Loading...
HomeMy WebLinkAboutCAG2020-289 - Original - Puget Sound Energy - GRNRA South Pump Station Line Extension - 09/04/2020ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: o Director or Designee o Mayor Date of Council Approval: Budget Account Number: Budget? o Yes o No Grant? o Yes o No Type:Review/Signatures/RoutingDate Received by City Attorney:Comments: Date Routed to the Mayor’s Office: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? o Yes o No* *If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? o Yes o No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper) Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 Nancy Yoshitake for Steve Lincoln Public Works 9/2/20 9/9/20 4 N/A 4 D20047 4 Puget Sound Energy Contract Green River Natural Resource Area South Pump Station Primary line extension. $66,908.45 Mayor's signature 4 9/2/2020 Okay to sign 9/4/2020 Original CAG2020-289 Docusign Envelope lD: 648056A5-4227 -48E8-9F 45-5AC09D655D52 9 tn*A coMMERCIAt ELECTRIC FACIIITIEs coNrn.acr ou'" gliTl2o Contract is subjecl to revision after 90 days cusroMER (ovvNER) NAME crry oF kENT (ATTN: srEpHEN LINCoLN)COO\¡/NER NAME (IF APPLICABLE) SERVI'EADDRESS 6916 s 24orH sr ctÌY KENT STATE WA ztP 98032 BILLING ADDRESS 4OO WGOWE ST "'t" KENT sTArÊ wA ztP 98032 t"o"u 253.8s6.s5s2 EMAIL slincoln@kentwa.gov PSEWoRKoRDER No iOS0g¿ZZg Summary of Charges Construction Costs: Transformation Charges: Less Applicable Margin Allowance: Sub-Total (Potential Refundable Costs): $ 50,27859- Permitting Fees*: Relocation/Removal of Existing Facilities: Other Non-Refundable Construction Charges $ 1,918.19 $ o.oo $ ro,zr r.oe Sub-Total (Non-Refundable Costs):$ ra,ozg.ez Total Amount to be Billed Under This Contract: $ Oe,SOA.qo Customer lnitials $ gz,szo.g¿ $ tz.zoe2.g__ $ o.oo Brief Description of Work: Primary line extension from J01 to J02, install (2) 4" red poly conduit supplied by PSE for road crossing, install new J-box (575) install (1) 4" conduit from J-box to new transformer vaulVlid, instaf I new 1000kva transformer 12O12O8, connect customer wire (3) runs of 300mcm. Road crossing by city of Kent with Potelco inspector. All trenching along property can be open trench, all pits for vaults provided by City of Kent. Brief Description of Other Costs: Permit fees, flagging cost, traffic police, transformer difference due to high LRC. *""Please note below charges will be applied after service connection is completed.**" "lf the above Permitting Fees are associated with service work only, those costs will be billed with the applicable service charges below after the service is energized. SECONDARY SERVICE CHARGES (PERMANENT AND TEMPORARYI ARE NOT INCLUDED IN THE SUMMARY OF CHARGES ABOVE Any applicable Secondary Service Type charges listed below will be billed after your service line installation, based on the actual work performed. Base Costs, in the table below, include Schedule 87 tax and are current costs effective 111112018. These charges also do not include permitting fees, trenching and other excavation related work that is your responsibility. The Secondary Service Type charges from the list below that apply to your project will be invoiced on a second bill. Secondaru Service Tvpe f480 Voltaqe or Belowl Gost dSchedule 87 tax effect Single wire run to handhole or transformer $611.12 Each additional run of wire(oer circuits)$140.60 Each additional trip beyond lsltrip due to customer requirements $418.48 per trip Hourly rate for additional enqineerinq $182.67 Underground Temporary Service Charge $182 nn Overhead Temporary Service Charge $260.00 Overhead Permanent Service Charge s1 039 57 Customer lnitials: By signing this contract you are authorizing PSE to continue with all the needed elements to complete your project. Upon receipt of a signed contract, PSE will bill you for the amount indicated on the "Totat Amount to Be Billed lJnder This Contract' line. The bill will sent to the billing address listed on this contract. PSE requires payment of these line extension charges prior to scheduling construction. Payments can be made via pse.com (fees may apply), by mail, or at a PSE Pay Station. Delaying payment may result in a construction delay for your project. Customer requested changes in the scope of the project may result in additional charges, andior delays to your prqect. Signature Name: $eenenl=meetn Title:Date DR Mayor 09/04/2020Dana Ralph DR DocuSign Envelope lD: 64805645-4227 -4888-9F 45-54C09D655D52 TERMS AND CONDITIONS PROJECT INFORMATION 1. The PSE drawing shows the proposed scope of your project including the location of permanent, above ground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your prqect is noted on the work sketch drawing. Please review this drawing as soon as possible to ensure there are no unforeseen conflicts between PSE's design and your project. lf you determine there are conflicts or if you identify a discrepancy while reviewing the drawing for your project, please contact me at the number below. This is attached as Exhibit A. 2. Additionalconstruction-related information and information on metering and service entrance requirements areprovided in PSE's Electric Service handbook for commercial projects. lf you would like a copy of the handbook please contact me at the number below. lt is your responsibility to provide your project manager, site superintendent, and/or subcontractors with any relevant information from this correspondence that apply to their work in support of your project. 3. The Excavation Requirements & Final Grade Certification must be signed by the project owner or designee and returned to me along with a signed copy of this contract. This is attached as Exhibit B. 4. Transformers have been sized for diversified commercial loads only, and shall not be used for high load factor (continuous) temporary power uses, such as electric heaters for dry-out. Fault currents for non- residential transformers in your pro.¡ect are noted on the attached PSE design drawing. Please notify the PSE representative listed on this contract immediately if you believe there are conflicts between this design and your project. lt is your responsibility to provide your project manager, site superintendent, and subcontractors with any information from this correspondence and it's attachments that apply to their work. 5. The requirements for trenching by customers on public right-of-ways and/or on Puget Sound Energy easements must be signed by the project owner or designee and returned along with a signed copy of this contract. This is attached as Exhibit C. POTENTIAL REFUNDS Margin Allowance: lf PSE has not provided a Margin Allowance or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85, up to two (2) years after the line extension is energized. Customers are responsible for making the refund request. DIM Refund: Other refunds associated with the line extension charge may be available if additional permanent service hook-ups are made to your line extension. These service hook-ups must be made within five (5) years of the date on which your project is initially energized Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which your line extension is initially energized. lt is the custome/s responsibility to make the refund request. Your refund request should be directed to PSE's Customer Accounting Coordinators at Sched uleS5refundrequests@pse.com. RATE SCHEDULE 85 Allterms and conditions, costs, and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this contract and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this contract. The entirety of Rate Schedule 85 can be viewed at PSE's website www.pse.com. This cost information is valid for 90 days from the date of this contract. Should we receive your contract after this period, the costs will be subject to changes. The amount noted on this contract is an estimated cost; however PSE's Schedule 85 line extension tariff requires customers to pay the actual cost of construction. PSE will determine the actual cost of the job once construction is complete. lf the actual cost of the job is more than 10% above or below the estimated cost, an additional billing or refund will result to account for the difference. DocuSign Envelope lD: 648056A5-4227 -4E88-9F 45-5AC09D655D52 9';{tt, REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT.OF-WAYS AND/OR ON PUGET SOUND ENERGY, INC. EASEMENTS The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way or Puget Sound Energy, lnc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE permit or easement must comply with these requirements. 1. All trench construction must be performed by a Washington State licensed and bonded contractor. 2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated representative, and receive on-site approval by that representative, and localjurisdiction. 3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through Friday. Same day excavation and backfill is required for all trenching. Job start notification to the localjurisdiction is the responsibility of Potelco, lnc. Customer shall notify Potelco Project Manager three working days prior to trenching. Penalties for failure to comply with this requirement will be borne by the customer. 4. lf the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements. 5. PSE, all participating utilities, and One-Call Locate, must be notified a minimum of 72 hours in advance of the date and time for right-of-way trenching and facility placement. The One-Call Locate number is 1-800-424-5555. State law requires locating service notification. 6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris shall be removed off-site each day, in accordance with local regulatory requirements. All erosion control requirements in accordance with local regulatory requirements are the responsibility of the customer. 7. Material excavated from the shoulder of the right-of-way shall be properly disposed, and replaced with select backfill material in accordance with local regulatory requirements. 8. Proper compaction is required to comply with local regulatory specifications. lf the permit requires compaction testing, the cost of said testing is the responsibility of the customer. 9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications and satisfaction. '10. ln the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume trenching. ln the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the company for costs should PSE perform the trenching. Customer lnitials. 11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable attorneys'fees) arísing out of, or in connection with, the above mentioned trenching activities. Customer lnitials I AGREE TO ADHERE TO THE ABOVE CONDITIONS Service Address: 6316 S 240TH ST KENT 98032 Work Order Number: rcs094728 Signature:Name. ñeeh Tifle:Date DR DR Dana Ralph Mayor 09/04/2020 ROW 85'ROW60'W JAMES ST 64TH AVE S314429-164838 314430-164840 314427-164842 314429-164842 314429-164839 U3540 314444-164838 314446-164838 1000kVA 277/480V (ABC) J J J J 314430-164823 314430-164822 25 kVA 120/240V (B) KNT 36 B A ℄℄℄℄℄ ℄ ℄ ℄ ℄ ROW 75' "6316" FAULT CURRENT TABLE 3Ø PM TRANSFORMERS (480Y/277V) 277V WINDINGS 480V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 1000kVA 0.1 --5.30 22,700 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' JOB SITE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 6" MINUS CUBIC YARD 5/8" CRUSHED ROCK AT J01 -REQUIRED TO PROVIDE 11' X 9' WORK PIT & 6" MINUS CUBIC YARD 5/8" CRUSHED ROCK AT J02 -REQUIRED TO PROVIDE 11' X 11' WORK PIT & 6” MINUS CUBIC YARD 5/8" CRUSHED ROCK AT V01 TRENCHING PITS. -CUSTOMER TO BORE (2) 4" RED POLY,± 150' JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 314446-164838 1000kVA 6259350 SITE SPECIFIC NOTES AT J01: 314430-164840 -EXISTING JBOX AND VAULT TO REMAIN -INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (MID 7625900) -INSTALL (1) SETS OF CABLE TAGS AØEIQ080, BØEIQ081, CØEIQ082 AT J02: 314444-164838 -INSTALL (1) HH 4'8" X 7' X 5' HH W/ GROUNDS PER STD 6045.5000 (JBOX15L) -INSTALL (4) JBOX 200A 15KV 4 BSH W/HDWR (MID7625900) -INSTALL (6) 12kV ELBOW KIT PER STD 6041.1000 (MID 7625900) -INSTALL (2) SETS OF CABLE TAGS AØEIQ080, BØEIQ081, CØEIQ082, & AØEIQ083, BØEIQ084, CØEIQ085 -INSTALL GRID #314444-164838 AT V01: 314446-164838 -INSTALL (1) HH 7' X 7' X 4' W/60"X24"ACCESS W/8'X10' COVER PER STD 6045.5000 (PM3P15L) -INSTALL (1) 1000KVA 277/480 PADMOUNT TRF (MID: 6259350) -INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL (4) #2 TO 500 KCMIL CONNECTOR LUGS (MID 7651002) -INSTALL (12) MOUNTING BOLT KITS (MID 7651008) -INSTALL (1) SETS OF CABLE TAGS AØEIQ083, BØEIQ084, CØEIQ085 -INSTALL GRID #314446-164838 -CONNECT CUSTOMER OWNED, INSTALLED, & MAINTAINED 3-RUNS OF 300 MCM SPAN SPECIFIC NOTES J01 TO A: -INSTALL 2-4" DB120 CONDUIT, ± 20' ___' ACTUAL B TO J02: -INSTALL 2-4" DB120 CONDUIT, ± 20' ___' ACTUAL J01 TO J02: -INSTALL (1) RUN 3Ø 1/0 UG JKT CABLE, ± 230' ___' ACTUAL J02 TO V01: -INSTALL 1-4" DB120 CONTINUOUS PVC CONDUIT, ± 20' ___' ACTUAL -INSTALL 1-RUN 3Ø 1/0 UG JKT CABLE, ± 50' ___' ACTUAL VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED J01 314430 164840 EXISTING w/4-Pos J-Bus x3 3 - J02 314444 164838 4'8"x7'x5' w/2-3' Sq Doors Matid: 7663200 w/4-Pos J-Bus x3 Matid: 7625900 6 6 V01 314446 164838 7'x7'x4' W/8'X10' COVER Matid: 7917900 1000KVA PM TRF 277/480 Matid: 6259350 3 - UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. HONEYSETT 253-395-6839 05/08/20 J. REIBMAN 425-457-4004 05/08/20 E. SCHOTT 714-893-2405 05/08/20 RW#118828 KENT GREEN RIVER NATURAL RESOURCES AREA SOUTH PUMP STATION NEW JBOX, NEW TRF & 3Ø PRI L/E 6316 S 240TH ST, KENT, WA 98032 N/A N/A N/A 105094728 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM SE 14-22N-04E N/A N/A 2204E056 2204E096 2204E056 KNT-36 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE HONEYSETT 253-245-0883 DAVE.HONEYSETT@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# 509312038 509312037 508860820 3000663280 104324987 105094728 Service Capital Elec Simple Superior 105094728SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2204E096 Owner / Developer Contact Info officeATTN: CITY OF KENT 400 W GOWE STREET KENT, WA 98032 JASON BRYANT 253-261-5663 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 270' 4,040 SQ FT 800A ELECTRIC 212.349kW 600A 0.9% 2.8% CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE KNT-36 05/2019 57.00 55.00 58.00 .15 .15 .15 57.15 55.15 58.15 SCALE: 1:100 UNDERGROUND CIRCUIT MAP 2204E056 JOB SITE Fabian Gomez 8/12/2020 J 314444-164838 314446-164838 1000 kVA 120/208V (ABC) 2X90° R=60" 2X90° R=60" 90° R=60" 10' 10'20' 150' 20' 4X4 BORE PIT CUSTOMER SUPPLIED 11' X 11' WORK PIT CUSTOMER SUPPLIED 2-4" RED POLY CONTINUOUS CONDUIT ± 150' 1-4" DB120 CONTINUOUS PVC CONDUIT ± 20' 20 CUBIC YARDS OF 6” CRUSHED ROCK CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 1 WILL BE A SPARE PSE TO INSTALL IN CUSTOMER PROVIDED TRENCH CUSTOMER TO BORE B A 4X4 BORE PIT CUSTOMER SUPPLIED 314430-164840 11' X 9' WORK PIT CUSTOMER SUPPLIED PSE INST. 1-RUN 3Ø UG 1/0 PRI ± 230' (AØEIQ080) (BØEIQ081) (CØEIQ082) PSE INST. 1-RUN 3Ø UG 1/0 PRI ± 50' NEW CABLE TAGS NEW CABLE TAGS J 314446-164838 1000 kVA 120/208V (ABC) (AØEIQ083) (BØEIQ084) (CØEIQ085) 10' 10'20' 150' 20' 314444-164838 314430-164840 ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. HONEYSETT 253-395-6839 05/08/20 J. REIBMAN 425-457-4004 05/08/20 E. SCHOTT 714-893-2405 05/08/20 RW#118828 KENT GREEN RIVER NATURAL RESOURCES AREA SOUTH PUMP STATION NEW JBOX, NEW TRF & 3Ø PRI L/E 6316 S 240TH ST, KENT, WA 98032 N/A N/A N/A 105094728 AS NOTED 2 OF 2 KING N/A N/A CSPSKEIN SE 14-22N-04E N/A N/A 2204E056 2204E096 2204E056 KNT-36 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1050947282" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" 4,750 lbs 2,490 lbs VAULT & EXCAVATION DETAIL @ J01 Not to scale 6055.1030 CLEAR WORKING SPACE FOR J-BOX NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 1.5' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Not to scale 1.5' MIN 3' MIN 3' MIN 3' MIN 10' MIN 3' MIN Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL Not to scale 10' 10' APPROVED TRANSFORMER AREA 10' TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACESCOMBUSTIBLE BUILDING WALLS AND ROOFNEW CONDUIT DIAGRAM NOT TO SCALE NEW CABLE DIAGRAM NOT TO SCALE Phone & TV Excavated Dirt Pile Final Grade 24" Min 48" Max 18" Backfill for DB 120 Conduit 12" Min Separation 6" or 12" of sand, 5/8" minus 3" of sand, 5/8" minus, or clean backfill bedding JOINT TRENCH DETAIL 36" Min Cover ROADSIDE Typical To Excavated Dirt Pile (No Rocks over 10" Diameter) or clean backfill shading DB120 Grade Conduit DB 120 (NTS) - A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for electric line extension trenches (No PSE gas) - A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter. PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE J01 J02 4 1 190 2 890 890 3Ø 1/0AL JKT 230 EIQ080 EIQ081 EIQ082 - J01 J02 4 1 190 2 SPARE J02 V01 4 1 20 1 289 289 3Ø 1/0AL JKT 50 EIQ083 EIQ084 EIQ085 4" PVC (FT) & BENDS =400 5 0 0 0 1/0 AL JKT TOTAL (FT) =270 Will maintain 36" Min. depth while directional drilling 36" Min Depth Final Grade TYPICAL BORE COVER TYPICAL BORE NOTE CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY. PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAY NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC RIGHT OF WAY. NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENT MINIUM SEPARATION. CROSSINGS CONDUIT TABLE X-ING NO. LOCATION GAS POWER Length Remarks (type of crossing) SIZE Type Qty Location SIZE Type Qty (Primary, Feeder, Secondary, St. FROM TO (in)sched each N-S-E-W (in)sched each (ft)Light, Gas Only, etc.) A B 4 RED PE 2 150 PRIMARY 150= 4" RED POLY (ft) 2" Excavation - 20 cubic yards 10'-0" 7'-0" 8'-0" 8" 4'-2" SIDE VIEW 4'-6"Crushed 6" Rock 11' 11' TOP VIEW 3'-6" 7'-0" 6045.5000Not to scale VAULT & EXCAVATION DETAIL (V01) PSE ENTRY CUSTOMER ENTRY Fabian Gomez 8/12/2020 Envelope lD: 648056A5-4227 -48E8-9F 45-54C09D655D52 YUuE I SOUND ENERGY PSE ELECTRICAL FACILITIES EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFIGATION PURPOSE This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating rìghts. lf PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction. EXCAVATION REQUIREMENTS The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a condition of receiving electrical service for your project. lf you need additional information, please call the PSE contact person listed below. 1. Developer is responsible for acquiring utility locates by calling One-Call, 1-800-424-5555 at least 48 hours (two full working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative Code and Safety Standards. 2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation. 3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical facilities and other utilities within a joint trench. 4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages caused by improper backfill or compaction. 5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and any foundation on Developer's property. 6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid level bottom with a 6 inch deep layer of crushed rock bedding. 7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify and provide final grade, property lines, and utility easements prior to installation of PSE's electrical facilities. 8. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages resulting from dig-ins due to changes or variations in grade that are made after the installation of PSE's facilities. FINAL GRADE CERTIFICATION By my signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold harmless Puget Sound Energy from all liabílity arising out of, or in connection with my work, including but not limited to all claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate within easement areas or rights-of-way, or from digging without adequate rights on adjoining properties. Service Address: 63.16 S 240TH ST KENT 98032 Work Order Number: losOg¿ZZg Signature Name: Seene++ineefn-Title:Date 2806 08/15 09/04/2020 Mayor 09/04/2020