HomeMy WebLinkAboutCAG2019-220 - Change Order - #13 - Scarsella Bros, Inc - 228th St UPRR Grade Separation Bridge & Roadway - 07/31/2020ApprovalOriginator:Department: Date Sent:Date Required: Authorized to Sign: o Director or Designee o Mayor Date of Council Approval: Budget Account Number: Budget? o Yes o No Grant? o Yes o No Type:Review/Signatures/RoutingDate Received by City Attorney:Comments: Date Routed to the Mayor’s Office: Date Routed to the City Clerk’s Office:Agreement InformationVendor Name:Category: Vendor Number:Sub-Category: Project Name: Project Details: Agreement Amount: Start Date: Basis for Selection of Contractor: Termination Date: Local Business? o Yes o No* *If meets requirements per KCC 3.70.100, please complete “Vendor Purchase-Local Exceptions” form on Cityspace. Notice required prior to disclosure? o Yes o No Contract Number: Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor’s Signature and Contract Cover Sheet forms. (Print on pink or cherry colored paper) Visit Documents.KentWA.gov to obtain copies of all agreementsadccW22373_1_20 July 28, 2020 KENT WAsHrNctoN CHANGE ORDER NO. #13 NAME OF CONTRACTOR: Scarsella Bros. Inc. (..Contractor',) CONTRACT NAME & PROJECT NUMBER:S. 228th St. Union Pacific Railroad Grede Separation Bridoe and Roadway Phase 5 (19-3022) ORIGINAL CONTRACT DATE: Aprit 19. 2019 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shatl remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change makes the following revisions to the contract Documents and provides compensation for the added work: Install shotcrete facing over Hilfiker SEW at SW2 wall location above the Interurban Trail connector to provide uniformity in wall facing type at SW bridge embankment fill walls. 2. Completion, The contract amount and time for performance provisions of Section II "Time of " and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and wssr) $l3,8oz,tlo.4o Net Change by Previous Change Orders (incl. applicable WSST) $151,939.05 Current Contract Amount (incl, Previous Change Orders) $13,954,095.45 Current Change Order $120,091.75 Applicable WSST Tax on this Change Order $0.00 Revised Contract Sum $14,074,177.20 CHANGE ORDER - 1 OF 3 Original Time for Completion (inseft date) 240 working days Revised Time for Completion under prior Change Orders (insert date) 240 working days Days Required (f ) for this Change Order 0 calendar days Revised Time for Completion (insert date) 240 working days In accordance with Sections I-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below, Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits, This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied, The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: By: (signature) Print Name: 44fiT4/{"t4/ 8;A&AaA I tc z+tantiAftt DATE: CITY OF KENT: By (signature) Print Name: I DATE' ("t@ CHANGE ORDER - 2 OF 3 07/31/2020 Dana Ralph Mayor ATTEST: Kent City Clerk APPROVED AS TO FORM: (applicable if Mayorb signature required) Kent Law Department Iln lhls field, you m.y $ter the electrcnic fll€path where the antra€t has been s8vedl CHANGE ORDER - 3 OF 3 FILE NO: 2OO.2KENT WasHrNGroN CHANGE ORDER WORKSHEET NO. O13 Construction Management Division - Public Works Project: S. 228th St Union Pacific Railroad Grade Separation Phase 5 Project Engineer: Cameron Bloomer, PE Project No.: O7-3O22 Owners Rep:KBA, Inc Fed-Aid No.: Contractor: HLP-FMSTB-L2L6 (00s) Scarsella Bros. Inc. Date: TlLO/2020 I. PROPOSED CHANGE Th is Change makes the following revisions to the Contract Documents and provides compensation for the added work Install shotcrete facing over Hilfiker SEW at SW2 wall location above the Interurban Trail connector. II. REASON AND BACKGROUND FOR CHANGE To rovide uniformi in wall facin e at SW bri embankment fill walls. III. METHOD OF PAYMENT NEW PAY |TEM(S)Not Applicable Change Order No.FOR ACCOUNI'NG USE ONI.Y Sch. No.Item Description Total Est. otv Qty this PE Unit Unit Price Total Estimated Cost of Item X Shotcrete SW2 Hilfiker Wall 1 0 LS $L4,O9r.75 $L4,O9r.75 Independent Estimate Attached - REQUIRED CREATE PAY ITEM ONLY - Payment to be made at a later date upon completion of work PAY THIS PAY ESTIMATE Material Submittals Required - CC: Construction Coordinator New Sub Reqrd?No DELETE EXISTING PAY per 1-09.5 Not Applicable T ChanSe Order No.FOR ACCOUNT'NG USE ONLY Sch. No.B.l. No.Item Description Qtv Unit Unit Price Cost of ltem $$ $$ Independent Estimate Attached - REQUIRED REV. DATE: 3/15/79 FILE NO: 2OO.2KENT Chan$e Order No.FOR ACCOUNT'TVG USE ONI-Y Sch. No.B.l. No.Item Description otv Unit Unit Price Cost of ltem X 10045 Shotcrete Facinq 5,300 SF $20.00 $106,000 n Independent Estimate Attached - REQUIRED TNCREASE/DECREASE TO EX|ST|NG pAy Not Applicable TOTAL ESTIMATED COST OF CHANGE ORDER * THIS PAY ESTIMATE IV. WORKING DAYS *Total of the Cost of Item Golumns 091.7s1 o Original Contract 240 Due This Change Order*a Previous Total 240 DATE:DATE:*Exolanation/Justification Reouired: This Change Order does not impact the critical path, and no change to the working days is being made. TOTAL WORKING DAYSX 240 *This Change Order + Previous Total All work' materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By:Date: 7llOl2O2O Construction Supervisor:Date:1 -t) - Zoz;t Construction Manager: \,Dater /o n 2 REV. DATE: 3/ts/79 $trvce r g45 SCARSELLA BROTHERS INC. RE June 3. 2020 City of Kent 220 Fourth Avenue South Kent, WA 98032 Attn Cameron Bloomer Field Engineer KBA, Inc. 07-3022 228th St. UPRR Phase 5 COP 009 Barrier Coping at NWI and SW3 (RFP 003) SCARSELLA BROS. IS PLEASED TO SUBMIT THE FOLLOWING CHANGE ORDER PROPOSAL FOR THIS PROJECT: NOTES 1. Assumes 2" overbreak on Hilfiker walls. Approx. 33 CY for 5,300 SF of wall. 2. Assumes half a shift to remove overhang and one full shift to re-install; 4-10 schedule. Sincerely Matthew Scarsella Project Manager ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE BID AMOUNT Shotcrete Overbreak LS 1.00 $ 8.537.76 $ 8,537.76 Remove & Re-install Overhanq LS 1.00 $ 4.354.99 $ 4,354.99 2 Additional Manlifts incl. Tax DAY 2.00 $599.50 $ '1 ,1 99.00 TOTAL $ 14.091.7s NCO PACITIC NORTHWIST 1 8644 72ND AVH,IUE SoUTll I(ENI, I1,A 98032 PH:425.251.1684 tX: 425.251.6548 ilc.# c0Nc0((044ts Moin 0llke 5l 4 l (onrrnsniol (irtle (onord, ft 94520 PH: 9?5.685.6799 tX: 925.685,6851 Lk.# I 99902 Date: 06/01120 To: SB Structures; Matt Scarsella From: Scott Betz RE: 228h Street Bridge Project - Hilfiker Wall Overbreak - COP #1 We are assuming an average of 2" overbreak to shoot the Hilfiker walls. The additional cost to shoot over the Hilfiker wall 'SW2' is $7,623 (Tax included). This price is based on the additional 33 cubic yards assumed on 5,300 square feet of wall to be done with shotcrete. Ifyou have any questions, please feel free to call. Sincerely, The Conco Companies SbdA.@ Scott Betz B PHASE 5OB CUANTIry 1.00 ITEM #lneuovE & RE-rNsrALL ovERHANG NOTES 4-10 SCHEDULE ITEM MATERIAL EQUIPMENT LABOR UNIIS COST AMT UNITS COST AMT UNIIS L;(Js I AMI REMOVE OVERHANG 0.00 0.00 0.00 CARP FOREMAN (1)0.00 0.00 5.00 78.55 392.75 CARPENTER (1)0.00 0.00 5.00 73.44 367.20 RE-INSTALL OVERHANG 0.00 0.00 0.00 CARP FOREMAN (1)0.00 0.00 10.00 78.55 785.50 CARPENTER (2)0.00 0.00 20.00 73-44 1.468.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0. TOTAL QUANTITY 0.00 0.00 1 IT COST 0.00 014.25 MARKUP 21 .OOo 0.00 21 .000/o 0.00 29.00o/o 874.13 COSTw/MU 0.00 0.00 BTOTAL 3 PRIME MARKUP 12.OOo/o 466.61 TOTAL 4.354.99 ffiFEnentals"RENTAL INVOICE 27500 Riverview Center Blvd Sullo 100 Bonlla Sprlngs, FL 34134 For cor€spondence onry (no paym *o, oO g,N gD BrLLro: REil"qtttt sB srRUcruRES LLc g'$$)c{u*9's0' PO BOX 68847 SEATTLE, WA 98168-0847 To ensure accurate and timely postlng, detach and send top portlon wlth your payment lltlvolcE lrto,INVOTCE DATE 31247129-00s 04/08/2O2O tNvotcE AMoutIT GURRENCT $2529.00 USD cusToilEn ilo-TERMS 2856210 Due Upon Receipt s Fargo /ABA#:121000248 4217t27869 Herc RentalsName: CHECK PAYMENT ONLIT{E PAYMENT HERC RENTALS P.O, Box 936257 Atlanta, GA 31193 irl{'TTCONTROL EyHSht& rv$rw. HercRentals. com PAY BY PHONE/OUE!TfONs: A77-953-a77a :R#t IJPDATE 52666750 2856210 RE TMIN OVERPASS.KENT IR DAory now take check-by-phone paymentsl Just callus at 877-953-8778 (option 1, and then option 1 again). with check by mail? Please include a remit with your payment. by AGH/Wire? Please send your remittance to HercTimeChecks@HercRentals.com. general inquiries, call 877-953-8778 (opt. 1, 5) or email AccountsReceivable@HercRentals.com 2390.00190,83 545.00 1139.00 2390.00BOOM STMIGHT 6sFT IIB 4WD DSL 8/ 545.00 IC#: 800234650 CAT,/Class! 4104190 Make: GENIE Model: 5-65 Ser #: S60H-39804 HR OUT: 754.50 HR IN: HR CHG: ITECT TO THE TERIIS AND { nal ,dirrctmFnt Total 2390.00 2390.00 239.00 2629,00 2390.00 2390.00 239.00 2629.O0 3/tLlzO T 28 TOTAL RENTAL DAYS: INVOICE FROM: RENTAL TAXABLE LATE CHANGIES MAV APPLYRENTAL START DATE: L/I5/2O 8;OO TRACK OVERPASS - KENT RENTED FROM: HERC RENTATS 722 4403 ZO'IH STREET EAST FIFE, WA 98424 PHi 253-922-3852 S 228TH 5T , wA 98032 INVOICE DATE: 04/08/2020 Page 1 of 1 CUSTOMER #: 2856210 RES/QUoTE #:52666750 INVOICE # : 31,247 lZ9- OO3 ) O lo b 3t Ant nrc* srfiarinl dre' l+!'4 -WtrJF >cn tf1gDOrDrL D-3.to.ot lr H,es, $ec€e. oFtSr.a(1'?_ la f1g-ut8!- t$\r)F rb nrLf txtll o D O o o AOU!&;ra^- FrrnrtA rlllr- STSTC^^, From: Tor Cc: Subject: Date: Attachments: Bieren. Chad Connor. Eric; Malonev. Carla Barry. Jason RE: COP 010 Shotcrete over Hilfiker Wall Friday, June t9,2020 4:17:33 PM imaoe002.png imaoe004.png imaoe006.pno Hi Eric, I've discussed the Shotcrete proposal with Tim, and have his approval. Please proceed. Thank you, Chad KENT Chad Bieren, P.E. Deputy Public Works Director/City Engineer Engineering Administration I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 | Cell'253-740-9139 cbieren@KentWA.gov www.KentWA.oov PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL W.rrrrerei From: Connor, Eric Sent: Friday, June 05, 2020 9:15 AM To: Bieren, Chad <CBieren@kentwa.gov>; Maloney, Carla <CMaloney@kentwa.gov> Cc: Barry, Jason <JBarry@kentwa.gov> Subject: FW: COP Ol-0 Shotcrete over Hilfiker Wall Good Morning, Attached is the cost projection worksheet that I keep up. This one has the shotcrete costs incorporated into it. Bl 10045 has the quantity increased by the 5,300 SF and the proposed extras are added to the change order section at the bottom. Please let me know if I can help with any additional information. lt will take a while to get approval on the change order (Council approval) so I would like to get this moving forward ASAP! Thank you I Eric Eric ConnOr I Construction Engineering Manager Construction Management I Public Works Department Phone 253-856-5533 | Cell 253-797-0693 crTY oF KENT, WASHTNGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E.MAIL From: Cameron Bloomer tnaitto:cOloomertat l Sent: Thursday, June 04,2020 7:18 AM To: Madfai, Mark; Connor, Eric Cc: Barry, Jason; Dane Setzer Subject: FW: COP 010 Shotcrete over Hilfiker Wall Hello Mark and Eric, Attached is the additional cost to install a shotcrete fascia on SEW wall SW2. lf agreed to, the City would pay this and the 2OS/SF bid item price. $14,09i..75 + 5,300*20 = S120,091.75. Thank you, Cameron Bloomer, PE C 206.819.7 L48 | cbloomer@kbacm.com KBA, f nC. I Construction Management Specialists I www.kbacm.com From: M atthew Scarsel la <matthew.s@SCARSELLABROS.com> Sent: Wednesday, June 3, 2020 4:52 PM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Barry, Jason <J Barry@ kentwa.gov> Subject: COP 010 Shotcrete over Hilfiker Wall Hi Cameron, See attached Change Order Proposal for the added scope to shotcrete over the Hilfiker wall. I tried to make these LS so that everything is captured in the unit price for shotcrete. Let me know if there is a problem with anything that I included. Than ks, Matt Scarsella Bros., lnc Matthew Scarsella, P.E. I Project Manager P.O. Box 68697 Seattle, Washington 98168-0697 o: (253) 872-7173 | c: (206) 817-2765 matthew.s@scarsel labros.com EXTERNAL EMAIL From: Tol Ccr Subject: Date! Attachments: Cameron Bloomer Barry. Jason; Madfai. Mark Dane Setzer RE: 228th Street - Shotcrete over Hilfiker Wall Thursday, May 21, 2020 B:17:59 AM imaoe002.ono EXTERNAL EMAIL Hello Jason/Mark, I had an error in my math. I measured LOL to LOL between the walls and should not have deduced the SF covered by the trail moment slab as it was already accounted for. This lncreases the estimate to 5302 SF and $122K. Do we want to request Conco's pricing even though it is a little more than unit price? Thank you, Shotcrete Oua ntitv Tackoff / Cost Estimate Cameron Bloomer, KBA. lnc. 5.20.2020 t H SF sw3 60 14 840 sw3 20 12.5 250 sw3 125.O7 1t 1376 5W3 114.93 7.5 862 sw3 40 6 240 sw3 40 7.75 310 msm, Slal 3€8 J# TotalSW3 Quantity 3878 NW2 360 2s.5 9180 Total Shotcrete Qty Estimated Cost at 23$/5F 5302 $ rer,gsr.sr Cameron Bloomer, PE C 206.819.7 I4B I cbloomer@kbacm.com KBA, lnc. I Construction Management Speciolists I www.kbacm.com From: Cameron Bloomer Sent: Wednesday, May 20,2020 3:31 PM To: Barry, Jason <J Barry@kentwa.gov>; M adfai, M ark <M M adfai @ kentwa.gov> Cc: Dane Setzer <dsetzer@kbacm.com> Subject: RE: 228th Street - Shotcrete over Hilfiker Wall Hello Jason, Attached is what I came up with. Roughly 5000 SF, about S115,000 Thank you, Cameron Bloomer, PE C 206.819.71,48 | cbloomer@kbacm.com KBA, lnc. I Construction Management Specialists I www.kbacm.com From: Barry, Jason <JBarry@kentwa.gov> Sent: Wednesday, May 20, 2020 1:53 PM To: Cameron Bloomer <cbloomer@kbacm.com>; Madfai, Mark <MMadfai@kentwa.gov> Subject: FW: 228th Street - Shotcrete over Hilfiker Wall We ever get a take-off on footage for that area? From : Matthew Sca rsel la I mailto : matthew. s@SCARSELLABROS. com] Sent: Wednesday, May 20, 2020 12:03 PM To:'cbloomer@kbacm.com' Cc: Barry, Jason; Madfai, Mark; Jared Rockey Subject: 228th Street - Shotcrete over Hilfiker Wall Hi Cameron, Conco said they will shotcrete over the Hilfiker wall at unit price + some additional conc waste that will belostinthevoidsoftherock. Theyestimatethewastetobeapproximatelyl0-l5cydsper 2,000 SF. SB Structures will have some time to remove and reset the short piece of work deck that has been built on SW2. Shotcrete will need to be installed after SW3 moment slab and prior to SW2 barrier. Thanks, Matt Scarsella Bros., lnc. Matthew Scarsella, P.E. I Project Manager P.O. Box 68697 Seattle, Washington 98168-0697 o: (253) 872-7173 | c: (206) 817-2765 matthew.s@scarsellabros.com EXTERNAL EMAIL KENT Wa5HrNcToN CHANGE ORDER NO. #13 NAME OF CONTRACTOR: Scarsella Bros, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER:C 11Oth Cl' I lnian rtqaifia rlail rd Cr:rlo Qanrrrl'ian Elrirlaa and Roadway Phase 5 (19-3022) ORIGINAL CONTRACT DATE :April 19. 20L9 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This Change makes the following revisions to the Contract Documents and provides compensation for the added work: Install shotcrete facing over Hilfiker SEW at SW2 wall location above the Interurban Trail connector to provide uniformity in wall facing type at SW bridge embankment fill walls. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and WSST) $13,802,146.40 Net Change by Previous Change Orders (i ncl. applicable WSST) $151,939.05 Current Contract Amount (incl. Previous Change Orders) $13,954,08s.4s Current Change Order $120,091.75 Applicable WSST Tax on this Change Order $o.oo Revised Contract Sum $14,074,177.20 CHANGE ORDER - 1 OF 3 Original Time for Completion (inseft date) 240 working days Revised Time for Completion under prior Change Orders (insert date) 240 working days Days Required (+) forthis Change Order 0 calendar days Revised Time for Completion (insert date) 240 working days In accordance with Sections L-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below, Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits, This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: By: (signature) Print Name: n4rfifr{,ta,/ EOQ<r&te Its /&rtEcr z*u46At DATE: CITY OF KENT: By: (signature) Print Name: T tc (tiile) DATE: CHANGE ORDER - 2 OF 3 Dana Ralph Mayor 07/31/2020 ATTESTI Kent City Clerk APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department lln thls field, you m.y rnt€r the electron,c fllepath where rhe contract has been savedl CHANGE ORDER - 3 OF 3 KENT FILE NO: 2OO.2 CHANGE ORDER WORKSHEET NO. O13 Construction Management Division - Public WorksProject: S, 228th St Union Pacific Railroad project No.: O7-3O22 Grade Separation phase 5 Project Engineer: Cameron Bloomer, pE Fed-Aid No.: HLP-FMSIB-L2I6 (005)Contractor: Scarsella Bros. Inc.Owners Rep:KBA, Inc Date: 7/LO/2020 I. PROPOSED CHANGE This Change makes the following compensation for the added work revisions to the Contract Documents and provides Install shotcrete facing over Hilfiker SEW at SW2 wall location above the Interurban Trailconnector. IT. REASON AND BACKGROUND FOR CHANGE vide uniform in wall facin e embankment fill walls.To e at SW bri IrI. METHOD OF PAYMENT NEW PAY |TEM(S)Not Applicable Change Order No.FOR usEorvt_y Sch. No.Item Description Total Est. ow Qty this PE Unit Unit Price Total Estimated Cost of Item X Shotcrete SWz Hilfiker Wall 1 0 LS $14,09t.75 $74,09L.75 Independent Estimate Attached - REQUIRED CREATE PAY ITEM ONLY - payment to be made a! a later date upon completion of work !PAY THIS PAY ESTIMATE New Sub Reqrd?No Change Order No.ACCOUNTING USE V Sch. No.B.I. No.Item Description otv Unit Unit Price Cost of ltem $$ $Independent Estimate Attached - RE9UIRED U DELETE EXISTING PAY ITEM (S) per 1-09.5 Not Applicable t REV. DATE: 3/75/19 FILE NO: 2OO.2KENT WASHTNGToN Chan(e Order No.FOR usE o,vt_ Sch. No.B.l. No.Item Description otv Unit Unit Price Cost of ltem X 10045 Shotcrete Facin g 5,300 SF $20.00 $106,000 Independent Estimate Attached - REQUIRED TNCREASE/DECREASE TO EX|ST|NG pAy |TEM Not Applicable TOTAL ESTIMATED COST OF CHANGE ORDER * THIS PAY ESTIMATE rV. WORKING DAYS *Total of the Cost of Item Columns r20 t,75 o Original Contract 240 Due This Change Order*Previous Total 240 *This oe drder oesChang not m thepact critica na nod ncha topath workithege daysngamde. TOTAL WORKING DAYS*240 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specificationsand contract special provisions for the type of work described. Prepared By:nB Date: T lltl 2(J2() Construction Supervisor: Construction Manager: '1 l"'; ' J,iZ-)Date: Date: n" 2 REV. DATE: 3/1.5/19 June 3, 2020 Clty of Kent 220 Fourlh Avenue South Kent, WA 98032 Attn: Cameron Bloomer Field Engineer KBA, Inc. 07-3022 228th St. UpRR phase 5 COP 009 Barrier Coping at NW1 and SW3 (RFp OO3) SCARSELLA BROS. IS PLEASED TO SUBMIT THE FOLLOWING CHANGE ORDER PROPOSAL FOR THIS PROJECT: NOTES: 1' Assumes 2" overbreak on Hilfiker walls. Approx. 33 cy for 5,300 sF of wall.2' Assumes half a shift to remove overhang and one full shift to re-install; 4-10 schedule. Sincerely, Matthew Scarsella Project Manager RE: RIPTION UNIT QUANTIW UNIT PRICE BID AMOUNT Shotcrete Overbreak LS 1.00 $ 8,537.76 $ 8,537.76Remove & Re-install Additiona Manlifts incl.AX LS 1.00 $ 4,354.99 $ 4,354.99 DAY 2.00 $ 599.50 $ 1,199.00 TOTAL $ 14,091.75 PACTK ilORTHWTST 1 8644 72ND Al/H'rUt SOUTH KrNl lt/A 90032 PH:425.251.1684 FX: 425.251 .6548 Lrc.# c0lt(0(c044tsNCO Date: 06/01/20 To: SB Structures; Matt Scarsella From: Scott Betz RE: 228h Street Bridge Project - Hilfiker Wall Overbreak - COp #1 We are assuming an average of 2" overbreak to shoot the Hilfiker walls. The additional cost to shoot over the Hilfiker wall 'SW2' is $7,623 (Tax included). This price is based on the additional 33 cubic yards assumed on 5,300 square feet of wall to be done with shotcrete. Ifyou have any questions, please feel free to call. Sincerely, The Conco Companies 3dA-@ *lsin Off;r* 5l4l forrrrnarrirl [irrie (sntord, G 945ii0 PH:925.685.6799 FX: 975.685.685 l ti{.# I 999i}? Scott Betz JOB 228TH PHASE 5 QUANTITY 1.00 ITEM #REMOVE & RE-INSTALL OVERHANG NOTES 4.10 SCHEDULE ITEM MATERIAL LAtsOR UNIIS COST AMT UNIIS COS I AMI UNITS COST AMT REMOVE OVERHANG 0.00 0.00 0.00 CARP FOREMAN (1)0.00 0.00 5.00 78.55 392.75 CARPENTER (1)0.00 0.00 500 73.44 367.20 RE-INSTALL OVERHANG 0.00 0,00 0.00 CARP FOREMAN (1)0.00 0.00 10.00 78.55 785.50 CARPENTER (2)0.00 0.00 20.00 73.44 1.468.80 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.o0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UNIT 0.00 0.00 3 01 MARKUP 21 .00o/o 0.00 21.OOak 0.00 29.00o/o 874.13 UNIT COSTw/ MU 0.00 0.00 3,888.38 SUBTOTAL 3.888.38 PRIME MARKUP 12.O0o/o 466.61 TOTAL 4,354.99 IffEnentals"'RENTAT TNVOTCE 27500 Riverview Cent€r Blvd Suite 100 Bonila Sprlngs, FL 34134 For conosponden cs only (no, *"*, :OI?_N gD BrLLro: Rt;; q ?'ilt sB srRUcruRES LLc gg$*)c\uGF'P0' PO BOX 68847 SEATTLE, WA 98.1 68-0847 To ensure accurate and timely postlngf detach and send top portlon wlth your payhent 3L247L29-OO3 04/08/20"0 2629.00$USD 28s6210 Due Upon Receipt NT Bank: RTN/ABA#: Name: 121000248 42t7L27869 Herc Rentals Fargo HERC RENTALS P.O. Box 936257 Atlanta, GA 31193 l]'i'TiCONTROL 89&rckt* USTOMI LIPDATF 2856210 caf )BY MR TRAIN OTY IR D, now take check-by-phone paymentsl Just call us at 877-953-8778 (option 1, and then option 1 again) with check by mail? Please include a remit with your payment. by AGHMire? Please send your remittance to HercTimeChecks@HercRentals.com or general inquiries, call 877-953-8778 (opt. 1, 5) or email AccountsReceivable@HercRentals.com. 1 2390.0090,83 545,00 1139.00 2390.00BOOM STRAIGHT 6sFT JIB 4WD DSL 8/ 545.00 IC#: 800234650 CAT/Class: 4104190 trlake: GENIE Model: 5-65 Ser #: S50H-39804 HR OUT: 754.50 HR IN: HR CHG: fll- lr Adiustment Total INVOICE FROM: 3/LL/2O TOTAL CHARGES TAXABLE CHARG T 2390,00 2390.00 239.00 2629.O0 2390.00 2390.00 239.00 2629.00 LATE CHARGES I4AY APPLYRENTAL START DATE: tlLS|7O 8:00 wA 98032 TRACK OVERPASS - KENT 05 s 228TH 5T RENTED FROrvl: HERC RENTATS 722 4403 zOTH STREET EAST NFE, WA 98424 PH:253-922-3852 INVOICE DATE: 04/08/2020 Page 1 of 1 CUSTOMER #: 2856210 RE5/QUOTE #i52656750 INVOICE # : 3I247129-OO3 ) o b ^rlr| 'rF.Gl' Sfif?;li1ll- WtrJF )ca dlS5rrDn- D-3.to.ot t'rr' il f Wa 3t It Er,t:gqlrcEa. orttfrre(UL l$rr- o TtE-w.tL $v0F nr tlrt-f l'(tq \TAtt- D O 0 o couuexrryt_ lrtreren- ul*. SfSrC..\ From: To: Cc: Subject: Date! Attachments: Bieren- Chad Connor. Eric; Malonev. Carla Banv. Jason RE: COP 010 Shotcrete over Hilfiker Wall Friday, June L9, 2020 4:17:33 PM imaoe002.pno imaoe004.png image006.pno Hi Eric, I've discussed the shotcrete proposal with rim, and have his approval. proceed. Thank you, Chad Please KEl.lT Chad Bieren, P.E, Deputy pubtic Works Director/City Engineer Engineering Administration I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 | Cell'253-740-9139 cbieren@KentWA.gov www.KentWA.gov PLEASE COT.JSIDER THE FNVIRONMENT BFFORE PRINTING THI-S E-MAII. frtNrrOtOr From: Connor, Eric Sent: Friday, June 05,2020 9:15 AM To: Bieren, chad <cBieren@kentwa.gov>; Maloney, Carla <CMaloney@kentwa.gov> Cc: Barry, Jason <J Barry@ kentwa.gov> Subject: FW: COP 010 Shotcrete over Hilfiker Wall Good Morning, Attached is the cost projection worksheet that I keep up. This one has the shotcrete costs incorporated into it. Bl 10045 has the quantity increased by the 5,300 SF and the proposed extras are added to the change order section at the bottom. Please let me know if I can help with any additional information. lt will take a while to get approval on the change order (Council approval) so I would like to get this moving forward ASAPI Thank you I Eric Eric Connor, Construction Engineering Manager Construction Management I Public Works Department Phone 253-855-5533 | Cell 253-797-0693 CITY OF KENT, WASHINGTON FLEASE COI{SIDER THF ENVIRONMENT BEFQ'IE PRIruT!NG TFiIS F.I4AIL From: Cameron Bloomer tmailto:cntoomertOf lSent: Thursday, June 04,2020 7:18 AM To: Madfai, Mark; Connor, Eric Cc: Barry, Jason; Dane Setzer Subject: FW: COP 010 Shotcrete over Hilfiker Walt Hello Mark and Eric, Attached is the additional cost to install a shotcrete fascia on SEW wall SW2. lf agreed to, the City would pay this and the 20$/sF bid item price. $14,091..75 + 5,300*20 = s120,091.75. Thank you, Cameron Bloomer, pE C 206.879.7748 | cbloomer@kbacm.com l(EA, !nc" I Construction Monogement Specialists I www,kbacm.com From: M atthew Scarsel la <matthew.s @SCARSELLABROS.com> Sent: Wednesday, June 3,2020 4:52 pM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Barry, Jason <JBarry@kentwa.gov> Subject: COP 010 Shotcrete over Hilfiker Wall Hi Cameron, See attached Change Order Proposal for the added scope to shotcrete over the Hilfiker wall. I tried to make these LS so that everything is captured in the unit price for shotcrete. Let me know if there is a problem with anything that I included. Than ks, Matt Scarsella Bros., lnc. Matthew Scarsella, P.E. I Project Manager P.O. Box 68697 Seattle, Wash ington 98168-0697 o:(253) 872-7I73 | c: (206) 8It-2765 matthew.s @scarsel I abros.com EXTERNAL EMAIL From: Tor Cc: Subject: Date! Attachments: Cameron Bloomer Barry. Jason; Madfai. Mark Dane Setzer RE: 228th Street - Shotcrete over Hilfiker Wall Thursday, May 21,2020 8:17:59 AM imaoe002.pno EXTERNAL EMAIL Hello Jason/Mark, I had an error in my math. I measured LOL to LOL between the walls and should not have deduced the SF covered by the trail moment slab as it was already accounted for. This lncreases the estimate to 5302 SF and ;nZr. Do we want to request Conco's pricing even though it is a little more than unit price? Thank you, Shotcrete Quantitv Tackof,f / Cost Estimate Cameron Eloomer, KBA, lnc. 5.20.2020 L H SF sw3 60 L4 840 sw3 20 12.5 250 SW3 125.07 11 1376 sw3 1L4.93 7.5 862 sw3 40 6 240 SW3 4A 7.75 3i"0 mem, Slal 3€e l-+5 TotalSW3 Quantity 3878 NW2 360 25.5 9180 Total Shotcrete Qty Estimated Cost at Zf $/Sf 5:lo2 $ rer,ssr.az Cameron Bloomer, pE C 206.819.7I4B I cbloomer@kbacm.com KtsA, lnc. I Construction Management Specialists I www.kbacm.com From: Cameron Bloomer Sent: Wednesday, May 20,2020 3:31 pM To: Barry, Jason <i Barry@ kentwa.gov>; M adfai, Ma rk <M M adfai @ kentwa.gov> Cc: Dane Setzer <dsetzer@kbacm.com> Subject: RF: 228th Street - Shotcrete over Hilfiker Wall Hello Jason, Attached is what I came up with. Roughly 5000 SF, about Si.l-5,000. Thank you, Cameron Bloomer, PE C 206.819.1 1.48 | cbloomer@kbacm.com KBA, lnc. I Construction ManogementSpeciolists I www,kbacm.com From: Barry, Jason <JBarrv@kentwa.gov> Sent: Wednesday, May 20, 2020 1:53 PM To: Cameron Bloomer <cbloomer@kbacm.com>; Madfai, Mark <MMadfai@kentwa.gov> Subject: FW: 228th Street - Shotcrete over Hilfiker Wall We ever get a take-off on footage for that area? From : Matthew Sca rsel la I ma i lto : matthew. s@SCARSELLABROS.com] Sent: Wednesday, May 20,2020 12:03 PM To:'cbloomer@kbacm.com' Cc: Barry, Jason; Madfai, Mark; Jared Rockey Subject: 228th Street - Shotcrete over Hilfiker Wall Hi Cameron, Conco said they will shotcrete over the Hilfiker wall at unit price + some additional conc waste that will belostinthevoidsoftherock. Theyestimatethewastetobeapproximatelyl0-l5cydsper 2,000 SF. SB Structures will have some time to remove and reset the short piece of work deck that has been built on SW2. Shotcrete will need to be installed after SW3 moment slab and prior to SW2 barrier. Thanks, Matt Scarsella Bros., lnc. Matthew Scarsella, P.E. I Project Manager P.O. Box 68697 Seattle, Washington 98168-0697 o: (253) 872-7173 | c: (206) 817-276s matthew.s@scarsellabros.com EXTERNAL EMAIL KENT WA5BTNGToN CHANGE ORDER NO. #L3 NAME OF CONTMCTOR: Scarsella Bros. Inc. (..Contractor,') CONTRACT NAME & PROJECT NUMBER and Roadway Phase 5 (19-3022) C ??ath Cf I lninn DrniFia Dail A Crzda Qan:rrlinn Erilna ORIGINAL CONTRACT DATE: April 19, 2019 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change makes the following revisions to the contract Documents and provides compensation for the added work: Install shotcrete facing over Hilfiker SEW at SW2 wall location above the Interurban Trail connector to provide uniformity in wall facing type at SW bridge embankment fill walls, 2. The contract amount and time for performance provisions of Section II "Time of completion," and section III, "compensation," are hereby modified as follows: Original Contract Sum, (including applicable alternates and WSST) $13,802,146.40 Net Change by Previous Change Orders (incl. applicable WSST) $1s1,939.05 Current Contract Amount (incl. Previous Change Orders) $13,954,08s.45 Current Change Order $120,091.75 Applicable WSST Tax on this Change Order $o.oo Revised Contract Sum $14,074,177.20 CHANGF ORDER - 1 OF 3 Original Time for Completion (inseft date) 240 working days Revised Time for Completion under prior Change Orders (insert date) 240 working days Da ys Required (*) for this Change Order 0 calendar days Revised Time for Completion (insert date) 240 working days In accordance with sections I-04.4 and 1-04.5 0f the Kent and wsDoT standardSpecifications, and Section VII of the Agreement, the Contractor accepts all requirements of thisChange Order by signing below, Also, pursuant to the above-referenced contract, Contractoragrees to waive any protest it may have regarding this Change Order and acknowledges andaccepts that this Change Order constitutes final settlement ofltt claims of any kjnd or naturearising from or connected with any work either covered or affected by this Change brder, including,without limitation, claims related to contract time, contract acceleration, on-ite or home officeoverhead, or lost profits, This Change Order, unless otherwise provided, does not relieve theContractor from strict compliance with the guarantee and warranty provisions of the originalcontract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any),and this Change Order, prior to the effective date oithis Change Order, are liereby ratified andaffirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Ordershall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they areauthorized to enter into this contract modification, which is binding on the parties of this contract. 3' The Contractor will adjust the amount of its performance bond (if any) for this projectto be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which willbecome effective on the last date written below. CONTRACTOR: By: (signature) Print Name: n//fr44it4/ E?latAcA I ts DATE: CITY OF KENT: By (signature) Print Name: lts (titte) DATE: CHANGE ORDER - 2 OF 3 Dana Ralph Mayor 07/31/2020 ATTEST: Kent City Clerk APPROVED AS TO FORM: (appllcable if Mayor's signature required) Kent Law Department $n lhls fi€ld, you Bay €ntsr the electrontc fllrpath where the contract has teen savedl CHANGE ORDER - 3 OF 3 FILE NO: 2OO.2KENT CHANGE ORDER WORKSHEET NO. O13 Construction Management Division - Public Works Project: S. 228th St Union Pacific Railroad Project No.: 07-3022 Grade Separation Phase 5 Project Engineen Cameron Bloomer, PE Fed-Aid No.: HLP-FMSIB-L2L6 (005) Owners Rep:KBA, Inc Contractor: Scarsella Bros. Inc, Date: 7/7O/2O2O I PROPOSED CHANGE This Change makes the foll owing revisions to the Contract Documents and provides compensation for the added work: Install shotcrete facing over Hilfiker SEW at SW2 wall location above the Interurban Trail connector. II. REASON AND BACKGROUND FOR CHANGE To rovide uniform in wall facin e at SW brid e embankment fill walls. rTI. METHOD OF PAYMENT NEW PAY ITEM(S)Not Applicable Chan{e Order No.FOR ACCOUNI'NG USE ONLY Sch. No.Item Description Total Est. ow Qty this PE Unit Unit Price Total Estimated Cost of Item X Shotcrete SW2 Hilfiker Wall 1 0 LS $74,O91.75 $14,091.75 U Independent Estimate Attached - REQUIRED CREATE PAY ITEM ONLY - Payment to be made at a later date upon comDletion of work U PAY THIS PAY ESTIMATE Material Submittals Reouired - CC: Construction Coordinator New Sub Reqrd?No DELETE EXISTING PAY ITEM(S) per 1{9.5 Not Applicable 1. Change Order No.FOR ACCOUNT''VG USE ONLY Sch- No.B.l. No.Item Description Qtv Unit Unit Price Cost of ltem $$ $$ LJ Independent Estimate Attached - REQUIRED n REV. DATE:3/75h9 KENT FILE NO: 2OO.2 Chan(e Order No.Y Sch. No.B.l. No.Item Description ow Unit Unit Prioe Gost of ltemX10045Shotcrete Facing 5,300 SF $20.00 $106,000 Independent Estimate Attached - REQUIRED TNCREASE/DECREASE TO EXtSTtNc pAy rTEM(S)Not Applicable TOTAL ESTIMATED COST OF CHANGE ORDER X THIS PAY ESTIMATE *Total of the Cost of ftem Columns IV. WORKING DAYS 120 091.7s o Original Contract DATE 240 Due This Change Order*I Previous Total 240 TE Th is Cha rdeo rnge does not the ticacri a ndmpact no e thetopathchang worki ng daysde. TOTAL WORKING DAYSX 240 *This Change Order + previous Total All work, materials and measurements to be in accordance with the standard specificationsand contract special provisions for the type of work described. Prepared By:Bar Date:lo zfJ20 Construction Supervisor:Date: "?";_r - Jl,]-*t Construction Manager:Date: ,' 2 REV, DATE: 3/1.5/19 June 3, 2020 City of Kent 220 Fourlh Avenue South Kent, WA 98032 Attn: Cameron Bloomer Field Engineer KBA, lnc. RE:07-3022 228th St. UPRR Phase 5 COP 009 Barrier Coping at NW1 and SW3 (RFP 003) SCARSELLA BROS. IS PLEASED TO SUBMIT THE FOLLOWING CHANGE ORDER PROPOSAL FOR THIS PROJECT NOTES: 1. Assumes 2" overbreak on Hilfiker walls. Approx. 33 CY for 5,300 SF of wall. 2. Assumes half a shift to remove overhang and one full shift to re-install; 4-10 schedule. Sincerely Matthew Scarsella Project Manager ITEM DESCRIPTION UNIT QUANTIry UNIT PRICE BID AMOUNT Shotcrete Overbreak LS 1.00 $ 8.537.76 $8.537.76 Remove & Re-install Overhang LS 1.00 $ 4,354.99 $4,354.99 2 Additional Manlifts incl. Tax DAY 2.OO $599.50 $ 1,199.00 TOTAL $ 't 4.091.75 NCO PACTK ilORTHWEST r 8644 72ilD AVENUT SoUTll (Et'tl l|/A 98032 PH:425.251.1684 FX:425.251.6548 UC# C0it(0((044r5 ffinin CIflke -514l [onlriertid (irdc (onrord, (A 94520 l'fr: 925.685.6799 IX: ??5.685.6851 l-ir.,f I 9990? Date: 06/01/20 To: SB Structures; Matt Scarsella From: Scott Betz RE: 228h Street Bri Scott Betz - Hilfiker Wall Overbreak - COp #1 Wea-re-assuming an average of 2" overbreak to shoot the Hilfiker walls. The additional cost to shoot overthe Hilfiker wall 'SW2' is $7,623 (Tax included). This price is based on the additional 33 cubic yardsassumed on 5,300 square feet of wall to be done with shbtcrete. Ifyou have any questions, please feel free to call. Sincerely, The Conco Companies JOB 228TH PHASE 5 loro*r,.,-1.00 ITEM #REMOVE & RE-INSTALL OVERHANG l*or.,4-,IO SCHEDULE TRUCTURES ITEM MATERIAL LABOR UNIIS COST AMT UNIIS COSI AMT UNITS COST AMI REMOVE OVERHANG 0.00 0.00 0.00 CARP FOREMAN (1)0.00 0.00 5.00 78.55 392.75 CARPENTER (1)0.00 0.00 5.00 73.44 367.20 RE-INSTALL OVERHANG 0.00 0.00 0.00 CARP FOREMAN (1)0.00 0.00 10.00 78.55 785.50 CARPENTER (2)0.00 0.00 20.00 73.44 1.468.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AL 0.00 0.00 IT 0.00 14 MARKUP 21.00o/o 0.00 21 .OOo/"0.00 29.00o/o 874.13 UNITCOSTw/MU 0.00 0.00 3.888.38 SUBTOTAL 3,888.38 PRIME MARKUP 12.00%466.61 TOTAL 4,354,99 'mF;Rentats"RENTAI INVOTCE 27500 Riverview Center Btud Sullo 100 Bonlla Springs, FL 34134 For corr€*ponden c€ onry (no payrn *o, oO-trjN gD BrLLro, REil-q?titt sB srRUcruRES LLc sg$('tc{u*g'go' PO BOX 68847 SEATTLE, WA 98168-0847 To ensure accurate and tlmely postlng, detach and send with your payment 3L247L29-O03 04/08/2020 2629.00$USD 28s6210 Due Upon Receipt Bank: l{ame: RTN,/ABA#: Acct#: Beneficia 121000248 42t7t27869 Herc Rentals Fargo HERC RENTALS P.O. Box 936257 Atlanta, GA 31193 Pl.t.7*CONTROL 8yffihs e 2455210 CL 'BYMR N OTY IR tt, now take check-by-phone payments! Just call us at 877-953-8778 (option 1, and then option 1 again). with check by mail? Please include a remit with your paymeni. by ACH/Wire? Please send your remittance to HercTimeChecks@HercRentals.com general inquiries, call 877-953-8778 (opt. f , 5) or email AccountsReceivable@HercRentals.com 2390.00190.83 545.00 1139.00 2390.00BOOM STRAIGHT 6sFT IIB 4WD DSL 8/ 545.00 IC#: 800234650 CAT,/Clasc: 4104190 Make: GENIE ifodel: 5-65 Ser #: S60H-39804 HR OUT: 754.50 HR IN: HR CHG: Orioinal Adiustment Total INVOICE FROM: 3/LL/zO RENTAL CHARGES TAXABLE CHARGES TAX TOTAL CHARGES 2390.00 2390.00 239.00 2629.O0 2390.00 2390.00 239.00 2629.O0 LATE CHARGES TTAY APPLYRENTAL START DATE: L/T5/2O 8:OO TRACK OVERPASS - KENT 690s s 228TH ST , wA 98032 RENTED FROM: HERC RENTAI.S 722 4403 zOTH STREET EAST FIFE, WA 98424 PHi 253-922-3852 INVOIcE DATE: 04/08/2020 Page 1 of 1 cusToMER #:28567LO RES/QUOTE #i526667so INVOICE # | 3L247729-OO3 ) 5 I b ^tp rrr,cf. srtrJttrlt WUJF Pc.e t/JSMrDn- D-3.lo.ot drr' d f* jt I r Et,eg$rc.C?- op'r$La(UL l$a- Tte-w,?L WWF ro rhLf ,x[a o D O 0 o cour<ryt- lttrQreA gtu.. SfS rC.^ From: To: Cc: Subject: Date: Attachments: Bieren. Chad Connor. Eric; Maloney. Carla Barry. Jason RE: COP 010 Shotcrete over Hilfiker Wall Friday, lune 19,2020 4:17:33 PM image002.pno imaoe004.pno imaoe006.pno Hi Eric, I've discussed the Shotcrete proposal with Tim, and have his approval. Please proceed. Thank you, Chad KENT l*.!NrtQ.6r Chad Bieren, P.E. Deputy Pubtic Works Director/City Engineer Engineering Administration I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 | Cell,253-740-9139 cbieren@KentWA.gov www,KentWA.oov PLE.qSE COr'lsIDe R THE FNVIRONMEruT AEFORE pRIf{TING THIS E-MAtL From: Connor, Eric Sent: Friday, June 05, 2020 9:15 AM To: Bieren, Chad <CBieren@kentwa.gov>; Maloney, Carla <CMaloney@kentwa.gov> Cc: Barry, Jason <J Barry@ kentwa.gov> Subject: FW: COP OLO Shotcrete over Hilfiker Wall Good Morning, Attached is the cost projection worksheet that I keep up. This one has the shotcrete costs incorporated into it. Bl 10045 has the quantity increased by the 5,300 SF and the proposed extras are added to the change order section at the bottom. Please let me know if I can help with any additional information. lt will take a while to get approval on the change order (Council approval) so I would like to get this moving forward ASAPI Thank youl Eric Eric ConnOr, Construction Engineering Manager Construction Management I Public Works Department Phone 253-856-5533 | Cell 253-797-06913 CITY OF KENT, WASHINGTON PLEASF CONSIDER THE ;IVVIROT{MENT BEFORE PRINTING THTS E-MA]L From: Cameron Bloomer Innallto:cbloomer(Ok lSent: Thursday, June 04,2020 7:18 AM To: Madfai, Mark; Connor, Eric Cc: Barry, Jason; Dane Setzer Subject: FW: COP 010 Shotcrete over Hilfiker Wall Hello Mark and Eric, Attached is the additional cost to install a shotcrete fascia on SEW wall SW2. lf agreed to, the City would pay this and the 20$/SF bid item price. S14,09j..75 + 5,300*20 = SI2O,O}I.75. Thank you, Cameron Bloomer, pE C 206.819.7148 | cbloomer@kbacm.com !(BA, f nc. I Constructton Management Specialists I www.kbacm.com From: Matthew Scarsella <matthew.s@SCARSE > Sent: Wednesday, June 3, 2020 4:52 pM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Barry, Jason <JBarry@kentwa.gov> Subject: COP 010 Shotcrete over Hilfiker Wall Hi Cameron, See attached Change order Proposal for the added scope to shotcrete over the Hilfiker wall. I tried to make these LS so that everything is captured in the unit price for shotcrete. Let me know if there is a problem with anything that I included. Thanks, Matt Scarsella Bros., lnc. Matthew Scarsella, P.E. I Project Manager P.O. Box 68697 Seattle, Washington 98169-0697 o: (253) 872-7173 | c: (206) 817-2765 m atthew.s @scarsellabros.com EXTERNAL EMAIL From! To: Ccl Subject: Date: Attachments: Cameron Bloomer Barry. Jason; Madfai. Mark Dane Setzer RE: 228th Street - Shotcrete over Hilfiker Wall Thursday, May 21, 2020 8:17:59 AM imaoe002.pno EXTERNAL EMAIL Hello Jason/Mark, I had an error in my math. I measured LOLto LOL between the walls and should not have deduced the SF covered by the trail moment slab as it was already accounted for. This lncreases the estimate to 5302 SF and 5122K. Do we want to request Conco's pricing even though it is a little more than unit price? Thank you, Shotcrete QuantitV Tackoff / Cost Estimate Cameron Bloomer, KBA, lnc. 5.20.2020 L H SF sw3 ffi 14 8it0 sw3 2A r.2.5 250 sw3 125.07 11 1376 sw3 LL4.93 7.5 862 sw3 40 6 240 sw3 40 7.75 310 ffi€fiF5{el w 1=t5 TotalSW3 Qllantity 3878 NW2 360 25.5 9180 Total Shotcrete Qty Estimated Cost at 23$lSF 5302 $ rzr,ssr.az Cameron Bloomer, PE C 206.819.7I48 | cbloomer@kbacm,com KBA, lnc. I Construction Monagement Specialists I www.kbacm.com From: Cameron Bloomer Sent: Wednesday, May 20,2020 3:31 pM To: Barry, Jason <i Barry@kentwa.gov>; M adfai, M a rk <M M adfa i @ kentwa.gov> Cc: Dane Setzer <dsetzer@kbacm.com> Subject: RE: 228th Street - Shotcrete over Hilfiker Wall Hello Jason, Attached is what I came up with. Roughly 5000 SF, about $1-15,000. Thank you, Cameron Bloomer, pE C 206.819.7748 | cbloomer@kbacm.com KBA, lnc" I Construction Monogement Speciolists I www.kbacm.com From: Barry, Jason <J Barry@ kentwa.gov> Sent: Wednesday, May 20, 2020 1:53 pM To: Cameron Bloomer <cbloomer@kbacm.com>; Madfai, Mark <@> Subject: FW: 228th Street - Shotcrete over Hilfiker Wall We ever get a take-off on footage for that area? From : Matthew Scarsella -[majLtO: matthew,s@SCARSELLABROS.com]Sent: Wednesday, May 20, 2020 12O3 pM To:'cbloomer@kbacm.com' Cc: Barry,lason; Madfai, Mark; Jared RockeySubject: 228th Street - Shotcrete over Hilfiklr Wail Hi Cameron, Conco said they will shotcrete over the Hilfiker wall at unit price + some additional conc waste thatwill belostinthevoidsoftherock. Theyestimatethewastetobeapproximatelyl0-l5cydsper 2'000 sF' SB structures will have some time to remove and reset the short piece of work deck thathas been built on sw2. shotcrete will need to be installed after SW3 moment slab and prior to sw2barrier. Than ks, Matt Scarsella Bros., lnc. Matthew Scarsella, p.E. I project Manager P.O. Box 68697 Seattle, Washington 9g169-0697 o: (253) 872-7Lt3 | c: (206) 8L7-2765 matthew.s@scarsellabros.com EXTERNAL EMAIL