HomeMy WebLinkAboutCAG2020-137 - Change Order - #4 - Active Construction, Inc. - Willis St & 4th Ave S Roundabout - 01/13/2021Agreement Routing Form
KENT For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cheny colored paper)WaSHtNGToN
E
oLcg
Originator:
C. Frame
Department:
PW Engineering
Date Sent:
1t22t2021
Date Required:
N/A
Authorized to Sign:
E Director or Designee E Mayor
Date of Council Approval
N/A
Budget Account Number:
R901 12.641 10.120
Budget? EIYes ENo
Grant? E Yes EI No
Type: N/A
tro
flo
ELol|-s
lHtrg
EooL
C'l
Vendor Name:
Active Construction, lnc
Category:
Contract
Vendor Number:
231 9336
Sub-Category:
Change Order #4
Project Name: Willis Street and 4th Ave. S. Roundabout
Project Details: lnstall three additional blast lighting units to achieve desired lighting
aesthetics.
Agreement Amount: $4,646.73
Start Date: N/A
Basis for Selection of Contractor: $id
Termination Date: N/A
Local Business? El Yes E No*
*lf meets requirements per KCC 3.70.100, please complete 'Vendor Purchase-Local Exceptions' form on Cityspace.
Notice required prior to disclosure?
EYes E No
Contract Number:
0AG202A-137
trltr
ty
J\,o
.a -s
Qt=E3oc
.9vt
Date Received by city Attorney:Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk's Office:
ad(W221/l_1_20 Visit Documents.KentwA.gov to obtain copies of all agreements
KENT
WASHINGToN
CHANGE ORDER NO. 4
NAME OF CONTMCTOR: ActiVe construction, Inc. ("contractor")
CONTMCT NAME & PROJECT NUMBER: Willis Street and 4th Ave. S. Roundabout
ORIGINAL CONTRACT DATE: MAY 15, 2O2Q
This Change Order amends the above-referenced contract; all other provisions of the
contract that arq not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the pafties, the project contract is modified as follows:
l. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Install three additional blast lighting units to achieve the desired lighting
aesthetics on center island artwork.
Z. The contract amount and time for peformance provisions of Section II "Time of
Completion," and SectiOn III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(including applicable alternates and
WSST)
$4,759,759.00
Net Change by Previous Change Orders
(incl. applicable WSST)
$43,871.59
Current Contract Amount
(incl. Previous Change Orders)
$4,803,630.59
Current Change Order $4,646.73
Applicable WSST Tax on this Change
Order
$0.00
Revised Contract Sum $4,808,277.32
CHANGE ORDER - 1 OF 3
Original Time for ComPletion
(insert date)
100
Revised Time for ComPletion under
prior Change Orders
(inseft date)
100
Days Required (+) for this Change Order o calendar days
Revised Time for ComPletion
(insert date)
100
In accordance with Sections L-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agtees to waive any prolest it may have regarding this Change Order and acknowledges and
alcepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have aPPlied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modiflcation, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below'
Its Intefim Public Works Director
CITV OF KENT:
Y
Print Name . Charl Riprrrn
DATE:s/nt
(signature)
(title)
CONTRACTOR:
me:
DATE:I
lutte)tlt t
Print
By:
CHANGE ORDER - 2OF 3
N
ATTESTI
Kent City
APPROVED AS TO FORM:
(applicable if Mayofs signature required)
Kent Law Depaftment
[tn this fleld, you may enter the €lectronlc lllepoth she.8 the mntEct ha5 b€En sav€dl
CHANGE ORDER. 3 OF 3
FILE NO: 2OO.2KENT
CHANGE ORDER WORKSHEET NO. 4
Construction E Division - Public Works
Project: Willis St &4 Ave S Roundabout Project No.: 18-3020
Project Engineer: Thomas Leyrer
Capital Projects Brian Shields
Manaqer:
Fed-Aid No.: nla
Contractor: ACI
Date: 01-08-2021
I. PR.OPOSED CHANGE
Per RFIO11 response from KPG consultants, three (3) additional blast lighting units to be added
to project, bringing the required quantity of 34 to 37. This is necessary to achieve desired
lightnig aesthetics on center island artwork. CO to cover the cost of all labor, equipment, and
materials to rform the necessa work
rT. REASON AND BACKGROUND FOR CHANGE
Contract documents only called out 34 necessary blast lighting units while 37 units are needed
to achieve desired lighting aesthetics on center island artwork. The new quantity of lights was
confirmed KPG architectural des n consultant for this contract in their res onse to RFI011.
III. METHOD OF PAYMENT
NEW PAY |TEM(S)Not
ChanSe Order No.FOR ACCOUNT''VG USE ONLY
Sch. No.Item Description Total
Est. Qty
Qty this
PE
Unit Unit Price Total Estimated Gost of
Item
VI CO4 - Additional blast liqhtinq 1 1 LS $4,646.73 $4,646.73
Independent Estimate Attached
- REOUIRED U CREATE PAY ITEM ONLY - Payment to be made
at a later date uoon comoletion of work X PAY THIS PAY ESTIMATE
Material Submittals Required - CC: Construction Coordinator New Sub Reqrd?No
DELETE EXISTING PAY per 1-09.5 Not Applicable
Chante Order No.FOR ACCOUNT'NG USE ONLY
Sch. No.B.l. No.Item Description Qtv Unit Unit Price Gost of ltem
Independent Estimate Attached - REQUIRED
Change Order No.FOR ACCOUNT''VG USE ONLY
Sch. No.B.l. No.Item Description Qtv Unit Unit Price Gost of ltem
INCREAS EASE TO EXTSTTNG PAY ITEM(S)
7
Not
REV. DATE: 3/27lLg
FILE NO: 2OO.2KENT
tr Independent Estimate Attached - REQUIRED
TOTAL ESTIMATED COST OF CHANGE ORDER *
*Total of the Cost of ftem Columns
THIS PAY ESTIMATE $4,646.73
IV. WORKING DAVS
6.73
Original Contract 100 Due This Change Order*o Previous Total 100
DATE:DATE:*Exolanation/Just Reouired:
TOTAL WORKING DAYS*100
xThis Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Gapital Projects Manager:Date: 6t*CAg-Z-eZ\
Construction Engineering
Supervisor:
Construction Manager:
a/-,//'Date:
Date:
t/a/z-t
2 REV. DATE: 3/27/I8
A.C.r.
PROJECT
JOB # 20-014
EQUIP, NO.
MANPOWER
WoRKTNGFOREMAN @r.00
OPERATOR @ 1.0 0
OPERATOR @ 1.0 0
OPERATOR @ 1.0 0
LABORER@ 1.00
LABORER@l00
DESCRIPTION
DESCRIPTION
DESCRIPTION
Willis St. and 4th Ave. S Roundabout
DATEWORKPERFORMED: TBD2020
DESCRIPTION OF WORK
Added Blast Lighting ffom RFI 0l I
LABOR CLASS / RATES
HOURS
0.0
0.0
0.0
0.0
0.0
0.0
$85.82
$82. l7
$82. l7
$82. l7
s64.49
$64.49
SUBTOTAL LABOR
@ RATE
LS @ $0.00
SUBTOTAL MATERHLS
@ RATE
SERVICE SUBTOTAL
@ RATE
LS@ $4,148.87
SUB CONTRACTOR SUBTOTAL
A.C.I. PHASE
CODE
TBD
@
@
@
@
@
@
@
TOTAL
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
EQUIPMENT DESCRIPTION / RATES
EQUIPMENTDESCRIPTION HOURS @ RATE
SUBTOTAL EQUIPMENT
TOTAL
$0.00
TOTAL
$0.00
$0.00
TOTAL
$0.00
TOTAL
$4,148.87
$4,148.87
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$497.86
$4,646,73
MATERIAL COSTS
UNIT
1.00
SERVICE COSTS
UNIT
SUB CONTRACTOR
UNIT
1.00
MARK.UP ON LABOR 29O/O
SUBTOTAL LABOR
MARK-UP ON EQUIPMENT 2I%
SUBTOTAL EQUIPMENT
TAX ON MATERIALS (N/A ON WATER & SEWER) 0.00o/o
MARK-UP ON MATERIALS 27O/O
SUBTOTAL MATERHLS
MARK-UP ON SERVICE COST 2IO/O
- SUBTOTALSERVICECOST
MARK-UP ON SUB-CONTRACTOR COST >$25,000 (Varies) l2o/o
SUBTOTAL SUB-CONTRACTOR COST
GRAND TOTAL $4,646.73
%(F ttrcTRtc
Phone {2i31 38$-5022
Fax {2531 272-5214
Change Order Request
4696 - Willis Street & 4th Ave S. Roundabout COR Subject: BLAST added tighting and arms
To Jim Holland
ACt
5{10 River Road East
Tacoma, WA 98443
253-248-1090
253-248-1093 (FAX)
Contract No:
GOR Number:
COR Revision Number:
COR Date:
Work Type:
GC COR / RFI No:
RFI Reference No:
Days Valid:
I 8-3020
4696-3
0
9116t2020
Price / Do Not
Proceed
RFt #11
RFt #11
5Return To Fred Duke
Totem Electric of Tacoma lnc
2332 Jefferson Ave
Tacoma, WA 98402
253-722-2840
253-272-5214 (FAX)
fd u ke@totemelectric.com
Scope Of Work / Time Extension Request
Per direction provided through RFI #11, Totem needs to add 1 BLAST light fixture in a foundation "A" in the center of
the roundabout and 2 arms for fixtures already included.
Details
{)t I.\r_(}\l\. t\{.
Description
Cost
/ Rate I
aty
Hrs Workerc Ext
crew of one to place arms & light $101.15
12.00
Hrs 1.00 $1213.80
form and install light
T238 - 2016 Utility Truck $19.45 6.00 $116.70
foreman rig
BLAST light fixture and arms $1,498.00 1.00
LUMP SUM $1498.00
per attached quote
Misc. Mat. pipe, forming, wire,
etc.$500,00
1.00
LUMP SUM $500.00
conduit, fittings, wire, form ply and hardware, etc
Breakout
Labor:
Overhead Percent @ 31%:
Equipment:
Overhead Percent @ 21%:
Material:
Overhead Percent @ 21%:
$1,213.80
$376.28
$116.70
$24.51
$1,998.00
$419.58
Total: $4,148.87
Reservation of Rights
This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the
sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for
any of these items.
Signed By:?+ fre Dated: 911612020
Fred Duke
Project Manager
Date: Sep 11,2020 Quote: TAWA20-5026-1
Expires
Quote
Phone: (253) 779-3600
Fax: (253) 779-3605
From: Aaron Null
Quoter Ph: (253) 779-3634
email: aaron.nu ll@graybar.com
2020
2A20
o Page 112
GraftaR
worKs Io your advantage
Project
Location
Quote
To:
QTY Type
1
Totem Electric
2332 S Jefferson
Tacoma WA 98402-1405
WILLIS STREET & 4TH AV S
ROUNDABOUT - New Bid
KENT WA
TAWA20-5026-1
For
Bid D Sep 11
Oct 11,
ate
Part
423-OOOO1 3-04 COLORBLAST GEN4 POWERCORE,
RGBA, GLEAR LENS, GRAY HOUSING,UUCE
ExtPrice
$998.00
$500.00
$1,498.00
120-000201-05 23' MOUNTTNG ARM
-FREIGHT ALLOWED IF ADDED TO THE ORIGINAL
ORDER & SUBJECT TO ADDITIONAL FREIGHT
CHARGE IF ORDERED SEPERATELY--
Total:
Notes:
NO MOUNTING OR HANGING HARDWARE INCLUDED UNLESS NOTED
QUOTED BOM IS OUR BEST INTERPRETATION OF THE AVAILABLE PLANS AND IS UP TO
THE CONTRACTOR TO VERIFY ALL MATERIAL, COUNTS, VOLTAGES, FINISHES AND
DIMENSIONS
FACTORIES TO CONFIRM LEAD TIME OF MATERIAL AFTER RETURN OF APPROVED
SUBMITTALS . ESTIMATED UP TO 15.18 WEEKS AFTER APPROVAL & RELEASE OF
ORDER AND SUBJECT TO CHANGE BASED ON CURRENT FACTORY SCHEDULE AT
TIME OF RELEASE
ESTIMATED 1.3 WEEK TRANSIT TIME AFTER MATERIAL SHIPMENT FROM FACTORY
FACTORIES TO CONFIRM LEAD TIME FOR SUBMITTALS AT TIME OF ORDER
SIGNED APPROVED SUBMITTALS REQUIRED FOR ANY MATERIAL TO BE RELEASED
FOR MANUFACTURING
QUOTING STANDARD FACTORY WARRANTIES UNLESS NOTED OTHERWISE
PRICING DOES NOT INCLUDE SALES TAX
ANY CHANGES TO QUOTED BOM OR QTY'S WILLVOID THIS QUOTATION
2
Aaron Null Page 112
:l
REQT.IEST FOR INFORMATION
RFINo. lorr llonNo. lzo-ort lcoNrnecrNo.1 8-3020 lrere:8127120
NAME:St and 4th Avc, S Roundabout
TO;Brian Shields
Construction Inspector
City of Kent
PHONE:bshields@KentWA.gov
REFERENCE TO DRAWING OR SPECtrICATION NO.Sheets: SE006
SUBJECT Storm Clarification
Please recall that during the conference call 8/1 8 discussing the accent lighting KPG stated that there were 3 each
additional Blast Light fixtures from the 34 each call out on Sheet SE006. It was made known there is to be 2 each
Blast Light Fixtures on arrns and there was one Blast Light fixture in the very center no one was aware of that
one. Please reference the attached plan sheet SE006. From the meeting ACI and Totem now understand there is
an addition of 3 each light fixtures. 2 each Blast Light fixtures that require mounting arrns on the exterior of
sculptures 1 &2 and I each Blast Light fixture in the center of the roundabout Type A. That one Blast Light
fixture they claim to be in the center is not identified like the others that they clearly identifo as BLAST RGBA
LIGHTFIXTURE, TYP.
Please advise and approve the three additional lights from the 34 each call out on SE006 and pricing will follow
If the City of Kent or others would like to meet to better discuss please let us know so we can make ourselves
available.
REQUIRED DATE OF' INFORMATION:
IMPACTONJOB Roundabout Completion / Installation
TO SCTIEDTILE:es
COSTEFFECT:INCREASE (approximate value TBD on verification of quantifv )
CHANGEINPRICE
DECREASE (approximate value _)
PREPAREDBY:Jim Holland - Project Manager
RESPONSE:
Cornd- fiul i! (3) rdditiomt Eltrt RGBA frrhrro fiom 34 b 3? nradrd Thc onr (1) Bm RGEA
fudtru in the ombr of g$arry lbfrnt fuurdrtkn typ. A b NOT on r mounting tnn to it docr not
graphically havc an arm mount in thc ccntar of the fixturc (as the rcst of the other fixturse). The
callout for it to be a Blaet fidure is on SE006 on gatoway featurc foundation type A.
PREPAREDBY Phuong N. Nguycn TURE:
SIGNATURE:
DATE:
8/31n0
Qss) 248-1091 (2s3) 248-1092 F AX
PO BOX 430 pUyALLUp, WASHINGTON 9837t
www.activeconstruction.com
Lgen4, RGBA, LOa-277vAc,80-degree spread lens,gray houslng, UVCE/CeCwith gsGRArNorEsgErar tai,l sortmI 1 rla :, t6tru nu23',mounting arms andassociated tamper resistantfastenersBlast Uoht Rxture:. Color Klnetics Colorglast powercoreicnffiilu!,r'ffiffiffiffiffis*tmsrmorErul o'ods mrm Dg .F dllrslEmmi.lst r$ tFtrlmJrtllf^ne ql.utrcgllttt lErmtcfutDfitot t ulor8rm-ffi':roms rn( rr, l6t l! tlgotE EIA hrhm ru(rlErn nEFli4 r6nr ulEmrbtilGiN'Tmq" mffsHffffi*ftI rm 0AlaAt rEmnE rln Mro tat uujtr sll Eilr lGrt rfi clEuy lgtMouru.n, s:m[ gGtsgl tro s@.nGE dtEIf,A'IIE TOXSET,AI ETTTEFmITF!E lEtf, sGrwffiffiffi#' fislMnot $rlni lTsw Y FlltFt FuriD^lxlt n9E BSE_ rm\ElHGilEIhII 'ITTfiEfEtD Gr[.rufixtmvf DAt5nsra iltsEcllCltllGlR:6RA,G{lG}ftFfiRtIE narArArhil D€IALlJtiear Grara Lhht,FI\,Q',ret. Color Klnetics Color Graze MX4 powercore RGBA, 6o_degreex 3o-degree angte, 2 ft wtth watertighi "utJo* l"iJoendosure box and end to end Jumper cable, leader cablesand associated tamper resishit fasteners -' '----' 'EM8€E! 4qcEilTu$rlrilc LAYOUT ruN{ (Ar ROUXDABOUnA (noted onis localedon gatewayfioundaflorrstyp.total) on mountingand (1 total)mounted onfeafureAx-SITE ELEM€I{TS DETAILSBID SUBMTNALIVIUJS SIREET AND ,t'IH AVE SROUNDAAOUTDivirioa