HomeMy WebLinkAboutCAG2020-281 - Amendment - #3 - KPG, P.S. - 4th & Willis Roundabout Landscape Design - 03/03/2021February 25, 2021
OK to sign, 2/25/2021, TW.
CAG2020-281
AMENDMENT - 1 OF 2
AMENDMENT NO. 3
NAME OF CONSULTANT OR VENDOR: KPG, P.S.
CONTRACT NAME & PROJECT NUMBER: 4th & Willis Roundabout Landscape Design
ORIGINAL AGREEMENT DATE: 09/01/2020
This Amendment is made between the City and the above-referenced Consultant or Vendor
and amends the original Agreement and all prior Amendments. All other provisions of the original
Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force
and effect. For valuable consideration and by mutual consent of the parties, Consultant or
Vendor’s work is modified as follows:
1.Section I of the Agreement, entitled “Description of Work,” is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, the Consultant or Vendor shall:
As described in attached Exhibit A, incorporated herein, consultant shall
complete final design, provide plans and specifications, assist with
permitting and bid phase and provide construction administration.
2.The contract amount and time for performance provisions of Section II “Time of
Completion,” and Section III, “Compensation,” are modified as follows:
Original Contract Sum,
including applicable WSST
$82,704.00
Net Change by Previous Amendments
including applicable WSST
$0.00
Current Contract Amount
including all previous amendments
$82,704.00
Current Amendment Sum $170,034.00
Applicable WSST Tax on this
Amendment
$0.00
Revised Contract Sum $252,738.00
AMENDMENT - 2 OF 2
Original Time for Completion
(insert date)
12/31/2020
Revised Time for Completion under
prior Amendments
(insert date)
02/28/2021
Add’l Days Required (±)for this
Amendment
210 calendar days
Revised Time for Completion
(insert date)
09/30/2021
The Consultant or Vendor accepts all requirements of this Amendment by signing below, by
its signature waives any protest or claim it may have regarding this Amendment, and
acknowledges and accepts that this Amendment constitutes full payment and final settlement of
all claims of any kind or nature arising from or connected with any work either covered or affected
by this Amendment, including, without limitation, claims related to contract time, contract
acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise
provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and
warranty provisions of the original Agreement.
All acts consistent with the authority of the Agreement, previous Amendments (if any), and
this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed,
and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be
deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this Amendment, which is binding on the parties of this contract.
IN WITNESS, the parties below have executed this Amendment, which will
become effective on the last date written below.
CONSULTANT/VENDOR:
By:
(signature)
Print Name:
Its
(title)
DATE:
CITY OF KENT:
By:
(signature)
Print Name: Dana Ralph
Its Mayor
(title)
DATE:
ATTEST:
___________________________
Kent City Clerk
APPROVED AS TO FORM:
(applicable if Mayor’s signature required)
Kent Law Department
P:\Planning\4th and Willis Roundabout\KPG Contract\KPG-60percent Design-AMENDMENT 3
03/03/2021
Signature: ML� � 3vamene
Terry Ju gman (FebA, 202110:45 PST)
Email: tjungman@kentwa.gov
Signature: /--� �-
Email: rlashley@kentwa.gov
Signature:
Brian Levenhagen (Feb 24, 202111:37 PST)
Email: bjlevenhagen@kentwa.gov
E-TRANSMITTAL: Amendment 3 for 4th & Willis
Roundabout Landscape Design
Final Audit Report 2021-02-24
Created: 2021-02-23
By: Lynn Osborn (losborn@kentwa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAQWVOH7bpwOPN9whYjZjL7pyiT5rMOZeh
"E-TRANSMITTAL: Amendment 3 for 4th & Willis Roundabout L
andscape Design" History
Document created by Lynn Osborn (losborn@kentwa.gov)
2021-02-23 - 6:22:21 PM GMT- IP address: 146.129.252.126
Document emailed to Terry Jungman (tjungman@kentwa.gov) for signature
2021-02-23 - 6:38:23 PM GMT
Email viewed by Terry Jungman (tjungman@kentwa.gov)
2021-02-23 - 6:41:09 PM GMT- IP address: 146.129.252.126
'a Document e-signed by Terry Jungman (tjungman@kentwa.gov)
Signature Date: 2021-02-23 - 6:45:16 PM GMT - Time Source: server- IP address: 146.129.252.126
Document emailed to Elizabeth Gibson PLA (liz@kpg.com) for signature
2021-02-23 - 6:45:18 PM GMT
°`. Email viewed by Elizabeth Gibson PLA (liz@kpg.com)
2021-02-23 - 9:23:11 PM GMT- IP address: 50.228.75.194
Document e-signed by Elizabeth Gibson PLA (liz@kpg.com)
Signature Date: 2021-02-23 - 9:24:39 PM GMT - Time Source: server- IP address: 67.135.39.146
Document emailed to Ronald Lashley (rlashley@kentwa.gov) for signature
2021-02-23 - 9:24:41 PM GMT
Email viewed by Ronald Lashley (rlashley@kentwa.gov)
2021-02-24 - 5:46:29 PM GMT- IP address: 146.129.252.126
Document e-signed by Ronald Lashley (rlashley@kentwa.gov)
Signature Date: 2021-02-24 - 7:34:50 PM GMT - Time Source: server- IP address: 146.129.252.126
Adobe Sign
Document emailed to Brian Levenhagen (bjlevenhagen@kentwa.gov) for signature
2021-02-24 - 7:34:53 PM GMT
Email viewed by Brian Levenhagen (bjlevenhagen@kentwa.gov)
2021-02-24 - 7:35:15 PM GMT- IP address: 146.129.252.126
Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov)
Signature Date: 2021-02-24 - 7:37:22 PM GMT - Time Source: server- IP address: 146.129.252.126
Agreement completed.
2021-02-24 - 7:37:22 PM GMT
0 Adobe Sign