HomeMy WebLinkAboutCAG2019-084 - Change Order - #12 - Scarsella Brothers, Inc. - LID 363: S 224th Street Project - 05/19/2020 Agreement Routing Form • For Approvals,Signatures and Records Management K ENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASHINGTON (Print on pink or cherry colored paper) Originator: Department- S.Anderson PW Engineering Date Sent: > 6/29/20 Date Required: o N/A 0. Authorized to Sign: Q0 Director or Designee ❑Mayor Date of Council Approval: N/A Budget Account Number: r9oto1.s411o.12o Grant? El Yes ❑No Budget? 0 Yes ❑No Type: N/A Vendor Name: Scarsella Bros., Inc. Category: Contract Vendor Number: 34547 Sub-Category: C p Change Order#12 to Project Name: Lid 363: S. 224th Street Project E 0 c Project Details:Additional work required to complete revision #9. New guardrail, signs, channelization and install temporary striping on 218th Street and 88th Avenue. Agreement Amount: $27,968.61 Basis for Selection of Contractor: Bid Start Date: N/A Termination Date: N/A Local Business? ❑Yes O No* *If meets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? ❑Yes �No Contract Number: CAG2019-084 Date Received by City Attorney: t�1 Comments: C 'M �> �W � L M i'f1 Date Routed to the Mayor's Office: ii� Date Route�tothe�CityCler�k's Office: Visit Documents.KentWkgov to obtain copies of all agreements �-� KEN T CHANGE ORDER NO. #12 NAME OF CONTRACTOR: Scarsella Bros, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Lid 363: S 224th Street Project ORIGINAL CONTRACT DATE: February 19, 2019 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Additional work required to complete revision #9. New guardrail, signs, channelization and install temporary striping on 2181h Street and 881h Avenue. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $8,423.307.67 (including applicable alternates and WSST) Net Change by Previous Change Orders $394,371.78 (incl. applicable WSST) Current Contract Amount $8,817,679.45 (incl. Previous Change Orders) Current Change Order $27,968.61 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $8,845,648.06 CHANGE ORDER - 1 OF 3 Original Time for Completion 130 working days (insert date) Revised Time for Completion under 22.5 working days prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion 225 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KKEEN-T: (signature) (sig ture) Print Name: \��� /� i�c Print Name: Timothy J. LaPorte, P.E. Its Its Public Works Director (title) �tte�ZD DATE: DATE: L JAIC CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) r Kent City Clerk Kent Law Department i I i (In this field,you may enter the elettroriW filepath where the contract has been saved] I CHANGE ORDER - 3 OF 3 KENT FILE NO: 200.2 G CHANGE ORDER WORKSHEET NO. 12 Construction Management Division - Public Works Project: LID 363 2241h St Improvements Project No.: 14-3010 Project Engineer: Stephen Lincoln Fed-Aid No.: Owners Rep: Jason Bryant Contractor: Scarsella Date: 5/5/20 I. PROPOSED CHANGE Additional work required to complete Revision # 9. Install temporary striping on 2181h St and 88th Ave II. REASON AND BACKGROUND FOR CHANGE The City of Kent identified the need for a channelization change @ 96th and 218th resulting in the issuance of Revision No. 9. Crews removed existing signs and channelization. New guardrail, signs and channelization was installed per Revision # 9. Crews installed temporary channelization on 218th and 881h Ave for the winter suspension including layout and RPM's. Temporary channelization was applied twice due to wet conditions. III. METHOD OF PAYMENT NEW PAY ITEMS) ❑ Not Applicable Change Order No. - FOR A CCOUN77NG USE ONLY Total Est. Qty this Total Estimated Cost of Sch. No. Item Description Qty PE Unit Unit Price Item - ------------------- - - Install guardrail, signs, and ----------5----....__: channelization-..per Revision--9------------1--------.-... ---------1----- ---FA $20,520.61 ......':.._......._._..$20.520'-6-1 Install & maintain temporary 5 Channelization 1 1 FA $7 448.00 $7,448.00 ® Independent Estimate Attached ❑ CREATE PAY ITEM ONLY- Payment to be made ® ; PAY THIS PAY ESTIMATE - REQUIRED at a later date upon completion of work ❑ -- ---. . .. . - - ... -----.-. ----- !- .q.. . Material Submittals Required CC Construction Coordinator New Sub Re rd? No DELETE EXISTING PAY ITEMS) per 1-09.5 ® Not Applicable Change Order No. - FOR A CCOUN77NG USE ONLY Sch.No. B.I.No. Item Description Qty Unit Unit Price Cost of Item ❑ Independent Estimate Attached -REQUIRED i ❑ 1 REV. DATE:4/01/10 KENT• FILE NO: 200.2 INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® NotAppllcable Change Older No. - FOR A CCOUN77NG USE ONLY Sch. No. B.I.No. Item Description Qty Unit Unit Price Cost of Item - --- -- - - ..---.....-......... ......- - -...-......-.......----------+ ---------------------------.------..__...- .... - -------------- ---- ----- - Independent Estimate Attached -REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * $27,968.61 *Total of the Cost of Item Columns THIS PAY ESTIMATE 127L968.61 IV. WORKING DAYS Original Contract 130 Due This Change Order* ! Previous Total ; 190 __:. -- -- --- ------------....---------.......--...--....---------------...-._-2....----------------------._...- -- - - - — ------ -- --- --.............- DATE: 5 5 20 DATE: 5 5 2 ---- ----..__.. ------------ -�-.......... ..................... --...-------........... —-- ............. -- ----�- ----.,._...... -- ---- ------------------- --...- Explanation/]uglification Required: On critical path for project completion -- TOTAL WORKING DAYS* 190 Ll *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: c �—*�1�� y Date: .4. Jason Bryant Construction Engineering Date: Supervisor: f4y,l P ul Kuehne Construction Engineering Date: Manager: Eric Connor 2 REV. DATE:4/01/10 FA Sheet No.. 119 DAILY REPORT OF FORCE ACCOUNT WORKED / �- T Project Name: LID 363 224th St Phase 2 Project No: 14-3010 Item No.: Date: 12/12/2019 Description of Work: Add new channelization @ 98th and 216th including guardrail per revision#9 Install signs per Revision#9 Work by Subcontractor?: NO Prime Contractor: Scarsella Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Jeff B Foreman 1 7948 $ 7948 Tina D Laborer 4 57 92 $ 231.68 Connor M Laborer 4 5792, $ 231.68 $ $ SUBTOTAL-LABOR: $ 542.84 LABOR OVERHEAD&PROFIT @ 29% $ 157A2 LABOR TOTAL S 700.26 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment 9 Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 2-287 Ford PU 1 1969, $ 19.69 Highway SpecBlies 1 172697 $ 1,726,97 is SUBTOTAL-EQUIPMENT $ 1746.6E EQUIPMENT OVERHEAD&PROFIT @ 21% $ 36680 EQUIPMENT TOTAL S 2,113.46 MATERIALS/SERVICES/RENTALS MATERIALS i SERVICES Quantity Units I Unit Price DOLLAR AMOUNT Peterson Brothers Inc 1 ea $ 5,963.23 $ 5,963.23 SPM Marking Inc 1 ea $ 8,963.75 $ 8,963,75 $ $ SUBTOTAL $ 14,926 98 OVERHEAD&PROFIT @ 12% $ 1,79124 TOTAL S 16,718.22 Verification of Hours Worked: TOTAL $ 19,531.94 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date f" P' SHEET TOTAL: $ 19,531.94 Owner's Representative t - Date �' �*' Pay Estirnate Entered. Date: By: 7220 River Road E Puyallup, WA 98371 (360)316-6831 (� r!3 hway efe hi hwa s ecialfies.com I Date Estimate# sPcIAL1tEs Lc P rC 9 YP 1 1{4/2019 130 Bill To Ship To �Scarseila Brothers Will Call PO Box 68697 7220 River Rd E Seattle. WA. 98168-0697 Puyallup WA 98371 Job No. Project Name Terms Date Req'd Delivery By Rep 14-3010C-Rev.9 1-11)363 Net 30 12/4/2019 PCs Description Qty Price Each Total Post.2' x 2" x 12"Qwik-Punch 6 72.00 432,00 Lower Sign Support.2-1/2"x 24". 7ga HD 7 35.00 245.00 SNS Bracket.2° Post Cap. Flat Blade 1 15.00 15.00 SNS Bracket..90"Cross Piece 1 12.50 12.50 31'8- Drive Rivet w/Nylon Washer 22 1.10 24.20 2.5"Corner Bolt w/Serrated Hex Flange Nut 7 1.10 7.70 I i i I Subtotal $1.571.40 Sales Tax (9.9%) S155.57 Total $1 726 97 Page 2 Petersen Brothers, Inc. 2008 East Valley Hwy Sumner, WA 98390 (253)863-8136 Scarsella Brothers, Inc. INVOICE ID 1903102 P.O. Box 68697 DRAW ID 1903102 Seattle, WA 98168-0697 DATE November 16.2019 SALESPERSON CONTRACT ID: 19-031 CUSTOMER ID.,.SC-ARSEi_LNE LID 363(Kent)224th, ET AL PO:1 14-3010 LOCATION: 1715 Kent/Use Tax ------ - Item Description I Units Unit of Uni± Total Units Units in Current Contracted measure Price in Place Place this Billing Period 1 1305-Type 31 GR,6'SP 670.00 LF 39.72 356.25 2 1310-Anchor Type 10 1.00 EA 1,015,94 1.00 3 1311 -Ty 31 Buried Term Ty 2 1.00 EA 5,039.91 ��� 4 1312-Ty 31 NFT fVSKT T 2 SP 2.00 EA 2,803.20 3,00 C1a 37.5 LF Guardrail&2 EA NFT's 1 00 LS 5,96323 1.00 1.00 5.963.23 Total 5,963.231 Invoice Sub-total 5,963.23 Retainage Held -298.16 Amount due this Invoice $5,665.07 Billed to date: 29,539,02 Paid to date: 22,397.00 Retainage 1,476,95 Total amount due $5,665,07 Current week quantities are estimated and subject to verification and adjustment at contract completion. For questions regarding this billing please contact Jean Denison at 253-863-8136, ext. 126. Specialized Pavement Marking, Inc. INVOICE 11095 SW Industrial Way, Ste. A Tualatin, OR 97062 To; Scarsella Brothers, Inc. Invoice#: 24672-2 PO Box 68697 Date: 02/29/20 Seattle,WA 98168 Application#: 2 Customer Reference: 14-3010 Invoice Due Date: 03/30/20 Contract: 24672- LID 363: S 224TH STREET PROJECT CITY OF KENT Payment Terms: Net 30 days Work Performed 02101120-02129/20 Quantity Unit Total Contract Item JTD Price U/M To Date 1000 5100;SINGLE SOLID PLASTIC EDGE LINE 0.000 1.50000 LF 0,00 1010 5105; PROFILED PLASTIC DOUBLE YELLOW 0.000 2.75000 LF 0.00 CENTERLINE 1020 5110; PROFILED PLASTIC TWLTL LINE 0.000 2.50000 LF 0.00 1030 5112: SOLID PLASTIC WIDE LANE LINE 0.000 4.50000 LF 0.00 1040 5115;PLASTIC STOP LINE(24 ICH WIDE ) 0.000 45.00000 LF 0.00 1050 5120; PAINTING TRAFFIC CURB 0.000 6,50000 LF 0.00 1060 5125: PLASTIC TRAFFIC ARROW 0.000 200.00000 EA 0,00 1070 Alt 1;Additional Mobilization(After One) 0.000 1,000.00000 EA 0,00 1080 CO1.1;Temp Paint Per Shift-2 Men Truck and Materials 1.000 2,000.00000 LSm 2,000.00 1090 CO1.2; Layout for Temp Striping 1.000 1,000.00000 LSm 1,000.00 1100 CO2.1;Type 2 RPM's ��c q 165.000 10.00000 EA 1,650.00 1110 CO3 1; Ph2 Rev#9-98th Ave&S 216th St Channelization 1,000 8,963.75000 LSm 8,963.75 1120 C04.1;Temp Paint Per Shift-2 Men Truck& Materials 2.18.20 1.000 2,000.00000 LSm 2,000.00 Total To Date: 15,613.75 Plus Sales Tax : 000 Less Retainage 780.69 Less Previous Applications : 12,933.06 Total Due This Invoice : 1,900.00 Page 1 of 1 ii�sv/sw V FA Sheet No.: 120 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: LID 363 224th St Phase 2 Project No: 14-3010 Item No : Date: 12/13/2019 Description of Work: Install signs bases per Revision#9 Work by Subcontractor? No Prime Contractor: Scarsella Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Jeff B Foreman 1 79.48 $ 79.48 Tina D Laborer 1 57.92 $ 5792 Connor M Laborer 1 57.92 $ 57 92 $ SUBTOTAL-LABOR: $ 19532 LABOR OVERHEAD&PROFIT @ 29% $ 56.64 LABOR TOTAL $ 251.96 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs tandby Rate AMOUNT 2-287 Ford PU 1 19.69 $ 19.69 S Is - SUBTOTAL-EQUIPMENT $ 19.69 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 4.13 EQUIPMENT TOTAL $ 23.82 MATERIALMERVIC ESMENTALS MATERIALS r SERVICES Quantity Units Unit Price DOLLAR AMOUNT $ is SUBTOTAL $ OVERHEAD&PROFIT @ 21% $ TOTAL $ Verification of Hours Worked: TOTAL $ 275.78 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative/ Date-.�/5 Z SHEET TOTAL: $ 275.78 Owner s Representative i� - Date Pay EstigtWe En Yed: Date: By: FA Sheet No.: 121 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: LID 363 224th St Phase 2 Project No: 14-3010 Item No.: Date. 1 211 6/201 9 Description of Work: Install signs per Revision#9 'Mork by Subcontractor? NO Prime Contractor: Scarsella Sub-Contractor. LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate His OT Rate AMOUNT Jeff B Foreman 1 79.48 $ 79.48 Staosi p Laborer 4 55.75 $ 223,00 Connor M Laborer 4 57.92 $ 23168 $ $ SUBTOTAL-LABOR: $ 534 16 LABOR OVERHEAD&PROFIT @ 29% $ 154.91 LABOR TOTAL S 689.07 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs atand'cy ate AMOUNT 2_287 Ford PU 1 1969 $ 1969. SUBTOTAL-EQUIPMENT $ 1969 EQUIPMENT OVERHEAD&PROFIT @ 21°o $ 4 13 EQUIPMENT TOTAL S 23.82 MATERIALSISERVICES/RENTALS MATERIALS i SERVICES Quantity Units Unit Price DOLLAR AMOUNT $ $ SUBTOTAL $ OVERHEAD&PROFIT @ 21% $ TOTAL S Verification of Hours Worked TOTAL $ 712.89 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative ? Date j !d SHEET TOTAL: $ 712.89 Owner's Representative •"�•.f r �-,.._ Date •'y �i� �� Pay Esytfirlate E ered: Date: By FA Sheet No.: 122 DAILY REPORT OF FORCE ACCOUNT WORKED -SENT Project Name: LID 363 224th St Phase 2 Project No: 14-3010 Item No. Date: 12/12/2019 Description of Work: Temporary channelization on 218th/88th Work by Subcontractor?: No Prime Contractor: Scarsella Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT 1 $ - $ S - SUBTOTAL-LABOR $ LABOR OVERHEAD&PROFIT @ 29% $ LABOR TOTAL $ EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs I Hourly Rate Hrs Standby Rate AMOUNT $ SUBTOTAL-EQUIPMENT $ EQUIPMENT OVERHEAD&PROFIT @ 21% $ EQUIPMENT TOTAL $ MATERIALSISERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT SPM Marking Inc-Temp Striping 1 ea $ 2,000.00 $ 2,000.00 SPM Marking Inc-La ut 1 ea $ 1.000.00 S 1,000.00 SPM Marking Inc-RPM's 1 ea $ 1,65000 $ 1,650,00 SPM Marking Inc-Temp Striping 1 ea $ 2,000.00 $ 2,00000 is - SUBTOTAL $ 6,650.00 OVERHEAD&PROFIT @ 12% $ 798.00 TOTAL $ 7,448.00 Verification of Hours Worked: TOTAL $ 7,44800 12%MARKUP (for prime when subcontract work) $ - Contractor's Re{uesentative J Date J t y SHEET TOTAL: $ 7,448.00 6,vner'sRepresentative - �---T. Date S'V' %X Pay Estirthate Efltered: Date: By: Specialized Pavement Marking, Inc. INVOICE 11095 SW Industrial Way, Ste. A Tualatin, OR 97062 To: Scarsella Brothers,Inc. Invoice#: 24672-2 PO Box 68697 Date: 02/29/20 Seattle,WA 98168 Application#: 2 Customer Reference: 14-3010 Invoice Due Date: 03/30/20 Contract: 24672- LID 363: S 224TH STREET PROJECT CITY OF KENT Payment Terms: Net 30 days Work Performed 02/01/20-OV29/20 Quantity Unit Total Contract Item JTD Price Ulm To Date 1000 5100;SINGLE SOLID PLASTIC EDGE LINE 0.000 1.50000 LF 0.00 1010 5105;PROFILED PLASTIC DOUBLE YELLOW 0.000 2.75000 LF 0.00 CENTERLINE 1020 5110;PROFILED PLASTIC TWLTL LINE 0,000 2.50000 LF 0.00 1030 5112;SOLID PLASTIC WIDE LANE LINE 0.000 4.50000 LF 0.00 1040 5115; PLASTIC STOP LINE(24 ICH WIDE ) 0.000 45.00000 LF 0,00 1050 5120; PAINTING TRAFFIC CURB 0.000 6.50000 LF 0.00 1060 5125: PLASTIC TRAFFIC ARROW 0.000 200.00000 EA / ,. 0.00 1070 Alt 1;Additional Mobilization(After One) 0.000 1,000.00000 EA �c 0.00 1080 C01.1;Temp Paint Per Shift-2 Men Truck and Materials 1.000 2,000.00000 LSm 2,000.00 1090 C01.2; Layout for Temp Striping 1.000 1,000.00000 LSm 1,000.00 1100 CO2.1;Type 2 RPM's 165.000 10,00000 EA 1,650.00 1110 CO3.1; Ph2 Rev#9-98th Ave&S 216th St Channelization 1.000 8,963.75000 LSm 8,963.75 v 1120 C04,1;Temp Paint Per Shift-2 Men Truck&Materials 2.18.20 1.000 2,000.00000 LSm 2,000.00 Total To Date: 15,613.75 Plus Sales Tax: 0.00 Less Retainage: 780.69 Less Previous Applications : 12,933.06 Total Due This Invoice: 1,900.00 Page 1 of 1 PUBLIC WORKS DESIGN ENGINEERING Carla Maloney, P.E. Design Engineering Manager 400 West Gowe Kent, WA 98032 Fax: 253-856-6500 PHONE: 253-856-5500 Date: September 27, 2019 To: Eric Connor, Construction Engineering Manager cc: Paul Kuehne, Construction Supervisor Eric Knowles, City Surveyor Jason Bryant, Capital Project Manager From: Craig Morris, Engineering Designer II Through: Carla Maloney, P.E., Design Engineering Manager Mark Madfai, Design Engineering Supervisor Ken Langholz, Engineer IV Stephen Lincoln, Project Engineer Regarding: S. 224th Street Improvements - 88th Ave S/S 218th St S 222nd St to 94th PI. S. Project No. 14-3010C Revision No. 9 ISSUE Sheet 25A of 34: Add new channelization at the intersection of 98th Ave S and S 2161h St. -ISSUE-Detatt`'LG 4RRfSSflN-C-f�f-EK-C-Ui:-V-Ef-T-tETAI LING--1fAL-L-F�aTIN-G..COV€R: Attachments: Sheet 25-A-of 34.- --GARR4-SON-•CREEK-C--U-L-VER-RETAINING-WALL F-G&T-ING COVER-D€TAI-L City of Kent Public Works Department Timothy J. LaPorte, P.E., Public Works Director < F, � - �` `+ I\ § A rca I� gi 6 tlys W W_—2 V N m 3 3 3 5 6 N O —._ — ---------- —_ I EP N N in c R Y y y 0 S 3AV H166 N _ _ I y i F z a 9 M>y� N - ----- ism MlvM3a5,t oo ———————eVe lso�— � c W $ � fca 1 I W Ia $I € C py �' a„ F � � � I O �� L�-- nO Z S 8 $ A hN 8 8 8 $ g 8 q = z In W p "a i ffi a o'n ui Z Igo a IQ ro¢ Ws S N 2 m W X •a N In I of l i OO D 1 �1 8 4)' U 3l c� � N O ti ,� S dd mmm� mmr N VOj 4' [ nu 8.'a Nm �mC Lm,"' I 2U Q) F: g Q � CZN 3 hry �� \\ m$ - 0 F W Doti g aFIOEWAY \ — y � P O \ \ N S 3AV Hi86 'pB' , a �oo,ic - g o — .ro, S 3AV HIS6 AYM3Alaa ---um ----- I o g 3 W '� ro n fix s r k r r - - M✓a � YK 0 N W gF. NNE Q o m Z^MI O� ae3 ZZ~ 7m N N2 I O JOWE m Zi p a a RZO �m< O V Q0Z0 OYW (5� L s N K 3 Q 8 N O C m 0 l7