CAG2019-084 - Change Order - #13 - Scarsella Brothers, Inc. - LID 363: S 224th Street Project - 09/30/2020
Agreement Routing Form 4111/ • For Approvals,Signatures and Records Management KEN T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASHINGTON (Print on pink or cherry colored paper) Originator: Department: S.Anderson PW Engineering Date Sent: Date Required: C 10/16/20 N/A 2 Authorized to Sign: Date of Council Approval: 0 Director or Designee 0 Mayor N/A Budget Account Number: Grant? 0 Yes 0 No R90101.64110.120 Budget? 0 Yes 0 No Type: N/A Vendor Name: Category: Scarsella Bros, Inc. Contract Vendor Number: Sub-Category: 34547 Change Order#130'470Project Name: LID 363: S 224th St Project E Project Details: Remove and replace PRV vault lid for ease of use, staff safety, and product longevity. g y• c E Agreement Amount: $51,853.76 Basis for Selection of Contractor: Bid co Start Date: N/A Termination Date: 225 Working Days 4 Local Business? ❑Yes 0 No* *If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number::e''� /1, ❑Yes 0 No CA2019-084 1 e 20 L ci Ob1 Date Received by City Attorney: Comments: C WWI 2 DC .). N C 40 03 at ,` Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: adr-Pr2A7i_,_,, Visit Documents.KentWA.gov to obtain copies of all agreements osjtY(1? KENT CHANGE ORDER NO. #13 NAME OF CONTRACTOR: Scarsella Bros, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Lid 363: S 224th Street Project ORIGINAL CONTRACT DATE: February 19, 2019 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Remove and replace PRV vault lid for ease of use, staff safety, and product longevity. Procure the control system for the PRV which was not included in the contract plans. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $8,423,307.67 (including applicable alternates and WSST) Net Change by Previous Change Orders $422,340.39 (incl. applicable WSST) Current Contract Amount $8,845,648.06 (incl. Previous Change Orders) Current Change Order $47,139.78 Applicable WSST Tax on this Change $4,713.98 Order Revised Contract Sum $8,897,501.82 CHANGE ORDER - 1 OF 3 Original Time for Completion 130 working days (insert date) Revised Time for Completion under 225 working days prior Change Orders (insert date) Days Required (±) for this Change Order 0 calendar days Revised Time for Completion 225 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CI OF KENT: By: /�.�,? (— BY:("\-*—s 14a-6-- (signature)_, ( ignature) Print Name: >,, Print Name: Timothy J. LaPorte, P.E. Its i,A Its Public Works Director (title) (till DATE: ./ .- DATE: f/3o 2D CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) 4/t Kent City Clerk Kent Law Department [in this held,you may enter the electronic tdepath where the contract has been saved) CHANGE ORDER - 3 OF 3 KENT FILE NO: 200.2 CHANGE ORDER WORKSHEET NO. 13 Construction Management Division - Public Works Project: LID 363 224th St Improvements Project No.: 14-3010 Project Engineer: Stephen Lincoln Fed-Aid No.: Owners Rep: Jason Bryant Contractor: Scarsella Date: 7/17/20 I. PROPOSED CHANGE • Remove and replace PRV (Pressure Reducing Valve) vault Lid. • Procure the control system for the PRV. IL REASON AND BACKGROUND FOR CHANGE • Operations requested an upgrade to the access hatch on the specified PRV vault lid for ease of use, staff safety, and product longevity. This required removing and replacing the already installed lid and hatch with the upgraded product. • Contract plans did not include design, manufacturing, programming, and commissioning of a control system for the PRV vault. Our contractor was asked to contract with Systems Interface to provide this product and service. The product was delivered to the City of Kent for installation by City staff. III. METHOD OF PAYMENT NEW PAY ITEM(S) El Not Applicable Change Order No. 1 - FOR ACCOUNTING USE ONLY Sch. No. Item Description 1 Total Est. 1 Qty this '_. Unit Unit Price Total Estimated Cost of Qty 1 PE 1 Item 2 I Remove and Replace PRV 1 1 i 1 i FA 1 $21,015.88 i $21,015.88 Vault Lid 2 I Procure Control System from I 1 1 1 1 FA 1 $26,123.90 1 $26,123.90 Systems Interface • • • ® i Independent Estimate Attached s E l CREATE PAY ITEM ONLY— Payment to be made ® I PAY THIS PAY ESTIMATE -REQUIRED I 1 at a later date upon completion of work Material Submittals Required — CC: Construction Coordinator ` New Sub Reqrd? I No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. - 1 FOR ACCOUNTING USE ONLY Sch.No. B.I.No. Item Description Qty Unit Unit Price Cost of Item Independent Estimate Attached - REQUIRED 1 REV. DATE: 4/01/10 KENT FILE NO: 200.2 INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch. No. B.I. No. i Item Description_..__......._......_.._.._......__.._Qty .......:.......__Unit.___.',.................._.._Unit Price Cost of Item Independent Estimate Attached -REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * $47,139.78 *Total of the Cost of Item Columns THIS PAY ESTIMATE $47,139.78 IV. WORKING DAYS Original Contract 130 Due This Change Order* 0 Previous Total _... _ 190 DATE: ! 5/5/20 DATE: 5/5/20 Explanation/Justification Reauireq: On critical path for project completion TOTAL WORKING DAYS* 190 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Jason Bryant Date: 8/5/20 Jason Bryant Construction Engineering Date: Supervisor: �_ �� r s//21) Paul Kuehne Construction Engineering Date:Manager: / � j,- rr 8 .A -// 0 ric Connor 2 REV. DATE:4/01/10 FA Sheet No.: 123 DAILY REPORT OF FORCE ACCOUNT WORKED -fENT Project Name: LID 363 224th St Phase 2 Project No: 14-3010 Item No.: Date: 1/31/2020 Description of Work: Remove and replace PRV Lid. Relocate ladder. Supply new PRV Lid Work by Subcontractor? no Prime Contractor: Scarsella Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Kent H Foreman 4 78.23 $ 312.92 Dave J Foreman 4 78.23 $ 312.92 Eddie D Operator 4 72.75 $ 291.00 Kent B Operator 4 72.75 $ 291.00 Joe H Foreman 4 78 23 $ 312.92 $ SUBTOTAL-LABOR. $ 1,520.76 LABOR OVERHEAD&PROFIT @ 29% $ 441.02 LABOR TOTAL $ 1,961.78 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 2-280 Tool Truck 4 30.23 $ 120.92 3-122 Tool Truck 4 30.95 $ 123 80 17-243 Hitachi 345 2 141.76 $ 283.52 17-261 Hitachi 345 3 141.76 $ 425.28 15-101 966 Loader 2 86.05 $ 172.10 SUBTOTAL-EQUIPMENT $ 1,125.62 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 236.38 EQUIPMENT TOTAL $ 1,362.00 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Oldcastle Invoice#10235160 1 ea $ 14 621 57 $ 14,621 57 $ $ $ $ SUBTOTAL $ 14,621,57 OVERHEAD&PROFIT @ 21% $ 3,070.53 TOTAL $ 17,692.10 Verification of Hours Worked: TOTAL. $ 21,015.88 12%MARKUP (for prime when subcontract work) $ - Contractors Representative Date SHEET TOTAL: $ 21,015.88 Owner's Representative Date Pay Estimate Entered: Date: By: 0 idcastle Infrastructure' Page' ,a COP•mrf Invoice 2608 A Street SE Telephone:253839-3500 Remits,:to:Cldrante kraetanm.e Inc Auburn,WA 06002 Fax •253-735-4201 P.O.Box 742387 Loa Angeles,CA 900742387 Ship To:LID 363 Kent Sold To:SCARSELLA BROS,INC. 881h eve S S 218th PO BOX 66697 Kent SEATTLE,WA 98168 0697 KENT,WA 98030 5051 Reference:Dan Rivera Tax exempt number:A164507 19 Ske:Atbum Invoke No. Date Customer No Order No Customer PO Delivery terms Mode of Delivery 010235160 1/31(2020 001025 S164790 14-3010 FOB Job Pond Brat. Packing slip(.) ...:SP199710 Unit kern Desoription Mark Unit price Amount 1 00 Ea 0060215 54'x 90'x 12'Cover Slab o4 36 8800,00 6.800.00 a 72 LW Hatch per DWG 010-S164790-002 SHEET 4 OF 5 1.00 Ea 0030028 57 x 52'x 12 Cover Slab nd 36' 5,021 57 5,021 57 x 36 LW Hatch per I31518 010S184790-002 SHEET 5 OF 5 1.00 Ea 0210310 816 Top w/(2)Blockouts per 2,800.00 2-800AO DWG 010S164790-002 SHEET 2 OF 5 1 00 Ea 4100293 Core Orating by Evergreen 4.00 Ea 6030010 Clutches-Burke 4-ton each TOTAL AMOUNT DUE BY :31112020 US 14,621.57 rri."sos..i.� ."Irab°i*ww"Damn Gbr:n a..r.�.o�e.a e.wwvm.a,.®..e. "�'K.e:m.d..�r r s.r.tra s.�aa w n rtx...•.m. MRT1EAfT4 TOTu a PESr OUE f M TPAe Winer Ay MexYaie6Oxlf aF lO vnv COLLECT TTOerF(rEEA rETEA DUMximne CUSTOMER Scanned with CamScanner The PRV Vault isn't part of the order for the culvert and I can't find it in our project files. If I know who was handling it I can resurrect it. Doug Myers Project Manager Oldcastle Infrastructure' 2808 A St SE .caxcam.r* Auburn,WA 98002 P 253-561-8154 i C 253.258.1474 E douq myersailoIdcastle corn oldcastlei nfrastructure.com From: Dan Rivera [mailto:dan.r@SCARSELLABROS.comj Sent:Wednesday, September 25, 2019 4:56 PM To: Myers, Doug <Doug.Myers@oldcastle.com> Subject: [EXTj FW: LID 363 224th St Phase 2- PRV vault lid CAUTION: this email originated from outside of the organization. Do not click links or open attachments unless you are expecting this email and know the contents are safe. Doug—the City of Kent has a request for the PRV Vault we had delivered for the S 224`h ST Project(14-3010). If you have any questions please let me know. THX! Dan A. Rivera Project Manager (253)261-8432 Cell (253)872-7173 Office Dan.r@scarsellabros.com cotPACr01 SCARSELLA s,r;c[ 1935 From: Bryant,Jason [mailto:JBryant@kentwa.govj Sent: Wednesday, September 25, 2019 9:08 AM To: Dan Rivera <dan.rPSCARSELLABROS.com> Cc: Matthew Scarsella <matthew.s@SCARSELLABROS.com>; Shields, Brian <BShields@kentwa.gov>; Chau,Tsz <TChau@kentwa.gov> Subject: LID 363 224th St Phase 2- PRV vault lid 3 Dan, The City would like to order a different lid for the PRV vault, Attached is a quote from a lid we bought in the past. Could you please check with Doug from Oldcastle and see what it will take to return the one we have and get the new one? Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 Cell 253-261-5663 JBrvant(a KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 4 Bryant, Jason From: Bryant, Jason Sent: Tuesday, September 10, 2019 2:04 PM To: Reed, Jim Subject: RE: 218th Vault Lid Jim, Sounds good, just give me a call and we'll meet up. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 I Cell 253-261-5663 Brva ntCo1 Kent WA,gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Reed, Jim Sent: Tuesday, September 10, 2019 1:43 PM To: Bryant, Jason Subject: Re: 218th Vault Lid Yes i have some ideas and have been looking at the Utility Vault catalog. Maybe we can meet up tomorrow and hash it out. Sent from my iPhone On Sep 10, 2019, at 1:29 PM, Bryant,Jason<JBrvant@kentwa.gov>wrote: Jim, Do you have a specification for the lid that you would like to replace it with? Maybe some photos? Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 I Cell 253-261-5663 ,)BrvantOKentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 1 From: Reed, Jim Sent: Tuesday, September 10, 2019 12:50 PM To: Bryant, Jason Subject: 218th Vault Lid Hi Jason, We would like to have the PRV vault lid at 218th replaced with a lid with aluminum spring lift doors and recessed padlock hasps. Can you help me with the process to get this accomplished. Thanks, Jim Jim Reed, Field Supervisor Water Source and Supply I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5667 I Cell 253-740-1884 JreedCd KentWA.ggy CITY OF KENT,WASHINGTON KentWA.gov Facebook Twitter YouTube PLEASE CONSIDER THE ENVIRONMENT QEEORE PRINTING THIS E-MAIL 2 Bryant, Jason From: Bryant,Jason Sent: Wednesday, June 12, 2019 8:39 AM To: Reed,Jim;Johnson, Paul Subject: RE: LID 363 224th St Phase 2- PRV vault Thank you for the quick response!! Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 I Cell 253-261-5663 )8rvantetiKentWA,gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Reed, Jim Sent:Tuesday, June 11, 2019 3:49 PM To: Johnson, Paul; Bryant, Jason Subject: RE: LID 363 224th St Phase 2- PRV vault This looks like the right vault. Thanks, Jim Jim Reed, Field Supervisor Water Source and Supply I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5667 I Cell 253-740-1884 Ireed@KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Johnson, Paul Sent: Tuesday, June 11, 2019 3:02 PM To: Reed, Jim Subject: FW: LID 363 224th St Phase 2- PRV vault Paul Johnson, Water Distribution Supervisor Water Department I Public Works Department 5821 South 240t" Street, Kent, WA 98032 Phone 253-856-5614 I Fax 253-856-6600 PMJohnsonakentwa.gov CITY OF KENT, WASHINGTON KentWA.00v Facebook YouTube 1 PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant,Jason Sent:Tuesday, June 11, 2019 2:07 PM To: Reynolds, Steve <SReynolds@kentwa.gov>;Johnson, Paul <PMJohnson@kentwa.gov> Cc: English, Elbert<EEnglish(akentwa.gov>; Shields, Brian <BShieldsPkentwa.gov>; Chau,Tsz<TChau@kentwa.gov> Subject: LID 363 224th St Phase 2- PRV vault Steve/Paul, I received the PRV vault submittal from Scarsella for the 22e St phase 2 project. I believe it is the correct vault but wanted to give you guys a chance to take a look. I wasn't sure who's in charge of the PRV when I'm done so I sent it to both of you. I included the PRV drawings from our plans as well for you to reference. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 l Cell 253-261-5663 JBryantPKentWA_ctov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 2 FA Sheet No.: 123 DAILY REPORT OF FORCE ACCOUNT WORKED - fEN-r Project Name: LID 363 224th St Phase 2 Project No: 14-3010 Item No.: Date: 1/31/2020 Description of Work: Contract with Systems Interface to design, manufacture, program, and commission a control system for the project's PRV Vault on S 218th st. Work by Subcontractor? no Prime Contractor: Scarsella Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT $ $ $ SUBTOTAL-LABOR. $ - LABOR OVERHEAD&PROFIT©29% $ - LABOR TOTAL $ - EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT $ $ SUBTOTAL-EQUIPMENT $ - EQUIPMENT OVERHEAD&PROFIT @ 21% $ - EQUIPMENT TOTAL $ - MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Systems Interface Invoice#24936 1 ea $ 11,874.50 $ 11,874.50 Systems Interface Invoice#24722 1 ea $ 6.477.00 $ 6,477.00 Systems Interface Invoice#25134 1 ea $ 3.238.50 $ 3,238.50 $ SUBTOTAL $ 21,590.00 OVERHEAD&PROFIT @ 21% $ 4,533.90 TOTAL $ 26,123.90 Verification of Hours Worked: TOTAL $ 26,123.90 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 26,123.90 Owner's Representative Date Pay Estimate Entered: Date: By: 10032.11..W 1.4,41""MO UV Invoice Systems Interface Inc. `w:;=.: SOLO T0:Scarp/EN Bros Inc Invoke Rum Me. 20505 5/01 S 1116111 St 1,111 19 2020 lowoka Doe: Su10otto Porches*OrUrr Run00r. 102010 ropoS urobor Rent,WA WVSCARSEk-IA 6ROS b ING' c�to.5 vP q.a R e Smaw WWIloo Ship Duo: 0N11/202C Imnk1ep Urns, P%epnu SN0 Vte SWewnen: Rob Sehenunr Po/NM Tans: NW 00 Pro*e5C CIF/of Kent 218th PRV Controls TAY Wools**Not Prot Fwle bon.Shop Snobs Cawpoo,and Mho,to Cloy el PAW I Sow 1004 0d I SMONS I Decagon I Woo Value t Wwok.a I Duo i 1 1 Or15i0ol CaYed 721,55000 W.ATT.00 711.570 50 Towie: 521,55000 Y3.O71 00 7110e 50 Corona VAN 521.800.00 Percent Cwnptw:1 OS00I Awwei Dee TRW trwola:ri71 AY USD Thank TOW Roma To:Syvlrrolnodsca SNP To:Screo0e Won Mc _I OON80 10002 07tl1 Av.W era 190B Si Mtlleo,WA P5275-5000 Ca R:1120 Mw:Accounts ReotlCODle Pont,WA w011 PAST DUE ACCOUNTS WILL BE CHARGED 1%SERVICE CHARGE PER*OWN ON THE UNPAID SALMICE Scanned with CamScanner I farm R..W WA 9OM WO USA Systems Interface Inc. ;: _ Invoice SOLD TO:semen.Bros.So. OR l� �r 2 1 Mqa Number 7/TA 8404 8,98A SI I^ Invoke Deno: 014/11/1020 .gROS,���bwau..OmarTAanbec 143010 SII►ro}ot Rowboc 3105000 Sent.WA 9ma1 SGp,AS Co:Now P5*00 limbo,: FAIL. 148800p Step Dow 0311411090 Onoienq Torn; Prepa.. l Snip V SMsammr: Rob Schema. Perron,Tonne: Net RI J Protect:City of Kent 21E111 PRV Control. The Ywobk I04 AS mantl bendarso s neMwtl ine 1 Oed I SMpp'1 Dw totkon 1 Rem VANI 1 7— _7 1 I 1 Dr41M Carats l 821,500.00 taco MAR W Took: 311,5W.00 30.00 00,477.00 Connect moo:I tt1,N0.00 I Portent Compi.k:I 30.00I Amount Ow Dee 0.wit.:I SI4TT.00 II Thank Your Ranh To;Spkom UMaea Inc Snq Ten Xar.all.Sfas.Inc GI.:MIO]0 10809I7St Ave 8404 S 1981n St Mohawk WA 082 1-5000 Co W 1170 ' AccountsRacsMOk UK WA O1*1 PAST CUE ACCOUNTS WILL BE CHARGED 1%SERVICE CHARGE PER 01O5TN 011 THE UNPAID IMARCE Scanned with CamScanner Systems Interface Inc. Invoice SOLD T0:Snacks Bros.Inc. Invoke Number: 25131 e.a 5196th SI Invoke Doe: 0,02020 Porches.Order Nvnb.r: 143010 S0 Prof.Numb, S208006 Kent,WA 08031 Customer Prol.ct Number: F.O.B.' I4dateo Shp Date: 07/102020 N5okkn0 Terms3 Pro4ns Ship VW: Women: Rob ScOommer Payment Tenn.: Net30 Project:City o1 Kent 2181h PRP Controls The moome ie tor. Bern I Drama I SNPP.e I Description I Item P0k.I I mol.e6 I Dee Cnpnal Contract 421,59001 S14361.50 UMW Taos: $21,90.00 414301.30 03.2311.50 Contact Vaut:I $31,S90.00 Percent couplet. Amom.Dw Die Percival suns°10SO There Y. name To:Systeme Interlace Inc. Ship Te:Snrse4 Bros.Mk. GU 40e030 10E102 nth Ave W 8404 S 1960 St cut i/eo,WA 98275-5000 Co N:1130 Attn:Accounts Recenehe Kent,WA 90031 PAST DUE ACCOUNTS WILL BE CHARGED 1%SERVICE CHARGE PER BONTN ON THE UNPAID BALANCE Scanned with CamScanner Bryant, Jason From: Swinford, Kevin Sent: Wednesday, February 19, 2020 1:01 PM To: Cross, Jordan A. Cc: Beesley, Craig S.; Davis, Matt V.; Bryant,Jason; Bauer, Sean; Halverson, Ron Subject: RE: 218th PRV controls Drawing Submittal Hello Jordan Yes, by all means go ahead and get things ordered. The drawings look good. Ok, for a little background. This panel you are building is going into large underground vault. As of last week there was no power at the service for this vault. Once power is established we will run power to the vault and install a small distribution panel. Once I have your panel we'll install that in the vault as well and run dedicated conduits to the valve, pressure transducers, meter, entry switches(s), flood alarm, radio antenna and distribution panel. We'll also need to get an antenna mounted on the telemetry pole and the coax run into the vault. Once that's all completed we'll bring System's in for final start up and testing. This isn't going to happen overnight as there are several projects ahead of this one. Honestly I don't see a start-up until possibly fall. It appears Stephen Morgret and Thor will be in town Monday for another project and I'll give them the PLC components and push button switch. Cheers Kevin R Swinford, SCADA Technician Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5613 I Cell 253-740-6590 kwwnnoord+lKentWAyov CITY OF KENT, WASHINGTON KentWA.cov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Cross, Jordan A.<JCross@systems-interface.com> Sent: Wednesday, February 19, 2020 10:08 AM To:Swinford, Kevin <KSwinford@kentwa.gov> Cc: Beesley, Craig S. <CSBeesley@systems-interface.com>; Davis, Matt V. <mvd@ systems-interface.com> Subject: RE: 218th PRV controls Drawing Submittal EXTERNAL EMAIL Thanks for your notes, I've made updates for you to review. If there are no objections I'm going to go ahead and order the parts for the panel. -Jordan Systems Interface Inc Jordan Cross Project Engineer Systems Interface Inc 10802 47th Ave. W Mukilteo, WA 98275 Main: 425-622-9501 Direct: 425-622-9558 3AC@ systems-interface.con www.systems-interface.com From:Swinford, Kevin <KSwinford@kentwa.gov> Sent:Tuesday, February 18, 2020 2:27 PM To: Cross,Jordan A. <1Cross@systems-interface.com> Subject: RE: 218th PRV controls Drawing Submittal Hello Jordan My comments and the updated correlation spread sheet. Looking back at and earlier email on 2/10 it looks like I sent you the wrong correlation sheet labeled 640 pump station. Disregard that one and use the attached. Thanks Kevin R Swinford, SCADA Technician Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5613 ; Cell 253-740-6590 kswinfordCaKentWA.gov CITY OF KENT,WASHINGTON KentWA.aov facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From:Cross, Jordan A. <1Cross@systems-interface.com> Sent: Tuesday, February 18, 2020 9:24 AM To:Swinford, Kevin <KSwinford@kentwa.gov> Cc: Beesley, Craig S. <CSBeesley@systems-interface.com> Subject: 218th PRV controls Drawing Submittal EXTERNAL EMAIL Hi Kevin, Please review the attached drawings and let us know what revisions are necessary. Thanks, 2 Bryant, Jason From: Bauer, Sean Sent: Friday, January 31, 2020 10:50 AM To: Bryant, Jason; Swinford, Kevin Cc: Araucto, Joseph; Halverson, Ron Subject: RE: Updated Scope/Price for 218th PRV Thanks for all your help with this Jason! Sean M. Bauer, Water System Manager Water Division I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5610 I Cell 253-740-7089 sbauereKentWA.00v CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant,Jason Sent: Friday,January 31,2020 10:48 AM To:Swinford, Kevin<KSwinford@kentwa.eov> Cc: Bauer, Sean<SBauer@kentwa.gov>; Araucto,Joseph<JAraucto@kentwa.gov>; Halverson, Ron <RHalverson@kentwa.eov> Subject: RE: Updated Scope/Price for 218th PRV Kevin, I have requested Scarsella contact Systems Interface and get the ball rolling. We will need a quote from ACCU Corn to include in the change order. Can you contact them and get that? I`ll copy you in on all of the communications for the PRV with Systems. FYI the new PRV lid was delivered today. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 I Cell 253-261-5663 )BrvantelKentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Swinford, Kevin Sent: Thursday, January 30, 2020 7:03 AM To: Bryant, Jason 1 Cc: Bauer, Sean; Araucto, Joseph; Halverson, Ron Subject: FW: Updated Scope/Price for 218th PRV Jason, Attached is System's interface's proposal for the panel build at the 218th PRV. System's will be building and supplying the cabinet and components needed to properly control the valve. The basic programming will also be completed by System's. The component exceptions are the PLC items you delivered to me and a radio modem. The City will put those components in System's hands to be installed in the panel. System's will deliver the panel and City personnel will install it. Once installed System's will provide a day of testing and commissioning. The radio antenna and cable still need to be provided and installed prior to start up. This "hopefully" will be done by our radio vendor Accu Corn. Questions? 1. Will this work by Accu Corn be a change order thru the project or will this be a separate contract with Accu Corn? 2. Will you need a firm quote from Accu Corn for the work to be provided, if it will be a change order? As you are aware none of this can be completed without the electrical service. Please keep me informed on that piece. Thank you so much for your help Kevin R Swinford, SCADA Technician Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5613 I Cell 253-740-6590 kswinford)KentWA.gov CITY OF KENT,WASHINGTON KentWA.aov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From:Schommer, Rob H.<rhs@systems-interface.com> Sent:Wednesday,January 29, 2020 2:38 PM To:Swinford, Kevin<KSwinfordCa?kentwa.Aov> Subject: Updated Scope/Price for 218th PRV EXTERNAL EMAIL I've attached our updated proposal with the City providing the PLC components. Thanks, -Rob - Systems Interface Inc` 2 Jason—I finally have all the Invoices from Rob(Systems Interface), but just following up on ACCU Corn? THX! Dan A. Rivera I Project Manager Scarsella Bros. Inc. PO Box 68697 I Seattle, WA 98168 Cell(253)261-8432 coo SiACTgss SCARSELLA s'NCE 0.0 From: Bryant,Jason [mailto:JBrvant@kentwa.eov] Sent: Friday,January 31, 2020 10:45 AM To: Dan Rivera <dan.rc SCARSELLABROS.com> Subject: FW: Updated Scope/Price for 218th PRV Dan, The City would like Scarsella to hire Systems Interface to complete the PRV. Attached is the quote to complete it. We will pay the appropriate mark up as well. Could you contact Schommer, Rob H. rhsOsystems-interface.com and get the ball rolling. The change order will also include work with ACCU Corn for the antenna. I don't have a quote on that yet but will get one soon. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 I Cell 253-261-5663 )BrvantClKentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Swinford, Kevin Sent: Thursday, January 30, 2020 7:03 AM To: Bryant, Jason Cc: Bauer, Sean; Araucto, Joseph; Halverson, Ron Subject: FW: Updated Scope/Price for 218th PRV Jason, Attached is System's interface's proposal for the panel build at the 218th PRV. System's will be building and supplying the cabinet and components needed to properly control the valve. The basic programming will also be completed by System's. The component exceptions are the PLC items you delivered to me and a radio modem. The City will put those components in System's hands to be installed in the panel. System's will deliver the panel and City personnel will install it. Once installed System's will provide a day of testing and commissioning. 2 The radio antenna and cable still need to be provided and installed prior to start up. This "hopefully" will be done by our radio vendor Accu Corn. Questions? 1. Will this work by Accu Corn be a change order thru the project or will this be a separate contract with Accu Corn? 2. Will you need a firm quote from Accu Corn for the work to be provided, if it will be a change order? As you are aware none of this can be completed without the electrical service. Please keep me informed on that piece. Thank you so much for your help Kevin R Swinford, SCADA Technician Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5613 I Cell 253-740-6590 kswinford(atKentWA.00v CITY OF KENT, WASHINGTON KentWA.4ov Facebook YouTube _'EASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Schommer, Rob H.<rhs@systems-interface.com> Sent: Wednesday,January 29, 2020 2:38 PM To: Swinford, Kevin <KSwinford@kentwa.gov> Subject: Updated Scope/Price for 218th PRV EXTERNAL EMAIL I've attached our updated proposal with the City providing the PLC components. Thanks, -Rob -<-1) Systems Interface Inc` Robert H. Schommer, P.E. Vice President Systems Interface Inc 10802 47th Ave W., Mukilteo, WA 98275 cell: 206-979-3683 main: 425-481-1225 rns@systems-interface.com www.systems-interface.com This e-mail message(including attachments,if any)is confidential and may be privileged.Any unauthorized distribution or disclosure is prohibited.Disclosure to anyone other than the intended recipient does not constitute waiver of privilege.If you have received this e-mail in error,please notify us and delete it and any attachments from your computer system and records. 3 (425)481-1225 T (425)481-2115 F ice Inc. www.systems-interface.com Systems In t 10802 47th Ave W. Mukilteo,WA 98275 USA PROPOSAL To: Kevin Swinford Company: City of kent Re: PRV Vault Control System Date: 1/29/2020 From: Robert H. Schommer, P.E. Pages: 1 QS1 8L031-4 Hi Kevin, Thank you for the opportunity to provide an updated quotation to design, manufacture, program, and commission a control system for your Pressure Reducing Valve Vault. Our proposed scope of supply includes: • Engineered Design Submittal package with: o Panel Layout Drawings. o Electrical Schematics. o Bill of Materials. o Data Sheets. o Programming of the PLC and Operator Interface Units. • PRV Vault Control Panel, with: o Nemx 4X rated Stainless Steel Enclosure, approximately 30"x30"x10", with backpanel. o Inner swing-out subpanel. o Incoming 120 VAC Main Circuit Breaker and Power Distribution. o Surge Suppressor. o Interior Control Panel Light with Door Switch. O 100 Watt Forced Air Panel Heater with Integral Thermostat. O 850VA UPS system with low battery and power fail contacts. O 24VDC Power Supply with Fused Power Distribution. O 12VDC Power Supply with Fused Power Distribution (for Radio). o Swing-out-panel mounted Operator Interface Devices including: • Control Power On/Off Selector Switch • Power On Indicating Lamp • Siemens TP900 Color Operator interface Touchscreen. o Installation and wiring of a City-supplied Siemens S7-1200 Programmable Logic Controller(PLC) with an Analog Input Module and Communications Module. o Installation and wiring of a City-supplied Dataradio Integra-TR Wireless Modem. o Polyphaser Surge Arrestor and Coax jumpers as needed. o Control Relays as required for interfacing with field devices. o Wire, wire duct, terminal blocks, and custom engraving as required • Operation and Maintenance Manual (electronic and hardcopy if required). • Factory Testing • UL508 Certification • Delivery of the completed panel to the jobsite. • One day of on-site testing, commissioning, and training services. Proposed Pricing $21,590- Proposed Terms: 100% upon shipment, Net 30 1 of 2 (425)481-1225 T (425)481-2115 F www.systems-interface.com Systems Interface Inc. 10802 47111 Ave W. Mukilteo, WA 98275 USA PROPOSAL Exclusions: • Siemens PLO Components (supplied by the City). • Data Radio Components (supplied by the City). • Radio Antenna or cabling external to the control panel. • Programming modifications to the Headquarters Master SCADA system. • Sales or Use Taxes. • Installation, Field Wiring, Field Terminations, or Conduit. • Mounting brackets, fittings, tubing, anchoring systems, etc. • Cost of Permits and/or Inspection Requirements. • Costs relating to administering and managing a subcontract (a Purchase Order is expected). • Spare Parts • Field Devices (i.e. Limit Switches, Pressure or Flow Transmitters, etc.) • Seismic Calculations, Arc-Flash Analysis, Short Circuit Coordination Studies. Please contact me with any questions or concerns. Sincerely, Systems Interface Inc. Robert H. Schommer, P.E. Vice President rhsasystem s-i nterface.com 2 of 2 Bryant, Jason From: Swinford, Kevin Sent: Tuesday, January 28, 2020 11:17 AM To: Bryant,Jason;Araucto, Joseph Subject: RE: LID 363 224th St Phase 2- Submittal of materials for PRV Station Hey Gents Yup I approved them last July....that was along time ago! Yes, Jason we would like to get our hands on those. How best to get them? Kevin R Swinford, SCADA Technician Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5613 I Cell 253-740-6590 k sw i n fo rd Cat KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant,Jason<JBryant@kentwa.gov> Sent:Tuesday,January 28, 2020 10:31 AM To:Araucto,Joseph <JAraucto@kentwa,gov>; Swinford, Kevin<KSwinford@kentwa.gov> Subject: RE: LID 363 224th St Phase 2-Submittal of materials for PRV Station Joe/Kevin, West Coast Signal has the components that are on the approved submittal in hand. We can pick them up at any time. If we need to have West Coast perform more work that was not included in the specs we can. I will just need a list to give them to get an estimate. Let me know what I can do to help out. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 I Cell 253-261-5663 }BrvantCalKentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Araucto, Joseph Sent: Tuesday, January 28, 2020 10:18 AM To: Swinford, Kevin Cc: Bryant, Jason Subject: FW: LID 363 224th St Phase 2- Submittal of materials for PRV Station Kevin, Jason Bryant sent me the email thread below showing transmittal for Siemens components from Scarcella of the attachment for your review. Below also is the link to the plan set for reference. Sheet 27 shows the PRV and list of components required in the PRV. P:\Public\PROJECTS\ In Construction\14-3010 S 224th Street Project Phase II\300 Revisions\300.1 Revisions During Construction\Current Set-Plans.pdf We also looked at the specifications which listed components that are included as part of the PRV. What is unclear is if these are to be installed in a cabinet or just provided. I am hanging my hat on the statement in the specifications that the payment of PRV station to include "all other requirements for a fully functioning PRV Station." We should at least require Scarcella to provide the required components as listed in the contract document. Joseph Araucto, P.E. Utility Engineer I Public Works Operations 5821 South 240m Street, Kent, WA 98032 Phone 253-856-5664 Cell 253-508-4068 JAraucto6-Kent W A.gov CITY OF KENT, WASHINGTON www.KentWA.00v Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant, Jason Sent: Tuesday, January 28, 2020 8:51 AM To: Araucto, Joseph Subject: FW: LID 363 224th St Phase 2- Submittal of materials for PRV Station Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 I Cell 253-261-5663 )BrvantOKentWA.00v CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryant, Jason Sent: Monday, July 15, 2019 9:02 AM To: Swinford, Kevin Subject: FW: LID 363 224th St Phase 2- Submittal of materials for PRV Station Kevin, Jim Reed asked me to send this submittal to you for review. 2 Bryant, Jason From: Swinford, Kevin Sent: Tuesday, September 10, 2019 7:52 AM To: Bond, Bryan; Halverson, Ron Cc: Bryant, Jason Subject: RE: 218th PRV Attachments: 218th Power Application.pdf Gents The specifications are very vague. Here's my input. The new power request was for an underground 100 amp single phase 120/240 service. Please see attached request sent to Mr. Sorensen on April 2nd Since there are no plan details showing the new electrical service that I can see the contractors electrician should be able to determine what is required for equipment, where and how the service/meter panel is mounted and arrange all special requests and inspections with the proper agencies. Three 2" conduit penetrations were requested to enter the vault. One is for electrical, one is for the telemetry antenna coax and the 3rd was slated as a spare to be brought to the surface and placed in a pull box on the east side of the vault. The contractor is suppose to install a 50' high pole near the NW corner of the vault and run a 2" sch 80 conduit from the pole to the vault using one of the conduits that penetrate the vault. The City will then coordinate with its radio contractor to install an antenna and run coax to the vault interior. The City will contract with Systems Interface to build, program, install and commission a control panel for the future operation of the control valve. Start up of the mag meter and initiation of telemetry communications will be coordinated by the City at or near the time the control panel is commissioned. Please let me know if I missed anything or someone has determined a different approach? Thanks Kevin R Swinford, SCADA Technician Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5613 I Cell 253-740-6590 kswinford*KentWA.gov CITY OF KENT, WASHINGTON 1