HomeMy WebLinkAboutCAG2020-137 - Change Order - #1 - Active Construction, Inc. - Willis St & 4th Ave S Roundabout - 01/13/2021Agreement Routing Form KENT For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper)WA3HtNoroN G oLcc Originator: C. Frame Department: PW Engineering Date Sent: 1t22t2021 Date Required N/A Authorized to Sign: E Director or Designee E Mayor Date of Council Approval: N/A Budget Account Number: R901 12.641 10.120 Budget? EIYes trNo Grant? EYes ENo Type: N/A C .9tht G ELorF E*,co Eo atLo Vendor Name: Active Construction, lnc Category: Contract Vendor Number: 231 9336 Sub-Category: Change Order #1 Project t,tame: Willis Street and 4th Ave. S. Roundabout Project Details: Relocate temporary light at NW corner of the roundabout to accomodate safe merge point. Agreement Amount: $3,342.88 Start Date: N/A Basis for Selection of Contractor: $id Termination Date: N/A Local Business? E Yes E No* *lf meets requirements per KCC 3.70.100, please complete "Vendor Purchase-Local Exceptions' form on Cityspace. Notice required prior to disclosure? EYes EINo Contract Number: cAG2020-137 glc fl-\o .a -qo=Eg Gt .9ut Date Received by city Atrorney:Comments: Date Routed to the Mayor's Office: Date Routed to the City Clerk s Office ad(W22lil_l -20 Visit Documents.KentwA.gov to obtain copies of all agreements KENT WasHrNGtoN CHANGE ORDER NO. 1 NAME OF CONTRACTOR: CONTRACT NAME & PROJECT NUMBER: ORIGINAL CONTRACT DATE : Active Construction, Inc. ("Contractor") Willis Street and 4th Ave. S, Roundabout May 15, 2020 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to : Relocate temporary light at the NW corner of the roundabout to accommodate safe merge point at SB 4th Ave. S to WB SR516. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and WSST) $4,759,759.00 Net Change by Previous Change Orders (incl. applicable WSST) $o.oo Current Contract Amount (incl. Previous Change Orders) $4,759,759.00 Current Change Order $3,342.88 Applicable WSST Tax on this Change Order $0.00 Revised Contract Sum $4,763,101.88 CHANGE ORDER - 1 OF 3 Original Time for ComPletion (insert date) 100 Revised Time for ComPletion under prior Change Orders (insert date) 100 Days Required (+) for this Change Order 0 calendar days Revised Time for ComPletion (insert date) 100 In accordance with Sections t-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agreis to waive any protest it may have regarding this Change Order and acknowledges and aicepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have aPPlied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. Its Interim Public Works Director CITY OF KENT: (/,-t E-:,^ Print Name:Chad Bieren DATE:l/n /at (signature) (titte) CONTRACTOR: ame: (tiile) L "- I By: DATE: Print CHANGE ORDER. 2 OF 3 ATTEST: 4; Kent City Clerk APPROVED AS TO FORMI (applicable if Mayork signature required) Kent Law Department Un this fleld, you mey eoter lhe electrcnlc fllepath where the @ntGd has b€€n savedl CHANGE ORDER - 3 OF 3 KENT FILE NO: 2OO.2 WA3xrNotoN CHANGE ORDER WORKSHEET NO. 1 Construction neeri Division - Public Works Projectr Willis St & 4 Ave S Roundabout Project No.: 18-3020 Project Engineer: Thomas Leyrer Capital Projects Brian Shields Manager: Fed-Aid No.l nla Contractor: ACI Dater 01-08-2021 r. PROPOSED CHANGE II. REASON AND BACKGROUND FOR CHANGE Re o cate tem pora rY I ht a t N W co rn er of rou nd a bo ut to a cco m moda te sa fe m e rg e p o n t a t S B 4 th AVE S to W B S R5 1 6 Incl u d e s a bo r eq u p men t a nd ateri ls to exi sti teImamoveng m p I h t n a u rtena n ce s to n CW loca ti o n Re o cate tem po ra rY ig ht at N W corne r of ro u n d a b o u t to cco m m od ate s afe merg e p o nt a t SB 4 th AVE S to W B S R5 1 6 c o ntract d d n ot a ccom m o d ate re o catio n of te m p g ht ng a fte r te m p ora ry t raffic rota ry was re moved a n d perm a n e n t co nfi9 u rat o n m p e m e nte d Te m p I h t n Inecessatofactateitmntortonstalationofmanentfixtures III. METHOD OF PAYHENT NEW PAY |TEM(S)Not Change Order No.FOR ACCOUNII'VC USE ONLV Sch. No Item Description Total Est. Qty Qty this PE Unit Unit Price Total Estimated Cost of Item VI COl Added Temp Liqhtinq 1 1 LS $3,342.88 $3,324.98 U Independent Estimate Attached - REQUIRED n CREATE PAY ITEM ONLY - Payment to be made at a later date uoon completion of work X PAY THIS PAY ESTIMATE Material Submittals Reouired - CC: Construction Coordinator New Sub Reqrd?No DELETE EX|ST|NG PAY |TEM(S)1-09.5 Not Applicable Change Order No.FOR ACCOUNTTTVG USE ON[Y Sch. No.B.l. No.Item Qty Unit Unit Price Gost of ltem LJ Independent Estimate Attached - REQUIRED Change Order No.FOR Y Sch. No.B.l. No.Item Qtv Unit Unit Price Cost of ltem INCREASVDECREASE TO EXtSTtNc PAY rTEM(S) L Not REV. DATE:3/27/L8 KENT FILE NO: 2OO.2 Independent Estimate Attached - REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * *Total of the Cost of Item Columns THIS PAY ESTIMATE $3,324.88 IV. WORKING DAYS TOTAL WORKING DAYS*100 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Capital Projects Manager:Date:6/^@'Ll Construction Engineering Supervisor: Construction Manager: Date: Date: r1efri 2 324.88 Original Contract 100 Due This Change Order*o Previous Total 100 DATE:DATE:*Exolanation/Just ouired; REV. DATE:3/27/78 A.C.I. PROJECT JOB # 20-014 EQUIP. NO. MANPOWER woRKrNG FOREMAN @ r.0 0 OPERATOR @ 1.00 oPERATOR @100 OPERATOR @ 1.0 0 LABORER@ 1.00 LABORER@ 1.00 DESCRIPTION DESCRIPTION DESCRIPTION Willis St. and 4th Ave. S Roundabout DATE WORK PERFORMED: DESCRIPTION OF WORK Added Temp Light LABOR CLASS / RATES HOURS 0.0 0.0 0.0 0.0 0.0 0.0 MATERIAL COSTS UNIT 1.00 SERVICE COSTS UNIT SUBCONTRACTOR TJNIT L00 A.C.I. PIIASE CODE TBD9^/2020 $85.82 $82. l7 $82. I 7 $82. I 7 $64.49 %4.49 SUBTOTAL LABOR @ RATE LS @ $0.00 SUBTOTAL MATERIALS @ RATE SERYICE SUBTOTAL @ RATE LS @ $2,9U.71 SUB CONTRACTOR SUBTOTAL @ @ @ @ @ @ @ TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 EQUIPMENT DESCRIPTION / RATES EQUIPMENTDESCRIPTION HOURS @ RATE SUBTOTAL EQUIPMENT TOTAL s0.00 TOTAL $0.00 $0.00 TOTAL s0.00 TOTAL 929U.71 s2,gli/'.71 MARK-UPONLABOR 29% SUBTOTAL LABOR MARK-UP ON EQUIPMENT 2I% SUBTOTAL EQUIPMENT TAX ON MATERIALS (N/A ON WATER& SEWER) 0.00o/o MARK-UP ON MATERHLS 21% SUETOTAL MATERHLS MARK.UP ON SERVICE COST 2IO/O SUBTOTAL SERVICE COST MARK-UP ON SUBCONTRACTOR COST >$25,0fit (Varies) 12% SUBTOTAL SUBCONTRACTOR COST $0.00 $0.00 $0.00 s0.00 $0.00 $0.00 $0.00 $0.00 $0.00 s358.17 $3,342.E8 GRANDTOTAL $3J42.88 %iA rtrcTRtc @ Phone (f$l 383-5022 Fax (26itl 272-5214 Change Order Request 4696 - Willis Street & 4th Ave S. Roundabout COR Subject: added temp light and arm & the moving of pole To Jim Holland ACt 5110 River Road East Tacoma, WA 98443 253-248-1090 253-248-1093 (FAX) Contract No: 18-3020 COR Number: 4696-5 GOR Revision Number: 0 COR Date: 1012712020 work rype: f[j; *"* order / Days Valid: 5 Return To Fred Duke Totem Electric of Tacoma lnc 2332 Jefferson Ave Tacoma, WA 98402 253-722-2840 253-272-5214 (FAX) fd u ke@totemelectric.com Details Degcripdgl Cost I Rate Sv , $trc Wqksrs Ext Foreman, Josh Bedient $1 01.1 5 8.00 Hrs 1.00 $809.20 4 hrs move pole, 4 hrs arm, lite Operator, Ken Hills $79.54 8.00 Hrs 1.00 $636.32 4 hrs move pole, 4 hrs arm, lite T238 - 2016 Utility Truck, Josh $19.54 8.00 $156.32 4 hrs move pole, 4 hrs arm, lite T246 - 2014 Utility Truck, Ken $15.61 4.00 $62.44 2 hrs move pole, 2 hrs arm, lite T334 - 1997 Boom Truck, Ken $45.32 6.00 $271.92 4 hrs move pole,2 hrs arm, lite T332 - 2000 Bucket Truck, Ken $38.88 8.00 $311.04 4 hrs move pole,4 hrs arm, lite splice kits, pole & brkt, nuts, bolts, etc $100.00 1.00 LUMP SUM $100.00 misc. materials Breakout Labor: Overhead Percent @ 31%: Equipment: Overhead Percent @ 21%: Material: Overhead Percent @ 21%: $1,445.52 $448.11 $801.72 $168.36 $100.00 $21.00 Total: $2,984.71 Reservation of Rights This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our reguest for any of these items. Signed By:?+ Pe Dated: 1012712020 Fred Duke Project Manager