Loading...
HomeMy WebLinkAboutCAG2020-252 - Change Order - #2 - CFC Construction, LLC - City Hall Courtyard Improvements - 10/13/2020 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr:AA Agreement Routing Form Dir Dir/Depep: RL . BL • For Approvals,Signatures and Records Management This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. KENT WASHINGTON (Print on pink or cherry colored paper) Originator: Department: Nate Harper Parks, Recreation & Community Services Date Sent: Date Required: e 10/13/2020 10/13/2020 C Authorized to Sign: Date of Council� g Approval: C ❑p Director or Designee ❑Mayor 7/21/2020 Budqet Account Number: Grant? ❑Yes El No F20094.64110.9419 Budget? E]Yes ❑No Type: N/A Vendor Name: Category: CFC Construction,LLC Contract Vendor Number: Sub-Category: 2333777 Change Order 4 Z O I-Pa Project Name: City Hall Courtyard Improvements E i O C Project Details:Change Orders #2-6 attached for various changes due to unforeseen conditions. +0 C w Agreement Amount: $ 263,191.5( Basis for Selection of Contractor: Bid w sh.. Start Date: Termination Date: N/A — Change Order Only pt Q Local Business? ❑Yes ID No* *Ifineets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: []Yes ❑� No CAG2020-252 Date Received by City Attorney: Comments: p1 C a+ 3 a, •� i N R C Cn Date Routed to the Mayor's Office: N/A V1 Date Routed to the City Clerk's Office: AM22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.200804 T NOTE: By submitting a bid, the bidder agrees to be bound by the terms of this change order form for any change orders. CHANGE ORDER NO. 002 NAME OF CONTRACTOR: CFC Construction LLC ("Contractor") CONTRACT NAME & PROJECT NUMBER: City Hall Courtyard Improvements #FAC19-81 ORIGINAL CONTRACT DATE: 08/06/2020 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Provide and install floor drain waterproofing at four (4) existing floor drains as indicated by RFI001#FAC19-81_BA Response issued 200812 and RFI001 Response Attachments; 1/R.1 FLOOR DRAIN WP Detail, dated 8/11/2020, The existing drains are to be salvaged, cleaned, wire wheeled, existing bolt holes in lower flange to be drilled out and tapped for 5/16" x 18 galvanized bolt to anchor upper flange of drain (per email from Broderick Architects -- Erik), provide and install the roof drain waterproofing system per Laurenco, Wetherholt & Associates and Broderick Architects, roof drain waterproofing inspections/approvals, installation of the upper flange/roof drain components with the final elevation of drain to be +/- 1/8" below the finished elevation of the new tile pavers at each roof drain location. Prior to new paver installation, the remaining roof drain waterproofing system components (including weep system components located around the drains and just below the new pavers) will be installed over the upper flange and galvanized mounting bolts. NOTE: Two of the existing roof drain grills are not the original roof drain components and they do not fit into the existing roof drain saddle, 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: ___.-._- Original Contract Sum, $ 263,191.50 (including applicable alternates and WSST) Net Change by Previous Change Orders $ (incl. applicable WSST) Current Contract Amount ��- - �.}.$._-278,745.50 (incl. Previous Change Orders) Current Change Order _..____.._799.68 _-------- Applicable WSST Tax on this Change $ 79 g7 Order Revised Contract Sum $ 279,625.15 { Original Time for Completion 11/04/2020 (insert date) Revised Time for Completion ; 11/14/2020 under prior Change Orders (insert date) Days Required (f) for this Change - 1 +1 calendar days - ' Order i Revised Time for Completion 11/15j2020 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3= The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR. CITY OF KENT;T- (signature) By: (signature) Print Name:_Chris Cummings Print Name: e. Le &,, [ Its Owner Its a •at (title) (title) DATE: 9/23/2020 DATE: - -� j- (2020 i ' 1 APPROVEQ AS TO FORM: (applicable if Mayor's signature required) Kent Law Department �3❑n laid,you may-ter LP.e C:e t'a'tc to"r h whore;he ccnt'act 1.,X""r edvedi https://documents kentwa clov/WebLinkZBrowse aspx?startid=208065 ITEMIZED REPORT FOR CHANGE ORDER# 2 FINAL 10/8/2020 City of Kent-City Hall Courtyard Improvements Project#: FAC19-81 Description: Provide and install floor drain waterproofing at four(4)existing floor drains,as indicated by RFI001#FAC19-81 BA Response and RF1001 Response Attachments.The existing drains are to be salvaged,cleaned,wire wheeled,drill&tap bolt holes,provide and install waterproofing, install new anchor bolts and provide and install drain weep components. LABOR `.., Off „ :TOTICti 141,09 Description Quantity Unit Unit Rate Subtotal Laborer-salvage,clean existing mortar&wire wheel 1 HR $ 63.80 $ 63.81 Carpenter-drill and tap existing bolt holes 1 HR $ 77.28 $ 77.28 0 HR $ $ 0 HR $ $ 0 HR $ $ MATERIALS,SUPPL#�101ffl t ;\, `.` „. TOTAL Description Quantity Unit Unit Rate Subtotal Drill Bit/Tap/Cutting Oil 1 EA $ 12.18 $ 12.18 Wire Wheel 1 EA $ 9.52 $ 9.52 Galvanized 5/16"x 18 bolts-1"long 3 EA $ 1.27 $ 3.81 0 EA $ - $ 0 EA $ - $ 0 EA $ $ RENTAL "MACFIINERY9IC}UI01ViENT:'' TOTAL $ Description Quantity Unit Unit Rate Subtotal 0 HR $ $ - 0 HR $ $ BONDS,INSURANCE,FEES and TAXES TOTAL $ 1568 Description Quantity Unit Unit Rate Subtotal Bond Premium Increase-Amount added to total below 2% PERC $ 784.00 $ 15.68 0 $ $ 0 $ $ SUPERVISjdIV;°arid FIELD CyIY` ,`W, II�IL`;,:: TOTAL Description Quantity Unit Unit Rate Subtotal 0 HR $ $ 0 HR $ $ 0 HR $ $ SUBCCtIVTRaCTOR t "\, .: - TOTAL Description Quantity Unit Unit Rate Subtotal 0 EA $ $ 0 EA $ $ 0 EA $ $ SUBOTAL $ 166.60 s.65 A o :,..: 29.40 t BOND PREMIUM INCREASE $ 1568 "CF1i N E bRDEit#002 TOTAL ` %qq: Submitted By: Darren Hamlin CFC Construction LLC