HomeMy WebLinkAboutCity Council Meeting - Council Workshop - Minutes - 04/07/2020
Approved
City Council Workshop
Workshop Regular Meeting
Minutes
April 7, 2020
Date: April 7, 2020
Time: 5:00 p.m.
Place: Chambers
I. CALL TO ORDER
Attendee Name Title Status Arrived
Toni Troutner Council President Present
Bill Boyce Councilmember Present
Brenda Fincher Councilmember Present
Satwinder Kaur Councilmember Present
Marli Larimer Councilmember Present
Zandria Michaud Councilmember Present
Les Thomas Councilmember Present
Dana Ralph Mayor Present
II. PRESENTATIONS
1 Sound Transit Kelly Peterson 45 MIN.
Kelly Peterson, Link Light Rail Liaison provided the committee with an update
on the Federal Way Link Extension project.
Peterson advised the Federal Way Link Extension timeline includes planning
2012-2018, design/build from 2019-2024, start of service in 2024.
Kiewit is the contractor that has extensive experience with Sound Transit.
The permit process includes the submitting and review of packages, what the
packages include and tracking the permitting process.
Current and proposed demolition was detailed.
Kent Des Moines station and garage concepts were reviewed:
o Midway design review needs to be used
o High Capacity Transit Code applies
o Midway Subarea Plan
o Development Agreement
South 272nd Street Station concept and details on the Star Lake Park and
Ride changes were reviewed as well as the Midway Landfill waste removal
and backfill.
The timeline moving forward is as follows:
City Council Workshop Workshop Regular
Meeting
Minutes
April 7, 2020
Kent, Washington
Page 2 of 3
o Permitting through February 2021
o Demolition underway
o Soil remediation
o Utility Work - May 2020
o Midway landfill waste removal - May 2020
o Heavy construction 2020-2023
o Testing 2023-2024
o Revenue Service begins 2024
Typical construction work hours were reviewed and the construction hotline
1-888-298-2395 was provided.
During the spring/summer 2020:
o Utility relocations
o Structure demolition
o Clearing and grading
o Tree removal
o Light rail construction begins
FWLE and Covid-19
o Remove working
o Takes more time to complete reviews
o Sound Transit Work stoppage until May 4th (some exceptions (demolition,
stormwater, treatment system, survey).
Operations and Maintenance Facility South
o DEIS process still underway
o Sound Transit staff working remotely
o Draft EIS - Public Comment later in 2020
o Staffing agreement - Committee of the Whole
o Staff time through the EIS process
2 Sewer Relining and Replacement
Program
Jens Vincent 15 MIN.
Jens Vincent, Sewer/Storm Drainage Manager provided the Sewer Re-lining
Benefits presentation that included details on the traditional line replacement
done at Tudor Square.
Cured-in-place-pipe is a trenchless rehabilitation and restoration for existing
pipes, and extends the life of the host pipe.
Vincent indicated fats, oils and grease and root intrusion impacts in addition
to the traffic disruption and financial aspects.
City Council Workshop Workshop Regular
Meeting
Minutes
April 7, 2020
Kent, Washington
Page 3 of 3
Reviewed equipment used, liner installation process and provided before and
after examples.
Meeting ended at 5:55 p.m.
Kimberley A. Komoto
City Clerk
Federal Way Link Extension
Update
Council Workshop
April 7, 2020
FWLE Segments
N
Segment 3 [Federal Way]
Traditional vs. FWLE Design Build
Time Time
Traditional Process Design Build Process
Planning
Building
Civil
SEPA
Zoning Code
Critical Area Review
Mechanical
Plumbing
Structures
Clear and Grub
Water/Sewer/Storm
Roads/Sidewalks
Traffic Signals/Street Lights
Environmental/NPDES
Pe
r
m
i
t
s
I
s
s
u
e
d
In
s
p
e
c
t
i
o
n
Se
g
m
e
n
t
1
Se
g
m
e
n
t
2
Packages
Segment 1
S1.05 –KDM Early Site Work
S1.06 –KDM Station
S1.07 –KDM Garage
S1.08a –Early Utilities
S1.09 –Drainage
S1.10 –Guideway Grading and Walls
S1.11 –Roadway Site Grading and Walls
S1.12 –Maintenance of Traffic
S1.13 –Demo Clear and Grade
Segment 2
S2.01 –Structure B
S2.02 –Structure C
S2.03 –Structure SL
S2.04 –Structure Z
S2.05 –Star Lake Station
S2.06 –Star Lake Garage
S2.07 –SL Sta. and Gar. Site Clearing,
Grading and Utilities
S2.08 –Not used
S2.09 –N and S of Midway Civil
S2.09a –Midway Landfill Civil
S2.10 –Roadway and Walls at SL Station
S2.11 –SL Maintenance of Traffic
S2.12 –Demo Clear and Grade at SL
Corridor Wide
CW.01 –Track
CW.02 –Systems Design
CW.03a –Early Ductbank
CW.04e –Standard Drawings –Structures
CW.04g -Standard Drawings –Sta. and Gar.
CW.04h –Standard Drawings –Walls
CW.04i –Standard Drawings –Drainage
CW.05 –Geotech Lab/Field Services
CW.06 –Not used
CW.07 –Landscaping
* 1 to 20+ permits per package
Permitting
•Since May 2019
•Permit Sequencing
•Package Review –30%, 60%, 90%, Final Plans
•Permit requirements for each package identified
•Comment Resolution
•Weekly Permitting Meetings
•Weekly Task Force Meetings
•Technical Meetings and Field Meetings
•Currently in the peak of permitting
•Permitting through February 2021
Tools
-Communication
-Spreadsheet
-Bluebeam
-Permit Binder
-Permitting Meetings
-Comment Resolution
-Staff
Tracking the Process
S. 240th Street
Terra Villa Demolition
S. 240th Street
X
X X
XX
X
X
XXX
X XX XXX
X
X XXX X
XX XXX
XX
XX
Demolished
KDM Station and Garage
•Midway Design Review
•High Capacity Transit Code
•Midway Subarea Plan
•Development Agreement
30th Ave. South
Pacific HWYN
KDM Station –looking southwest across 30th Ave. S. from the parking garage.
KDM Station –looking southeast across 30th Ave. from the station platform.
KDM Station –looking south along the platform and 30th Ave. S.
N
I-5
Star Lake Station –Looking southeast
Star Lake Station and Garage–looking southeast across the bus loop and short term parking.
Star Lake Station Pedestrian Plaza looking north.
Midway Landfill Removal
-Excavate landfill along rail line
-Backfill with good soil
-Dispose of waste off-site
-Re-install environmental protections
-Gas collection system
-Landfill cover
-Liner
-Stormwater control
Legend:
-Guideway
-Work Area
-Future I-5 Lane (SR509)
N
Moving Forward
•Permitting through February 2021
•Demolition underway
•Soil remediation
•Utility work –May 2020
•Midway landfill waste removal –May 2020
•Heavy construction 2020 –2023
•Testing 2023 –2024
•Revenue Service Begins 2024
SEWER RE-LINING BENEFITS
Public Works
Council Workshop
April 7th, 2020
TRADITIONAL LINE REPLACEMENT
TUDOR SQUARE 2019
WHAT IS CIPP LINING?
Cured-In-Place-Pipe (CIPP)
This is a trenchless rehabilitation and
restoration for existing pipes, and
extends the life of the host pipe.
HYDROGEN
SULFIDE
FATS, OILS AND GREASE (FOG)
ROOT
INTRUSION
TRAFFIC
DISRUPTION
EQUIPMENT USED
LINER INSTALLATION PROCESS
LINER INSTALLATION CONTINUED
LINDA HEIGHTS
BASIN
Before After
Before After
FWLE and Covid-19
•Remote working
•web based meetings
•e-mail
•phone
•Takes more time to complete reviews, more challenging
•Sound Transit Work Stoppage
•Until May 4th
•Some Exceptions (demolition, stormwater treatment system, survey)
Operations and
Maintenance
Facility -South
•DEIS Process still underway
•Three sites (one in Kent, two in Federal Way)
•Sound Transit staff working remotely
•Field data collection delayed due to Covid-19
•Draft EIS –Public Comment later in 2020
•Staffing agreement –Committee of the Whole
•Staff time through the EIS process