HomeMy WebLinkAboutCAG2020-320 - Original - Puget Sound Energy - West Hill Reservoir Project - 08/11/2020ApprovalOriginator:Department:
Date Sent:Date Required:
Authorized to Sign:
o Director or Designee o Mayor
Date of Council Approval:
Budget Account Number:
Budget? o Yes o No
Grant? o Yes o No
Type:Review/Signatures/RoutingDate Received by City Attorney:Comments:
Date Routed to the Mayor’s Office:
Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category:
Vendor Number:Sub-Category:
Project Name:
Project Details:
Agreement Amount:
Start Date:
Basis for Selection of Contractor:
Termination Date:
Local Business? o Yes o No*
*If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace.
Notice required prior to disclosure?
o Yes o No
Contract Number:
Agreement Routing Form
For Approvals, Signatures and Records Management
This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper)
Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20
Contract amount has been reduced since
Council approval.
DATE: October 6, 2020
TO: Kent City Council
SUBJECT: West Hill Reservoir Schedule 74 Construction Agreement -
Authorize
MOTION: Authorize the Mayor to sign all documents necessary to complete
the power undergrounding project prior to construction of the West Hill
Reservoir subject to final terms and conditions acceptable to the Public
Works Director and City Attorney.
SUMMARY: In August of 2019, Council approved the Kronisch property as the site
for a new drinking water reservoir on the West Hill. The reservoir is needed to meet
water storage and fire flow standards, and will enable future development and
redevelopment on the West Hill.
The project requires relocation of existing overhead power lines from overhead to
underground. This is necessary because if left in place the overhead powerlines will
conflict with construction equipment.
Power line overhead to underground conversion requires the city to pay 40% of the
cost, via an agreement with PSE. The City’s share would be $145,144.69.
BUDGET IMPACT: The costs for the construction agreement with PSE will not
exceed $145,144.69 and are included in the project budget, which will be paid for
from the water fund.
SUPPORTS STRATEGIC PLAN GOAL:
Evolving Infrastructure - Connecting people and places through strategic investments in physical
and technological infrastructure.
Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and
inviting parks and recreation.
ATTACHMENTS:
1.West Hill Reservoir PSE Schedule 74 (PDF)
09/22/20 Committee of the Whole RECOMMENDED TO
COUNCIL BY CONSENSUS
Construction Agreement, Attachment “B” to Schedule 74, Page 1
Kent 38th Ave S – Sch74 Conversion
SCHEDULE 74 UNDERGROUND CONVERSION
Project Construction Agreement
Project Name: Kent 38th Ave S – Sch74 Conversion
Project Number: 101122390
THIS Agreement, dated as of this 11 day of August, 2020, is made by and between the City of
Kent, a Municipal Corporation (the “Government Entity”), and PUGET SOUND ENERGY, Inc., a
Washington Corporation (the “Company").
RECITALS
A. The Company is a public service company engaged in the sale and distribution of electric
energy, and pursuant to its franchise or other rights from the Government Entity, currently locates its
electric distribution facilities within the jurisdictional boundaries of the Government Entity.
B. The Government Entity has determined that it is necessary to replace the existing overhead
electric distribution system within the area specified in the Project Plan (as defined below) (the
"Conversion Area") with a comparable underground electric distribution system, all as more specifically
described in the Project Plan (the "Conversion Project").
C. The Government Entity and the Company have previously entered into a Project Design
Agreement dated as of __________ (the "Design Agreement"), pursuant to which the parties completed
certain engineering design, cost assessment, operating rights planning and other preliminary work relating
to the Conversion Project and, in connection with that effort, developed the Project Plan.
D. The Government Entity and the Company wish to execute this written contract in accordance
with Schedule 74 of the Company's Electric Tariff G ("Schedule 74") to govern the completion of the
Conversion Project, which both parties intend shall qualify as an underground conversion under the terms
of Schedule 74.
AGREEMENT
The Government Entity and the Company therefore agree as follows:
1. Definitions.
(a) Unless specifically defined otherwise herein, all terms defined in Schedule 74 shall have the same
meanings when used in this Agreement, including, without limitation, the following:
i) Cost of Conversion;
ii) Public Thoroughfare;
iii) Temporary Service;
iv) Trenching and Restoration;
v) Underground Distribution System; and
vi) Underground Service Lines.
(b) “Company-Initiated Upgrade” shall mean any feature of the Underground Distribution System
which is required by the Company and is not reasonably required to make the Underground
Distribution System comparable to the overhead distribution system being replaced. For
purposes of the foregoing, a "comparable" system shall include, unless the Parties otherwise
agree, the number of empty ducts (not to exceed two (2), typically having a diameter of 6" or less)
Construction Agreement, Attachment “B” to Schedule 74, Page 2
Kent 38th Ave S – Sch74 Conversion
of such diameter and number as may be specified and agreed upon in the Project Plan necessary
to replicate the load-carrying capacity (system amperage class) of the overhead system being
replaced.
(c) “Estimated Reimbursable Private Conversion Costs” shall mean the Company's good faith
estimate of the Reimbursable Private Conversion Costs, as specified in the Project Plan and as
changed and adjusted from time to time in accordance with Section 6, below.
(d) “Estimated Reimbursable Temporary Service Costs” shall mean the Company's good faith
estimate of the Reimbursable Temporary Service Costs, as specified in the Project Plan and as
changed and adjusted from time to time in accordance with Section 6, below.
(e) “Estimated Reimbursable Upgrade Costs” shall mean the Company's good faith estimate of the
Reimbursable Upgrade Costs, as specified in the Project Plan and as changed and adjusted from
time to time in accordance with Section 6, below.
(f) “Estimated Shared Company Costs” shall mean the Company's good faith estimate of the Shared
Company Costs, as specified in the Project Plan and as changed and adjusted from time to time
in accordance with Section 6, below.
(g) “Estimated Shared Government Costs” shall mean the Government Entity's good faith estimate of
the Shared Government Costs, as specified in the Project Plan and as changed and adjusted
from time to time in accordance with Section 6, below.
(h) “Government-Requested Upgrade” shall mean any feature of the Underground Distribution
System which is requested by the Government Entity and is not reasonably required to make the
Underground Distribution System comparable to the overhead distribution system being replaced.
For purposes of the foregoing, any empty ducts installed at the request of the Government Entity
shall be a Government-Requested Upgrade.
(i) “Party” shall mean either the Company, the Government Entity, or both.
(j) “Private Property Conversion” shall mean that portion, if any, of the Conversion Project for which
the existing overhead electric distribution system is located, as of the date determined in
accordance with Schedule 74, (i) outside of the Public Thoroughfare, or (ii) pursuant to rights not
derived from a franchise previously granted by the Government Entity or pursuant to rights not
otherwise previously granted by the Government Entity.
(k) “Project Plan” shall mean the project plan developed by the Parties under the Design Agreement
and attached hereto as Exhibit A, as the same may be changed and amended from time to time in
accordance with Section 6, below. The Project Plan includes, among other things, (i) a detailed
description of the Work that is required to be performed by each Party and any third party, (ii) the
applicable requirements and specifications for the Work, (iii) a description of the Operating Rights
that are required to be obtained by each Party for the Conversion Project (and the requirements
and specifications with respect thereto), (iv) an itemization and summary of the Estimated Shared
Company Costs, Estimated Shared Government Costs, Estimated Reimbursable Private
Conversion Costs (if any), Estimated Reimbursable Temporary Service Costs (if any) and
Estimated Reimbursable Upgrade Costs (if any), and (v) the Work Schedule.
(l) “Operating Rights” shall mean sufficient space and legal rights for the construction, operation,
repair, and maintenance of the Underground Distribution System.
(m) “Reimbursable Private Conversion Costs” shall mean (i) all Costs of Conversion, if any, incurred
by the Company which are attributable to a Private Property Conversion, less (ii) the distribution
pole replacement costs (if any) that would be avoided by the Company on account of such Private
Property Conversion, as determined consistent with the applicable Company distribution facilities
Construction Agreement, Attachment “B” to Schedule 74, Page 3
Kent 38th Ave S – Sch74 Conversion
replacement program, plus (iii) just compensation as provided by law for the Company's interests
in real property on which such existing overhead distribution system was located prior to
conversion; provided that the portion of the Reimbursable Private Conversion Costs attributable to
the Costs of Conversion under subparagraph (i) of this paragraph shall not exceed the Estimated
Reimbursable Private Conversion Costs without the prior written authorization of the Government
Entity.
(n) “Reimbursable Temporary Service Costs” shall mean all costs incurred by the Company which
are attributable to (i) any facilities installed as part of the Conversion Project to provide Temporary
Service, as provided for in Schedule 74, and (ii) the removal of any facilities installed to provide
Temporary Service (less salvage value of removed equipment); provided that the Reimbursable
Temporary Service Costs shall not exceed the Estimated Reimbursable Temporary Service Costs
without the prior written authorization of the Government Entity.
(o) “Reimbursable Upgrade Costs” shall mean all Costs of Conversion incurred by the Company
which are attributable to any Government-Requested Upgrade; provided that the Reimbursable
Upgrade Costs shall not exceed the Estimated Reimbursable Upgrade Costs without the prior
written authorization of the Government Entity.
(p) “Shared Company Costs” shall mean all Costs of Conversion (other than Reimbursable Upgrade
Costs, Reimbursable Private Conversion Costs and Reimbursable Temporary Service Costs)
incurred by the Company in connection with the Conversion Project; provided, however, that the
Shared Company Costs shall not exceed the Estimated Shared Company Costs without the prior
written authorization of the Government Entity. For the avoidance of doubt, the "Shared Company
Costs" shall, as and to the extent specified in the Design Agreement, include the actual,
reasonable costs to the Company for the "Design Work" performed by the Company under the
Design Agreement.
(q) “Shared Government Costs” shall mean all Costs of Conversion incurred by the Government
Entity in connection with (i) any duct and vault installation Work which the Parties have specified
in the Project Plan is to be performed by the Government Entity as part of the Government Work,
and (ii) the acquisition of any Operating Rights which the Parties have, by mutual agreement,
specified in the Project Plan are to be obtained by the Government Entity for the Conversion
Project, but only to the extent attributable to that portion of such Operating Rights which is
necessary to accommodate the facilities of the Company; provided, however, that the Shared
Government Costs shall not exceed the Estimated Shared Government Costs without the prior
written authorization of the Company.
(r) “Total Shared Costs” shall mean the sum of the Shared Company Costs and the Shared
Government Costs. For the avoidance of doubt, the Total Shared Costs shall not include, without
limitation, (i) costs to the Government Entity for Trenching and Restoration, or (ii) costs associated
with any joint use of trenches by other utilities as permitted under Section 3(b).
(s) “Work” shall mean all work to be performed in connection with the Conversion Project, as more
specifically described in the Project Plan, including, without limitation, the Company Work (as
defined in Section 2(a), below) and the Government Work (as defined in Section 3(a), below).
(t) “Work Schedule” shall mean the schedule specified in the Project Plan which sets forth the
milestones for completing the Work, as the same may be changed and amended from time to
time in accordance with Section 6, below.
2. Obligations of the Company.
(a) Subject to the terms and conditions of this Agreement, the Company shall do the following as
specified in, and in accordance with the design and construction specifications and other
requirements set forth in, the Project Plan (the "Company Work"):
Construction Agreement, Attachment “B” to Schedule 74, Page 4
Kent 38th Ave S – Sch74 Conversion
i) furnish and install an Underground Distribution System within the Conversion Area
(excluding any duct and vault installation or other Work which the Parties have
specified in the Project Plan is to be performed by the Government Entity);
ii) provide a Company inspector on-site at the times specified in the Work Schedule to
inspect the performance of any duct and vault installation Work which the Parties
have specified in the Project Plan is to be performed by the Government Entity; and
iii) upon connection of those persons or entities to be served by the Underground
Distribution System and removal of facilities of any other utilities that are connected to
the poles of the overhead system, remove the existing overhead system (including
associated wires and Company-owned poles) of 15,000 volts or less within the
Conversion Area except for Temporary Services.
(b) Upon request of the Government Entity, the Company shall provide periodic reports of the
progress of the Company Work identifying (i) the Company Work completed to date, (ii) the
Company Work yet to be completed, and (iii) an estimate regarding whether the Conversion
Project is on target with respect to the Estimated Shared Company Costs, the Estimated
Reimbursable Private Conversion Costs (if any), the Estimated Reimbursable Temporary Service
Costs (if any), the Estimated Reimbursable Upgrade Costs (if any) and the Work Schedule.
(c) Except as otherwise provided in the Company's Electric Tariff G, the Company shall own, operate
and maintain all electrical facilities installed pursuant to this Agreement including, but not limited
to, the Underground Distribution System and Underground Service Lines.
(d) Subject to the terms and conditions of this Agreement, the Company shall perform all Company
Work in accordance with the Project Plan, the Work Schedule and this Agreement.
3. Obligations of the Government Entity.
(a) Subject to the terms and conditions of this Agreement, the Government Entity shall do the
following as specified in, and in accordance with the design and construction specifications and
other requirements set forth in, the Project Plan (the "Government Work"):
i) provide the Trenching and Restoration;
ii) perform the surveying for alignment and grades for ducts and vaults; and
iii) perform any duct and vault installation and other Work which the Parties have
specified in the Project Plan is to be performed by the Government Entity.
(b) Other utilities may be permitted by the Government Entity to use the trenches provided by the
Government Entity for the installation of their facilities so long as such facilities or the installation
thereof do not interfere (as determined pursuant to the Company's electrical standards) with the
Underground Distribution System or the installation or maintenance thereof. Any such use of the
trenches by other utilities shall be done subject to and in accordance with the joint trench design
specifications and installation drawings set forth or otherwise identified in the Project Plan, and the
Government Entity shall be responsible for the coordination of the design and installation of the
facilities of the other utilities to ensure compliance with such specifications and drawings.
(c) Upon request of the Company, the Government Entity shall provide periodic reports of the
progress of the Government Work identifying (i) the Government Work completed to date, (ii) the
Government Work yet to be completed, and (iii) an estimate regarding whether the Conversion
Project is on target with respect to the Estimated Shared Government Costs and the Work
Schedule.
(d) The Government Entity shall be responsible for coordinating all work to be performed in
connection with the street improvement program within the Conversion Area.
Construction Agreement, Attachment “B” to Schedule 74, Page 5
Kent 38th Ave S – Sch74 Conversion
(e) Subject to the terms and conditions of this Agreement, the Government Entity shall perform all
Government Work in accordance with the Project Plan, the Work Schedule and this Agreement.
4. Work Schedule.
(a) The Government Entity and the Company have agreed upon the Work Schedule as set forth in
the Project Plan. Changes to the Work Schedule shall be made only in accordance with
Section 6, below.
(b) Promptly following the execution of this Agreement, and upon completion by the Government
Entity of any necessary preliminary work, the Government Entity shall hold a pre-construction
meeting involving all participants in the Conversion Project to review project design, coordination
requirements, work sequencing and related pre-mobilization requirements. Following the pre-
construction meeting, the Government Entity shall give the Company written notice to proceed
with the Work at least ten (10) business days prior to the commencement date specified in the
Work Schedule.
(c) Subject to the terms and conditions of this Agreement, each Party shall perform the Work
assigned to it under this Agreement in accordance with the Work Schedule. So long as the
Company performs the Company Work in accordance with the Work Schedule, the Company
shall not be liable to the Government Entity (or its agents, servants, employees, contractors,
subcontractors, or representatives) for any claims, actions, damages, or liability asserted or
arising out of delays in the Work Schedule.
5. Location of Facilities.
All facilities of the Company installed within the Conversion Area pursuant to this Agreement shall be
located, and all related Operating Rights shall be obtained, in the manner set forth in the applicable
provisions of Schedule 74, as specified by the Parties in the Project Plan.
6. Changes.
(a) Either Party may, at any time, by written notice thereof to the other Party, request changes in the
Work within the general scope of this Agreement (a "Request for Change"), including, but not
limited to: (i) changes in, substitutions for, additions to or deletions of any Work; (ii) changes in the
specifications, drawings and other requirements in the Project Plan, (iii) changes in the Work
Schedule, and (iv) changes in the location, alignment, dimensions or design of items included in
the Work. No Request for Change shall be effective and binding upon the Parties unless signed
by an authorized representative of each Party.
(b) If any change included in an approved Request for Change would cause a change in the cost of,
or the time required for, the performance of any part of the Work, an equitable adjustment shall be
made in the Estimated Shared Company Costs, the Estimated Shared Government Costs, the
Estimated Reimbursable Private Conversion Costs (if any), the Estimated Reimbursable
Temporary Service Costs (if any), the Estimated Reimbursable Upgrade Costs (if any) and/or the
Work Schedule to reflect such change. The Parties shall negotiate in good faith with the objective
of agreeing in writing on a mutually acceptable equitable adjustment. If the Parties are unable to
agree upon the terms of the equitable adjustment, either Party may submit the matter for
resolution pursuant to the dispute resolution provisions in Section 10, below.
(c) The Work Schedule, the Estimated Shared Company Costs, the Estimated Shared Government
Costs, the Estimated Reimbursable Private Conversion Costs, the Estimated Reimbursable
Temporary Service Costs and/or the Estimated Reimbursable Upgrade Costs shall be further
equitably adjusted from time to time to reflect any change in the costs or time required to perform
the Work to the extent such change is caused by: (i) any Force Majeure Event under Section 11,
below, (ii) the discovery of any condition within the Conversion Area which affects the scope, cost,
Construction Agreement, Attachment “B” to Schedule 74, Page 6
Kent 38th Ave S – Sch74 Conversion
schedule or other aspect of the Work and was not known by or disclosed to the affected Party
prior to the date of this Agreement, or (iii) any change or inaccuracy in any assumptions regarding
the scope, cost, schedule or other aspect of the Work which are expressly identified by the Parties
in the Project Plan. Upon the request of either Party, the Parties will negotiate in good faith with
the objective of agreeing in writing on a mutually acceptable equitable adjustment. If, at any time
thereafter, the Parties are unable to agree upon the terms of the equitable adjustment, either
Party may submit the matter for resolution pursuant to the dispute resolution provisions in
Section 10, below.
(d) Notwithstanding any dispute or delay in reaching agreement or arriving at a mutually acceptable
equitable adjustment, each Party shall, if requested by the other Party, proceed with the Work in
accordance with any approved Request for Change. Any request to proceed hereunder must be
accompanied by a written statement setting forth the requesting Party's reasons for rejecting the
proposed equitable adjustment of the other Party.
7. Compensation and Payment.
(a) Subject to and in accordance with the terms and conditions of this Agreement (including, without
limitation, the payment procedures set forth in this Section 7), payment in connection with the
Conversion Project and this Agreement shall be as follows:
i) The Total Shared Costs shall be allocated to the Parties in the following percentages:
(A) sixty percent (60%) to the Company, and (B) forty percent (40%) to the
Government Entity.
ii) The Government Entity shall pay one hundred percent (100%) of all Reimbursable
Private Conversion Costs, if any.
iii) The Government Entity shall pay one hundred percent (100%) of all Reimbursable
Upgrade Costs, if any.
iv) The Government Entity shall pay one hundred percent (100%) of all Reimbursable
Temporary Service Costs, if any.
v) The Government Entity shall pay one hundred percent (100%) of the costs it incurs to
perform that portion of the Government Work specified in Section 3(a)(i) and (ii) (i.e.,
Trenching and Restoration and surveying).
vi) The Company shall pay one hundred percent (100%) of the costs it incurs to design,
provide and construct any Company-Initiated Upgrade.
vii) The Company shall pay one hundred percent (100%) of the costs it incurs to obtain
Operating Rights outside the Public Thoroughfare.
(b) Based on the allocation of responsibilities set forth in Section 7(a), above, the Parties shall
determine the net amount payable by the Government Entity or the Company, as applicable, to
the other Party under this Agreement (the "Net Amount"). The Net Amount shall be determined
by using the amount of the Total Shared Costs allocated to the Government Entity under
Section 7(a)(i), and adjusting such amount as follows:
i) Subtracting (as a credit to the Government Entity) the amount of the Shared
Government Costs.
ii) Adding (as a credit to the Company) the amount of all Reimbursable Private
Conversion Costs, Reimbursable Upgrade Costs and Reimbursable Temporary
Service Costs.
iii) Subtracting (as a credit to the Government Entity) any payments previously made to
the Company by the Government Entity under the Design Agreement which, under
the terms of the Design Agreement, are to be credited to the Government Entity
under this Agreement.
The Net Amount, as so calculated, (A) will be an amount payable to the Company if it is a positive
number, and (B) shall be an amount payable to the Government Entity if it is a negative number.
Construction Agreement, Attachment “B” to Schedule 74, Page 7
Kent 38th Ave S – Sch74 Conversion
(c) Within sixty (60) business days of completion of the Conversion Project, the Government Entity
shall provide the Company with an itemization of the Shared Government Costs (the "Government
Itemization"), together with such documentation and information as the Company may reasonably
request to verify the Government Itemization. The Government Itemization shall, at a minimum,
break down the Shared Government Costs by the following categories, as applicable: (i) property
and related costs incurred and/or paid by the Government Entity, including any costs of obtaining
Operating Rights, and (ii) construction costs incurred and/or paid by the Government Entity,
including and listing separately inspection, labor, materials and equipment, overhead and all costs
charged by any agent, contractor or subcontractor of the Government Entity.
(d) Within thirty (30) business days after the Company's receipt of the Government Itemization and
requested documentation and information, the Company shall provide the Government Entity a
written statement (the "Company Statement") showing (i) an itemization of the Shared Company
Costs, (ii) the Parties' relative share of the Total Shared Costs based on the Company's
itemization of the Shared Company Costs and the Government Entity's itemization of the Shared
Government Costs set forth in the Government Itemization, (iii) any Reimbursable Private
Conversion Costs, (iv) any Reimbursable Upgrade Costs, (v) any Reimbursable Temporary
Service Costs, (vi) any credits to the Government Entity for payments previously made to the
Company by the Government Entity under the Design Agreement which, under the terms of the
Design Agreement, are to be credited to the Government Entity under this Agreement, and
(vii) the Net Amount, as determined in accordance with Section 7(b), above, together with such
documentation and information as the Government Entity may reasonably request to verify the
Company Statement. The itemization of the Shared Company Costs included in the Company
Statement shall, at a minimum, break down the Shared Company Costs by the following
categories, as applicable: (i) design and engineering costs, and (ii) construction costs, including
and listing separately inspection, labor, materials and equipment, overhead and all costs charged
by any agent, contractor or subcontractor of the Company.
(e) Within thirty (30) business days after the Government Entity's receipt of the Company Statement
and requested documentation and information, the Net Amount shall be paid by the owing Party to
the other Party, as specified in the Company Statement.
8. Indemnification.
(a) The Government Entity releases and shall defend, indemnify and hold the Company harmless
from all claims, losses, harm, liabilities, damages, costs and expenses (including, but not limited
to, reasonable attorneys' fees) caused by or arising out of any negligent act or omission or willful
misconduct of the Government Entity in its performance under this Agreement. During the
performance of such activities the Government Entity's employees or contractors shall at all times
remain employees or contractors, respectively, of the Government Entity.
(b) The Company releases and shall defend, indemnify and hold the Government Entity harmless
from all claims, losses, harm, liabilities, damages, costs and expenses (including, but not limited
to, reasonable attorneys' fees) caused by or arising out of any negligent act or omission or willful
misconduct of the Company in its performance under this Agreement. During the performance of
such activities the Company's employees or contractors shall at all times remain employees or
contractors, respectively, of the Company.
(c) Solely for purposes of enforcing the indemnification obligations of a Party under this Section 8,
each Party expressly waives its immunity under Title 51 of the Revised Code of Washington, the
Industrial Insurance Act, and agrees that the obligation to indemnify, defend and hold harmless
provided for in this Section 8 extends to any such claim brought against the indemnified Party by
or on behalf of any employee of the indemnifying Party. The foregoing waiver shall not in any way
preclude the indemnifying Party from raising such immunity as a defense against any claim
brought against the indemnifying Party by any of its employees.
Construction Agreement, Attachment “B” to Schedule 74, Page 8
Kent 38th Ave S – Sch74 Conversion
9. Conversion of Service to Customers within Conversion Area.
(a) Upon commencement of the Work, the Government Entity shall notify all persons and entities
within the Conversion Area that service lines to such customers must be converted from overhead
to underground service within the applicable statutory period following written notice from the
Government Entity that service from underground facilities are available in accordance with RCW
35.96.050. Upon the request of any customer, other than a single family residential customer,
within the Conversion Area, the Company shall remove the overhead system and connect such
persons’ and entities’ Underground Service Lines to the Underground Distribution System.
(b) The Parties acknowledge that single family residences within the Conversion Area must (i)
provide a service trench and conduit, in accordance with the Company's specifications, from the
underground meter base to the point of service provided during the conversion, and (ii) pay for the
secondary service conductors as defined in Schedule 85 of the Company's Electric Tariff G. The
Government Entity shall exercise its authority to order disconnection and removal of overhead
facilities with respect to owners failing to convert service lines from overhead to underground
within the timelines provided in RCW 35.96.050.
10. Dispute Resolution.
(a) Any dispute, disagreement or claim arising out of or concerning this Agreement must first be
presented to and considered by the Parties. A Party who wishes dispute resolution shall notify the
other Party in writing as to the nature of the dispute. Each Party shall appoint a representative
who shall be responsible for representing the Party's interests. The representatives shall exercise
good faith efforts to resolve the dispute. Any dispute that is not resolved within ten (10) business
days of the date the disagreement was first raised by written notice shall be referred by the
Parties' representatives in writing to the senior management of the Parties for resolution. In the
event the senior management are unable to resolve the dispute within twenty (20) business days
(or such other period as the Parties may agree upon), each Party may pursue resolution of the
dispute through other legal means consistent with the terms of this Agreement. All negotiations
pursuant to these procedures for the resolution of disputes shall be confidential and shall be
treated as compromise and settlement negotiations for purposes of the state and federal rules of
evidence.
(b) Any claim or dispute arising hereunder which relates to any Request for Change or any equitable
adjustment under Section 6, above, or the compensation payable by or to either Party under
Section 7, above, and which is not resolved by senior management within the time permitted
under Section 10(a), above, shall be resolved by arbitration in Seattle, Washington, under the
Construction Industry Arbitration Rules of the American Arbitration Association then in effect. The
decision(s) of the arbitrator(s) shall be final, conclusive and binding upon the Parties. All other
disputes shall be resolved by litigation in any court or governmental agency, as applicable, having
jurisdiction over the Parties and the dispute.
(c) In connection with any arbitration under this Section 10, costs of the arbitrator(s), hearing rooms
and other common costs shall be divided equally among the Parties. Each Party shall bear the
cost and expense of preparing and presenting its own case (including, but not limited to, its own
attorneys' fees); provided, that, in any arbitration, the arbitrator(s) may require, as part of his or
her decision, reimbursement of all or a portion of the prevailing Party's costs and expenses
(including, but not limited to, reasonable attorneys' fees) by the other Party.
(d) Unless otherwise agreed by the Parties in writing, the Parties shall continue to perform their
respective obligations under this Agreement during the pendency of any dispute.
Construction Agreement, Attachment “B” to Schedule 74, Page 9
Kent 38th Ave S – Sch74 Conversion
11. Uncontrollable Forces.
In the event that either Party is prevented or delayed in the performance of any of its obligations under
this Agreement by reason beyond its reasonable control (a "Force Majeure Event"), then that Party’s
performance shall be excused during the Force Majeure Event. Force Majeure Events shall include,
without limitation, war; civil disturbance; flood, earthquake or other Act of God; storm, earthquake or
other condition which necessitates the mobilization of the personnel of a Party or its contractors to
restore utility service to customers; laws, regulations, rules or orders of any governmental agency;
sabotage; strikes or similar labor disputes involving personnel of a Party, its contractors or a third
party; or any failure or delay in the performance by the other Party, or a third party who is not an
employee, agent or contractor of the Party claiming a Force Majeure Event, in connection with the
Work or this Agreement. Upon removal or termination of the Force Majeure Event, the Party claiming
a Force Majeure Event shall promptly perform the affected obligations in an orderly and expedited
manner under this Agreement or procure a substitute for such obligation. The Parties shall use all
commercially reasonable efforts to eliminate or minimize any delay caused by a Force Majeure Event.
12. Insurance.
(a) PSE shall, and shall require each of its contractors to, secure and maintain in force throughout the
duration of the Conversion Project (or, if sooner, until termination of this Agreement)
comprehensive general liability insurances, with a minimum coverage of $__________ per
occurrence and $__________ aggregate for personal injury; and $__________ per occurrence/
aggregate for property damages, and professional liability insurance in the amount of $________.
(b) The Government Entity shall ensure that each of its contractors performing any Government Work
secures and maintains in force throughout the duration of the Conversion Project (or, if sooner,
until termination of this Agreement) insurance policies having the same coverage, amounts and
limits as specified Section 12(a), above.
(c) In lieu of the insurance requirements set forth in Section 12(a), above, the Company may self-
insure against such risks in such amounts as are consistent with good utility practice. Upon the
Government Entity's request, the Company shall provide the Government Entity with reasonable
written evidence that the Company is maintaining such self-insurance.
13. Other.
(a) Agreement Subject To Tariff. This Agreement is subject to the General Rules and Provisions set
forth in Tariff Schedule 80 of the Company's electrical Tariff G and to Schedule 74 of such Tariff
as approved by the Washington Utilities and Transportation Commission and in effect as of the
date of this Agreement.
(b) Termination. The Government Entity reserves the right to terminate the Conversion Project and
this Agreement upon written notice to the Company. In the event that the Government Entity
terminates the Conversion Project and this Agreement, the Government Entity shall reimburse the
Company for all costs reasonably incurred by the Company in connection with the Work
performed prior to the effective date of termination. In such event, the costs reimbursable to the
Company (i) shall not be reduced by any Shared Government Costs or other costs incurred by the
Government Entity, and (ii) shall be paid within thirty (30) days after the receipt of the Company's
invoice therefor. Sections 1, 5, 7, 8, 9, 10, 11 and 13 shall survive any termination of the
Conversion Project and/or this Agreement.
(c) Facilities Greater Than 15,000 Volts. Nothing in this Agreement shall in any way affect the rights
or obligations of the Company under any previous agreements pertaining to the existing or future
facilities of greater than 15,000 Volts within the Conversion Area.
1,000,000
1,000,000 1,000,000 1,000,000
Construction Agreement, Attachment “B” to Schedule 74, Page 10
Kent 38th Ave S – Sch74 Conversion
(d) Compliance With Law. The Parties shall, in performing the Work under this Agreement, comply
with all applicable federal, state, and local laws, ordinances, and regulations.
(e) No Discrimination. The Company, with regard to the Work performed by the Company under this
Agreement, shall comply with all applicable laws relating to discrimination on the basis race, color,
national origin, religion, creed, age, sex, or the presence of any physical or sensory handicap in
the selection and retention of employees or procurement of materials or supplies.
(f) Independent Contractor. The Company and the Government Entity agree that the Company is an
independent contractor with respect to the Work and this Agreement. The Company is acting to
preserve and protect its facilities and is not acting for the Government Entity in performing the
Work. Nothing in this Agreement shall be considered to create the relationship of employer and
employee between the Parties. Neither the Company nor any employee of the Company shall be
entitled to any benefits accorded employees of the Government Entity by virtue of the Work or this
Agreement. The Government Entity shall not be responsible for withholding or otherwise
deducting federal income tax or social security or contributing to the State Industrial Insurance
Program, or otherwise assuming the duties of an employer with respect to the Company, or any
employee of the Company.
(g) Nonwaiver of Rights or Remedies. No failure or delay of either Party to insist upon or enforce
strict performance by the other Party of any provision of this Agreement or to exercise any other
right under this Agreement, and no course of dealing or performance with respect thereto, shall,
except to the extent provided in this Agreement, be construed as a waiver or, or choice of, or
relinquishment of any right under any provision of this Agreement or any right at law or equity not
otherwise provided for herein. The express waiver by either Party of any right or remedy under
this Agreement or at law or equity in a particular instance or circumstance shall not constitute a
waiver thereof in any other instance or circumstance.
(h) No Third Party Beneficiaries. There are no third-party beneficiaries of this Agreement. Nothing
contained in this Agreement is intended to confer any right or interest on anyone other than the
Parties, their respective successors, assigns and legal representatives.
(i) Governmental Authority. This Agreement is subject to the rules, regulations, orders and other
requirements, now or hereafter in effect, of all governmental regulatory authorities and courts
having jurisdiction over this Agreement, the Parties or either of them. All laws, ordinances, rules,
regulations, orders and other requirements, now or hereafter in effect, of governmental regulatory
authorities and courts that are required to be incorporated into agreements of this character are by
this reference incorporated in this Agreement.
(j) No Partnership. This Agreement shall not be interpreted or construed to create an association,
joint venture or partnership between the Parties or to impose any partnership obligations or liability
upon either Party. Further, neither Party shall have any right, power or authority to enter into any
agreement or undertaking for or on behalf of, to act as or be an agent or representative of, or to
otherwise bind the other Party.
(k) Severability. In the event that any provision of this Agreement or the application of any such
provision shall be held invalid as to either Party or any circumstance by any court having
jurisdiction, such provision shall remain in force and effect to the maximum extent provided by
law, and all other provisions of this Agreement and their application shall not be affected thereby
but shall remain in force and effect unless a court or arbitrator holds they are not severable from
the invalid provisions.
Construction Agreement, Attachment “B” to Schedule 74, Page 11
Kent 38th Ave S – Sch74 Conversion
(l) Notice. Any notice under this Agreement shall be in writing and shall be faxed (with a copy
followed by mail or hand delivery), delivered in person, or mailed, properly addressed and
stamped with the required postage, to the intended recipient as follows:
If to the Government Entity: City of Kent
400 West Gowe
Kent, WA,98032
Attn: Drew Holcomb
Phone: 253-561-1587
If to the Company: Puget Sound Energy, Inc.
6905 South 228th St
Kent, WA 98032
Attn: Khader Gouesse
Phone: 253-254-2896
Any Party may change its address specified in this Section 13(l) by giving the other Party
notice of such change in accordance with this
Section 13(l).
(m) Applicable Law. This Agreement shall in all respects be interpreted, construed and enforced in
accordance with the laws of the State of Washington (without reference to rules governing conflict
of laws), except to the extent such laws may be preempted by the laws of the United States of
America.
(n) Entire Agreement. This Agreement constitutes the entire agreement of the Parties with respect to
the subject matter hereof and all other agreements and understandings of the Parties, whether
written or oral, with respect to the subject matter of this Agreement are hereby superseded in their
entireties; provided, however, that except as expressly set forth in this Agreement, nothing herein
is intended to or shall alter, amend or supersede the Design Agreement and the same shall
remain in full force and effect in accordance with its terms.
(o) Successors and Assigns. This Agreement shall be binding upon and inure to the benefit of the
respective successors, assigns, purchasers, and transferees of the Parties, including but not
limited to, any entity to which the rights or obligations of a Party are assigned, delegated, or
transferred in any corporate reorganization, change of organization, or purchase or transfer of
assets by or to another corporation, partnership, association, or other business organization or
division thereof.
Government Entity: Company:
PUGET SOUND ENERGY, INC.
BY BY
ITS ITS
Date Signed Date Signed
Approved as to form:
City of Kent
Mayor
10/12/2020
Supervisor of PI
10/20/20
City of Kent
Kent 38th Ave S Underground Conversion Page 1
101122390
Exhibit “A” Project Plan
Schedule 74 Underground Conversion
City of Kent – Kent 38th Ave S – Sch74 Conversion
PSE Project Number: 101122390
August 10th, 2020
Pursuant to Puget Sound Energy (PSE’s) Rate Schedule 74 and as described in this Project Plan,
PSE will convert its existing overhead electrical distribution system of 15,000 volts or less to an
equivalent Underground Distribution System. This Project Plan describes the scope of
construction work (the “Construction Work”) to be performed by PSE and the City of Kent (the
“City”) for the conversion of certain PSE electrical distribution system facilities as described
herein (the “Conversion Area”). Construction of this Conversion Project is contingent upon and
shall commence only after both written acceptance of this Project Plan and written execution of a
Schedule 74 Construction Agreement by the City and PSE.
This Project Plan includes and consists of:
Description of the Construction Work to be performed
Construction Drawings, Standards, Specifications and Requirements for the Construction
Work (attached)
Construction Work Schedule
Construction Costs Estimate Summary (attached)
Revisions to this Project Plan must be mutually approved by all the City and PSE.
Construction Work
This Conversion Project will replace PSE’s existing overhead electrical distribution system with
an Underground Distribution System within the following area (the “Conversion Area”): Along
38th Ave S, in front of parcel# 1253200070, between the poles located on the south corner of the
property and the north corner of the property. The Conversion Project is approximately 125 feet
in length, including laterals and road crossings.
The Conversion Project includes modification or replacement of all existing services lines within
the Conversion Area to connect to the Underground Distribution System and removal of PSE’s
existing overhead electric distribution facilities (including PSE distribution poles and pole
mounted street lights) from the Conversion Area. No street lights will be relocated as part of the
project.
City of Kent
Kent 38th Ave S Underground Conversion Page 2
101122390
Responsibilities of Parties
City Responsibilities
a)At least ten (10) business days prior to the scheduled commencement of Construction Work,
hold a pre-construction meeting involving all participants in the Conversion Project to review
project design, coordination requirements, work sequencing and related premobilization
requirements.
b)At least ten (10) business days prior to the scheduled commencement of Construction Work,
give PSE written notice to proceed with the Construction Work to allow for delivery of PSE
materials to the job site and mobilization of PSE’s crew for duct and vault installation.
c)Provide written notice to customers within the Conversion Area in advance of Conversion
Project Construction Work start. The notice will include contact information for both the
City and PSE, the expected Conversion Project schedule, anticipation of service interruptions
and work required to be performed by customers.
d)Coordinate other utility conversion, removal and relocation from PSE’s poles. No other
utility attached the PSE poles involved in the project.
e)Perform site restoration.
f)Provide all surveying for equipment placement, locations, and establish all grade elevations
for the Underground Distribution System within the Conversion Area.
Puget Sound Energy Responsibilities
a)Provide all duct and vault materials, cables, electrical equipment and components necessary
for installation of the Underground Distribution System including certifications of materials
origins (COMOs) as may be required for products that must meet applicable provisions of the
Buy America Act as administered by the Federal Highways Administration (FHWA) and/or
the Federal Transit Administration (FTA).
b)Provide all necessary excavation, bedding, backfill, off-site disposal, and coordination for
installation of the Underground Distribution System. This includes trenching, backfill, and
restoration for cut-over and transfer of existing underground system and service lines from
the existing overhead distribution system to the new Underground Distribution System.
c)Install the Underground Distribution System in trenches and excavations provided by
Potelco. Provide written notice to the City when the Underground Distribution System is
energized.
d)Perform cut-over and transfer of existing Underground Distribution System and existing
underground service lines from the overhead distribution system to the new Underground
Distribution System where applicable (see City Responsibility item “f” concerning trenching
responsibility). PSE will notify the City for excavation and the affected customers at least
two (2) business days prior to installation, transfer, and connection of underground service
lines. Affected service lines are listed in the Service Lines section of this Project Plan.
e)Install and connect replacement underground service lines to single family residences and
connect modified and replacement non-residential underground service lines provided by
City of Kent
Kent 38th Ave S Underground Conversion Page 3
101122390
customers within the Conversion Area pursuant to PSE Tariff Schedule 85. Affected service
lines are listed in the Service Lines section of this Project Plan.
f)Remove the existing overhead electric distribution system including, conductors, equipment,
down guys, anchors and poles after all service lines to customers within the Conversion Area
are connected to the Underground Distribution System and all other utilities have been
removed from PSE’s poles. Holes left following removal of poles will be filled with crushed
rock and compacted in accordance with applicable City standards or specifications.
g)Provide flagging and traffic control as required for all work performed by PSE (except as
may otherwise be reasonably provided by the City during installation of ducts and vaults in
conjunction with City performed trenching, excavation, back-fill and restoration).
h)Attend weekly (or as otherwise agreed by the City and PSE) construction coordination
meetings facilitated by the City and its contractor during periods of Conversion Project
construction.
Construction Work Schedule
The Construction Work will be performed in accordance with the following Work Schedule,
unless this schedule is revised by mutual agreement of the City and PSE or circumstances
beyond the reasonable control of the City and/or PSE preclude such performance.
Excavation and Installation of ducts and vaults: Duct and Vault schedule will begin
(September 15th 2020) and is anticipated to be (9) working days of construction.
Installation and energization of the Underground Distribution System: is estimated to begin
(October 5th 2020) and is anticipated to be (11) working days of construction.
Removal of overhead facilities: is estimated to begin (once all PSE facilities have been
removed from PSE poles) and is anticipated to be (1) working day of construction.
Work Schedule Restrictions: (are noted in PSE’s Right of Way use permit).
Construction Cost Estimate
The estimated costs to perform the Construction Work and the allocation of costs between the
parties are presented in the attached Construction Costs Estimate Summary. These estimated
costs are valid for ninety (90) days from the date shown on the attached Construction Costs
Estimate Summary. If this Project Plan and a Schedule 74 Construction Agreement are not fully
executed within ninety (90) days from this date, the estimated costs shall be subject to revision.
The scope of work provided for in previously executed Design Agreement has been completed
with written acceptance of this Project Plan by the City and PSE. The Construction Cost
Estimate reflects and provides for Construction Work costs commencing with PSE attendance at
the required pre-construction meeting and receipt of the City’s written notice to proceed with
Construction Work. Work performed and/or costs incurred by PSE in response to City request
following acceptance of the Project Plan and prior to the pre-construction meeting are not
City of Kent
Kent 38th Ave S Underground Conversion Page 4
101122390
included in the Construction Cost Estimate, and shall be subject to addition to the Construction
Cost Estimate by revision as described below.
Estimated Inspection and Service Provider Outside Services costs are based on 2020 contract
rates. Costs for Construction Work performed by PSE in 2021 shall be subject to revision to
reflect PSE Service Provider contract rates which become effective after this date. Further, in
the event performance of the Construction Work does not proceed substantially as provided in
this Project Plan, PSE’s estimated construction costs shall be subject to revision.
Changes in Construction Work scope, performance and/or schedule can result in actual
Construction Costs which significantly differ from estimated costs shown in the Construction
Cost Estimate Summary. In the event performance of the Construction Work cannot or does not
proceed substantially as provided in this Project Plan, such changes shall promptly be brought to
the attention of PSE and the City when anticipated or known and shall be documented in a
revision to the Construction Cost Estimate (a “Cost Estimate Revision”) mutually agreed and
executed by the City and PSE.
Project Assumptions
The project design, construction plans and cost estimates are based on and reflect the following
assumptions. Construction conditions that are not consistent with these assumptions may result
in a request for change or an equitable adjustment to project compensation under Section 6 of the
Construction Agreement and addressed by a Cost Estimate Revision.
Cost Assumptions
1.The Construction Work will be performed in accordance with the Construction Drawings and
Construction Work Schedule.
2.All PSE cables can be pulled through the ducts and vaults system, including existing ducts
and vaults if applicable, to be used for the Conversion Project utilizing normal cable pulling
equipment and methods.
3.A City Street Use permit is the only permit necessary for PSE to perform its work for this
Conversion Project and will be issued within two (2) weeks of PSE submitting a complete
permit application (including any supporting documentation reasonably required by the
City). There will be no charge for the permit or inspection fees.
4.The estimated daily productivity rate for PSE duct and vault installation is based on the City’s
contractor opening a minimum of 60 feet of trench per working day. The daily productivity
rate is used to estimate the number of days a PSE installation crew will be required during
installation of ducts & vaults. The installation crew will be scheduled in full day increments
and in one continuous effort. Changes to a continuous schedule require a minimum of five
days advance notice and must be mutually agreed between the City and PSE.
5.Attendance by the PSE Project Manager at scheduled weekly construction coordination
meetings is included and reflected in the Construction Cost Estimate during periods when the
PSE ducts and vaults are actively being installed and when the PSE line crew is performing
installation, energization, cut-over and removal work. Attendance at additional meetings that
City of Kent
Kent 38th Ave S Underground Conversion Page 5
101122390
may be requested/required during other periods will be addressed by a Cost Estimate
Revision.
6.Traffic control provided by PSE assumes the use of two flaggers, basic signage and simple
channelization. Additional traffic control measures are not included and if
requested/required will be addressed by a Cost Estimate Revision.
7.Work to be performed by PSE does not include installation and/or removal of Temporary
Service facilities at the request of others during construction.
8.Cut-over and transfer work will be completed during regular working hours except as
described in Schedule Assumption #3 below. Changes in the performance of this work will
be addressed by a Cost Estimate Revision.
9.New guy anchors shall be installed prior to installation of new ducts in the same area.
10.When Fluidized Thermal Backfill (FTB) is used, associated cost will be allocated 100% to
PSE when required for a Company Initiated Upgrade and otherwise 100% to the City.
11.Installation of protective bollards may be necessary at some locations and may not be
included in the project design. In the event unplanned bollards are required, associated costs
will be a Shared Cost and addressed by a Cost Estimate Revision.
Schedule
1.There will be a total of three (3) PSE crew mobilizations as follows: i) one mobilization of a
duct and vault crew; ii) one mobilization of an underground line crew for installation of
underground conductors and equipment; and iii) one mobilization of an overhead line crew
for removal of the existing overhead facilities. Once mobilized PSE crews will have
continuous productive work until all PSE Construction Work is complete.
2.All PSE Construction Work will be performed during regular working hours from 9am – 3pm
and Monday through Friday excluding holidays. In the event that lane closures are
necessary for performance of work, PSE shall be limited to working between the hours of
9am – 3pm and Monday through Friday. PSE and the City will mutually agree to weekly
work schedules for the Construction Work. PSE shall be allowed to perform PSE work as
scheduled without changes or interruptions caused by other construction activities.
3.PSE customers within the Conversion Area will experience interruption of electric service
during performance of the Construction Work when cutting over and transferring system and
customer loads from the overhead distribution system to the Underground Distribution
System. Cut-over and transfer work will be performed during the regular working hours
specified in Schedule Assumption #2 above except as otherwise provided below. PSE will
notify customers at least two (2) business days in advance of scheduled service interruptions.
City of Kent
Kent 38th Ave S Underground Conversion Page 6
101122390
Additional Considerations
Service Lines
Service lines within the Conversion Area must be modified or replaced to provide underground
service from the Underground Distribution System as described in Construction Drawings.
Performance of the work and associated costs shall be governed by PSE Tariff Schedule 85.
PSE Design & Construction Standards
This Conversion Project has been designed and will be constructed in accordance with PSE
design and construction standards in effect as of the date of this Project Plan. PSE standards
applicable to Construction Work to be performed by the City have been provided to the City in
PSE’s “Electric Distribution Trench/Duct/Vault Construction Standards, 2013”. All relevant
PSE standard described above are attached to this Project Plan by this reference.
New Service
Connection of new or increased load for City facilities (such as new traffic signals) under terms
of PSE Tariff Schedule 85 will be addressed on a separate work order and work sketch.
Additional costs may apply and will be quoted separately.
PSE Design & Construction Standards
This Conversion Project has been designed and will be constructed in accordance with PSE
design and construction standards in effect as of the date of this Project Plan. PSE standards
applicable to Construction Work to be performed by the City have been provided to the City in
PSE’s “Electric Distribution Trench/Duct/Vault Construction Standards, 2013”. All relevant
PSE standards described above are attached to this Project Plan by this reference.
Temporary Support (Holding) of PSE Poles
Whenever any pole(s) are required to be temporarily supported (held) due to excavation in
proximity to such poles, the City will coordinate with PSE to provide such support. The need to
temporarily support such poles shall be determined by PSE, and if required, such support shall be
provided by PSE. As used herein, “temporary support” means supporting one or more poles for
a continuous working period of ten hours or less.
Acceptance of Project Plan
The City and PSE mutually agree to and accept this Project Plan as of the date indicated below:
For the City: For PSE:
By: ______________________________ By: _____________________________
Its: ______________________________ Its: _____________________________
Date: ____________________________ Date: ___________________________
Mayor
10/12/2020
Supervisor of PI
10/20/20
Scope of Work
To: CITY OF KENT
400 West Gowe
Kent, WA 98032
Attn: DREW HOLCOMB
Project Description:OH/UG CONVERSION FOR KENT WEST WATER RESERVOIR
Location:24811 38TH AVE S KENT, WA, 98032
PSE Project Manager:KHADER GOUESSE
Activity:
PSE Order #:
40%40%60%
PSE Materials $28,084.82
PSE Construction Labor 63,024.33$ 23,705.00$ Customer Obligation $0.00
PSE Project Management $11,207.41 $2,429.90 PSE Obligation $0.00
PSE Inspection
PSE Overheads $47,917.19
Federal Income Tax $1,099.13 $13,872.82
Total Actual Costs:12,306.54$ 155,329.06$ 23,705.00$
TOTAL PROJECT VALUE:3
Date: 4/5/2018
FACILITY CONVERSION/MODIFICATION BILLING DETAIL
The city of Kent request PSE to convert OH/UG Sch74 on 38th Ave S, in front of parcel# 1253200070, between the poles located on the
south corner of the property and the north corner of the property.
Customer Installed Duct and VaultPSE Construction Cost Estimate
101122390 101122390
PSE Design Cost Change Orders
CITY OF KENT Credit for D+V:
101122390
Customer Cost Customer Cost PSE Cost Share
CITY OF KENT Obligation Incl/CO's:$67,054.24
$52,831.24
-$14,223.00
$191,340.60
PSE Billable Amount to Customer
Puget Sound Energy, Inc. PO Box 90868 Bellevue, WA 98009-0868
Billing Detail Form 5/01
Proposal for:
Kent 38th AVE South Overhead/Underground
fromBid Date:
Time: 5:00PM
9/15/2020 SCI Infrastructure, LLC
License: SCOCC*993JA
2821South 154th Street, Seattle, WA 98188
Kent - City Of
(206) 242-0633
Page 1 of 2
Item Description Quantity Unit Unit Price Total Price
12,500.0001 Mobilization And General Conditions LS 12,500.001.00
950.0002 Clearing And Grubbing LS 950.001.00
2,450.0003 Install 4-Inch Conduit LF 7.00350.00
3,500.0004 Install 6-Inch Conduit LF 10.00350.00
1,200.0005 Trench Safety Systems LS 1,200.001.00
8,800.0006 Power Or Gas Trenching LF 55.00160.00
8,500.0007 Project Traffic Control LS 8,500.001.00
15,600.0008 Dig And Set Vaults EA 5,200.003.00
3,250.0009 Pothole Utilities EA 325.0010.00
800.0010 Street Cleaning HR 200.004.00
2,200.0011 Landscape Restoration LS 2,200.001.00
59,750.00Total:
Attachment Enclosed! = Zero Total Price
= Locked Bid-Item
Estimator: Mark Scoccolo Generated by a SharpeSoft Product
Job Conditions - Attachment 'A'
Kent 38th AVE South Overhead/Underground
SCI Infrastructure, LLC Page 2 of 2
Pricing includes Mobilization and Demobilization, clearing and basic erosion control, trenching approx 165 feet and
installing 2 each 6-inch conduit and 2 each 4-inch conduit provided by PSE. Excavating, bedding and setting 3 vaults
provided by PSE. Backfilling and area restoration is included.
General Exclusions or Clarifications:
1. No Permits, Sales Tax, Deposits, Bonds, Fees
2. No Construction Staking, Compaction Testing
3. Spoil Removal of our work only
4. De-Watering of our work only
5. No Rock Excavation, Hammering or Blasting is included
6 . No handling of hazardous substances
Estimator: Mark Scoccolo
For Job: Kent 38th AVE South Overhead/Underground
Generated by a SharpeSoft Product
RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS
Next: 10/6/2020 7:00 PM