Loading...
HomeMy WebLinkAboutCAG2019-220 - Change Order - #16 - Scarsella Bros, Inc - 228th St UPRR Grade Separation Bridge & Roadway - 11/18/2020Agreement Routing Form KENT For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper)WaSHtNGToN E oLoc Originator C. Frame Department: PW Engineering Date Sent: 1t22t2021 Date Required: N/A Authorized to Sign: E Director or Designee E Mayor Date of Council Approval: N/A Budget Account Number: R20067.641 10.120 Budget? EYes ENo Grant? EYes ENo Type: Federal co ty G ELor-5 +,tro EooL C'l Vendor Name: Scarsella Bros., lnc Category: Contract Vendor Number: 34547 Sub-Category: Change Order #16 ProjectName: S.228th St. Union Pacific Railroad Grade Separation Bridge and Roadway Phase 5 Project oetails:Shift the existing luminaires and add 2 new. Replace contract drawings with revisions on 61,63,64 and 68 Agreement Amount: $22,959.68 Start Date: N/A Basis for Selection of Contractor: Sld Termination Date: N/A Local Business? EYes E No* *lf meets requirements per KCC 3.70.100, please complete 'Vendor Purchase-Local Exceptions" form on Cityspace. Notice required prior to disclosure? EYes ENo Contract Number: cpcg19-224 trltr le J E$o=E3 tg.? .9vt Date Received by City Attorney Comments: Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: dd((W221/l l_20 Visit Documents.KentwA.gov to obtain copies of all agreements KENT WasHrroroN CHANGE ORDER NO. #L6 NAME OF CONTRACTOR: Scarsella Bros. Inc. (,.Contractor,,) CONTRACT NAME & PROJECT NUMBER:S. 228th St. Union Pacific Railroad Grade Separation Bridge and Roadwav Phase 5 (19-3022) ORIGINAL CONTRACT DATE: Aoril 19, 2019 This Change Order amends the above-referenced contract; all other provisions of thecontract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to : This Change makes the following revisions to the Contract Documents and provides compensation for the added work: Shift the existing luminaires and add 2 new luminaires at the locations shown in FWD 010. The new luminaires shall meetthe existing contract requirements. Replace contract drawings 61,63,64 and 65 of 68 with the revised drawings called out as revision 4. These were previously issued in FWD 10, 2. The contract amount and time for performance provisions of Section iI ..Time of completion ," and section III, "compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and wssT) $13,802,146.40 Net Change by Previous Change Orders (incl, applicable WSST) $301,270.98 Current Contract Amount (incl. Previous Change Orders) $14,103,417.39 Current Change Order $22,959.68 Applicable WSST Tax on this Change Order $0.00 Revised Contract Sum $14,t26,377.06 CHANGE ORDER - 1 OF 3 Original Time for Completion (insert date) 240 rvorking days Revised Time for Completion under prior Change Orders (insert date) 240 rvorking days Days Required (*) for this Change Order 0 calendar days Revised Time for Completion (insert date) 240 rvorking days In accordance with Sections L-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: By rffi) ,.-,tr (signature) Print Name' otr.4z//1,,1 ScZrrAzA (title) DATE: t/,42/zaz-a CITY OF KENT: A.;,- (signature) Print Name: Chad Bierenits Interim Public Works Director (title) DATE: //- /6 - 2o,zo tfi CHANGE ORDER - 2 OF 3 ATTEST: Kent City Clerk APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [In this field, you may enler the electrcnic filepath where the contrad has been saved] CHANGE ORDER - 3 OF 3 T<ENT FILE NO: 2OO.2 CHANGE ORDER WORKSHEET NO. 016 Construction Management Division - Public Works Project S. 228th St Union Pacific Railroad : Grade Separation Phase 5 Project Engineer: Cameron Bloomer, PE Owners Rep: KBA, Inc Project No.: 07-3022 Fed-Aid No.: Contractor: HLP-FMSTB-L2L6 (005) Scarsella Bros. Inc. Date: LOlL3/2O2O I. PROPOSED CHANGE This Change makes the following revisions to the Contract Documents and provides compensation for added work: Shift existing and add 2 new luminaires at the locations shown in FWD 010. New luminaires shall meet existing contract requirements. REPLACE Contract Drawings 6t,63,64, and 65 of 68 with the revised drawings called out as Revision 4. These were previously issued in FWD 10. II. REASON AND BACKGROUND FOR CHANGE 1) A conflict with the existing OH power lines at the bridge required the shifting of luminaire poles on Span 1. To maintain light coverage, other luminaires were shifted and an additional barrier mounted luminaire was needed. 2) When the City purchased the Prologis Driveway, there was a Prologis owned luminaire on the property, at -STA 3+90 RT. It was taken down during the work and the City decided a City standard pole and foundation should be installed in its place. This will provide light close to where DWF, Pacific Power, and Proloqis property driveways tie into the roadway. III. METHOD OF PAYMENT NEW PAY |TEM(S)Not Applicable ChanSe Order No.FOR ACCOUNI'IVG USE ONLY Sch. No.Item Description Total Est. otv Qty this PE Unit Unit Price Total Estimated Cost of Item 6 Added Luminaires 1 LS $22.959,68 $22.959.68 LI Independent Esti mate Attached - REOUIRED LJ CREATE PAY ITEM ONLY - Payment to be made at a later date uoon comoletion of work U PAY THIS PAY ESTIMATE Material Submittals Reouired - CC: Construction Coordinator New Sub Reqrd?No DELETE EXISTING PAY ITEM(S) per 1-09.5 REV. DATE: 3/7sh9 Change Order No.FOR ACCOUNT,,VG USE ONLY Sch. No.B.l. No.ltem Description otv Unit Unit Price Cost of ltem Not Applicable 7 FILE NO:2OO.2KENT $$ $$ Independent Estimate Attached - REQUIRED Change Order No.FOR ACCOUNT"VG USE ONLY Sch. No.B.l. No.Item Description otv Unit Unit Price Cost of ltem LF $$ Independent Estimate Attached - REQUIRED TNCREASE/DECREASE TO EXTSTTNG pAY |TEM(S)Not Applicable TOTAL ESTIMATED COST OF CHANGE ORDER * THIS PAY ESTIMATE IV. WORKING DAYS xTotal of the Cost of Item Columns 959.68 o Original Contract 240 Due This Change Order*o Previous Total 240 DATE:DATE:*Exolanation/Justification Reouired: This Change Order does not impact the critical path, and no change to the working days is beinq made. TOTAL WORKING DAYSX 240 *This Change Order + Previous Total All worlg materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By:Cameron Bloomer Date: LOltSl2O2O Construction Supervisor:a-'--Date: Construction Manager:Date:/e/ql*, ?e 2 REV. DATE: 3/7sh9 1945 SCARSELLA EROTHERS INC. RE: October 12,2020 City of Kent 220 Fourlh Avenue South Kent, WA 98032 Attn:Cameron Bloomer Field Engineer KBA, lnc. 07-3022 228th St. UPRR Phase 5 COP 014 lllumination Revisions (FWD 010) SCARSELLA BROS. IS PLEASED TO SUBMIT THE FOLLOWING CHANGE ORDER PROPOSAL FOR THIS PROJECT: NOTES: Sincerely Matthew Scarsella Project Manager ITEM DESCRIPTION UNIT QUANTITY UNIT PR]CE BID AMOUNT Totem - lllumination Revisions LS 1.00 $ 20.499.71 $ 20.499.71 Prime Markup LS 12.OOo/o $ 20.499.71 $2.459.97 TOTAL $ 22.959.68 %A trEcTRrc Phone (2$31 383-f022 Fax (25i1! 272-5214 FWD 010 - lllumination Revisions t )f I.\r: ()Il,\. t\( 4656 - S 228th St Union Pacific Railroad Grade Separation Bridge & Roadway Phase 5 COR Subject: FWD 010 - lllumination Revisions To Matthew Scarsella Scarsella Bros., Inc PO Box 68697 Seattle, WA 98168-0697 253-872-7173 253-39s-1209 (FAX) Contract No: COR Number: GOR Revision Number: COR Date: Work Type: Owner COR No: Days Valid: 07 3022 TA 6582 4656-2 0 10t1t2020 Price / Proceed FWD O1O 30 Return To Jeff Stephens Totem Electric of Tacoma, lnc. 2332 S. Jefferson Ave Tacoma, WA 98402 253-722-2839 253-272-5214 (FAX) JStephens@totemelectric.com Details Description Cost / Rate I atv Hrs Workerc Ext Labor to lnstall Luminaire Poles, Foundation, and Wiring $101.15 16.00 Hrs 2.00 $3236.80 Two Luminaire Poles and Luminaires - Graybar Quote $10,934.00 1.00 LUMP SUM $10934.00 Luminaire Pole Foundation $324.75 1.00 EACH $324.7s Conduit and Wire $10.75 70.00 LF $752.50 Barrier Junction Box $450.00 1.00 EACH $450.00 USE Tax 10.0o/o $1 ,246.13 1.00 $1246.1 3 Breakout Labor: Overhead Percent @ 29%: $3,236.80 $938.67 Material : Overhead Percent @ 21%: Other: $12,461,25 $2,616.86 $1,246.1s Total: $20,499.71 Reservation of Rights This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for any of these items. Signed By:ffi Dated: 101112020 Jeff Stephens Project Manager Date: Sep 30,2020 Project Location Quote To: QTY Type 1 2 2 LOT TOTAL S 228TH ST UNION PACIFIC RAILROAD GRADE SEPERATION BRIDGE & RDWY - New Bid KENT WA TAWA20-5A82-1 Phone: (253) 779-3600 Fax: (253) 779-3605 From: Aaron Null Quoter Ph: (253) 779-3634 email : aaron.null@graybar.com o Quote: TAWA20-5A82-1 Quote Page 112 Grayba,ft works to y-our advantage Totem Electric 2332 S Jefferson Tacoma WA 98402-1405 For Bid Date Sep 30, 2020 Expires Oct 30, 2020 1 Part COK 4O'MH ALUM LTG POLE W 8'BOLT ON LA,4 BOLT BASE, Wl BREAKAWAY CPLGS POLE#21 COK 4O'MH ALUM LTG POLE W 12' BOLT ON TRUSS LA,4 BOLT BASE, W/ BRIDGE ELBOW POLE #20 AEL ATB M-P6O-MVOLT-R3-NL-P7 SHORTING CAP Total: Notes: NO MOUNTING OR HANGING HARDWARE INCLUDED UNLESS NOTED QUOTED BOM IS OUR BEST INTERPRETATION OF THE AVAILABLE PLANS AND IS UP TO THE CONTRACTOR TO VERIFY ALL MATERIAL, COUNTS, VOLTAGES, FINISHES AND DIMENSIONS FACTORIES TO CONFIRM LEAD TIME OF MATERIAL AFTER RETURN OF APPROVED SUBMITTALS - ESTIMATED UP TO 15-18 WEEKS AFTER APPROVAL & RELEASE OF ORDER AND SUBJECT TO CHANGE BASED ON CURRENT FACTORY SCHEDULE AT TIME OF RELEASE ESTIMATED 1-3 WEEK TRANSIT TIME AFTER MATERIAL SHIPMENT FROM FACTORY FACTORIES TO CONFIRM LEAD TIME FOR SUBMITTALS AT TIME OF ORDER SIGNED APPROVED SUBMITTALS REQUIRED FOR ANY MATERIAL TO BE RELEASED FOR MANUFACTURING QUOTING STANDARD FACTORY WARRANTIES UNLESS NOTED OTHERWISE PRICING DOES NOT INCLUDE SALES TAX ANY CHANGES TO QUOTED BOM OR QTY'S WILL VOID THIS QUOTATION $10,934.00 $10,934.00 Aaron Null Page 112 GRAYBAR ELECTRIC COMPANY, INC. TERMS AND CONDITIONS OF SALE L ACCEPIANCE OF ORDER; TERMINATION - Acceptance of any order is subjecr to credit approval and acceptance of order by Graybar Electric Company, Inc. ("craybtr") Buyer md without liability ro Graybr. 2 PRICESANDSIilPMENTS-Unlcssotheruiscquotcd,priccsshallbcthoscincffectattirncofshipmenr,whichshallbcmadeF.O.B.shippingpoior,prcpaidandbill.3. RETURN OFCooDs - credit may be allorved for gmds rclumed wiah prior approval. A deduction may b€ made from crcdits issued ro coviicoir ofhandling. 4. TAXES - Priccs shown do not includc salcs or othcr taxcs imposcd on thc srlc ofgoods. Taxcs now or hcrcaftcr imposed upon salcs or shiprncnts will bc addcd to thc purchasc price, Buyer agrces to reirnburse Graybu for any such tax or provide Graybar whh acceptabl€ tax exemption cenificare. 5, DELAY IN DELIVERY ' Graybar is nol lo bc accoutrtablc for dclays in dclivcry occasioned by acts ofGod, failure of its supplicrs to ship or delivcr on timc, or other circumstances beyond Graybar's reasonable conlrol. Foctory shipment or del ivery dates ore the besr esrimaaes of our supplicrs. ind in no case shall Graybar be liable for any consequential or special damages arising from any delay ia shipment or delivery. 6. LIMITED \VARRANTIES - Graybu wffiants that all goods sold rre free of any security interest and will make available to Buyer all mnsfenble wtrranties (including without limilation weanties with respect to intellectual property infringemenl) made ro Graybe by the manufaclurer of thc goods. GRAY-BAR MAKES NO OTHER EXPRESSbR IMPLIED WARRANTIES, AND SPECIFICALLY DTSCLAIMS ALL IMPLIED WARRANTIES INCLUDINC B'T NoT LIMTTED To THE IMPLIED WARRANTIES oF MERCHANTABILTTY AND FITNESS FOR PURPOSE, UNLESS OTHERWISE AGREED IN WRITINC BY AN AI.,TTHORTZED REPRESENTATIVE OF CRAYBAR. PRODUCTS SOLD HEREUNDER ARE NOT INTENDED FOR USE IN OR IN CONNECTION WITH (I) ANY SAFETY APPLICATION OR THE CONTAINMENT AREA OF A NUCLEAR FACILIry, OR (2) IN A HEALTHCARE APPLICATION, WHERE THE GOODS HAVE POTENTIAL FOR DIRECT PATIENT CONTACT OR WHERE A SIX (6) FOOT CLEARANCE FROM A PATIENT CANNOT BE MAINTAINED AT ALL TIMES. 7. LIMITATION OF LIABILITY - Buycr's rcmcdics undcr this agrccmcnt arc subjcct to any Iimitations containcd in manufacrurcr's rcms and conrlitions to Graybar, a copy of Graybnr's oprion, and lN No CASE SHALL GRAYBAR BE LIABLE FoR INCIDENTAL, SPECIAL, oR CONSEQUENTIAL DAMAGES. In addition, claims for shonages, other than loss in transit, musr be mrde in wriring not more lhan five (5) days lfter receipt of shipment. 8. WAMR - The failure of Graybar to insist upon rhe performmce of any of the tems or conditions of this agrcement or to exercise any righ! hereunder shall not b€ decmed to be a rvaivcr of such tcms, conditions, or rights in thc futurc, nor shall it be dccmcd to bc a waivcr of any othcr tcm, condition, or right undcr this agrecmcnt. 9. MODIFICATION OF TERMS AND CONDITIONS - These term and conditions supcrsedo all othercommunications, legotiations, and prior oral or wrinen sraremen* uPon Craybar unless made in writing and signed on its behalf by a duly authorized representotiye of Graybor. No conditions, usage of trade, course of dealing or performance, undcrstanding or agrcemcnt, Purpo(ing to modify, vary, explain, or supplcment these terms and conditions shall bc binding unlels herafrer made in writingind iigned by the Party to bc bound. Any prcposed modifications or additional tems orc spccifically rcjcctcd and decmcd a matcrisl altcntion hcrcof. If this tlmumcnt shall bc dccmicl an - BcccPtonce of a Prior offer by Buycr, such acceptance is expressly conditional upon Buye/s 0ssent to any additional or different tems set forth herein. 10. REELS - Whcn Graybar ships rclurnablc rccls, a rccl dcposit may bc includcd in thc invoice. The Buyer should contacr rhc ncarcst Graybar seruice lmation to return recls. I l. CERTIFICATION - Craybr hereby ccrtifies that these goods werc produccd in compliance with all applicable requiremenrs of Secrions 6, 7, and 12 of the Fair LaborStildilds Act, as amendcd, rnd of rcgulations and ordcs of thc United States Dcpartmcnt of Labor issucd undcr Section l4 thcrcof. This agrcemcnt is subjcct to Executivc Ordm I 1246, as amended, the Rehabilitation Act of 1973, as amended, the Vietnam Veterans' Readjusrmenr Assisrance Acr of 1974, as amended, E.o- 13496, 2tCFR pan 42l, Appendix A to Subpan A, and the cofi€sponding regulations, to rhe extent required by larv. 4l CFR 60-l.4,60-741 ,5, and 60-?50.5 are incor?orated herein by rcference, lo the cxtcnt lcgally rcquircd. 12, FOREIGN CORRUPT PRACTICES ACT - Buyer shall comply with applicablc laws and rcgulations relating to atrti-coruption, including, without limiration, (i) rhe Unirerl for Economic Coopenlion and Developmenfs Convenlion on Combating Bribery of Foreign Public Officials itr Inrenarional Business Tiansactions, ihe U.N. Convef,r;n Againsr Comlption. and the Inter-American Convenlion Against Comption in Buyels country or any country where performance of this agreement or delivcry of goods will occur. I 3. ASSIGNMENT - Euyer shall not assiSn its rights or delegale its duties hercunder or any interest herin without the prior written coosent of Gnybar, 1nd any such assignment, without such consent, shall be void. l4' CENERAL PROVISIONS - All lypognptrical or clerical enors madc by Graybar in any quotation, acknowlcdgment or publication arc subject to coft€ction. This agrccment shall bc govcmed by the laws of the State of Missouri applicable to contracts to be fomed and fully perfomerJ within rhe Stare of Missouri, without giving effect to th;hoicc or Court for rhe Emtem District of Missouri, and no other place unless olheruise detemincd in Cmybar's sole discretion. Buyer hereby inev@ably consents to ihe jurisdiction of such court or courts rnd agrees to appear in any such action upon written notice lhercof, l5- PAYMENT TERMS - Payment lerms shall be ds stated on Graybar's invoice or as otheffiise mutually agreed. As a condhion of the sales agreemenr, a monthly senice charge of the lesser of l-ll2% or the maxinrum pemittcd by law may bc addcd to all accounts not paid by net duc date. Visa, MasleCrd. Amcrican Express, and Discover credit ctrds arc accsptcd at point of purchasc only, 16. EXPORTING - Buyer acknowledges that rhis ordcr and the perfomatrce thcrcof trc subject to compliance with any and all applicablc United Statcs larvs, regulations, or Expon Administratioo Act, as may be amended. Buyer funher agrees that if the expon laws ue applicable, it will not disclo$c or r€-export any technical data received unrJer this order to any countries for which the United States govemment requires an export liccnse or other suppoding documcntation at the tinri ofexporl or transfcr, unless Buycr has oblaincd prior rvrittcn aulhorization from thc Unitcd Stutss Office ofExporr Control orothcr authority rcsponsiblc for such matrcrs. KENT WAsHrNcroN Field Work Directive FWD O1O 07-3022 HLP 1216 (006) 8/26/2020 Project Name: Contractor: Subject: S. 228th St. Union Pacific Roilroad Grade Seporotion - Ph 5 Scarsella Bros., lnc. lllumination Revisions PW Project Number: FederalAid Number: Date: Scope: Make the following changes to the Contract Documents: . Replace Contract Drawing 55 of 68 - Revise luminaire at 3+90 to City standard pole and foundation. This was also noted in fWO OOg.Called out as Luminaire #21 on revised drawing 65 o Replace Contract Drawing 61 of 68 - Add a bollard at STA t4+44.3. Add 37 LF of 4" Solid Yellow Plastic Line around bollard. o Replace place sheets 63,64 and 65 - Revise location of Luminaires #1, and #7-#L5. Add 1 barrier mounted Luminaire, called out as #20. Measurement and Payment: o Provide LS price for new Luminaires and associated electrical work o Track Time and Material efforts associated with bollard installation, payment via Bl L355, and striping for payment via 5075. Attachment(s): o Revision 4, with revised Contract Drawings 55, 61, 63,64,65, and bollard details. Contractor Acknowledgement: By:///n11.1on, Sno.u"1/i s61g. 912112020 Matthew Scarsella, Project Manager Owner Approval: By Cr,tt *, z. sh/,,'? 8t26t2020 Date Cameron Bloomer, KBA lnc. Date:rc,/c,/z^o THIS FIELD WORK DTRECTTVE DOES NOT PROVIDE FOR EITHER A TrME EXTENSTON OR A CHANGE tN THE CONTRACT pRrCE. LABOR, EQU|PMENT, AND/OR MATERIAL OUTLINED IN THIS FIELD WORK DIRECTIVE SHALL BE PAID BY BID ITEM(S) OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR CONTRACTPRICEINCREASES. ANYPROTESTTOTHEFIELDWORKDIRECTIVESHALLFOLLOWl.O4.5OFTHEWSDOTSTANDARDSPECIFICATIONS. @] CHANNELIZATION LEGEND 6 smfiEMncwdEst lE *P mdE src w. uiE E e*sffi6p6ncEOS6Els m m*YrruRmonEutrurE m Msnc sm uE 2a' # as Htmu6jB m ffi@9uutFF@tsm 6 ffinc ft08 ffi xqr sD u - a-74{, sT ffi rT tr cR6 d NOTES L U WE S 6m UNES gU AE PimE PLASIC U6 PA Mi SD rN y-20.&d 2 WE M 6M W PAMXS PA KAI SE t nFc arcE su aE Fusnc a xdr sn 3 =I o +: i I F fngincsinS CHATINELIZATIONST,7t93 ?O STA,2t+50 S.22ETH ST. UNION PACIFIC RAILROAO PHASE 5 iiF.olrJarlEs;EEg: i9rreraIIIIIill.tINTERURBANTRAILll i?I8p-as<EodxFg6Ee9x"s E*YPROLOGISi$rB!iDRIVEWAYROLOGIS:;?=Er: tgrEg5.!iH368THAVE.S.LLEY_fwYMATCH LINEABOVE RIGHT-----:.i -i;jiirii!'r11 ,.II8?NNotII*nl5- 9?;=,3!:q?8962*E6iizi5clzlolil1972nd AVE-I'ATCH LINE STA. '19+50 SEE SHEET 64 MATCH LINE STA. 10+50 B€LOW LEFTi;9;3::rii!-,grihsgo>2elasf,6oPBq76z att4"llAVE. S.'t9+50 sEE SHEET 63qNt;SSaei;.3qiFi cEi6 iH;F 3E.i 36I76thUPRR4EFt',1Ilt tlnMATCHI*-I35HAVE.l;ltrtg4thcH6th AVE. N^;d4.o*€r;3;lzlol{lhl"I9-orI *rq 3E}Ei;8T:;EiiiE;gIflsBii*$;d:i:oiei9**::Ee$ EFi aE!o4rrra{-tr=zIINN@{-aIEilfrEEf,IY9RaaETEr-@t76ih AvE.H{INN@q{tl.oo_e4rh AVE.-TI. Iiilt--->'lilSlr#lj2Ei!EF6;it2z2!IISEia5:tu!! (Ndr-rux)2oc JCS 2-F t-2' ,/r\ ,A l-7' ,/6\ ,A 2' 2' ,/d tJ' ,/Gs-s-RT It/\2'o LI ,,(\2'o !5 At\2'6 LT IT _--Il t1 12 16+$LT 12' 12 20+$ t2+10 \1 @ @ @ I d 8+40 l2' a SIGN SCHEDULE E!9 WIRING SCHEDULE SPECIAL SIGN - 1 TUMINAIRE SCHEDULE @ Nm: & gffi gl[ & FffilClE N0 lX$M mxsT STAD&0 PSS 6-42d, a-61X. Gie Ap !-6S sia66iEl B#:il6Jf€ I QNIES f cNUt6 (m) @ d $ES tNO @AnnES6 @ous rN rod@ /3\ TYPICAL 2'-O'' TRENCH DETAIL \-,/ Nor ro scALE TYPICAL ASPHALT RESIORATION DETAIL ffid E!!.01 c @ ;i iloE9l. A[ FXTnES $Atr & t34 VAI UO, E0V8T 2. U UTINffi &NN6 AEdE ME O'J. F* tW|NASS ilfrNm d Elmm g€ gcE .€IANOMNG Iffi Rd PN@S TYPICAL SOD RESTORATION DETAIL ALTERNATE SPREAD FOOTING DETAIL@ EMER€NCY UXIED TO beeha MM Divisior ELECTRICAL sctEDUr.-Es a{o stoNAGE AND OETAITS ORAOS SEPARAIION PH SE 5