HomeMy WebLinkAboutCAG2019-084 - Change Order - #11 - Scarsella Brothers, Inc. - LID 363: S 224th Street Project - 04/14/2020 Agreement Routing Form \'Z0000 • For Approvals,Signatures and Records Management KEN T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. W n s H i N c T o d (Print on pink or cherry colored paper) Originator: Department: S.Anderson PW Engineering Date Sent: Date Required: a 6/29/20 N/A a. aAuthorized to Sign: Date of Council Approval: 0 Director or Designee ❑Mayor N/A Budget Account Number: Grant? 0 Yes ❑No D90101.64110.330 Budget? 0 Yes ❑No Type: N/A Vendor Name: Category: Scarsella Bros., Inc. Contract Vendor Number: Sub-Category: C 34547 Change Order#11 *o Project Name: Lid 363: S. 224th Street Project E a. 0 Project Details:Additional work required to drive steel foundation piles for the Garrison Creek Culvert due to unknown obstructions. C Agreement Amount:$16,465.99 Basis for Selection of Contractor: Bid Start Date: N/A Termination Date: N/A Local Business? ❑Yes []No* *If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce. Notice required prior to disclosure? Contract Number: ❑Yes 0 No CAG2019-084 Date Received by City Attorney: Comments: at C •> i 4! W C 0 Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: -- Visit Documents.KentWA.gov to obtain copies of all agreements • KENT CHANGE ORDER NO, #11 NAME OF CONTRACTOR: Scarsella Bros, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Lid 363: S 22411 Street Project ORIGINAL CONTRACT DATE: February 19, 2019 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Additional work required to drive steel foundation piles for the Garrison Creek Culvert due to unknown obstructions. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $8,423,307.67 1 (including applicable alternates and WSST) Net Change by Previous Change Orders $377,905.79 j (incl. applicable WSST) Current Contract Amount $8,801,213.46 (incl. Previous Change Orders) Current Change Order $16,465.99 Applicable WSST Tax on this Change $0.00 i Order Revised Contract Sum $8,817,679.45 CHANGE ORDER - 1 OF 3 Original Time for Completion 130 working days (insert date) Revised Time for Completion under 225 working days prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion 225 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: (signature) 4� 11 signature) Print Name:'_ !► Print Name: Timothy J. LaPorte, P.E. Its CT- AvyA,0;-,*Ve_ Its Public Works Director (title) (ti e) DATE: �13r�Z> DATE:�/ /5` 20 CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) (Ai V•' 1 Kent City Clerk Kent Law Department [in this field,you may enter the electronic Mepath where the contract has been saved! CHANGE ORDER - 3 OF 3 KE 0 FILE NO: 200.2 CHANGE ORDER WORKSHEET NO. 11 Construction Management Division - Public Works Project: LID 363 2241h St Improvements Project No.: 14-3010 Project Engineer: Stephen Lincoln Fed-Aid No.: Owners Rep: Jason Bryant Contractor: Scarsella Date: 3/6/20 I. PROPOSED CHANGE Additional work required to drive steel foundation piles for the Garrison Creek culvert II. REASON AND BACKGROUND FOR CHANGE SB Structures crews encountered unknown obstructions while installing steel piles support the footings of the new culvert at Garrison Creek. Additional labor and equipment hours were necessary to install piles to the required depth. III. METHOD OF PAYMENT NEW PAY ITEM(S) Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of Qty PE Item __...................._...._;............... ----......._......._...._.._.._._..---..—_-...._..._.--- ......-----._.._.____..................................................................................--._..._............. Foundation Pile Extra Work 1 1 FA $16,465.99 $16,465.99 Independent Estimate Attached CREATE PAY ITEM ONLY— Payment to be made ® PAY THIS PAY ESTIMATE -REQUIRED at a later date upon.completion of work ❑ _ .. _ ..... .....__........._.._... 4._. _........ ..._...-............._._.._ . Material Submittals Required — CC: Construction Coordinator New Sub Re rd? No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch.No. B.I.No. Item Description Qty Unit Unit Price Cost of Item _...._........................................_.............. -....__ .............................--............................_............--._..._...................._.......... .............._........_.................... ......- _.... --.................--..._........__......................_ ... Independent Estimate Attached -REQUIRED INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item 1 REV. DATE:4/01/10 KENT FILE NO: 200.2 wA= Independent Estimate Attached - REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * $16,465.99 *Total of the Cost of Item Columns THIS PAY ESTIMATE $16,465.99 IV. WORKING DAYS Original Contract 130 Due This Change Order* Q Previous Total 190 .._......_..... ......... ......... ......... .. ................. ........_. DATE: 3/6/20 DATE: 3/6120 .---....--......._................................................ - ............................_--..........._ — ------- ._—_.. .........._............. Exp anati2nn jJustification Required• On critical path for project completion TOTAL WORKING DAYS* 190 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: . . Date: Jason Bryant r' Construction Engineering Date: y Supervisor: 3 .2 i TO Pau ehn Construction Engineering Date: Manager: L y$�r/ d Eric Connor 2 REV. DATE: 4/01/10 ° . m . . , # mqm „ 2 § g®LU § � § z \ 2 d LLI ) - ® - - - - - - - - ® ® - - - - - - ® - - - - - - - - - - ®------ 7 ® ) R2235 %�. 2 u . , ; 2 . . . / � ! l, ) � � � � 0 C) 0.aF-W - - ) e w = 43��amV) § � d ( k /\(( �§ q� � a}� 2 [\ !)}; -0 ld G ; (6In (0U6 o/ � 6 � � � 6�)� \ � » � � A7\ • ) (n2 fk | | k k * § § k / � ! } E ) A sco !; 2U3 $ $ a3 ) 3E § ; / S § k ) < < wo ! [ 0 o ZZF-0 ° e § y ! § o § B2 ) gym ! $ E LU w § _ tr - ) ; s ) k2 00 ; ° § o ! � CL = 0 zS � § G § @I ° ° « N ? / G o § J ® , LU § ` ■ » ! - - ® - ® - - ® - - - - _ uj - 2 § glmmAmR § cr ) 2 ! LL w o a - - - ® ® - - - - - - - G w E jaa ` as ° @a ® maa m E u oQQoeeoQtzcer S & ocuoc � oo � oe TFIJ » \ / _ _ u ) En - ) LU $ ( - LU g � (§ # � k cc x � § { 2 � � m ) \ \ \k \ §co ) _ \ i k7 B \ Bryant, Jason From: Bryant, Jason Sent: Tuesday, August 20, 2019 1:34 PM To: David Shearer <david@shearerdesign. net>; Brett E. Larabee; shayter@geoengineers.com Cc: Shields, Brian; Chau, Tsz Subject: Fwd: 143010 LID 363 S 224th St - IMPACT PILE HAMMER MAXIMUM CRITERIA Attachments: image001jpg; ATT00001.htm; refusal.pdf; ATT00002.htm All, Please read the email slow from Scarsella. Let me know what you think? Thank you, Jason Bryant Sent from my I phone Begin forwarded message: From: Loch Louman <loch.I@SCARSELLABROS.com> Date: August 20, 2019 at 11:29:57 AM PDT To: "Bryant,Jason (JBryant(@kentwa.gov)" <JBryant@kentwa.gov> Cc:Jared Rockey<ia red.r@sbstructures.com>, Matthew Scarsella <matthew.s@SCARSELLABROS.com> Subject: 143010 LID 363 S 224th St-IMPACT PILE HAMMER MAXIMUM CRITERIA EXTERNAL EMAIL Jason, Reference the attached pile driving refusal criteria. The Delmag 46-32 impact hammer, that we are using for the closed end 24"pipe pile for the culvert, is supplied by PACO Equipment CO.. PACO has issued the attached pile driving criteria to maintain during driving. With this in mind, we will not exceed 120-blows/ff during pile driving and will not exceed 250-blows/ft for the last foot. Also 10-ft of hammer stroke will not be exceeded. Using this criteria we should still make the new required tip elevation but thought I would let you know the hammer constraints. Thanks, 1 Bryant, Jason From: David shearer <david@shearerdesign.net> Sent: Tuesday, August 20, 2019 2:27 PM To: Bryant, Jason; 'Brett E. Larabee'; shayter@geoengineers.com Cc: Shields, Brian; Chau, Tsz Subject: RE: 143010 LID 363 S 224th St - IMPACT PILE HAMMER MAXIMUM CRITERIA EXTERNAL EMAIL Jason I think we are going to have to do each pile on a case by case basis.Therefore they should install the plies such that they done exceed the hammer refusal criteria (120/ft& 250/ft last foot.) and see what pile tip we are able to achieve, then evaluate. David Shearer From: Bryant,Jason <J Bryant@ kentwa.gov> Sent:Tuesday,August 20, 2019 1:34 PM To: David Shearer<d avid @shearerdesign. net><david@shearerdesign.net>; Brett E. Larabee <blarabee@geoengineers.com>; shayter@geoengineers.com Cc:Shields, Brian<BShields@kentwa.gov>; Chau,Tsz<TChau@kentwa.gov> Subject: Fwd: 143010 LID 363 S 224th St- IMPACT PILE HAMMER MAXIMUM CRITERIA All, Please read the email slow from Scarsella. Let me know what you think? Thank you, Jason Bryant Sent from my I phone Begin forwarded message: From: Loch Louman <loch.l@SCARSELLABROS.com> Date:August 20, 2019 at 11:29:57 AM PDT To: "Bryant,Jason (JB_ryant@kentwa.gov)" <JBryant@kentwa.gov> Cc:Jared Rockey<ia red.r@sbstructures.com>, Matthew Scarsella <matthew.s@SCARSELLABROS.com> Subject: 143010 LID 363 S 224th St- IMPACT PILE HAMMER MAXIMUM CRITERIA EXTERNAL EMAIL Jason, Reference the attached pile driving refusal criteria. 1 Bryant, Jason From: Shields, Brian Sent: Saturday, August 24, 2019 8:41 PM To: blarabee@geoengineers.com; david@shearerdesign.net Cc: Bryant, Jason Subject: Pile depths Brett/David, We drove the remaining four piles on the East side of the creek today on the S 224th St ph 2 job.The depths achieved were approximately elevation 39 to 40. Our previously discussed requirement was 36.The diesel hammer blow count was greater than 250, with less than two feet of movement when the above mentioned depths were achieved. The hammer's manufacturer requires a max of 250 blows for two feet of movement. Is elevation 40-39 acceptable? The contractor plans on performing demolition activities to the West approach on Monday.The sooner we can get an answer,the better; once the approach is gone, so is our crane pad. I appreciate your understanding of the urgency and "last minute" status that is attached to this email. Let me know if you have any questions. I will have my work and personal phones on me all weekend. 253-293-4973 (work cell) 206-458-1617 (personal) Feel free to call either phone. Thanks, Brian Shields Sent from my iPhone 1 Bryant, Jason From: Brett E. Larabee <blarabee@geoengineers.com> Sent: Monday, August 26, 2019 8:00 AM To: David shearer Cc: Bryant, Jason; Shields, Brian Subject: Kent 224th Piles Attachments: 8-24-19 Pile Logs 2E to 2H.pdf EXTERNAL EMAIL David, Sounds like the piles came up a little short of our minimum embedment criteria.The driving resistance over the last 4 feet exceeded 32 blow/foot, so we are confident we are in the "stiff clay" soil. Logs are attached for reference. Are we ok with the shallower total embedment depth? Let's talk when you can. Brett Brett E. Larabee, PE Geotechnical Engineer( GeoEngineers, Inc. Telephone: 253.722,2436 Mobile: 208.761.6940 Email: blarabeea geoengineers.com Confidentiality: This message is confidential and intended solely for use of the individual or entity to whom it is addressed. If you are not the person for whom this message is intended, please delete it and notify me immediately, and please do not copy or send this message to anyone else. 1 Bryant, Jason From: David shearer <david@shearerdesign.net> Sent: Monday, August 26, 2019 12:48 PM To: Shields, Brian; blarabee@geoengineers.com Cc: Bryant, Jason Subject: RE: Pile depths EXTERNAL EMAIL Brian & Bret I looked at Piles 2E(Tip 38.0) , 2F(Tip 40.92). 2G (Tip 39.42) 2H (tip 38.72). Because we had some dene material in the last four feet of driving these piles will be acceptable for vertical and lateral loads even though the final tip elevation was above the target El 36.0. David Shearer -----Original Message----- From: Shields, Brian <BShields@kentwa.gov> Sent: Saturday,August 24,2019 8:41 PM To: blarabee@geoengineers.com; david@shearerdesign.net Cc: Bryant,Jason <JBryant@kentwa.gov> Subject: Pile depths Brett/David, We drove the remaining four piles on the East side of the creek today on the S 224th St ph 2 job.The depths achieved were approximately elevation 39 to 40. Our previously discussed requirement was 36.The diesel hammer blow count was greater than 250, with less than two feet of movement when the above mentioned depths were achieved.The hammer's manufacturer requires a max of 250 blows for two feet of movement. Is elevation 40-39 acceptable? The contractor plans on performing demolition activities to the West approach on Monday.The sooner we can get an answer,the better; once the approach is gone, so is our crane pad. I appreciate your understanding of the urgency and "last minute" status that is attached to this email. Let me know if you have any questions. I will have my work and personal phones on me all weekend. 253-293-4973 (work cell) 206-458-1617 (personal) Feel free to call either phone. Thanks, Brian Shields Sent from my iPhone i Bryant, Jason From: Brett E. Larabee <blarabee@geoengineers.com> Sent: Wednesday, August 21, 2019 8:23 AM To: David shearer; Bryant, Jason; Sean A. Hayter Cc: Shields, Brian; Chau, Tsz Subject: RE: 143010 LID 363 S 224th St - IMPACT PILE HAMMER MAXIMUM CRITERIA EXTERNAL EMAIL I agree with this approach. If they cannot meet the currently specified installation criteria with the D46 hammer we should be notified to evaluate acceptability of the pile. Thanks, Brett Brett E. Larabee, PE Geotechnical Engineer I GeoEngineers, Inc. Telephone: 253.722.2436 From: David shearer<d avid @shearerdesign.net> Sent: Tuesday,August 20, 2019 2:27 PM To: 'Bryant,Jason' <JBryant@kentwa.gov>; Brett E. Larabee<blara bee @geoengineers.com>;Sean A. Hayter <shavter@geoengineers.com> Cc: 'Shields, Brian' <BShields@kentwa.gov>; 'Chau, Tsz' <TChau@kentwa.gov> Subject: RE: 143010 LID 363 S 224th St- IMPACT PILE HAMMER MAXIMUM CRITERIA (EXTERNAL) Jason I think we are going to have to do each pile on a case by case basis.Therefore they should install the plies such that they done exceed the hammer refusal criteria (120/ft& 250/ft last foot.) and see what pile tip we are able to achieve,then evaluate. David Shearer From: Bryant,Jason <JBryant@kentwa.gov> Sent:Tuesday,August 20, 2019 1:34 PM To: David Shearer<david@shearerdesign. net><david@shearerdesign.net>; Brett E. Larabee <blarabee@geoengineers.com>; shavter@geoengineers.com Cc: Shields, Brian <BShields@kentwa.gov>; Chau,Tsz<TChau@kentwa.gov> Subject: Fwd: 143010 LID 363 S 224th St- IMPACT PILE HAMMER MAXIMUM CRITERIA All, Please read the email slow from Scarsella. Let me know what you think? 1 Thank you, Jason Bryant Sent from my I phone Begin forwarded message: From: Loch Louman <loch.l@SCARSELLABROS.com> Date: August 20, 2019 at 11:29:57 AM PDT To: "Bryant,Jason (JBryant@kentwa.gov)" <JBryant@kentwa.gov> Cc:Jared Rockey<ja red.r@sbstructures.com>, Matthew Scarsella <matthew.s@SCARSELLABROS.com> Subject: 143010 LID 363 S 224th St-IMPACT PILE HAMMER MAXIMUM CRITERIA EXTERNAL EMAIL Jason, Reference the attached pile driving refusal criteria. The Delmag 46-32 impact hammer, that we are using for the closed end 24"pipe pile for the culvert, is supplied by PACO Equipment CO.. PACO has issued the attached pile driving criteria to maintain during driving. With this in mind, we will not exceed 120-blows/ft during pile driving and will not exceed 250-blows/ft for the last foot. Also 10-ft of hammer stroke will not be exceeded. Using this criteria we should still make the new required tip elevation but thought I would let you know the hammer constraints. Thanks, Confidentiality: This message is confidential and intended solely for use of the individual or entity to whom it is addressed. If you are not the person for whom this message is intended, please delete it and notify me immediately, and please do not copy or send this message to anyone else. 2 Pile Driymg Rec6rd o Pa„c of Job No. Pilc No. E Project Pile Location v s� Representative Date �f_��u Pile Type Tip Deter(in.) Butt Diameter(in..) Length(ft) Wall Thickness(in.) Grade? Batter(H:V) Harmer Make and Model_ Type Max.Rated Energy(ft-lbs) Ram Wt.(Ibs) Rated Stroke(ft) Cushion Type Thickness(in.)/Depth(ft)_1_O Design Load Calculated Capacity Factor of Safety Penetration into Ground(ft) Z5 Tip Depth,Vertical(ft) Ground Elevation(ft) 6 3. ;�' Tip Elevation(ft) 3 ' Water Elevation(ft)/Time Initial Drive—Start J Finish Driving Time(min.) Redrive—Start e Ei Finish Redrive Time(min.) AM »•� Date of Redrive Set-up Time ,,,; Total No..of Blows Remarks Blows/ Blows/ Blows/ Blows/ Blows/ ( Blows/ Fcet Energy Foot Feet Enemy Fog Feet Energy Foot Fect E _v Foot Feel Enemy Foot Feet Ener_ Foot 0-1 21 41 61 81 101 2 22 U j 42 62 82 102 3 23 " 9 43 63 83 103 4 j 24 V,P, 44 64 84 104 5 j 25 i 45 65 85 105 6 26 46 66 86 106 7 27 47 67 87 107 8 28 48 68 88 108 9 29 49 69 89 109 10 I`F 30 50 70 90 110 11 31 51 71 91 111 12 32 52 72 92 112 13 4E S3 33 53 T 93 113 14 34 54 74 94 114 I5 1 35 55 75 95 115 I6 36 56 76 96 116 17 37 57 77 97 117 18 C_ 38 58 78 98 1L8 19 7"1 39 59 79 99 119 20 '�j 40 60 30 100 120 Dedrive (Depth= ) 1" 2- 3„ 4- 5" 6" 7" 8" 9" 10" 11" 12" 'E=Energy(kip-ft),Blow/min.,H=Stroke(ft),( ) Estimated,#=Setting GMENGiNEER� TACO:/N/Fonns/Pile Driving Recorddoc Ead Sciw=-TedwwloW He Driving Record ' Page of Job No. Pile No. 5 i Project Pile Location Representative Date i-- Pile Type Tip Diameter(in.) Batt Diameter(in.) Length(ft) Wali Thickness(in.) Grade Batter(H:V) Hammer Make and Model Type Max:Rated Energy(ft-lbs) Ram Wt.(lbs) Rated Stroke(ft) Cushion Type Thickness(in.)/Depth(ft) Design Load Calculated Capacity Factor of Safety Penetration into Ground(ft) Tip Depth,Vertical(ft) f Ground Elevation(R) 6 .$L' Tip Elevation(ft) Water Elevation(ft)/Iime Initial Drive—Start ��? Finish Driving Time(min.) Redrive—Start -4 Finish t`1 Redrive Time(min.) Bate of Re-drive ;; ! -t{ j 4 Set-up Time 1+ -j"_ It Total No-of Blows Remarks BIowA Blows/ I31owsJ Blows/ $lows/ I Blows/ Fast Enerev I Foot Feet Energy Foot Feet Energy Foot Fxt En v Poot Fcu Foot Fat 'Ener- Foot 0 1 21 41. I 61 81 101 2 22 g 42 62 I 82 IO2 3 23 ci( 43 63 83 103 4 24 44 64 84 104 5 25 45 65 85 105 6 4 26 46 66 86 106 7 27 47 67 87 107 8 28 48 68 84 I 1.08 9 29 49 69 89 109 30 50 70 90 110 11 .3I 51 71 91 ill Ilk- 12'. "q;ct 32 52 72 92 112 13 ^ 33 53 73 93 113 14 34 S4 74 94 1t4 i5 ZD 35 55 75 95 115 I6 36 56 76 96 116 17 Zb 37 57 77 97 117 �. 18 jZ 38 58 78 98 Y128 19 39 59 79 99 119 20 Z 40 60 8o 100 120 Dedrive (Depth=_ ) 1' 2- 3" 4" 5" 6" 7" : 8" 9' i0" 11" 12� *E=Energy(kip-it),Blow/min.,It=Stroke(ft),( )=Es nnated,#=Setting GEOENGINEERS� TACO:/N/Forms/Pile Driving Record dm afi smw�.TedwAow . 2 Pile Driving Record l Page of Job No. Project Pile No. Representative Pile Location Date Pile Type Len Tip Dieter(in.) Batt Diameter(in-) gth(ft) Wall Thickness(in.) Grade Batter(H:V) Hammer Make and Model ,fie Max.Razed Energy(ft-lbs) Ram Wt.(Ibs) Rated Stroke(#}) Cushion.Type Thickness(in.)/Depth(ft)_/ 0 1 Design Load Calculated Capacity Factor of Safety Penetration into Ground(ft) Tip Depth,Vertical(ft) Ground Elevation(ft) Tip Elevation(ft) Water Elevation(ft)/Time /F Initial Drive—Start Finish Diving Time(min,) Redrive—Stair 01'; Z Finish Redrive Time(min,} Date of Redrive 8 1-2M 1 c) Set-up Time Jr , Total No-of Blows Remarks Blows/ ( Blows/ I Blows/ Blows! Blows/ ( Blows/ Feet Energy Foot Feet Energy Foot Feet Energy Foot Feet En � Foot Feet Energy Foot Feet Energy Fool 0-1 21 �a 41 61 2 � 81 ]O1 ` Z 42 62 82 102 3 23 43 63 83 103 4 24 70 44 64 j 84 I04 7 25 45 65 85 105 6 26 46 66 7 �7 I 86 106 47 67 87 107 8 -8 48 68 88 108 9 19 49 69 89 109 10 30 50 70 90 110 11 3I 51 I 71 91 111 12 i 32 52 ' 72 3 92 112 13 33 53 73 93 113 14 Z7 34 54 74 94 II4 15 35 55 75 95 115 16 36 56 76 96 116 17 V 37 57 77 47 117 18 c' 38 58 78 410o I1$ 19 39 59 79 20 40 60 30 1�0 Dcdrive (Depth— 2" 3, 47 5" 6 7- 8' g:, 101, 121, 12' •E=Energy(kip-ft),Blow/min.,If=Stroke(ft),( )=Estimated,#t=Setting GEOEMGINEER IAC(>:/N/Forrns/Pile Driving Recorddoc Ea,Saar TedvoLoR + 1 Pile Dri-g Record Fade of Job No.Pro Pile No. Project %_ - -SJr Pile Location _ J -.tea r: Representative L c I AD f!- Date Pile Type sc`'c { �� .,fG , ' Tip Diameter(in.) �. Butt Diameter(in.) 2 Length(ft) Wail Thickness(in.) C).S Grade Batter(H:V) — Hammer Make and Model / Type Max.Rated Ener5'(ft-lbs) Ram Wt (lbs) Rated Stroke(ft) Cushion Type Thickness(in.)/Depth(ft) 0` Design Load Calculated Capacity Factor of Safety Penetration into Ground(ft).Ground Elevation(ft) Tip Depth Vertical(ft) ' = Tip Elevation(ft) Water Elevation(ft)(I i m / / / Initial Drive-Start ru Finish Driving Time(min) Redrive-Start _ rj �'t Finish S: Redrive Time(thin.} j r, Date of Redrive „` - Set-up Time is' Total No-of Blows Remarks C - Blows/ Blows/ Blows/ c B1ows� Blows! I Blons! Feet Eaergv ( Foot ( Fret F-,ergy Foot Feet Energy Foot Feet E v I Foot Foot 1 i 1 Enemy Foot Feet Energy Foot 41 I 61 81 101 2 ( 22 42 62 82 102 3 -- 23 43 63 93 103 4 t 24 44 64 ' 84 104 r; 5 ..' 25 1' 45 65 85 105 6 26 46 66 86 I I06 7 '?A�;: 07 ' 47 67 87 107 8 -)8 48 68 88 108 9 I b �9 49 69 89 109 1.0 Z 30 50 70 90 110 11 j Z_ 31 51 I 71 91 111 12 ;Z- 32 32 ,72 ]— 92 112 13 U 33 53 7; 93 113 14 34 54 74 94 114 15 �Z 35 55 75 95 1 L5 16 Z,4 36 56 76 96 116 I7 ZZ 37 57 77 97 117 ]S �Z 38 58 7$ 198 118 19 39 59 79 119 20 40 60 'So 100 120 Dedrive (Depth= ) 1" 2- 3:, 4- 5-, b» 7-' 8=4 9= 1 p 1 I" 12- *E=Energy(kip-ft),Blow/min.,11=Stroke(ft),( )=Estimated,#=Setting GMENGiNEERS CACO:/N/FornslPileDrivicwRecarddoc Exts ,TecnoloR � f FA Sheet No.: 118 DAILY REPORT OF FORCE ACCOUNT WORKED �T Project Name: LID 363 224th St Phase 2 Project No: 14-3010 Item No.: Date: 8/19/19-8/24-19 Description of Work: Driving Cast-in-Place Concrete Pile 24 Inch Diameter Work by Subcontractor?: Yes Prime Contractor: Scarsella Sub-Contractor: SB Structures LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Clark L PileDnver Foreman 6 7724 11 105.53 $ 1,62427 Clark L Pile Driver Double time 3 133.83 $ 401,49 Ian L Pile Driver -14 72.09 8 97.82 $ (226.70) Ian L Pile Driver Double time 31 12354 59.64 $ 370,62 Dave D Pile Driver 4 72.09 11 97.82 $ 1,364.38 Dave D Pile Driver Double time 3 123.54 79.17 $ 370.62 Jarret A Crane Operator 8 77.87 11 104.12 $ 1,768.28 Jarret A Crane Operator Double time 1 130.38 $ 130.38 SUBTOTAL-LABOR: $ 5,803.34 LABOR OVERHEAD&PROFIT @ 29% $ 1,682.97 LABOR TOTAL $ 7,486.31 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs 7 Hourly Rate Hrs Standby Rate AMOUNT 03-100 4x2 15 KGVW Gas 20 29.28 $ 585.60 117-311 Manitowac 3900 20 268.88 $ 5,377.60 15-92 Cat 938 loader 59.27 $ - 37-47 Light Plant 14.89 $ 2-216 Ford F 350 15.33 $ - SUBTOTAL-EQUIPMENT $ 5,96320 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 1,25227 EQUIPMENT TOTAL $ 7,215.47 MATERIALWSERVIC E S/RENTALS MATERIALS i SERVICES Quantity Units Unit Price DOLLAR AMOUNT $ SUBTOTAL $ OVERHEAD&PROFIT @ 21% $ TOTAL $ Verification of Hours Worked: TOTAL: $ 14,701.78 12%MARKUP (for prime when subcontract work) $ 1,764.21 Contractor's Representativ f � SHEET TOTAL: $ 16,465.99 Owner's Representative Date 4 L,-,4 Pay Estimate Entered: ` Date: By: