HomeMy WebLinkAboutCAG2020-137 - Change Order - #1 - Active Construction, Inc. - Willis St & 4th Ave S Roundabout - 01/13/2021Agreement Routing Form
KENT For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)WA3HtNoroN
G
oLcc
Originator:
C. Frame
Department:
PW Engineering
Date Sent:
1t22t2021
Date Required
N/A
Authorized to Sign:
E Director or Designee E Mayor
Date of Council Approval:
N/A
Budget Account Number:
R901 12.641 10.120
Budget? EIYes trNo
Grant? EYes ENo
Type: N/A
C
.9tht
G
ELorF
E*,co
Eo
atLo
Vendor Name:
Active Construction, lnc
Category:
Contract
Vendor Number:
231 9336
Sub-Category:
Change Order #1
Project t,tame: Willis Street and 4th Ave. S. Roundabout
Project Details: Relocate temporary light at NW corner of the roundabout to accomodate
safe merge point.
Agreement Amount: $3,342.88
Start Date: N/A
Basis for Selection of Contractor: $id
Termination Date: N/A
Local Business? E Yes E No*
*lf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions' form on Cityspace.
Notice required prior to disclosure?
EYes EINo
Contract Number:
cAG2020-137
glc
fl-\o
.a -qo=Eg
Gt
.9ut
Date Received by city Atrorney:Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk s Office
ad(W22lil_l -20 Visit Documents.KentwA.gov to obtain copies of all agreements
KENT
WasHrNGtoN
CHANGE ORDER NO. 1
NAME OF CONTRACTOR:
CONTRACT NAME & PROJECT NUMBER:
ORIGINAL CONTRACT DATE :
Active Construction, Inc. ("Contractor")
Willis Street and 4th Ave. S, Roundabout
May 15, 2020
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to :
Relocate temporary light at the NW corner of the roundabout to
accommodate safe merge point at SB 4th Ave. S to WB SR516.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,
(including applicable alternates and
WSST)
$4,759,759.00
Net Change by Previous Change Orders
(incl. applicable WSST)
$o.oo
Current Contract Amount
(incl. Previous Change Orders)
$4,759,759.00
Current Change Order $3,342.88
Applicable WSST Tax on this Change
Order
$0.00
Revised Contract Sum $4,763,101.88
CHANGE ORDER - 1 OF 3
Original Time for ComPletion
(insert date)
100
Revised Time for ComPletion under
prior Change Orders
(insert date)
100
Days Required (+) for this Change Order 0 calendar days
Revised Time for ComPletion
(insert date)
100
In accordance with Sections t-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agreis to waive any protest it may have regarding this Change Order and acknowledges and
aicepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have aPPlied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
Its Interim Public Works Director
CITY OF KENT:
(/,-t E-:,^
Print Name:Chad Bieren
DATE:l/n /at
(signature)
(titte)
CONTRACTOR:
ame:
(tiile)
L
"-
I
By:
DATE:
Print
CHANGE ORDER. 2 OF 3
ATTEST:
4;
Kent City Clerk
APPROVED AS TO FORMI
(applicable if Mayork signature required)
Kent Law Department
Un this fleld, you mey eoter lhe electrcnlc fllepath where the @ntGd has b€€n savedl
CHANGE ORDER - 3 OF 3
KENT FILE NO: 2OO.2
WA3xrNotoN
CHANGE ORDER WORKSHEET NO. 1
Construction neeri Division - Public Works
Projectr Willis St & 4 Ave S Roundabout Project No.: 18-3020
Project Engineer: Thomas Leyrer
Capital Projects Brian Shields
Manager:
Fed-Aid No.l nla
Contractor: ACI
Dater 01-08-2021
r. PROPOSED CHANGE
II. REASON AND BACKGROUND FOR CHANGE
Re o cate tem pora rY I ht a t N W co rn er of rou nd a bo ut to a cco m moda te sa fe m e rg e p o n t a t S B
4 th AVE S to W B S R5 1 6 Incl u d e s a bo r eq u p men t a nd ateri ls to exi sti teImamoveng m p
I h t n a u rtena n ce s to n CW loca ti o n
Re o cate tem po ra rY ig ht at N W corne r of ro u n d a b o u t to cco m m od ate s afe merg e p o nt a t SB
4 th AVE S to W B S R5 1 6 c o ntract d d n ot a ccom m o d ate re o catio n of te m p g ht ng a fte r
te m p ora ry t raffic rota ry was re moved a n d perm a n e n t co nfi9 u rat o n m p e m e nte d Te m p I h t n Inecessatofactateitmntortonstalationofmanentfixtures
III. METHOD OF PAYHENT
NEW PAY |TEM(S)Not
Change Order No.FOR ACCOUNII'VC USE ONLV
Sch. No Item Description Total
Est. Qty
Qty this
PE
Unit Unit Price Total Estimated Cost of
Item
VI COl Added Temp Liqhtinq 1 1 LS $3,342.88 $3,324.98
U Independent Estimate Attached
- REQUIRED n CREATE PAY ITEM ONLY - Payment to be made
at a later date uoon completion of work X PAY THIS PAY ESTIMATE
Material Submittals Reouired - CC: Construction Coordinator New Sub Reqrd?No
DELETE EX|ST|NG PAY |TEM(S)1-09.5 Not Applicable
Change Order No.FOR ACCOUNTTTVG USE ON[Y
Sch. No.B.l. No.Item Qty Unit Unit Price Gost of ltem
LJ Independent Estimate Attached - REQUIRED
Change Order No.FOR Y
Sch. No.B.l. No.Item Qtv Unit Unit Price Cost of ltem
INCREASVDECREASE TO EXtSTtNc PAY rTEM(S)
L
Not
REV. DATE:3/27/L8
KENT FILE NO: 2OO.2
Independent Estimate Attached - REQUIRED
TOTAL ESTIMATED COST OF CHANGE ORDER *
*Total of the Cost of Item Columns
THIS PAY ESTIMATE $3,324.88
IV. WORKING DAYS
TOTAL WORKING DAYS*100
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Capital Projects Manager:Date:6/^@'Ll
Construction Engineering
Supervisor:
Construction Manager:
Date:
Date:
r1efri
2
324.88
Original Contract 100 Due This Change Order*o Previous Total 100
DATE:DATE:*Exolanation/Just ouired;
REV. DATE:3/27/78
A.C.I.
PROJECT
JOB # 20-014
EQUIP. NO.
MANPOWER
woRKrNG FOREMAN @ r.0 0
OPERATOR @ 1.00
oPERATOR @100
OPERATOR @ 1.0 0
LABORER@ 1.00
LABORER@ 1.00
DESCRIPTION
DESCRIPTION
DESCRIPTION
Willis St. and 4th Ave. S Roundabout
DATE WORK PERFORMED:
DESCRIPTION OF WORK
Added Temp Light
LABOR CLASS / RATES
HOURS
0.0
0.0
0.0
0.0
0.0
0.0
MATERIAL COSTS
UNIT
1.00
SERVICE COSTS
UNIT
SUBCONTRACTOR
TJNIT
L00
A.C.I. PIIASE
CODE
TBD9^/2020
$85.82
$82. l7
$82. I 7
$82. I 7
$64.49
%4.49
SUBTOTAL LABOR
@ RATE
LS @ $0.00
SUBTOTAL MATERIALS
@ RATE
SERYICE SUBTOTAL
@ RATE
LS @ $2,9U.71
SUB CONTRACTOR SUBTOTAL
@
@
@
@
@
@
@
TOTAL
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
EQUIPMENT DESCRIPTION / RATES
EQUIPMENTDESCRIPTION HOURS @ RATE
SUBTOTAL EQUIPMENT
TOTAL
s0.00
TOTAL
$0.00
$0.00
TOTAL
s0.00
TOTAL
929U.71
s2,gli/'.71
MARK-UPONLABOR 29%
SUBTOTAL LABOR
MARK-UP ON EQUIPMENT 2I%
SUBTOTAL EQUIPMENT
TAX ON MATERIALS (N/A ON WATER& SEWER) 0.00o/o
MARK-UP ON MATERHLS 21%
SUETOTAL MATERHLS
MARK.UP ON SERVICE COST 2IO/O
SUBTOTAL SERVICE COST
MARK-UP ON SUBCONTRACTOR COST >$25,0fit (Varies) 12%
SUBTOTAL SUBCONTRACTOR COST
$0.00
$0.00
$0.00
s0.00
$0.00
$0.00
$0.00
$0.00
$0.00
s358.17
$3,342.E8
GRANDTOTAL $3J42.88
%iA rtrcTRtc
@
Phone (f$l 383-5022
Fax (26itl 272-5214
Change Order Request
4696 - Willis Street & 4th Ave S.
Roundabout
COR Subject: added temp light and arm & the moving of
pole
To Jim Holland
ACt
5110 River Road East
Tacoma, WA 98443
253-248-1090
253-248-1093 (FAX)
Contract No: 18-3020
COR Number: 4696-5
GOR Revision Number: 0
COR Date: 1012712020
work rype: f[j; *"* order /
Days Valid: 5
Return To Fred Duke
Totem Electric of Tacoma lnc
2332 Jefferson Ave
Tacoma, WA 98402
253-722-2840
253-272-5214 (FAX)
fd u ke@totemelectric.com
Details
Degcripdgl
Cost
I Rate
Sv
, $trc Wqksrs Ext
Foreman, Josh Bedient $1 01.1 5 8.00
Hrs 1.00 $809.20
4 hrs move pole, 4 hrs arm, lite
Operator, Ken Hills $79.54 8.00
Hrs 1.00 $636.32
4 hrs move pole, 4 hrs arm, lite
T238 - 2016 Utility Truck, Josh $19.54 8.00 $156.32
4 hrs move pole, 4 hrs arm, lite
T246 - 2014 Utility Truck, Ken $15.61 4.00 $62.44
2 hrs move pole, 2 hrs arm, lite
T334 - 1997 Boom Truck, Ken $45.32 6.00 $271.92
4 hrs move pole,2 hrs arm, lite
T332 - 2000 Bucket Truck, Ken $38.88 8.00 $311.04
4 hrs move pole,4 hrs arm, lite
splice kits, pole & brkt, nuts,
bolts, etc $100.00 1.00
LUMP SUM $100.00
misc. materials
Breakout
Labor:
Overhead Percent @ 31%:
Equipment:
Overhead Percent @ 21%:
Material:
Overhead Percent @ 21%:
$1,445.52
$448.11
$801.72
$168.36
$100.00
$21.00
Total: $2,984.71
Reservation of Rights
This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the
sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our reguest for
any of these items.
Signed By:?+ Pe Dated: 1012712020
Fred Duke
Project Manager