HomeMy WebLinkAboutCAG2020-137 - Change Order - #2 - Active Construction, Inc. - Willis St & 4th Ave S Roundabout - 01/13/2021Agreement Routing Form
KENT For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)WasHtNoroN
o
oLco.
Originator:
C. Frame
Department:
PW Engineering
Date Sent:
112212021
Date Required
N/A
Authorized to Sign:
E Director or Designee E Mayor
Date of Council Approval:
N/A
Budget Account Number:
R901 12.641 '10,120
Budget? EYes trNo
Grant? EYes E No
Type: N/A
co
IPo
EL.olfr
E
Pco
Eo
7tL
Ol
Vendor Name:
Active Construction, lnc
Category:
Contract
Vendor Number:
231 9336
Sub-Category:
Change Order #2
Project Name: Willis Street and 4th Ave. S. Roundabout
Project Details: lnstall new pedestal at electrical service cabinet that's capable of receiving
quantity of conduit runs shown on plans and demo existing cabinet.
Agreement Amount: $7,795.07
Start Date: N/A
Basis for Selection of Contractor: gid
Termination Date: N/A
Local Business? E Yes El No*
*lf meets requirements per KCC 3.70.100, please complete'Vendor Purchase-Local Exceptions" form on Cityspace.
Notice required prior to disclosure?
EYes E No
Contract Number:
cAG2020-137
g|c
T
J\o
a*
o=Ei oc.9vt
Date Received by City Attorney:Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk's Office:
ad((W22173_1,20 Visit Documents.KentWA.gov to obtain copies of all agreements
KENT
WA3HI!GToN
CHANGE ORDER NO. 2
NAME OF CONTMCTOR:
CONTMCT NAME & PROJECT NUMBER:
ORIGINAL CONTMCT DATE:
Active Construction. Inc. ("Contractor")
Willis Street and 4th Ave. S. Roundabout
May 15. 2020
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the pafties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equiPment necessary to:
Install new pedestal at electrical service cabinet that's capable of
receiving quantity of conduit runs shown on plans and demo existing
cabinet. The cabinet is necessary to power specified electrical
a P Pu ftena n ces/sYstem s.
Z. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "COmpensation," are hereby modified as follows:
Original Contract Sum,
(including applicable alternates
wssr)
and
$4,759,759.00
Net Change by Previous Change Orders
(incl, applicable WSST)
$3,342.88
Current Contract Amount
(incl. Previous Change Orders)
$4,763,101.88
Current Change Order $7,795.07
Applicable WSST Tax on this C hange
Order
$o.oo
Revised Contract Sum $4,770,896.95
CHANGE ORDER - 1 OF 3
Original Time for ComPletion
(inseft date)
100
Revised Time for Completion under
prior Change Orders
(insert date)
100
Days Required (+) for this Change Order 0 calendar days
Revised Time for Completion
(insert date)
r00
In accordance with Sections L-A4.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below, Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
a-cepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have apPlied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
Its Interim Publlc Works Director
CITY OF KENTI
, (Z-l &),^
Print Name:Chad Bieren
(signature)
DATE:
(titte)
CONTRACTOR:
me
(title)
T 't-
I
By:
DATE:
Print
CHANGE ORDER - 2 OF 3
0n/*
ATTEST:
t//y\
Kent City Clerk
APPROVED AS TO FORI{:
(applicable if Mayor\ slgnature required)
Kent Law Department
Un ttlls neld, you may ent€a the electrcnlc fllepath where th€ contnd h# been savedl
CHANGE ORDER - 3 OF 3
FILE NO: 2OO.2KENT
CHANGE ORDER WORKSHEET NO. 2
Construction Engineering Division - Public Works
Project: Willis St & 4th Ave S Roundabout
Project Engineer: Thomas Leyrer
Capital Projects Brian Shields
Manaqer:
Project No.:
Fed-Aid No.:
Contractor:
18-3020
nla
ACI
Date: 01-08-2021
I. PROPOSED CHANGE
Install new pedestal at electrical service cabinet on NE corner of Saar St and 4 Ave S that is
capabale of receiving quantity of conduit runs shown on plans, as necessary to power specified
electrical appurtenances/systems. CO2 to cover all labor, equipment, and material necessary to
place new pedestal, demo existing pedestal, placement of new type 8 junction box, and
mountin of existin service cabinet to the new
II. REASON AND BACKGROUND FOR CHANGE
Old service cabinet pedestal unable to receive necessary conduit runs to build project to
completion. Mike Sorensen and transportation group provided technical oversight in the
decision to place existing cabinet on new pedestal and install new type 8 junction box adjacent
to new edestal location.
III. METHOD OF PAYMENT
NEW PAY |TEM(S)Not Applicable
ChanSe Order No.FOR ACCOUNT'NG USE ONLY
Sch. No.Item Description Total
Est. Qty
Qty this
PE
Unit Unit Price Total Estimated Cost of
Item
VI CO2 - New Electrical Pedestal 1 1 LS $7,795.07 $7,795.07
Independent Estimate Attached
- REOUIRED LI CREATE PAY ITEM ONLY - Payment to be made
at a later date upon completion of work X PAY THIS PAY ESTIMATE
n Material Submittals Reouired - CC: Construction Coordlnator New Sub Reqrd?No
ChanSe Order No.FOR ACCOUNI"VG USE ONLY
Sch. No.B.l. No.n Qtv Unit Unit Price Cost of ltem
tt Independent Estimate Attached - REQUIRED
DELETE EXISTING PAY ITEM(S) per 1{9.5 Not Applicable
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ffi wotnppficabte
I REV. DATE:3/27/L8
FILE NO: 2OO.2KENT
Chan(e Order No.FOR ACCOUNI'NG USE ONI.Y
Sch. No.B.l. No.Item Description Qtv Unit Unit Price Cost of ltem
Independent Estimate Attached - REQUIRED
TOTAL ESTIMATED COST OF CHANGE ORDER X
*Total of the Cost of Item Columns
THIS PAY ESTIMATE g7,795.07
IV. WORKING DAYS
7 795.O7
Original Contract 100 Due This Change Order*o Previous Total 100
DATE:DATE:*Exolanation/Justification Reouired:
TOTAL WORKING DAYS*ro0
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Capital Projects Manager:
Construction Engineering
Supervisor:
Date:
Date:
6/ *OK-2a>-l
/, ',
2
Gonstruction Manager:Date
REV. DATE: 3/27/I8
FILE NO: 2OO.2KENT
3 REV. DATE: 3/27/I8
A.C.I. A.C.I. PHASE
'ROJECT
Willis St. and 4th Ave. S Roundabout
CODE
JOB#20-014 DATEWORKPERFORMED: TBD2020 TBD
DESCRIPTION OFWORK
Provide revisions to the existing power service including, but not limited to, extension ofnew conduits, new service pedestal, added Type 8 J-
Box, demo old pedestal and associated conductors, trenching, forming, etc.
MANPOWER
woRKrNG FOREMAN @ 1.0 0
OPERATOR @ r.0 0
OPERATOR @ 1.00
oPERATOR @ 1.0 0
LABORER @ 1.0 0
LABORER@ 1.00
DESCRIPTION
DESCRIPTION
DESCRIPTION
I.ABOR CLASS / RATES
HOURS
0.0
0.0
0.0
0.0
00
0.0
MATERIALCOSTS
UNIT
1.00
SERVICE COSTS
IJNIT
SUB CONTRACTOR
UNIT
1.00
$85.82
$82. l7
$82. I 7
$82. l7
$64.49
$64.49
SUBTOTALLABOR
@ RATE
LS @ $o.oo
SUBTOTAL MATARIALS
@ RATE
SERVICESUBTOTAL
@ RATE
LS @ $6,95e.88
SUB CONTRACTOR SUBTOTAL
@
@
@
@
@
@
@
TOTAL
$0.00
$o.oo
$0.00
$0.00
$0.00
$0.00
$0.00
EQUIP. NO.
EQUIPMENT DESCRIPTION / RATES
EQUIPMENTDESCRIPTION HOURS @ RATE
SUBTOTAL EQUIPMENT
TOTAL
s0.00
TOTAL
s0.00
$0.00
TOTAL
$0.00
MARK.UP ON LABOR 29O/O
SUBTOTALLABOR
MARK-UP ON EQUIPMf,,NT 210/O
SUBTOTAL f,,QUIPMENT
TAX ON MATERIALS (N/A ON WATER & SEWER) 0,00o/o
MARK.UP ON MATERIAIf 2IO/O
SUBTOTAL MATERHLS
MARK-UP ON SERVICE COST 2IO/O
SUBTOTAL SERVICE COST
MARK-UP ON SUB-CONTRACTOR COST >$25,{X)0 (Varies) 12%
SUBTOTAL SUB-CONTRACTOR COST
TOTAL
$6,959.88
s6,959.8E
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$835.19
$7,79s,O7
GRANDTOTAL $7,795.07
ELECTRIC
Phone {t$l $83-5029
Far {2$}f 272-5214
Change Order Request
{rl l\((}\l\. t\{
4696 - Willis Street & 4th Ave S. Roundabout COR Subject: Existing Service Revisions
To Jim Holland
ACt
5110 River Road East
Tacoma, WA 98443
253-248-1090
253-248-1093 (FAX)
Gontract Nol
COR Number:
COR Revision Number:
COR Date:
Work Type:
Days Valid:
18-3020
4696-2
0
9t2t2020
Price / Do Not
Proceed
5
Return To Fred Duke
Totem Electric of Tacoma Inc
2332 Jefferson Ave
Tacoma, WA 98402
253-722-2840
253-272-5214 (FAX)
fd u ke@totemelectric.com
Scope Of Work / Time Extension Request
Provide revisions to the existing power service including, but not limited to, extension of new conduits, new service
pedestal, added type 8 j-box, demo of old pedestal and associated conductors, trenching, forming, etc.
Details
Description
Cost
I Rate
atv
Hrs Workers Ext
Labor Per Scope below $95.86 12.00
Hrs 3.00 $3450.96
Averaged Labor Rate
Backhoe $36.22 6.00 $217.32
Per Equipment List
Foreman Utility Truck $19.54 12.00 $234.48
Per Equipment List
Type 8 J-box $1,250.00
1.00
EACH $1250.00
Conduit, fittings $314.00
1.00
LUMP SUM $314.00
(150 LF & 14 - 90's)
Breakout
Labor:
Overhead Percent @ 31%:
Equipment:
Overhead Percent @ 21%:
Material:
Overhead Percent @ 21%:
$3,450.96
$1,069.80
$451.80
$94.88
$1,564.00
$328.44
Total: $6,959.88
Reservation of Rights
This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the
sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for
any of these items.
Signed By:? t- P#*Dated:91212020
Fred Duke
Project Manager
9t2t2020 Totem Eleckic Mail - FW: Kent Roundabout - service cabinet(TZ**n
, ELECTRTc
Duke, Fred <fduke@totemelectric.com>
FW: Kent Roundabout - service cabinet
1 message
Jim Holland <JimH@activeconstruction.com> Tue, Aug 11,2020 at 3:37 pM
To: "Palfenier, Roger" <rpalfenier@totemelectric.com>, "Duke, Fred" <fduke@totemelectric.com>, Josh Bedient
<j bedient@totemelectric.com>
Cc: Kevin Aalmo <kevina@activeconstruction.com>, Elizabeth Morris <elizabethc@activeconstruction.com>
Team,
Please review email below from Brian our City of Kent inspector concerning the existing power cabinet/area. Please send
pricing for the additional work and materials so we can propose it to the City.
Thanks,
-.lim
JII\4 HOLLAND I Ploject \4anager/ Estimator
O:253 248-1091 | M: 253 49s-8286lF 253 248-1093 |(GET ACTIVE'
P.O. Box 430, Ptryallup, WA 98371 |rvwu,.actitecorrstluction.corl ljinh@Tactiveconslruction.com
ACI is an Equat Opportunity Enrployer I FOLLOW US: ll
notifl' ths scndcr br.rcplv e-mail, anrl then dcstrol'all ct:1>ics ofthe nlessage and irs atachrnents, ifnnr'.
From: Shields, Brian [mailto:BShields@kentwa.gov]
Sent: Tuesday, August 11, 2020 2:45 PM
To: Elizabeth Morris <elizabethc@activeconstruction.com>; Jim Holland <JimH@aciiveconstruction.com>;Kevin Aalmo
<kevina@activeconstruction.com>
Cc: Ghanim, Mazin <MGhanim@kentwa.gov>
Subject: Kenl Roundabout - service cabinet
Team,
The City of Kent has decided to use the existing cabinet on a new pedestal and install a type 8 J-box adjacenUbehind the
cabinet. I can mark it in the field with Kevin, tomorrow.
https:/lmail.google.com/mail/u/0?ik=f991efsce7&view=pt&search=all&permlhid=thread-f%3A1674770331132020899%7Cms g-to/olA1674770A911.3,2A2... 1lz
91212020 Totem Elechic Mail - FW: Kenl Roundabout - service cabinet
Please provide updated pricing for the placement of the pedestal and cabinet switch over. All items able to be paid by
existing bid items will be (ie junction box per ea).
Let me know if you have any questions. Thanks!
Brian Shields, Senior Construction Inspector
Construction Management I Public Works Department
220 4th Avenue South, l(ent, WA 98032
Main/Cell 253-293-4973 | Desk zse-es6-6sto
bshields@KentWA.gov
CITY OF KENT, IIVASI|INGTON
KentWA.gov Facebook Twitter YouTube
THE ENVIRONf{EN'T BEFORE PRINTING THISP
https://mail,google.com/mail/u/0?ik=f€lglefSceTgvisriv=pt&search-all&permthid=thread-f%3A 1674770931132020899%7Cms g-P/o3A167477039113202... Zl2
Shields, Brian
Sent:
To:
Cc:
From:Sorensen, Michael
Tuesday, August 04,20201:41 PM
Shields, Brian; Leyrer, Thomas
Ghanim, Mazin; Moore, Jim; Hawkes, Derek
RE: Willis & 4th Roundabout - RFI 003
Hi Brain,
Sounds like a great solution!
Thank you,
Mike
From: Shields, Brian
Sent: Monday, August 03,2020 10:05 AM
To: Leyrer, Thomas; Sorensen, Michael
Cc: Ghanim, Mazin; Moore, Jim; Hawkes, Derek
Subject: RE: Willis & 4th Roundabout - RFI 003
Totem is saying they can "make it work" but it won't be installed exactly as planned. I am comfortable with their
solution, so long as Mike's group is. lt will require a new concrete pedestal and a type 8 J-box but we can save the -
58,000 for a new cabinet by reusing the old.
Brian Shields, Senior Construction Inspector
Construction Management I Public Works Department
22O 4th Avenue South, Kent, WA 98032
|4ainlCell 257-293-4973 | Desk 2s3-ss6-6s1o
bshields@KentWA.gov
clw oF KENT, WASHINGTON
KentwA.qov Facebook i.!!i,i:"ll::i YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Leyrer, Thomas
Sent: Monday, August 03,2020 9:45 AM
To: Sorensen, Michael
Cc: Shields, Brian; Ghanim, Mazin; Moore, Jim; Hawkes, Derek
Subject: FW: Willis & 4th Roundabout - RFI 003
Hi Mike,
Please see email from Brian below. Could the existing cabinet at 4th & Saar be reused on a new
pedestal? Does the existing cabinet need to remain in service while the new one gets installed?
Thank you,
Thomas
Thomas Leyrer, P.E, Engineer III
Design Engineering I Public Works Department
400 West Gowe Street, Kent, WA 98032
Subject:
1
Phone 253-856-5562
tlevrer@kentwa.oov
CITY OF KENT, WASHINGTON
KentWA.qov Facebook ! rl;,ill'r,;r; YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E.MAIL
From: Shields, Brian <BShields@kentwa.gov>
Sent: Monday, August 3,2O2O 9:31AM
To: Leyrer, Thomas <TLeyrer@kentwa.gov>
Subject: Fwd:Willis & 4th Roundabout - RFI 003
Thomas,
I requested a price for new cabinet. It is pretty expensive. Can we verify if there is room to reuse the existing cabinet on a
new pedestal? I've talked with signal techs a bit but Totem Ian still concerned.
Thanks.
Get Outlook for iOS
From: Eliza beth Morris <elizabethc@activeconstruction.com>
Sent: Monday, August 3,2O2O 9:25:46 AM
To: Shields, Brian <BShields@kentwa.gov>
Subject: FW: Willis & 4th Roundabout - RFI 003
Brian,
Please see belodattached!
Thank you,
ELIZABETH MORRIS I Project Engineer
O:253 248-1436lM: 414 323-0607 lF:253 248-1092 |
(GET ACTIVE'
P.O. Box 430, Puyallup, WA 98371 | www.activeconstruction.com I elizabethc(@activeconstruction.com
2
EXTERNAL EMAIL
ACI is an Equal Opportunity Employer I FOTLOW US: fl
IMPORTANT/CONITIDI?,NTIAL: 'I'his e-mail message (and any attachments accompanying it) may contain confidential information. f'he information is
intended only for the usc of the intended recipient(s). l)elivery of this message to anyone other than the intended recipient(s) is not intended to waive any
privilege or otherwise detract from the confidentiality of the message. If you are not thc ifltended recipient, or if this message has been addressed to you in
error, do not tead, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, plcase promptly notiS' the sender by reply e-mail,
and then dcstroy all copies of the message and its attachments, if any.
From: Jim Holland
Sent: Friday, July 10, 202010:02 AM
To:'Shields, Brian' <BShields@kentwa.eov>
Cc: Kevin Aalmo <kevina@activeconstruction.com>; Elizabeth Morris <elizabethc@activeconstruction.com>
Subject: Willis & 4th Roundabout - RFl003
Good Morning Brian,
Please see attached RFI 003 for your review and response. As discussed in the field yesterday andpictures attached
Thank you,
-Jim
JIM HOLLAND I Project Manager/ Estimator
O:253 248-1091 | M: 253 49s-8286 | F: 253 248-1093 |
6'GET ACTIVE'
P.O. Box 430, Puyallup, WA 98371| www.activeconstruction.com ljimh@activeconstruction.com
ACI is an Equal Opportunity Employer I FOttOW US: Jl
intcndcd only for thc usc of thc intcndcd recipicnt(s). Dclivcry of this mcssage t() anyonc othcr than thc intcndcd recipicnt(s) is not intcndcd to waivc any
privilcge or othcnvisc dctract from thc confidentiality of the messagc. I I you arc not thc inte ndcd rccipicnt, or if this mcssegc has bccn addrcsscd to you in
and thcn destroy all copics of thc messagc and its attachmcnts, if any.
3