Loading...
HomeMy WebLinkAboutCity Council Meeting - Council - Agenda - 6/2/2020 KENT CITY COUNCIL AGENDAS Tuesday, June 2, 2020 7:00 PM Chambers THIS IS A REMOTE MEETING DUE TO THE COVID-19 CORONAVIRUS EMERGENCY A live broadcast is available on Kent TV21, www.facebook.com/CityofKent, and www.youtube.com/user/KentTV21 To listen to this meeting, call 1-888-475-4499 or 1-877-853-5257 and enter Meeting ID 980 0091 4972 Please call 253-856-5700 or email CityCouncil@KentWA.gov to provide public comment. Mayor Dana Ralph Council President Toni Troutner Councilmember Bill Boyce Councilmember Marli Larimer Councilmember Brenda Fincher Councilmember Zandria Michaud Councilmember Satwinder Kaur Councilmember Les Thomas ************************************************************** COUNCIL MEETING AGENDA - 7 P.M. 1. CALL TO ORDER 2. ROLL CALL 3. AGENDA APPROVAL Changes from Council, Administration, or Staff. 4. PUBLIC COMMUNICATIONS A. Public Recognition i. Employee of the Month ii. City of Kent Charitable Giving Campaign Presentation for Make a Senior Day - Meals on Wheels Program B. Community Events C. Public Safety Report 5. REPORTS FROM COUNCIL AND STAFF City Council Meeting City Council Regular Meeting June 2, 2020 A. Mayor Ralph's Report B. Chief Administrative Officer's Report C. Councilmember's Reports 6. PUBLIC HEARING 7. PUBLIC COMMENT During the coronavirus emergency the public will not have the opportunity to provide live comment. Written comments may be submitted to Citycouncil@KentWA.gov, or someone wishing to submit a comment may call 253-856-5700. 8. CONSENT CALENDAR A. Approval of Minutes 1. Council Workshop - Workshop Regular Meeting - May 19, 2020 5:00 PM 2. City Council Meeting - City Council Regular Meeting - May 19, 2020 7:00 PM 3. Committee of the Whole - Committee of the Whole - Regular Meeting - May 26, 2020 4:00 PM B. Payment of Bills - Approve C. HCMA/Human Capital Management & Automation – Project Budget, Contracts, and Change Orders - Authorize D. Consultant Services Agreement with Otak, Inc., for the Mill Creek at 76th Avenue Flood Protection Improvements Structural and Stream Geometry - Authorize E. Resolution Adopting the Residential Traffic Calming Program - Adopt 9. OTHER BUSINESS A. Interagency Agreement with the Washington State Department of Commerce for the Coronavirus Relief Fund for Local Governments CARES Grant - Authorize B. Consultant Services Agreement with Aerospace Machinists Joint Training Committee - Authorize 10. BIDS 11. EXECUTIVE SESSION AND ACTION AFTER EXECUTIVE SESSION A. Current or Potential Litigation, as per RCW 42.30.110(1)(i) 12. ADJOURNMENT City Council Meeting City Council Regular Meeting June 2, 2020 NOTE: A copy of the full agenda is available in the City Clerk's Office and at KentWA.gov. Any person requiring a disability accommodation should contact the City Clerk's Office in advance at 253-856-5725. For TDD relay service, call the Washington Telecommunications Relay Service 7-1-1. Page 1 of 9 Administration • It’s been a hard couple weeks following the reduction of 27 positions (11 occupied) and the furloughs in our Recreation Division announced on Tuesday, May 19. Our thoughts are with everyone impacted by yet another unfortunate consequence of COVID-19. • We’ve tasked the Recovery Team with making sure we are tracking and documenting every possible COVID-19 expense for CARES reimbursement. Our economic development staff continue to flesh out a plan to use $1 million in CARES dollars for job training and small business grants. Permitting • New applications are back to pre-shutdown levels but permit issuance and inspection requests are still down about 25% from the pre-Covid levels. We believe this is due to our customers’ own delays with restarting some projects as the construction trades consider how to safely return to work. • Staff continue to work with our vendors to finalize specifications on our new permitting system which we expect to be fully operational in early 2021. Economic Development • As previously reported, Kent’s Lodging Tax Advisory Committee grant program was cancelled for 2020 and prior year grantees’ awards were reduced considering the drastically lower revenue outlook. On a positive note, our neighboring cities of SeaTac and Tukwila, who each have much larger lodging tax funds, offered to consider the requests of our applicants whose proposals support our regional space and advanced manufacturing hub brand identity. ECD is coordinating the transfer of these requests to these neighboring cities. • Staff, along with Mayor Ralph, participated in a virtual conversation with the Kent Chamber of Commerce regarding the impacts of COVID-19 on Kent’s business community and shared how the city is responding to and supporting recovery efforts. • ECD is collaborating with its counterparts in Auburn, Burien, Covington, Des Moines and Renton to develop a process for intake, review and distribution of CARES Act funds provided to cities to address the economic fallout of COVID-19. As a portion of these funds will be used to provide grants to businesses, a coordinated approach will provide consistency across municipal boundaries, streamline the process and eliminate confusion for applicants. • Working with our industry association and non-profit partners, we distributed Round 2 of a regional survey to document impacts of COVID-19 on the business community. With a third survey to roll out in June, we will be able to see the impacts over time, to inform our recovery effort strategies. • Development is underway on an application to allow web visitors to see a GIS-enabled ADMINISTRATION ECONOMIC AND COMMUNITY DEVELOPMENT June 2, 2020 5.B Packet Pg. 4 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 2 of 9 map of new development projects already under construction, or coming soon to Kent. Set to launch this summer, BuildKentWA.com will augment our public notice process with an online source for information about new projects, residential and commercial. Once launched, this new tool will be promoted on Kent’s social media platforms, required public notice boards and associated mailings. • Layoffs and gathering resources for those employees. • Setting up a new program for the Parks & Recreation employees (SharedWork) with ESD - preparing training for them. • Working on testing scenarios for Workday. • Police Commander promotional (both the WPR and CSA processes) will be held remotely via Zoom May 27 as Public Safety Testing (PST) was declined an exemption by the Governor’s office. The remote process is a first and has required some logistical hoops to move through. TransformAP • Deploy a single system solution to reduce the complexity and human error potential of the current solution. TransformAP will provide a single system of record and improved audit controls. The current antiquated scanning hardware platform supporting this process is plagued by systemic issues and poses a significant security risk. WebQA Replacement (KentWorks) • To increase employee productivity, improve resident ease of use, and provide faster turnaround, the city is looking to upgrade or replace the current request application, WebQA, with a Cloud based mobile friendly service request platform. Information Technology operational support for May 12, 2020 to May 26, 2020  Number of tickets opened – 250  Number of tickets closed – 350 • Assisted city departments with several contracting issues that have arisen considering the COVID-19 emergency. • Met with the Law Department’s Legal Secretary of over 20 years to deliver the unfortunate news that she was being laid off. Notified the office of the Law Department’s budget reductions. • Reviewed policies relating to the arming of Kent Corrections Officers for the purposes of conducting felony transports and conducted a liability assessment. • Assisted ECD in planning for the establishment of a program for grant distribution to businesses, funded by the Federal CARES Act. • Continued negotiations with King County on a Memorandum of Understanding to resolve pending litigation concerning King County’s operation and maintenance of a quarantine and isolation facility in Kent. • Worked alongside outside counsel to help resolve an outstanding property dispute related to the condemnation of property from Hytek Finishes Co. This property is necessary to complete the wetland mitigation requirements for the S. 224th Street project. This settlement resolves the matter without further litigation and without compromising the Model Toxic Control Act case against Hytek for the contamination of the property. • Attended meetings with Emergency Management and have started preparations for returning legal staff to the office. • Continued preparation of a request for proposal for medical services at the Kent Correction Facility. • Between May 11 – May 25, 2020: o Received 162 new criminal cases for filing consideration from the Police Department. Forty-four of those cases were for people who were booked into custody and 118 of the cases were for people who remain out of custody pending a filing decision. o Filed 126 criminal cases with the court. • Reviewed approximately 119 hours of Body Worn Camera (BWC) footage. • Attended the daily in-court jail calendar. HUMAN RESOURCES INFORMATION TECHNOLOGY LAW 5.B Packet Pg. 5 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 3 of 9 • Given proclamations from the Governor and the Kent Municipal Court, worked to change case approach in response to COVID-19 including: o Answered emails, texts and phone calls from police officers, Kent Municipal Court, defense attorneys, and witnesses concerning case impacts due to COVID- 19. o Reviewed and advised KPD on new case law, legislation and emergent issues regarding COVID 19. o Two prosecutors attended an in-person court meeting to discuss plans for re- opening Kent Municipal Court, currently scheduled for June 2, 2020. o Reviewed over 2,100 pending criminal cases to prioritize court hearings when court re-opens. o Handled two DUI Court hearings where participants and staff appeared telephonically. o Reviewed missed infraction calendars and contacted defense attorneys regarding potential settlements. • Six prosecutors attended a one-hour Continuing Legal Education (CLE) on DUIs. • Five prosecutors attended various other free CLE webinars. • Held four prosecutor team meetings and two criminal paralegal team meetings. • Continued to assist the Clerk’s office with public records requests as needed, and Public Works, ECD, IT and Parks with many high priority contracts and development projects, including property rights and access issues involving Naden Avenue. • Assisted the Clerk’s office in preparing the agenda for the City Council meetings and Committee of the Whole meetings. • Assisted the HR Department in a number of sensitive employment and labor related matters. Human Services • Human Services staff continue to process grant applications received on May 5. Staff and Human Services Commissioners will begin reviewing and rating the first half of the applications. Commissioners will meet virtually to discuss the first batch of applications (all new, currently unfunded programs) in mid-June. Staff and Commissioners will then be assigned the second batch of applications (currently funded programs) prior to a second virtual discussion. Final funding allocations should be completed by the end of July. Equity in grantmaking continues to be a focus of conversations and trainings with Commissioners. • Staff continue to participate in trainings and meetings with local HUD field office staff to ensure our city is prepared to receive the CDBG-CV funds from HUD. There are many administrative steps that must be completed in order to receive the additional $670,541 in supplemental CDBG funding for grants to prevent, prepare for, and respond to the coronavirus. In order to respond quickly to the immediate needs faced by our community, the CARES Act provides that the city may amend their Citizen Participation Plan (CPP) to establish expedited procedures to amend the 2019 Annual Action Plan for Housing and Community Development. Amendments to the CPP and 2019 Annual Action Plan will run concurrently, and staff will be accepting public comment. While HUD has not yet released additional guidance or specific regulations, most jurisdictions are cautiously moving forward to be able to expend funds in a timely manner. • The Kent Community Foundation continues to host twice-weekly meetings primarily focused on responding to the need for food and food distribution to residents. The community response to the crisis continues to be truly amazing. A second drive by donation event has been scheduled at Kent Station Saturday, June 13 from 11am - 1pm. Click here to visit Kent Station’s site for a list of much-needed items and check back as they will keep updating it. For those who wish to donate, please put donations in your car trunk (envelopes with cash or checks written to Kent Community Foundation also accepted) and pull up in a parking spot in front of Johnny Rockets at PARKS, RECREATION, AND COMMUNITY SERVICES 5.B Packet Pg. 6 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 4 of 9 Kent Station (418 Ramsay Way). Pop open your trunk and volunteers will unload your donations. Diapers are also in high demand and donations are currently being accepted through May 30. Hiring/Retirement/Recruitment/Leaves/ Promotions • Entry Level Officer Liam Bertolacci started May 18, 2020. Significant crime- activities/arrests/ investigations • On May 12, officers responded to a carjacking in progress. A suspect had watched a mother place her 4-year-old into a car before entering the car and trying to steal it with the child inside. The suspect began to drive away before the mother yanked her child out of the car. The suspect fled the scene. Officers later identified the suspect by viewing camera footage from a nearby business. Officers arrested the suspect for attempted kidnapping and vehicle theft. • On May 13, officers responded to a felony order violation in progress. A suspect had assaulted his girlfriend, smashed the victim's vehicle with an axe, and then chased the victim while trying to hit her with the axe. The suspect got into a vehicle and fled the scene. The vehicle and suspect were located nearby with the axe where he was arrested for multiple felony crimes. The driver was found to have a loaded gun beneath his seat and he did not have a CPL, so he was also arrested. • On May 13, officers stopped a stolen car on W. Smith after a pursuit. The driver was arrested and a firearm was recovered on the driver's seat. • On May 15, officers were doing proactive patrol at Hawthorn Suites when they saw a partially stripped vehicle with two subjects inside. It had an obstructed VIN and the officers believed it might be stolen. One subject attempted to quickly walk away from the vehicle and was contacted. He became combative and he struck one of the officers in the face with a closed fist. The officers became engaged in a fight and the suspect attempted to disarm the other officer and after several TASER applications, the subject was taken into custody and booked for assault 4 and attempted disarming. • On May 16, officers responded to the Waterford at the Lakes Apartments for a rape in progress. According to the victim, she heard a knock on the door, opened it at which time unknown suspect forcibly entered, attacked her, and brutally raped her. The victim fought back, and was able to grab her TASER and tased him. He fled from the apartment - she hid in the closet and called 911. The suspect is unknown to the victim. Detectives are investigating. • On May 16, a suspect and victim were in a moving vehicle when for unknown reason per the victim, he was shot in arm by suspect. The vehicle then crashed into a tree and suspect fled on foot. A K9 track was initiated and the suspect was located and arrested. • On May 16, during a domestic violence arrest at Driftwood Apartments, officers located cocaine, cash, and various IDs and credit cards on the suspect - a known felon. He was arrested outside his vehicle at which time officers observed drug paraphernalia and possible stolen property. The vehicle was impounded, and a search warrant served. Multiple additional victims' cards and property were located along with a .380 LCP stolen handgun out of Tacoma. • On May 16, officers saw a speeding car going westbound on Kent Kangley Rd. When officers tried to stop the vehicle, it went down several roads and into an apartment complex then took off. It went down the 277th corridor, running red lights at Hwy 167. Officers eventually stopped the vehicle by using spikes. • On May 17, a suspect pulled a gun and robbed a Shell Gas Station clerk of about $600. The surveillance cameras picked up a suspect vehicle being driven by another subject. • On May 17, officers found two stolen vehicles at 7-11 at 108th & 208th. They detained two people who admitted to stealing the cars and/or knowing the cars were stolen. Each were arrested and POLICE 5.B Packet Pg. 7 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 5 of 9 booked for theft of motor vehicle and possession of stolen vehicle. • On May 19, officers responded to a suspicious parked BMW with a male driver passed out inside. There was drug paraphernalia visible inside the BMW and the driver was arrested for possession. Covington PD had published a bulletin earlier that same day identifying him as a commercial burglar. Officers spotted items inside the BMW that matched the photos in the Covington PD bulletin. The BMW was impounded for a search warrant for the drug case. When officers served the warrant, they found paraphernalia as well as multiple items associated to the Covington burglary. • On May 20, officers responded to a vehicle prowl in progress at Used Car Repair, 25951 104th Ave. SE. They found the suspect inside a victim's car and arrested the suspect. The suspect was in possession of an extremely large amount of suspected stolen property belonging to numerous victims. • On May 21, officers contacted an unwanted subject loitering at Lake Meridian Apartments. The subject had been visiting a friend but after an argument had left the apartment but wouldn't leave the complex. The subject was given a trespass warning but still refused to leave and was arrested for trespassing. Post arrest the suspect faked a medical emergency while urinating in the back of the patrol car. Once removed from the patrol car by officers, the suspect became combative and repeatedly kicked and flailed throwing her urine all over several officers. She was arrested and booked for multiple crimes - including two counts of assault 3. • On May 22, SOU Officers were checking a homeless encampment on the south side of Kent-Des Moines Road. A transient was holding machete in each hand. He ignored commands to drop the weapons and took off running still armed with the machetes. Numerous KPD and WSP units arrived in the area and cornered him just south of the Des Moines 7-11 on KDM. He was finally arrested after an effective taser deployment and evaluated by Puget Sound Fire and cleared for booking. He was transported to RJC and booked for assault. • On May 24, officers responded to Lake Meridian Apartments where a victim had three gunshots to his leg and was transported to Harborview with serious injuries. Both suspects were detained and questioned by Detectives and two handguns were recovered. There were several casings found in the parking lot where the altercation occurred. The victim is a resident of Fife, and the two suspects reside in the #O building of the apartment complex. • On May 24, a suspect was arrested after he and two other suspects came to the victim’s residence to collect a debt of $30. Upon being denied the money, the suspect forced his way into the residence by kicking the door and started to physically assault one male victim. He then pepper-sprayed another victim. Another suspect pulled out a handgun and threatened the residents before fleeing on foot. Two of the victims refused to cooperate for fear of retribution, while two others provided statements. • On May 24, officers were dispatched to a vehicle vs. pedestrian accident within the Alvista 240 apartments (Formerly known as the Royal Firs apartments.) Dispatch reported that the pedestrian/victim was on the ground trapped under the vehicle. Kent patrol arrived and with the assistance of citizens in the complex, were able to get the vehicle jacked up and off the injured victim. According to the driver of the vehicle and witness accounts, the driver’s dog jumped out of his car window and attacked the victim’s dog. The driver in turn exited his vehicle to retrieve his dog, however the car was not put in park, so it rolled backwards, striking the victim who was behind it, pinning her underneath. Fire/medics arrived at which time it was determined that victim had critical injuries. She was transported to Harborview Medical Center where her status at this time is unknown. • On May 25, a drug-affected transient female suspect made contact at an Alderbrooke Apartment and got the 6-and- 7-year-old girls inside to unlock the back 5.B Packet Pg. 8 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 6 of 9 slider. She then took them by hand to the Kent Valley Motel. An unknown transient subject contacted the resident to notify them. Everyone was quickly located near Alderbrooke/Central. Statements indicate the girls were taken to at least two units at Kent Valley briefly. The suspect was arrested and booked for kidnapping and burglary. Major emphasis patrol • Racers emphasis held over the holiday weekend – three officers had multiple contacts. Events and awards • Letter of Commendation for Detective Eric Wesson: o In February 2019, 15-year-old Francisco shot multiple times at close range, at a car that Salvador Estrada Bautista was in. This shooting was gang retaliation as Salvador was about to testify in a murder trial for an incident in April 2017. On April 30, 2020 Francisco Javier Herrera Bernal was convicted of Assault 1 with Felony Armed Enhancement and sentenced to 10 years. On May 1, 2020 Sergeant Phil Johnson received an email from Senior Deputy Prosecuting Attorney Adrienne McCoy regarding the hard work that Detective Eric Wesson put into this case. Senior DPA McCoy credits Detective Wesson for the conviction because of his excellent investigation. Detective Wesson convinced Salvador to cooperate in a case where he was shot for having previously cooperated with the police. Detective Wesson developed a trust with Salvador that no other person had. He helped the prosecutors deal with threats to Salvador that were made after the shooting and during the trial. He made sure Kent Police Officers did patrols near Salvador’s home, so his family would be as safe as possible. He participated in safety planning meetings with the family and he transported them to and from court for the hearing. Detective Wesson was commended for his exceptional service, as well as being a model of the Kent Police Department’s mission to aggressively fight crime while serving with compassion. Land Survey • Topography field data for Signature Point Pump Station, West Hill Reservoir, Washington Ave. Pump Station & Mill Creek LOMR. • Right- of-way boundaries for 76th Ave. Road Raising, Mill Creek re-establishment & West Hill Transmission main/reservoir. • Construction staking for Upper Mill Creek Dam, Meet Me On Meeker/Riverbend driving range improvements and 76th Ave. utility vaults. GIS • GIS maps prepared for transportation sustainability, residential traffic calming & environmental drainage basins, wetlands & stream updates. • GIS support for CityWorks asset management, Azure Cloud system & Amanda Permitting software. Construction • LID 363 - S 224th St improvements – 88th Ave S / S 218th St improvements – S 222nd St to 94th Pl S (Ph 2). Construction of the pond access road continues this week followed by fine grading of the pond and placing a layer of sand beneath the pond liner. Preparing to place the last of the curb & gutter this week with sidewalk placement scheduled for next week. • 228th St. Union Pacific Railroad Grade Separation Bridge and Roadway (Ph 5 of 5) - Barrier rebar delivery is scheduled so forming of moment slab and barrier is proceeding this week. Girder set on hold pending girder erection plan approval from UPRR. The project team is hoping to get the plan back by the end of June. With an approved plan PSE’s power shut-down can be scheduled with a (minimum) two-week lead time. Geofoam cap on the west abutment wall is scheduled to be completed this week. Work on the new Interurban Connector Trail section from 68th to 72nd is ongoing. Illumination bases are being completed this week and grading/prep for sidewalk pours are beginning this week. Placement of PUBLIC WORKS 5.B Packet Pg. 9 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 7 of 9 concrete curb & gutter, ADA ramps, and driveways will begin on Monday, June 1. The full closure of S 228th St from 72nd Ave S to 76th Ave S (4th Ave N) with detour in place for the duration of the project. The Interurban trail is temporarily open for use. A temporary closure will be scheduled and implemented when contract work resumes following the suspension of work on the site due to COVID-19 safety concerns. There is no access to either direction of S 228th St. from the trail outside of the fenced pathway as this is an active construction site. • Fuel Tank Replacement Project - supply chain issues related to some equipment such as fuel dispensers out of China resulted in delays. Equipment is now available, and work is resuming this week. • Green River Natural Resource Area (GRNRA) South Stormwater Pump Station - placement of the steel header beams and trusses is complete on the garage building. Roof steel decking placement is complete on the generator shelter. Placement of wood underlayment in both buildings begins this week. • Meet Me on Meeker Sidewalk / Riverbend Driving Range Improvements - placement of concrete sidewalk scheduled to proceed this week. Electricians are installing conduit and electrical appurtenances. • Willis Street and 4th Ave S Roundabout - Council has authorized the award of this project to Active Construction of Tacoma. The contract is executed, and the preconstruction meeting is scheduled for Wednesday, June 3. Mobilization and activity on site will begin the following week. • 76th Avenue South Improvements - Council has authorized the award of this project to Northwest Cascade, Inc. of Puyallup. The contract is signed, and the preconstruction meeting is scheduled for Friday, May 29. Staff is also coordinating a meeting with Blue Origin, Northwest Cascade, and our team to ensure Blue Origin’s needs are being addressed throughout the duration of the project. CenturyLink and Comcast are working to complete relocation of their utilities prior to construction proceeding. Work is tentatively scheduled to proceed on June 15. • GRE West Meeker – 64th & Meeker (6500 W Meeker) – beginning Tuesday, May 26, the contractor is implementing a traffic bypass on Meeker St. to construct a new concrete elevated crosswalk across Meeker St. The bypass will be in place for 3-to-4 weeks. • Puget Sound Energy Utility Upgrades – as part of PSE’s utility upgrade project, Lakeside Industries began performing grind and overlay work on S 196th St and S 194th St between the Green River and 64th Ave S last week between the hours of 7:00 am and 6:00 pm. This work will also be taking place on 66th Ave S from S 196th St to 190th St during the same work hours. Multiple lane closures with traffic control will be in place for the duration of this work. Design • The Design Engineering team continues to work on delivering projects while telecommuting. The team is utilizing the Microsoft Teams environment to hold conference calls to coordinate project elements amongst the team, along with other departments and consultants. Trips to the field are made on an as-needed basis. In the last two weeks the team met with the Signature Pointe Apartment Leasing Officer and evaluated site conditions for the Meet Me on Meeker driving range for coordination with the adjacent GRE segment. The 4th Ave and Willis Roundabout, 76th Street Improvement (road raising), and the 2020 contracted overlay projects have merge meetings scheduled to transition the projects from design to construction. Work on the Meet Me on Meeker – Russell to GRE segment – continues at an accelerated pace to meet Puget Sound Regional Council and WSDOT requirements to secure contingency grant funding due mid-July. Reith Road watermain replacement design is wrapping up and is expected to advertise in June. Other heavy work on Signature Pointe Levee is underway as the team dives into the details. In the meeting with Signature Pointe Apartments, the team has identified several needs – maintained 5.B Packet Pg. 10 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 8 of 9 access on 62nd, night time operation of gates, maintenance and use of building/facilities next to the proposed levee. Coordination with Economic & Community Development and Public Works Operations staff on the Westhill reservoir and transmission main projects for placement of main along Veterans Drive and reservoir site needs. The team continues to support efforts in the development of Meet Me on Meeker segments and Naden, make progress on updating the Kent Design and Construction Standards, and supporting capital improvement project under construction. Environmental • Solid Waste Program – Facebook Live Q&A is being launched on May 28. Here’s the link you’ll want to use: https://www.facebook.com/events/3 26198788349383/ . The event is this Thursday, May 28 at 10 am on Kent Public Works Facebook page. So far, we have 134 responses! We are looking forward to it! • Our Adopt-A-Street/Adopt-A-Spot program is growing although at a somewhat slower pace due to social distancing – currently there are about 60 adopters. • Staff will be working with IT to launch the new GIS based IDDE data base for staff use this week. Staff have been working on populating this data base with spill and illicit discharge/connection reports from 2015 up to present day. This project should be completed soon so that we can see five years of IDDE history in a GIS format. This information will be used for our stormwater planning program. • The Washington State Department of Health has confirmed that projects related to the West Hill reservoir will not be impacted by King County’s delays in their approval process of the Water System Plan. • The Downey Farmstead side channel phase 3 project is out for construction bids now, with bids opening on June 9. This phase will include about 25,000 cubic yards of material removal, with 10,000 plants and 5 fish habitat structures installed. This phase is particularly exciting because we will be getting the excavation down to the final side channel elevation in the middle of the site. There will be approximately 75,000 cubic yards of additional material to remove in future phases, and we have a deadline of Friday, May 29 for the final application for the Puget Sound Acquisition and Restoration Large Capacity Grant. PW Operations • Operations is working with “full” staff while implementing social distancing measures. Administration, non-reps and management are primarily telecommuting and available via email, Teams or city cellphones. Crews’ project work is on hold and staff will be focusing on normal maintenance and resident requests, working singularly or in small teams. Streets • Street maintenance crews will be performing sidewalk sweeping on S 196th St, hot patch dig-out repair at 19931 72nd Ave S, 24014 94th Ave S, 23903 94th Ave S and 3629 S 253rd St, hot patch shoulders on Military Rd, hot patch repair on 84th Ave S, prep sand storage area at the East Hill Shop. The sidewalk crew will grind sidewalks on W Valley Hwy, and inspect city sidewalk on Russell Rd S and S 196th St. The concrete crew will prep area for pour and pour new sidewalk on S 196th St and on W Valley Hwy and concrete repair at 27902 122nd Pl SE. • Signs and markings crew are doing sign maintenance on the East Hill, install bases and signs for retro reflectivity program on 33rd Ave S, set bases for the retro reflectivity program on 46th Ave S, set bases and install signs on Reith Rd, SE 248th St and 132nd Ave SE, set base on S 246th St, replace signs on SE 244th St and inspect traffic control at S 192nd St. Solid waste crew are removing debris and illegal signs on 104th Ave SE, SE 240th St, 124th Ave SE, 30th Ave S and the bus stop on Pac Hwy, performing hot spot inspections on Military Rd and Russel Rd and graffiti removal from the 212th St bridge and retaining wall, Joe Jackson bridge and Don Wickstrom bridge. • Water Vegetation crews will be line trimming and mowing at 3.5 tank, Clark 5.B Packet Pg. 11 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Page 9 of 9 Springs, Armstrong Springs, Summit Reservoir, 108th St well, 114th Ave vactor site, 640 zone tank, West Hill sites, Seven Oaks well, Woodland Way PRV, Guiberson Corrosion facility and Garrison Creek. Street vegetation crews will be spraying on 152nd Ave SE, SE 256th St, 144th Ave SE, 124th Ave SE, 108th Ave SE and Canyon Rd, spray sidewalks, planted beds and tree wells and weed planted beds, tree wells and planted beds in the Downtown Core and mow and line trim on 64th Ave S, SE 208th and downtown mow strips. The sidearm crew will be mowing on SE 244th St, SE 248th St, 124th Ave SE, 92nd Ave S, S 200th St, S 262nd St, 68th Ave S, Frager Rd, Russell Rd, S 212th St, 64th Ave S, GRNRA bike path, SE 223rd Dr, 120th Ave SE, 108th Ave SE, S 259th Pl, GRNRA sewage cells, super highway and interior trails and smaller roads in the Panther Lake area on 116th Ave SE and SE 208th St. The Wetland mitigation crew will be transplanting at the GRNRA nursery, line trim, remove weeds and test run irrigation on Frager Rd, line trimming Lake Meridian outlet channel and nursery, assemble irrigation at 72nd Ave site and irrigation delivery at Leber property. The Wetland maintenance crew will be mowing and line trimming at Horseshoe Bend, fish ladder, Ramstead, Park Meridian, FP wetlands, Stillwater Greens, Rainier View Estates, Meridian Meadows, Roses Meadows, Lindental and McKenna Meadows. The holding pond crew will be mowing and line trimming at Garrison Greens, The Meadows, Westminster, Swan Court, Pacific Terrace, Benson Highlands, Braun Short Plat, Eastmont, Jami Lane, 25th improvement ponds, Weisner, Chancellor Park, Pacific Heights, Meadowbrook, Hazelwood Meadows, LOE Estates, Shamrock Park, Killa Hans, Parkview, Nancy’s Grove, SR 516 #2, Cedar Pointe, Avalon Ct, Canary Hill, Country Club N, Hawkesbury, Heather Glen and Southridge. Water • Water crews will relocate water services for Trinity Church on Reith Rd, disconnect and cap Kent springs reserve transmission main and flush out in Covington. Continue plan reviews for Clark Springs, 125K tank and West Hill Reservoir, install and connect Pump Station #3 to permanent power with PSE. Replace 4-inch meter at 22247 76th Ave S and three-inch meter at 21414 68th Ave S. Storm • Storm crews will perform storm line cleaning at SE 244th St, 109th Ave SE and SE 248th St, manhole changeouts at 6920 S 212th St and on S 212th St, pond maintenance at 109th Pl SE and 110th Ave SE, potholing for utilities on SE 267th Pl, digging ditches on SE 260th Ln and 132nd Ave SE. The crew will also be performing National Pollutant Discharge Elimination System (NPDES) assessing at S 228th St and S 232nd and pumping at SE 227th St and SE 224th St. Sewer • Sewer crews will exercise valves and replace impeller at Lindental, storm tv inspection on 84th Ave S, frame and lid inspections on S 212th Pl and Military Rd and line flushing on S 241st St and 32nd Pl S Fleet/Warehouse • Warehouse crew continues to maintain the shops yard keeping it clean and picked up and maintaining the wash rack, assisting with CDL training, receiving parts and inventory orders and posting to stock or work orders. • Fleet crews will be working on putting new vehicles into service, setting up new seven- yard trucks, mower repairs, couple vehicles at body shops and dealer being worked on, COVID-19 safety modifications to the shop and scheduled and nonscheduled repairs. The radio shop is programing radios, preparing vehicles for auction and working on new vehicle set up. # # # 5.B Packet Pg. 12 Co m m u n i c a t i o n : C h i e f A d m i n i s t r a t i v e O f f i c e r ' s R e p o r t ( R e p o r t s f r o m C o u n c i l a n d S t a f f ) Pending Approval City Council Workshop Workshop Regular Meeting Minutes May 19, 2020 Date: May 19, 2020 Time: 5:00 p.m. Place: Chambers I. CALL TO ORDER Attendee Name Title Status Arrived Toni Troutner Council President Present Bill Boyce Councilmember Present Brenda Fincher Councilmember Present Satwinder Kaur Councilmember Present Marli Larimer Councilmember Present Zandria Michaud Councilmember Present Les Thomas Councilmember Present Dana Ralph Mayor Present II. PRESENTATIONS 1 Budget Paula Painter 90 MIN. Finance Director, Paula Painter provided the Council with an extensive update on the 2020 budget. On April 14, 2020 a presentation was made during the Committee of the Whole that included the potential 2020 revenue impacts due to COVID-19 and the funds that are impacted. Since April, staff has conducted budget reduction exercises, and created a plan, including a communications plan. Painter provided details on the CARES Act: § The Federal Government passed the CARES Act § The State is making some funds available to cities with populations under 500K (Calculated at: population x $30 = nearly $3.9 million) § Grant agreements will be brought before the Council The funds have a limited use and can be used on new costs directly associated with COVID-19 and cannot be used for revenue loss or to address the revenue shortfalls. The Mayor’s recommendation is to use $1 million for job training and small businesses and the remaining to reimburse COVID-19 related expenditures. Painter review the role of the City Council - As City’s policy making body, and the role of the mayor - As City’s Chief Executive 8.A.1 Packet Pg. 13 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 5 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) City Council Workshop Workshop Regular Meeting Minutes May 19, 2020 Kent, Washington Page 2 of 2 The projected revenue shortfall of $15.7 million is expected to affect the General Fund, street fund, youth/teen fund, and criminal justice fund. The City is addressing the revenue shortfall through: § Use of Fund Balance § Non-Departmental Capital Transfer Reductions § Department One-Time reductions § Departments Ongoing Reductions 2020 General Fund Expenditure Budget by department was reviewed. Painter provided extensive details on the position impacts. Painter provided details on each department’s budget reductions, both one-time and ongoing. Next Steps: § Departments to adopt proposed budget reduction plan § Aspects of plan in quarterly budget adjustment for council’s consideration o Allocate salary costs to health and wellness fund o Allocate position cost to solid waste fund § Transfer out of School Zone Camera fund to general fund § Ensure compliance with plan § Monitor impacted revenue streams Councilmembers expressed their appreciation for staff’s work on this process and acknowledged how difficult this has been. Mayor Ralph expressed how much she values the City employees and apologized for having to say goodbye to members of the City family members today. She is grateful for the recreation team and their willingness to work through this process. Without the current fund balance, many more employees would have been impacted by these reductions. Meeting ended at 6:16 p.m. Kimberley A. Komoto City Clerk 8.A.1 Packet Pg. 14 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 5 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Pending Approval Kent City Council City Council Regular Meeting Minutes May 19, 2020 Date: May 19, 2020 Time: 7:00 p.m. Place: Chambers 1. CALL TO ORDER Mayor Ralph called the meeting to order. 2. ROLL CALL Attendee Name Title Status Arrived Dana Ralph Mayor Present Toni Troutner Council President Present Bill Boyce Councilmember Present Brenda Fincher Councilmember Present Satwinder Kaur Councilmember Present Marli Larimer Councilmember Present Les Thomas Councilmember Present Zandria Michaud Councilmember Present 3. AGENDA APPROVAL A. Move to approve the agenda as presented. RESULT: APPROVED [UNANIMOUS] MOVER: Toni Troutner, Council President SECONDER: Les Thomas, Councilmember AYES: Troutner, Boyce, Fincher, Kaur, Larimer, Thomas, Michaud 4. PUBLIC COMMUNICATIONS A. Public Recognition Mayor Ralph presented the COVID-19 Hate and Bias Proclamation and thanked Councilmember Kaur for requesting the Proclamation. i. Appointment to the Public Facilities District Board Mayor recommended Zenovia Harris for appointment to the Public Facilities District Board. B. Community Events None C. Public Safety Report Chief Padilla presented the Public Safety Report that included awarding a 8.A.2 Packet Pg. 15 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 7 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council City Council Regular Meeting Minutes May 19, 2020 Kent, Washington Page 2 of 7 second Lifesaving Medal to Officer Jason Nixon. Officer Nixon is being commended for his compassion in taking the time to stop, even while off duty, to help in a serious situation. Chief Padilla awarded Lifesaving Medals to Garth Corner and Corey Eaton. Officers Corner and Eaton are being commended for their extraordinary actions which were instrumental in saving a victim's life. Chief Padilla provided details on the status of recent major crimes. Chief Padilla expressed appreciation of staff that he had to let go today and assured residents that the Kent Police Department is capable and ready to respond to emergency services and deliver public safety in the way the City deserves it. 5. REPORTS FROM COUNCIL AND STAFF A. Mayor Ralph's Report Mayor Ralph expressed appreciation for the work of all city staff and indicated she is sad that staff have been affected by layoffs and reductions to working hours. Mayor Ralph expressed appreciation of the Kent Parks Recreation Staff and detailed the many summer events that have been cancelled. Mayor Ralph recognized Derek Matheson for his guidance and work during this budget reduction process. B. Chief Administrative Officer's Report Chief Administrative Officer, Derek Matheson advised that in addition to evaluating operating budget reductions, staff also considered cost saving activities for capital projects. Matheson advised that Economic Development continues to look for new ways to support local businesses and will evaluate the CARES Grant funding to support job trainings and the small business community. Matheson advised of the progress in bringing staff back into City offices. Matheson advised his written report is in today's agenda packet and there is no executive session tonight. C. Councilmember's Reports Council President Troutner provided a brief overview of the budget presentation that was made during tonight’s workshop and expressed appreciation of staff for their work on the budget reduction exercise. 8.A.2 Packet Pg. 16 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 7 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council City Council Regular Meeting Minutes May 19, 2020 Kent, Washington Page 3 of 7 Councilmember Kaur serves on the Sound Cities Association Domestic Violence Initiative Regional Task Force that met and discussed the increase in domestic violence calls that did not always result in an arrest. Visit the King County webstie for resources or contact the Protection Order Advocacy Program at 206-477-3758. Councilmember Kaur chairs the Sound Cities Association Puget Sound Clean Air Agency Advisory Council. Kaur provided details on the air pollution and transportation planning presentations. Councilmember Kaur serves on the Association of Washington Cities State and Federal Policy Committee. The committee is working on the draft statement of policy document that serves as a framework for setting the Annual Policy Agenda. Councilmember Kaur requested a moment of privilege and recognized Kent resident LeeLee Smith for her efforts to help Kent families. Visit “The Sharing Pantry - Kent East Hill” for more information. Councilmember Larimer serves on the Sound Cities Association Advisory Council on Aging and Disability Services. The Council heard an update from the Public Health Department. Larimer provided details on celebrating “Older Americans Month” during the month of May. The theme for 2020 is “Make your Mark,” and you can share your #OAM2020 plans and stories on social media. Larimer suggested visiting the Kaiser Permanente website for an easy do it yourself face mask pattern. Councilmember Larimer serves on the Sound Cities Association Affordable Housing Committee that recently discussed what is happening to housing due to COVID-19 and what could be coming in the next year. Even in a recession, housing prices increase due to people becoming less mobile. There are less corporate incentives and less incentives for buildings. The committee will reorient their work plan and priorities to address the new challenges. Councilmember Boyce serves on the Sound Cities Association Public Issues Committee. Mayor Ralph recently addressed the committee and discussed COVID-19 issues. The COVID-19 Hate & Bias Proclamation will be before the SCA Board. The committee also discussed not increasing the fees and rates due to COVID-19. Councilmeber Fincher indicated that people may feel isolated and may have a need to reach out for help during this COVID-19 time. Contact the 24 hour Crisis Line at 206-461-3222 for help. 6. PUBLIC HEARING Mayor Ralph provided a brief overview of tonight's public hearing process for 8.A.2 Packet Pg. 17 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 7 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council City Council Regular Meeting Minutes May 19, 2020 Kent, Washington Page 4 of 7 the Targeted Residential Investment Program (“TRIP”). Mayor Ralph opened the public hearing. Long Range Planning Manager, Hayley Bonsteel gave the staff presentation The program of requirements to qualify for MFTE program per RCW 84.14, designed specifically to meet Kent’s housing supply needs in Downtown and Midway. This is a tax exemption on improvements, not on land. Bonsteel provided the details of the Midway and Downtown RTA 8 and 12- year plans and provided key details on the importance of structured parking. Bonsteel advised of the benefits of urban residential development, weighed the benefits of adopting and not adopting the TRIP, detailed the housing units affordable to different income levels chart and how the program supports adopted policy. Bonsteel closed her presentation by indicating the TRIP implements adopted city policy, is a critical tool to help realize community vision and helps Kent shape our development future. Councilmember Fincher spoke against the program as presented and expressed a desire to have the 30% AMI option for the 8-year plan also. Councilmember Thomas spoke in support of the program as presented. Larimer spoke in support of the program. Councilmember Kaur spoke against the program as presented and expressed a desire to have the 30% AMI option for the 8-year plan also. Council President Troutner spoke in support of the program as presented. Councilmember Boyce spoke in support of the program as presented. Mayor Ralph advised four written comments were received and paraphrased their comments that will be admitted into the record. Comments were received by: Eli Hanacek from CBRE, Cristina Kapela Dugoni, JD., from Davis Investors and Management, LLC, John Hempelmann from Cairncross & Hemplemann and Ivana Halvorsen from Barghausen Consult Engineers. Council President Troutner moved to submit the written comments into the records, seconded by Councilmember Thomas. The motion 8.A.2 Packet Pg. 18 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 7 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council City Council Regular Meeting Minutes May 19, 2020 Kent, Washington Page 5 of 7 passed 6 AYES (Boyce, Fincher, Kaur, Michaud, Thomas) 1 NAY (Kaur). Council President Troutner moved to close the public hearing, seconded by Councilmember Thomas, the motion passed unanimously 7-0. A. Public Hearing on the Ordinance Adopting the Targeted Residential Area Investment Program - Adopt MOTION: Adopt Ordinance No. 4360, designating Downtown Kent and Midway as Targeted Residential Areas for purposes of ad valorem property tax exemptions pursuant to RCW 84.14. RESULT: ADOPTED [5 TO 2] MOVER: Bill Boyce, Councilmember SECONDER: Les Thomas, Councilmember AYES: Troutner, Boyce, Larimer, Thomas, Michaud NAYS: Fincher, Kaur 7. PUBLIC COMMENT None. 8. CONSENT CALENDAR Move to approve consent items A - E. RESULT: APPROVED [UNANIMOUS] MOVER: Toni Troutner, Council President SECONDER: Les Thomas, Councilmember AYES: Troutner, Boyce, Fincher, Kaur, Larimer, Thomas, Michaud A. Approval of Minutes 1. Council Workshop - Workshop Regular Meeting - May 5, 2020 5:00 PM 2. City Council Meeting - City Council Regular Meeting - May 5, 2020 7:00 PM 3. Committee of the Whole - Committee of the Whole - Regular Meeting - May 12, 2020 4:00 PM B. Mill Creek at 76th Ave. Flood Protection Improvements – Drainage Easement, Access Easement, and Temporary Construction Easement - Authorize 8.A.2 Packet Pg. 19 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 7 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council City Council Regular Meeting Minutes May 19, 2020 Kent, Washington Page 6 of 7 MOTION: Authorize the Mayor to sign a settlement agreement along with all documents necessary for the acquisition of a Drainage Easement, an Access Easement, and a Temporary Construction Easement on portions of property owned by Earle M. Jorgensen Company, located at 22011 76th Avenue South (APN 122204-9110), for an amount not to exceed $818,600.00 subject to final terms and conditions acceptable to the City Attorney and Public Works Director. C. Appoint Zenovia Harris to the Public Facilities District Board of Directors - Approve MOTION: Approve the appointment of Zenovia Harris to fill the recently vacated Position Number 5 of the Public Facilities District Board, for the remainder of the 4-year term that will expire on August 31, 2023. D. Re-allocation of Lodging Tax Advisory Committee Funds for Business Recovery Efforts - Authorize MOTION: Authorize the Mayor to reallocate $50,000 from funds previously awarded for outside consulting to the Economic Development team to support new business recovery initiatives, in light of the economic crisis brought about by Covid-19, subject to final terms and conditions acceptable to the Economic and Community Development Director and City Attorney. E. Consolidating Budget Adjustment Ordinance for Adjustments between January 1, 2020 and March 31, 2020 - Adopt MOTION: Adopt Ordinance 4359 authorizing consolidating budget adjustments made between January 1, 2020 and March 31, 2020, reflecting an overall budget increase of $9,761,225. 9. OTHER BUSINESS None. 10. BIDS None. 11. EXECUTIVE SESSION AND ACTION AFTER EXECUTIVE SESSION None. 12. ADJOURNMENT Mayor Ralph adjourned the meeting. 8.A.2 Packet Pg. 20 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 7 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council City Council Regular Meeting Minutes May 19, 2020 Kent, Washington Page 7 of 7 Meeting ended at 8:23 p.m. Kimberley A. Komoto City Clerk 8.A.2 Packet Pg. 21 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 1 9 , 2 0 2 0 7 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Pending Approval Kent City Council - Committee of the Whole Committee of the Whole - Regular Meeting Minutes May 26, 2020 Date: May 26, 2020 Time: 4:00 p.m. Place: Chambers 1. CALL TO ORDER Council President Troutner called the meeting to order. 2. ROLL CALL Attendee Name Title Status Arrived Toni Troutner Council President Present Bill Boyce Councilmember Present Brenda Fincher Councilmember Present Satwinder Kaur Councilmember Present Marli Larimer Councilmember Present Zandria Michaud Councilmember Present Les Thomas Councilmember Present Dana Ralph Mayor Present 3. AGENDA APPROVAL No changes were made to the agenda. 4. DEPARTMENT PRESENTATIONS 1. INFO ONLY: Kent Police Youth Board Presentation Community Education Coordinator, Stacy Judd, along with members of the Kent Police Youth Board gave the Committee a presentation on the work of the board. Grant Requirements: •Complete community survey of Vape/Marijuana stores •Create maps of areas surrounding surveyed locations and take pictures of ads, window displays, etc. •Present to local leadership organization •Run YOU CAN ads on social media •Create localized YOU CAN ads •Present media awareness PowerPoint Councilmembers expressed their appreciation of the Kent Police Youth Board and their work to educate the public. 8.A.3 Packet Pg. 22 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 2 6 , 2 0 2 0 4 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council - Committee of the Whole Committee of the Whole - Regular Meeting Minutes May 26, 2020 Kent, Washington Page 2 of 4 Anyone interested in joining the Youth Board, please contact Stacy Judd at sjudd@kentwa.gov. 2. Consultant Services Agreement with Otak, Inc., for the Mill Creek at 76th Avenue Flood Protection Improvements Structural and Stream Geometry - Authorize Design Engineer, Susanne Smith discussed the Consultant Services Agreement with Otak, Inc. for Structural and Stream Geometry Design for the Mill Creek at 76th Avenue South Flood Protection Improvements Project. She provided a project overview which includes a culvert replacement, habitat and vegetation improvements, raise 76th above FEMA flood elevation as well as two grants from the State of Washington Department of Commerce totaling $3 million and drainage fund. MOTION: Authorize the Mayor to sign a Consultant Services Agreement with Otak, Inc. for Structural Engineering and Stream Geometry Consulting Services for the Mill Creek at 76th Avenue South Flood Protection Improvements project in an amount not to exceed $346,300., subject to final terms and conditions acceptable to the City Attorney and Public Works Director. RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 3. Resolution Adopting the Residential Traffic Calming Program - ADOPT City Traffic Engineer, Erik Preston presented the update on the Residential Traffic Calming Program which gives the residents a formal process to bring their concerns about speed and cut-through traffic on residential streets to the attention of the City. Preston gave an overview of how the program will work, specifically how the public can submit a request or contact the RTCP and what the process will be following that initial request. The requests will be reviewed, and data will be collected at the location of concern. If the area of concern meets the qualification requirements set forth by RTCP then a neighborhood meeting will be scheduled, a plan made, and ballots will be mailed to every affected home in the study area. If the desired changes pass, then the requested changes will be made, and a follow-up study will be done to ensure that the residents’ concerns have been resolved. MOTION: Adopt Resolution No. 2012, repealing Resolution No. 1817 and adopting a new Residential Traffic Calming Program to better address quality of life concerns related to traffic in residential neighborhoods by considering traffic speeds and cut-through traffic as well as other neighborhood factors. 8.A.3 Packet Pg. 23 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 2 6 , 2 0 2 0 4 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council - Committee of the Whole Committee of the Whole - Regular Meeting Minutes May 26, 2020 Kent, Washington Page 3 of 4 RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 4. INFO ONLY: 2021-2026 Transportation Improvement Program Senior Transportation Planner, April DelChamps presented the draft projects for the 2020-2025 Transportation Improvement Program (TIP). There are three types of changes, projects being removed, new projects and projects with significant changes to either the description or the limits. DelChamps reviewed all of these changes and updates at length. DelChamps discussed next steps, to include a Public Hearing on June 16th so that the TIP will be approved by June 30th as required by law. 5. Payment of Bills - Approve MOTION: Approve the Payment of Bills RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 6. HCMA/Human Capital Management & Automation – Project Budget, Contracts, and Change Orders - Authorize Information Technology Director, Mike Carrington provided an extensive overview of the Human Capital Management and Automation project. Details on the reasons for the increase in the project budget from the $2.15 million to $4.39 million were provided. MOTION: Establish a new budget for the HCMA project at $4.39 million; authorize the Mayor to sign all contracts, change orders, and other documents necessary to advance the HCMA project that cumulatively do not exceed the project budget, subject to final terms and conditions acceptable to City Administration and the City Attorney; ratify past actions consistent with this motion; provide that future change orders beyond the project budget, but within the overall City budget, be authorized according to their amended contract values and in accordance with the Kent City Code; and authorize the Mayor to sign contract renewals under the terms of the project contracts within established budgets. RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 5. ADJOURNMENT 8.A.3 Packet Pg. 24 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 2 6 , 2 0 2 0 4 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) Kent City Council - Committee of the Whole Committee of the Whole - Regular Meeting Minutes May 26, 2020 Kent, Washington Page 4 of 4 Council President adjourned the meeting. Meeting ended at 5:06 p.m. Kimberley A. Komoto City Clerk 8.A.3 Packet Pg. 25 Mi n u t e s A c c e p t a n c e : M i n u t e s o f M a y 2 6 , 2 0 2 0 4 : 0 0 P M ( A p p r o v a l o f M i n u t e s ) DATE: June 2, 2020 TO: Kent City Council SUBJECT: Payment of Bills - Approve MOTION: Approve the Payment of Bills received through 4/30/20 and paid on 4/30/20, and audited by the Committee of the Whole on 5/12/20, and approve the payment of bills received through 5/15/20 and paid on 5/15/20, and approve the checks issued for payroll 4/16/20 - 4/30/20 and paid on 5/5/20, and checks issued for payroll 5/1/20-5/15/20 and paid on 5/20/20, and audited by the Committee of the Whole on 5/26/20. SUMMARY: 8.B Packet Pg. 26 Approval of payment of the bills received through-----04/30/20 and paid:04/30/20 Approval of checks issued for Vouchers: Date Amount 04/30/20 Wire Transfers 8280 8296 $2,002,261.65 04/30/20 Regular Checks 744438 744897 $7,310,539.00 04/30/20 Payment Plus 102216 102275 $882,471.31 Void Checks ($1,040.00) 04/30/20 Use Tax Payable $21,239.76 $10,215,471.72 Audited by the Committee of the Whole on -- 5/26/2020 Approval of payment of the bills received through-----05/15/20 and paid:05/15/20 . Approval of checks issued for Vouchers: Date Amount 05/15/20 Wire Transfers 8297 8312 $1,966,197.94 05/15/20 Regular Checks 744898 745131 $3,089,737.94 05/15/20 Payment Plus 102776 102310 $152,992.50 Void Checks $0.00 05/15/20 Use Tax Payable $1,086.60 $5,210,014.98 Approval of checks issued for Payroll:4/16/20-4/30/20 and paid:5/5/2020 Date Amount 5/5/2020 Checks 0.00 5/5/2020 Advices 451111 451851 1,815,904.15 5/5/2020 Voids and Reissues 0.00 1,815,904.15 Approval of checks issued for Payroll:5/1/20-5/15/20 and paid:5/20/2020 Date Amount 5/20/2020 Checks 0.00 5/20/2020 Advices 451852 452592 1,811,442.34 5/20/2020 Voids and Reissues 0.00 1,811,442.34 Document Numbers Document Numbers Document Numbers Document Numbers 05/26/20 Committee of the Whole RECOMMENDED TO COUNCIL BY CONSENSUS RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 8.B Packet Pg. 27 DATE: June 2, 2020 TO: Kent City Council SUBJECT: HCMA/Human Capital Management & Automation – Project Budget, Contracts, and Change Orders - Authorize MOTION: Establish a new budget for the HCMA project at $4.39 million; authorize the Mayor to sign all contracts, change orders, and other documents necessary to advance the HCMA project that cumulatively do not exceed the project budget, subject to final terms and conditions acceptable to City Administration and the City Attorney; ratify past actions consistent with this motion; provide that future change orders beyond the project budget, but within the overall City budget, be authorized according to their amended contract values and in accordance with the Kent City Code; and authorize the Mayor to sign contract renewals under the terms of the project contracts within established budgets. SUMMARY: The Human Capital Management and Automation (HCMA) project’s primary objective is to systemically resolve the City’s human capital management and automation “pay” related business process issues. Focus is placed on fixing and improving Human Resources, Finance, Information Technology, and citywide timekeeping workflows. Supporting this work will include the deployment of a new business system technology platform - Workday, being implemented by Collaborative Solutions, LLC, originally projected not to exceed $2.15 million. The key business driver associated with HCMA is to minimize, and where possible eliminate, sources of systemic process errors by implementing the necessary measures to continually improve end-to-end personnel, employee benefits, scheduling, timekeeping and payroll accuracy. This includes responsive time entry, in-place and post-payroll processing. There are two reasons for the increase in the project budget from the $2.15 million Council established in October 2019 to the $4.39 million sought today: 1) actual contract costs that came in higher than originally estimated, and 2) the reallocation of planned (i.e. not unexpected) costs from other parts of the City budget to the HCMA project budget. The Council is familiar with public works projects, where an engineer or architect estimates the cost, staff bids the project, and the low bid can come in under or over the estimate. In addition, public works projects almost always have change orders that increase costs during the construction phase and therefore the project budget 8.C Packet Pg. 28 usually includes a contingency. Technology projects are similar in that staff estimates the cost, but actual contract costs can come in under or over the estimate, resulting in projects that require change orders. The original estimate for the Workday and Collaborative Solutions contracts was $1.63 million and the actual contract costs came in at $2.79 million. A significant reason for the contracts coming in over the original estimate is the vendors insisted they include not only the cost of the capital project but future annual subscription costs as well (3 full years). Therefore, staff needs to move expenses that were expected to appear in future operating budgets into the HCMA capital project to align with contract amounts. The original estimate for change orders was $200,000 and change orders from inception to date have totaled close to $300,000. The larger of the two change orders moved the “go live” date from October to December 2020, in part due to COVID-19-related scheduling challenges. Other costs beyond ongoing subscriptions that staff did not expect to appear in the project budget last fall include 1) a separate but closely related IT capital project called Telestaff, and 2) costs associated with the IT project manager assigned to the HCMA project. Telestaff at $106,400 integrates with Workday and makes the system work more effectively for work groups with highly complex schedules and pay calculations such as the City’s Police Department. The Mayor signed the contract to originally acquire the Telestaff software, but Council approval is needed to authorize the contract provisions that allow future renewals of the software at the contracted for subscription cost. The IT project manager was originally included in the IT operating budget. The position’s move into the HCMA capital project budget is part of a larger reallocation that Council approved in the last budget process that moved a portion of all IT project managers from the operating budget to the appropriate capital project budgets consistent with best practices in budgeting. The original project budget also included funds to hire temporary limited term and/or temporary staff to backfill current staff assigned to the project. The estimate for this expense was $320,000 and the actual cost is forecasted at $629,240. This includes partial coverage for the unexpected departure of the City’s Accounting and Reporting Manager from the project/Finance department. EXHIBITS: 1. Copies of the applicable change orders for Workday, Collaborative Solutions, and Telestaff are included. The main contracts are voluminous and available upon request. 2. US Communities Purchasing Cooperative Agreement BUDGET IMPACT: The new budget for the HCMA project is being reestablished at $4.39 million. Components of the budget include the Workday product at $982,763, 8.C Packet Pg. 29 Collaborative Solutions’ implementation services at $2,106,949 (includ ing all change orders to date), Telestaff at $106,400, staff backfill at $629,240, project management at $160,000, and a contingency of $400,000. Funding will come from a combination of IT Capital Fund Balance, IT Operating accounts along with several other Capital resource funds. SUPPORTS STRATEGIC PLAN GOAL: Innovative Government - Delivering outstanding customer service, developing leaders, and fostering innovation. Evolving Infrastructure - Connecting people and places through strategic investments in physical and technological infrastructure. Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and inviting parks and recreation. Sustainable Services - Providing quality services through responsible financial management, economic growth, and partnerships. ATTACHMENTS: 1. Collaborative Solutions C01-City of Kent (DOCX) 2. Collaborative Solutions_C02-City of Kent Revised (002) (DOCX) 3. Kronos_47948 CO - CITY OF KENT, TSG, Telestaff (PDF) 4. USC MICPA 11-8-2018 (PDF) 05/26/20 Committee of the Whole RECOMMENDED TO COUNCIL BY CONSENSUS RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 8.C Packet Pg. 30 Project Change Order March 9, 2020 Proprietary & Confidential 1 Project Change Order This change order form is used for requesting, documenting and approving changes to the Workday deployment including but not limited to: changes to project scope; changes for a major configuration element; project timeline/schedule changes; integration specifications changes; addition of resources; or any other deliverable change from the originally planned Workday deployment. Summary Customer: City of Kent SOW/Project Name: PROJ_47494/City of Kent/pay Change Order #: C01 Project Manager (Customer): Annette Pape, City of Kent Project Sponsor (Customer): Teri Smith Engagement Manager (CS): Wendy Landsiedel, Collaborative Solutions Acceptance Due Date: March 27, 2020 Change Type: Contract Extension (additional hours added) Impact Assessed by: Wendy Landsiedel, Functional Leads Request Description Desire to extend deployment timeline. Business Purpose / Reason for Change Deployment timeline was aggressive. Within the Architect stage it was recognized that the level of effort and number of hours required to achieve such an aggressive pace could not be sustained with success. Additional review of limited end-to-end testing also imposed risk that could impact overall project success. Extending the project schedule will allow the teams to slow down and be thoughtful and detailed in their approach and more importantly, avoid resource burnout. Impact Assessment Project Activities Affected: Increases to meetings as follows: • 10 additional hours for workstream/consulting meetings for each resource for the following functional areas: HCM, Recruiting, Compensation, Benefits, Payroll, Time Tracking, Absence, Talent, Data Conversion, Integrations, Reporting, and OC&T. • 10 additional hours for internal status full team, cross-functional meetings for all Collaborative resources. 8.C.a Packet Pg. 31 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s C 0 1 - C i t y o f K e n t ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , Project Change Order March 9, 2020 Proprietary & Confidential 2 • 10 additional hours for status or consulting meetings with City of Kent for all Collaborative resources. • Testing support representation (36 hours/1 resource) from the following functional areas: HCM, Recruiting, Compensation, Benefits, Payroll, Time Tracking, Absence, Talent, Reporting, Data Conversion, and Analyst. • Project Management to support all additional meetings and activities. Project Schedule Impact: • Go Live date change to December 14, 2020 and extending contract expiration date to January 5, 2021 from original end date of October 23, 2020. • Configure & Prototype stage will be extended by 4 weeks. • Test stage will be extended by 5 weeks. • Deploy stage will be extended by 1 week. • Post Go-Live will be extended by 1 week. Estimated Effort and Costs: The following is the change in effort and cost estimate: Role Rate Hours Cost Portfolio Director $280 30 $8400 Functional Architect $240 30 $7200 Engagement Manager $240 226 $52240 HCM $185 76 $14060 Recruiting $185 76 $14060 Compensation $185 76 $14060 Benefits $185 96 $17760 Payroll $185 96 $17760 Time Tracking $185 76 $14060 Absence $185 76 $14060 Talent $185 66 $12210 Data Conversion $185 66 $12210 Reporting $185 66 $12210 Integrations $185 30 $5550 OC&T $185 30 $5550 Technical Analyst (Integrations) $120 30 $3600 Analyst (HCM, Recruiting, Comp, Benefits, Talent, Data Conversion) $120 116 $13920 Total 1262 $240910 Payment Terms • This change order will be billed monthly based on actual usage (Time and Materials) at the rate prescribed in the SOW and shown in the Estimated Effort and Cost table above. Assumptions 8.C.a Packet Pg. 32 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s C 0 1 - C i t y o f K e n t ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , Project Change Order March 9, 2020 Proprietary & Confidential 3 • This change order is for schedule change only and does not include any additional hours for changes to scope, requirements, configuration, or unit testing. • All Assumptions from the Statement of Work dated November 21, 2019 apply to this Change Order Authorization City of Kent Authorization Signature Collaborative Solutions, LLC Authorization Signature Name Name Title President Date Date 8.C.a Packet Pg. 33 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s C 0 1 - C i t y o f K e n t ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , Project Change Order March 16, 2020 Proprietary & Confidential 1 Project Change Order This change order form is used for requesting, documenting and approving changes to the Workday deployment including but not limited to: changes to project scope; changes for a major configuration element; project timeline/schedule changes; integration specifications changes; addition of resources; or any other deliverable change from the originally planned Workday deployment. Summary Customer: City of Kent SOW/Project Name: PROJ_47494/City of Kent/pay Change Order #: C02 Project Manager (Customer): Annette Pape, City of Kent Project Sponsor (Customer): Teri Smith Engagement Manager (CS): Wendy Landsiedel, Collaborative Solutions Acceptance Due Date: March 27, 2020 Change Type: Post Architect Session Scope Change Impact Assessed by: Wendy Landsiedel, Functional Leads Business Purpose / Reason for Change The proposed changes were identified during the Architect Sessions held in partnership with City of Kent. The complexity and intricacy of the details involved in benefits, time keeping, absence, and payroll were unveiled through detailed discussions surrounding current processes. In an effort to increase accuracy, focus on end - user ease of transaction, and improve security the team made key business decisions that resulted in additional scope and hours. Request Description Additional Scope as identified through the Architect stage of the Workday deployment in partnership with Collaborative Solutions. Function Scope Count HCM Core Configuration of 1 additional financial organization for the use of FUND, GRANT, PROGRAM, BU Up to one (1) Custom Object to track FTE on Position Up to one (1) Compensation: Core Additional Compensation plans: Allowance Up to twenty-seven (27) Additional One-time payment plans Up to eight (8) Additional Compensation steps Up to four hundred ninety (490) Benefits Additional Benefit plans: Group benefit plans into benefit plan years Up to sixty-seven (67) 8.C.b Packet Pg. 34 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s _ C 0 2 - C i t y o f K e n t R e v i s e d ( 0 0 2 ) ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , Project Change Order March 16, 2020 Proprietary & Confidential 2 Function Scope Count Additional Benefit groups: Based on eligibility criteria Up to four (4) Additional Enrollment events Up to seventeen (17) Additional Enrollment rules Up to seven (7) Configure tenant for the open enrollment cycle. Plan & provider counts must adhere to the defined number of plans & providers above Performance Management Configuration of competencies and goals in Workday to be completed by City of Kent. Up to eighty-five (85) competencies to be delivered. Up to eighty-five (85) Conversion of Core Talent Data: Certifications Up to five (5) Recruiting Additional Offer letter template(s) Up to one (1) (up to eight (8) conditional text blocks per letter) Learning Management Removed from scope Absence Management Additional Time-off plans (accruing) Up to nine (9) Configuration: Maintain time-off types, eligibility, plans, accruals, calculations, and balance periods. Up to one hundred forty-seven (147) Additional Leave types with entitlement Up to eight (8) Additional Leave types for intermittent enable Up to eight (8) Time Tracking Additional Time entry codes Up to nine (9) Additional Time calculations Up to thirty-five (35) Additional Time tracking templates Up to three (3) Additional Work schedule calendars to be completed by City of Kent Up to forty-five (45) Payroll Additional Earning Codes Up to seventy-five (75) Additional Deduction codes Up to fifty (50) Additional payroll calculation rules proportionate to additional earning and deduction codes Establish new payroll accounting to depend on organization structures and the use of FUND, PROGRAM, and GRANT Up to one (1) Payroll History: Additional support hours required to convert current Year-To-Date wage and tax data (payroll) including taxable wages and subject wages, for federal, state/province, and local taxes reconciled to tax returns loaded as quarterly data due to configuration complexity. (Active Employees and Employees paid within current calendar(go-live) year and Retirees. Reporting Creation of reports to support City of Kent in DRS, W2, and GL reporting. Reports should contain the information necessary for City of Kent to create agency specific reports. All hours previously in scope for these integrations will be moved to reporting (390). Integrations See table immediately following (-190) 8.C.b Packet Pg. 35 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s _ C 0 2 - C i t y o f K e n t R e v i s e d ( 0 0 2 ) ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , Project Change Order March 16, 2020 Proprietary & Confidential 3 Impact Assessment Project Activities Affected: • Collaboration • Configuration • Migration from tenant to tenant • Testing • Data Conversion Project Schedule Impact: • Project schedule impact has been adjusted as a separate change order. • Delays in change order approval for funding could add further schedule impacts. Estimated Effort and Costs: The following is the change in effort and cost estimate: Role Rate Hours Cost Functional Architect $240 30 $7,200 HCM $185 30 $5,550 8.C.b Packet Pg. 36 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s _ C 0 2 - C i t y o f K e n t R e v i s e d ( 0 0 2 ) ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , Project Change Order March 16, 2020 Proprietary & Confidential 4 Learning $185 -423 ($78,255) Recruiting $185 12 $2,220 Compensation $185 75 $13,875 Benefits $185 203 $37,555 Payroll $185 510 $94,350 Time Tracking $185 193 $35,705 Absence $185 216 $39,960 Talent $185 45 $8,325 Reporting $185 390 $72,150 Integrations $185 -190 ($35,150) Analyst (HCM, Recruiting, Comp, Benefits, Talent, Data Conversion) $120 270 $32,400 Travel Budget Reduction (CCS & June Testing) ($37,000) Meetings hours budget reduction from SOW* ($142,720) Total $56,165 Payment Terms • This change order will be billed monthly based on actual usage (Time and Materials) at the rate prescribed in the SOW and shown in the Estimated Effort and Cost table above. Assumptions • This change order reflects extensive review of level of effort by multiple subject matter experts and is accurate based on the information provided in discussions and documentation as captured and reviewed within the Architect phase of the project. • All Assumptions from the Statement of Work dated November 21, 2019 apply to this Change Order Authorization City of Kent Authorization Signature Collaborative Solutions, LLC Authorization Signature Name Name Title President Date Date 8.C.b Packet Pg. 37 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s _ C 0 2 - C i t y o f K e n t R e v i s e d ( 0 0 2 ) ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , Project Change Order March 16, 2020 Proprietary & Confidential 5 *Meetings hours budget detail: Role Rate Hours Cost John Gilman $185 36 $6,660 Vicki Stevenson $185 36 $6,660 Alecia Holmes $185 36 $6,660 Tracie Rogers $185 36 $6,660 Valerie Sneed $185 36 $6,660 Taylor Ehrlich $120 36 $4,320 Rachel Taylor $185 36 $6,660 Steph Mehmen $240 36 $6,660 Katja Schmidt $185 36 $6,660 Lauren McCombs $185 36 $6,660 Rachel Levy $185 36 $6,660 Wendy Landsiedel $185 28 $6,720 Lauren Drozynski $240 36 $8,640 Brennan Borunda $185 36 $6,660 Barbara Neel $185 36 $6,660 Jo Nading $185 36 $6,660 Ryan Roberts $280 28 $7,840 David Curtis $185 36 $6,660 Kevin Hare $185 36 $6,660 Latrice Brown $185 36 $6,660 Meetings hours budget reduction from SOW* 740 ($142,720) 8.C.b Packet Pg. 38 At t a c h m e n t : C o l l a b o r a t i v e S o l u t i o n s _ C 0 2 - C i t y o f K e n t R e v i s e d ( 0 0 2 ) ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , PROJECT CHANGE ORDER FORM Customer Name CITY OF KENT Solution ID 6164416 Bill-to 6164416 CITY OF KENT 220 4TH AVE S KENT WA 98032-5838 US Ship-to 6164416 CITY OF KENT 220 4TH AVE S KENT WA 98032-5838 US Payment Terms Net 30 Days Customer Purchase Order Daniel Crabtree Kronos Practice Public Sector 20127 Sales Person Customer to provide Project # 47948 Operating Unit / Currency KRONOS US OU / USD New Task Required Yes New Order Required No Project Budget Impact Billing Role Item UOM Contract Type Previous Order # Qty Minus Decreases Rate Ext Amount Solution Consultant 9990057-PRO HR Estimate 40 180.00 7,200.00 Solution Developer 9990057-PRO HR Estimate 40 180.00 7,200.00 Totals 80.00 14,400.00 Amounts exclude tax Authorization Signatures (I authorize the change to the Kronos Project Budget, as described above, and I authorize Kronos to invoice for the amount ap plicable.) Customer Project Manager * Signature Date 8.C.c Packet Pg. 39 At t a c h m e n t : K r o n o s _ 4 7 9 4 8 C O - C I T Y O F K E N T , T S G , T e l e s t a f f ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , Comments Additional hours to participate in 3rd party vendor (Workday) discovery discussion and testing activities . Order Management Internal Use Only If Change Order processed please check box Date 8.C.c Packet Pg. 40 At t a c h m e n t : K r o n o s _ 4 7 9 4 8 C O - C I T Y O F K E N T , T S G , T e l e s t a f f ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , MASTER INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENT This Master Intergovernmental Cooperative Purchasing Agreement (“Agreement”) is made between certain government agencies that execute a Lead Public Agency Certificate (collectively, “Lead Public Agencies”) to be appended and made a part hereof and other government agencies (“Participating Public Agencies”) that agree to the terms and conditions hereof through the U.S. Communities registration process and made a part hereof. RECITALS WHEREAS, after a competitive solicitation and selection process by Lead Public Agencies, in compliance with their own policies, procedures, rules and regulations, a number of suppliers (each, a “Contract Supplier”) have entered into Master Agreements with Lead Public Agencies to provide a variety of goods, products and services based on national and international volumes (herein “Products and Services”); WHEREAS, Master Agreements are made available by Lead Public Agencies through U.S. Communities and provide that Participating Public Agencies may purchase Products and Services on the same terms, conditions and pricing as the Lead Public Agency, subject to any applicable local purchasing ordinances and the laws of the State of purchase; WHEREAS, the parties desire to comply with the requirements and formalities of any intergovernmental cooperative act, if applicable, to the laws of the State of purchase; WHEREAS, the parties hereto desire to conserve resources and reduce procurement cost; WHEREAS, the parties hereto desire to improve the efficiency, effectiveness and economy of the procurement of necessary Products and Services; NOW, THEREFORE, in consideration of the mutual promises contained in this Agreement, and of the mutual benefits to result, the parties agree as follows: 1. That each party will facilitate the cooperative procurement of Products and Services. 2. That the procurement of Products and Services subject to this Agreement shall be conducted in accordance with and subject to the relevant statutes, ordinances, rules and regulations that govern each party’s procurement practices. 3. That the cooperative use of solicitations obtained by a party to this Agreement shall be in accordance with the terms and conditions of the solicitation, except as modification of those terms and conditions is otherwise allowed or required by applicable law. 4. That the Lead Public Agencies will make available, upon reasonable request and subject to convenience, information which may assist in improving the effectiveness, efficiency and economy of Participating Public Agencies’ procurement of Products and Services 5. That the Participating Public Agency will make timely payments to the Contract Supplier for Products and Services received in accordance with the terms and conditions of the procurement. Payment, inspections and acceptance of Products and Services ordered by the Participating Public Agency shall be the exclusive obligation of such Participating Public Agency. Disputes between the Participating Public Agency and Contract Supplier are to be resolved in accordance with the applicable laws and venue rules of the State of purchase. 6. The Participating Public Agency shall not use this Agreement as a method for obtaining additional concessions or reduced prices for similar products or services. 7. The Participating Public Agency is solely responsible for ordering, accepting, and paying and any other action, inaction or decision regarding the Products and Services obtained under this Agreement. A Lead Public Agency shall not be liable in any fashion for any violation by a Participating Public Agency, and the Participating Public Agency shall be responsible for its own conduct to the extent permitted by law. 8. The exercise of any rights or remedies by the Participating Public Agency shall be the exclusive obligation of such Participating Public Agency. 9. This Agreement shall remain in effect until termination by a party giving thirty (30) days prior written notice to U.S. Communities at 2999 Oak Road, Suite 710, Walnut Creek, CA 94597. 10. This Agreement shall become effective after execution of the Lead Public Agency Certificate or Participating Public Agency registration, as applicable. MICPA Version 08.01.18 8.C.d Packet Pg. 41 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) LEAD PUBLIC AGENCY CERTIFICATE I hereby acknowledge, on behalf of I'qiiff&x CftUtyfy lfft(the "Lead Public Agency") that I have read and agree to the general terms and conditions set forth in the enclosed Master Intergovernmental Cooperative Purchasing Agreement, (MICPA) regulating the use of the Master Agreements and purchase of Products that from time to time are made available by Lead Public Agency to Participating Public Agencies nationwide through U.S. Communities. Copies of Master Agreements and any amendments thereto made available by Lead Public Agency will be provided to Suppliers and U.S. Communities to facilitate use by Participating Public Agencies. I understand that the purchase of one or more Products under the provisions of the MICPA is at the sole and complete discretion of the Participating Public Agency. Authorized Signature, Lead Public Agency JjiLjut' 9, 2-0iA Date MICPA Version 8.1.15 8.C.d Packet Pg. 42 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 43 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 44 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 45 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 46 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 47 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 48 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 49 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 50 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 51 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 52 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 53 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 54 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 55 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) Lead Public Agency Certificate LEAD AGENCY CERTIF'ICATE ( I hereby acknowledge, on behalf of (the "Lead Public Agency") that I have forth in the enclosed Masterread and agree to the generalterms and set lntergovernmental Cooperative Purchasing Agreement, (MICPA) regulating the use of the Master Agreements and purchase of Products that from time to time are made available by Lead Public Agency to Participating Public Agencies nationwide through U.S. Communities. Copies of Master Agreements and any amendments thereto made available by Lead Public Agency will be provided to Suppliers and U.S. Communities to facilitate use by Participating Public Agencies. I understand that the purchase of one or more Products under the provisions of the MICPA is at the sole and complete discretion of the Participating Public Agency. t, ature, Lead Public Agency M|CPAVersion 8.1.15 8.C.d Packet Pg. 56 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) Lead Public Agency Certificate LEAD PUBLIC AGENCY CERTIFICATE 11 ‘A. (4- iS)Or&Ar45-.? I hereby acknowledge, on behalf of It' _ the Lead ublic Agency") that I have read and agree to the general terms and conditions set forth in the enclosed Master Intergovernmental Cooperative Purchasing Agreement, (MICPA) regulating the use of the Master Agreements and purchase of Products that from time to time are made available by Lead Public Agency to Participating Public Agencies nationwide through U.S. Communities. Copies of Master Agreements and any amendments thereto made available by Lead Public Agency will be provided to Suppliers and U.S. Communities to facilitate use by Participating Public Agencies. I understand that the purchase of one or more Products under the provisions of the MICPA is at the sole and complete discretion of the Participating Public Agency. Authorized Signature, Lead Public Agency t Date MICPA Version 8.1.15 8.C.d Packet Pg. 57 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 58 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) Lead Public Agency Certificate LEAD PUBLIC AGENCY CERTIFICATE I hereby acknowledge, on behalf of Washington County Public Schools (the "Lead Public Agency") that I have read and agree to the general terms and conditions set forth in the enclosed Master Intergovernmental Cooperative Purchasing Agreement (MICPA) regulating the use of the Master Agreements and purchase of Products that from time to time are made available by Lead Public Agency to Participating Public Agencies nationwide through U.S. Communities. Copies of Master Agreements and any amendments thereto made available by Lead Public Agency will be provided to Suppliers and U.S. Communities to facilitate use by Participating Public Agencies. I understand that the purchase of one or more Products under the provisions of the MICPA is at the sole and complete discretion of the Participating Public Agency. tit ��.iJilw rized Jignature, Lead Government Agency 7/p<'pl,/%3 Date 8.C.d Packet Pg. 59 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) 8.C.d Packet Pg. 60 At t a c h m e n t : U S C M I C P A 1 1 - 8 - 2 0 1 8 ( 2 3 0 4 : H C M A / H u m a n C a p i t a l M a n a g e m e n t & A u t o m a t i o n – P r o j e c t B u d g e t , C o n t r a c t s , a n d C h a n g e O r d e r s ) DATE: June 2, 2020 TO: Kent City Council SUBJECT: Consultant Services Agreement with Otak, Inc., for the Mill Creek at 76th Avenue Flood Protection Improvements Structural and Stream Geometry - Authorize MOTION: Authorize the Mayor to sign a Consultant Services Agreement with Otak, Inc. for Structural Engineering and Stream Geometry Consulting Services for the Mill Creek at 76th Avenue South Flood Protection Improvements project in an amount not to exceed $346,300., subject to final terms and conditions acceptable to the City Attorney and Public Works Director. SUMMARY: The Mill Creek at 76th Avenue South Flood Protection Improvements project consists of improving the Mill Creek channel, replacing culverts, adding habitat improvements, planting stream vegetation and raising 76th Avenue South above the FEMA base flood elevation. In 2018, the City received a State of Washington Department of Commerce grant for $2 million dollars and in 2019 the City received an additional State of Washington Department of Commerce grant for $1 million dollars. Consultant services are needed for retaining wall designs, structural design for three bridges to replace undersized culverts, a technical information report, stream geometry analysis and design for construction plans and specifications. BUDGET IMPACT: The contract will be paid for using budgeted storm drainage funds and grant funds. SUPPORTS STRATEGIC PLAN GOAL: Innovative Government - Delivering outstanding customer service, developing leaders, and fostering innovation. Evolving Infrastructure - Connecting people and places through strategic investments in physical and technological infrastructure. Sustainable Services - Providing quality services through responsible financial management, economic growth, and partnerships. 8.D Packet Pg. 61 ATTACHMENTS: 1. Consultant Services Agreement with OTAK (PDF) 05/26/20 Committee of the Whole RECOMMENDED TO COUNCIL BY CONSENSUS RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 8.D Packet Pg. 62 CONSULTANT SERVICES AGREEMENT - 1 (Over $20,000) CONSULTANT SERVICES AGREEMENT between the City of Kent and Otak, Inc. THIS AGREEMENT is made between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Otak, Inc. organized under the laws of the State of Washington, located and doing business at 11241 Willows Road NE, Suite 200, Redmond, WA 98052, Phone: (425) 739 -7965, Contact: Lori McFarland (hereinafter the "Consultant"). I. DESCRIPTION OF WORK. Consultant shall perform the following services for the City in accordance with the following described plans and/or specifications: The Consultant shall provide final design services for the Mill Creek at 76th Avenue South Flood Protection Improvements Project. For a description, see the Consultant's Scope of Work which is attached as Exhibit A and incorporated by this reference. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time those services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon the effective date of this Agreement. Consultant shall complete the work described in Section I by December 31, 2021. III. COMPENSATION. A. The City shall pay the Consultant, based on time and materials, an amount not to exceed Three Hundred Forty Six Thousand, Three Hundred Dollars ($346,300.00), for the services described in this Agreement. This is the maximum amount to be paid under this Agreement for the work described in Section I above, and shall not be exceeded without the prior written authorization of the City in the form of a negotiated and executed amendment to this agreement. The Consultant agrees that the hourly or flat rate charged by it for its services contracted for herein shall remain locked at the negotiated rate(s) for a period of one (1) year from the effective date of this Agreement. The Consultant's billing rates shall be as delineated in Exhibit A. B. The Consultant shall submit monthly payment invoices to the City for work performed, and a final bill upon completion of all services described in this Agreement. The City shall provide payment within forty-five (45) days of receipt of an invoice. If the City objects to all or any portion of an invoice, it shall notify the Consultant and reserves the option to only pay that portion of the invoice not in dispute. In that event, the parties will immediately make every effort to settle the disputed portion. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: 8.D.a Packet Pg. 63 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h CONSULTANT SERVICES AGREEMENT - 2 (Over $20,000) A. The Consultant has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Consultant maintains and pays for its own place of business from which Consultant’s services under this Agreement will be performed. C. The Consultant has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Consultant’s services, or the Consultant is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Consultant is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Consultant has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Consultant’s business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Consultant maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. Either party may terminate this Agreement, with or without cause, upon providing the other party thirty (30) days written notice at its address set forth on the signature block of this Agreement. After termination, the City may take possession of all records and data within t he Consultant’s possession pertaining to this project, which may be used by the City without restriction. If the City’s use of Consultant’s records or data is not related to this project, it shall be without liability or legal exposure to the Consultant. VI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any subcontract, the Consultant, its subcontractors, or any person acting on behalf of the Consultant or subcontractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Consultant shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. VII. INDEMNIFICATION. Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Consultan t's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Consultant's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's duty to defend, indemnify, and hold the City harmless, and Consultant’s liability accruing from that obligation shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL 8.D.a Packet Pg. 64 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h CONSULTANT SERVICES AGREEMENT - 3 (Over $20,000) INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Consultant refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Consultant’s part, then Consultant shall pay all the City’s costs for defense, including all reasonable expert witness fees and reasonable attorneys’ fees, plus the City’s legal costs and fees incurred because there was a wrongful refusal on the Consultant’s part. The provisions of this section shall survive the expiration or termination of this Agreement. VIII. INSURANCE. The Consultant shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. IX. EXCHANGE OF INFORMATION. The City will provide its best efforts to provide reasonable accuracy of any information supplied by it to Consultant for the purpose of completion of the work under this Agreement. X. OWNERSHIP AND USE OF RECORDS AND DOCUMENTS. Original documents, drawings, designs, reports, or any other records developed or created under this Agreement shall belong to and become the property of the City. All records submitted by the City to the Consultant will be safeguarded by the Consultant. Consultant shall make such data, documents, and files available to the City upon the City’s request. The Consultant acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington. As such, the Consultant agrees to cooperate fully with the City in satisfying the City’s duties and obligations under the Public Records Act. The City’s use or reuse of any of the documents, data, and files created by Consultant for this project by anyone other than Consultant on any other project shall be without liability or legal exposure to Consultant. XI. CITY'S RIGHT OF INSPECTION. Even though Consultant is an independent contractor with the authority to control and direct the performance and details of the work authorized under this Agreement, the work must meet the approval of the City and shall be subject to the City's general right of inspection to secure satisfactory completion. XII. WORK PERFORMED AT CONSULTANT'S RISK. Consultant shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XIII. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties’ performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred 8.D.a Packet Pg. 65 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h CONSULTANT SERVICES AGREEMENT - 4 (Over $20,000) in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section VII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the add ressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modificati on of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Consultant. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. A ll of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Consultant agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Consultant's business, equipment, and personnel engaged in operations covered by th is Agreement or accruing out of the performance of those operations. I. Public Records Act. The Consultant acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Consultant in its performance of this Agreement may be subject to public review and disclosure, even if those records are not produced to or possessed by the City of Kent. As such, the Consultant agrees to cooperate fully with the City in satisfying the City’s duties and obligations under the Public Records Act. J. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. / / / / / / / / / / / / 8.D.a Packet Pg. 66 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h CONSULTANT SERVICES AGREEMENT - 5 (Over $20,000) K. Counterparts and Signatures by Fax or Email. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearing the original signature was received in person. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and affirmed, and the terms of the Agreement shall be deemed to have applied. CONSULTANT: By: (signature) Print Name: Its (title) DATE: CITY OF KENT: By: (signature) Print Name: Dana Ralph Its Mayor DATE: NOTICES TO BE SENT TO: CONSULTANT: Lori McFarland Otak, Inc. 11241 Willows Road NE, Suite 200 Redmond, WA 98052 (425) 739-7965 (telephone) (425) 822-4446 (facsimile) NOTICES TO BE SENT TO: CITY OF KENT: Timothy J. LaPorte, P.E. City of Kent 220 Fourth Avenue South Kent, WA 98032 (253) 856-5500 (telephone) (253) 856-6500 (facsimile) APPROVED AS TO FORM: Kent Law Department ATTEST: Kent City Clerk P:\Public\Administration\Contracts\Contracts Prepared (Kathi)\Otak 8.D.a Packet Pg. 67 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h EEO COMPLIANCE DOCUMENTS - 1 DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City’s equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City’s sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: ___________________________________________ For: __________________________________________ Title: _________________________________________ Date: _________________________________________ 8.D.a Packet Pg. 68 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City’s nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City’s equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. 8.D.a Packet Pg. 69 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h EEO COMPLIANCE DOCUMENTS - 3 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: ___________________________________________ For: __________________________________________ Title: _________________________________________ Date: _________________________________________ 8.D.a Packet Pg. 70 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx Exhibit A City of Kent Mill Creek at 76th Avenue S Flood Protection Improvements Final Design Otak Project No. 33048 Scope of Services The project is part of Project A-7 in the City of Kent Master Drainage Plan (September 2008). The project relates to other planned work with a sediment removal project downstream and upstream of the culverts described as the Mill Creek Re-establishment Project, raising the road grade of 76th Avenue S known as the 76th Avenue S Improvements Project, and this project as the Mill Creek at 76th Avenue S Flood Protection Improvements Project. These projects equally serve the goal of reducing flooding to the roadway and adjacent properties. Providing “complete street” improvements is also a goal and may be included in both projects, depending on phasing of the work. The flood protection project will consist of replacing five existing culverts with three bridges, revisions to the creek alignment, cross section and grade, and will be coordinated with the 76th Avenue S Improvements project. Otak’s scope for this contract is limited to the creek crossing structure design and stream revisions. As a result of a first design phase which included alternatives analysis, the City of Kent has selected the preferred alternative as described below. The preferred alternative depends in part on the results of on-going coordination with property owners to obtain property rights, and acceptance from permitting agencies. This scope assumes that the preferred alternative will be developed through final design with construction estimated to align with the in-water-work window beginning in August 2021. While the project is combined into the Joint Aquatic Resource Permit Application (JARPA) for the Mill Creek Re-establishment project that will remove excessive sediment deposits from the adjacent reaches of stream, this project is not expected to be constructed at the same time. The preferred alternative will include stream and structures design for three crossings to replace undersized culverts through a stretch of Mill Creek approximately 950 feet in length. Two crossings are under driveways shared by businesses at 22011 76th Avenue S and 22203 76th Avenue S. The third crossing is at 76th Avenue S near the south property line of 22203 76th Avenue S. The alignment of the stream will be modified at the third crossing to improve the radius of the 90° bend (referred to as Alignment B in the Type, Size and Location (TS&L) Report). The preferred structure type is a precast prestressed wide flanged girder (PCPS WF) bridge with a cast- in-place (CIP) deck for all three crossings. The two driveway crossings will have a span length of 46 feet and approximate widths of 65 feet and 80 feet. The roadway crossing will have a minimum span length of 32 feet and a width of approximately 80 feet. It is expected that walls above the ordinary high water mark will be needed to conserve space for stream cross-section and the design is considered part of this scope. The work will be accomplished under separate tasks with each requiring a separate notice to proceed. Project management is included in each task. Project Schedule The project delivery schedule is as follows, multiple task NTP’s may occur simultaneously and not necessarily in 8.D.a Packet Pg. 71 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 2 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx the order below. NTP will be paired for Tasks 3 and 4, and Tasks 6 and 7. Task 1 – Alternatives Analysis – Immediately after NTP Task 2 – 30% stream geometry design – two months after task NTP Task 3 – 50% stream geometry design – three months after task NTP Task 4 – 50% bridge and retaining wall design – three months after task NTP Task 5 – Technical Information Report – two months after task NTP Task 6 – 100% stream geometry design – four months after task NTP Task 7 – 100% bridge and retaining wall design – four months after task NTP The anticipated duration of the reviews by the City is 3 weeks for each task. Review time by WDFW, Ecology, and the Corps of Engineers will be estimated in the project schedule. Mutually agreeable changes to the project schedule, whether initiated by the City or Otak, may be the basis for adjustments in the project budget. Items and Services to Be Furnished by the City The City will provide the following items and services. Otak is entitled to rely on the accuracy and completeness of this and other data furnished and represented by the City and others.  Available as-built drawings and information on other projects in the immediate vicinity.  CADD standards and City Standard Design Details.  Site boundary and topographic survey including utilities critical area boundaries and existing ground surface.  Utility coordination including temporary relocations during construction and permanent utility plans.  Right-of-way plan.  Rights-of-entry upon all lands necessary for the performance of the work, including official notices to property owners and agencies.  Timely reviews of Otak submittals at the mutually agreed upon times according to the project schedule and the consolidation of all review comments by others onto one review set prior to return to Otak.  Payment of all application reviews and/or permit fees.  Geotechnical information as needed for structural design.  The City will prepare any exhibits needed for property owner coordination, public outreach, utility coordination.  A LOMR, if required, will be prepared by others. Design Criteria The City will establish the project parameters and design criteria. Reports and plans shall be developed in accordance with the latest edition and amendments as of the date of the contract Notice to Proceed, for the following documents. Changes in any design standards or requirements after work has begun may result in Extra Work. Agency Manual or Guidelines City of Kent  Kent Design and Construction Standards Manual 2009 and Standard Plans, including updated standards  Kent 2017 Surface Water Design Manual  Kent Drafting/CADD Standards Washington State Department of Transportation (WSDOT)  Washington State Department of Transportation Standard Specifications for Road, Bridge, and Municipal Construction (M41- 10), current version  Bridge Design Manual (BDM) (M23-50), June 2018  Geotechnical Design Manual (GDM) (M46-03), May 2018 8.D.a Packet Pg. 72 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 3 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx American Association of State Highway and Transportation Officials (AASHTO)  Load and Resistance Factor Design (LRFD) Bridge Design Specifications 7th Edition, 2014 with the current Interims United States Department of Transportation, Federal Highway Administration (FHWA)  Rockery Design and Construction Guidelines, November 2006 FHWA Publication No. FHWA-CFL/TD-06-006 Washington Department of Fish and Wildlife (WDFW)  Water Crossing Design Guidelines, 2013  Integrated Streambank Protection Guidelines, 2002  Stream Habitat Restoration Guidelines, 2012 Other  King County Surface Water Design Manual 2016  U.S. Army Corps of Engineers and Ecology Mitigation Plan Guidance Task 1: Alternatives Analysis  Additional hydraulic alternatives developed to an approximately 20-percent design level, including horizontal alignment, cross-section, footprint layout, and vertical alignment of culvert replacements and roadway and driveway improvements/restoration.  Based on a new alternative, additional hydraulic evaluation to check maximum velocities and depths at the 2-, 25-, and 100-year peak discharges.  Based on a new alternative, additional structural analysis including: a. Revisions to stream geometry b. Geotechnical coordination c. Structure geometry relative to the roadway and adjacent improvements d. Development of culvert/bridge structure type options for the new alternative dimensions e. Develop foundation type options f. Develop preliminary sketches and costs of each option  Revisions to the Type, Size, Location (TS&L) Memorandum to incorporate the new alternative.  Revisions to the JARPA exhibits for the new alternative. Project Management Otak will manage their work to ensure effective and efficient communication between Otak and City project team members, submittal of invoices in a timely manner, proactively anticipating and resolving problems and ensuring quality products that meet the project’s goals and objectives. Otak’s project manager and other appropriate staff will participate in coordination and design meetings as needed. Hours for project management, site visits, and meetings are incorporated into the following tasks below. Assumptions:  Site visits for up to six staff  Weekly project status email  Bi-weekly phone meetings  Up to 24 staff hours attending meetings at the City  Project management for up to 12 months Task 2: 30-Percent Stream Geometry Design 2.1 30-Percent Stream Design 8.D.a Packet Pg. 73 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 4 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx Otak will perform a field assessment to record observations and gather field measurements documenting stream characteristics at the culvert locations, as well as the immediate upstream and downstream reaches to prepare qualitative assessments and take field measurement and photographs regarding: bed material, particle size distribution, habitat type, sediment transport processes, and man-made channel alterations. Field data will be collected to identify the spatial distribution of the following: · Bed material characteristics. · Channel form and process using channel evolution classification. · Reach-scale channel processes including sediment sources, transport, and deposition · Relative abundance of large and small woody debris and their effects on channel stability. · Hydraulic controls/constrictions not previously identified Otak will use the information collected during the field assessment to document geomorphic recommendations for designing the stream channel including gravel size for bed material, stable channel dimensions. The documentation and recommendations will be included in a Basis of Design Memorandum. Otak will develop a 30-percent design for stream improvements consisting of plan and profile sheets with typical sections. Assumptions:  The channel dimensions and floodplain as space permits will fit within the structure spans previously selected by the City, using bankfull width recommended in Otak’s technical memorandum Mill Creek Road Crossing Analysis dated April 17, 2019. 2.1.1 Hydraulic Analysis Otak and the City will have one meeting to coordinate with the consultant that is preparing the LOMR to verify that Otak’s methodology provides the data consistent with the needs of the LOMR work. Otak will complete hydraulic analyses using HEC-RAS, based on topographic survey data collected for the stream channel. The model domain will extend approximately 300’ upstream and 300’ downstream of the most upstream and downstream culverts to evaluate any effects on upstream or downstream properties and to verify compliance with the zero-rise requirement for the City. The hydraulic analysis will be used to verify water surface elevations, minimum freeboard and debris clearance, as well as velocities for confirming stable channel dimensions and bed material. A stable channel analysis will be performed using analytical methods following accepted methods in WDFW guidelines for stream simulation culverts, based on the hydraulic model results. The results of the analysis will be used to confirm bed material gradation, and stable channel dimensions and gradient for the stream simulation culvert. Assumptions:  The HEC-RAS hydraulic analysis and model will be provided, but no zero-rise report will be prepared. 2.2 Sediment Source Management Design Flows from the downtown core enter Mill Creek near the south end of the project through the Boeing Creek tributary. Heavy sediment plumes have been observed at this outfall. Otak will participate in a field visit with the City to identify sources and volumes of sediment supply. The flow from the downtown core will be analyzed to identify methods of sediment management. Up to three concepts will be proposed prior to submittal of the 30-percent design. Sediment source management concepts that may be considered include 8.D.a Packet Pg. 74 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 5 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx a settling vault at the outfall, a settling basin located upstream of the outfall, stabilization of eroding reaches of the Boeing Creek tributary, and/or revegetation of disturbed or eroding areas within the downtown core. If the City’s preferred method is located within this project’s limits, it will be incorporated into the submittal. Assumptions:  Field work will be accomplished in one field day with two Otak staff  Up to three concepts will be prepared with only one to be carried forward into the 30-percent submittal  This task will require a separate Notice to Proceed from the other Task 2 work. 2.3 Off-site Stormwater Management Design Privately-owned water quality swales and water quality ponds will be impacted by the stream improvements. Otak will prepare planning-level design concepts, with the primary goal of minimizing footprint and restoring the water quality treatment functions intended for these facilities. Assumptions:  Up to two swales and three ponds will be impacted  If available, as-constructed record drawings and TIRs for the existing swales and ponds will be provided by the City. If not available, the City’s basemap will include sufficient detail to determine existing functionality 2.4 Permitting Agencies Coordination The City may request technical design support during permit coordination. An allowance has been included to respond to requests to furnish data, respond to questions by permitting agencies, or attend meetings. Assumptions:  An allowance of 40 hours is assumed 2.5 Streambank Restoration Design For use in permit applications, Otak will prepare a 30-percent level design of streambank restoration landscape and temporary irrigation design along approximately 950 linear feet of creek, inclusive of crossings. Planting areas will extend from the ordinary highwater mark to the back of sidewalk and the limits of disturbance for the creek grading, as applicable. The design will identify the plant palette, proposed areas for planting and temporary irrigation, and proposed connection location(s) for temporary irrigation. Assumptions:  Landscape plans prepared by Otak for 30-percent design will include sheet setups, planting palette and areas to be planted, irrigation type and areas to be irrigated, and the point of connection with system pressure data at that point.  Landscape and irrigation design to use AutoCAD along with Land f/x program Deliverables:  PDF files for each deliverable  CADD files  Basis of Design Memorandum  Concept and 30-percent plans  30-percent cost estimate  Hydraulic model for use by others in preparation of LOMR 8.D.a Packet Pg. 75 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 6 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx Task 3: 50-Percent Stream Geometry Design Upon receipt of the City comments for the 30-percent design and the task notice to proceed, Otak will further the stream geometry design, streambank restoration design, and off-site stormwater management design. The 50-percent design will include plans, a list of anticipated special provisions, and construction cost estimate. 3.1 Sediment Source Management Design If authorized by the City, Otak will advance the design of the preferred concept for sediment source management from the Downtown core outfall to 50-percent level, including preparation of plans, specifications and cost estimate. Assumptions:  The City will provide current CADD files for City-designed items that may affect Otak’s design. Deliverables:  PDF files for each deliverable  CADD files  50-percent plans  List of anticipated special provisions  50-percent cost estimate Task 4: 50-Percent Bridge and Retaining Wall Design The objective of this task is to develop structural calculations, plans, specifications and construction costs to the 50% design level for the following structures: · Bridges: o Bridge carrying 76th Avenue S over Mill Creek o Bridge carrying the driveway access to 22011 76th Avenue S over Mill Creek o Bridge carrying the driveway access to 22033 76th Avenue S over Mill Creek · Retaining walls between bridges · Retaining wall at approximate Station 11+50 Left Considerations related to construction phasing, geotechnical coordination, shoring, traffic phasing, stream impacts, utility impacts and grading will be evaluated in coordination with other disciplines and the City. Task 4.1 Bridges Otak will develop the bridge option recommended in the previously prepared Type, Size and Location (TS&L) report for each of the three bridges. The recommended bridge type is a single span precast prestressed wide flange girder bridge with a cast in place concrete deck. Bridge span lengths are assumed to be approximately 32 feet at the 76th Avenue S crossing and 46 feet at the two driveway crossings. It is assumed that the bridge will be founded on spread footings. Bridge design staff will continue coordination with the geotechnical engineer, who is under separate contract with the City, to determine the foundation type and incorporate foundation design recommendations, including ground improvements if needed, into the design. Otak will develop design calculations and will prepare plans for submittal to the City. Bridge items will be included in the project cost estimate. Special provisions for non-standard WSDOT bridge items will be prepared for submittal to the City. Task 4.2 Retaining Walls It is assumed that retaining walls will be needed to support the west side of the 76th Avenue S roadway adjacent 8.D.a Packet Pg. 76 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 7 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx to Mill Creek between the bridges. Wall types may be reinforced concrete semi-gravity cantilever, soldier pile, gravity block or structural earth walls. If it is determined that walls are needed at other locations or that other wall types are needed, additional scope and fee may be needed to complete the design. Structural design staff will coordinate with grading, utility, hydraulics and geotechnical disciplines to determine wall needs and design. It is further assumed that exposed walls facing Mill Creek will be above the ordinary highwater mark. Otak will develop design calculations and will prepare plans for submittal to the City. Retaining wall items will be included in the project cost estimate. Special provisions for non-standard WSDOT retaining wall items will be prepared for submittal to the City. Assumptions:  Bridges will be based on the recommended option in the previously completed TS&L report  Bridge foundations will be spread footings  Retaining walls type will be reinforced concrete semi-gravity cantilever, soldier pile, gravity block or structural earth walls  City review comments will be minor and significant changes to the design requiring an effort greater than the level of effort assumed in the attached fee estimate will not be needed.  This scope of work does not include construction support services or bridge load rating, which, if needed, will be provided under a separate scope and fee.  The following structural plan sheets will be needed: Deliverables:  50% bridge and retaining wall plans  50% bridge and retaining wall items included in the project construction cost estimate  50% bridge and retaining wall special provisions Task 5: Technical Information Report Otak will prepare a Stormwater Technical Information Report (TIR) based on requirements set forth in the 2017 City of Kent Surface Water Design Manual (SWDM) that will cover all the culvert replacements for this project. It will contain all calculations, conceptual design analyses, reports, studies, etc. performed in the modeling and design phase of this project, including the off-site stormwater management facilities. The TIR will comply with the requirements for a Targeted Drainage Review (TDR) Project Category 2, which will only require analyses and documentation for the following Core and Special Requirements: 1. Core Requirement #1: Discharge at the Natural Location 2. Core Requirement #2: Offsite Analysis - the three new culverts will only require Offsite Analyses Level 1 (qualitative survey) 3. Core Requirement #4: Conveyance System a) The five culverts that will be replaced with bridges for Fish Passage will comply with Kent’s SWDM 1.2.4.1 – Culverts. The replacement requires conveying the 25-year peak flow and not creating or aggravating a severe flooding problem during the 100-year peak flow. The new bridges and stream channel restoration will also provide fish passage per SWDM Section 4.3.2. b) Conveyance System Implementation Requirements per SWDM Section 1.2.4.3 · Methods of Analysis and Design per SWDM Section 3.2 · Composition – The stream channels with the new bridges will be designed as vegetation/natural gravel-lined channels, as opposed to armored systems. · Interflow and Interception – Any significant seeps that could impact the road or structures proposed by the project will be intercepted and directed to the downstream stream channel or wetland, and provisions for passage of concentrated flows will be made. · Outfalls – Design for collected and concentrated surface and storm water runoff will include 8.D.a Packet Pg. 77 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 8 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx energy dissipation and will not include new point discharges over steep slopes (>15%). · Spill Control – All pollution-generating impervious surfaces that drain to the culverts are assumed to already have treatment and spill control measures. · Ground Water Protection - All pollution-generating impervious surfaces that drain to the culverts are assumed to already have treatment and spill control measures · Pump Systems – All surface and storm water conveyance systems within the project are assumed to be gravity systems. 4. Core Requirement #5: Erosion and Sediment Control (ESC) - A comprehensive Construction Stormwater Pollution Prevention (CSWPP) plan will be prepared. Implementation of the CSWPP will address: a) ESC and SWPP plans b) Wet Season Construction c) Construction within Critical Areas and Buffers d) Maintenance e) Final Stabilization f) Other Required Permits (NPDES and WDFW HPA) 5. Core Requirement #6: Maintenance and Operation (O&M) – The Project is assumed to be maintained by the City of Kent. 6. Core Requirement #7: Financial Guarantees and Liabilities – Assumed to be provided by City of Kent. 7. Special Requirement #4: Source Control BMP for Utility Corridor Maintenance per Activity Sheet A-45 in the Stormwater Pollution Prevention Manual Assumptions:  A single TIR for one Targeted Drainage Category 2 Review will be required for all of the culvert replacements in this project  The one Offsite Analysis will include a Level 1 downstream and upstream analysis (qualitative surveys) for all culvert crossings. If the City of Kent determines that a Level 2 or 3 downstream and/or upstream analysis is necessary, or that the project has a Downstream Drainage Problem Requiring Special Attention per SWDM Sections 1.2.2.1.1 and 2, then a separate scope and fee will be required to complete those tasks  No drainage or water quality problem impact mitigation, per SWDM Sections 1.2.2.2 and 3, is included in this scope  Preparation of an Operations and Maintenance manual for the bridges is not included Deliverables:  Draft Drainage System TIR (pdf)  Final Drainage System TIR (pdf) Task 6: 100% Stream Geometry Design Upon receipt of the City comments for the 50-percent design and the task notice to proceed, Otak will complete the stream geometry design, streambank restoration design, and off-site stormwater management design. The 100-percent design will include plans, special provisions, and construction cost estimate. Otak will support the City in the preparation of an estimated construction schedule to determine working days. 6.1 Sediment Source Management Design If authorized by the City, Otak will advance the design of the preferred concept for sediment source management from the Downtown core outfall to 100-percent level, including preparation of plans, specifications and cost estimate. 8.D.a Packet Pg. 78 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 9 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx Assumptions:  City will prepare a LOMR for the entire Mill Creek system, which will include a zero-rise analysis.  The City will provide current CADD files for City-designed items that may affect Otak’s design. Deliverables:  PDF files for each deliverable  CADD files  100-percent plans  Special provisions  100-percent cost estimate Task 7: 100% Bridge and Retaining Wall Design Otak will address City review comments on the 50% design deliverables and finalize the structural design. It is assumed that the nature of the comments will be minor and significant changes to the design requiring an effort greater than the level of effort assumed in the attached fee estimate will not be needed. Significant changes to the design may require additional scope and fee to complete the design. Task 7.1 Bridges Otak will address City review comments and finalize the bridge design, geotechnical coordination, calculations, plans, specifications and construction cost estimate. Task 7.2 Retaining Walls Otak will address City review comments and finalize the retaining wall design coordination, calculations, plans, specifications and construction cost estimate. Assumptions:  City review comments will be minor and significant changes to the design requiring an effort greater than the level of effort assumed in the attached fee estimate will not be needed. Significant changes to the design may require additional scope and fee to complete the design.  See below for a list of the needed structural plan sheets: Deliverables:  Responses to structural related comments from the City review of the 50% submittal  Final bridge and retaining wall plans  Final bridge and retaining wall items included in the project construction cost estimate  Final bridge and retaining wall special provisions The estimated number of sheets for all tasks is listed below: ask No. Sheet Name 30-Percent No. of Sheets 50-Percent No. of Sheets 100-Percent No. of Sheets 2.1, 3, 6 Stream Plan and Profile 3 3 3 2.1, 3, 6 Stream Details 1 4 4 2.1, 3, 6 Temporary Stream Bypass Plan 2 3 3 2.2, 3, 6 Sediment Stream Management 2 2 2.3, 3, 6 Offsite Stormwater Management 3 4 2.5, 3, 6 Landscape Plans 3 3 3 2.5, 3, 6 Planting Schedule and Details 1 2 3 8.D.a Packet Pg. 79 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h Page 10 Mill Creek at 76th Avenue S Flood Protection Improvements Project – Final Design May 14, 2020 k:\project\33000\33048\contract\33048a final design\mill creek culvert replacement scope_2020_0514.docx 4, 7 Structures Key Map 1 1 4, 7 76th Avenue S Bridge 4, 7 Bridge Layout 1 1 4, 7 General Notes, Typical Section 1 1 4, 7 Foundation Layout 1 1 4, 7 Footing and Abutment Details 1 2 4, 7 Framing Plan 1 1 4, 7 Typical Bridge Section 1 1 4, 7 Deck Reinforcing Plan 1 4, 7 Deck Section 1 4, 7 Bridge Approach Slab 1 4, 7 22011 Driveway Bridge 4, 7 Bridge Layout 1 1 4, 7 General Notes, Typical Section 1 1 4, 7 Foundation Layout 1 1 4, 7 Footing and Abutment Details 1 2 4, 7 Framing Plan 1 1 4, 7 Typical Bridge Section 1 1 4, 7 Deck Reinforcing Plan 1 4, 7 Deck Section 1 4, 7 22033 Driveway Bridge 4, 7 Bridge Layout 1 1 4, 7 General Notes, Typical Section 1 1 4, 7 Foundation Layout 1 1 4, 7 Footing and Abutment Details 1 2 4, 7 Framing Plan 1 1 4, 7 Typical Bridge Section 1 1 4, 7 Deck Reinforcing Plan 1 4, 7 Deck Section 1 4, 7 Common Bridge Sheets 4, 7 Girder Details 3 3 4, 7 Intermediate Diaphragm Details 1 4, 7 Traffic/Pedestrian Barrier 2 2 4, 7 Bar list 3 4, 7 Retaining Walls 4, 7 Plan and Elevation 3 3 4, 7 Wall Typical Section 2 2 4, 7 Wall Details 1 3 Total 10 50 68 8.D.a Packet Pg. 80 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h City of Kent Mill Creek at 76th Ave S Flood Protection Improvements - Final Design Exhibit A Fee Estimate Otak, Inc., Project 33048.A Russ Gaston Lori McFarland Bob Doherty Xin Lu Janna Langhi Dave Stewart Charles Dewey Shailee Jain Julia White Curtis LaPierre Tom Early Mark Shelby Ahmed Kayanda PIC Proj. Mgmt.CADD Admin Task Description # o f s h e e t s Sr . P I C / S r . PM C i v i l Ci v i l E n g i n e e r X CE X CE I V En g i n e e r i n g De s i g n e r I V CE V I I I CE I V En g i n e e r i n g De s i g n e r I V En g i n e e r i n g De s i g n e r I I I La n d s c a p e Ar c h i t e c t V I La n d s c a p e Ar c h i t e c t I V La n d s c a p e Ar c h i t e c t V En g i n e e r i n g Te c h I V Pr o j e c t A d m i n As s i s t a n t 1.0 Alternatives Analysis 1 6 4 8 9 12 2 2 44 $6,086 2.0 30-Percent Stream Geometry Design 2.1 30-Percent Stream Design 6 1 8 18 12 52 48 24 163 $18,327 2.1.1 Hydraulic Analysis 1 4 2 4 24 35 $4,027 2.2 Sediment Source Management Design 2 4 12 8 32 40 4 102 $11,634 2.3 Off-site Stormwater Management Design 1 4 12 56 72 8 153 $17,177 2.4 Permittting Agencies Coordination 6 24 8 38 $6,102 2.5 Streambank Restoration Design 4 2 2 4 24 4 8 44 $5,548 3.0 50-Percent Stream Geometry Design 18 2 10 36 40 60 96 4 32 16 32 328 $37,780 3.1 Sediment Source Management Design 2 2 4 8 24 38 $4,214 4.0 50-Percent Bridge and Retaining Wall Design 4.1 Bridges 24 24 88 240 140 68 560 $72,120 4.2 Retaining Walls 6 6 24 92 8 130 $16,182 5.0 Technical Information Report 1 4 12 40 40 16 113 $12,921 6.0 100-Percent Stream Geometry Design 20 1 10 14 32 48 64 8 24 20 32 253 $28,949 6.1 Sediment Source Management Design 2 2 2 8 16 28 $3,156 7.0 100-Percent Bridge and Retaining Wall Design 7.1 Bridges 38 32 96 292 168 44 632 $82,384 7.2 Retaining Walls 8 4 20 72 8 104 $12,920 Total Hours 68 12 128 232 540 472 145 216 192 436 16 80 40 238 18 2765 Billing Rate (including OH and Profit)$249.00 $193.00 $189.00 $124.00 $106.00 $165.00 $123.00 $106.00 $91.00 $153.00 $116.00 $133.00 $92.00 $85.00 Total Labor Cost, including Overhead and Profit $2,988 $24,704 $43,848 $66,960 $50,032 $23,925 $26,568 $20,352 $39,676 $2,448 $9,280 $5,320 $21,896 $1,530 $339,527 Expenses, estimated at 2%$6,773 Project Total $346,300 To t a l H o u r s (O t a k ) To t a l F e e b y Ta s k ( O t a k ) Structural LandscapeHydraulics \contract\33048-Mill Creek_2019_0514.xlsx 5/15/2020 8.D.a Packet Pg. 81 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h EXHIBIT B INSURANCE REQUIREMENTS FOR CONSULTANT SERVICES AGREEMENTS Insurance The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Consultant shall obtain insurance of the types described below: 1.Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2.Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Consultant’s Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3.Workers’ Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4.Professional Liability insurance appropriate to the Consultant’s profession. B. Minimum Amounts of Insurance Consultant shall maintain the following insurance limits: 1.Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2.Commercial General Liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate. 8.D.a Packet Pg. 82 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h EXHIBIT B (Continued) 3. Professional Liability insurance shall be written with limits no less than 1,000,000 per claim. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Consultant’s insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant’s insurance and shall not contribute with it. 2. The Consultant’s insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the Consultant and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Consultant’s Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Consultant before commencement of the work. F. Subcontractors Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Consultant. 8.D.a Packet Pg. 83 At t a c h m e n t : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O T A K ( 2 3 0 0 : C o n s u l t a n t S e r v i c e s A g r e e m e n t w i t h O t a k , I n c . , f o r t h e M i l l C r e e k a t 7 6 t h DATE: June 2, 2020 TO: Kent City Council SUBJECT: Resolution Adopting the Residential Traffic Calming Program - Adopt MOTION: Adopt Resolution No. 2012, repealing Resolution No. 1817 and adopting a new Residential Traffic Calming Program to better address quality of life concerns related to traffic in residential neighborhoods by considering traffic speeds and cut-through traffic as well as other neighborhood factors. SUMMARY: The City of Kent Residential Traffic Calming Program (“Program”) was first adopted in July of 1999. The program was established to guide City officials and inform residents about the processes for implementing traffic calming on residential streets. It has been more than a decade since the program was last updated in 2009 (Resolution 1817). Since then there has been a concerted effort to continue to streamline these processes. The 2020 update eliminates the need for the two-phase approach previously used in which a variety of passive control devices were first employed and then physical alterations to the street were considered. Instead, the update establishes clearly defined decision points and thresholds. This new approach maintains transparency, while allowing discretion and flexibility when warranted. The result is a process that is data driven, prompt, and more user-friendly. Currently speed is the only factor used to determine eligibility for the program. This update uses a points system that factors in not only speed, but also traffic volume, cut-through traffic, crash history, pedestrian facilities, and the presence of parks, schools, school walking routes, and transit stops to score each street for eligibility. BUDGET IMPACT: None. ATTACHMENTS: 1. Resolution Residential Traffic Calming Resolution (2020 RTCP) (PDF) 05/26/20 Committee of the Whole RECOMMENDED TO COUNCIL BY CONSENSUS RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS Next: 6/2/2020 7:00 PM 8.E Packet Pg. 84 Page | 1 Residential Traffic Calming Program RESOLUTION NO. 2012 A RESOLUTION of the City Council of the City of Kent, Washington, repealing Resolution No. 1817 and adopting a new Residential Traffic Calming Program to better address quality of life concerns related to traffic in residential neighborhoods by considering traffic speeds and cut-through traffic as well as other neighborhood factors. RECITALS A. Residential streets within the City of Kent have measurable safety and community character impacts due to the speed and volume of through traffic. Through Resolution No. 1546, adopted on July 6, 1999, the City has addressed these impacts by the Residential Traffic Calming Program (“RTCP”). The City has made adjustments to the RTCP at various times, most recently with the adoption of Resolution 1817, adopted on October 20, 2009. B. The Mayor and City Council recognize the need to update and revise the means by which residential traffic impacts are addressed, and have directed the City's Public Works Department to consider proven solutions that include resident involvement. In response, the Department conducted research on residential traffic calming efforts throughout the United States and developed the RTCP. 8.E.a Packet Pg. 85 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 2 Residential Traffic Calming Program C. The RTCP is general in nature, establishing overall policies and approaches, but leaves the specific details of implementation to the Public Works Director, in order to adapt program implementation to meet neighborhood needs on a more flexible case-by-case basis. This program is designed to evaluate a wide variety of factors that negatively impact the safety and quality of residential environments. These factors include traffic speed, volume, crash history, pedestrian facilities, and prominent neighborhood features. This program will allow residents to identify problems and solutions specific to their neighborhoods with the help of City staff. If a neighborhood qualifies, potential traffic calming measures will be considered, including the construction of physical devices to reduce traffic volumes and speeds. Installation of physical devices shall be based upon sound engineering and transportation planning principles and with regard to neighborhood aesthetics. The RTCP will provide for periodic evaluation of the solutions as implemented and may include follow-up surveys to determine project effectiveness and resident satisfaction. D. The updated RTCP creates a more stream-lined and responsive approach by eliminating the two-phase program. Phase one of the current two-phase program requires resident involvement that may impact personal safety and does not reduce traffic speeds long-term. This phase also requires additional data collection and analysis that delays formal evaluation and creates additional steps for residents that discourages further participation in the program. This new approach maintains transparency, while allowing discretion and flexibility when warranted. The result is a process that is data driven, prompt, and more user-friendly. E. On March 24, 2020, the Committee of the Whole heard a presentation regarding the RTCP. On May 26, 2020 the Committee of the 8.E.a Packet Pg. 86 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 3 Residential Traffic Calming Program Whole reviewed the RTCP in its final form and recommended its adoption by resolution. NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: RESOLUTION SECTION 1. – Repealer – Resolution No. 1817. Resolution No. 1817 is hereby repealed in its entirety. SECTION 2. – Program Adopted. The City Council hereby adopts the RTCP attached as Exhibit A. SECTION 3. – Public Works Director Authorized. The Public Works Director is hereby authorized to implement the RTCP and to adopt procedures and standard construction plans consistent with the principles set forth in this resolution and to deviate from specific standards when special circumstances so warrant. SECTION 4. – Availability of Program Details. A copy of the RTCP shall be kept on file with the City Clerk and the Public Works Department. Brochures summarizing the RTCP will be made available to the public. SECTION 5. – Severability. If any one or more section, subsection, or sentence of this resolution is held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this resolution and the same shall remain in full force and effect. SECTION 6. – Ratification. Any act consistent with the authority and prior to the effective date of this resolution is hereby ratified and affirmed. SECTION 7. – Corrections by City Clerk. Upon approval of the City Attorney, the City Clerk is authorized to make necessary corrections to this 8.E.a Packet Pg. 87 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 4 Residential Traffic Calming Program resolution, including the correction of clerical errors; resolution, section, or subsection numbering; or references to other local, state, or federal laws, codes, rules, or regulations. SECTION 8. – Effective Date. This resolution shall take effect and be in force immediately upon its passage. June 2, 2020 DANA RALPH, MAYOR Date Approved ATTEST: June 2, 2020 KIMBERLEY A. KOMOTO, CITY CLERK Date Adopted APPROVED AS TO FORM: ARTHUR “PAT” FITZPATRICK, CITY ATTORNEY 8.E.a Packet Pg. 88 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 5 Residential Traffic Calming Program EXHIBIT A RESIDENTIAL TRAFFIC CALMING PROGRAM The City of Kent Residential Traffic Calming Program (RTCP) was first adopted in July of 1999. The program was established to guide City officials and inform residents about the processes for implementing traffic calming on residential streets. It has been more than a decade since the program was last updated in 2009 (Resolution 1817). Since then there has been a concerted effort to continue to streamline these processes. The 2020 update eliminates the need for the two-phase approach previously used in which a variety of passive control devices were first employed and then physical alterations to the street were considered. Instead, the update establishes clearly defined decision points and thresholds. This new approach maintains transparency, while allowing discretion and flexibility when warranted. The result is a process that is data driven, prompt, and more user-friendly. Program Elements 1. Eligibility The RTCP is designed to address neighborhood traffic concerns on residential streets, both local streets and residential collector streets. 2. Request for Action Residents may contact City staff via letter, phone, email, or an online form such as the Residential Traffic Calming Citizen Action Request Form to request the installation of traffic calming measures. 3. Gathering Support Early neighborhood engagement is key. A minimum of five residents are required to initiate the process by filling out an online form or contacting City staff directly. 8.E.a Packet Pg. 89 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 6 Residential Traffic Calming Program 4. City Response to Request for Action City staff will follow-up with the residents that initiated the request for action, typically within 48 hours, to discuss next steps. 5. Data Collection and Evaluation In consultation with the residents, the City Traffic Engineer will define the study area. The City will then conduct a traffic study to determine if the minimum requirements are met to qualify for the installation of traffic calming devices. As part of the traffic study, points will be awarded based on characteristics of each street as outlined in Table 1, which assigns points based on the following factors: • Traffic Speeds: The 85th-percentile of all vehicles in both directions over a 7-day minimum period, points awarded by the number of mph over the posted speed limit. • Average Daily Traffic (ADT) Volumes: The average number of vehicles per day in both directions over a 7- day minimum period. • Cut-Through Traffic: A measured imbalance where the ADT in one direction is 2.5 times greater than the other direction. • Crash History: The most recent 5-year crash data from the WSDOT Crash Data Portal; points awarded for each crash. • Pedestrian Facilities: The typical presence of sidewalks or separated shoulder walkways. • Park, School (K-12), or Transit Stop: The presence or proximity of these features or presence of a school 8.E.a Packet Pg. 90 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 7 Residential Traffic Calming Program walking route on the study street. Use the highest scoring criteria from this section. A minimum total score of 50 points is required to move forward with consideration of traffic calming measures. If the total score is less than 50 points, the City will work with the neighborhood to identify appropriate education and enforcement strategies. Validation of Traffic Study Results If the minimum point threshold is met, a minimum of two speed studies, conducted at least 8 weeks apart, are required before moving forward with engineering recommendations. Traffic speeds and volumes in the second study must be within 10 percent of the original study to validate the results. If the speeds and volumes of the second study are not within 10 percent, a final third study will be conducted. Reconsideration of Requests for Action Requests for action that were not successfully implemented in previous attempts will only be reconsidered in the following instances: • The proposal was not implemented due to budget constraints and the minimum points required continue to be met. • Traffic conditions have changed due to roadway improvements or land use changes, as determined by the City Traffic Engineer. • At least 36 months have passed since the previous request for action that failed to meet the minimum points required. 8.E.a Packet Pg. 91 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 8 Residential Traffic Calming Program Table 1: Residential Traffic Calming Program (RTCP) Scoring Criteria Criteria Possible Points Traffic Speeds 1 Lower than the posted speed 0 – 0.9 over 1.0 – 1.9 over 2.0 – 2.9 over 3.0 – 3.9 over 4.0 – 4.9 over 5.0 – 5.9 over 6.0 – 6.9 over 7.0 – 7.9 over 8.0 – 8.9 over 9.0 – 9.9 over 10.0+ over 0 0 2 5 9 15 23 31 37 42 46 50 Average Daily Traffic (ADT) Volumes Local Street 0-400 ADT 401-600 ADT 601-800 ADT 801-1,000 ADT 1,001+ ADT Residential Collector Street 0-1,000 ADT 1,001-1,500 ADT 1,501-2,000 ADT 2,001-2,500 ADT 2,501+ ADT 1 5 10 15 20 1 5 10 15 20 Cut-Through Traffic Average Daily Traffic in one direction is 2.5 times the other direction. 15 Crash History 2 Property Damage Only/No Apparent Injury Possible Injury Minor Injury Serious Injury Fatality 3 6 9 15 30 Pedestrian Facilities No sidewalks Sidewalks only on one side of the street Sidewalks on both sides of the street 5 3 0 Park, School (K-12), or Transit Stop 3 Street borders or features one of these Street is on a designated school walk route Not on a walk route, but within ¼ mile 4 of these 5 3 1 1 85th percentile of all vehicles in both directions, over a 7 day period. The number of mph over the posted speed. 2 WSDOT Crash Data Portal most recent 5 year range. Points awarded for each crash. 3 Take the highest scoring criteria from this section. 4 Distance to a park property, school property, or transit stop; measured along the street centerline. 8.E.a Packet Pg. 92 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 9 Residential Traffic Calming Program 6. Implementation Staff will share the results of the traffic study with the residents and discuss strategies and next steps. Strategies include a combination of education, enforcement, and engineering. If the request for action meets the minimum points requirement and qualifies for traffic calming measures, the City will hold a neighborhood meeting to help determine the preferred types of traffic calming devices and their approximate location. Education and Enforcement • Neighborhood Speed Watch Program • Radar Speed Trailer • Traffic Enforcement • Vegetation Code Enforcement (trim or remove) Engineering • Chicanes/Slow Points • Closure (full or partial) • Curb Extensions • Diverters • Lane Striping • Medians • Mini roundabout • Neighborhood Entrance Treatments • Partial Closure • Raised Crosswalk 5 • Blue Residential Area Signs 5 Must meet the requirements of Resolution 1931 - Adopting A Policy For Addressing Installation And Maintenance Of Crosswalk Markings Throughout The City Of Kent. 8.E.a Packet Pg. 93 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 10 Residential Traffic Calming Program • Slow Points Chokers • Speed Dots • Speed Cushions • Speed Limit Pavement Markings • Stationary Radar Sign • Traffic Circles • Turn/Access Restrictions • General Parking Modifications All traffic calming measures are subject to approval by the City Traffic Engineer, School District Transportation Department, Kent Police Department, and the Fire Marshall. The Public Works Director has the discretion to move an application forward or to address safety issues discovered outside of the RTCP process. 7. Neighborhood Voting and Notification After the meeting, the City will mail a ballot to affected residents within the study area, allowing those residents to vote on the traffic calming measures the City recommends be installed. The City requires a 50% ballot return rate and a two-thirds majority approval of the returned ballots is required before any traffic calming measures will be installed. Residents will be notified of the ballot results and if applicable, the approximate construction timeline. 8. Installation City engineering staff will design the traffic calming measures and develop a plan to install them. 9. Evaluation and Follow-up 8.E.a Packet Pg. 94 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g Page | 11 Residential Traffic Calming Program A follow-up study should occur at least 6 months after installation. Traffic speed and volume data should be collected and any change in traffic volumes and speeds on the treated streets documented. 8.E.a Packet Pg. 95 At t a c h m e n t : R e s o l u t i o n R e s i d e n t i a l T r a f f i c C a l m i n g R e s o l u t i o n ( 2 0 2 0 R T C P ) ( 2 3 0 2 : R e s o l u t i o n A d o p t i n g t h e R e s i d e n t i a l T r a f f i c C a l m i n g DATE: June 2, 2020 TO: Kent City Council SUBJECT: Interagency Agreement with the Washington State Department of Commerce for the Coronavirus Relief Fund for Local Governments CARES Grant - Authorize MOTION: Authorize the Mayor to sign the interagency agreement to accept funds from the Washington State Department of Commerce in the amount of $3,894,000 for the costs incurred due to the public health emergency with respect to the Coronavirus Disease 2019 (COVID-19) during the period of March 1, 2020 thru October 31, 2020, amend the budget and authorize expenditure of the funds in accordance with the agreement terms, subject to final terms and conditions acceptable to the Finance Director and City Attorney. SUMMARY: Governor Inslee has directed the Washington State Department of Commerce to release a portion of the federal Coronavirus Relief Funds to local governments, which includes an award of $3,894,000 to the City of Kent. Funds may only be used to cover costs that (1) are necessary expenditures incurred due to the public health emergency with respect to the Coronavirus Disease 2019 (COVID-19); (2) were not accounted for in the budget most recently approved as of March 27, 2020 (the date enactment of the CARES Act) for the State or government; and (3) were incurred during the period that begins on March 1, 2020 and ends on October 31, 2020. The Mayor’s recommendation is to use approximately $1 million for expenses associated with the provision of economic support in connection with the COVID-19 public health emergency, such as grants to small businesses to reimburse the costs of business interruption caused by required closures and job training. The remaining would be used to reimburse the City for COVID-19 related expenditures. BUDGET IMPACT: Revenues of up to $3,894,000 for reimbursement to the City for COVID-19 related expenditures, and job training and grants to small businesses. SUPPORTS STRATEGIC PLAN GOAL: Innovative Government - Delivering outstanding customer service, developing leaders, and fostering innovation. 9.A Packet Pg. 96 Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and inviting parks and recreation. Sustainable Services - Providing quality services through responsible financial management, economic growth, and partnerships. ATTACHMENTS: 1. Department of Commerce CRF Program Guidelines (PDF) 2. Department of Commerce Interagency Agreement (PDF) 3. Department of Commerce Working Papers (PDF) 9.A Packet Pg. 97 (Dated 5-18-2020) Coronavirus Relief Funds for Local Governments Program Guidelines CARES Act Funds for Local Governments In Washington State Administered by the Department of Commerce Local Government Division P.O. Box 42525 Olympia, WA 98504-2525 9.A.a Packet Pg. 98 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Contact Information Mailing / Street Address: Washington State Department of Commerce Local Government Division PO Box 42525 1011 Plum Street SE Olympia, WA 98504-2525 Program Leadership: Tony Hanson Deputy Assistant Director Community Capital Facilities Unit 360-725-3005 Tony.Hanson@commerce.wa.gov Tina Hochwender Managing Director Community Assistance and Research Unit 360-725-3087 Tina.Hochwender@commerce.wa.gov Commerce Leadership: Lisa Brown, Ph.D. Director Mark Barkley Assistant Director Local Government Division This publication is available in an alternative format upon request. Events sponsored by Commerce are accessible to persons with disabilities. Accommodations may be arranged with a minimum of 10 working days’ notice by calling 360-725-3087 9.A.a Packet Pg. 99 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Coronavirus Relief Funds (CRF) for Local Governments Program Guidelines TABLE OF CONTENTS General Information .................................................................... 1 1. Source of Funds .............................................................. 1 2. Allocation Formula .......................................................... 1 3. Period of Performance .................................................... 1 4. Intended Use ................................................................... 1 5. Eligible Costs .................................................................. 2 6. Ineligible Costs ............................................................... 4 7. Eligible Cost Test ............................................................ 4 8. Cost Reimbursements ..................................................... 5 Process & Procedure to Obtain Funds ....................................... 7 1. Award Letter .................................................................... 7 2. Working Papers .............................................................. 7 3. Contract .......................................................................... 7 4. Reimbursement Requests ............................................... 8 5. A-19 Certification and Activity Report .............................. 8 9.A.a Packet Pg. 100 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 1 General Information 1. Source of Funds You have been awarded funds through the state’s Coronavirus Relief Funds (CRF). The funds are available under section 601(a) of the Social Security Act, as added by section 5001 of the Coronavirus Aid, Relief, and Economic Security Act (“CARES Act”). Your grant is funded entirely through the federal stimulus funding under the CARES Act provided by the U.S. Department of Treasury (US Treasury) to the Governor via the Office of Financial Management (OFM). On April 27, 2020 Governor Inslee announced the award of nearly $300 million to local governments in CRF from the state's allocation of the CARES Act funding. 2. Allocation Formula OFM developed the allocation methodology and determined the jurisdiction amounts. The allocations were based on 2019 population estimates for each jurisdiction. Funds will be provided to cities and counties with populations under 500,000 that were ineligible to receive direct funding under the CARES Act. Each county will receive a minimum distribution of $250,000 and each city will receive a minimum distribution of $25,000. Cities and counties with populations over 500,000 did not receive a direct allocation from the state. Instead these jurisdictions received a direct allocation from the US Treasury (i.e. city of Seattle, King Co., Pierce Co., Snohomish Co., etc.). For a complete list of cities and counties and their allocations, click here. 3. Period of Performance The Coronavirus Relief Funds may only be used for costs incurred by local governments in response to the COVID-19 public health emergency during the period of March 1, 2020 thru October 31, 2020. The US Treasury’s Guidance provides an end date of December 30, 2020. This is the end date in which the state must have reimbursed all “recipients of the funds” (grantees) their costs incurred in response to the COVID-19 emergency. In order to allow time for Commerce to process final payments and conduct contract closeouts; and for OFM to fully utilize any unspent funds before they expire, expenditures are only being accepted on costs incurred through October 31, 2020. All final requests for reimbursement must be submitted no later than November 15, 2020. 4. Intended Use Under the CARES Act, the Coronavirus Relief Funds (CRF) may be used to cover costs that: 1. Are necessary expenditures incurred due to the public health emergency with respect to the Coronavirus Disease 2019 (COVID–19); AND 2. Are NOT accounted for in the budget most recently approved as of March 27, 2020 (the date of enactment of the CARES Act) for the State or local government. The “most recently 9.A.a Packet Pg. 101 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 2 approved” budget refers to the enacted budget for the relevant fiscal period for the particular government. A cost meets this requirement if: a) The cost cannot lawfully be funded using a line item, allotment, or allocation within that budget; OR b) The cost is for a substantially different use from any expected use of funds in such a line item, allotment, or allocation. 3. A cost is not considered to have been accounted for in a budget merely because it could be met using a budgetary stabilization fund, rainy day fund, or similar reserve account. Funds may NOT be used to fill shortfalls in government revenue to cover expenditures that would not otherwise qualify under the statute. Although a broad range of uses is allowed, revenue replacement is not a permissible use of Fund payments. The use of these funds are very broad and flexible, and can be used for both operating and capital expenditures. If funds are being used for capital expenditures such as acquisition of real property or construction / renovation costs, please contact us immediately. We will provide you with further information and guidance. Utilizing CRF for these purposes will require additional Federal and state provisions being applied to the project such as:  All projects must be reviewed under a Federal Section 106 review for archaeological and cultural resources if the project: acquires property, disturbs ground, and/or involves structures more than 50 years old. Grantees must submit documentation to the project manager when the review is complete. Section 106 supersedes the Governor’s Executive Order 05-05 review.  Construction / renovation projects may be required to meet high-performance building standards and document they have entered the state’s LEED certification process.  Construction / renovation projects will be required to follow Federal Davis Bacon and state prevailing wage laws, rules, and regulations. Additionally, grantees must ensure all capital expenditures are only for costs incurred through the limited timeframe of March 1, 2020 thru October 31, 2020. 5. Eligible costs There are six (6) primary eligible cost categories. These cost categories and their eligible cost sub- categories are as follows: 1. Medical expenses such as:  COVID-19-related expenses of public hospitals, clinics, and similar facilities.  Expenses of establishing temporary public medical facilities and other measures to increase COVID-19 treatment capacity, including related construction costs.  Costs of providing COVID-19 testing, including serological testing.  Emergency medical response expenses, including emergency medical transportation, related to COVID-19. 9.A.a Packet Pg. 102 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 3  Expenses for establishing and operating public telemedicine capabilities for COVID-19-related treatment. 2. Public health expenses such as:  Expenses for communication and enforcement by State, territorial, local, and Tribal governments of public health orders related to COVID-19.  Expenses for acquisition and distribution of medical and protective supplies, including sanitizing products and personal protective equipment, for medical personnel, police officers, social workers, child protection services, and child welfare officers, direct service providers for older adults and individuals with disabilities in community settings, and other public health or safety workers in connection with the COVID-19 public health emergency.  Expenses for disinfection of public areas and other facilities, e.g., nursing homes, in response to the COVID-19 public health emergency.  Expenses for technical assistance to local authorities or other entities on mitigation of COVID-19-related threats to public health and safety.  Expenses for public safety measures undertaken in response to COVID-19.  Expenses for quarantining individuals. 3. Payroll expenses for public safety, public health, health care, human services, and similar employees whose services are substantially dedicated to mitigating or responding to the COVID-19 public health emergency. 4. Expenses of actions to facilitate compliance with COVID-19-related public health measures, such as:  Expenses for food delivery to residents, including, for example, senior citizens and other vulnerable populations, to enable compliance with COVID-19 public health precautions.  Expenses to facilitate distance learning, including technological improvements, in connection with school closings to enable compliance with COVID-19 precautions.  Expenses to improve telework capabilities for public employees to enable compliance with COVID-19 public health precautions.  Expenses of providing paid sick and paid family and medical leave to public employees to enable compliance with COVID-19 public health precautions.  COVID-19-related expenses of maintaining state prisons and county jails, including as relates to sanitation and improvement of social distancing measures, to enable compliance with COVID-19 public health precautions.  Expenses for care for homeless populations provided to mitigate COVID-19 effects and enable compliance with COVID-19 public health precautions. 5. Expenses associated with the provision of economic support in connection with the COVID-19 public health emergency, such as:  Expenditures related to the provision of grants to small businesses to reimburse the costs of business interruption caused by required closures.  Expenditures related to a state, territorial, local, or Tribal government payroll support program.  Unemployment insurance costs related to the COVID-19 public health emergency if such costs will not be reimbursed by the federal government pursuant to the CARES Act or otherwise. 9.A.a Packet Pg. 103 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 4 6. Any other COVID-19-related expenses reasonably necessary to the function of government that satisfy the Fund’s eligibility criteria. 6. Ineligible costs Non-allowable expenditures include, but are not limited to: 1. Expenses for the state share of Medicaid. 2. Damages covered by insurance. 3. Payroll or benefits expenses for employees whose work duties are not substantially dedicated to mitigating or responding to the COVID-19 public health emergency. 4. Expenses that have been or will be reimbursed under any federal program, such as the reimbursement by the federal government pursuant to the CARES Act of contributions by states to state unemployment funds. 5. Reimbursement to donors for donated items or services. 6. Workforce bonuses other than hazard pay or overtime. 7. Severance pay. 8. Legal settlements. 7. Eligible cost test Grantees are charged with determining whether or not an expense is eligible based on the US Treasury’s Guidance and as provided in the grantee’s contract scope of work with Commerce. To assist grantees with this determination, Commerce has developed an eligibility cost test. This test gives each grantee full authority to make the appropriate call for each circumstance. TEST – If all responses for the particular incurred cost are “true” for all five statements below, then a jurisdiction can feel confident the cost is eligible: 1. The expense is connected to the COVID-19 emergency. 2. The expense is “necessary”. 3. The expense is not filling a short fall in government revenues. 4. The expense is not funded thru another budget line item, allotment or allocation, as of March 27, 2020. 5. The expense wouldn’t exist without COVID-19 OR would be for a “substantially different” purpose. It is the responsibility of each grantee to define “necessary” or “substantially different”, giving the grantee the authority and flexibility to make their own determination. Additional consideration – The intent of these funds is to help jurisdictions cover the immediate impacts of the COVID-19 emergency. Both direct costs to the jurisdiction and costs to their communities. There are many possible eligible costs. Many costs are clearly eligible and others are in more of a grey area. One could probably justify some of the “grey area” costs based on the test, but are they directly addressing the immediate impacts? Possibly not. In these situations it may be safer and more appropriate to utilize the funds in one of the many other eligible cost categories that more clearly meet the intent of the funds. Again, each grantee has the full authority to make the final call based on their circumstances and justification. 9.A.a Packet Pg. 104 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 5 8. Cost reimbursement Funds are available on a reimbursement basis only, and cannot be advanced under any circumstances. If funds are being used for the acquisition of real property or construction / renovation costs, please contact us immediately. Reimbursable costs are those that a Grantee has already incurred. We may only reimburse grantees for eligible costs incurred in response to the COVID-19 public health emergency during the period of March 1, 2020 thru October 31, 2020. Final Date of Reimbursements In order to ensure all awardees and their costs incurred in response to the COVID-19 emergency are paid out by December 30, 2020 per the US Treasury’s Guidance, expenditures are only being accepted on costs incurred through October 31, 2020. All final requests for reimbursement must be submitted no later than November 15, 2020. Grantees will not be required to submit a proposed budget prior to contract execution. Grantees will have the discretion and flexibility to determine where these funds may best serve their communities. Each grantee will determine eligible costs to submit for reimbursement. For reporting purposes, expenditures must be tracked at the sub-category level for the six (6) primary eligible cost categories, as follows: 1. Medical Expenses A. Public hospitals, clinics, and similar facilities B. Temporary public medical facilities & increased capacity C. COVID-19 testing, including serological testing D. Emergency medical response expenses E. Telemedicine capabilities F. Other 2. Public Health Expenses A. Communication and enforcement of public health measures B. Medical and protective supplies, including sanitation and PPE C. Disinfecting public areas and other facilities D. Technical assistance on COVID-19 threat mitigation E. Public safety measures undertaken F. Quarantining individuals G. Other 3. Payroll expenses for public employees dedicated to COVID-19 A. Public Safety B. Public Health C. Health Care D. Human Services E. Economic Development F. Other 4. Expenses to facilitate compliance with COVID-19 measures A. Food access and delivery to residents B. Distance learning tied to school closings C. Telework capabilities of public employees 9.A.a Packet Pg. 105 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 6 D. Paid sick and paid family and medical leave to public employees E. COVID-19-related expenses in county jails F. Care and mitigation services for homeless populations G. Other 5. Economic Supports A. Small Business Grants for business interruptions B. Payroll Support Programs C. Other 6. Other COVID-19 Expenses No receipts or proof of payment for costs incurred will be required to be submitted to Commerce. Grantees are still required to maintain sufficient accounting records in accordance with state and federal laws. Monitoring visits may be scheduled. 9.A.a Packet Pg. 106 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 7 Process and Procedure to Obtain Funds 1. Award Letter Commerce strives to administer funds expediently and with a minimum of red tape. We do so within the policies and procedures established by the US Treasury and state’s Legislature, OFM, Commerce, and the Office of the Attorney General. Prior to receiving funds, a contract will need to be executed with Commerce. Award letters with instructions to initiate the contracting process will be emailed to each city and county receiving an allocation by no later than May 22nd. Emails to cities will be sent to mayors and any other contacts obtained with the assistance of the Association of Washington Cities. Emails to counties will be sent to the county commissioners and any other contacts obtained with the assistance of the Washington State Association of Counties. Included with the award letter will be:  CRF Program Guidelines  A draft contract template for review and to initiate the public process for authorization to execute once the final contract is available for execution  Working Papers 2. Working papers Your grant award packet includes Working Papers. The Working Papers ask for basic information needed to create a contract:  Contact information for the person who will administer the grant once the contract is signed. Grant documents and correspondence will be sent to this person.  Your Statewide Vendor Number (SWV#)  Your Federal Indirect Rate  Your fiscal year end date  Name and title for the person authorized by the jurisdiction to sign the contract Please complete and return the Working Papers to the Commerce project manager identified in the award letter as soon as possible, even if you do not plan to begin drawing your funds for a while. Your project manager will manage your contract until project completion. Feel free to give us a call if you have any questions as you fill out the form (see contact information on previous page). 3. Contract Once the completed Working Papers have been received by the Commerce project manager identified in the award letter, a contract will be prepared and sent to you for signature. Have the authorized representative sign the contract and then return a scanned pdf copy to your project manager. Then the project manager will route the contract for Commerce’s signature. It generally takes two to four weeks to fully execute a contract. Once executed by Commerce a fully executed copy will be scanned and a pdf copy emailed to the jurisdiction and you will have access to your funds. Commerce is working to make the contracting process as quick and easy as possible. 9.A.a Packet Pg. 107 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 8 4. Reimbursements This is a reimbursement-style grant, meaning no advance payments. Funds are available once a contract is executed. All grantees are required to set up a SWV number so funds may be sent electronically. Grantees have the flexibility to cash out their grant or draw down funds as frequently as once a month as long as you have incurred documented eligible costs in response to the COVID-19 public health emergency during the period of March 1, 2020 thru October 31, 2020. All final requests for reimbursement must be submitted no later than November 15, 2020. Commerce has moved to electronic vouchering through their Contracts Management System (CMS) Online A-19 Portal. Requests for reimbursement must be submitted online through the CMS System by an individual authorized by the Grantee’s organization. Online electronic vouchering provides for grantees to receive reimbursements as quickly as possible. Grantees with barriers to using the online A- 19 portal, may request an A-19 form from their Commerce project manager. Access to CMS is available through the Secure Access Washington (SAW) portal. You will need to create a SAW account if you do not already have one. Please find detailed instructions here: Office of Financial Management. It may take up to three weeks after you submit this information for an electronic transfer account to be set up. We will automatically receive your SWV number from the office that sets them up. Once logged into SAW, add the Department of Commerce to your ‘services’ and submit an Online A-19 External User Request form. Then Commerce will add you as a new external user in CMS; and the CMS system will generate and email a registration code to you to complete the CMS registration. For additional grantee support, refer to the Commerce Online A-19 Webpage for External Users, which includes SAW resources and the CMS manual for external users. The A-19 voucher must include a detailed breakdown of the costs incurred within each eligible budget category and the total reportable eligible expenses in response to the COVID-19 public health emergency. Accompanying with each voucher must be an executed A-19 certification and A-19 activity report. Incomplete or improperly prepared submissions may result in payment delays. After receipt and acceptance of a fully completed A-19 voucher submittal, grantees can expect electronic reimbursements within 7-10 days. No receipts or proof of payment for costs incurred will be required to be submitted to Commerce. Grantees are still required to maintain sufficient accounting records in accordance with state and federal laws; and are responsible for maintaining clear and accurate program records, and making them accessible to Commerce and the State Auditor. Monitoring visits may be scheduled. 5. A-19 Certification and Activity Report In order to receive reimbursement for eligible expenses incurred, each A-19 Voucher must include: 1. A completed A-19 Certification:  An individual authorized to execute on behalf of the local government must certify by signing this document under penalty of perjury that the items and costs listed herein and on the accompanying Commerce A-19 Voucher are eligible charges for necessary expenditures incurred due to the COVID-19 public health emergency that were not previously accounted for in the most recent approved budget as of March 27, 2020, 9.A.a Packet Pg. 108 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f 9 and that the funds were used in accordance with section 601(a) of the Social Security Act, as added by section 5001 of the Coronavirus Aid, Relief, and Economic Security Act (“CARES Act”). 2. A completed A-19 Activity Report (instructions included in document):  Must be submitted as an Excel spreadsheet, not a PDF.  Include a detailed breakdown of the individual eligible expenditures reported by each sub-category of the six (6) primary budget categories. Each primary budget category includes sub-categories and provides an option to add “other” sub-categories.  Include the total amount of all previous reimbursement requests for each applicable sub-category.  Include the total amount of funds being requested in the current reimbursement request for each applicable sub-category.  Include a brief description of the use of the funds being requested for each applicable sub-category. Keep descriptions as concise as possible, but include adequate context to demonstrate how these funds addressed the COVID-19 emergency. If applicable, please consider: o Providing a brief description of the specific activities performed. o Identifying specific populations served. o Identifying specific programs created or utilized. o Including any known or intended outcomes, results, or community impacts. A certification and activity report must be completed and returned with each reimbursement voucher. After the contract is executed, you will receive additional instructions on how to submit electronic reimbursement requests with the A-19 certification and A-19 activity report. 9.A.a Packet Pg. 109 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e C R F P r o g r a m G u i d e l i n e s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Interagency Agreement with «Organization» through the Coronavirus Relief Fund for Local Governments For Costs incurred due to the public health emergency with respect to the Coronavirus Disease 2019 (COVID-19) during the period of March 1, 2020 thru October 31, 2020. Start date: March 1, 2020 9.A.b Packet Pg. 110 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f ii TABLE OF CONTENTS Special Terms and Conditions 1. Authority…………………………………………………………………………………..1 2. Acknowledgement of Federal Funding………………………………………………..1 3. Contract Management ........................................................................................... 1 4. Compensation ........................................................................................................ 1 5. Expenses…………………………………………………………………………………1 6. Indirect Costs…………………………………………………………………………….1 7. Billing Procedures and Payment ............................................................................ 1 8. Audit……………………………………………………………………………………….2 9. Debarment…………………………….………………………………………………….3 10. Laws ....................................................................................................................... 3 11. Order of Precedence .............................................................................................. 4 General Terms and Conditions 1. Definitions .............................................................................................................. 5 2. All Writings Contained Herein ................................................................................ 5 3. Amendments .......................................................................................................... 5 4. Assignment ............................................................................................................ 5 5. Confidentiality and Safeguarding of Information.................................................... 5 6. Copyright................................................................................................................ 6 7. Disputes ................................................................................................................. 6 8. Governing Law and Venue .................................................................................... 6 9. Indemnification ....................................................................................................... 7 10. Licensing, Accreditation and Registration ............................................................. 7 11. Recapture .............................................................................................................. 7 12. Records Maintenance ............................................................................................ 7 13. Savings .................................................................................................................. 7 14. Severability ............................................................................................................ 7 15. Subcontracting ....................................................................................................... 7 16. Survival .................................................................................................................. 8 17. Termination for Cause ........................................................................................... 8 18. Termination for Convenience................................................................................. 8 19. Termination Procedures ........................................................................................ 8 20. Treatment of Assets ............................................................................................... 9 21. Waiver .................................................................................................................. 10 Attachment A, Scope of Work ................................................................................................... 11 Attachment B, Budget & Invoicing ............................................................................................. 13 Attachment C, A-19 Certification ................................................................................................ 14 Attachment D, A-19 Activity Report ........................................................................................... 16 9.A.b Packet Pg. 111 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f FACE SHEET iii Contract Number: «Contract_Number» Washington State Department of Commerce Local Government Division Community Capital Facilities Unit Coronavirus Relief Fund for Local Governments 1. Contractor 2. Contractor Doing Business As (optional) «Organization» «Address» «City», Washington «Postal_Code» 3. Contractor Representative 4. COMMERCE Representative «First» «Last» «CDBG_ContractsTitle» «CDBG_ContractsPhone_Number» «Email» «Full_Name» Project Manager «LU_Project_ManagerPhone_Number» Fax 360-586-5880 «Mgr_EMail» P.O. Box 42525 1011 Plum Street SE Olympia, WA 98504-2525 5. Contract Amount 6. Funding Source 7. Start Date 8. End Date «Amount» Federal: State: Other: N/A: March 1, 2020 October 31, 2020 9. Federal Funds (as applicable) «Amount» Federal Agency: CFDA Number: US Dept. of the Treasury 21.999 Indirect Rate (if applicable): «Indirect_Rate» 10. Tax ID # 11. SWV # 12. UBI # 13. DUNS # «TIN_Number» «SWV_Number» «UBI_Number» «DUNS_Number» 14. Contract Purpose To provide funds for costs incurred due to the public health emergency with respect to the Coronavirus Disease 2019 (COVID-19) during the period of March 1, 2020 thru October 31, 2020. Final invoices must be received by November 15, 2020. 15. Signing Statement COMMERCE, defined as the Department of Commerce, and the Contractor, as defined above, acknowledge and accept the terms of this Contract and Attachments and have executed this Contract on the date below and warrant they are authorized to bind their respective agencies. The rights and obligations of both parties to this Contract are governed by this Contract and the following documents hereby incorporated by reference: Attachment “A” – Scope of Work, Attachment “B” – Budget & Invoicing, Attachment “C” – A-19 Certification, Attachment “D” – A-19 Activity Report FOR CONTRACTOR FOR COMMERCE «Sig_Auth_Whole_Name», «Sig_Authority_Title» Date Mark K. Barkley, Assistant Director, Local Government Division Date APPROVED AS TO FORM ONLY BY ASSISTANT ATTORNEY GENERAL 05-01-2020. APPROVAL ON FILE. 9.A.b Packet Pg. 112 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f SPECIAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 1 1. AUTHORITY COMMERCE and Contractor enter into this Contract pursuant to the authority granted by the Interlocal Cooperation Act, Chapter 39.34 RCW. 2. ACKNOWLEDGMENT OF FEDERAL FUNDS Funds under the Contract are made available and are subject to Section 601(a) of the Social Security Act, as amended by section 5001 of the Coronavirus Aid, Relief, and Economic Security Act (CARES Act), and Title V and VI of the CARES Act. The Contractor agrees that any publications (written, visual, or sound) but excluding press releases, newsletters, and issue analyses, issued by the Contractor describing programs or projects funded in whole or in part with federal funds under this Contract, shall contain the following statements: “This project was supported by a grant awarded by US Department of the Treasury. Points of view in this document are those of the author and do not necessarily represent the official position or policies of the US Department of the Treasury. Grant funds are administered by the Local Government Coronavirus Relief Fund thru the Washington State Department of Commerce.” 3. CONTRACT MANAGEMENT The Representative for each of the parties shall be responsible for and shall be the contact person for all communications and billings regarding the performance of this Contract. The Representative for COMMERCE and their contact information are identified on the Face Sheet of this Contract. The Representative for the Contractor and their contact information are identified on the Face Sheet of this Contract. 4. COMPENSATION COMMERCE shall pay an amount not to exceed the contract amount listed on the Face Sheet for the performance of all things necessary for or incidental to the performance of work under this Contract as set forth in the Scope of Work (Attachment A). 5. EXPENSES Contractor shall receive reimbursement for allowable expenses as identified in the Scope of Work (Attachment A) or as authorized in advance by COMMERCE as reimbursable. Travel expenses may include airfare (economy or coach class only), other transportation expenses, and lodging and subsistence necessary during periods of required travel. Contractor shall receive compensation for travel expenses at current state travel reimbursement rates. 6. INDIRECT COSTS Contractor shall provide their indirect cost rate that has been negotiated between their entity and the federal government. If no such rate exists a de minimis indirect cost rate of 10% of modified total direct costs (MTDC) will be used. 7. BILLING PROCEDURES AND PAYMENT COMMERCE shall reimburse the Contractor for eligible Project expenditures, up to the maximum payable under this Contract. When requesting reimbursement for expenditures made, Contractor shall submit all Invoice Vouchers and any required documentation electronically through COMMERCE’s Contracts Management System (CMS), which is available through the Secure Access Washington (SAW) portal. If the Contractor has constraints preventing access to COMMERCE’s online A-19 portal, a hard copy A-19 form may be provided by the COMMERCE Project Manager upon request. 9.A.b Packet Pg. 113 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f SPECIAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 2 The voucher must be certified by an official of the Contractor with authority to bind the Contractor. The final voucher shall be submitted to COMMERCE no later than November 15, 2020. COMMERCE will pay Contractor upon acceptance of services provided and receipt of properly completed invoices, which shall be submitted to the Representative for COMMERCE not more often than monthly. The invoices shall describe and document, to COMMERCE's satisfaction, reimbursable expenditures as set forth under the Scope of Work (Attachment A) and Budget & Invoicing (Attachment B). The invoice shall include the Contract Number as stated on the Face Sheet. Each voucher must be accompanied by an A-19 Certification (Attachment C) and A-19 Activity Report (Attachment D). The A-19 Certification must be certified by an authorized party of the Contractor to certify and attest all expenditures submitted on the voucher are in compliance with the United States Treasury Coronavirus Relief Fund (“Fund”) Guidance for State, Territorial, Local, and Tribal Governments: https://home.treasury.gov/system/files/136/Coronavirus-Relief-Fund-Guidance-for-State-Territorial-Local- and-Tribal-Governments.pdf The A-19 Activity Report must be submitted which describes, in Excel spreadsheet and narrative form, a detailed breakdown of the expenditures within each applicable budget sub-category identified in the voucher, as well as a report of expenditures to date. COMMERCE will not release payment for any reimbursement request received unless and until the A-19 Certification and A-19 Activity Report is received. After approving the Invoice Voucher, A-19 Certification and Activity Report, COMMERCE shall promptly remit a warrant to the Contractor. Payment shall be considered timely if made by COMMERCE within thirty (30) calendar days after receipt of properly completed invoices. Payment shall be sent to the address designated by the Contractor. COMMERCE may, in its sole discretion, terminate the Contract or withhold payments claimed by the Contractor for services rendered if the Contractor fails to satisfactorily comply with any term or condition of this Contract. No payments in advance or in anticipation of services or supplies to be provided under this Agreement shall be made by COMMERCE. Duplication of Billed Costs The Contractor shall not bill COMMERCE for services performed under this Agreement, and COMMERCE shall not pay the Contractor, if the Contractor is entitled to payment or has been or will be paid by any other source, including grants, for that service. Disallowed Costs The Contractor is responsible for any audit exceptions or disallowed costs incurred by its own organization or that of its subcontractors. Should the Contractor be found to spent funds inconsistent with federal laws, rules, guidelines, or otherwise inappropriately, it is the responsibility of the Contractor to reimburse Commerce for any amount spent on disallowed costs. 8. AUDIT Contractor shall maintain internal controls providing reasonable assurance it is managing federal awards in compliance with laws, regulations, and provisions of contracts or grant agreements that could have a material effect on each of its federal programs; and prepare appropriate financial statements, including a schedule of expenditures of federal awards. If the Contractor is a subrecipient and expends $750,000 or more in federal awards from any and/or all sources in any fiscal year, the Contractor shall procure and pay for a single audit or a program-specific audit for that fiscal year. Upon completion of each audit, the Contractor shall: 9.A.b Packet Pg. 114 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f SPECIAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 3 A. Submit to COMMERCE the reporting package specified in OMB Super Circular 2 CFR 200.501, reports required by the program -specific audit guide (if applicable), and a copy of any management letters issued by the auditor. B. Submit to COMMERCE follow-up and developed corrective action plans for all audit findings. If the Contractor is a subrecipient and expends less than $750,000 in federal awards from any and/or all sources in any fiscal year, the Contractor shall notify COMMERCE they did not meet the single audit requirement. The Contractor shall send all single audit documentation to auditreview@commerce.wa.gov. 9. DEBARMENT A. Contractor, defined as the primary participant and it principals, certifies by signing these General Terms and Conditions that to the best of its knowledge and belief that they: i. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency. ii. Have not within a three-year period preceding this Contract, been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public or private agreement or transaction, violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, receiving stolen property, making false claims, or obstruction of justice; iii. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of federal Executive Order 12549; and iv. Have not within a three-year period preceding the signing of this Contract had one or more public transactions (Federal, State, or local) terminated for cause of default. B. Where the Contractor is unable to certify to any of the statements in this Contract, the Contractor shall attach an explanation to this Contract. C. The Contractor agrees by signing this Contract that it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by COMMERCE. D. The Contractor further agrees by signing this Contract that it will include the clause titled “Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction,” as follows, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions: LOWER TIER COVERED TRANSACTIONS i. The lower tier Contractor certifies, by signing this Contract that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. ii. Where the lower tier Contractor is unable to certify to any of the statements in this Contract, such contractor shall attach an explanation to this Contract. E. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, person, primary covered transaction, principal, and voluntarily excluded, as used in this section, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact COMMERCE for assistance in obtaining a copy of these regulations. 10. LAWS The Contractor shall comply with all applicable laws, ordinances, codes, regulations, and policies of local, state, and federal governments, as now or hereafter amended, including, but not limited to: 9.A.b Packet Pg. 115 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f SPECIAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 4 United States Laws, Regulations and Circulars (Federal) Contractor shall comply with Uniform Administrative Requirements, Cost Principles, and Audit Requirement for Federal Award, 2 CFR 200, Subpart F – Audit Requirements. Contractor shall comply with the applicable requirements of 2 CFR Part 200, including any future amendments to 2 CFR Part 200, and any successor or replacement Office of Management and Budget (OMB) Circular or regulation. Contractor shall comply with Omnibus Crime Control and Safe streets Act of 1968, Title VI of the Civil Rights Act of 1964, Section 504 of the Rehabilitation Act of 1973, Title II of the Americans with Disabilities Act of 1990, Title IX of the Education Amendments of 1972, The Age Discrimination Act of 1975, and The Department of Justice Non-Discrimination Regulations, 28 C.F.R. Part 42, Subparts C.D.E. and G, and 28 C.F.R. Part 35 and 39. 11. ORDER OF PRECEDENCE In the event of an inconsistency in this Contract, the inconsistency shall be resolved by giving precedence in the following order: • Applicable federal and state of Washington statutes and regulations • Special Terms and Conditions • General Terms and Conditions • Attachment A – Scope of Work • Attachment B – Budget & Invoicing • Attachment C – A-19 Certification • Attachment D – A-19 Activity Report 9.A.b Packet Pg. 116 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f GENERAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 5 1. DEFINITIONS As used throughout this Contract, the following terms shall have the meaning set forth below: A. “Authorized Representative” shall mean the Director and/or the designee authorized in writing to act on the Director’s behalf. B. “COMMERCE” shall mean the Department of Commerce. C. “Contract” or “Agreement” means the entire written agreement between COMMERCE and the Contractor, including any attachments, documents, or materials incorporated by reference. E-mail or facsimile transmission of a signed copy of this contract shall be the same as delivery of an original. D. "Contractor" shall mean the entity identified on the face sheet performing service(s) under this Contract, and shall include all employees and agents of the Contractor. E. “Personal Information” shall mean information identifiable to any person, including, but not limited to, information that relates to a person’s name, health, finances, education, business, use or receipt of governmental services or other activities, addresses, telephone numbers, social security numbers, driver license numbers, other identifying numbers, and any financial identifiers. F. ”State” shall mean the state of Washington. G. "Subcontractor" shall mean one not in the employment of the Contractor, who is performing all or part of those services under this Contract under a separate contract with the Contractor. The terms “subcontractor” and “subcontractors” mean subcontractor(s) in any tier. 2. ALL WRITINGS CONTAINED HEREIN This Contract contains all the terms and conditions agreed upon by the parties. No other understandings, oral or otherwise, regarding the subject matter of this Contract shall be deemed to exist or to bind any of the parties hereto. 3. AMENDMENTS This Contract may be amended by mutual agreement of the parties. Such amendments shall not be binding unless they are in writing and signed by personnel authorized to bind each of the parties. 4. ASSIGNMENT Neither this Contract, work thereunder, nor any claim arising under this Contract, shall be transferred or assigned by the Contractor without prior written consent of COMMERCE. 5. CONFIDENTIALITY AND SAFEGUARDING OF INFORMATION A. “Confidential Information” as used in this section includes: i. All material provided to the Contractor by COMMERCE that is designated as “confidential” by COMMERCE; ii. All material produced by the Contractor that is designated as “confidential” by COMMERCE; and iii. All personal information in the possession of the Contractor that may not be disclosed under state or federal law. B. The Contractor shall comply with all state and federal laws related to the use, sharing, transfer, sale, or disclosure of Confidential Information. The Contractor shall use Confidential Information solely for the purposes of this Contract and shall not use, share, transfer, sell or disclose any Confidential Information to any third party except with the prior written consent of COMMERCE or as may be required by law. The Contractor shall take all necessary steps to assure that Confidential Information is safeguarded to prevent unauthorized use, sharing, transfer, sale or disclosure of Confidential Information or violation of any state or federal laws related thereto. Upon request, the Contractor shall provide COMMERCE with its policies and procedures on confidentiality. 9.A.b Packet Pg. 117 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f GENERAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 6 COMMERCE may require changes to such policies and procedures as they apply to this Contract whenever COMMERCE reasonably determines that changes are necessary to prevent unauthorized disclosures. The Contractor shall make the changes within the time period specified by COMMERCE. Upon request, the Contractor shall immediately return to COMMERCE any Confidential Information that COMMERCE reasonably determines has not been adequately protected by the Contractor against unauthorized disclosure. C. Unauthorized Use or Disclosure. The Contractor shall notify COMMERCE within five (5) working days of any unauthorized use or disclosure of any confidential information, and shall take necessary steps to mitigate the harmful effects of such use or disclosure. 6. COPYRIGHT Unless otherwise provided, all Materials produced under this Contract shall be considered "works for hire" as defined by the U.S. Copyright Act and shall be owned by COMMERCE. COMMERCE shall be considered the author of such Materials. In the event the Materials are not considered “works for hire” under the U.S. Copyright laws, the Contractor hereby irrevocably assigns all right, title, and interest in all Materials, including all intellectual property rights, moral rights, and rights of publicity to COMMERCE effective from the moment of creation of such Materials. “Materials” means all items in any format and includes, but is not limited to, data, reports, documents, pamphlets, advertisements, books, magazines, surveys, studies, computer programs, films, tapes, and/or sound reproductions. “Ownership” includes the right to copyright, patent, register and the ability to transfer these rights. For Materials that are delivered under the Contract, but that incorporate pre-existing materials not produced under the Contract, the Contractor hereby grants to COMMERCE a nonexclusive, royalty- free, irrevocable license (with rights to sublicense to others) in such Materials to translate, reproduce, distribute, prepare derivative works, publicly perform, and publicly display. The Contractor warrants and represents that the Contractor has all rights and permissions, including intellectual property rights, moral rights and rights of publicity, necessary to grant such a license to COMMERCE. The Contractor shall exert all reasonable effort to advise COMMERCE, at the time of delivery of Materials furnished under this Contract, of all known or potential invasions of privacy contained therein and of any portion of such document which was not produced in the performance of this Contract. The Contractor shall provide COMMERCE with prompt written notice of each notice or claim of infringement received by the Contractor with respect to any Materials delivered under this Contract. COMMERCE shall have the right to modify or remove any restrictive markings placed upon the Materials by the Contractor. 7. DISPUTES In the event that a dispute arises under this Agreement, it shall be determined by a Dispute Board in the following manner: Each party to this Agreement shall appoint one member to the Dispute Board. The members so appointed shall jointly appoint an additional member to the Dispute Board. The Dispute Board shall review the facts, Agreement terms and applicable statutes and rules and make a determination of the dispute. The Dispute Board shall thereafter decide the dispute with the majority prevailing. The determination of the Dispute Board shall be final and binding on the parties hereto. As an alternative to this process, either of the parties may request intervention by the Governor, as provided by RCW 43.17.330, in which event the Governor's process will control. 8. GOVERNING LAW AND VENUE This Contract shall be construed and interpreted in accordance with the laws of the state of Washington, and any applicable federal laws, and the venue of any action brought hereunder shall be in the Superior Court for Thurston County. 9.A.b Packet Pg. 118 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f GENERAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 7 9. INDEMNIFICATION Each party shall be solely responsible for the acts of its employees, officers, and agents. 10. LICENSING, ACCREDITATION AND REGISTRATION The Contractor shall comply with all applicable local, state, and federal licensing, accreditation and registration requirements or standards necessary for the performance of this Contract. 11. RECAPTURE In the event that the Contractor fails to perform this Contract in accordance with state laws, federal laws, and/or the provisions of this Contract, COMMERCE reserves the right to recapture funds in an amount to compensate COMMERCE for the noncompliance in addition to any other remedies available at law or in equity. Repayment by the Contractor of funds under this recapture provision shall occur within the time period specified by COMMERCE. In the alternative, COMMERCE may recapture such funds from payments due under this Contract. 12. RECORDS MAINTENANCE The Contractor shall maintain books, records, documents, data and other evidence relating to this contract and performance of the services described herein, including but not limited to accounting procedures and practices that sufficiently and properly reflect all direct and indirect costs of any nature expended in the performance of this contract. The Contractor shall maintain records that identify, in its accounts, all federal awards received and expended and the federal programs under which they were received, by Catalog of Federal Domestic Assistance (CFDA) title and number, award number and year, name of the federal agency, and name of the pass-through entity. The Contractor shall retain such records for a period of six (6) years following the date of final payment. At no additional cost, these records, including materials generated under the contract, shall be subject at all reasonable times to inspection, review or audit by COMMERCE, personnel duly authorized by COMMERCE, the Office of the State Auditor, and federal and state officials so authorized by law, regulation or agreement. If any litigation, claim or audit is started before the expiration of the six (6) year period, the records shall be retained until all litigation, claims, or audit findings involving the records have been resolved. 13. SAVINGS In the event funding from state, federal, or other sources is withdrawn, reduced, or limited in any way after the effective date of this Contract and prior to normal completion, COMMERCE may suspend or terminate the Contract under the "Termination for Convenience" clause, without the ten calendar day notice requirement. In lieu of termination, the Contract may be amended to reflect the new funding limitations and conditions. 14. SEVERABILITY The provisions of this contract are intended to be severable. If any term or provision is illegal or invalid for any reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of the contract. 15. SUBCONTRACTING The Contractor may only subcontract work contemplated under this Contract if it obtains the prior written approval of COMMERCE. If COMMERCE approves subcontracting, the Contractor shall maintain written procedures related to subcontracting, as well as copies of all subcontracts and records related to subcontracts. For cause, COMMERCE in writing may: (a) require the Contractor to amend its subcontracting procedures as they 9.A.b Packet Pg. 119 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f GENERAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 8 relate to this Contract; (b) prohibit the Contractor from subcontracting with a particular person or entity; or (c) require the Contractor to rescind or amend a subcontract. Every subcontract shall bind the Subcontractor to follow all applicable terms of this Contract. Contractor shall incorporate 2 CFR Part 200, Subpart F audit requirements into all subcontracts. The Contractor is responsible to COMMERCE if the Subcontractor fails to comply with any applicable term or condition of this Contract. The Contractor shall appropriately monitor the activities of the Subcontractor to assure fiscal conditions of this Contract. In no event shall the existence of a subcontract operate to release or reduce the liability of the Contractor to COMMERCE for any breach in the performance of the Contractor’s duties. Every subcontract shall include a term that COMMERCE and the State of Washington are not liable for claims or damages arising from a Subcontractor’s performance of the subcontract. 16. SURVIVAL The terms, conditions, and warranties contained in this Contract that by their sense and context are intended to survive the completion of the performance, cancellation or termination of this Contract shall so survive. 17. TERMINATION FOR CAUSE In the event COMMERCE determines the Contractor has failed to comply with the conditions of this contract in a timely manner, COMMERCE has the right to suspend or terminate this contract. Before suspending or terminating the contract, COMMERCE shall notify the Contractor in writing of the need to take corrective action. If corrective action is not taken within 30 calendar days, the contract may be terminated or suspended. In the event of termination or suspension, the Contractor shall be liable for damages as authorized by law including, but not limited to, any cost difference between the original contract and the replacement or cover contract and all administrative costs directly related to the replacement contract, e.g., cost of the competitive bidding, mailing, advertising and staff time. COMMERCE reserves the right to suspend all or part of the contract, withhold further payments, or prohibit the Contractor from incurring additional obligations of funds during investigation of the alleged compliance breach and pending corrective action by the Contractor or a decision by COMMERCE to terminate the contract. A termination shall be deemed a “Termination for Convenience” if it is determined that the Contractor: (1) was not in default; or (2) failure to perform was outside of his or her control, fault or negligence. The rights and remedies of COMMERCE provided in this contract are not exclusive and are in addition to any other rights and remedies provided by law. 18. TERMINATION FOR CONVENIENCE Except as otherwise provided in this Contract, COMMERCE may, by ten (10) business days written notice, beginning on the second day after the mailing, terminate this Contract, in whole or in part. If this Contract is so terminated, COMMERCE shall be liable only for payment required under the terms of this Contract for services rendered or goods delivered prior to the effective date of termination. 19. TERMINATION PROCEDURES Upon termination of this contract, COMMERCE, in addition to any other rights provided in this contract, may require the Contractor to deliver to COMMERCE any property specifically produced or acquired for the performance of such part of this contract as has been terminated. The provisions of the "Treatment of Assets" clause shall apply in such property transfer. COMMERCE shall pay to the Contractor the agreed upon price, if separately stated, for completed work and services accepted by COMMERCE, and the amount agreed upon by the Contractor and COMMERCE for (i) completed work and services for which no separate price is stated, (ii) partially completed work and services, (iii) other property or services that are accepted by COMMERCE, and (iv) the protection and preservation of property, unless the termination is for default, in which case the Authorized Representative shall determine the extent of the liability of COMMERCE. Failure to agree 9.A.b Packet Pg. 120 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f GENERAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 9 with such determination shall be a dispute within the meaning of the "Disputes" clause of this contract. COMMERCE may withhold from any amounts due the Contractor such sum as the Authorized Representative determines to be necessary to protect COMMERCE against potential loss or liability. The rights and remedies of COMMERCE provided in this section shall not be exclusive and are in addition to any other rights and remedies provided by law or under this contract. After receipt of a notice of termination, and except as otherwise directed by the Authorized Representative, the Contractor shall: A. Stop work under the contract on the date, and to the extent specified, in the notice; B. Place no further orders or subcontracts for materials, services, or facilities except as may be necessary for completion of such portion of the work under the contract that is not terminated; C. Assign to COMMERCE, in the manner, at the times, and to the extent directed by the Authorized Representative, all of the rights, title, and interest of the Contractor under the orders and subcontracts so terminated, in which case COMMERCE has the right, at its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts; D. Settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts, with the approval or ratification of the Authorized Representative to the extent the Authorized Representative may require, which approval or ratification shall be final for all the purposes of this clause; E. Transfer title to COMMERCE and deliver in the manner, at the times, and to the extent directed by the Authorized Representative any property which, if the contract had been completed, would have been required to be furnished to COMMERCE; F. Complete performance of such part of the work as shall not have been terminated by the Authorized Representative; and G. Take such action as may be necessary, or as the Authorized Representative may direct, for the protection and preservation of the property related to this contract, which is in the possession of the Contractor and in which the Authorized Representative has or may acquire an interest. 20. TREATMENT OF ASSETS Title to all property furnished by COMMERCE shall remain in COMMERCE. Title to all property furnished by the Contractor, for the cost of which the Contractor is entitled to be reimbursed as a direct item of cost under this contract, shall pass to and vest in COMMERCE upon delivery of such property by the Contractor. Title to other property, the cost of which is reimbursable to the Contractor under this contract, shall pass to and vest in COMMERCE upon (i) issuance for use of such property in the performance of this contract, or (ii) commencement of use of such property in the performance of this contract, or (iii) reimbursement of the cost thereof by COMMERCE in whole or in part, whichever first occurs. A. Any property of COMMERCE furnished to the Contractor shall, unless otherwise provided herein or approved by COMMERCE, be used only for the performance of this contract. B. The Contractor shall be responsible for any loss or damage to property of COMMERCE that results from the negligence of the Contractor or which results from the failure on the part of the Contractor to maintain and administer that property in accordance with sound management practices. C. If any COMMERCE property is lost, destroyed or damaged, the Contractor shall immediately notify COMMERCE and shall take all reasonable steps to protect the property from further damage. D. The Contractor shall surrender to COMMERCE all property of COMMERCE prior to settlement upon completion, termination or cancellation of this contract All reference to the Contractor under this clause shall also include Contractor’s employees, agents or Subcontractors. 9.A.b Packet Pg. 121 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f GENERAL TERMS AND CONDITIONS INTERAGENCY AGREEMENT FEDERAL FUNDS State of Washington Interagency Agreement Version 072019 Department of Commerce Page 10 21. WAIVER Waiver of any default or breach shall not be deemed to be a waiver of any subsequent default or breach. Any waiver shall not be construed to be a modification of the terms of this Contract unless stated to be such in writing and signed by Authorized Representative of COMMERCE. 9.A.b Packet Pg. 122 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Attachment A State of Washington Interagency Agreement Version 072019 Department of Commerce Page 11 Scope of Work This funding is made available under section 601(a) of the Social Security Act, as added by section 5001 of the Coronavirus Aid, Relief, and Economic Security Act (“CARES Act”) and Section V and VI of the CARES Act, for costs incurred due to the public health emergency with respect to the Coronavirus Disease 2019 (COVID-19). Under the CARES Act, the Coronavirus Relief Fund may be used to cover costs that: 1. Are necessary expenditures incurred due to the public health emergency with respect to the Coronavirus Disease 2019 (COVID–19); AND 2. Are not accounted for in the budget most recently approved as of March 27, 2020 (the date of enactment of the CARES Act) for the State or government. These funds may be used to reimburse for expenditures incurred during the period of March 1, 2020 thru Oct. 31, 2020. Please note: In order to ensure all funds have been fully utilized prior to the US Treasury’s December 30, 2020 end date, the State of Washington must closeout contracts by October 31, 2020. All final requests for reimbursement must be received no later than November 15, 2020. Expenditures must be used for necessary actions taken to respond to the public health emergency. These may include expenditures incurred to allow the local government to respond directly to the emergency, such as by addressing medical or public health needs, as well as expenditures incurred to respond to second- order effects of the emergency, such as by providing economic support to those suffering from employment or business interruptions due to COVID-19-related business closures. Funds may not be used to fill shortfalls in government revenue to cover expenditures that would not otherwise qualify under the statute. Although a broad range of uses is allowed, revenue replacement is not a permissible use of Fund payments. Payments may be used only to cover costs not accounted for in the budget most recently approved as of March 27, 2020. A cost meets this requirement if either: 1. The cost cannot lawfully be funded using a line item, allotment, or allocation within that budget; OR 2. The cost is for a substantially different use from any expected use of funds in such a line item, allotment, or allocation. The “most recently approved” budget is the enacted budget for the relevant fiscal period for the particular government. A cost is not considered to have been accounted for in a budget merely because it could be met using a budgetary stabilization fund, rainy day fund, or similar reserve account. Allowable expenditures include, but are not limited to: 1. Medical expenses such as: a. COVID-19-related expenses of public hospitals, clinics, and similar facilities. b. Expenses of establishing temporary public medical facilities and other measures to increase COVID-19 treatment capacity, including related construction costs. c. Costs of providing COVID-19 testing, including serological testing. d. Emergency medical response expenses, including emergency medical transportation, related to COVID-19. e. Expenses for establishing and operating public telemedicine capabilities for COVID-19-related treatment. 2. Public health expenses such as: 9.A.b Packet Pg. 123 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Attachment A State of Washington Interagency Agreement Version 072019 Department of Commerce Page 12 a. Expenses for communication and enforcement by State, territorial, local, and Tribal governments of public health orders related to COVID-19. b. Expenses for acquisition and distribution of medical and protective supplies, including sanitizing products and personal protective equipment, for medical personnel, police officers, social workers, child protection services, and child welfare officers, direct service providers for older adults and individuals with disabilities in community settings, and other public health or safety workers in connection with the COVID-19 public health emergency. c. Expenses for disinfection of public areas and other facilities, e.g., nursing homes, in response to the COVID-19 public health emergency. d. Expenses for technical assistance to local authorities or other entities on mitigation of COVID- 19-related threats to public health and safety. e. Expenses for public safety measures undertaken in response to COVID-19. f. Expenses for quarantining individuals. 3. Payroll expenses for public safety, public health, health care, human services, and similar employees whose services are substantially dedicated to mitigating or responding to the COVID- 19 public health emergency. 4. Expenses of actions to facilitate compliance with COVID-19-related public health measures, such as: a. Expenses for food delivery to residents, including, for example, senior citizens and other vulnerable populations, to enable compliance with COVID-19 public health precautions. b. Expenses to facilitate distance learning, including technological improvements, in connection with school closings to enable compliance with COVID-19 precautions. c. Expenses to improve telework capabilities for public employees to enable compliance with COVID-19 public health precautions. d. Expenses of providing paid sick and paid family and medical leave to public employees to enable compliance with COVID-19 public health precautions. e. COVID-19-related expenses of maintaining state prisons and county jails, including as relates to sanitation and improvement of social distancing measures, to enable compliance with COVID-19 public health precautions. f. Expenses for care for homeless populations provided to mitigate COVID-19 effects and enable compliance with COVID-19 public health precautions. 5. Expenses associated with the provision of economic support in connection with the COVID-19 public health emergency, such as: a. Expenditures related to the provision of grants to small businesses to reimburse the costs of business interruption caused by required closures. b. Expenditures related to a State, territorial, local, or Tribal government payroll support program. c. Unemployment insurance costs related to the COVID-19 public health emergency if such costs will not be reimbursed by the federal government pursuant to the CARES Act or otherwise. 6. Any other COVID-19-related expenses reasonably necessary to the function of government that satisfy the Fund’s eligibility criteria. 9.A.b Packet Pg. 124 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Attachment B State of Washington Interagency Agreement Version 072019 Department of Commerce Page 13 Budget & Invoicing The Contractor shall determine the appropriate budget and use of funds within the following 6 budget categories and their sub-categories: 1. Medical 2. Public Health 3. Payroll 4. Actions to Comply with Public Health Measures 5. Economic Support 6. Other Covid-19 Expenses The Contractor shall submit invoice reimbursement requests to the Commerce Representative using the Commerce Contract Management System’s (CMS) Online A-19 Portal. Each reimbursement request must include: 1. A-19 Certification form – An authorized party of the local government will certify each invoice (A19) submitted for reimbursement and attest that all incurred expenditures meet the US Treasury Department’s guidance: https://home.treasury.gov/system/files/136/Coronavirus-Relief-Fund- Guidance-for-State-Territorial-Local-and-Tribal-Governments.pdf 2. A-19 Activity Report 3. A detailed breakdown of the expenditures incurred within each applicable budget sub-category on the A-19 Activity Report. The A-19 Certification and Activity Report templates will be provided with the executed contract. The documents are included in Attachment C and Attachment D for reference. Receipts and proof of payment for costs incurred do not need to be submitted with A-19s. All contractors are required to maintain accounting records in accordance with state and federal laws. Records must be sufficient to demonstrate the funds have been used in accordance with section 601(d) of the Social Security Act. Commerce reserves the right to audit any costs submitted for reimbursement. The Contractor shall comply with Commerce A-19 audits and provide the appropriate records upon request. 9.A.b Packet Pg. 125 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Attachment C State of Washington Interagency Agreement Version 072019 Department of Commerce Page 14 9.A.b Packet Pg. 126 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Attachment C State of Washington Interagency Agreement Version 072019 Department of Commerce Page 15 9.A.b Packet Pg. 127 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Attachment D State of Washington Interagency Agreement Version 072019 Department of Commerce Page 16 9.A.b Packet Pg. 128 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f Attachment D State of Washington Interagency Agreement Version 072019 Department of Commerce Page 17 9.A.b Packet Pg. 129 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e I n t e r a g e n c y A g r e e m e n t ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e CORONAVIRUS RELIEF FUNDS FOR LOCAL GOVERNMENTS Coronavirus Relief Funds for Local Governments Contract Working Papers Local Government Name: Kent COM Contract Number: 20-6541C-211 COM Short Code: CV20211 Grant Amount: $3,894,000 Instructions: Before you can receive funds a contract will need to be executed between your local governmental entity and the state. Please follow these steps to get the contracting process started: 1. Completely fill out the survey questions by typing your responses in the electronic version of this form; 2. Compile and email these documents to: Susan Butz at susan.butz@commerce.wa.gov All grantees are required to set up an SWV number so funds may be sent electronically. Please find detailed instructions here: Office of Financial Management. It may take up to three weeks after you submit this information for an electronic transfer account to be set up. You may immediately submit your contract readiness survey to us; we will automatically receive your SWV number from the office that sets them up. Thank you for your assistance in making this contract-writing process as quick and easy as possible! If you have any questions or need additional information, please contact Susan Butz, at susan.butz@commerce.wa.gov or (360) 764-9552. Page 1 of 560 9.A.c Packet Pg. 130 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e W o r k i n g P a p e r s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f C o m m e r c e f o r GRANTEE INFORMATION * Required Field 1 List the contact information for the person who will administer the grant once the contract is signed. Grant documents and correspondence will be sent to this person. First Name: * Last Name: * Title: * E-mail Address: * Telephone Number: * 2 Street Address: * City: * Zip Code: * 3 Statewide Vendor (SWV) number: * 4 Your Federal Indirect Rate: 5 Your fiscal year end date: 6 List the name and title for the person authorized by this organization to sign the contract. First Name: Last Name: Title: Page 2 of 560 9.A.c Packet Pg. 131 At t a c h m e n t : D e p a r t m e n t o f C o m m e r c e W o r k i n g P a p e r s ( 2 3 0 9 : I n t e r a g e n c y A g r e e m e n t w i t h t h e W a s h i n g t o n S t a t e D e p a r t m e n t o f C o m m e r c e f o r DATE: June 2, 2020 TO: Kent City Council SUBJECT: Consultant Services Agreement with Aerospace Machinists Joint Training Committee - Authorize MOTION: Authorize the Mayor to sign an agreement with the Aerospace Machinists Joint Training Committee, to support recovery of the Kent Valley Industrial base from coronavirus impacts through subsidized wages for dislocated workers, amend the budget and authorize expenditure of the funds in accordance with terms and conditions acceptable to the Economic and Community Development Director and City Attorney. SUMMARY: The Aerospace Machinists Joint Training Committee, d/b/a Aerospace Apprenticeship Committee (AJAC), will establish and coordinate training and employer engagement strategies that incentivize hiring and training of entry-level and low income/low skilled incumbent workers in response to the COVID-impacted workplaces and local economy. AJAC will: · Establish and provide financial aid to allow tuition free training for dislocated workers and low income/lower skilled workers in the Kent Valley. · Provide on-the-job training (OJT) support to manufacturing companies who hire and train new workers, including entry-level OJT training plans and a wage reimbursement for up to $2,200 dollars per worker. · Engage Kent Valley manufacturing employers to promote AJAC training and wage reimbursement incentive funding to hire and train new workers (including the recently laid off). This authorization is for $97,500 between now and the end of 2020. The City will be reimbursed up to $65,000 from the Port of Seattle through its Port Partnership Program Interlocal Agreement for this work. This project continues the long-range economic development efforts to grow unique training offerings and partnerships through the Kent Training Center run by AJAC, and previously funded through Port of Seattle Partnership Program in 2017. BUDGET IMPACT: As detailed in the summary. 9.B Packet Pg. 132 SUPPORTS STRATEGIC PLAN GOAL: Sustainable Services - Providing quality services through responsible financial management, economic growth, and partnerships. ATTACHMENTS: 1. AJAC 2020 Consultant Services Agreement & Scope (PDF) 9.B Packet Pg. 133 CONSULTANT SERVICES AGREEMENT - 1 (Over $20,000) CONSULTANT SERVICES AGREEMENT between the City of Kent and Aerospace Machinists Joint Training Committee THIS AGREEMENT is made between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Aerospace Machinists Joint Training Committee, d/b/a Aerospace Apprenticeship Committee (AJAC), a nonprofit corporation organized under the laws of the State of Washington , located and doing business at Kent, Washington (hereinafter the "Consultant"). I. DESCRIPTION OF WORK. Consultant shall perform the following services for the City in accordance with the following described plans and/or specifications: the Aerospace Machinists Joint Training Committee will establish and coordinate training and employer engagement strategie s that incentivize hiring and training of entry-level and low income/low skilled incumbent workers in response to the COVID-impacted workplaces and local economy. AJAC will: a. Establish and provide financial aid to allow tuition free training for dislocated workers and low income/low skilled workers in the Kent Industrial Valley. b. Provide On -the-Job Training (OJT) supports to manufacturing companies who hire and train new workers, including entry-level OJT training plans and a wage reimbursement for up to $2,200 dollars per worker. c. Engage Kent Industrial Valley manufacturing employers to promote AJAC training and wage reimbursement incentive funding to hire and train new workers Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time those services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon the effective date of this Agreement. Consultant shall complete the work described in Section I by June 30, 2021. III. COMPENSATION. A. The City shall pay the Consultant, based on time and materials, an amount not to exceed $97,500, for the services described in this Agreement. This is the maximum amount to be paid under this Agreement for the work described in Section I above, and shall not be exceeded without the prior written authorization of the City in the form of a negotiated and executed amendment to this agreement . The Consultant agrees that the hourly or flat rate charged by it for its services contracted for herein shall remain locked at the negotiated rate(s) for a period of one (1) year from the effective date of this Agreement. The Consultant's billing rates shall be as delineated in Exhibit A. B. The Consultant shall submit quarterl y payment invoices to the City for work performed, and a final bill upon completion of all services described in this Agreement. The City shall provide payment within forty-five (45) days of receipt of an invoice. If the City objects to all or any portion of an invoice, it shall notify the Consultant and reserves the option to only pay that 9.B.a Packet Pg. 134 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d CONSULTANT SERVICES AGREEMENT - 2 (Over $20,000) portion of the invoice not in dispute. In that event, the parties will immediately make every effort to settle the disputed portion. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Consultant has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Consultant maintains and pays for its own place of business from which Consultant’s services under this Agreement will be performed. C. The Consultant has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Consultant’s services, or the Consultant is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Consultant is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Consultant has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Consultant’s business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Consultant maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. Either party may terminate this Agreement, with or without cause, upon providing the other party thirty (30) days written notice at its address set forth on the signature block of this Agreement. After termination, the City may take possession of all records and data within the Consultant’s possession pertaining to this project, which may be used by the City without restriction. If the City’s use of Consultant’s records or data is not related to this project, it shall be without liability or legal exposure to the Consultant. VI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any subcontract, the Consultant, its subcontractors, or any person acting on behalf of the Consultant or subcontractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Consultant shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. VII. INDEMNIFICATION. Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Consultant's pe rformance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Consultant's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, 9.B.a Packet Pg. 135 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d CONSULTANT SERVICES AGREEMENT - 3 (Over $20,000) employees, agents and volunteers, the Consultant's duty to defend, indemnify, and hold the City harmless, and Consultant’s liability accruing from that obligation shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Consultant refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Consultant’s part, then Consultant shall pay all the City’s costs for defense, including all reasonable expert witness fees and reasonable attorneys’ fees, plus the City’s legal costs and fees incurred because there was a wrongful refusal on the Consultant’s part. The provisions of this section shall survive the expiration or termination of this Agreement. VIII. INSURANCE. The Consultant shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. IX. EXCHANGE OF INFORMATION. The City will provide its best efforts to provide reasonable accuracy of any information supplied by it to Consultant for the purpose of completion of the work under this Agreement. X. OWNERSHIP AND USE OF RECORDS AND DOCUMENTS. Original documents, drawings, designs, reports, or any other records developed or created under this Agreement shall belong to and become the property of the City. All records submitted by the City to the Consultant will be safeguarded by the Consultant. Consultant shall make such data, documents, and files available to the City upon the City’s request. The Consultant acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington. As such, the Consultant agrees to cooperate fully with the City in satisfying the City’s duties and obligations under the Public Records Act. The City’s use or reuse of any of the documents, data, and files created by Consultant for this project by anyone other than Consultant on any other project shall be without liability or legal exposure to Consultant. XI. CITY'S RIGHT OF INSPECTION. Even though Consultant is an independent contractor with the authority to control and direct the performance and details of the work authorized under this Agreement, the work must meet the approval of the City and shall be subject to the City's general right of inspection to secure satisfactory completion. XII. WORK PERFORMED AT CONSULTANT'S RISK. Consultant shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in th e performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XIII. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practi cable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. 9.B.a Packet Pg. 136 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d CONSULTANT SERVICES AGREEMENT - 4 (Over $20,000) C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties’ performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section VII of this Agreement. D. Written Notice . All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non -assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Consultant. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Consultant agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Consultant's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Consultant acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Consultant in its performance of this Agreement may be subject to public review and disclosure, even if those records are not produced to or possessed by the City of Kent. As such, the Consultant agrees to cooperate fully with the City in satisfying the City’s duties and obligations under the Public Records Act. J. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. / / / / / / / / / / 9.B.a Packet Pg. 137 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d CONSULTANT SERVICES AGREEMENT - 5 (Over $20,000) K. Counterparts and Signatures by Fax or Email. This Agr eement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearing the original signature was received in person. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and affirmed, and the terms of the Agreement shall be deemed to have applied. CONSULTANT: By: (signature) Print Name: Its (title) DATE: CITY OF KENT: By: (signature) Print Name: Dana Ralph Its Mayor DATE: NOTICES TO BE SENT TO: CONSULTANT: Chris Pierson Aerospace Joint Apprenticeship Committee 6770 East Marginal Way South Bldg A-106 Seattle, WA 98108 206-546 -8859 (telephone) CPierson@ajactraining.ofg NOTICES TO BE SENT TO: CITY OF KENT: William Ellis City of Kent 220 Fourth Avenue South Kent, WA 98032 (253) 856 -5707 (telephone) (253) 856 -6554 (facsimile) APPROVED AS TO FORM: Kent Law Department ATTEST: Kent City Clerk [In this field, you may enter the electronic filepath where the contract has been saved] 9.B.a Packet Pg. 138 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d EEO COMPLIANCE DOCUMENTS - 1 DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City’s equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City’s sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: ___________________________________________ For: __________________________________________ Title: _________________________________________ Date: _________________________________________ 9.B.a Packet Pg. 139 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City’s nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City’s equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. 9.B.a Packet Pg. 140 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d EEO COMPLIANCE DOCUMENTS - 3 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: ___________________________________________ For: __________________________________________ Title: _________________________________________ Date: _________________________________________ 9.B.a Packet Pg. 141 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d EXHIBIT A SCOPE OF WORK/SPECIFIC REQUIREMENTS 1. Scope of Work: The Aerospace Joint Apprenticeship Committee (AJAC) will accomplish the following: • Tuition-Free Training: o Provide financial aid to allow tuition free training for at least 50 dislocated workers and low income/low skilled incumbent workers in South King County. o Identify and develop new short-term training program offerings at the Kent Training Center, redesigned to respond to the COVID-impacted workplace. • On-the-Job Training (OJT) Incentive Funding: o Administer and track entry-level OJT training plans for new hires up to 6 months of employment. o Offer manufacturing employers wage reimbursements for up to 50% of wages up to $2,200 for new hires or other eligible incumbent workers where an OJT training plan is implemented. • Engage Employers: o Engage at least 15 employers in the planning and design of training, as well as the screening and placement of participants. o Incentivize employers to hire and/or retain vulnerable entry-level staff. o Promote career advancement opportunities through short-term training and apprenticeship offerings. 2. Metrics, Deliverables and Final Report: Goals: Strategies: Outcomes& Metrics Deliverable Better prepare low- income residents of Kent for careers in adv anced manufacturing • Short -term training • Apprenticeship • Outreach to: WorkSource; Neighborhood House; SJI; Multi-Service Center; PIE; TRAC Associates; Pacific Associates; King County Housing Authority, etc. • Knowledge gains • Credentialed completion • Job placement At least 50 job seekers or incumbent workers receive training 9.B.a Packet Pg. 142 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d • Online assessments/ screening for financial aid eligibility; • Provision of financial aid for those who do not qualify for aid • 1.0 leveraged FTE Navigator • 1.0 leveraged FTE instructor Incentivize Kent Industrial Valley manufacturing companies to hire and train local residents • Provide OJT training plans for entry-level jobs • Provide wage reimbursement incentive up to $2,200 per for new workers hired/trained • .25 FTE Business Developer • .25 FTE Business Services Manager • Job placement • OJT training plans completed • Employers served At least 10 OJT training participants with wage reimbursements at 3+ companies Engage Kent Industrial Valley employers around AJAC-supported training and placement resources and opportunities • Social media, AJAC newsletter, AMP website, and email promotion of AJAC training programs and OJT incentive funding • Virtual and in- person meetings with employers • Program planning and design • Website visits • Newsletter subscriptions • Employers served At least 20 employers served The City may request periodic project updates from AJAC. 9.B.a Packet Pg. 143 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d 3. Definition and restatement of how funds are to be used. Category: Port of Seattle Funds: Matching Funds: Total Funds: Business Admin/Service Delivery (.5 FTE) $27,500 $32,500.00 $60,000 Training Subsidies $10,500 $10,500 OJT Wage Reimbursement $22,000 $22,000 Marketing/Outreach of Programs $5,000 $5,000 TOTAL FUNDS $65,000.00 $32,500.00 $97,500.00 4. Port Approval and Recognition: a. All projects must utilize and identify the Port and City of Kent as a partner or sponsor. Prior to implementation, Port requires a review of the proposed placement of the Port logo on advertising, promotion materials, booth displays, online, digital or printed materials. b. Prior to specific advertising execution or implementation, the Port will review and approve the advertising placement and schedule. 5. The Agreement and Final Report: 6. Miscellaneous: These funds cannot be used to underwrite general or capital expenses associated with an event or program already in progress. TASK DESCRIPTION SCHEDULE Task 3 Final Report and Accounting: 1. Provide a detailed report on the results of the project as outlined in the Scope of Work 2. Provide a detailed report on the Project Metrics as outlined above. 3. Provide copies of all printed promotional materials. 4. Provide links to any softcopy materials. 5. Provide a detailed accounting of the monies spent, including City’s 50% matching funds. No later than July 31, 2021 9.B.a Packet Pg. 144 At t a c h m e n t : A J A C 2 0 2 0 C o n s u l t a n t S e r v i c e s A g r e e m e n t & S c o p e ( 2 3 0 8 : A g r e e m e n t w i t h t h e A e r o s p a c e J o i n t A p p r e n t i c e s h i p C o m m i t t e e a n d