CHANGE ORDER NO. #2
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: Floisand Studio ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Town Square Design
ORIGINAL CONTRACT DATE: June 18, 2007
This Change Order amends the above-referenced contract; all other provisions of the contract that
are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by
mutual consent of the parties, the protect contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified as follows:
Provide all labor, materials, and equipment necessary to:
Floisand Studio will prepare the final 70 percent of the permit and
construction drawing sets. The permit set will contain the base drawings that
are required to obtain a building permit. These drawings include at a
minimum the site plan, floor plan, exterior elevations, building sections, wall
section, structural drawings and required calculations. The construction set
will contain the base permit drawings, as well, as the reflected ceiling plan,
interior elevations, and architectural details that are necessary to facilitate
construction. Floisand Studio will also provide written specifications, but not
a complete bidding manual at the Town Square Plaza in Kent, Washington as
shown in the Contractor's Proposal dated August 1, 2007 attached and
incorporated as Exhibit A.
2. The contract amount and time for performance provisions of Section II "Compensation," and
Section III, "Time for Completion," are hereby modified as follows:
Original Contract Sum, $14,245.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $9,800.00
(incl. applicable WSST)
Current Contract Amount $24,045.00
(incl. Previous Change Orders)
Current Change Order $18,875.00
Applicable WSST Tax on this Change Order $0.00
Revised Contract Sum $42,920.00
Original Time for Completion July 31, 2007
(insert date)
Revised Time for Completion under na
prior Change Orders
(insert date)
Days Required t for this Change Order +30 calendar days
Revised Time for Completion August 31, 2007
(insert date)
Pursuant to Section XIII, F, entitled "Modification," of the Contract executed by the parties, the
Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-
referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and
acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or
nature arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to
enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will become
effective on the last date written below.
CONTRACTOR: CITY OF KENT:
By: By:
(sign ture) ( %gnature)
Print Name: Richard Floisand Print Name: Suzette Cook
Its Principal Its Mayor
(TItle) �._ tle)
DATE: DATE:
b �S '
APPfROVED AS TO FORM:
,• n
d2�
en Law Pep rtment
Town Square Plaza Design Change Order #2
CONTRACT MODIFICATION-2 OF 2
FLOISAND STUDIO sea tleewe 98134 south 2e
ph 206 634 0136
fax 206 223 1351
August 14, 2007
Mr Perry Brooks
Park&Open Space Planner
City of Kent
220 Fourth Avenue South
Kent, WA 98032
Fax 253 856 6050
Re* change order#2 for Purchase Order#53852
Dear Perry
Thank you for considering us for the additional services for the design of the Kent Town Square
Facilities Building The following is a change order to complete the final 70% of the Construction
Documents and Construction Administration for work related to the Kent Town Square Facilities
Building
CLIENTS GOALS
The Project: Permit and Construction the Kent Town Square Faalities Building which will
include bathrooms,mechanical/electncal rooms, and a tank storage room for Kent Town
Square
Client's Budget: Not to be determined Budget is currently unknown and not to be estimated
by Architect
Client's Schedule: Client would like to receive the permit and begin construction by the end of
summer,2007
ARCHITECTURAL SERVICES
Feasibility Study: Included in another contract
Schematic Design Included in another contract
Design Development- Included in another contract
Permit and Construction Drawinas FS will prepare the final 70%of the permit and
construction drawing sets The permit set will contain the base drawings that are required to
obtain a building permit These drawings include at a minimum the site plan,floor plan,
exterior elevations, budding sections,wall section, structural drawings and required
calculations The construction set will contain the base permit drawings as well as the
reflected ceding plan, interior elevations,and architectural details that are necessary to
August 14, 2007 Proposal for City of Kent Parks Department page 1 of 3
facilitate construction FS voll also provide written specifications,but not a complete bidding
manual
Permitting:We will submit all necessary information to the City of Kent Budding Department
and make required corrections in order to receive the building permit in a timely fashion
Professional Design Services Fees:
We are pleased to submit fees for the final 70%of the Construction Documents and
Construction Administration for the amount of$18,875
Fee Structure: The design fees we proposed for the project include Architectural Design,
and Structural Engineering and Energy Calculations, and Mechanical Engineering and
Waterproofing Consulting They do not include Civil Engineering, Electrical Engineering, Cost
Consulting, and Landscape Design Compensation for additional items not outlined will be
negotiated with the City of Kent Reimbursable expenses related to the project, such as
plotting and reproduction of large format drawings, postage and delivery, and parking and
travel expenses will be billed at cost plus a factor of 1 12
Professional Service Fees by Phase:
Fee %of Fee
Construction Documents $5,875 31%
Construction Administration $10,000 53%
Mechanical Engineering $1,500 8%
Waterproofing Consultant $1,500 8%
Reimbursable Services
Drawing production
A-C size plots Bond $5/plot
D-E size plots Bond $25/plot
Reimbursable Services/Expenses 112 x cost
Personnel Transportation $0 375/mile
Floisand Studio Standard Rate Table:We are providing the Floisand Studio rates for the
primary staffing categories projected to work on this project They have been used to estimate
the Proposed Lump Sum Fee described in this proposal
Richard Floisand-Principal Architect $90 per hour
Allison Hogue-Principal Designer $90 per hour
Tim Carter-Staff Architect $75 per hour
Patrick Nopp-Staff Architect $75 per hour
August 14,2007 Proposal for City of Kent Parks Department page 2 of 3
Jerry McNeil-Office manager $65 per hour
Subconsultants
Graf Design-Structural Engineering
Nic Rossouw, Structural Principal
404 Dexter Avenue North
Seattle WA 98109 $90 per hour
Steven Rainbow,PE
Rainbow Consulting Mechanical Engineering
336 NW 50th Street,
Seattle,WA 98107 $80 per hour
Don Davis,RRC/RWC
Waterproofing Consultant
Wetherholt and Associates, Inc
1001 Cooper Point Road Southwest,#140-PMB 185
Olympia,Washington 98502 $175 per hour
We bill at the end of each month based upon the percentage of the work completed
Payments not received within 60 days of billing will terminate any contracts or responsibilities
of the Architect
Requirements for Information or Services Provided by Others:The Architect's Basic
Services consist of those described above Any site surveys,civil engineering,mechanical
engineering, geotechnical reports and engineering,drainage system design and landscape
design,electrical engineering, and permitting applications(above standard assistance to the
Owner in obtaining building permits)if required, are an extra service as described Any permit
or regulatory fees are also not included in our fees
Please let me know if you have any questions regarding this proposal.Thank you for your
consideration
Richard Floisand
Principal, Floisand Studio
August 14,2007 Proposal for Crty of Kent Parks Department page 3 of 3