HomeMy WebLinkAboutCAG2020-137 - Change Order - #5 - Active Construction, Inc. - Willis St & 4th Ave S Roundabout - 01/13/2021Agreement Routing Form
KENT For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)WagHTNGToN
o
oLcc
Originator:
C. Frame
Department:
PW Engineering
Date Sent:
1t22t2021
Date Required
N/A
Authorized to Sign:
EI Director or Designee E Mayor
Date of Council Approval
N/A
Budget Account Number:
R901 12.641 10.120
Budget? EYes ENo
Grant? EYes ENo
Type: N/A
co
IG
ELorFs
Ptro
EgoL
tD
Vendor Name:
Active Construction, lnc
Category:
Contract
Vendor Number:
231 9336
Sub-Category:
Change Order #5
Project Name: Willis Street and 4th Ave. S. Roundabout
ProjectDetails: lnstall new underground electricalcrossing across 3rd Ave. S. at SR516 to
remove aerial power supply to existing luminaire.
Agreement Amount: $3,920.00
Start Date: N/A
Basis for Selection of Contractor
Termination Date:
Bid
N/A
Local Business? EYes E No*
*lf meets requirements per KCC 3.70.100, please complete'Vendor Purchase-Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
EYes E No
Contract Number:
cAG2020-137
glc
3
\o
.E -qo=E,e
Gc.9UI
Date Received by City Attorney:Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk s Office
ad(W221/1,1,20 Visit Documents.KentwA.gov to obtain copies of all agreements
KENT
W^sHrNGtoN
CHANGE ORDER NO. 5
NAME OF CONTMCTOR: Active Qonstruction, Inc. ("contractor")
CoNTRACT NAME & PRoJECT NUMBER; willis street and 4tl Ave. 5. Roundabout
ORIGINAL CONTRACT DATE: May 15,-2020
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the pafties, the project contract is modified as follows:
1, Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
install new underground electrical crossing across 3'd Ave. S at SR516
to remove aerial power supply to existing street Luminaire.
2. The contract amount and time for peformance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(inctuding applicable alternates and
wssr)
$4,7s9,7s9.00
Net Change by Previous Change O rders
(incl. applicable WSST)
$48,518.32
Current Contract Amount
(incl . Previous Change Orders)
$4,808,277,12
Current Change Order $3,920.00
Applicable WSST Tax on this Change
Order
$0.00
Revised Contract Sum $4,812,197,32
CHANGE ORDER. 1 OF 3
Original Time for ComPletion
(insert date)
100
Revised Time for Completion un der
prior Change Orders
(inseft date)
r00
Days Required (+) for this Change Order 0 calendar days
Revised Time for Co mpletion
(insert date)
100
In accordance with Sections t-O4.4 and 1-04.5 of the Kent and WSDOT Standard
Speciflcations, and Section VII of the Agreement, the Contractor accepts all requirements of this
Cirange Ordei by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
"I.eptr that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connectdd with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from sirict compliance wilh the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have aPPlied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3, The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CITY OF KENT:
t /tshrDATE:
(titte)
(fu E-:..
Interi r
Print Name : Chad Bieren
Its Pr rhlir Works f)i
(signature)
CONTRACTOR:
me
(titte)
I
DATE:
Print
By:
CHANGE ORDER - 2OF 3
ATTEST:
Kent City Clerk
APPROVED AS TO FORMI
(applicable lf Mayor's signature required)
Kent Law Depaftment
[h thls Reld, you may €nter the eleEtronlc fllepath where the conksct ias bes svedJ
CHANGE ORDER - 3 OF 3
FILE NO: 2OO.2KET
CHANGE ORDER WORKSHEET NO. 5
Construction neeri Division - Public Works
Project: Willis St & 4 Ave S Roundabout Project No.: 18-3020
Project Engineer: Thomas Leyrer
Capital Projects Brian Shields
Fed-Aid No.: nla
Contractor: ACI
Mana eri
Dater 01-08-2021
I. PROFOSED CHANGE
Place underground conduit for street lighting crossing 3'd Ave S at SR516. This CO to cover
electrician's labor, equipment, and materials necessary to perform this work. Trenching and
road restoration activities will be paid by existinq contract pay items.
II. REASON AND BACKGROUND FOR CHANGE
New underground electrical crossing is necessary across 3'd Ave S at SR516 to remove aerial
power supply to exisiting street luminaire. The technical oversight for this was provided by COK
Transportation group.
ITT. METHOD OF PAYMENT
NEW PAY |TEM(S)Not
Chan{e Order No.FOR ACCOUNI'NG USE ONLY
Sch. No.Item Description Total
Est. Qty
Qty this
PE
Unit Unit Price Total Estimated Gost of
Item
VI CO5 - 3'd ave conduit
crossinq
1 1 LS $3,920.00 $3,920.00
Independent Estimate Attached
- REOUIRED U CREATE PAY ITEM ONLY - Payment to be made
at a later date uoon comoletion of work X PAY THIS PAY ESTIMATE
Material Submittals Reouired - CC: Construction Coordinator New Sub Reqrd?No
DELETE EXISTING PAY ITEM(S) per 1-09.5 Not
Chan{e Order No.FOR ACCOUNT'NC USE ONLY
Sch. No.B.l. No.Unit Unit Price Gost of ltem
L_t Independent Estimate Attached - REQUIRED
Change Order No.FOR ACCOUNI'NG USE ONLV
Sch. No.B.l. No.Item Description Qtv Unit Unit Price Cost of ltem
TNcREASE/DECREASE TO EXTSTTNG PAY rTE M(s)
7
Not Applicable
REV. DATE:3/27/78
FILE NO: 2OO.2KENT
Independent Estimate Attached - REQUIRED
TOTAL ESTIMATED COST OF CHANGE ORDER *
*Total of the Cost of Item Columns
THIS PAY ESTTMATE $3,920.OO
IV. WORKING DAYS
920.OO
Original Contract 100 Due This Change Orderx o Previous Total 100
DATE:DATE:*explanation/Just
TOTAL WORKING DAYS*100
*This Ghange Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Capital Projects Manager:Date:6r'-ag*>a >-p
Construction Engineering
Supervisor:
Construction Manager:
Date:
Date:/a/u
2 REV. DATE: 3/27/78
A.C.r.
PROJECT
IOB # 20-0t4
EQUIP. NO.
Willis St. and 4th Ave. S Roundabout A.C.I. PHASE
CODE
TBDTBD
$85.82
$82. I 7
982.17
$82. I 7
s64.49
$64.49
SUBTOTAL LABOR
@ RATE
LS @ $0.00
SUBTOTAL MATERIALS
@ RATE
SERVICE SUBTOTAL
@ RATE
LS @ $3,500.00
SUB CONTRACTOR SUBTOTAL
MANPOWER
WoRKTNGFOREMAN @ 1.00
OPERATOR @ 1.0 0
oPERATOR @ l.o 0
OPERATOR @ 1.0 0
LABORER@l00
LABORER @ 1.0 0
DESCRIPTION
DESCRIPTION
DESCRIPTION
DATE WORK PERFORMED :
DESCRIPTION OF WORK
Added Street Light Xing
LABOR CLASS / RATES
IIOURS
0.0
0.0
0.0
0.0
0.0
0.0
@
@
@
@
@
@
@
TOTAL
$o oo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
EQUIPMENT DESCRIPTION / RATES
f,,QUIPMENT DESCRIPTION HOURS @ RATE
SUBTOTAL EQUIPMENT
TOTAI,
s0.00
TOTAL
$0.00
$0.00
TOTAL
$0.00
MARK.UP ON II\BOR 29%
SUBTOTALLABOR
MARK-UP ON EQUIPMEN"T 21%
SUBTOTAL EQUIPMENT
TAX ON MATERIALS (N/A ON WATER & SEWER) O.OO%
MARK.UP ON MATERIAIS 2IO/O
SUBTOTAL MATERIAI,S
MARK-UP ON SERVICE COST 21O/O
SUBTOTAL SERVICE COST
MARK-UP ON SUB-CONTRACTOR COST >$25,000 (Varies) t2o/o
SUBTOTAL SUB.CONTRACTOR COST
MATERIAL COSTS
UNIT
1.00
SERVICE COSTS
UNIT
SUB CONTRACTOR
UNIT
TOTEM ELECTRIC I.OO
TOTAL
$3,500.00
$3,s00.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
s0.00
$0.00
$0.00
$420.00
$3,920.00
GRAND TOTAL $3,920.00
tu Fhone (2i31 $83.5022
Fax {25i}f 2v2-6214
Change Order Request
t)l I\( ()\1\. l\{
4696 - Willis Street & 4th Ave S
Roundabout
COR Subject: SE 3rd St. lighting repair (conduit, wire,
labor)
To Jim Holland
ACt
5110 River Road East
Tacoma, WA 98443
253-248-1090
253-248-1093 (FAX)
Contract No: 18-3020
COR Number: 4696-6
COR Revision Number: 0
COR Date: 121912020
Work Type: Price / Proceed
Days Valid: 5
Return To Fred Duke
Totem Electric of Tacoma lnc
2332 Jefferson Ave
Tacoma, WA 98402
253-722-2840
253-272-5214 (FAX)
fd u ke@totemelectric.com
Details
Description
Gost
f Rate
otv
I Hrs Workers E)C
Foreman, Schaun Brodie $1 01.1 5 3.00
Hrs 1.00 $303.45
SE 3rd St. lighting repair
Foreman, Schaun Brodie $101.15 3.00
Hrs 1.00 $303.4s
SE 3rd St. lighting repair
Foreman, Chris Bond $1 01.1 5 3.00
Hrs 1.00 $303.45
SE 3rd St. lighting repair
Foreman, Chris Bond $101.15 3.00
Hrs 1.00 $303.45
SE 3rd St. lighting repair
T340 - T340 - 201 9 Bucket Truck $43.55 6.00 $261.30
SE 3rd St. lighting repair
T238 - T238 - 2016 Utitity Truck $19.54 6.00 $117.24
SE 3rd St. lighting repair
conduit, wire, fittings, splices, etc.$526.46 1.00
LUMP SUM $526.46
SE 3rd St. lighting repair
conduit, wire, fittings, splices, etc.$673.45 1.00
LUMP SUM $673.45
SE 3rd St. lighting repair
Breakout
Labor:
Overhead Percent @ 31%:
Equipment:
Overhead Percent @ 21%:
Material:
Overhead Percent @ 21%:
$1,213.80
$376.28
$378.54
$79.49
$1,199.91
$251.98
Total: $3,500.00
Reservation of Rights
This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the
sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for
any of these items.
Signed By:? + fr-F*Dated: 121912020
Fred Duke
Project Manager
Shields, Brian
From:
Sent:
To:
Cc:
Attachments:
Subject:
Connor, Eric
Monday, January Ll, 202111:23 AM
Shields, Brian
Howlett, Mark; Leyrer, Thomas
FW: Roundabout - 3rd ave conduit crossing
Willis Street Light Crossing Quote.pdf
Good Morning Brian,
I am okay with proceeding with the proposed pricing plus applicable unit pricing for the
additional street light conduit work on SE 3'd.
Thank you,
Eric
Eric Connof I Construction Engineering Manager
Phone 253-856-5533 | Cell 253-797-0693
crTY oF KENT, WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E.MAIL
From: Shields, Brian <BShields@kentwa.sov>
Sent: Monday, January Ll,2O2'J,71,:17 AM
To: Connor, Eric <EConnor@kentwa.gov>
Subject: Roundabout - 3rd ave conduit crossing
E ric,
Attached is the estimate from ACI to get the overhead line removed at the 3'd ave crossing.
His estimate is a little high. I don't think the sawcutting/removals are 20" in those areas, they will be paid according to
the pay description formulas.
Can you confirm that we would like to proceed?
As a reminder, this is the solution that keeps away from replacing any curb ramps/concrete and avoids out-of-ROW
work. This would be the cost added on to the concrete work, should we go an alternate route.
Brian Shields, Senior construction Inspector
Construction Management I Public Works Department
22O 4th Avenue South, Kent, WA 98032
MainlCell 253-293-4973 | Desk 2s3-8s6-6sto
bshields@KentWA.qov
crTY oF KENT, WASHTNGTON
KentWA.oov Facebook iwi{.ilr,:l YouTube
L
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E.MAIL