 St 2 0 0 0 1900 0 0 0 0 0 0 0 0 0 0 0 0 0
457 S 200 St 84 Ave S - 80 Ave S 2 0 0 0 1230 0 0 0 0 0 0 0 0 0 0 0 0 0
458 S 200 St 80 Ave S - west end of lines 2 0 0 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0
459 81 Ave S S 200 St - S 196 St 2 0 0 0 1115 0 0 0 0 0 0 0 0 55 0 0 0 0
460 80 Pl S 80 Ave S - 84 Ave S 2 0 0 0 3210 0 0 0 0 135 0 0 0 7310 0 0 0 0
461 S 192 St 84 Ave S - 80 Ave S 2 0 0 0 1255 0 0 2510 0 0 0 0 0 0 0 0 0 0
462 S 192 St 80 Ave S - west end of lines 2 0 0 0 550 0 0 0 0 0 0 0 0 0 0 0 0 0
463 S 192 St 84 Ave S - east end of lines 2 0 0 0 425 0 0 0 0 0 0 0 0 425 0 0 0 0
464 S 194 St 84 Ave S - west end of lines 2 0 0 0 1735 0 0 0 0 0 0 0 0 0 0 0 0 0
465 92 Ave S S 208 St - S 204 Pl 3 0 0 0 1125 0 0 0 0 0 0 0 0 2250 0 0 0 0
466 92 Ave S S 204 Pl - S 202 St 3 0 0 0 820 0 0 0 0 0 0 0 0 1640 0 0 0 0
467 92 Ave S S 202 St - Talbot Rd S 3 0 0 0 1415 0 0 0 0 0 0 0 0 2830 0 0 0 0
468 S 200 St Talbot Rd S - 98 Ave S 3 0 0 0 1185 0 0 0 0 0 0 0 0 2370 0 0 0 0
469 S 200 St 98 Ave S - 102 Pl SE 3 0 0 0 1330 0 0 0 0 0 0 0 0 2660 0 0 0 0
470 S 200 St 102 Pl SE - 108 Ave SE 3 0 0 0 1910 0 0 0 0 105 0 0 0 3480 0 0 0 0
471 S 202 St 92 Ave S - 94 Pl S 3 0 0 0 0 0 0 0 0 0 0 0 0 700 0 0 0 0
472 100 Ave SE SE 216 St - S 213 St 8, 3 0 0 0 885 0 0 0 0 0 0 0 0 885 0 0 0 0
473 100 Ave SE S 213 St - S 210 Pl 3 0 0 0 835 0 0 0 0 0 0 0 0 930 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 14 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
474 100 Ave SE S 210 Pl - SE 208 St 3 0 0 0 740 0 0 0 0 0 0 0 0 1480 0 0 0 0
475 SE 213 Pl 100 Ave SE - 103 Pl SE 3 0 0 0 0 0 0 0 0 0 0 0 0 1115 0 0 0 0
476 103 Pl SE SE 213 Pl - SE 216 St 8, 3 0 0 0 0 0 0 0 0 0 0 0 0 750 0 0 0 0
477 S 216 St 98 Ave S - 100 Ave SE 8 0 0 0 662 0 0 0 0 0 0 0 0 1184 0 0 0 0
478 SE 216 St 100 Ave SE - 103 Pl SE 8 0 0 0 1105 0 0 0 0 0 0 0 0 2210 0 0 0 0
479 SE 216 St 103 Pl SE - 105 Pl SE 8 0 0 0 585 0 0 0 0 0 0 0 0 1170 0 0 0 0
480 SE 216 St 105 Pl SE - 108 Ave SE 8 0 0 0 860 0 0 0 0 80 0 0 0 1905 0 0 0 0
481 98 Ave S S 216 St - 95 Pl S 8 0 0 0 535 0 0 0 0 0 0 0 0 2730 0 0 0 0
482 S 218 St 95 Pl S - 94 Pl S 8 0 0 0 0 0 0 0 0 0 0 0 0 600 0 0 0 0
484 88 Ave S S 218 St - S 228 St 7, 8 0 0 0 0 0 0 0 0 0 0 0 0 6870 0 0 0 0
485 88 Ave S S 228 St - S 236 Pl 7, 19 0 0 0 2755 0 0 0 0 0 0 0 0 2600 0 0 0 0
486 88 Ave S S 180 St - south end of lines 2 0 0 0 140 0 0 0 0 0 0 0 0 0 0 0 0 0
487 77 Ave S S 212 St - S 206 St 2 0 0 0 360 3120 0 0 0 195 0 0 0 0 0 0 0 0 Paint over Type 1 RPM lines.
488 77 Ave S S 206 St - S 202 St 2 0 0 0 235 2060 0 0 0 125 0 0 0 0 0 0 0 0
489 77 Ave S S 202 St - north end of lines 2 0 0 0 1985 0 0 120 0 0 0 0 0 0 0 0 0 0
490 120 Ave SE SE 248 St - SE 244 St 9 0 0 0 1665 0 0 0 0 125 0 0 0 2145 0 0 0 0 Paint over Type 1 RPM lines.
491 120 Ave SE SE 244 St - SE 240 St 9 0 0 0 1725 0 0 0 0 110 0 0 0 2090 0 0 0 0
492 120 Ave SE SE 240 St - SE 236 St 9 0 0 0 1425 0 0 0 0 110 0 0 0 1245 0 0 0 0
493 120 Ave SE SE 236 St - SE 234 St 9 0 0 0 575 0 0 0 0 0 0 0 0 670 0 0 0 0
494 SE 234 St 116 Ave SE - 120 Ave SE 9 0 0 0 1175 0 0 0 0 0 0 0 0 2530 0 0 0 0
495 SE 236 St 120 Ave SE - SE 234 St 9 0 0 0 1155 0 0 0 0 0 0 0 0 2900 0 0 0 0
496 SE 244 St 120 Ave SE - 119 Pl SE 9 0 0 0 120 0 0 0 0 55 0 0 0 0 0 0 0 0
497 140 Ave SE SE 240 St - SE 238 St 10 0 0 0 525 0 0 0 0 0 0 0 0 0 0 0 0 0
498 SE 240 St 116 Ave SE - 120 Ave SE 9 0 0 0 505 1430 0 2440 0 215 0 0 0 2440 0 0 0 0
499 SE 240 St 120 Ave SE - 132 Ave SE 9 0 0 0 510 6720 0 7710 0 210 0 0 0 7360 0 0 0 0
500 SE 240 St 132 Ave SE - 140 Ave SE 9, 10 0 0 0 1280 3370 0 1130 0 255 0 0 0 4835 0 0 0 0 Paint over Type 1 RPM lines.
501 SE 240 St 140 Ave SE - 148 Ave SE 10 0 0 0 3090 0 0 0 0 0 0 0 0 5680 0 225 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 15 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
502 148 Ave SE SE 240 St - SE 244 St 10 0 0 0 670 0 0 0 0 0 0 0 0 1340 0 0 0 0
503 148 Ave SE SE 244 St - 146 Ave SE 10 0 0 0 1830 0 0 0 0 0 0 0 0 3660 0 0 0 0
504 148 Ave SE 146 Ave SE - SE 256 St 16, 10 0 0 0 2300 0 0 0 0 0 0 0 0 4600 0 0 0 0
505 124 Ave SE SR 516 (Kent-Kangley Road) -
SE 264 Ct 15 0 0 0 535 0 0 0 0 70 0 0 0 830 0 0 0 0 Paint over Type 1 RPM lines.Y
506 124 Ave SE SE 264 Ct - SE 264 St 15 0 0 0 450 0 0 0 0 0 0 0 0 450 0 0 0 0 Y
507 124 Ave SE SE 264 St - SE 263 St 15 0 0 0 390 0 0 0 0 55 0 0 0 520 0 0 0 0
508 124 Ave SE SE 263 St - SE 261 ST 15 0 0 0 520 0 0 0 0 0 0 0 0 1050 0 0 0 0 Paint over Type 1 RPM lines.
509 124 Ave SE SE 261 ST - SE 260 Pl 15 0 0 0 175 0 0 0 0 0 0 0 0 350 0 0 0 0 Paint over Type 1 RPM lines.
510 124 Ave SE SE 260 Pl - SE 259 St 15 0 0 0 670 0 0 0 0 0 0 0 0 880 0 0 0 0 Paint over Type 1 RPM lines.
511 124 Ave SE SE 259 St - SE 258 Pl 15 0 0 0 180 0 0 0 0 0 0 0 0 0 0 0 0 0
512 124 Ave SE SE 258 Pl - SE 258 St 15 0 0 0 280 0 0 0 0 0 0 0 0 0 0 0 0 0
513 124 Ave SE SE 258 St - SE 256 St 15 0 0 0 300 600 0 0 0 225 0 0 0 860 0 0 0 0
514 124 Ave SE SE 256 St - SE 248 St 15, 9 0 0 0 2650 0 0 0 0 95 0 0 0 5080 0 0 0 0
515 124 Ave SE SR 516 (Kent-Kangley Road) -
SE 270 St 15, 17 0 0 0 1585 0 0 0 0 155 0 0 0 2220 0 0 0 0 Paint over Type 1 RPM lines.
516 124 Ave SE SE 270 St - SE 274 St 15, 17 0 0 0 1445 0 0 0 0 105 0 0 0 2480 0 0 0 0
517 124 Ave SE SE 274 St - SE 277 Pl 15, 17 0 0 0 1100 0 0 0 0 0 0 0 0 2230 0 0 0 0
518 124 Ave SE SE 277 Pl - SE 278 Pl 15, 17 0 0 0 325 0 0 0 0 105 0 0 0 340 0 0 0 0
519 124 Ave SE SE 278 Pl - SE 280 St 15, 17 0 0 0 480 0 0 0 0 0 0 0 0 390 0 0 0 0
520 124 Ave SE SE 280 St - SE 282 St 15, 17 0 0 0 650 0 0 0 0 0 0 0 0 1300 0 0 0 0
521 SE 282 St 124 Ave SE - 128 Ct SE 15, 17 0 0 0 1305 0 0 0 0 0 0 0 0 260 0 0 0 0
522 120 Ave SE / SE 277 Pl / 118
Ave SE
SE 276 St - south City Limits
(past SE 280 St)15, 17 0 0 0 2040 0 0 0 0 0 0 0 0 3305 0 0 0 0
523 144 Ave SE SE 256 St - SE 260 St 16 0 0 0 1185 0 0 0 0 0 0 0 0 2370 0 0 0 0
524 144 Ave SE / SE 263 St SE 260 St - 147 Ave SE 16 0 0 0 1800 0 0 0 0 155 0 0 0 3450 0 150 0 0 Wide lane lines for painted island
525 SE 263 St / 148 Ave SE 147 Ave S - SE 267 St 16 0 0 0 1680 0 0 0 0 0 0 0 0 3360 0 0 0 0
526 148 Ave SE / 152 Way SE SE 267 St - SR 516 (Kent-
Kangley Road)16 0 0 0 2545 0 0 0 0 195 0 0 0 3660 0 0 0 0
527 152 Ave SE SR 516 (Kent-Kangley Road) -
SE 275 St 16 0 0 0 1030 0 0 0 0 215 0 0 0 1220 0 0 0 0
528 152 Ave SE SE 275 St - SE 276 Pl 16 0 0 0 565 0 0 0 0 85 0 0 0 810 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 16 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
529 152 Ave SE SE 276 St - SE 278 St 16 0 0 0 525 0 0 0 0 145 0 0 0 665 0 0 0 0
530 152 Ave SE SE 278 St - SE 280 St 16 0 0 0 1085 0 0 0 0 115 0 0 0 1260 0 0 0 0
531 152 Ave SE SE 280 St - SE 282 St 16 0 0 0 1360 0 0 0 0 100 0 0 0 1600 0 0 0 0
532 SE 280 St 152 Ave SE - SR 516 (Kent-
Kangley Road)16 0 0 0 3720 0 0 0 0 0 0 0 0 7100 0 0 0 0
533 SE 282 St 144 Ave SE - 132 Ave SE 15, 16, 17 0 0 0 0 0 0 0 0 90 0 0 0 5815 0 0 0 0
534 144 Ave SE SR 516 (Kent-Kangley Road) -
SE 275 Pl 16 0 0 0 1110 0 0 0 0 160 0 0 0 2220 0 0 0 0
535 144 Ave SE SE 275 Pl - SE 276 Pl 16 0 0 0 240 0 0 0 0 0 0 0 0 480 0 0 0 0
536 144 Ave SE SE 276 Pl - SE 278 St 16 0 0 0 475 0 0 0 0 0 0 0 0 660 0 0 0 0
537 144 Ave SE SE 278 St - SE 282 St 16 0 0 0 0 0 0 0 0 0 0 0 0 1335 0 0 0 0
538 144 Ave SE SE 282 St - SE 283 Pl 16 0 0 0 0 0 0 0 0 0 0 0 0 460 0 0 0 0
539 144 Ave SE SE 283 Pl - SE 285 Pl 16 0 0 0 0 0 0 0 0 0 0 0 0 1000 0 0 0 0
540 144 Ave SE SE 285 Pl - SE 287 St 16 0 0 0 0 0 0 0 0 0 0 0 0 425 0 0 0 0
541 144 Ave SE SE 287 St - SE 288 St 16 0 0 0 0 0 0 0 0 0 0 0 0 320 0 0 0 0
542 SE 270 St 124 Ave SE - 116 Ave SE 15, 17 0 0 0 2370 0 0 0 0 105 0 0 0 2220 0 0 0 0
543 SE 264 St 124 Ave SE - 126 Pl SE 15 0 0 0 0 0 0 0 0 0 0 0 0 740 0 0 0 0
544 127 Ave SE SR 516 (Kent-Kangley Road) -
SE 268 St 15 0 0 0 85 0 0 0 0 0 0 0 0 0 0 0 0 0
545 114 Ave SE SR 516 (Kent-Kangley Road) -
SE 272 Pl 14, 17 0 0 0 3255 0 0 0 0 0 0 0 0 0 0 0 0 0
546 SE 264 St 114 Ave SE - west end of lines 14 0 0 0 210 0 0 0 0 0 0 0 0 0 0 0 0 0
547 111 Ave SE SR 516 (Kent-Kangley Road) -
SE 264 St 14 0 0 0 620 0 0 0 0 0 0 0 0 620 0 0 0 0
548 108 Ave SE SE 260 St - SE 264 St 14 0 0 0 0 0 0 0 0 0 0 0 0 2520 0 0 0 0 Y
549 108 Ave SE SE 264 St - SE 272 St 14 0 0 0 2660 0 0 0 0 0 0 0 0 5320 0 0 0 0
550 108 Ave SE SE 272 St - SE 280 St 14 0 0 0 1865 0 0 0 0 0 0 0 0 3425 0 0 0 0
551 SE 260 St SR 515 / 104 Ave SE / 108 Ave
SE / Benson Rd - 108 Ave SE 14 0 0 0 0 0 0 0 0 280 0 0 0 0 0 0 0 0
552 SE 272 St 108 Ave SE - 104 Ave SE 14 0 0 0 1230 0 60 0 0 185 0 0 0 2460 0 75 0 0
553 104 Ave SE SE 272 St - SE 264 St 14 0 0 0 2020 0 0 0 0 100 0 0 0 4240 0 0 0 0
554 100 Pl SE SE 260 St - 104 Ave SE 14 0 0 0 1925 0 0 0 0 0 0 0 0 2930 0 0 0 0
555 SE 264 St 104 Ave SE - 108 Ave SE 14 0 0 0 625 0 0 0 0 45 0 0 0 1720 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 17 of 18 1/19/2021 7:45 AM
APPENDIX B
2021 Painting Locations and Estimated Quantities
Map
Key Street Name Location Desc Pages Skip
Yellow
Single
Solid
Yellow
Wide
Solid
Line
Yellow
Double
Solid
Yellow
TWLTL
Yellow
Intersection
Extension
Line
Yellow
Skip
Lane
Line
White
Single
Solid
Whie
Gore
Line
White
Bike
Lane
Line
White
Wide
Dotted
Bike
Lane
Line
White
Wide
Dotted
Lane
Line
White
Edge
Line
White
Dotted
Lane
Line
White
Dotted
Edge
Line
White
Bus
White
Intersection
Extension
Line
Notes
Coordinate
Painting w/
Paving Work
Yellow Lane Markings (ln-ft)White Lane Markings (ln-ft)
563 S 250 St 20 Ave S - 24 Pl S 5 0 0 0 0 0 0 0 0 0 1590 0 0 0 0 0 0 0
564 S 252 St Pacific Hwy S - 25 Ave S 5 0 0 0 535 0 0 0 0 0 0 0 0 850 0 0 0 0
567 S 272 St Pacific Hwy S - 26 Ave S 11 0 0 0 2665 0 0 4490 0 565 0 0 0 0 0 0 0 0
568 S 272 St 26 Ave S - NB I-5 Ramp 11 0 0 0 670 0 0 2210 0 210 0 0 0 0 0 0 0 0
570 S 260 St Pacific Hwy S - 25 Ave S 11 0 0 0 385 260 0 0 0 0 0 0 0 0 0 0 0 0
571 S 260 St 25 Ave S - 27 Pl S 11 0 0 0 870 0 0 0 0 0 0 0 0 0 0 0 0 0
572 S 260 St 27 Pl S - 29 Ave S 11 0 0 0 340 0 0 0 0 0 0 0 0 0 0 0 0 0
573 S 260 St 29 Ave S - 30 Ave S 11 0 0 0 225 0 0 0 0 0 0 0 0 0 0 0 0 0
574 S 260 St 30 Ave S - 33 Ave S 11 0 0 0 1235 0 0 0 0 0 0 0 0 0 0 0 0 0
575 S 260 St 33 Ave S - 34 Ave S 11 0 0 0 215 0 0 0 0 0 0 0 0 0 0 0 0 0
576 S 260 St 34 Ave S - Military Road S 11 0 0 0 475 0 0 450 0 0 0 0 0 0 0 0 0 0
577 S Reith Rd Military Road S - 38 Ave S 11 0 0 0 450 0 0 0 0 0 0 0 0 1100 0 0 0 0
578 S Reith Rd 38 Ave S - 42 Ave S 11 0 0 0 0 0 0 0 0 0 0 0 0 1390 0 0 0 0
579 S Reith Rd 42 Ave S - S 253 St / 44 Ave S 11, 12 0 0 0 0 0 0 0 0 0 0 0 0 3740 0 0 0 0
581 S Reith Rd Lake Fenwick Rd S - SR 516
(Kent-Des Moines Road)6 0 0 0 0 0 0 0 0 0 0 0 0 1455 0 0 0 0
582 S 268 St Military Road S - 40 Ave S 11 0 0 0 1925 0 0 0 0 0 0 0 0 3850 0 0 0 0
585 Lake Fenwick Rd S S Reith Rd - 45 Pl S 6 0 0 0 1045 0 0 0 0 0 0 0 0 2090 0 0 0 0
586 Military Road S S 272 St - S 268 St 11 0 0 0 1870 0 0 0 0 310 0 0 0 1960 0 0 0 0 Y
587 Military Road S S 268 St - S 264 St 11 0 0 0 1290 0 0 0 0 0 0 0 0 2580 0 0 0 0 Y
588 Military Road S S 264 St - S Reith Rd 11 0 0 0 2430 0 0 0 0 155 0 0 0 2620 0 0 0 0 Y
589 Military Road S S Reith Rd - S 250 St 11, 5 0 0 0 2965 0 0 0 0 165 0 0 0 5450 0 0 0 0 Y
590 Military Road S S 250 St - S 244 St 5 0 0 0 1915 0 0 0 0 0 0 0 0 3830 0 0 0 0
591 Military Road S S 244 St - SR 516 (Kent-Des
Moines Road)5 0 0 0 2060 0 0 0 0 165 0 0 0 5000 0 0 0 0
592 Military Road S SR 516 (Kent-Des Moines
Road) - Veterans Dr 5 0 0 0 0 0 0 0 0 250 0 0 0 2490 0 0 0 0
593 Military Road S Veterans Dr - S 229 Pl 5 0 0 0 305 0 0 0 0 0 0 0 0 1380 0 0 0 0
594 72 Ave S / S 262 St S 277 St - Interurban Trail
Crosswalk 13 1550 0 0 3350 0 0 0 0 0 0 0 0 10965 0 0 0 0
P:\Public\PROJECTS\_In Design\21-3011.1 2021 Paint Line and RPM Refresh\60 Design\60.8 Estimating\2021_Paint_Line_List Updated.xlsx 18 of 18 1/19/2021 7:45 AM
2021 Paint Line Striping & RPM/Araucto A - 3 January 25, 2021
Project Number: 21-3011.1
TRAFFIC CONTROL PLANS
2019 PAINT PROJECT
2019 PAINT PROJECT
2021 Paint Line Striping & RPM/Araucto A - 4 January 25, 2021
Project Number: 21-3011.1
PREVAILING WAGE RATES
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe
benefits. On public works projects, worker's wage and benefit rates must add to not less than this
total. A brief description of overtime calculation requirements are provided on the Benefit Code
Key.
Journey Level Prevailing Wage Rates for the Effective Date: 02/09/2021
County_
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
Trade
Asbestos Abatement Workers
Boilermakers
Brick Mason
Brick Mason
Building Service Employees
Building Service Employees
Building Service Employees
Building Service Employees
Cabinet Makers (In Shop).
Carpenters
Carpenters
Carpenters
Carpenters
Carpenters
Carpenters
Carpenters
Cement Masons
King Cement Masons
King Cement Masons
King Cement Masons
King
King
King
King
King
King
King
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Job Classification
Journey Level
Journey Level
Journey Level
Pointer -Caulker -Cleaner
Janitor
Traveling Waxer/Shampooer
Window Cleaner (Non -Scaffold)
Window Cleaner (Scaffold)
Journey Level
Acoustical Worker
Carpenter
Carpenters on Stationary Tools
Creosoted Material
Floor Finisher
Floor Layer
Scaffold Erector
Application of all Composition
Mastic
Application of all Epoxy
Material
Application of all Plastic
Material
Application of Sealing
Compound
Application of Underlayment
Building General
Composition or Kalman Floors
Concrete Paving
Curb Et Gutter Machine
Curb Et Gutter, Sidewalks
Curing Concrete
Wage Holiday Overtime Note
$52.39
$69.29
$60.57
$60.57
$26.28
$26.63
$29.33
$30.33
$22.74
$64.94
$64.94
$65.07
$65.07
$64.94
$64.94
$64.94
$64.84
5D
5N
7E
7E
5S
5S
5S
5S
7A
7A
7A
7A
7A
7A
7A
7A
$64.34 7A
$64.84 7A
$64.34 7A
1H
1C
1N
1N
2F
2F
2F
2F
1
4C
4C
4C
4C
4C
4C
4C
4U
*Risk
Class
View
View
View
View
View
View
View
View
View
View
View
View
View
View
View
View
View
4U
View
4U
View
4U
View
$64.84
7A
41J
View
$64.34
7A
41J
View
$64.84
7A
41J
View
$64.34
7A
41J
View
$64.84
7A
41J
View
$64.34
7A
41J
View
$64.34
7A
41J
View
King
King
King
King
King
King
King
King
King
King
King
King
King
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
Cement Masons
King
Cement
Masons
King
Cement
Masons
King
Cement
Masons
King
Cement
Masons
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
King
Cement Masons
Divers Et Tenders
Divers Et Tenders
Divers Et Tenders
Divers Et Tenders
Divers Et Tenders
Divers Et Tenders
Divers Et Tenders
Divers Et Tenders
Divers Et Tenders
Dredge Workers
Dredge Workers
Dredge Workers
Dredge Workers
Dredge Workers
Dredge Workers
Dredge Workers
Drywall Applicator
Drywall Tapers
Electrical Fixture Maintenance
Workers
Electricians - Inside
Electricians - Inside
Electricians - Inside
Finish Colored Concrete
Floor Grinding
Floor Grinding/Polisher
Green Concrete Saw, self -
powered
Grouting of all Plates
Grouting of all Tilt -up Panels
Gunite Nozzleman
Hand Powered Grinder
Journey Level
Patching Concrete
Pneumatic Power Tools
Power Chipping Et Brushing
Sand Blasting Architectural
Finish
Screed Et Rodding Machine
Spackling or Skim Coat
Concrete
Troweling Machine Operator
Troweling Machine Operator on
Colored Slabs
Tunnel Workers
Bell/Vehicle or Submersible
Operator (Not Under Pressure)
Dive Supervisor/Master
Diver
Diver On Standby
Diver Tender
Manifold Operator
Manifold Operator Mixed Gas
Remote Operated Vehicle
Operator/Technician
Remote Operated Vehicle
Tender
Assistant Engineer
Assistant Mate (Deckhand)
Boatmen
Engineer Welder
Leverman, Hydraulic
Mates
Oiler
Journey Level
Journey Level
Journey Level
$64.84 7A 4U View
$64.84 7A 4U View
$64.34 7A 4U View
$64.84 7A 4U View
$64.34
7A
4U
View
$64.34
7A
4U
View
$64.84
7A
4U
View
$64.84
7A
4U
View
$64.34
7A
4U
View
$64.34
7A
4U
View
$64.84
7A
4U
View
$64.84
7A
4U
View
$64.84
7A
4U
View
$64.84 7A 4U View
$64.34 7A 4U View
$64.84 7A 4U View
$64.84 7A 4U View
$64.84 7A 4U View
$118.80 7A 4C View
$81.98
7A
4C
View
$118.80
7A
4C
8V View
$76.98
7A
4C
View
$69.91
7A
4C
View
$69.91
7A
4C
View
$74.91
7A
4C
View
$69.91
7A
4C
View
$65.19 7A 4C View
$70.62
5D
3F
View
$70.07
5D
3F
View
$70.62
5D
3F
View
$71.97
5D
3F
View
$73.41
5D
3F
View
$70.62
5D
3F
View
$70.07
5D
3F
View
$64.94
5D
1 H
View
$65.31
5P
1 E
View
$31.99
5L
1 E
View
Cable Splicer $89.11 7C 4E View
Cable Splicer (tunnel) $95.77 7C 4E View
Certified Welder $86.08 7C 4E View
King
Electricians - Inside
Certified Welder (tunnel)
$92.44
7C
4E
View
King
Electricians - Inside
Construction Stock Person
$43.18
7C
4E
View
King
Electricians - Inside
Journey Level
$83.05
7C
4E
View
King
Electricians - Inside
Journey Level (tunnel)
$89.11
7C
4E
View
King
Electricians - Motor Shop
Journey Level
$47.53
5A
1 B
View
King
Electricians - Powerline
Cable Splicer
$82.39
5A
4D
View
Construction
King
Electricians - Powerline
Certified Line Welder
$75.64
5A
4D
View
Construction
King
Electricians - Powerline
Groundperson
$49.17
5A
4D
View
Construction
King
Electricians - Powerline
Heavy Line Equipment
$75.64
5A
4D
View
Construction
Operator
King
Electricians - Powerline
Journey Level Lineperson
$75.64
5A
4D
View
Construction
King
Electricians - Powerline
Line Equipment Operator
$64.54
5A
4D
View
Construction
King
Electricians - Powerline
Meter Installer
$49.17
5A
4D
8W
View
Construction
King
Electricians - Powerline
Pole Sprayer
$75.64
5A
4D
View
Construction
King
Electricians - Powerline
Powderperson
$56.49
5A
4D
View
Construction
King
Electronic Technicians
Journey Level
$53.57
7E
1 E
View
King
Elevator Constructors
Mechanic
$97.31
7D
4A
View
King
Elevator Constructors
Mechanic In Charge
$105.06
7D
4A
View
King
Fabricated Precast Concrete
All Classifications - In -Factory
$18.25
5B
1 R
View
Products
Work Only
King
Fence Erectors
Fence Erector
$44.40
7A
4V
8Y
View
King
Fence Erectors
Fence Laborer
$44.40
7A
4V
8Y
View
King
Flaggers
Journey Level
$44.40
7A
4V
8Y
View
King
Glaziers
Journey Level
$69.26
7L
1Y
View
King
Heat Et Frost Insulators And
Journeyman
$79.43
5J
4H
View
Asbestos Workers
King
Heating Equipment Mechanics
Journey Level
$89.61
7F
1 E
View
King
Hod Carriers Et Mason Tenders
Journey Level
$54.01
7A
4V
8Y
View
King
Industrial Power Vacuum
Journey Level
$13.69
1
View
Cleaner
King
Inland Boatmen
Boat Operator
$61.41
5B
1 K
View
King
Inland Boatmen
Cook
$56.48
5B
1 K
View
King
Inland Boatmen
Deckhand
$57.48
5B
1 K
View
King
Inland Boatmen
Deckhand Engineer
$58.81
5B
1 K
View
King
Inland Boatmen
Launch Operator
$58.89
5B
1 K
View
King
Inland Boatmen
Mate
$57.31
5B
1 K
View
King
Inspection/Cleaning/Sealing Of
Cleaner Operator, Foamer
$31.49
1
View
Sewer Et Water Systems By
Operator
Remote Control
King
Inspection/Cleaning/Sealing Of
Grout Truck Operator
$13.69
1
View
Sewer Et Water Systems By
Remote Control
King
Inspection/Cleaning/Sealing Of
Head Operator
$24.91
1
View
Sewer Et Water Systems By
Remote Control
King
Inspection/Cleaning/Sealing Of
Technician
$19.33
1
View
Sewer Et Water Systems By
Remote Control
King
Inspection/Cleaning/Sealing Of
Tv Truck Operator
$20.45
1
View
Sewer Et Water Systems By
Remote Control
King
Insulation Applicators
Journey Level
$64.94
7A
4C
T
View
King
Ironworkers
Journeyman
$75.23
7N
10
View
King
Laborers
Air, Gas Or Electric Vibrating
$52.39
7A
4V
8Y
View
Screed
King
Laborers
Airtrac Drill Operator
$54.01
7A
4V
8Y
View
King
Laborers
Ballast Regular Machine
$52.39
7A
4V
8Y
View
King
Laborers
Batch Weighman
$44.40
7A
4V
8Y
View
King
Laborers
Brick Pavers
$52.39
7A
4V
8Y
View
King
Laborers
Brush Cutter
$52.39
7A
4V
8Y
View
King
Laborers
Brush Hog Feeder
$52.39
7A
4V
8Y
View
King
Laborers
Burner
$52.39
7A
4V
8Y
View
King
Laborers
Caisson Worker
$54.01
7A
4V
8Y
View
King
Laborers
Carpenter Tender
$52.39
7A
4V
8Y
View
King
Laborers
Cement Dumper -paving
$53.35
7A
4V
8Y
View
King
Laborers
Cement Finisher Tender
$52.39
7A
4V
8Y
View
King
Laborers
Change House Or Dry Shack
$52.39
7A
4V
8Y
View
King
Laborers
Chipping Gun (30 Lbs. And
$53.35
7A
4V
8Y
View
Over)
King
Laborers
Chipping Gun (Under 30 Lbs.)
$52.39
7A
4V
8Y
View
King
Laborers
Choker Setter
$52.39
7A
4V
8Y
View
King
Laborers
Chuck Tender
$52.39
7A
4V
8Y
View
King
Laborers
Clary Power Spreader
$53.35
7A
4V
8Y
View
King
Laborers
Clean-up Laborer
$52.39
7A
4V
8Y
View
King
Laborers
Concrete Dumper/Chute
$53.35
7A
4V
8Y
View
Operator
King
Laborers
Concrete Form Stripper
$52.39
7A
4V
8Y
View
King
Laborers
Concrete Placement Crew
$53.35
7A
4V
8Y
View
King
Laborers
Concrete Saw Operator/Core
$53.35
7A
4V
8Y
View
Driller
King
Laborers
Crusher Feeder
$44.40
7A
4V
8Y
View
King
Laborers
Curing Laborer
$52.39
7A
4V
8Y
View
King
Laborers
Demolition: Wrecking Et Moving
$52.39
7A
4V
8Y
View
(Incl. Charred Material)
King
Laborers
Ditch Digger
$52.39
7A
4V
8Y
View
King
Laborers
Diver
$54.01
7A
4V
8Y
View
King
Laborers
Drill Operator (Hydraulic,
$53.35
7A
4V
8Y
View
Diamond)
King
Laborers
Dry Stack Walls
$52.39
7A
4V
8Y
View
King
Laborers
Dump Person
$52.39
7A
4V
8Y
View
King
Laborers
Epoxy Technician
$52.39
7A
4V
8Y
View
King
Laborers
Erosion Control Worker
$52.39
7A
4V
8Y
View
King
Laborers
Faller Et Bucker Chain Saw
$53.35
7A
4V
8Y
View
King
Laborers
Fine Graders
$52.39
7A
4V
8Y
View
King
Laborers
Firewatch
$44.40
7A
4V
8Y
View
King
Laborers
Form Setter
$52.39
7A
4V
8Y
View
King
Laborers
Gabian Basket Builders
$52.39
7A
4V
8Y
View
King
Laborers
General Laborer
$52.39
7A
4V
8Y
View
King
Laborers
Grade Checker Et Transit Person
$54.01
7A
4V
8Y
View
King
Laborers
Grinders
$52.39
7A
4V
8Y
View
King
Laborers
Grout Machine Tender
$52.39
7A
4V
8Y
View
King
Laborers
Groutmen (Pressure) Including
$53.35
7A
4V
8Y
View
Post Tension Beams
King
Laborers
Guardrail Erector
$52.39
7A
4V
8Y
View
King
Laborers
Hazardous Waste Worker (Level
$54.01
7A
4V
8Y
View
A)
King
Laborers
Hazardous Waste Worker (Level
$53.35
7A
4V
8Y
View
B)
King
Laborers
Hazardous Waste Worker (Level
$52.39
7A
4V
8Y
View
C)
King
Laborers
High Scaler
$54.01
7A
4V
8Y
View
King
Laborers
Jackhammer
$53.35
7A
4V
8Y
View
King
Laborers
Laserbeam Operator
$53.35
7A
4V
8Y
View
King
Laborers
Maintenance Person
$52.39
7A
4V
8Y
View
King
Laborers
Manhole Builder-Mudman
$53.35
7A
4V
8Y
View
King
Laborers
Material Yard Person
$52.39
7A
4V
8Y
View
King
Laborers
Motorman -Dinky Locomotive
$53.35
7A
4V
8Y
View
King
Laborers
Nozzleman (Concrete Pump,
$53.35
7A
4V
8Y
View
Green Cutter When Using
Combination Of High Pressure
Air Et Water On Concrete Et
Rock, Sandblast, Gunite,
Shotcrete, Water Blaster,
Vacuum Blaster)
King
Laborers
Pavement Breaker
$53.35
7A
4V
8Y
View
King
Laborers
Pilot Car
$44.40
7A
4V
8Y
View
King
Laborers
Pipe Layer Lead
$54.01
7A
4V
8Y
View
King
Laborers
Pipe Layer/Tailor
$53.35
7A
4V
8Y
View
King
Laborers
Pipe Pot Tender
$53.35
7A
4V
8Y
View
King
Laborers
Pipe Reliner
$53.35
7A
4V
8Y
View
King
Laborers
Pipe Wrapper
$53.35
7A
4V
8Y
View
King
Laborers
Pot Tender
$52.39
7A
4V
8Y
View
King
Laborers
Powderman
$54.01
7A
4V
8Y
View
King
Laborers
Powderman's Helper
$52.39
7A
4V
8Y
View
King
Laborers
Power Jacks
$53.35
7A
4V
8Y
View
King
Laborers
Railroad Spike Puller - Power
$53.35
7A
4V
8Y
View
King
Laborers
Raker - Asphalt
$54.01
7A
4V
8Y
View
King
Laborers
Re-timberman
$54.01
7A
4V
8Y
View
King
Laborers
Remote Equipment Operator
$53.35
7A
4V
8Y
View
King
Laborers
Rigger/Signal Person
$53.35
7A
4V
8Y
View
King
Laborers
Rip Rap Person
$52.39
7A
4V
8Y
View
King
Laborers
Rivet Buster
$53.35
7A
4V
8Y
View
King
Laborers
Rodder
$53.35
7A
4V
8Y
View
King
Laborers
Scaffold Erector
$52.39
7A
4V
8Y
View
King
Laborers
Scale Person
$52.39
7A
4V
8Y
View
King
Laborers
Sloper (Over 20")
$53.35
7A
4V
8Y
View
King
Laborers
Sloper Sprayer
$52.39
7A
4V
8Y
View
King
Laborers
Spreader (Concrete)
$53.35
7A
4V
8Y
View
King
Laborers
Stake Hopper
$52.39
7A
4V
8Y
View
King
Laborers
Stock Piler
$52.39
7A
4V
8Y
View
King
Laborers
Swinging Stage/Boatswain
$44.40
7A
4V
8Y
View
Chair
King
Laborers
Tamper Et Similar Electric, Air
$53.35
7A
4V
8Y
View
Et Gas Operated Tools
King
Laborers
Tamper (Multiple Et Self-
$53.35
7A
4V
8Y
View
propelled)
King
Laborers
Timber Person - Sewer (Lagger,
$53.35
7A
4V
8Y
View
Shorer Et Cribber)
King
Laborers
Toolroom Person (at Jobsite)
$52.39
7A
4V
8Y
View
King
Laborers
Topper
$52.39
7A
4V
8Y
View
King
Laborers
Track Laborer
$52.39
7A
4V
8Y
View
King
Laborers
Track Liner (Power)
$53.35
7A
4V
8Y
View
King
Laborers
Traffic Control Laborer
$47.48
7A
4V
9C
View
King
Laborers
Traffic Control Supervisor
$50.31
7A
4V
9C
View
King
Laborers
Truck Spotter
$52.39
7A
4V
8Y
View
King
Laborers
Tugger Operator
$53.35
7A
4V
8Y
View
King
Laborers
Tunnel Work -Compressed Air
$129.67
7A
4V
9B
View
Worker 0-30 psi
King
Laborers
Tunnel Work -Compressed Air
$134.70
7A
4V
9B
View
Worker 30.01-44.00 psi
King
Laborers
Tunnel Work -Compressed Air
$138.38
7A
4V
9B
View
Worker 44.01-54.00 psi
King
Laborers
Tunnel Work -Compressed Air
$144.08
7A
4V
9B
View
Worker 54.01-60.00 psi
King
Laborers
Tunnel Work -Compressed Air
$146.20
7A
4V
9B
View
Worker 60.01-64.00 psi
King
Laborers
Tunnel Work -Compressed Air
$151.30
7A
4V
9B
View
Worker 64.01-68.00 psi
King
Laborers
Tunnel Work -Compressed Air
$153.20
7A
4V
9B
View
Worker 68.01-70.00 psi
King
Laborers
Tunnel Work -Compressed Air
$155.20
7A
4V
9B
View
Worker 70.01-72.00 psi
King
Laborers
Tunnel Work -Compressed Air
$157.20
7A
4V
9B
View
Worker 72.01-74.00 psi
King
Laborers
Tunnel Work-Guage and Lock
$54.11
7A
4V
8Y
View
Tender
King
Laborers
Tunnel Work -Miner
$54.11
7A
4V
8Y
View
King
Laborers
Vibrator
$53.35
7A
4V
8Y
View
King
Laborers
Vinyl Seamer
$52.39
7A
4V
8Y
View
King
Laborers
Watchman
$40.36
7A
4V
8Y
View
King
Laborers
Welder
$53.35
7A
4V
8Y
View
King
Laborers
Well Point Laborer
$53.35
7A
4V
8Y
View
King
Laborers
Window Washer/Cleaner
$40.36
7A
4V
8Y
View
King
Laborers - Underground Sewer
General Laborer Et Topman
$52.39
7A
4V
8Y
View
Et Water
King
Laborers - Underground Sewer
Pipe Layer
$53.35
7A
4V
8Y
View
Et Water
King
Landscape Construction
Landscape
$40.36
7A
4V
8Y
View
Construction/Landscaping Or
Planting Laborers
King
Landscape Construction
Landscape Operator
$72.28
7A
3K
8X
View
King
Landscape Maintenance
Groundskeeper
$17.87
1
View
King
Lathers
Journey Level
$64.94
5D
1 H
View
King
Marble Setters
Journey Level
$60.57
7E
1 N
View
King
Metal Fabrication (In Shop).
Journey Level
$40.08
1
View
King
Millwright
Journey Level
$66.44
7A
4C
View
King
Modular Buildings
Cabinet Assembly
$13.69
1
View
King
Modular Buildings
Electrician
$13.69
1
View
King
Modular Buildings
Equipment Maintenance
$13.69
1
View
King
Modular Buildings
Plumber
$13.69
1
View
King
Modular Buildings
Production Worker
$13.69
1
View
King
Modular Buildings
Tool Maintenance
$13.69
1
View
King
Modular Buildings
Utility Person
$13.69
1
View
King
Modular Buildings
Welder
$13.69
1
View
King
Painters
Journey Level
$45.40
6Z
2B
View
King
Pile Driver
Crew Tender
$69.91
7A
4C
View
King
Pile Driver
Crew Tender/Technician
$69.91
7A
4C
View
King
Pile Driver
Hyperbaric Worker -
$80.76
7A
4C
View
Compressed Air Worker 0-30.00
PSI
King
Pile Driver
Hyperbaric Worker -
$85.76
7A
4C
View
Compressed Air Worker 30.01
44.00 PSI
King
Pile Driver
Hyperbaric Worker -
$89.76
7A
4C
View
Compressed Air Worker 44.01 -
54.00 PSI
King
Pile Driver
Hyperbaric Worker -
$94.76
7A
4C
View
Compressed Air Worker 54.01
60.00 PSI
King
Pile Driver
Hyperbaric Worker -
$97.26
7A
4C
View
Compressed Air Worker 60.01 -
64.00 PSI
King
Pile Driver
Hyperbaric Worker -
$102.26
7A
4C
View
Compressed Air Worker 64.01
68.00 PSI
King
Pile Driver
Hyperbaric Worker -
$104.26
7A
4C
View
Compressed Air Worker 68.01
70.00 PSI
King
Pile Driver
Hyperbaric Worker -
$106.26
7A
4C
View
Compressed Air Worker 70.01 -
72.00 PSI
King
Pile Driver
Hyperbaric Worker -
$108.26
7A
4C
View
Compressed Air Worker 72.01
74.00 PSI
King
Pile Driver
Journey Level
$65.19
7A
4C
View
King
Plasterers
Journey Level
$61.67
M
1 R
View
King
Playground Et Park Equipment
Journey Level
$13.69
1
View
Installers
King
Plumbers & Pipefitters
Journey Level
$90.69
6Z
1G
View
King
Power Equipment Operators
Asphalt Plant Operators
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Assistant Engineer
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Barrier Machine (zipper)
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Batch Plant Operator: concrete
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Bobcat
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Brokk - Remote Demolition
$69.12
7A
3K
8X
View
Equipment
King
Power Equipment Operators
Brooms
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Bump Cutter
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Cableways
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Chipper
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Compressor
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Concrete Finish Machine -
$69.12
7A
3K
8X
View
Laser Screed
King
Power Equipment Operators
Concrete Pump - Mounted Or
$72.28
7A
3K
8X
View
Trailer High Pressure Line
Pump, Pump High Pressure
King
Power Equipment Operators
Concrete Pump: Truck Mount
$73.49
7A
3K
8X
View
With Boom Attachment Over 42
M
King
Power Equipment Operators
Concrete Pump: Truck Mount
$72.84
7A
3K
8X
View
With Boom Attachment Up To
42m
King
Power Equipment Operators
Conveyors
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Cranes friction: 200 tons and
$75.72
7A
3K
8X
View
over
King
Power Equipment Operators
Cranes: 100 tons through 199
$74.22
7A
3K
8X
View
tons, or 150' of boom
(including jib with
attachments)
King
Power Equipment Operators
Cranes: 20 Tons Through 44
$72.84
7A
3K
8X
View
Tons With Attachments
King
Power Equipment Operators
Cranes: 200 tons- 299 tons, or
$74.99
7A
3K
8X
View
250' of boom including jib with
attachments
King
Power Equipment Operators
Cranes: 300 tons and over or
$75.72
7A
3K
8X
View
300' of boom including jib with
attachments
King
Power Equipment Operators
Cranes: 45 Tons Through 99
$73.49
7A
3K
8X
View
Tons, Under 150' Of Boom
(including Jib With
Attachments)
King
Power Equipment Operators
Cranes: A -frame - 10 Tons And
$69.12
7A
3K
8X
View
Under
King
Power Equipment Operators
Cranes: Friction cranes through
$74.99
7A
3K
8X
View
199 tons
King
Power Equipment Operators
Cranes: through 19 tons with
$72.28
7A
3K
8X
View
attachments, A -frame over 10
tons
King
Power Equipment Operators
Crusher
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Deck Engineer/Deck Winches
$72.84
7A
3K
8X
View
(power)
King
Power Equipment Operators
Derricks, On Building Work
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Dozers D-9 Ft Under
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Drill Oilers: Auger Type, Truck
$72.28
7A
3K
8X
View
Or Crane Mount
King
Power Equipment Operators
Drilling Machine
$74.22
7A
3K
8X
View
King
Power Equipment Operators
Elevator And Man -lift:
$69.12
7A
3K
8X
View
Permanent And Shaft Type
King
Power Equipment Operators
Finishing Machine, Bidwell And
$72.84
7A
3K
8X
View
Gamaco Et Similar Equipment
King
Power Equipment Operators
Forklift: 3000 Lbs And Over
$72.28
7A
3K
8X
View
With Attachments
King
Power Equipment Operators
Forklifts: Under 3000 Lbs. With
$69.12
7A
3K
8X
View
Attachments
King
Power Equipment Operators
Grade Engineer: Using Blue
$72.84
7A
3K
8X
View
Prints, Cut Sheets, Etc
King
Power Equipment Operators
Gradechecker/Stakeman
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Guardrail Punch
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Hard Tail End Dump
$73.49
7A
3K
8X
View
Articulating Off- Road
Equipment 45 Yards. &t Over
King
Power Equipment Operators
Hard Tail End Dump
$72.84
7A
3K
8X
View
Articulating Off -road
Equipment Under 45 Yards
King
Power Equipment Operators
Horizontal/Directional Drill
$72.28
7A
3K
8X
View
Locator
King
Power Equipment Operators
Horizontal/Directional Drill
$72.84
7A
3K
8X
View
Operator
King
Power Equipment Operators
Hydralifts/Boom Trucks Over
$72.28
7A
3K
8X
View
10 Tons
King
Power Equipment Operators
Hydralifts/Boom Trucks, 10
$69.12
7A
3K
8X
View
Tons And Under
King
Power Equipment Operators
Loader, Overhead 8 Yards. Ft
$74.22
7A
3K
8X
View
Over
King
Power Equipment Operators
Loader, Overhead, 6 Yards. But
$73.49
7A
3K
8X
View
Not Including 8 Yards
King
Power Equipment Operators
Loaders, Overhead Under 6
$72.84
7A
3K
8X
View
Yards
King
Power Equipment Operators
Loaders, Plant Feed
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Loaders: Elevating Type Belt
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Locomotives, All
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Material Transfer Device
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Mechanics, All (leadmen -
$74.22
7A
3K
8X
View
$0.50 Per Hour Over Mechanic)
King
Power Equipment Operators
Motor Patrol Graders
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Mucking Machine, Mole, Tunnel
$73.49
7A
3K
8X
View
Drill, Boring, Road Header
And/or Shield
King
Power Equipment Operators
Oil Distributors, Blower
$69.12
7A
3K
8X
View
Distribution E. Mulch Seeding
Operator
King
Power Equipment Operators
Outside Hoists (Elevators And
$72.28
7A
3K
8X
View
Manlifts), Air Tuggers, Strato
King
Power Equipment Operators
Overhead, Bridge Type Crane:
$72.84
7A
3K
8X
View
20 Tons Through 44 Tons
King
Power Equipment Operators
Overhead, Bridge Type: 100
$74.22
7A
3K
8X
View
Tons And Over
King
Power Equipment Operators
Overhead, Bridge Type: 45 Tons
$73.49
7A
3K
8X
View
Through 99 Tons
King
Power Equipment Operators
Pavement Breaker
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Pile Driver (other Than Crane
$72.84
7A
3K
8X
View
Mount)
King
Power Equipment Operators
Plant Oiler - Asphalt, Crusher
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Posthole Digger, Mechanical
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Power Plant
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Pumps - Water
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Quad 9, Hd 41, D10 And Over
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Quick Tower - No Cab, Under
$69.12
7A
3K
8X
View
100 Feet In Height Based To
Boom
King
Power Equipment Operators
Remote Control Operator On
$73.49
7A
3K
8X
View
Rubber Tired Earth Moving
Equipment
King
Power Equipment Operators
Rigger and Bellman
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Rigger/Signal Person, Bellman
$72.28
7A
3K
8X
View
(Certified)
King
Power Equipment Operators
Rollagon
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Roller, Other Than Plant Mix
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Roller, Plant Mix Or Multi -lift
$72.28
7A
3K
8X
View
Materials
King
Power Equipment Operators
Roto-mill, Roto-grinder
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Saws - Concrete
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Scraper, Self Propelled Under
$72.84
7A
3K
8X
View
45 Yards
King
Power Equipment Operators
Scrapers - Concrete Et Carry All
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Scrapers, Self-propelled: 45
$73.49
7A
3K
8X
View
Yards And Over
King
Power Equipment Operators
Service Engineers - Equipment
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Shotcrete/Gunite Equipment
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Shovel, Excavator, Backhoe,
$72.28
7A
3K
8X
View
Tractors Under 15 Metric Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoe:
$73.49
7A
3K
8X
View
Over 30 Metric Tons To 50
Metric Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoes,
$72.84
7A
3K
8X
View
Tractors: 15 To 30 Metric Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoes:
$74.22
7A
3K
8X
View
Over 50 Metric Tons To 90
Metric Tons
King
Power Equipment Operators
Shovel, Excavator, Backhoes:
$74.99
7A
3K
8X
View
Over 90 Metric Tons
King
Power Equipment Operators
Slipform Pavers
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Spreader, Topsider Et
$73.49
7A
3K
8X
View
Screedman
King
Power Equipment Operators
Subgrader Trimmer
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Tower Bucket Elevators
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Tower Crane Up To 175' In
$74.22
7A
3K
8X
View
Height Base To Boom
King
Power Equipment Operators
Tower Crane: over 175'
$74.99
7A
3K
8X
View
through 250' in height, base to
boom
King
Power Equipment Operators
Tower Cranes: over 250' in
$75.72
7A
3K
8X
View
height from base to boom
King
Power Equipment Operators
Transporters, All Track Or Truck
$73.49
7A
3K
8X
View
Type
King
Power Equipment Operators
Trenching Machines
$72.28
7A
3K
8X
View
King
Power Equipment Operators
Truck Crane Oiler/driver - 100
$72.84
7A
3K
8X
View
Tons And Over
King
Power Equipment Operators
Truck Crane Oiler/Driver Under
$72.28
7A
3K
8X
View
100 Tons
King
Power Equipment Operators
Truck Mount Portable Conveyor
$72.84
7A
3K
8X
View
King
Power Equipment Operators
Welder
$73.49
7A
3K
8X
View
King
Power Equipment Operators
Wheel Tractors, Farman Type
$69.12
7A
3K
8X
View
King
Power Equipment Operators
Yo Yo Pay Dozer
$72.84
7A
3K
8X
View
King
Power Equipment Operators-
Asphalt Plant Operators
$73.49
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Assistant Engineer
$69.12
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Barrier Machine (zipper)
$72.84
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Batch Plant Operator, Concrete
$72.84
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Bobcat
$69.12
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Brokk - Remote Demolition
$69.12
7A
3K
8X
View
Underground Sewer Et Water
Equipment
King
Power Equipment Operators-
Brooms
$69.12
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Bump Cutter
$72.84
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Cableways
$73.49
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Chipper
$72.84
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Compressor
$69.12
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Concrete Finish Machine -
$69.12
7A
3K
8X
View
Underground Sewer Et Water
Laser Screed
King
Power Equipment Operators-
Concrete Pump - Mounted Or
$72.28
7A 3K 8X View
Underground Sewer Et Water
Trailer High Pressure Line
Pump, Pump High Pressure
King
Power Equipment Operators-
Concrete Pump: Truck Mount
$73.49
7A 3K 8X View
Underground Sewer Et Water
With Boom Attachment Over 42
M
King
Power Equipment Operators-
Concrete Pump: Truck Mount
$72.84
7A 3K 8X View
Underground Sewer Et Water
With Boom Attachment Up To
42m
King
Power Equipment Operators-
Conveyors
$72.28
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Cranes friction: 200 tons and
$75.72
7A 3K 8X View
Underground Sewer Et Water
over
King
Power Equipment Operators-
Cranes: 100 tons through 199
$74.22
7A 3K 8X View
Underground Sewer Et Water
tons, or 150' of boom
(including jib with
attachments)
King
Power Equipment Operators-
Cranes: 20 Tons Through 44
$72.84
7A 3K 8X View
Underground Sewer Et Water
Tons With Attachments
King
Power Equipment Operators-
Cranes: 200 tons- 299 tons, or
$74.99
7A 3K 8X View
Underground Sewer Et Water
250' of boom including jib with
attachments
King
Power Equipment Operators-
Cranes: 300 tons and over or
$75.72
7A 3K 8X View
Underground Sewer Et Water
300' of boom including jib with
attachments
King
Power Equipment Operators-
Cranes: 45 Tons Through 99
$73.49
7A 3K 8X View
Underground Sewer Et Water
Tons, Under 150' Of Boom
(including Jib With
Attachments)
King
Power Equipment Operators-
Cranes: A -frame - 10 Tons And
$69.12
7A 3K 8X View
Underground Sewer Et Water
Under
King
Power Equipment Operators-
Cranes: Friction cranes through
$74.99
7A 3K 8X View
Underground Sewer Et Water
199 tons
King
Power Equipment Operators-
Cranes: through 19 tons with
$72.28
7A 3K 8X View
Underground Sewer Et Water
attachments, A -frame over 10
tons
King
Power Equipment Operators-
Crusher
$72.84
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Deck Engineer/Deck Winches
$72.84
7A 3K 8X View
Underground Sewer Et Water
(power)
King
Power Equipment Operators-
Derricks, On Building Work
$73.49
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Dozers D-9 Et Under
$72.28
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Drill Oilers: Auger Type, Truck
$72.28
7A 3K 8X View
Underground Sewer Et Water
Or Crane Mount
King
Power Equipment Operators-
Drilling Machine
$74.22
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Elevator And Man -lift:
$69.12
7A 3K 8X View
Underground Sewer Et Water
Permanent And Shaft Type
King
Power Equipment Operators-
Finishing Machine, Bidwell And
$72.84
7A 3K 8X View
Underground Sewer Et Water
Gamaco Et Similar Equipment
King
Power Equipment Operators-
Forklift: 3000 Lbs And Over
$72.28
7A 3K 8X View
Underground Sewer Et Water
With Attachments
King
Power Equipment Operators-
Forklifts: Under 3000 Lbs. With
$69.12
7A 3K 8X View
Underground Sewer Et Water
Attachments
King
Power Equipment Operators-
Grade Engineer: Using Blue
$72.84
7A 3K 8X View
Underground Sewer Et Water
Prints, Cut Sheets, Etc
King
Power Equipment Operators-
Gradechecker/Stakeman
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Guardrail Punch
$72.84
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Hard Tail End Dump
$73.49
7A 3K 8X View
Underground Sewer Et Water
Articulating Off- Road
Equipment 45 Yards. Et Over
King
Power Equipment Operators-
Hard Tail End Dump
$72.84
7A 3K 8X View
Underground Sewer Et Water
Articulating Off -road
Equipment Under 45 Yards
King
Power Equipment Operators-
Horizontal/Directional Drill
$72.28
7A 3K 8X View
Underground Sewer Et Water
Locator
King
Power Equipment Operators-
Horizontal/Directional Drill
$72.84
7A 3K 8X View
Underground Sewer Et Water
Operator
King
Power Equipment Operators-
Hydralifts/Boom Trucks Over
$72.28
7A 3K 8X View
Underground Sewer Et Water
10 Tons
King
Power Equipment Operators-
Hydralifts/Boom Trucks, 10
$69.12
7A 3K 8X View
Underground Sewer Et Water
Tons And Under
King
Power Equipment Operators-
Loader, Overhead 8 Yards. Et
$74.22
7A 3K 8X View
Underground Sewer Et Water
Over
King
Power Equipment Operators-
Loader, Overhead, 6 Yards. But
$73.49
7A 3K 8X View
Underground Sewer Et Water
Not Including 8 Yards
King
Power Equipment Operators-
Loaders, Overhead Under 6
$72.84
7A 3K 8X View
Underground Sewer Et Water
Yards
King
Power Equipment Operators-
Loaders, Plant Feed
$72.84
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Loaders: Elevating Type Belt
$72.28
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Locomotives, All
$72.84
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Material Transfer Device
$72.84
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Mechanics, All (leadmen -
$74.22
7A 3K 8X View
Underground Sewer Et Water
$0.50 Per Hour Over Mechanic)
King
Power Equipment Operators-
Motor Patrol Graders
$73.49
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Mucking Machine, Mole, Tunnel
$73.49
7A 3K 8X View
Underground Sewer Et Water
Drill, Boring, Road Header
And/or Shield
King
Power Equipment Operators-
Oil Distributors, Blower
$69.12
7A 3K 8X View
Underground Sewer Et Water
Distribution Et Mulch Seeding
I
Operator
King
Power Equipment Operators-
Outside Hoists (Elevators And
$72.28
7A 3K 8X View
Underground Sewer Et Water
Manlifts), Air Tuggers, Strato
King
Power Equipment Operators-
Overhead, Bridge Type Crane:
$72.84
7A 3K 8X View
Underground Sewer Et Water
20 Tons Through 44 Tons
King
Power Equipment Operators-
Overhead, Bridge Type: 100
$74.22
7A 3K 8X View
Underground Sewer Et Water
Tons And Over
King
Power Equipment Operators-
Overhead, Bridge Type: 45 Tons
$73.49
7A 3K 8X View
Underground Sewer Et Water
Through 99 Tons
King
Power Equipment Operators-
Pavement Breaker
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Pile Driver (other Than Crane
$72.84
7A 3K 8X View
Underground Sewer Et Water
Mount)
King
Power Equipment Operators-
Plant Oiler - Asphalt, Crusher
$72.28
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Posthole Digger, Mechanical
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Power Plant
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Pumps - Water
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Quad 9, Hd 41, D10 And Over
$73.49
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Quick Tower - No Cab, Under
$69.12
7A 3K 8X View
Underground Sewer Et Water
100 Feet In Height Based To
Boom
King
Power Equipment Operators-
Remote Control Operator On
$73.49
7A 3K 8X View
Underground Sewer Et Water
Rubber Tired Earth Moving
Equipment
King
Power Equipment Operators-
Rigger and Bellman
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Rigger/Signal Person, Bellman
$72.28
7A 3K 8X View
Underground Sewer Et Water
(Certified)
King
Power Equipment Operators-
Rollagon
$73.49
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Roller, Other Than Plant Mix
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Roller, Plant Mix Or Multi -lift
$72.28
7A 3K 8X View
Underground Sewer Et Water
Materials
King
Power Equipment Operators-
Roto-mill, Roto-grinder
$72.84
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Saws - Concrete
$72.28
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Scraper, Self Propelled Under
$72.84
7A 3K 8X View
Underground Sewer Et Water
45 Yards
King
Power Equipment Operators-
Scrapers - Concrete Et Carry All
$72.28
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Scrapers, Self-propelled: 45
$73.49
7A 3K 8X View
Underground Sewer Et Water
Yards And Over
King
Power Equipment Operators-
Service Engineers - Equipment
$72.28
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Shotcrete/Gunite Equipment
$69.12
7A 3K 8X View
Underground Sewer Et Water
King
Power Equipment Operators-
Shovel, Excavator, Backhoe,
$72.28
7A 3K 8X View
Underground Sewer Et Water
Tractors Under 15 Metric Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoe:
$73.49
7A 3K 8X View
Underground Sewer Et Water
Over 30 Metric Tons To 50
Metric Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoes,
$72.84
7A 3K 8X View
Underground Sewer Et Water
Tractors: 15 To 30 Metric Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoes:
$74.22
7A 3K 8X View
Underground Sewer Et Water
Over 50 Metric Tons To 90
Metric Tons
King
Power Equipment Operators-
Shovel, Excavator, Backhoes:
$74.99
7A
3K
8X
View
Underground Sewer Et Water
Over 90 Metric Tons
King
Power Equipment Operators-
Slipform Pavers
$73.49
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Spreader, Topsider Et
$73.49
7A
3K
8X
View
Underground Sewer Et Water
Screedman
King
Power Equipment Operators-
Subgrader Trimmer
$72.84
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Tower Bucket Elevators
$72.28
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Tower Crane Up To 175' In
$74.22
7A
3K
8X
View
Underground Sewer Et Water
Height Base To Boom
King
Power Equipment Operators-
Tower Crane: over 175'
$74.99
7A
3K
8X
View
Underground Sewer Et Water
through 250' in height, base to
boom
King
Power Equipment Operators-
Tower Cranes: over 250' in
$75.72
7A
3K
8X
View
Underground Sewer Et Water
height from base to boom
King
Power Equipment Operators-
Transporters, All Track Or Truck
$73.49
7A
3K
8X
View
Underground Sewer Et Water
Type
King
Power Equipment Operators-
Trenching Machines
$72.28
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Truck Crane Oiler/driver - 100
$72.84
7A
3K
8X
View
Underground Sewer Et Water
Tons And Over
King
Power Equipment Operators-
Truck Crane Oiler/Driver Under
$72.28
7A
3K
8X
View
Underground Sewer Et Water
100 Tons
King
Power Equipment Operators-
Truck Mount Portable Conveyor
$72.84
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Welder
$73.49
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Wheel Tractors, Farmall Type
$69.12
7A
3K
8X
View
Underground Sewer Et Water
King
Power Equipment Operators-
Yo Yo Pay Dozer
$72.84
7A
3K
8X
View
Underground Sewer Et Water
King
Power Line Clearance Tree
Journey Level In Charge
$53.10
5A
4A
View
Trimmers
King
Power Line Clearance Tree
Spray Person
$50.40
5A
4A
View
Trimmers
King
Power Line Clearance Tree
Tree Equipment Operator
$53.10
5A
4A
View
Trimmers
King
Power Line Clearance Tree
Tree Trimmer
$47.48
5A
4A
View
Trimmers
King
Power Line Clearance Tree
Tree Trimmer Groundperson
$36.10
5A
4A
View
Trimmers
King
Refrigeration Et Air
Journey Level
$85.51
6Z
1G
View
Conditioning Mechanics
King
Residential Brick Mason
Journey Level
$60.57
7E
1 N
View
King
Residential Carpenters
Journey Level
$36.44
1
View
King
Residential Cement Masons
Journey Level
$46.64
1
View
King
Residential Drywall Applicators
Journey Level
$64.94
7A
4C
View
King
Residential Drywall Tapers
Journey Level
$35.95
1
View
King
Residential Electricians
Journey Level
$83.05
7C
4E
View
King
Residential Glaziers
Journey Level
$27.62
1
View
King
Residential Insulation
Journey Level
$24.43
1
View
Applicators
King
Residential Laborers
Journey Level
$29.73
1
View
King
Residential Marble Setters
Journey Level
$15.12
1
View
King
Residential Painters
Journey Level
$23.37
1
View
King
Residential Plumbers Et
Journey Level
$90.69
6Z
1G
View
Pipefitters
King
Residential Refrigeration Et Air
Journey Level
$85.51
6Z
1G
View
Conditioning Mechanics
King
Residential Sheet Metal
Journey Level
$89.61
7F
1 E
View
Workers
King
Residential Soft Floor Layers
Journey Level
$15.12
1
View
King
Residential Sprinkler Fitters
Journey Level
$40.70
1
View
_(Fire Protection).
King
Residential Stone Masons
Journey Level
$15.12
1
View
King
Residential Terrazzo Workers
Journey Level
$55.71
7E
1 N
View
King
Residential Terrazzo/Tile
Journey Level
$24.39
1
View
Finishers
King
Residential Tile Setters
Journey Level
$21.04
1
View
King
Roofers
Journey Level
$55.55
5A
3H
View
King
Roofers
Using Irritable Bituminous
$58.55
5A
3H
View
Materials
King
Sheet Metal Workers
Journey Level (Field or Shop)
$89.61
7F
1 E
View
King
Shipbuilding Et Ship Repair
New Construction Boilermaker
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Carpenter
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Crane
$36.36
7V
1
View
Operator
King
Shipbuilding Et Ship Repair
New Construction Electrician
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Heat Et Frost
$79.43
5J
4H
View
Insulator
King
Shipbuilding Et Ship Repair
New Construction Laborer
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Machinist
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Operating
$36.36
7V
1
View
Engineer
King
Shipbuilding Et Ship Repair
New Construction Painter
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Pipefitter
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Rigger
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Sheet Metal
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction Shipfitter
$36.36
7V
1
View
King
Shipbuilding Et Ship Repair
New Construction
$36.36
7V
1
View
Warehouse/Teamster
King
Shipbuilding Et Ship Repair
New Construction Welder /
$36.36
7V
1
View
Burner
King
Shipbuilding Et Ship Repair
Ship Repair Boilermaker
$46.15
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Carpenter
$44.95
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Crane Operator
$45.06
7Y
4K
View
King
Shipbuilding Et Ship Repair
Ship Repair Electrician
$47.42
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Heat Et Frost
$79.43
5J
4H
I I View
Insulator
King
Shipbuilding Et Ship Repair
Ship Repair Laborer
$46.15
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Machinist
$46.15
7X
4.1
View
King
Shipbuilding Et Ship Repair
Ship Repair Operating Engineer
$45.06
7Y
4K
View
King
Shipbuilding Et Ship Repair
Ship Repair Painter
$46.15
7X
4.1
View
King
Shipbuilding Et Ship Repair
Ship Repair Pipefitter
$46.15
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Rigger
$46.15
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Sheet Metal
$46.15
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Shipwright
$44.95
7X
4J
View
King
Shipbuilding Et Ship Repair
Ship Repair Warehouse /
$45.06
7Y
4K
View
Teamster
King
Sign Makers Et Installers
Journey Level
$49.44
0
1
View
.(Electrical),
King
Sign Makers Et Installers (Non-
Journey Level
$31.96
0
1
View
Electrical).
King
Soft Floor Layers
Journey Level
$51.07
5A
3.
View
King
Solar Controls For Windows
Journey Level
$13.69
1
View
King
Sprinkler Fitters (Fire
Journey Level
$84.39
5C
1X
View
Protection)
King
Stage Rigging Mechanics (Non
Journey Level
$13.69
1
View
Structural)
King
Stone Masons
Journey Level
$60.57
7E
1 N
View
King
Street And Parking Lot Sweeper
Journey Level
$19.09
1
View
Workers
King
Surveyors
Assistant Construction Site
$72.28
7A
3K
8X View
Surveyor
King
Surveyors
Chainman
$69.12
7A
3K
8X View
King
Surveyors
Construction Site Surveyor
$73.49
7A
3K
8X View
King
Telecommunication Technicians
Journey Level
$53.57
7E
1 E
View
King
Telephone Line Construction -
Cable Splicer
$41.81
5A
2B
View
Outside
King
Telephone Line Construction -
Hole Digger/Ground Person
$23.53
5A
2B
View
Outside
King
Telephone Line Construction -
Installer (Repairer)
$40.09
5A
2B
View
Outside
King
Telephone Line Construction -
Special Aparatus Installer 1
$41.81
5A
2B
View
Outside
King
Telephone Line Construction -
Special Apparatus Installer II
$40.99
5A
2B
View
Outside
King
Telephone Line Construction -
Telephone Equipment Operator
$41.81
5A
2B
View
Outside
(Heavy)
King
Telephone Line Construction -
Telephone Equipment Operator
$38.92
5A
2B
View
Outside
(Light)
King
Telephone Line Construction -
Telephone Lineperson
$38.92
5A
2B
View
Outside
King
Telephone Line Construction -
Television Groundperson
$22.32
5A I
2B
View
Outside
King
Telephone Line Construction -
Television Lineperson/Installer
$29.60
5A
2B
View
Outside
King
Telephone Line Construction -
Television System Technician
$35.20
5A
2B
I View
Outside
King
Telephone Line Construction -
Television Technician
Outside
King
Telephone Line Construction -
Tree Trimmer
Outside
King
Terrazzo Workers
Journey Level
King
Tile Setters
Journey Level
King
Tile, Marble Et Terrazzo
Finisher
Finishers
King
Traffic Control Stripers
Journey Level
King
Truck Drivers
Asphalt Mix Over 16 Yards
King
Truck Drivers
Asphalt Mix To 16 Yards
King
Truck Drivers
Dump Truck
King
Truck Drivers
Dump Truck Et Trailer
King
Truck Drivers
Other Trucks
King
Truck Drivers - Ready Mix
Transit Mix
King
Well Drillers Et Irrigation Pump
Irrigation Pump Installer
Installers
King
Well Drillers Et Irrigation Pump
Oiler
Installers
King
Well Drillers Et Irrigation Pump
Well Driller
Installers
$31.67
5A
2B
View
$38.92
5A
2B
View
$55.71
7E
1 N
View
$55.71
7E
1 N
View
$46.54
7E
1 N
View
$49.13
7A
1 K
View
$64.55
5D
4Y
8L
View
$63.71
5D
4Y
8L
View
$63.71
5D
4Y
8L
View
$64.55
5D
4Y
8L
View
$64.55
5D
4Y
8L
View
$64.55
5D
4Y
8L
View
$17.71
1
View
$13.69 1 View
$18.00 1 View
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes
Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate
must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for
the worker.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage.
C. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage.
D. The first two (2) hours before or after a five -eight (8) hour workweek day or a four -ten (10) hour workweek day and
the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly
rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly
rate of wage.
E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
F. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day,
shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly
rate of wage.
G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four -
ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten
(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double
the hourly rate of wage.
H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment
breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through
Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate
of wage.
I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage.
The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid atone and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through
Saturday, Sundays and holidays shall be paid at double the hourly rate of wage.
K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours
worked on holidays shall be paid at double the hourly rate of wage.
M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid
at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double
the hourly rate of wage.
N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage.
All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
1
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes Continued
O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours
worked on Sundays, holidays and after twelve (12) hours, Monday through Friday and after ten (10) hours on Saturday
shall be paid at double the hourly rate of wage.
P. All hours worked on Saturdays (except makeup days if circumstances warrant) and Sundays shall be paid at one and
one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage.
Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on
Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall
be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times
the hourly rate of wage.
R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage.
S. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime
hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day
shall be paid at three times the hourly rate of wage.
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on
Labor Day shall be paid at three times the hourly rate of wage.
V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and
one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at
double the hourly rate of wage.
W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the
employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid
at double the hourly rate of wage.
X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday
through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on
Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the
holiday and all work performed shall be paid at double the hourly rate of wage.
Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any
employer and the employee) and all hours worked in excess of eight (8) hours per day (10 hours per day for a 4 x 10
workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate
of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the
workweek shall be paid at the straight -time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or
40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours
worked on Sundays and Labor Day shall be paid at double the hourly rate of wage.
Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All
hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay.
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes Continued
2. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage.
C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
holidays shall be paid at two times the hourly rate of wage.
F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday
pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of wage.
G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays
shall be paid at two and one-half times the hourly rate of wage including holiday pay.
H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall
be paid at one and one-half times the hourly rate of wage.
O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage.
R. All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double
the hourly rate of wage.
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage.
W. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four -day, ten-
hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall
be paid at double the hourly rate of wage. The first eight (8) hours worked on the fifth day shall be paid at one and
one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays
shall be paid at double the hourly rate of wage.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours
worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday
and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and
midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. The employer shall
have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given
to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked
eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such
time as the employee has had a break of eight (8) hours or more.
C. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage.
All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate
of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at
the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more.
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes Continued
E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week, once 40 hours of
straight time work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be paid
at double the hourly wage rate.
F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and
one-half times the hourly rate of wage including holiday pay.
H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at
two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be
compensated at one and one half (1-1/2) times the regular rate of pay.
All hours worked between the hours of 10:00 pm and 5:00 am, Monday through Friday, and all hours worked on
Saturdays shall be paid at a one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays
shall be paid at double the hourly rate of wage.
K. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal 5 am to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly
rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in
excess of twelve (12) hours in a single shift shall be paid at double the hourly rate of wage.
After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the
applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. When an employee
returns to work without at least eight (8) hours time off since their previous shift, all such time shall be a continuation
of shift and paid at the applicable overtime rate until he/she shall have the eight (8) hours rest period.
4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly
rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage.
B. All hours worked over twelve (12) hours per day and all hours worked on holidays shall be paid at double the hourly
rate of wage.
C. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be
paid at one and one half (1-1/2) times the straight time rate of pay, unless a four (4) day ten (10) hour workweek has
been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday
through Friday, the first two (2) hours of overtime after ten (10) hours of straight time work shall be paid at one and
one half (1-1/2) times the straight time rate of pay. On Saturday, the first twelve (12) hours of work shall be paid at
one and one half (1-1/2) times the straight time rate of pay, except that if the job is down on Monday through Friday
due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday
may be worked at the straight time rate of pay. All hours worked over twelve (12) hours in a day and all hours worked
on Sunday and Holidays shall be paid at two (2) times the straight time rate of pay.
4
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes Continued
4. D. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly
rate of wage. All hours worked on Saturday, Sundays and holidays shall be paid at double the hourly rate of pay. Rates
include all members of the assigned crew.
EXCEPTION:
On all multipole structures and steel transmission lines, switching stations, regulating, capacitor stations, generating
plants, industrial plants, associated installations and substations, except those substations whose primary function is
to feed a distribution system, will be paid overtime under the following rates:
The first two (2) hours after eight (8) regular hours Monday through Friday of overtime on a regular workday, shall
be paid at one and one-half times the hourly rate of wage. All hours in excess of ten (10) hours will be at two (2) times
the hourly rate of wage. The first eight (8) hours worked on Saturday will be paid at one and one-half (1-1/2) times
the hourly rate of wage. All hours worked in excess of eight (8) hours on Saturday, and all hours worked on Sundays
and holidays will be at the double the hourly rate of wage.
All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the
hourly rate of wage.
E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
On a four -day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours
worked after ten shall be paid at double the hourly rate of wage. The Monday or Friday not utilized in the normal four -
day, ten hour work week, and Saturday shall be paid at one and one half (1'/2) times the regular shift rate for the first
eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays
shall be paid at double the hourly rate of wage.
F. All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium
rate of 20% over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half times the
hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage.
G. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
H. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day,
and all hours on Sunday shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid
at three times the hourly rate of wage.
I. The First eight (8) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All
hours worked in excess of eight (8) per day on Saturdays shall be paid at double the hourly rate of wage. All hours
worked on Sundays and holidays shall be paid at double the hourly rate of wage.
The first eight (8) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All
hours worked in excess of eight (8) hours on a Saturday shall be paid at double the hourly rate of wage. All hours
worked over twelve (12) in a day, and all hours worked on Sundays and Holidays shall be paid at double the hourly
rate of wage.
K. All hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage, so long as Saturday
is the sixth consecutive day worked. All hours worked over twelve (12) in a day Monday through Saturday, and all
hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage.
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes Continued
4. L. The first twelve (12) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All
hours worked on a Saturday in excess of twelve (12) hours shall be paid at double the hourly rate of pay. All hours
worked over twelve (12) in a day Monday through Friday, and all hours worked on Sundays shall be paid at double
the hourly rate of wage. All hours worked on a holiday shall be paid at one and one-half times the hourly rate of wage,
except that all hours worked on Labor Day shall be paid at double the hourly rate of pay.
M. All hours worked on Sunday and Holidays shall be paid at double the hourly rate. Any employee reporting to work
less than nine (9) hours from their previous quitting time shall be paid for such time at time and one-half times the
hourly rate.
N. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays, and all work performed between the hours of midnight (12:00 AM) and eight AM (8:00 AM)
every day shall be paid at double the hourly rate of wage.
O. All hours worked between midnight Friday to midnight Sunday shall be paid at one and one-half the hourly rate of
wage. After an employee has worked in excess of eight (8) continuous hours in any one or more calendar days, all
additional hours shall be at the applicable overtime rate until such time as the employee has had a break of six (6)
hours or more. All hours worked on Holidays shall be paid at double the hourly rate of wage.
P. All hours worked on Holidays shall be paid at one and one-half times the hourly rate of wage.
Q. The first four (4) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday
through Saturday shall be paid at double the hourly rate. All hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
R. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is
the sixth consecutive day worked. All hours worked on Sundays and holidays shall be paid at double the hourly rate
of wage.
S. All hours worked on Saturdays and Holidays shall be paid at one and one-half times the hourly rate of wage. All hours
worked on Sundays shall be paid at double the hourly rate of wage.
T. The first two (2) hours of overtime for hours worked Monday -Friday shall be paid at one and one-half times the hourly
rate of wage. All hours worked in excess of ten (10) hours per day shall be paid at double the hourly rate of wage. All
hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. For work on Saturday which
is scheduled prior to the end of shift on Friday, the first six (6) hours work shall be paid at one and one-half times the
hourly rate of wage, and all hours over (6) shall be paid double the hourly rate of wage. For work on Saturday which
was assigned following the close of shift on Friday, all work shall be paid at double the hourly rate of wage.
U. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. (Except on makeup days if work is lost due to inclement
weather, then the first eight (8) hours on Saturday may be paid the regular rate.) All hours worked over twelve (12)
hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly
rate of wage.
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes Continued
4. V. Work performed in excess of ten (10) hours of straight time per day when four ten (10) hour shifts are established or
outside the normal shift (5 am to 6pm), and all work on Saturdays, except for make-up days shall be paid at time and
one-half (1 ''/z) the straight time rate.
In the event the job is down due to weather conditions, then Saturday may, be worked as a voluntary make-up day at
the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All
work performed on Sundays and holidays and work in excess of twelve (12) hours per day shall be paid at double (2x)
the straight time rate of pay.
After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the
applicable overtime rate until such time as the employee has had a break of eight (8) hours.
When an employee returns to work without a break of eight (8) hours since their previous shift, all such time shall be
a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight
(8) hours.
W. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid
at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double
the hourly rate of wage.
When an employee returns to work without at least eight (8) hours time off since their previous shift, all such time
shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break
of eight (8) hours.
X. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage. Work performed outside the normal shift of 6
am to 6pm shall be paid at one and one-half the straight time rate, (except for special shifts or three shift operations).
All work performed on Sundays and holidays shall be paid at double the hourly rate of wage. Shifts may be established
when considered necessary by the Employer.
The Employer may establish shifts consisting of eight (8) or ten (10) hours of work (subject to WAC 296-127-022),
that shall constitute a normal forty (40) hour work week. The Employer can change from a 5-eight to a 4-ten hour
schedule or back to the other. All hours of work on these shifts shall be paid for at the straight time hourly rate. Work
performed in excess of eight hours (or ten hours per day (subject to WAC 296-127-022) shall be paid at one and one-
half the straight time rate.
When due to conditions beyond the control of the Employer, or when contract specifications require that work can
only be performed outside the regular day shift, then by mutual agreement a special shift may be worked at the straight
time rate, eight (8) hours work for eight (8) hours pay. The starting time shall be arranged to fit such conditions of
work.
When an employee returns to work without at a break of eight (8) hours since their previous shift, all such time shall
be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of
eight (8) hours.
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Overtime Codes Continued
4. Y. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. All work
performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of
pay.
Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1.00) per hour
for all hours worked that shift.
After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the
applicable overtime rate until such time as the employee has had a break of eight (8) hours or more.
ZOvertime Calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly
rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually
provided for the worker. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40)
HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. All
hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium rate
of 20% over the hourly rate of wage. Work performed on Sundays may be paid at double time. All hours worked on
holidays shall be paid at double the hourly rate of wage.
Holidav Codes
A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, and Christmas Day (7).
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, the day before Christmas, and Christmas Day (8).
C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the
Friday after Thanksgiving Day, And Christmas Day (8).
D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day, And Christmas Day (8).
H. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Day after Thanksgiving Day,
And Christmas (6).
I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6).
Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day,
Christmas Eve Day, And Christmas Day (7).
K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
Friday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9).
L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, Friday after Thanksgiving Day, And Christmas Day (8).
N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (9).
8
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Holiday Codes Continued
P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday And Saturday
After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The
Following Monday Shall Be Considered As A Holiday.
Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas
Day (6).
R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After
Thanksgiving Day, One -Half Day Before Christmas Day, And Christmas Day. (7 1/2).
S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
And Christmas Day (7).
T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9).
Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the
Friday after Thanksgiving Day, And Christmas Day (8).
6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
the Friday after Thanksgiving Day, And Christmas Day (8).
E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and a Half -
Day On Christmas Eve Day. (9 1/2).
G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day,
Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Christmas Eve
Day (11).
H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (10).
I. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday
After Thanksgiving Day, And Christmas Day (7).
T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And
Christmas Day (9).
Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be
considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the
holiday.
A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed
As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall
be a regular work day.
9
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Holiday Codes Continued
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as
a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday.
C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be
observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday
on the preceding Friday.
D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day,
the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday
which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a
Saturday shall be observed as a holiday on the preceding Friday.
E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.
F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.
H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving
Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any
holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on
a Saturday shall be observed as a holiday on the preceding Friday.
I. Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The
Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6).
Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which
falls on a Saturday shall be observed as a holiday on the preceding Friday.
K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after
Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.
L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day
before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday
on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday.
10
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Holiday Codes Continued
M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, And the Day
after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the
following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.
N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. When Christmas falls on a Saturday, the preceding Friday shall be observed as a holiday.
P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday.
Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (8). Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the
preceding Friday shall be a regular work day.
R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day
after or before Christmas Day (10). If any of the listed holidays fall on Saturday, the preceding Friday shall be observed
as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a
holiday and compensated accordingly.
S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, Christmas Day, the Day after Christmas, and A Floating Holiday (9). If any of the listed holidays
falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly.
T. Paid Holidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and The Day
after or before Christmas Day. (10). If any of the listed holidays falls on a Sunday, the day observed by the Nation
shall be considered a holiday and compensated accordingly. Any holiday which falls on a Saturday shall be observed
as a holiday on the preceding Friday.
V. Holidays: New Year's Day, President's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
the Friday after Thanksgiving Day, Christmas Day, the day before or after Christmas, and the day before or after New
Year's Day. If any of the above listed holidays falls on a Sunday, the day observed by the Nation shall be considered
a holiday and compensated accordingly.
W. Holidays: New Year's Day, Day After New Year's, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, the Friday after Thanksgiving Day, Christmas Eve Day, Christmas Day, the day after Christmas, the day before
New Year's Day, and a Floating Holiday.
X. Holidays: New Year's Day, Day before or after New Year's Day, Presidents' Day, Memorial Day, Independence Day,
Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day before or after
Christmas day. If a holiday falls on a Saturday or on a Friday that is the normal day off, then the holiday will be taken
on the last normal workday. If the holiday falls on a Monday that is the normal day off or on a Sunday, then the holiday
will be taken on the next normal workday.
Y. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the
Friday after Thanksgiving Day, and Christmas Day. (8) If the holiday falls on a Sunday, then the day observed by the
federal government shall be considered a holiday and compensated accordingly.
11
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Holiday Codes Continued
Z. Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The
Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a
holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday.
15. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the day before Christmas Day and Christmas Day. (8) Any holiday which falls on a Sunday shall
be observed as a holiday on the following Monday.
B. Holidays: New Year's Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Independence Day, Labor
Day, Veteran's Day, Thanksgiving Day, and Christmas Day. (9)
C. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the day before Christmas Day and Christmas Day. (8)
D. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday
after Thanksgiving Day, Christmas Day, and the day after Christmas.
E. Holidays: the day before New Years's Day, New Year's Day, Martin Luther King, Jr. Day, Presidents' Day, Memorial
Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving Day, the day before
Christmas, and Christmas Day. (12)
Note Codes
8. D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour.
L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And
Level C: $0.25.
M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D:
$0.50.
N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level
C: $0.50, And Level D: $0.25.
P. Workers on hazmat projects receive additional hourly premiums as follows -Class A Suit: $2.00, Class B Suit: $1.50,
Class C Suit: $1.00, And Class D Suit $0.50.
Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the
shift shall be used in determining the scale paid.
S. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting
or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic
Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued
by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31,
2012.
12
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Note Codes Continued
8. T. Effective August 31, 2012 — A Traffic Control Laborer performs the setup, maintenance and removal of all temporary
traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during
construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or
where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of
Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012.
U. Workers on hazmat projects receive additional hourly premiums as follows — Class A Suit: $2.00, Class B Suit: $1.50,
And Class C Suit: $1.00. Workers performing underground work receive an additional $0.40 per hour for any and all
work performed underground, including operating, servicing and repairing of equipment. The premium for
underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive
an additional $0.50 per hour. The premium for work suspended shall be paid for the entire shift worked. Workers who
do "pioneer" work (break open a cut, build road, etc.) more than one hundred fifty (150) feet above grade elevation
receive an additional $0.50 per hour.
V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The
premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day.
The premiums are to be paid one time for the day and are not used in calculating overtime pay.
Depth premiums apply to depths of fifty feet or more. Over 50' to 100' - $2.00 per foot for each foot over 50 feet. Over
10l' to 150' - $3.00 per foot for each foot over 101 feet. Over 151' to 220' - $4.00 per foot for each foot over 220 feet.
Over 221' - $5.00 per foot for each foot over 221 feet.
Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent
and is measured by the distance travelled from the entrance. 25' to 300' - $1.00 per foot from entrance. 300' to 600'
- $1.50 per foot beginning at 300'. Over 600' - $2.00 per foot beginning at 600'.
W. Meter Installers work on single phase 120/240V self-contained residential meters. The Lineman/Groundmen rates
would apply to meters not fitting this description.
X. Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit:
$1.50, Class C Suit: $1.00, and Class D Suit: $0.50. Special Shift Premium: Basic hourly rate plus $2.00 per hour.
When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a
government agency or the contract specifications requires that work can only be performed outside the normal 5 am
to 6pm shift, then the special shift premium will be applied to the basic hourly rate. When an employee works on a
special shift, they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time
status. (For example, the special shift premium does not waive the overtime requirements for work performed on
Saturday or Sunday.)
Y. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work
(work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay.
Swinging Stage/Boatswains Chair: Employees working on a swinging state or boatswains chair or under conditions
that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above
the classification rate.
13
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Note Codes Continued
8. Z. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour.
Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the
Employer or when an owner (not acting as a contractor), a government agency or the contract specifications require
that more than (4) hours of a special shift can only be performed outside the normal 6 am to 6pm shift, then the
special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a
special shift, they will be paid a special shift premium for each hour worked unless they are in overtime or double-
time status. (For example, the special shift premium does not waive the overtime requirements for work performed
on Saturday or Sunday.)
A. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour.
Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the
Employer or when an owner (not acting as the contractor), a government agency or the contract specifications require
that more than four (4) hours of a special shift can only be performed outside the normal 6 am to 6pm shift, then the
special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a
special shift, they shall be paid a special shift premium for each hour worked unless they are in overtime or double-
time status. (For example, the special shift premium does not waive the overtime requirements for work performed on
Saturday or Sunday.)
Certified Crane Operator Premium: Crane operators requiring certifications shall be paid $0.50 per hour above their
classification rate.
Boom Pay Premium: All cranes including tower shall be paid as follows based on boom length:
(A) — 130' to 199' — $0.50 per hour over their classification rate.
(B) — 200' to 299' — $0.80 per hour over their classification rate.
(C) — 300' and over — $1.00 per hour over their classification rate.
B. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the
shift shall be used in determining the scale paid.
Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work
located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging
Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require
them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the
classification rate.
C. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work
located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging
Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require
them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the
classification rate.
Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting
or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal
of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian
traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control
Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the
State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012.
14
Benefit Code Key — Effective 9/2/2020 thru 3/2/2021
Note Codes Continued
D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines,
towers, dams, bridges, power generation facilities and manufacturing facilities such as chemical plants, etc., or
anywhere abrasive blasting is necessary to prepare surfaces, or hazardous materials encapsulation is required.
E. Heavy Construction includes construction, repair, alteration or additions to the production, fabrication or
manufacturing portions of industrial or manufacturing plants, hydroelectric or nuclear power plants and atomic
reactor construction. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00,
Level B: $0.75, Level C: $0.50, And Level D: $0.25.
F. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines,
towers, dams, power generation facilities and manufacturing facilities such as chemical plants, etc., or anywhere
abrasive blasting is necessary to prepare surfaces, or hazardous materials encapsulation is required.
15